Drawing MPD203 - Piping Enlargement Basement Floor Plan Rooms Demolition.pdf
PDF 5 MB Posted
- Solicitation number
- 36C25525R0114
About this file
These mechanical engineering drawings are for a VA Medical Center project to upgrade HVAC and steam systems at the Columbia, Missouri location. The project involves demolition and remodeling of mechanical rooms, specifically Mechanical Room E003, with comprehensive modifications to heating water, chilled water, and steam piping systems. Key components include installing new heat exchangers (ACA-HX-1 and ACA-HX-2), pumps (ACA-HWP-1 and ACA-HWP-2), and clean steam generators (ACA-USG-1) to provide redundancy and improved system performance.
The project includes multiple design scenarios with two deduct options, allowing flexibility in implementation. The drawings detail piping configurations for air handling units (ACA-AHU-1 through ACA-AHU-4), steam traps, expansion tanks, and associated equipment. The design ensures future extension capabilities, with valved and capped connections for potential expansion to additional air handling units. The project is fully sprinklered and scheduled for completion by July 25, 2025, with the U.S. Department of Veterans Affairs as the contracting agency and Alesia Architecture as the architect/engineer of record.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECH
ROOM
E003
ELEC ROOM
E003A
(E)LPC DN
(X)ACA-HX-1
(BELOW)
(E)HX-4
(E)HX-5
(BELOW)
(E)ACA-AHU-6
(E)STEAM
GENERATOR
(E )H
W R
(E)HWR
(E )H
W R
(E )M
P S
(E)4" HWR
(E)4" HWS
(X)ACA-AHU-3 (X)ACA-AHU-2 (X)ACA-AHU-1
(E)4" CHWS
(E)4" CHWR
(E)2" MPS
(E)4" LPS
(E)2" LPC
(X)ACA-AHU-4
(E)5" HWS
(E)5" HWR
(X)2 1/2" CHWS
(X)2 1/2" CHWR
(X)4" CHWR
(X)4" CHWS
(X)4" CHWS
(X)4" CHWR
(X)4" CHWS
(X)5" CHWR
(E)4" LPC
(E)1" LPC
(E)2" LPC
(E)2" LPC
(E)5" CHWS
(E)2" LPC
(E)5" CHWR
(E)5" CHWS
(E)5" CHWR
(E)6" CHWR
(E)6" CHWS
(X)HWP-2
(X)HWP-1
(X)HWP-3
(X)ACA-HX-2
(X)5" HWS
(E)3" HWR
(E)3" HWS
(E)5" HWS
(E)5" HWR(E)5" LPS
(E )M
P S
(E)MPS
(X)4" HWR
(X)ACA-HX-3 1
(X)5" HWR
(E)4" LPS
(X)4" LPS
(X)4" LPS
(E)4" LPC
(E)2 1/2" CHWR
(E)2 1/2" CHWS
(X)4" LPS
(E)4" LPS
(E)MPS
(X)AS
(E)4" LPS
(X)ET
(X)5" HWS
(E)UH
(X)4" HWR
(E)4" HWR
(E)4" HWS
(E)STEAM CONDENSATE TANK
AND CONDENSATE PUMP
(X)POT FEEDER
(X)LPS
(X)LPC
(X)LPC
(X)HC-4
(X)LPS
2 3 1 4 5 5.6
B
C
D.1
D
A
(E)HWR
(E)HWS 3
(X)LPS TO HC-2(X)LPS TO HC-3
(X)LPS TO HC-1
7 7
(E)12" MPS
(E)4" MPC
(E)4" LPC
(E)5" LPS
(E)5" LPS
(X)HC-3 (X)HC-2 (X)HC-1
(X)4" HWS
TO (E)AHU
TO DUCT
MOUNTED
HUMIDIFIER
(E)5" HWS
(E)5" HWR
(E)6" CHWS
(E)6" CHWR
(E)HWS TO UNIT
HEATER
(E)HWR TO UNIT
HEATER
(X)LPC
RE
G
IS
TE
RE
DPROFESSIONALENG
IN
EERER
IC
M.DeSPLINTER
M
ECHANICA
L
S
TATE OF CALIFORNIA
38688 Exp. 12-31-25
SIGNED: 06/23/25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. Box 190, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
07/25/2025
BASEMENT KEYPLAN
NORTH
E & F
SHIPPING
WAREHOUSE
OR ADDITION B A
ACA BUILDING
AREAS
AREA AREA
G
AREA
C & D
AREAS
BUILDING 1
100% FINAL BID
DOCUMENTS
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t S to ra g e /2
M
E P
T
.0
C o lu m b ia
M
O V
A M
C R
M E
S to ra g e
A C
A H
V A
C U p g ra d e s .r v t
-0
-2
:4
:4
MPD203
EMD BST
PIPING - ENLARGED BASEMENT FLOOR PLAN
ROOMS - DEMOLITION
N
1/4" = 1'-0"1
PIPING - ENLARGED BASEMENT FLOOR PLAN - MECHANICAL RM E003 - DEMOLITION
KEYNOTES - MPD203
NUMBER TEXT
REMOVE EXISTING HEAT EXCHANGER AND ASSOCIATED PIPING, AS SHOWN.
REMOVE ASSOCIATED ACCESSORIES, SUPPORTS, CONTROLS, ETC.
REMOVE EXISTING PUMP AND ASSOCIATED PIPING, AS SHOWN. REMOVE
ASSOCIATED ACCESSORIES, SUPPORTS, CONTROLS, ETC.
REMOVE CHILLED WATER PIPING, AS NEEDED, TO ALLOW FOR NEW AHU
INSTALLATION AND PREPARE FOR NEW CONNECTION.
REMOVE EXISTING AIR SEPARATOR AND ASSOCIATED PIPING AS SHOWN.
REMOVE ASSOCIATED ACCESSORIES, SUPPORTS, CONTROLS, ETC.
REMOVE EXISTING EXPANSION TANK AND ASSOCIATED PIPING AS SHOWN.
REMOVE ASSOCIATED ACCESSORIES, SUPPORTS, CONTROLS, ETC.
6 REMOVE EXISTING PIPING AS SHOWN AND PREPARE FOR NEW CONNECTION.
REMOVE EXISTING PIPING AS SHOWN AND CAP. REMOVE ASSOCIATED
ACCESSORIES, SUPPORTS, CONTROLS, ETC. INSULATE AND JACKET TO MATCH
EXISTING.
REMOVE EXISTING POT FEEDER AND ASSOCIATED PIPING AS SHOWN. REMOVE
ASSOCIATED ACCESSORIES, SUPPORTS, CONTROLS, ETC.
Mark Revisions: Date:
1 AMENDMENT #1 - BIDDER QUESTIONS-RESPONSES 07/29/2025
2 AMENDMENT #2 08/05/2025
WORK
F002
MECH
ROOM
E003
ELEC ROOM
E003A
2 3 1 4 5 5.6
B
C
D.1
D
A
(E)LPC DN
(X)ACA-HX-1
(BELOW)
(E)HX-4
(E)HX-5
(BELOW)
(E)ACA-AHU-6
(E)STEAM
GENERATOR
(E )H
W R
(E)HWR
(E )H
W R
(E)6" CHWS DN
(E)6" CHWR DN
(E )M
P S
(E)4" HWR
(E)4" HWS
(X)ACA-AHU-3 (X)ACA-AHU-2 (X)ACA-AHU-1
(E)4" CHWS
(E)4" CHWR
(E)2" MPS
(E)4" LPS
(E)2" LPC
(E)5" HWS
(E)5" HWR
(X)4" CHWR
(X)4" CHWS(X)4" CHWS
(X)4" CHWR
3 3
(X)4" CHWS
(X)5" CHWR
(E)4" LPC
(E)1" LPC
(E)2" LPC
(E)2" LPC
(E)5" CHWS
(E)2" LPC
(E)5" CHWR
(E)5" CHWS
(E)5" CHWR
(E)6" CHWR
(E)6" CHWS
(X)HWP-2
(X)HWP-1
(X)HWP-3
(X)ACA-HX-2
(X)5" HWS
(E)3" HWR
(E)3" HWS
(E)5" HWS
(E)5" HWR(E)5" LPS
(E )M
P S
(E)MPS
(X)4" HWR
(X)ACA-HX-3 1
(X)5" HWR
(E)4" LPS
(X)4" LPS
(X)4" LPS
(E)4" LPC
(E)2 1/2" CHWR
(E)2 1/2" CHWS
(X)4" LPS
(E)4" LPS
(E)MPS
(X)AS
(E)4" LPS
(X)ET
(X)5" HWS
(E)UH
(X)4" HWR
(E)4" HWR
(E)4" HWS
(E)STEAM CONDENSATE TANK
AND CONDENSATE PUMP
(X)POT FEEDER
(E)LPS
(E)LPC
(E)LPC
(E)HC-4
(E)LPS
(E)ACA-AHU-4
(E )M
P S
(E )L
P S
(E )L
P C
(E )M
P C
(E )L
P S
(X)HC-3 (X)HC-2 (X)HC-1
(X)4" HWS
TO (E)AHU
TO (E)AHU
TO DUCT
MOUNTED
HUMIDIFIER
(E)1" HWS TO UNIT
HEATER
(E)1" HWR TO UNIT
HEATER
(E)LPC
RE
G
IS
TE
RE
DPROFESSIONALENG
IN
EERER
IC
M.DeSPLINTER
M
ECHANICA
L
S
TATE OF CALIFORNIA
38688 Exp. 12-31-25
SIGNED: 06/23/25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. Box 190, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
07/25/2025
BASEMENT KEYPLAN
NORTH
E & F
SHIPPING
WAREHOUSE
OR ADDITION B A
ACA BUILDING
AREAS
AREA AREA
G
AREA
C & D
AREAS
BUILDING 1
100% FINAL BID
DOCUMENTS
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t S to ra g e /2
M
E P
T
.0
C o lu m b ia
M
O V
A M
C R
M E
S to ra g e
A C
A H
V A
C U p g ra d e s .r v t
-0
-2
:4
:5
MPD204
EMD BST
PIPING - ENLARGED BASEMENT FLOOR PLAN
ROOMS - DEMOLITION - DEDUCT #1
N
1/4" = 1'-0"1 PIPING - ENLARGED BASEMENT FLOOR PLAN - MECHANICAL RM E003 - DEMOLITION DEDUCT #1
KEYNOTES - MPD204
NUMBER TEXT
REMOVE EXISTING HEAT EXCHANGER AND ASSOCIATED PIPING AS SHOWN.
REMOVE ASSOCIATED ACCESSORIES, SUPPORTS, CONTROLS, ETC.
REMOVE EXISTING PUMP AND ASSOCIATED PIPING AS SHOWN. REMOVE
ASSOCIATED ACCESSORIES, SUPPORTS, CONTROLS, ETC.
REMOVE CHILLED WATER PIPING, AS NEEDED, TO ALLOW FOR NEW AHU
INSTALLATION AND PREPARE FOR NEW CONNECTION.
REMOVE EXISTING AIR SEPARATOR AND ASSOCIATED PIPING AS SHOWN.
REMOVE ASSOCIATED ACCESSORIES, SUPPORTS, CONTROLS, ETC.
REMOVE EXISTING EXPANSION TANK AND ASSOCIATED PIPING AS SHOWN.
REMOVE ASSOCIATED ACCESSORIES, SUPPORTS, CONTROLS, ETC.
6 REMOVE EXISTING PIPING AS SHOWN AND PREPARE FOR NEW CONNECTION.
REMOVE EXISTING PIPING AS SHOWN AND CAP. REMOVE ASSOCIATED
ACCESSORIES, SUPPORTS, CONTROLS, ETC. INSULATE AND JACKET TO MATCH
EXISTING.
REMOVE EXISTING POT FEEDER AND ASSOCIATED PIPING AS SHOWN. REMOVE
ASSOCIATED ACCESSORIES, SUPPORTS, CONTROLS, ETC.
Mark Revisions: Date:
1 AMENDMENT #1 - BIDDER QUESTIONS-RESPONSES 07/29/2025
2 AMENDMENT #2 08/05/2025
F002
MECH
ROOM
E003
ELEC ROOM
E003A
2 3 1 4 5 5.6
B
C
D.1
D
A
(E)LPC DN
(X)ACA-HX-1
(BELOW)
(E)HX-4
(E)HX-5
(BELOW)
(E)ACA-AHU-6
(E)STEAM
GENERATOR
(E )H
W R
(E)HWR
(E )H
W R
(E)6" CHWS DN
(E)6" CHWR DN
(E )M
P S
(E)4" HWR
(E)4" HWS
(X)ACA-AHU-2 (X)ACA-AHU-1
(E)4" CHWS
(E)4" CHWR
(E)2" MPS
(E)4" LPS
(E)2" LPC
(E)5" HWS
(E)5" HWR
(X)4" CHWR
(X)4" CHWS
(X)4" CHWS
(X)4" CHWR
(E)4" LPC
(E)1" LPC
(E)2" LPC
(E)2" LPC
(E)5" CHWS
(E)2" LPC
(E)5" CHWR
(E)5" CHWS
(E)5" CHWR
(E)6" CHWR
(E)6" CHWS
(X)HWP-2
(X)HWP-1
(X)HWP-3
(X)ACA-HX-2
(X)5" HWS
(E)3" HWR
(E)3" HWS
(E)5" HWS
(E)5" HWR
(E)5" LPS
(E )M
P S
(E)MPS
(X)4" HWR
(X)ACA-HX-3 1
(X)5" HWR
(E)4" LPS
(X)4" LPS
(X)4" LPS
(E)4" LPC
(E)2 1/2" CHWR
(E)2 1/2" CHWS
(X)4" LPS
(E)4" LPS
(E)MPS
(X)AS
(E)4" LPS
(X)ET
(X)5" HWS
(E)UH
(X)4" HWR
(E)4" HWR
(E)4" HWS
(E)STEAM CONDENSATE TANK
AND CONDENSATE PUMP
(X)POT FEEDER
(E)LPS
(E)LPC
(E)LPC
(E)HC-4
(E)LPS
(E)ACA-AHU-4
(E)ACA-AHU-3
(E )M
P S
(E )L
P S
(E )L
P S
(E )L
P C
(E )M
P C
(X)HC-1(X)HC-2
(X)4" LPS
(X)4" HWS
TO (E)AHU
(E)HC-3
(E)1" HWS TO UNIT
HEATER
(E)1" HWR TO UNIT
HEATER
TO DUCT
MOUNTED
HUMIDIFIER
(E)LPC
RE
G
IS
TE
RE
DPROFESSIONALENG
IN
EERER
IC
M.DeSPLINTER
M
ECHANICA
L
S
TATE OF CALIFORNIA
38688 Exp. 12-31-25
SIGNED: 06/23/25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. Box 190, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
07/25/2025
BASEMENT KEYPLAN
NORTH
E & F
SHIPPING
WAREHOUSE
OR ADDITION B A
ACA BUILDING
AREAS
AREA AREA
G
AREA
C & D
AREAS
BUILDING 1
100% FINAL BID
DOCUMENTS
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t S to ra g e /2
M
E P
T
.0
C o lu m b ia
M
O V
A M
C R
M E
S to ra g e
A C
A H
V A
C U p g ra d e s .r v t
-0
-2
:4
:5
MPD205
EMD BST
PIPING - ENLARGED BASEMENT FLOOR PLAN
ROOMS - DEMOLITION - DEDUCT #2
KEYNOTES - MPD205
NUMBER TEXT
REMOVE EXISTING HEAT EXCHANGER AND ASSOCIATED PIPING AS SHOWN.
REMOVE ASSOCIATED ACCESSORIES, SUPPORTS, CONTROLS, ETC.
REMOVE EXISTING PUMP AND ASSOCIATED PIPING AS SHOWN. REMOVE
ASSOCIATED ACCESSORIES, SUPPORTS, CONTROLS, ETC.
REMOVE CHILLED WATER PIPING, AS NEEDED, TO ALLOW FOR NEW AHU
INSTALLATION AND PREPARE FOR NEW CONNECTION.
REMOVE EXISTING AIR SEPARATOR AND ASSOCIATED PIPING AS SHOWN.
REMOVE ASSOCIATED ACCESSORIES, SUPPORTS, CONTROLS, ETC.
REMOVE EXISTING EXPANSION TANK AND ASSOCIATED PIPING AS SHOWN.
REMOVE ASSOCIATED ACCESSORIES, SUPPORTS, CONTROLS, ETC.
6 REMOVE EXISTING PIPING AS SHOWN AND PREPARE FOR NEW CONNECTION.
REMOVE EXISTING PIPING AS SHOWN AND CAP. REMOVE ASSOCIATED
ACCESSORIES, SUPPORTS, CONTROLS, ETC. INSULATE AND JACKET TO MATCH
EXISTING.
REMOVE EXISTING POT FEEDER AND ASSOCIATED PIPING AS SHOWN. REMOVE
ASSOCIATED ACCESSORIES, SUPPORTS, CONTROLS, ETC.
N
1/4" = 1'-0"1 PIPING - ENLARGED BASEMENT FLOOR PLAN - MECHANICAL RM E003 - DEMOLITION DEDUCT #2
Mark Revisions: Date:
1 AMENDMENT #1 - BIDDER QUESTIONS-RESPONSES 07/29/2025
2 AMENDMENT #2 08/05/2025
F002
MECH
ROOM
E003
ELEC ROOM
E003A
MP301
MP301
(E)ACA-AHU-6
(E)4" HWR
(E)4" HWS
(E)5" HWR
(E)4" LPC
(E)6" CHWR
(E)6" CHWS
(E)3" HWR
(E)3" HWS
(E)5" HWS
(E)5" HWR(E)5" LPS
(E )1
M P
S
(E)6" CHWS DN
(E)6" CHWR DN
(E)4" CHWS
(E)4" CHWR
(E)2" MPS
(E)4" LPS
(E)1" LPC
(E)2" LPC
(E)2" LPC
ACA-AHU-3 ACA-AHU-2
ACA-AHU-1
ACA-AHU-4
2 1/2" CHWS
2 1/2" CHWR
4" CHWR
4" CHWS
(E )H
W R
(E)HWR
(E )H
W R
(E )M
P S
(E)MPS
(E )H
W R
(E)HWR
(E )H
W R
(E )M
P S
(E)MPS
(E)MPS
(E)5" HWS
6" HWS
3" HWS
3" HWR
1 1/4" HWR
1 1/4" HWS
1 1/4" HWR
1 1/4" HWS
(E)4" LPC
6" LPS (15)
(E)5" LPS
(E)UH
(E)HX-4
(E)HX-5
(BELOW)
3" HWR
3" HWS
5" HWS
2 1/2" S
4" CHWR
1 1/4" HWS
1 1/4" HWR
2 1/2" S 2 1/2" S
3 1/2" S
1 1/2" HWS
1 1/2" HWR
2 1/2" S
3 1/2" S (15)
3 1/2" S
1 1/2" S
1 1/2" S (15)
(E)LPC DN
6" HWS
4" HWS
4" HWR
8" HWS
8" HWR
6" LPS (15)
8" HWR
5" HWR
6" HWR
(E)4" LPS (15)
(E)2 1/2" CHWS
(E)2 1/2" CHWR
(E)2" LPC
(E)4" HWR
(E)4" HWS
ACA-HX-2
ACA-HX-1
ACA-HWP-2
ACA-HWP-1 ACA-AS-1
ACA-ET-1
(E)STEAM CONDENSATE TANK
AND CONDENSATE PUMP
2 1/2" LPC
1 1/2" MPS
K
2 3 1 4 5 5.6
B
C
D.1
D
A
ACA-USG-1
(E)HWS
(E)HWR
ACA-CP-1
(E)STEAM
GENERATOR
(E )L
P S
(E )L
P S
(E )L
P C
(E )M
P C
(E )M
P S
ACA-AHU4-P-1
1 1/4" V
(E)5" CHWR
(E)5" CHWS
4" HWS
4" HWR
6" LPS
(E)1" HWS TO UNIT
HEATER
(E)1" HWR TO UNIT
HEATER
4" CHWS
4" CHWR
4" CHWS
1" MPC
N
1/4" = 1'-0"1
PIPING - ENLARGED BASEMENT FLOOR PLAN MECHANICAL RM E003 - REMODEL
RE
G
IS
TE
RE
DPROFESSIONALENG
IN
EERER
IC
M.DeSPLINTER
M
ECHANICA
L
S
TATE OF CALIFORNIA
38688 Exp. 12-31-25
SIGNED: 06/23/25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. Box 190, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
07/25/2025
BASEMENT KEYPLAN
NORTH
E & F
SHIPPING
WAREHOUSE
OR ADDITION B A
ACA BUILDING
AREAS
AREA AREA
G
AREA
C & D
AREAS
BUILDING 1
100% FINAL BID
DOCUMENTS
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t S to ra g e /2
M
E P
T
.0
C o lu m b ia
M
O V
A M
C R
M E
S to ra g e
A C
A H
V A
C U p g ra d e s .r v t
-0
-2
:3
:3
MP204
EMD BST
PIPING - ENLARGED BASEMENT FLOOR PLAN
ROOMS - REMODEL
PROVIDE MINIMUM 2'-0" CLEAR AROUND ALL NEW HEAT EXCHANGERS, PUMPS,
EXPANSION TANKS, AND TANKS FOR SUFFICIENT MAINTENANCE CLEARANCES.
MEET ALL MANUFACTURER RECOMMENDATIONS. SUBMIT COORDINATION
DRAWING OF NEW LAYOUT INCLUDING ALL EQUIPMENT, PIPING, AND
CLEARANCES FOR A/E REVIEW PRIOR TO INSTALLATION.
ALL NEW PIPING SHALL BE INSTALLED AT LEAST 8'-0" AFF UNLESS OTHERWISE
NOTED. THE INTENT IS TO AVOID RESTRICTING MAINTENANCE ACCESS. PIPING
CONNECTIONS TO FLOOR-MOUNTED EQUIPMENT AND PIPING MOUNTED ON A
WALL MAY BE UNDER 8'-0" AFF.
NUMBER TEXT
GENERAL NOTES - MP204
KEYNOTES - MP204
NUMBER TEXT
1 RECONNECT EXISTING CHILLED WATER PIPING TO NEW AHU.
MAINTAIN 3'-0" CLEAR BETWEEN EXISTING HOUSEKEEPING PAD FOR EXISTING
CONDENSATE RETURN STATION AND NEW HOUSEKEEPING PAD FOR NEW
HEATING WATER EQUIPMENT.
3 PROVIDE RELIEF VENT PIPING FROM ACA-USG-1 TO FLOOR DRAIN.
VALVED AND CAPPED FOR FUTURE EXTENSION TO ACA-AHU-6. (176 GPM
ALLOWANCE)
1 1
Mark Revisions: Date:
1 AMENDMENT #1 - BIDDER QUESTIONS-RESPONSES 07/29/2025
2 AMENDMENT #2 08/05/2025
F002
MECH
ROOM
E003
ELEC ROOM
E003A
MP301
K
2 3 1 4 5 5.6
B
C
D.1
D
A
(E)ACA-AHU-6
(E)4" HWR
(E)4" HWS
(E)5" HWR
(E)4" LPC
(E)6" CHWR
(E)6" CHWS
(E)3" HWR
(E)3" HWS
(E)5" HWS
(E)5" HWR(E)5" LPS
(E )1
M P
S
(E)6" CHWS DN
(E)6" CHWR DN
(E)4" CHWS
(E)4" CHWR
(E)2" MPS
(E)4" LPS
(E)1" LPC
(E)2" LPC
(E)2" LPC
ACA-AHU-3
ACA-AHU-2 ACA-AHU-1
4" CHWR
4" CHWS
(E )H
W R
(E)HWR
(E )H
W R
(E)MPS
(E )H
W R
(E)HWR
(E )H
W R
(E)MPS
(E)MPS
(E)5" HWS
6" HWS
1 1/4" HWR
1 1/4" HWS
1 1/4" HWR
1 1/4" HWS
(E)4" LPC
6" LPS (15)
(E)5" LPS
(E)UH
(E)HX-4
(E)HX-5
(BELOW)
2 1/2" S
4" CHWR
4" CHWR
1 1/4" HWS
2 1/2" S
2 1/2" S
3 1/2" S
1 1/2" HWS
1 1/2" HWR
2 1/2" S
3 1/2" S (15)
3 1/2" S
(E)LPC DN
6" HWS
4" HWS
4" HWR
8" HWS
8" HWR
6" LPS (15)
8" HWR
5" HWR
6" HWR
(E)4" LPS (15)
(E)2 1/2" CHWS
(E)2 1/2" CHWR
(E)2" LPC
(E)4" HWR
(E)4" HWS
ACA-HX-2
ACA-HX-1
ACA-HWP-2
ACA-HWP-1 ACA-AS-1
ACA-ET-1
(E)STEAM CONDENSATE TANK
AND CONDENSATE PUMP
2 1/2" LPC
1 1/2" MPS
ACA-USG-1
(E)ACA-AHU-4
(E )H
W S
(E )H
W R
4" CHWS4" CHWR 4" CHWS
1 1/4" HWR
ACA-CP-1
(E)STEAM
GENERATOR
(E )5
LP
S
(E )5
LP
S
(E )4
LP
C
(E )4
M
P C
(E )1
M P
S
(E)HC-4
VALVED AND CAPPED FOR
FUTURE EXTENSION TO ACA-
AHU-4. (55.7 GPM ALLOWANCE)
TEE WITH CAP FOR
FUTURE EXTENSION TO
ACA-AHU-4
4" HWR
4" HWS
6" LPS
(E)1" HWS TO UNIT
HEATER
(E)1" HWR TO UNIT
HEATER
1 1/4" V
LPC
1" MPC
3" HWS
3" HWR
RE
G
IS
TE
RE
DPROFESSIONALENG
IN
EERER
IC
M.DeSPLINTER
M
ECHANICA
L
S
TATE OF CALIFORNIA
38688 Exp. 12-31-25
SIGNED: 06/23/25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. Box 190, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
07/25/2025
BASEMENT KEYPLAN
NORTH
E & F
SHIPPING
WAREHOUSE
OR ADDITION B A
ACA BUILDING
AREAS
AREA AREA
G
AREA
C & D
AREAS
BUILDING 1
100% FINAL BID
DOCUMENTS
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t S to ra g e /2
M
E P
T
.0
C o lu m b ia
M
O V
A M
C R
M E
S to ra g e
A C
A H
V A
C U p g ra d e s .r v t
-0 -2
:0
:1
P
M
MP205
EMD BST
PIPING - ENLARGED BASEMENT FLOOR PLAN
ROOMS - REMODEL - DEDUCT #1
N
1/4" = 1'-0"1
PIPING - ENLARGED BASEMENT FLOOR PLAN MECHANICAL
RM E003 - REMODEL - DEDUCT #1
KEYNOTES - MP205
NUMBER TEXT
1 RECONNECT EXISTING CHILLED WATER PIPING TO NEW AHU.
MAINTAIN 3'-0" CLEAR BETWEEN EXISTING HOUSEKEEPING PAD FOR EXISTING
CONDENSATE RETURN STATION AND NEW HOUSEKEEPING PAD FOR NEW
HEATING WATER EQUIPMENT.
3 PROVIDE RELIEF VENT PIPING FROM ACA-USG-1 TO FLOOR DRAIN.
VALVED AND CAPPED FOR FUTURE EXTENSION TO ACA-AHU-6. (176 GPM
ALLOWANCE)
PROVIDE MINIMUM 2'-0" CLEAR AROUND ALL NEW HEAT EXCHANGERS, PUMPS,
EXPANSION TANKS, AND TANKS FOR SUFFICIENT MAINTENANCE CLEARANCES.
MEET ALL MANUFACTURER RECOMMENDATIONS. SUBMIT COORDINATION
DRAWING OF NEW LAYOUT INCLUDING ALL EQUIPMENT, PIPING, AND
CLEARANCES FOR A/E REVIEW PRIOR TO INSTALLATION.
ALL NEW PIPING SHALL BE INSTALLED ATLEAST 8'-0" AFF UNLESS OTHERWISE
NOTED. THE INTENT IS TO AVOID RESTRICTING MAINTENANCE ACCESS. PIPING
CONNECTIONS TO FLOOR-MOUNTED EQUIPMENT AND PIPING MOUNTED ON A
WALL MAY BE UNDER 8'-0" AFF.
NUMBER TEXT
GENERAL NOTES - MP205
Mark Revisions: Date:
1 AMENDMENT #1 - BIDDER QUESTIONS-RESPONSES 07/29/2025
2 AMENDMENT #2 08/05/2025
F002
MECH
ROOM
E003
ELEC ROOM
E003A
MP301
2 3 1 4 5 5.6
B
C
D.1
D
A
(E)ACA-AHU-6
(E)4" HWR
(E)4" HWS
(E)5" HWR
(E)4" LPC
(E)6" CHWR
(E)6" CHWS
(E)3" HWR
(E)3" HWS
(E)5" HWS
(E)5" HWR(E)5" LPS
(E )1
M P
S
(E)6" CHWS DN
(E)6" CHWR DN
(E)4" CHWS
(E)4" CHWR
(E)2" MPS
(E)4" LPS
(E)1" LPC
(E)2" LPC
(E)2" LPC
ACA-AHU-2
ACA-AHU-1
(E )H
W R
(E)HWR
(E )H
W R
(E )M
P S
(E)MPS
(E )H
W R
(E)HWR
(E )H
W R
(E )M
P S
(E)MPS
(E)MPS
(E)5" HWS
6" HWS
1 1/4" HWR
1 1/4" HWS
(E)4" LPC
6" LPS (15)
(E)5" LPS
(E)UH
(E)HX-4
(E)HX-5
(BELOW)
5" HWS
4" CHWR
4" CHWR
1 1/4" HWS
1 1/4" HWR
2 1/2" S
2 1/2" S
3 1/2" S
1 1/2" HWS
1 1/2" HWR
3 1/2" S (15)
3 1/2" S
(E)LPC DN
6" HWS
8" HWS
8" HWR
6" LPS (15)
8" HWR
5" HWR
6" HWR
(E)4" LPS (15)
(E)2 1/2" CHWS
(E)2 1/2" CHWR
(E)2" LPC
(E)4" HWR
(E)4" HWS
ACA-HX-2
ACA-HX-1
ACA-HWP-2
ACA-HWP-1 ACA-AS-1
ACA-ET-1
(E)STEAM CONDENSATE TANK
AND CONDENSATE PUMP
2 1/2" LPC
2 2
1 1/2" MPS
ACA-USG-1
(E)ACA-AHU-4
(E)ACA-AHU-3
(E )H
W S
(E)HWR
ACA-CP-1
1 1/2"
(E)HC-4
TEE WITH CAP FOR
FUTURE EXTENSION TO
ACA-AHU-3
FOR FUTURE EXTENSION
TO ACA-AHU-4
TEE WITH CAP FOR
FUTURE EXTENSION TO
ACA-AHU-4
4" HWS
4" HWR
6" LPS
(E)1" HWS TO UNIT
HEATER
(E)1" HWR TO UNIT
HEATER
(E )5
LP
S
(E )5
LP
S
(E )4
LP
C
(E )4
M
P C
(E )1
M P
S
1 1/4" V
LPC
1" MPC
3" HWR
3" HWS
RE
G
IS
TE
RE
DPROFESSIONALENG
IN
EERER
IC
M.DeSPLINTER
M
ECHANICA
L
S
TATE OF CALIFORNIA
38688 Exp. 12-31-25
SIGNED: 06/23/25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. Box 190, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
07/25/2025
BASEMENT KEYPLAN
NORTH
E & F
SHIPPING
WAREHOUSE
OR ADDITION B A
ACA BUILDING
AREAS
AREA AREA
G
AREA
C & D
AREAS
BUILDING 1
100% FINAL BID
DOCUMENTS
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t S to ra g e /2
M
E P
T
.0
C o lu m b ia
M
O V
A M
C R
M E
S to ra g e
A C
A H
V A
C U p g ra d e s .r v t
-0 -2
:0
:2
P
M
MP206
EMD BST
PIPING - ENLARGED BASEMENT FLOOR PLAN
ROOMS - REMODEL - DEDUCT #2
N
1/4" = 1'-0"1
PIPING - ENLARGED BASEMENT FLOOR PLAN MECHANICAL
RM E003 - REMODEL - DEDUCT #2
KEYNOTES - MP206
NUMBER TEXT
1 RECONNECT EXISTING CHILLED WATER PIPING TO NEW AHU.
2 CONNECT CLEAN STEAM CONDENSATE PIPING TO MPC PIPING.
MAINTAIN 3'-0" CLEAR BETWEEN EXISTING HOUSEKEEPING PAD FOR EXISTING
CONDENSATE RETURN STATION AND NEW HOUSEKEEPING PAD FOR NEW
HEATING WATER EQUIPMENT.
4 PROVIDE RELIEF VENT PIPING FROM ACA-USG-1 TO FLOOR DRAIN.
VALVED AND CAPPED FOR FUTURE EXTENSION TO ACA-AHU-6 AND ACA-AHU-3.
(186 GPM ALLOWANCE)
PROVIDE MINIMUM 2'-0" CLEAR AROUND ALL NEW HEAT EXCHANGERS, PUMPS,
EXPANSION TANKS, AND TANKS FOR SUFFICIENT MAINTENANCE CLEARANCES.
MEET ALL MANUFACTURER RECOMMENDATIONS. SUBMIT COORDINATION
DRAWING OF NEW LAYOUT INCLUDING ALL EQUIPMENT, PIPING, AND
CLEARANCES FOR A/E REVIEW PRIOR TO INSTALLATION.
ALL NEW PIPING SHALL BE INSTALLED ATLEAST 8'-0" AFF UNLESS OTHERWISE
NOTED. THE INTENT IS TO AVOID RESTRICTING MAINTENANCE ACCESS. PIPING
CONNECTIONS TO FLOOR-MOUNTED EQUIPMENT AND PIPING MOUNTED ON A
WALL MAY BE UNDER 8'-0" AFF.
NUMBER TEXT
GENERAL NOTES - MP206
Mark Revisions: Date:
1 AMENDMENT #1 - BIDDER QUESTIONS-RESPONSES 07/29/2025
2 AMENDMENT #2 08/05/2025
(E)AC-S13
(E)AHU-14
WORK SHOWN EAST OF THIS
LINE IS IN PIPE BASEMENT.
2" S (15)
(E)MPS (50)
2" MPS (50)
(E)CONDENSATE
RETURN TANK(E)USG
/4
M P
C
2" S (15)
2" MPS (50)
2" S
1 1/4" MPC
T S R Q
8.2
9.1
10.4
11.5
7.1
8.3
8.9
9.8
10.2
7.6
USG-3
(E)FD
N
1/8" = 1'-0"1 PIPING - BASEMENT ENLARGED FLOOR PLAN - RM C012 - REMODEL
RE
G
IS
TE
RE
DPROFESSIONALENG
IN
EERER
IC
M.DeSPLINTER
M
ECHANICA
L
S
TATE OF CALIFORNIA
38688 Exp. 12-31-25
SIGNED: 06/23/25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. Box 190, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
07/25/2025
BASEMENT KEYPLAN
NORTH
E & F
SHIPPING
WAREHOUSE
OR ADDITION B A
ACA BUILDING
AREAS
AREA AREA
G
AREA
C & D
AREAS
BUILDING 1
100% FINAL BID
DOCUMENTS
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t S to ra g e /2
M
E P
T
.0
C o lu m b ia
M
O V
A M
C R
M E
S to ra g e
A C
A H
V A
C U p g ra d e s .r v t
-0
-2
:3
:4
MP207
EMD BST
PIPING - ENLARGED BASEMENT FLOOR PLAN
ROOMS - REMODEL
KEYNOTES - MP207
NUMBER TEXT
1 CONNECT TO NEW DUCT-MOUNTED HUMIDIFIER DISPERSION GRID.
PROVIDE RELIEF VENT PIPING FROM USG-4 TO EXISTING FLOOR DRAIN AS
SHOWN.
ALL NEW PIPING SHALL BE INSTALLED ATLEAST 8'-0" AFF UNLESS OTHERWISE
NOTED. THE INTENT IS TO AVOID RESTRICTING MAINTENANCE ACCESS. PIPING
CONNECTIONS TO FLOOR-MOUNTED EQUIPMENT AND PIPING MOUNTED ON A
WALL MAY BE UNDER 8'-0" AFF.
NUMBER TEXT
GENERAL NOTES - MP207
Mark Revisions: Date:
1 AMENDMENT #1 - BIDDER QUESTIONS-RESPONSES 07/29/2025
2 AMENDMENT #2 08/05/2025
CLEAN
UTILITY
ROOM
E320
DENTAL
OPERATOR
E341
DENTAL
OPERATORY
E321
DENTAL
OPERATORY
E324
CORRIDOR
C3E2
DENTAL
OPERATORY
E317
DENTAL
OPERATORY
E318
DENTAL
CHIEF
OFFICE
E319
DENTAL
OPERATORY
E322
DENTAL
OPERATORY
E323
CORRIDOR
C3F1
CONFERENCE
ROOM
F307
HSKING
F308
STAFF
TOILET
F309
STAFF
TOILET
F310
EXAM ROOM
F328
EXAM ROOM
F327
STAFF
TOILET
F319
CLEAN
DISPATCH
F318
SOLID
HOLDING
F314
CLO.
F306A
(E)TU-AHU7-002
H-1
2" S(15)
(E )1
H
W S
(E )1
H
W R
F
C
D.1
D
E.1
E
3-TU-AHU8-9
3-TU-AHU8-9
(E)TU-AHU7-002
PROVIDE NEW HUMIDISTAT
(E)MS
3-TU-AHU31-1
3-TU-AHU31-1
(E )1
/2
H
W R
(E )1
/2
H
W S
C
2.8
STERILE
STORAGE
C347
CORRIDOR
C3C6
La L K
10.4
3-TU-AHU6-1
(E)3/4" HWS
(E)3/4" HWR
3-TU-AHU6-1
N
1/4" = 1'-0"2
PIPING - THIRD FLOOR PLAN - RM E320, F318 - REMODEL
N
1/4" = 1'-0"1
PIPING - THIRD FLOOR - RM A336 -
REMODEL
RE
G
IS
TE
RE
DPROFESSIONALENG
IN
EERER
IC
M.DeSPLINTER
M
ECHANICA
L
S
TATE OF CALIFORNIA
38688 Exp. 12-31-25
SIGNED: 06/23/25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. Box 190, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
07/25/2025
THIRD FLOOR KEYPLAN
NORTH
E & F
SHIPPING
WAREHOUSE
OR ADDITION B A
ACA BUILDING
AREAS
AREA AREA
G
AREA
C & D
AREAS
BUILDING 1
100% FINAL BID
DOCUMENTS
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t S to ra g e /2
M
E P
T
.0
C o lu m b ia
M
O V
A M
C R
M E
S to ra g e
A C
A H
V A
C U p g ra d e s .r v t
-0
-2
:3
:5
MP210
EMD BST
PIPING - ENLARGED THIRD FLOOR PLAN
ROOMS - REMODEL
KEYNOTES - MP210
NUMBER TEXT
1 CONNECT CLEAN STEAM PIPE TO NEW HUMIDIFIER DISPERSION GRID.
2 UTR TO EXISTING STEAM PIPING SERVING (E)AHU-8 ON ROOF.
3 RECONNECT HWS/R BRANCH PIPING TO NEW TERMINAL UNIT.
4 EXTEND HWS/R BRANCH PIPING TO NEW TERMINAL UNIT.
N
1/4" = 1'-0"3 PIPING - THIRD FLOOR PLAN - RM C347 - REMODEL
Mark Revisions: Date:
1 AMENDMENT #1 - BIDDER QUESTIONS-RESPONSES 07/29/2025
2 AMENDMENT #2 08/05/2025
(E)AC-S4
2-1/2" S(15) UP
(E)LPC
1 1/4" S (15)
(E)LPC DN
(E)MPS (50)
(E)LPC FROM (E)UNIT
HEATER
(E)LPC
2" MPS (50)
2" MPC
(E)PRV
(E)LPS UP
L K Jb J Hb H
5.4
5.5
6.2
6.3
6.7
7.2
8.2
7.6
USG-4
ST-5
22" V
1" SC UP
(E)AC-S3
2-1/2" S(15) DN
L K Jb J Hb H
5.4
5.5
6.2
6.3
6.7
7.2
8.2
7.6
N
1/8" = 1'-0"1
PIPING - ELEVATOR MACHINE ROOM - LOWER LEVEL - REMODEL
N
1/8" = 1'-0"2
PIPING - ELEVATOR MACHINE ROOM - UPPER LEVEL - REMODEL
RE
G
IS
TE
RE
DPROFESSIONALENG
IN
EERER
IC
M.DeSPLINTER
M
ECHANICA
L
S
TATE OF CALIFORNIA
38688 Exp. 12-31-25
SIGNED: 06/23/25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. Box 190, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
07/25/2025
100% FINAL BID
DOCUMENTS
NORTH
E & F
OR ADDITION B A
C & D
ACA BUILDING
AREAS
AREA AREA
AREAS
G
AREA BUILDING 1
PENTHOUSE FLOOR KEYPLAN
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t S to ra g e /2
M
E P
T
.0
C o lu m b ia
M
O V
A M
C R
M E
S to ra g e
A C
A H
V A
C U p g ra d e s .r v t
-0
-2
:3
:0
MP211
EMD BST
PIPING - PENTHOUSE FLOOR PLAN - REMODEL
KEYNOTES - MP211
NUMBER TEXT
CONNECT CLEAN STEAM PIPE TO EXISTING AHU HUMIDIFIER DISPERSION GRID.
PROVIDE REQUIRED PIPING ACCESSORIES COMPLETE WITH SHUTOFF VALVE,
STRAINER, CONTROL VALVE, AND (2)STEAM TRAPS. SEE DETAIL 9/MP401 FOR
ADDITIONAL INFORMATION.
2 PROVIDE RELIEF VENT PIPING FROM USG-4 TO FLOOR SINK AS SHOWN.
ALL NEW PIPING SHALL BE INSTALLED AT LEAST 8'-0" AFF UNLESS OTHERWISE
NOTED. THE INTENT IS TO AVOID RESTRICTING MAINTENANCE ACCESS. PIPING
CONNECTIONS TO FLOOR-MOUNTED EQUIPMENT AND PIPING MOUNTED ON A
WALL MAY BE UNDER 8'-0" AFF.
NUMBER TEXT
GENERAL NOTES - MP211
Mark Revisions: Date:
1 AMENDMENT #1 - BIDDER QUESTIONS-RESPONSES 07/29/2025
2 AMENDMENT #2 08/05/2025
(E)FD
(E)120x62 EA
2 1/2" S
1 1/4" HWR
1 1/4" HWS
4" CHWR
4" CHWR(E)4" HWS
(E)4" HWR
(E)18x48 EA
(E)5" LPS
(E)2 1/2" CHWR
(E)2 1/2" CHWS
3 1/2" S
6" HWS
(E)180x62 OA
CD.1 D
(E)6" CHWR
(E)4" HWS
(E)6" CHWS
ACA-AHU-1
4" CHWR
1 1/4" HWR
(E)4" LPS
42x102
1" CD3/4" D
3/4" D
1" CD
4 5 5.6
ACA-HX-2 ACA-HX-1
ACA-HWP-2 ACA-HWP-1 ACA-ET-1
ACA-AS-1
ACA-AHU-4
3 1/2" S2 1/2" S
6" LPS
8" HWS
6" LPS
8" HWR
6" LPS
8" HWS
6" LPS
1 1/2" S
6" HWR
1 1/2" S
5" HWS
6" HWS
3" HWR
8" HWR
8" HWS
(E)5" HWR
(E)5" HWS
(E)6" CHWR
(E)6" CHWS
(E)16x30
(E)24x28
(E)20x40
(E)28x58
(E )4 x2
(E )2 x2
S
A
(E )2 x2
R
A
(E )4 x4
(E)4" LPC
(E)10" MPS
4 5 5.6
2 1/2" LPC
(E)5" HWR(E)2 1/2" CHWR
(E)2 1/2" CHWS
(E)48x18
(E)5" LPS
ACA-CP-1
(E)5" HWS
ACA-USG-1
1 1/4" V
HOUSEKEEPING PAD
TO FLOOR DRAIN
1" MPC
3 1/2" S
ACA-HX-2
ACA-HX-1
ACA-HWP-2
ACA-HWP-1
ACA-ET-1
ACA-AS-1
3 1/2" S
8" HWS
8" HWR
6" LPS
4" HWR
1" MPC
(E)5" LPS
(E)4" LPC
(E)10" MPS
6" HWR
8" HWR
8" HWR
2 1/2" LPC
2 1/2" LPC
ACA-CP-1
(2' AFF)
1/4" = 1'-0"1
MECH ROOM E003 SECTION VIEW 1
1/4" = 1'-0"2 MECH ROOM E003 SECTION VIEW 2
RE
G
IS
TE
RE
DPROFESSIONALENG
IN
EERER
IC
M.DeSPLINTER
M
ECHANICA
L
S
TATE OF CALIFORNIA
38688 Exp. 12-31-25
SIGNED: 06/23/25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. Box 190, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
07/25/2025
100% FINAL BID
DOCUMENTS
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t S to ra g e /2
M
E P
T
.0
C o lu m b ia
M
O V
A M
C R
M E
S to ra g e
A C
A H
V A
C U p g ra d e s .r v t
-0
-2
:3
:0
MP301
EMD BST
PIPING - SECTION VIEWS
No Scale3
MECH ROOM E003 ISOMETRIC VIEW
ALL NEW PIPING SHALL BE INSTALLED AT LEAST 8'-0" AFF UNLESS OTHERWISE
NOTED. THE INTENT IS TO AVOID RESTRICTING MAINTENANCE ACCESS. PIPING
CONNECTIONS TO FLOOR-MOUNTED EQUIPMENT AND PIPING MOUNTED ON A
WALL MAY BE UNDER 8'-0" AFF.
NUMBER TEXT
GENERAL NOTES - MP301
Mark Revisions: Date:
1 AMENDMENT #1 - BIDDER QUESTIONS-RESPONSES 07/29/2025
2 AMENDMENT #2 08/05/2025
AHU HEATING WATER COIL PIPING DIAGRAM NTS 2
SINGLE SUCTION FLOOR-MOUNTED PUMP NTS 3
CLEAN STEAM GENERATOR NTS 4
TERMINAL UNIT WATER COILS - PIPING CONNECTIONS NTS 6
FLOOR - MOUNTED EXPANSION TANK - PIPING CONNECTIONS NTS 7WATER TREATMENT - CLOSED SYSTEMS NTS 10 AHU CHILLED WATER COOLING COIL PIPING DIAGRAM NTS 1
HEAT EXCHANGER - STEAM TO HOT WATER NTS 5DUCT-MOUNTED STEAM HUMIDIFIER - PIPING CONNECTIONS NTS 8INLINE-PUMP - CONNECTIONS NTS 11
AHU HUMIDIFIER DETAIL NTS 9PUMPED PREHEAT COIL (HOT WATER) - PIPING CONNECTIONS NTS 12
NOTES:
SEE SPECIFICATION SECTION "HYDRONIC PIPING" FOR Y STRAINER OPTION
FIRST 3 HANGERS FOR EACH PIPE AND
BRANCH SHALL BE SPRING & NEOPRENE
TYPE. TYPE "H" FOR 4" DIA. PIPE &
SMALLER. TYPE "H-P" FOR 5" DIA.
PIPE & LARGER.
RIGID PIPE
HANGER
INSTALL HANGER AS CLOSE TO
PIPE ELBOW AS POSSIBLE
(TYPICAL)
FLEXIBLE CONNECTOR (TYPICAL)
PUMP
FLOOR
VIBRATION ISOLATOR
(TYPICAL)
1" MIN.
DIA. PIPE STAND
CONCRETE INERTIA
BASE
DRAIN
SUCTION DIFFUSER
WITH BUILT IN STRAINER.
1/2"
PRESSURE GAUGE
RIGID PIPE
HANGER
OPTIONAL STRAINER
BUTTERFLY OR BALL
SHUT OFF VALVE, TYP.
CHECK VALVE
VA DETAIL NO.:- SD232123-02
1/2"
DOUBLE COIL
MV
MV
MV
MV
FLOW ELEMENT
WATER COIL
AIR VENT WHEN
COIL IS NOT
SELF-VENTING
TEST PLUG
(TYP.)
WATER COIL
DRAIN WHEN COIL
IS NOT SELF-DRAINING
DRAIN
NOTES:
1. WHEN COIL IS INCLUDED IN CASING MOUNTED ON VIBRATION ISOLATORS THE FIRST 2 HANGERS FOR EACH PIPE SHALL BE SPRING &
NEOPRENE TYPE. TYPE "H" FOR 4" Ø PIPE & SMALLER. TYPE "H-P" FOR 5" Ø PIPE & LARGER.
2. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE SWING OR USE OF ACCESS DOORS OR PANELS; NEITHER
SHALL IT BLOCK THE SERVICING OF FILTERS, VALES, OR EQUIPMENT.
3. THE FLOW ELEMENT MAY BE INSTALLED IN THE SUPPLY PIPING IF THE REQUIRED MINIMUM UPSTREAM AND DOWNSTREAM DIMENSIONS
CANNOT BE OBTAINED IN THE RETURN PIPING.
FE
TI
CALIBRATED BALANCING
VALVE (TYP.)
PIPE HANGER SHALL SUPPORT
PIPING INDEPENDENT OF COIL
REDUCER,
IF REQUIRED
TO CONDENSATE RETURN
TO HUMIDIFIER(S)
SET @20 PSIG
STEAM CONTROL
VALVE
SOFT WATER
FEED WATER
F&T TRAP ASSEMBLY
SHUTOFF VALVE
MODULATING LEVEL
CONTROL VALVE
SET @15 PSIG
WATER LEVEL
PRESSURE SAFETY
VALVE
TO FLOOR DRAIN
VA DETAIL NO.:- SD232213-10
CLEAN STEAM GENERATOR SKID
PC PT
LT LC
DOUBLE COIL
MV
MV
MV
MV
FLOW ELEMENT
WATER COIL
AIR VENT WHEN
COIL IS NOT
SELF-VENTING
TEST PLUG
(TYP.)
WATER COIL
REDUCER,
IF REQUIRED
DRAIN WHEN COIL
IS NOT SELF-DRAINING
DRAIN
FE
TI
CALIBRATED BALANCING
VALVE (TYP.)
PIPE HANGER SHALL SUPPORT
PIPING INDEPENDENT OF COIL
"M
IN
(T Y
P
D
D
NOTES:
1. THE ABOVE DETAIL SHOWS REQUIRED PIPING FOR TWO HEAT EXCHANGERS IN
PARALLEL. HEAT EXCHANGERS ARE 100% REDUNDANT.
2. PROVIDE SADDLE SUPPORTS AND LEGS OR HANGERS FOR HEAT EXCHANGER. MOUNTING
HEIGHT SHALL BE ADJUSTED TO FACILITATE GRAVITY RETURN OF STEAM CONDENSATE.
3. MAKE THE BYPASS THE SAME SIZE AS THE CONNECTIONS
TO THE CONTROL VALVES.
4. CONTROL VALVES SHALL BE IN 1/3 AND 2/3 SIZE ARRANGEMENT.
TEST
PLUG
(TYP.)
THERMOMETER
(TYP.)
STEAM
SUPPLY
HEAT
EXCHANGER
(TYP.)
RUN DRAIN LINE FROM RELIEF
VALVE
TO NEAREST FLOOR DRAIN.
(TYP.)
HW
R
HW
S
STEAM C
ONDENSATE TO
CONDENSATE R
ETURN STATIO
N
(T
YP)
1/2" CHECK VALVE
VACUUM BREAKER (TYP.)
SCALE
(TYP.)
DDC
TEMPERATURE
SENSORS
(TYP.)
SEE SCHEDULES FOR RELIEF
VALVE SETTING
TT
PI
PI
THERMOSTATIC
AIR
VENT (T
YP.)
CONTROL VALVES IN
2/3 & 1/3
SIZE ARRANGEMENT,
TYP.
BYPASS
IF INSTALLED
LOWER THAN
MAIN STEAM LINE,
PROVIDE
ANOTHER
SCALE
POCKET/TRAP
HERE.
TT
NC
DDC
PRESSURE
SENSORS
(TYP.)
VA DETAIL NO.:- SD232113-11
D
FLOOR MOUNTING BASE RING
WITH DRAIN ACCESS OPENING
SHOWN. ANGLE IRON LEGS MAY
BE USED AS AN OPTION.
6" HOUSEKEEPING
PAD
COLD WATER
FILL LINE.
DRAIN
FROM SYSTEM
DRAIN
TO PUMP
SUCTION
AIR SEPARATOR
HANGER
RODS
(TYP)
CONNECTOR PIPE.
BLADDER
EXPANSION
TANK
REDUCED PRESSURE ZONE
BACKFLOW
PREVENTER
NORMALLY CLOSED
BUTTERFLY
OR BALL
ISOLATION
VALVE
RUN DRAIN LINE
TO NEAREST
FLOOR DRAIN
AIR CHARGING
SHRAEDER VALVE
MV
AUTO. AIR VENT TO DRAIN
PI
VA DETAIL NO.:- SD232113-05
NOTES:
1. SEE SCHEDULE FOR COMPONENT SIZES.
2. SET PRESSURE REDUCING VALVE SO
PRESSURE AT HIGHEST POINT IN SYSTEM
HAS A MINIMUM OF 28kPa [4 PSIG].
3. PROVIDE STRAINER IN AIR SEPARATOR
VA DETAIL NO.:- SD232113-12
COIL
TEST PLUG (TYP.)
REDUCER, IF REQUIRED
WATER RETURN
MANUAL AIR VENT
UNION CONNECTIONS (TYP.)
WATER SUPPLY
SHUT OFF VALVE
DRAIN WITH HOSE CONNECTION
MV
MODULATION CONTROL VALVE
BALANCING VALVE
VA DETAIL NO.:- SD232500-02
NOTE:
TOP OF CHEMICAL POT FEEDER TANK SHALL NOT BE MORE THAN 4'-0"
ABOVE FINISHED FLOOR.
1"
CHEMICAL POT FEEDER-
MINIMUM CAPACITY
5 GALLONS [19L]
1"
FUNNEL
3/4"
TO DRAIN
F R
O M
P U
M P
D
IS
C H
A R
G E
T O
P U
M P
S U
C T
IO
N
AUTOMATIC FLOW CONTROL
AND BALANCE DEVICE
ISOLATION VALVES,
NORMALLY CLOSED
PRESSURE GAUGE
STRAINER
FLEXIBLE CONNECTION
PIPE HANGERS - PROVIDE DOUBLE
DEFLECTION NEOPRENER. FOR FIRST
TWO ON EACH SIDE OF PUMP
BALANCING DEVICE
BALL OR BUTTERFLY
DEVICE
1. SUPPORT PUMP FROM PIPING ONLY. DO NOT SUPPORT PUMP FROM MOTOR.
NOTES:
VA DETAIL NO.:- SD232123-01
DRAIN BY PLUMBING, SEE
PLUMBING PLANS FOR SIZE &
CONTINUATION
CONTROL VALVE
STEAM TRAP
STEAM
TRAP
STRAINER
SHUTOFF VALVE
TO PRESSURIZED
STEAM MAIN
DISPERSION TUBES IN AIR STREAM
COLD WATER BY PLUMBING,
SEE PLUMBING PLANS FOR
SIZE & CONTINUATION
DRAIN COOLER BY
MECHANICAL
3/4"D 3/4"D
3/4"D
DRAIN BY PLUMBING, SEE
PLUMBING PLANS FOR SIZE &
CONTINUATION
CONTROL VALVE
SCALE POCKET SCALE POCKET
STEAM
TRAP
STEAM TRAP
STEAM TRAP
DISPERSION TUBES IN AIR STREAM
NOTE:
SEE MANUFACTURER'S PIPING RECOMMENDATIONS FOR FINAL LAYOUT
COLD WATER BY
PLUMBING, SEE
PLUMBING PLANS
FOR SIZE &
CONTINUATION
DRAIN COOLER
MECHANICAL
3/4"D
3/4"D
3/4"D1"D
MODULATING CONTROL
VALVE
HWS
HWR
INLINE
PUMP(NOTE #1)
AV
AUTO. AIR VENT TO DRAIN, (TYP.2)
AV
SHUTOFF VALVE
FULL SIZE CONNECTIONS
TO ALL COIL HEADER
TAPPINGS
BALANCING
DEVICE MANUAL BYPASS
VALVE
PREHEAT
COIL
AIR
MANUAL BYPASS VALVE
VA DETAIL NO.:- SD238216-02
SHUTOFF VALVE,
NORMALLY CLOSED
NOTE:
1. PUMP IS ONLY USED FOR EMERGENCY EPIDEMIC MODE WITH
OA IS LESS THAN 34 F.
RE
G
IS
TE
RE
DPROFESSIONALENG
IN
EERER
IC
M.DeSPLINTER
M
ECHANICA
L
S T
ATE OF CALIFORNIA
38688 Exp. 12-31-25
SIGNED: 06/23/25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. Box 190, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
07/25/2025
100% FINAL BID
DOCUMENTS
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t S to ra g e /2
M
E P
T
.0
C o lu m b ia
M
O V
A M
C R
M E
S to ra g e
A C
A H
V A
C U p g ra d e s .r v t
-0
-2
:3
:0
MP401
EMD BST
PIPING DETAILS
VA DETAIL NO.:- SD238216-01
Mark Revisions: Date:
1 AMENDMENT #1 - BIDDER QUESTIONS-RESPONSES 07/29/2025
2 AMENDMENT #2 08/05/2025
SCHEDULE GENERAL NOTES
ABBREVIATION
ELECTRICAL CONTRACTOR
MECHANICAL CONTRACTORM.C.
DESCRIPTION
N O
T E
A N
O T
E C
MFR MANUFACTURER
STARTER TYPE
ELECTRONICALLY COMMUTATED MOTOR
FULL VOLTAGE
MANUAL STARTER
SOFT STARTER
VARIABLE FREQUENCY DRIVE
VARIABLE FREQUENCY DRIVE WITH BYPASS
E.C.
ECM
FV
MS
SS
VFD
VFD/B
PROVIDED BY
DISCONNECT TYPE
F FUSED
NF NON-FUSEDN
O
T E
B
RE
G
IS
TE
RE
DPROFESSIONALENG
IN
EERER
IC
M.DeSPLINTER
M
ECHANICA
L
S
TATE OF CALIFORNIA
38688 Exp. 12-31-25
SIGNED: 06/23/25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CORRECT REUSABLE
MEDICAL EQUIP STORAGE
589A4-24-101
800 HOSPITAL DR, COLUMBIA, MO
Shaffer Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698
Astral Engineers P.O. Box 190, Rancho Cucamonga, CA 91729 Phone: (909) 903-0015
Crux Consulting 18312 Harney St. / 663 N 132nd St. #73 Elkhorn, NE 68022 / Omaha, NE 68154 Phone: (402) 708-0383
Brighttree Studios 301 Brush Creek Rd Warrendale, PA 15086
(412) 212-7515
STAMP
07/25/2025
100% FINAL BID
DOCUMENTS
A u to d e s k D o c s /1
A
-2
-1
C o rr e c t R e u s a b le
M e d ic a l E q u ip m e n t S to ra g e /2
M
E P
T
.0
C o lu m b ia
M
O V
A M
C R
M E
S to ra g e
A C
A H
V A
C U p g ra d e s .r v t
-0
-2
:2
:3
MP501
EMD BST
PIPING SCHEDULES
1. DEDUCT #1: DO NOT PROVIDE NEW ACA-AHU4-P-1, IF DEDUCT #1 IS ACCEPTED.
2. DEDUCT #2: DO NOT PROVIDE NEW ACA-AHU4-P-1, IF DEDUCT #2 IS ACCEPTED.
3. PUMPS ACA-HWP-1 AND ACA-HWP-2 PROVIDE 2N REDUNDANCY AND SHALL OPERATE IN DUTY/STANDBY CONFIGURATION.
4. PROVIDE BASE-MOUNTED END SUCTION PUMP.
5. SEE SPEC SECTION 26 2911 FOR ADDITIONAL VFD INFORMATION.
6. PROVIDE ACCESSORIES AND INSTRUMENTATION PER DETAIL 3/MP401. SEE SPEC SECTION 23 2123 FOR ADDITIONAL INFORMATION.
7. CONTRACTOR SHALL CONFIRM EXISTING HEATING WATER SYSTEM BYPASSES PROVIDE SUFFICIENT FLOW TO MEET NEW PUMP MINIMUM FLOW REQUIREMENTS. ADJUST BYPASSES AS NEEDED.
NOTES:
PUMP SCHEDULE
TAG NAME
SERVICE
LOCATION GPM
PUMP FT.
HEAD AT
DESIGN
PUMP
EFFICIENCY
INLET SIZE
IMPELLER
SIZE
ELECTRICAL
MAX WEIGHT
(LBS)
MANUFACTURER MODEL NOTES
VOLTAGE PHASES RPM HP
DISCONNECT CONTROLLER/STARTER
BY (NOTE A) TYPE BY (NOTE A) TYPE (NOTE C)
ACA-HWP-1 ACA HEATING WATER MECH ROOM E003 900 60 83.4 5" 9.5" 480 3 1,800 20 E.C. VFD E.C. VFD 380 BELL & GOSSETT OR EQUAL e-1510 4BD 3,4,5,6,7
ACA-HWP-2 ACA HEATING WATER MECH ROOM E003 900 60 83.4 5" 9.5" 480 3 1,800 20 E.C. VFD E.C. VFD 380 BELL & GOSSETT OR EQUAL e-1510 4BD 3,4,5,6,7
ACA-AHU4-P-1 ACA-AHU-1 MECH ROOM E003 55.6 15 72.7 3' 4.5" 480 3 1,800 1/2 E.C. F E.C. FV 74 BELL & GOSSETT OR EQUAL e-90 2AAC 1,2
1. HEAT EXCHANGERS ACA-HX-1 AND ACA-HX-2 PROVIDE 2N REDUNDANCY AND SHALL OPERATE IN DUTY/STANDBY CONFIGURATION.
2. SYSTEM SIZED WITH ALLOWANCE FOR FUTURE SERVICE TO HEATING COILS IN ACA-AHU-5 AND ACA-AHU-6. 41 GPM AND 176 GPM ALLOWANCE, RESPECTIVELY.
3. PROVIDE U-TUBE HEAT EXCHANGER WITH WELDED CARBON SHELL. PROVIDE WITH REMOVABLE BUNDLE FOR INSPECTION.
4. PROVIDE ACCESSORIES AND INSTRUMENTATION PER DETAIL 5/MP401.
NOTES:
SHELL AND TUBE HEAT EXCHANGER SCHEDULE
TAG NAME SERVICE LOCATION CIRC. FLUID GPM EWT (°F) LWT (°F) WATER PD (PSIG)
FOULING
FACTOR
STEAM PRESS. ON SHELL (PSIG)
INPUT STEAM
(LBS/HR)
LMTD (°F)
MAX WEIGHT
(LBS)
MANUFACTURER MODEL NOTES
ACA-HX-1 ACA HEATING WATER MECH ROOM E003 WATER 900 170 190 2.06 0.0005 0.65 9,300 68.58 1,760 BELL & GOSSETT OR EQUAL SU-185 1,2,3,4
ACA-HX-2 ACA HEATING WATER MECH ROOM E003 WATER 900 170 190 2.06 0.0005 0.65 9,300 68.58 1,760 BELL & GOSSETT OR EQUAL SU-185 1,2,3,4
1. COMPLETE WITH MANUFACTURER PROVIDED SKID BASE, PRESSURE RELIEF VALVE, STEAM PRESSURE GAUGE, STEAM SEPARATOR, MAIN AND AUXILIARY STEAM TRAP, MAIN STEAM STRAINER AND STEAM PRESSURE CONTROL VALVE.
2. PROVIDE UNIONS FOR PIPING EXTERNAL TO THE UNIT BODY TO ALLOW DISASSEMBLY IN THE FIELD FOR TRANSPORT THROUGH THE EXISTING 34" PATHWAY.
3. STEAM GENERATOR SHALL BE STANDBY SYSTEM FOR EXISTING STEAM GENERATOR TO PROVIDE 2N REDUNDANCY FOR AHU-7A, 7B, 8, 9, 10A.
NOTES:
UNFIRED CLEAN STEAM-TO-STEAM GENERATOR SCHEDULE
TAG NAME SERVICE LOCATION
SOURCE STEAM WATER CONDITIONS OUTPUT STEAM
MAX. WEIGHT
(LBS)
MANUFACTURER MODEL NOTESINPUT
PRESSURE (PSI)
PRESSURE DROP
(PSIG)
FLOW
RATE(LBS/HR)
FLOW (GPM) EWT (F) FLOW(LBS/HR) PRESSURE(PSIG)
ACA-USG-1 ACA-AHU-1-4 MECH ROOM E003 50 10 1,340 2.0 40 1,050 15 2,600 ARMSTRONG OR EQUAL V160USG1230 1
USG-2 AHU-7A, 7B, 8, 9, 10A MECH ROOM G001 60 10 1,930 3.0 40 1,500 15 1,800 ARMSTRONG OR EQUAL RB90V1624 1,2,3
USG-3 AC-S13, & AHU-14 MECHANICAL C012 50 10 960 1.5 40 750 15 1,600 ARMSTRONG OR EQUAL RB90V1224 1
USG-4 AC-S3 & AC-S4 ELEVATOR MACHINE ROOM - LOWER LEVEL 50 10 960 1.5 40 750 15 1,600 ARMSTRONG OR EQUAL RB90V1224 1
2. PROVIDE WITH METALLIC THERMAL ELEMENT FOR AIR REMOVAL.
1. PROVIDE MAXIMUM AVAILABLE STATIC HEAD AS POSSIBLE.
NOTES:
STEAM TRAP SCHEDULE
TAG NAME
EQUIPMENT
LOCATION
CAPACITY AT MIN DIFF
PRESS(LBS/HR)
MIN INLET PRESS
(PSI)
PRESSURE DROP TRAP TYPE TRAP SIZE(IN.) NOTES
ST-1 ACA-HX-1 MECH ROOM E003 12,500 15 0.25 PSIG FLOAT & THERMOSTATIC 3" 1
ST-2 ACA-HX-1 MECH ROOM E003 12,500 15 0.25 PSIG FLOAT & THERMOSTATIC 3" 1
ST-3 ACA-HX-2 MECH ROOM E003 12,500 15 0.25 PSIG FLOAT & THERMOSTATIC 3" 1
ST-4 ACA-HX-2 MECH ROOM E003 12,500 15 0.25 PSIG FLOAT & THERMOSTATIC 3" 1
ST-5 DRIP LEG ELEVATOR MACHINE ROOM 115 15 12" INVERTED BUCKET 1" 2
ST-6 USG-4 ELEVATOR MACHINE ROOM 390 15 12" INVERTED BUCKET 1" 2
ST-7 DRIP LEG F307 CONFERENCE ROOM 3 15 12" INVERTED BUCKET 1" 2
1. PROVIDE ASME BLADDER TYPE PRE-CHARGED EXPANSION TANK. PRE-CHARGE TANK TO 12 PSI.
NOTES:
EXPANSION TANK SCHEDULE
TAG NAME LOCATION SYSTEM TYPE CAPACITY(GAL.)
MAX. WORKING
PRESSURE(PSIG)
MAX. WEIGHT
(LBS)
MANUFACTURER MODEL NOTES
ACA-ET-1 MECH ROOM E003 HEATING WATER 185 40 830 WESSELS OR EQUAL NTA-280 1
1. TANGENTIAL AIR SEPRATOR TYPE WITH BOTTOM BLOWDOWN CONNECTION.
2. PROVIDE WITH A REMOVABLE STAINLESS-STEEL STRAINER ELEMENT HAVING 3/36" PERFORATIONS.
NOTES:
AIR SEPARATOR
TAG NAME LOCATION SYSTEM TYPE MAX FLOW(GPM)
MAX. WORKING
PRESSURE(PSIG)
MAX. WEIGHT
(LBS)
MANUFACTURER MODEL NOTES
ACA-AS-1 MECH ROOM E003 HEATING WATER 900 125 220 WESSELS OR EQUAL SPA-8-S 1,2
1. SEE SPEC SECTION 23 2500 FOR ADDITIONAL INFORMATION.
NOTES:
CHEMICAL POT FEEDER
TAG NAME LOCATION SYSTEM TYPE VOLUME(GALLONS)
MAX. WORKING
PRESSURE(PSIG)
MAX. WEIGHT
(LBS)
MANUFACTURER MODEL NOTES
ACA-CP-1 MECH ROOM E003 HEATING WATER 5 125 40 WESSELS OR EQUAL CPFTA-4 1
Mark Revisions: Date:
1 AMENDMENT #1 - BIDDER QUESTIONS-RESPONSES 07/29/2025
2 AMENDMENT #2 08/05/2025
1 1
(E)6"
(E)5"
(E)CHWS
(E)CHWR
(E)8" CHWS & (E)8" CHWR
FROM CHILLER PLANT
TO MRI
TO SURGERY
(E)8"
(X)ACA-
AHU-1
(X)ACA-
AHU-4
(E)2-1/2"
MVMVMV
(E)ACA-
AHU-6
(X)ACA-
AHU-3
MV
(X)ACA-
AHU-2
MV
(E)4"
(E)4"
(E)4"
(E)5"
(E)5"
1 1 1
(E)TEST PLUG
(TYP.)
(X)HX-3
(X)HX-2
(X)HX-2
(X)POT FEEDER
(X)EXPANSION TANK
TO CHASE
(X)HWR
(X)AIR SEPARATOR
TO CHASE
TO NORTH END OF MECH ROOM
(X )H
W S
T
T
T
T
T
(X)HWP-1 (X)HWP-2 (X)HWP-3
(X)4" (X)4"
TO (E)UNIT HEATER
M M M M M
TO NORTH END OF
MECH ROOM
(X)HWR
(X )H
W S
TO (E)UH-5
(E)6"
(E)5"
(E)CHWS
(E)CHWR
(E)8" CHWS & (E)8" CHWR
FROM CHILLER PLANT
TO MRI
TO SURGERY
(E)8"
(E)2-1/2"
(E)ACA-
AHU-6
(E)4"
(E)4"
(E)4"
(E)5"
(E)5"
ACA-
AHU-3
ACA-
AHU-2
ACA-
AHU-1
2 2 2
ET-1
ACA-HX-1 ACA-HX-2
(E)5" HWR
8" HWR
ACA-AHU-2
1" 1" 1"
6"
ACA-AHU-1 ACA-AHU-3
3"
ACA-HWP-1 ACA-HWP-2
8"
8" 8"
TO CHASE
TO (E)UNIT HEATER
4 4
ACA-CP-1
MVMV
HC
HC
HC
ACA-AHU-4
HC
ACA-
AHU-4
7 7
MV M M MV M MV M MV M
TO CHASE
MV
M
MV
M
MV
M
MV
M
2-1/2"CHWS
2-1/2"CHWR
2-1/2"CHWS
2-1/2"CHWR
2-1/2"CHWS
2-1/2"CHWR
1-1/2"CHWS
1-1/2"CHWR
AS-1
TO NORTH END OF
MECH ROOM
2"
TO COLD WATER FILL LINE
BY PLUMBING
MV
BACKFLOW PREVENTER
PRESSURE REDUCING VALVE
2"
6" HWR
8" HWR
1" HWS
1" HWR
1" HWS
1" HWR
1" HWS
1" HWR
1-1/2" HWS
1-1/2" HWR
(E )4
H
W S
TO (E)UH-5
BY P.C. BY M.C.
TO NORTH END OF
MECH ROOM
VALVED AND CAPPED FOR FUTURE EXTENSION
TO ACA-AHU-6. (176 GPM ALLOWANCE)
2"
6" HWS
(E)5" HWS
8" HWS
ACA-AHU4-P-1
H W
S
RE
G
IS
TE
RE
DPROFESSIONALENG
IN
EERER
IC
M.DeSPLINTER
M
ECHANICA
L
S
TATE OF CALIFORNIA
38688 Exp. 12-31-25
SIGNED: 06/23/25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .