Columbia MO VAMC RME Storage and ACA HVAC Upgrades_Plumbing.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25525R0114
About this file
The document is a plumbing design set for the VA Medical Center project in Columbia, Missouri, specifically for correcting reusable medical equipment storage and HVAC upgrades. The plumbing sheets cover multiple floors (basement, first, third, and sixth) and include detailed renovation plans, demolition plans, enlarged floor plans, and technical details for plumbing systems. Key plumbing components include reduced pressure backflow preventers (RPBP-1 and RPBP-2), a water softener (WS-1), pressure reducing valves (PRV-1), and condensate drain connections. The design follows multiple building codes including the 2021 International Building Code, 2024 NFPA Life Safety Code, and 2022 NFPA National Fire Codes, with specific emphasis on professional installation, coordination between contractors, and compliance with VA project phasing requirements. The project involves multiple construction phases with work to be performed during unoccupied hours and careful coordination with VA staff to minimize disruption to hospital operations.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLUMBING SHEET INDEX:
AFF ABOVE FINISHED FLOOR
AHU AIR-HANDLING UNIT
BFP BACKFLOW PREVENTOR
BHP BRAKE HORSEPOWER
BTU BRITISH THERMAL UNIT
CFM CUBIC FEET PER MINUTE
CU FT CUBIC FEET
DIA, Ø DIAMETER
DN DOWN
DTR DOWN THRU ROOF
EL ELEVATION
ECM ELECTRONICALLY COMMUTATED MOTOR
FPS FEET PER SECOND
FT, ' FOOT OR FEET
FT LB FOOT-POUND
FD FLOOR DRAIN
GA GAGE OR GAUGE
GAL GALLONS
HD HEAD (PRESSURE)
HT HEIGHT
ID DIAMETER, INSIDE
IE INVERT ELEVATION BELOW FINISHED FLOOR
IN., " INCH OR INCHES
LF LINEAR FOOT OR FEET
MAX MAXIMUM
MIN MINIMUM
N/A NOT APPLICABLE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NO., # NUMBER
NTS NOT TO SCALE
OA OUTSIDE AIR
OD DIAMETER, OUTSIDE
PDI PLUMBING & DRAINAGE INSTITUTE
PML PLUMBING MATERIAL LIST
PPM PARTS PER MILLION
PSI POUNDS PER SQUARE INCH
RPM REVOLUTIONS PER MINUTE
RTU ROOFTOP UNIT
SCFM CFM, STANDARD CONDITIONS
SPEC SPECIFICATION
T TON
UTR UP THRU ROOF
VTR VENT THRU ROOF
PLUMBING ABBREVIATIONS:
ABBREVIATION DESCRIPTION
CW POTABLE COLD WATER
NOTES:
1. NOT ALL ABBREVIATIONS MAY APPLY.
2. PLUMBING MATERIAL LIST/PLUMBING SCHEDULES CONTAIN EQUIPMENT TAG
ABBREVIATIONS THAT ARE HEREBY INCORPORATED INTO THE ABBREVIATION LIST.
3. SEE OTHER DISCIPLINE DRAWINGS WITHIN THE CONSTRUCTION DOCUMENTS FOR
ABBREVIATIONS NOT DEFINED ABOVE OR IN PLUMBING MATERIAL LIST/PLUMBING
SCHEDULES.
1. INSTALLATION SHALL COMPLY WITH ALL APPLICABLE CODES, STANDARDS, AND
MANUFACTURER'S INSTALLATION REQUIREMENTS.
2. REVIEW ALL PROJECT DOCUMENTS INCLUDING SPECS AND DRAWINGS PERTAINING TO ALL
DISCIPLINES PRIOR TO SUBMITTING A BID. SUBMIT PRE-BID REQUEST FOR INFORMATION FOR
ITEMS IN QUESTION AND/OR CONFLICTS FOUND.
3. DRAWINGS SHOW THE DESIGN INTENT DIAGRAMMATICALLY. THEY DO NOT SHOW THE EXACT
UTILITY ROUTING NOR EVERY ELBOW, OFFSET, ETC. WHERE REQUIRED, THE CONTRACTOR
SHALL MAKE ADJUSTMENTS TO THEIR SYSTEMS TO AVOID CONFLICT WITH THE STRUCTURE
AND OTHER DISCIPLINES. THE COST FOR SUCH ADJUSTMENTS SHALL BE INCLUDED IN THE BID.
4. OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR WORK PERFORMED.
5. THE G.C. OR C.M. TEAM SHALL LEAD THE SUBCONTRACTORS IN PROVIDING A COORDINATED
SET OF SHOP DRAWINGS. SEE GENERAL REQUIREMENTS SPEC FOR ADDITIONAL
INFORMATION.
6. PROVIDE FIRESTOPPING FOR ALL UTILITY PENETRATIONS THRU FIRE-RATED ASSEMBLIES.
7. COORDINATE FRAMING REQUIREMENTS FOR ACCESS PANELS AND EQUIPMENT/PANEL
SUPPORTS WITH G.C. OR C.M. PRIOR TO SUBMITTING BID.
8. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE CORRECTION OF CONSTRUCTION
DEFICIENCIES LISTED ON THE JOB SITE OBSERVATION REPORT. RETURN THE JOB SITE
OBSERVATION REPORT TO A/E WITH DEFICIENCIES SIGNED OFF. PROVIDE PHOTOGRAPHIC
AND/OR VIDEO EVIDENCE OF CORRECTED DEFICIENCIES IF REQUESTED BY THE ENGINEER.
9. PROVIDE CLOSEOUT DOCUMENTATION UPON COMPLETION OF PROJECT. SEE GENERAL
REQUIREMENTS SPEC FOR ADDITIONAL INFORMATION.
GENERAL NOTES:
1. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BID SUBMISSION TO VERIFY ALL FIELD
CONDITIONS INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
A. LOCATIONS OF EXISTING PLUMBING SYSTEMS.
B. LOCATIONS OF ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL,
TECHNOLOGY, FIRE PROTECTION, AND FIRE ALARM SYSTEMS.
C. EXISTING SURFACES WHICH REQUIRE ALTERING.
D. INVERTS OF EXISTING DRAINAGE PIPING VIA CLEANOUT DEPTHS.
2. SCAN/X-RAY POST TENSION SLABS PRIOR TO ALTERATION. SHOP DRAWINGS SHALL REFLECT
REBAR AND TENSION CABLE LOCATIONS. OPENINGS SHALL BE COORDINATED WITH THE
STRUCTURAL ENGINEER PRIOR TO PERFORMING ANY WORK.
3. NOTIFY OWNER OF REQUIRED SYSTEM SHUTDOWNS AT LEAST TWO WEEKS PRIOR TO
SHUTDOWN. EXACT SHUTDOWN TIME AND PROCEDURE SHALL BE COORDINATED WITH
OWNER AT LEAST 96 HOURS PRIOR TO SHUTDOWN.
4. WHEN PIPING, EQUIPMENT, OR FIXTURES ARE NOTATED TO BE PERMANENTLY REMOVED
THEIR ASSOCIATED COMPONENTS SHALL ALSO BE REMOVED INCLUDING HANGERS,
SUPPORTS, AND ACCESSORIES.
5. COORDINATE THE DISCONNECTION AND REMOVAL OF POWERED SYSTEMS WITH THE E.C.
WHEN REMOVING POWERED PLUMBING EQUIPMENT.
6. REPAIR EXISTING FLOORS, WALLS, AND CEILINGS IN ALTERED AREAS TO MATCH EXISTING.
SEE ARCHITECTURAL PLANS FOR FINISH DETAILS IN REMODEL AREAS.
RENOVATION NOTES:
ISOLATION VALVE, NORMALLY OPEN
UNION
PIPE DOWN
PIPE UP
BRANCH-TOP CONNECTION
BRANCH-BOTTOM CONNECTION
PIPE CAP
CLEANOUT PLUGCO
CO
FLOOR CLEANOUTFCO
WALL CLEANOUT
WCO
FLOOR DRAIN
FLOOR SINK
1/8"/1'-0" PITCH DOWN - IN DIRECTION OF ARROW
PLUMBING SYMBOLS:
LINETYPE/SYMBOL DESCRIPTION
NOTES:
1. NOT ALL SYMBOLS MAY APPLY.
2. SEE SPECS AND DRAWINGS FOR SPECIFIC COMPONENT REQUIREMENTS.
PIPE REDUCER
DIRECTION OF WATER/GAS FLOW
ACCESS PANEL OR ROOF HATCH
ISOLATION VALVE IN VERTICAL PIPE, NO
FD FD
2021 INTERNATIONAL BUILDING CODE (IBC)
2024 NFPA 101 LIFE SAFETY CODE
2022 NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
2023 NATIONAL ELECTRICAL CODE (NEC) (NFPA 70)
2021 INTERNATIONAL MECHANICAL CODE (IMC)
2021 INTERNATIONAL PLUMBING CODE (IPC)
2015 ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)
ENERGY POLICY ACT OF 2005 (EPACT)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL,
COMMERCIAL AND MULTI-FAMILY HIGH-RISERESIDENTIAL BUILDINGS AND NEW LOW-RISE
RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2022.
SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2022.
UNLESS OTHERWISE SPECIFIED, SPECIFIC REFERENCES TO CODES, REGULATIONS, STANDARDS, MANUFACTURERS' INSTRUCTIONS, OR REQUIREMENTS OF REGULATORY AGENCIES, SHALL MEAN
THE LATEST EDITION OF EACH IN EFFECT AT THE DATE OF PROJECT SUBMISSION (U.N.O.)
EDITION REFERENCE CODE/STANDARD
CODES AND STANDARDS:
POINT OF CONNECTION OR DISCONNECTION
KEYNOTE SYMBOL#
DETAIL CALL-OUT SYMBOL
###-# EQUIPMENT TAG
GENERAL LEGEND:
SYMBOL DESCRIPTION
SECTION CUT CALL-OUT SYMBOL
ENLARGED PLAN CALL-OUT SYMBOL
EXISTING TO REMAIN
EXISTING TO BE REMOVED
NEW CONSTRUCTION
(E) EXISTING TO REMAIN
LINETYPE DESCRIPTION
(X) EXISTING TO BE REMOVED
1. PLUMBING WORK SHALL BE CONSTRUCTED IN A PROFESSIONAL MANNER. ENSURE
FIXTURES, EQUIPMENT, AND ASSOCIATED COMPONENTS ARE INSTALLED LEVEL AND PLUMB.
SEALANT BETWEEN FIXTURES AND SURFACES SHALL BE EVEN AND NEAT. COMPONENTS
SHALL BE CLEANED PRIOR TO OWNER TURNOVER.
2. IF A CONTRACTOR PROVIDES EQUIPMENT OTHER THAN THE BASIS OF DESIGN, THAT
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED AS A RESULT. THAT
INCLUDES, BUT IS NOT LIMITED TO, STRUCTURAL MODIFICATIONS FOR INCREASED WEIGHT,
AND ELECTRICAL EQUIPMENT, WIRING CONDUIT, AND BREAKER CHANGES FOR DIFFERENT
ELECTRICAL REQUIREMENTS.
3. COORDINATE POWER REQUIREMENTS WITH THE E.C. PRIOR TO PROVIDING SUBMITTALS TO
THE ENGINEER.
4. SEE SPEC SECTIONS 22 11 00 AND 22 13 00, FOR PIPE SYSTEM INSTALLATION, TESTING, CLEANING, AND DISINFECTION REQUIREMENTS.
5. PROVIDE IDENTIFICATION FOR PIPING, VALVES, AND EQUIPMENT PER SPEC SECTION
22 05 23.
6. PIPING SHALL NOT PASS THRU NOR UNDER ELECTRICAL ROOMS, DATA ROOMS, ELEVATOR
MACHINE ROOMS, ELEVATOR HOISTWAYS, SKYLIGHTS, AND ROOF ACCESS HATCHES.
7. INSULATION SHALL BE PROVIDED CONTINUOUS THROUGHOUT THE PIPING SYSTEM
INCLUDING AT HANGERS/SUPPORTS, PIPE FITTINGS, VALVES, AND ACCESSORIES. OPENINGS
SHALL BE PROVIDED TO ALLOW FOR VALVE HANDLE OPERATION AND ACCESS. INSULATION
THICKNESS SHALL MEET THE LISTED ENERGY CODE MINIMUM REQUIREMENTS. SEE SPEC
SECTION 22 07 11 FOR SYSTEMS REQUIRING INSULATION AND ADDITIONAL INSTALLATION
REQUIREMENTS.
8. VALVES SHALL BE ACCESSIBLE. PROVIDE KEYED ACCESS PANELS WHERE VALVES HAVE BEEN
LOCATED IN CONCEALED AREAS. ACCESS PANEL SIZE SHALL BE LARGE ENOUGH TO ACCESS
EACH VALVE AND FOR FULL VALVE OPERATION.
9. CLEANOUTS SHALL BE PROVIDED PER PLUMBING CODE REQUIREMENTS. IN ADDITION,
PROVIDE CLEANOUTS AT LAVATORIES, SINKS, AND URINALS. CLEANOUTS SHALL BE
INSTALLED IN ACCESSIBLE LOCATIONS.
10. INSTALL - TO PLACE IN POSITION AND CONNECT COMPLETE READY FOR USE.
FURNISH - TO PURCHASE/SUPPLY.
PROVIDE - TO FURNISH AND INSTALL.
PLUMBING NOTES:
CONTRACTOR ABBREVIATIONS:
ABBREVIATION DESCRIPTION
C.M. CONSTRUCTION MANAGER
E.C. ELECTRICAL CONTRACTOR
F.A.C. FIRE ALARM CONTRACTOR
F.P.C. FIRE PROTECTION CONTRACTOR
G.C. GENERAL CONTRACTOR
M.C. MECHANICAL CONTRACTOR
P.C. PLUMBING CONTRACTOR
T.C. TECHNOLOGY CONTRACTOR
T.C.C. TEMPERATURE CONTROL CONTRACTOR
INDIRECT DRAIND
POTABLE COLD WATER
SOFTENED WATERSW
PUMP DISCHARGE LINEPD
PLUMBING SYSTEMS:
LINETYPE/SYMBOL DESCRIPTION
NOTES:
1. NOT ALL SYMBOLS MAY APPLY.
2. SEE SPECS AND DRAWINGS FOR SPECIFIC COMPONENT REQUIREMENTS.
CD CONDENSATE DRAIN
DEIONIZED WATERDI
1. THE PROJECT WILL BE CONSTRUCTED IN MULTIPLE PHASES. SEE ARCHITECTURAL &
PHASING DOCUMENTS FOR PHASING REQUIREMENTS.
2. CONTRACTOR SHALL CONFIRM WORK BEING PERFORMED IN ACTIVE PHASE DOES NOT
ADVERSELY AFFECT NORMAL OPERATIONS IN OTHER OCCUPIED SPACES.
3. PROVIDE TEMPORARY CONNECTIONS AS REQUIRED TO MAINTAIN SERVICE TO OCCUPIED
SPACES.
4. DESIGN DRAWINGS DO NOT INDICATE EVERY REQUIRED STEP TO ACHIEVE PHASED
CONSTRUCTION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DEVELOP A CONSTRUCTION
PLAN TO INSTALL THE DESIGN WITHIN THE PHASING CONSTRAINTS.
5. CONSTRUCTION ACTIVITIES IN OCCUPIED SPACES SHALL BE PERFORMED DURING
UNOCCUPIED HOURS (NIGHTS, WEEKENDS, AND/OR HOLIDAYS). RESTORE SPACES TO
ORIGINAL CONDITIONS BEFORE HOSPITAL STAFF AND/OR PATIENTS ARRIVE.
6. CONSTRUCTION ACTIVITIES IN UNOCCUPIED SPACES THAT HAVE ADVERSE EFFECTS
(EXCESSIVE NOISE, EXCESSIVE VIBRATION, ETC.) SHALL BE PERFORMED DURING
UNOCCUPIED HOURS (NIGHTS, WEEKENDS, AND/OR HOLIDAYS).
7. COORDINATE SCHEDULE WITH THE VA TO DETERMINE EXACT ALLOWABLE TIMES OF
CONSTRUCTION ACTIVITIES IN EACH PROJECT AREA.
PHASING NOTES:
MAKEUP WATERMU
LINE TYPE /SYMBOL DESCRIPTION
1-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR SMOKE BARRIER
1-HOUR HAZARDOUS AREA FIRE BARRIER
FIRE-RATED ASSEMBLY LEGEND:
S S S S
HZ HZ HZ HZ
RE
G
IS
TE
RE
DPROFESSIONALENG
IN
EERER
IC
M.DeSPLINTER
M
ECHANICA
L
S
TATE OF CALIFORNIA
38688 Exp. 12-31-25
SIGNED: 06/23/25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. Box 190, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
07/25/2025
100% FINAL BID
DOCUMENTS
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t S to ra g e /2
M
E P
T
.0
C o lu m b ia
M
O V
A M
C R
M E
S to ra g e
A C
A H
V A
C U p g ra d e s .r v t
-0 -2
:4
:4
P
M
P001
RSS PSK
PLUMBING COVER SHEET
Sheet
Number Sheet Name
P001 PLUMBING COVER SHEET
P100 PLUMBING - BASEMENT FLOOR PLAN
P101 PLUMBING - FIRST FLOOR PLAN
P102 PLUMBING - THIRD FLOOR PLAN
P103 PLUMBING - SIXTH FLOOR PLAN
PD201 PLUMBING - ENLARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION
PD202 PLUMBING - ENALARGED BASEMENT FLOOR PLAN ROOMS - DEMOLITION
PD203 PLUMBING - ENLARGED FIRST FLOOR PLAN - PATHOLOGY - DEMOLITION
P201 PLUMBING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL
P202 PLUMBING - ENLARGED BASEMENT FLOOR PLAN ROOMS - REMODEL
P203 PLUMBING - ENLARGED THIRD FLOOR PLAN ROOMS - REMODEL
P204 PLUMBING - PENTHOUSE FLOOR PLAN
P401 PLUMBING - DETAILS
PLUMBING MATERIAL LIST
SYMBOL DESCRIPTION MANUFACTURER AND MODEL
RPBP-1 REDUCED PRESSURE BACKFLOW PREVENTER:
3/4" SIZE, LOW LEAD BRONZE MAIN BODY AND ACCESS COVERS (ASTM B 584), INTERNAL
POLYMER SEAT RING AND SILICONE SEAT DISC ELASTOMERS. COMPLETE WITH AIR GAP ADAPTER
AND INDIRECT DRAIN TO THE LOCAL FLOOR SINK. THE ASSEMBLY SHALL BE CONFIGURABLE TO
INCLUDE A SENSOR TO MONITOR EXCESSIVE WATER DISCHARGE FROM THE RELIEF VALVE FOR
FLOOD DETECTION. THE ASSEMBLY SHALL MEET THE REQUIREMENTS OF: USC; ASSE STD. 1013;
AWWA STD. C511; CSA B64.4. SHALL BE A ZURN WILKINS.
SEE SPECIFICATION SECTION 22 05 23 FOR PRODUCT REQUIREMENTS.
ZURN 975XL2 OR EQUAL.
RPBP-2 REDUCED PRESSURE BACKFLOW PREVENTER:
2" SIZE, LOW LEAD BRONZE MAIN BODY AND ACCESS COVERS (ASTM B 584), INTERNAL
POLYMER SEAT RING AND SILICONE SEAT DISC ELASTOMERS. COMPLETE WITH AIR GAP ADAPTER
AND INDIRECT DRAIN TO THE LOCAL FLOOR SINK. THE ASSEMBLY SHALL BE CONFIGURABLE TO
INCLUDE A SENSOR TO MONITOR EXCESSIVE WATER DISCHARGE FROM THE RELIEF VALVE FOR
FLOOD DETECTION. THE ASSEMBLY SHALL MEET THE REQUIREMENTS OF: USC; ASSE STD. 1013;
AWWA STD. C511; CSA B64.4. SHALL BE A ZURN WILKINS.
SEE SPECIFICATION SECTION 22 05 23 FOR PRODUCT REQUIREMENTS.
ZURN 975XL2 OR EQUAL.
FD-S-Z-HP-Y-2 FLOOR SINK:
SEE SPECIFICATION SECTION 22 13 00 FOR PRODUCT REQUIREMENTS.
ZURN G1750 OR EQUAL.
WS-1 WATER SOFTENER:
FLOOR-MOUNTED AUTOMATIC WATER SOFTENER SYSTEM. FRP RESIN TANK WITH HDPE BRINE
TANK CONSTRUCTION. 200 LBS/HR CAPACITY, 7 GPM CONTINUOUS FLOW RATE, 280 LBS SALT
STORAGE, 0.5 LBS/CU. FT. RESIN CAPACITY, 1 CU. FT. RESIN VOLUME, 94 HOURS BETWEEN
REGENERATION, 30-100 OPERATING PRESSURE RANGE, 1.2 GPM BACKWASH RATE.
SEE SPECIFICATION SECTION 22 31 11 FOR PRODUCT REQUIREMENTS.
ELECTRICAL REQUIREMENTS:
120V-1PH-60HZ, 5A
DIMENSIONS:
SOFTENER TANK 44"H X 7"ø
BRINE TANK 33"H X 18"ø
500 LBS TOTAL OPERATING WEIGHT.
MARLO MGT-15-3/4, OR EQUAL
PRV-1 PRESSURE REDUCING VALVE:
2" SIZE LOW LEAD CAST BRONZE ASTB 584 MAIN VALVE BODY, STAINLESS STEEL FASTENERS, ASSE LISTED 1003, IAPMO LISTED, CSA CERTIFIED, MEETS THE REQUIREMENTS OF NSF/ANSI 61. 25
PSI TO 75 PSI REDUCED PRESSURE RANGE. 50 PSI FACTORY PRESET. SET AT 30PSI.
SEE SPECIFICATION SECTION 22 05 23 FOR PRODUCT REQUIREMENTS.
ZURN 500XLHTSTSC, OR EQUAL
WET VENT SIZING:
BASED ON IPC, TABLE 912.3.
DRAINGE FIXTURE
UNIT LOAD
WET VENT PIPE SIZE
11-1/2"
42"
62-1/2"
123"
SANITARY DRAINAGE / VENT PIPE SIZING:
TABLE BASED ON IPC, CHAPTER 7, TABLE 710.1(1).
3 FT/SEC VELOCITY.
PIPE SIZE 4"3"2"1 1/2"
TOTAL FOR HORIZONTAL BRANCH 1602063
Mark Revisions: Date:
1 AMENDMENT #1 - BIDDER QUESTIONS-RESPONSES 07/29/2025
DN
DN
WORK
ROOM
F002
MECH
ROOM
E003
ELEC ROOM
E003A
COLD ROOM
B037A
(E)ACA-AHU-6
ACA-AHU-3 BY
MECHANICAL
ACA-AHU-2 BY
MECHANICAL
ACA-AHU-1 BY
MECHANICAL
ACA-AHU-4 BY
MECHANICAL
ACA-USG-1 BY
MECHANICAL
(E)USG
(E)FD
(E)FD (E)FD
(E)FD
(E)FD
(E)FD
(E)FD
(E)HB
(E)FD
(E)FD
(E)3/4"
(E )3
/4
(E)2 1/2" CW UP
(E)3/4"
(E)2 1/2"
(E )4
(E
)3
(E)4"
(E)4" CW DN
(E)FD
(E)FD
(E)FD
3/4" SW
(E)HB
(E)SW
ACA-AS-1 BY
MECHANICAL
3/4" D
RPBP-2
2" MU
PRV-1
WS-1
2 3 1 4 5 5.6
B
C
D.1
D
A
1" D
(E)CW
P401
(TYP)
1" CD
3/4" D
3/4" D
1" CD
3/4" D
3/4" D
1" CD
3/4" D
3/4" D
3/4" D
3/4" D
1" CD
N
3/16" = 1'-0"1
PLUMBING - ENLARGED BASEMENT FLOOR PLAN - MECH. RM E003 - REMODEL
RE
G
IS
TE
RE
DPROFESSIONALENG
IN
EERER
IC
M.DeSPLINTER
M
ECHANICA
L
S
TATE OF CALIFORNIA
38688 Exp. 12-31-25
SIGNED: 06/23/25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. Box 190, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
07/25/2025
BASEMENT KEYPLAN
NORTH
E & F
SHIPPING
WAREHOUSE
OR ADDITION B A
ACA BUILDING
AREAS
AREA AREA
G
AREA
C & D
AREAS
BUILDING 1
100% FINAL BID
DOCUMENTS
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t S to ra g e /2
M
E P
T
.0
C o lu m b ia
M
O V
A M
C R
M E
S to ra g e
A C
A H
V A
C U p g ra d e s .r v t
-0 -2
:4
:0
P
M
P201
RSS PSK
PLUMBING - ENLARGED BASEMENT FLOOR
PLAN ROOMS - REMODEL
KEYNOTES - P201
NUMBER TEXT
EXTEND NEW WALL-MOUNTED 3/4" SW FROM EXISTING SYSTEM TO ACA-USG-1
COMPLETE WITH LINE SIZE ISOLATION VALVE.
RECONNECT CW AND SW PIPING FROM ISOLATION VALVES TO THE NEW WATER
SOFTENER EQUIPMENT.
PROTECT IN PLACE EXISTING DRAIN MOUNTED TO WALL FROM THE BACKFLOW
PREVENTER TO THE FLOOR SINK.
4 PROTECT IN PLACE EXISTING WALL MOUNTED BACKFLOW PREVENTER ASSEMBLY.
PROVIDE CONDENSATE DRAIN FROM EQUIPMENT TO FLOOR SINK. SPILL 1"
ABOVE FLOOD LEVEL RIM MINIMUM. SEE DETAIL 1/P401 FOR ADDITIONAL
INFORMATION.
PROVIDE INDIRECT DRAIN FROM BACK FLOW PREVENTER TO FLOOR SINK. SPILL
1" ABOVE FLOOD LEVEL RIM MINIMUM.
PROTECT IN PLACE EXISTING WALL-MOUNTED SW PIPING ABOVE AND CW PIPING
BELOW.
PROVIDE NEW BACKFLOW PREVENTER ASSEMBLY AND PIPING ABOVE HEAD AS
SHOWN TO THE EQUIPMENT ACA-AS-1.
DEDUCT 1: DO NOT PROVIDE CONDENSATE PIPING FROM ACA-AHU-4
EQUIPMENT.
DEDUCT 2: DO NOT PROVIDE CONDENSATE PIPING FROM ACA-AHU-3, AND
ACA-AHU-4 EQUIPMENT.
WHERE PIPING IS CALLED OUT TO BE INSTALLED ABOVE HEAD, PIPING SHALL BE
PLACED AS CLOSE TO THE STRUCTURE AS POSSIBLE, BUT NO LESS THAN 8' ABOVE
FINISHED FLOOR.
NUMBER TEXT
GENERAL NOTES - P201
Mark Revisions: Date:
1 AMENDMENT #1 - BIDDER QUESTIONS-RESPONSES 07/29/2025
CLEAN
RECEIVING
BREAKOUT
G048
BULK
STORE
ROOM
G047
ETO
STERILIZER
ACCESS
G045
STERILIZER
ACCESS
G043A
MECH
ROOM
G001
USG-2 BY
MECHANICAL
(E)AHU-8
(E)USG-1
(E)HX-4
(E)HX-3
(E)HX-2
(E)HX-1
(E)CP-1
(E)AHU-9
(E)AHU-7A
(E)AHU-7B
(E)WATER
SOFTENING
SYSTEM
3/4" SW
1" D
(E)FD
(E)FD(E)FD
8.2
9.1
Z V
8.3
8.9
9.8
BB AA Y X W
(E)AC-S13
(E)AHU-14
WORK SHOWN EAST OF THIS
LINE IS IN PIPE BASEMENT.
(E)FD
D 1" D
USG-3 BY
MECHANICAL
WS-1
3/4" SW ABOVE HEAD
3/4" CW ABOVE HEAD
(E )4
C
W (E
)4
C W
3/4" D
(E)FD
RPBP-1
T S R Q P Na N
8.2
9.1
10.4
11.5
8.3
8.9
9.8
10.2
H-3 BY
MECHANICAL
H-2 BY
MECHANICAL
D
1" D
MP401
MP401
1" D
RE
G
IS
TE
RE
DPROFESSIONALENG
IN
EERER
IC
M.DeSPLINTER
M
ECHANICA
L
S
TATE OF CALIFORNIA
38688 Exp. 12-31-25
SIGNED: 06/23/25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. Box 190, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
07/25/2025
BASEMENT KEYPLAN
NORTH
E & F
SHIPPING
WAREHOUSE
OR ADDITION B A
ACA BUILDING
AREAS
AREA AREA
G
AREA
C & D
AREAS
BUILDING 1
100% FINAL BID
DOCUMENTS
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t S to ra g e /2
M
E P
T
.0
C o lu m b ia
M
O V
A M
C R
M E
S to ra g e
A C
A H
V A
C U p g ra d e s .r v t
-0 -2
:4
:0
P
M
P202
RSS PSK
PLUMBING - ENLARGED BASEMENT FLOOR
PLAN ROOMS - REMODEL
N
3/16" = 1'-0"2
PLUMBING - ENLARGED BASEMENT FLOOR PLAN - RM G001 - REMODEL
N
1/8" = 1'-0"1
PLUMBING - ENLARGED PIPE BASEMENT FLOOR PLAN - RM C012 - REMODEL
KEYNOTES - P202
NUMBER TEXT
PROVIDE SOFTENED WATER TO USG-3 ABOVE HEAD FROM WATER SOFTENER AS
SHOWN.
PROVIDE SOFTENED WATER TO USG-2 ABOVE HEAD FROM EXISTING WATER
SOFTENER AS SHOWN.
PROVIDE CONDENSATE DRAIN FROM FIXTURE TO FLOOR SINK. SPILL 1" ABOVE
FLOOD LEVEL RIM MINIMUM.
PROVIDE INDIRECT DRAIN FROM BACKFLOW PREVENTER TO FLOOR SINK. SPILL 1"
ABOVE FLOOD LEVEL RIM MINIMUM.
PROVIDE A NEW FLOOR-MOUNTED WATER SOFTENER. EXTEND 3/4" COLD
WATER TO THE NEW EQUIPMENT FROM THE EXISTING MAIN ABOVE HEAD
COMPLETE WITH NEW BACKFLOW PREVENTER ASSEMBLY.
PROVIDE CONDENSATE DRAIN FROM H-3 ABOVE HEAD TO THE FLOOR SINK AS
SHOWN. SPILL 1" ABOVE FLOOD LEVEL RIM MINIMUM.
7 PROVIDE 1" DRAIN AT FLOOR LEVEL TO (E)FD. SPILL 1" ABOVE FLOOD LEVEL RIM.
WHERE PIPING IS CALLED OUT TO BE INSTALLED ABOVE HEAD, PIPING SHALL BE
PLACED AS CLOSE TO THE STRUCTURE AS POSSIBLE, BUT NO LESS THAN 8' ABOVE
FINISHED FLOOR.
NUMBER TEXT
GENERAL NOTES - P202
Mark Revisions: Date:
CLEAN
UTILITY
ROOM
E320
OPERATORY
DENTAL
CHIEF
OFFICE
E319
HSKING
F308
STAFF
TOILET
F309
H-1 BY
MECHANICAL
P401
ABOVE HEAD
/4
D
(E)TU-AHU7-002
FIRE SEAL, SEE
3/4" D
MP401
RE
G
IS
TE
RE
DPROFESSIONALENG
IN
EERER
IC
M.DeSPLINTER
M
ECHANICA
L
S
TATE OF CALIFORNIA
38688 Exp. 12-31-25
SIGNED: 06/23/25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. Box 190, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
07/25/2025
THIRD FLOOR KEYPLAN
NORTH
E & F
SHIPPING
WAREHOUSE
OR ADDITION B A
ACA BUILDING
AREAS
AREA AREA
G
AREA
C & D
AREAS
BUILDING 1
100% FINAL BID
DOCUMENTS
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t S to ra g e /2
M
E P
T
.0
C o lu m b ia
M
O V
A M
C R
M E
S to ra g e
A C
A H
V A
C U p g ra d e s .r v t
-0 -2
:4
:0
P
M
P203
RSS PSK
PLUMBING - ENLARGED THIRD FLOOR PLAN
ROOMS - REMODEL
KEYNOTES - P203
NUMBER TEXT
1 3/4"D DOWN IN WALL TO MOP SINK. SPILL 1" ABOVE FLOOD LEVEL RIM.
N
1/4" = 1'-0"1
PLUMBING - ENLARGED THIRD FLOOR PLAN - RM E320 - REMODEL
WHERE PIPING IS CALLED OUT TO BE INSTALLED ABOVE HEAD, PIPING SHALL BE
PLACED AS CLOSE TO THE STRUCTURE AS POSSIBLE, BUT NO LESS THAN 8' ABOVE
FINISHED FLOOR.
NUMBER TEXT
GENERAL NOTES - P203
Mark Revisions: Date:
DRAW THRU
BLOW THRU
2" [50mm]
PLUS X
1" [25mm]
MINIMUM
X
2X
UNIT TYPE A B
WHERE X = STATIC PRESSURE IN PAN
DRAIN LINE SHALL BE AT LEAST THE SAME SIZE
AS THE NIPPLE ON THE DRAIN PAN
PIPING SHALL BE RIGID COPPER TYPE L OR
TYPE M UNLESS NOTE BELOW IS MET
PITCH DOWN
TOWARD DRAIN
CLEAN OUT
FLOOR SINK
DRAIN
PAN
NOTE: 1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA AND
IS INDOORS AND DOES NOT PASS THROUGH RATED BARRIERS.
2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS ARE
TO BE CONNECTED.
[2 m m
DIELECTRIC
FITTING
A B
NUT (TOP & BOTTOM)
ALL THREADED ROD
WASHER (TOP & BOTTOM)
PROVIDE PLASTIC COATED
HANGER WHEN HANGING
DISSIMILAR METAL PIPING.
ALL THREADED ROD
PROVIDE PLASTIC COATED
HANGER WHEN HANGING
DISSIMILAR METAL PIPING.
KNURLED HANGER
ROD NUT
DETAIL NOTES:
1. PROVIDE MINIMUM 1/2" SPACING BETWEEN FINISHED COVERING AND
ADJACENT WORK.
UNINSULATED PIPE
UNINSULATED/INSULATED
PIPE
SWIVEL RING HANGER CLEVIS HANGER
CONDENSATE DRAIN CONNECTION NTS 1
SUSPENDED PIPE SUPPORT NTS 2
FIRE SEAL OF 2 HR RATED FLOOR - FLOOR SINK NTS 4FIRE SEAL OF 1 HR RATED WALL - INSULATED PIPE NTS 5 HUMIDIFIER CONDENSATE PIPE CONNECTION TO DRAIN NTS 3
3/4"CONDENSATE PIPING
FROM HUMIDIFIER
1" DRAIN PIPING FROM
COOLING COIL(PLUMBING)
OPEN VENT
1"DRAIN TO
PLUMBING RECEPTOR
2% SLOPE
2% SLOPE
RE
G
IS
TE
RE
DPROFESSIONALENG
IN
EERER
IC
M.DeSPLINTER
M
ECHANICA
L
S
TATE OF CALIFORNIA
38688 Exp. 12-31-25
SIGNED: 06/23/25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. Box 190, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
07/25/2025
100% FINAL BID
DOCUMENTS
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t S to ra g e /2
M
E P
T
.0
C o lu m b ia
M
O V
A M
C R
M E
S to ra g e
A C
A H
V A
C U p g ra d e s .r v t
-0 -2
:4
:1
P
M
P401
RSS PSK
PLUMBING - DETAILS
Mark Revisions: Date:
| P001 - PLUMBING COVER SHEET |
| P201 - PLUMBING -ENLARGED BASEMENT FLOOR PLAN ROOMS -REMODEL |
| P202 - PLUMBING -ENLARGED BASEMENT FLOOR PLAN ROOMS -REMODEL |
| P203 - PLUMBING -ENLARGED THIRD FLOOR PLAN ROOMS -REMODEL |
| P401 - PLUMBING -DETAILS |
File details come from the government source that posted it. Updated .