589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 2 of 4.pdf
PDF 8 MB Posted
- Solicitation number
- 36C25522R0079
About this file
This solicitation is for a firm fixed-price construction contract to install new boilers in Building 13 at the Robert J. Dole VA Medical Center in Wichita, Kansas. The work includes demolishing existing boilers and associated equipment; installing two new high-efficiency natural gas-fired boilers, a new fuel oil system, steam and condensate piping, HVAC equipment and controls; and related mechanical, electrical and structural work. The period of performance is 450 calendar days. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 15. The anticipated award date is September 2022. Pricing is on a lump sum basis. The solicitation is unrestricted and available to all responsible sources.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8
F
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
(TYP.)
CONTROL
ROOM
OFFICE
TOILETBREAK
ROOM
IT
ROOM
BOILER
ROOM
(E) 38FOS & 38FOR REFER TO
DRAWING MP121.02 FOR
CONTINUATION
REFER TO MP101.02
FOR CONTINUATION
10 (E)32PC
IN TRENCH TO REMAIN AS IS
(E)38PC
DOWN TO REMAIN
AS IS
(E)38HPS
TO BLDG 20
IN EXISTING TRENCH
(E)32PC DOWN TO
EXISTING TRENCH.
REFER TO MD111.03 FOR CONTINUATION
EXISTING WATER TREATMENT
EQUIPMENT. REFER TO PLUMBING DRAWINGS
FOR SCOPE.
(E)254HPS DOWN
FROM MAIN LEVEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4
:3
A
M
13-MD111.03
MECHANICAL
DEMOLITION PLAN
SHOP & MAIN LEVELS, PHASE 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 Checker Author0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481 MECHANICAL DEMOLITION PLAN - SHOP & MAIN LEVELS, PHASE 3
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 ONCE THE FUEL-OIL (FOS/FOR) PIPING FROM THE EXISTING UNDERGROUND TANKS HAS BEEN
EXTEND TO NEW FUEL-OIL EQUIPMENT IN THE NEW BOILER PLANT. THE EXISTING FUEL-OIL
PUMPS SHALL BE DISCONNECTED AND REMOVED.
2 ONCE NEW BOILERS ARE OPERATIONAL THE EXISTING BOILERS SHALL BE DECOMMISSIONED,
DISCONNECTED AND REMOVED
3 EXISTING DEAERATOR AND CONDENSATE TANKS SHALL BE DISCONNECTED AND REMOVED IN ITS
ENTIRETY.
4 EXISTING STEAM PIPING WITHIN EXISTING BOILER PLANT SHALL BE DISCONNECTED AND
REMOVED AS INDICATED ON THE DRAWINGS.
5 CONTRACTOR SHALL DISCONNECT AND REMOVED EXISTING HVAC FOR EXISTING CONTROL ROOM, RESTROOM AND OFFICE INCLUDING EQUIPMENT, CONTROLS, DUCTWORK, HANGERS, SUPPORTS, AIR DEVICES, AND ASSOCIATED PIPING, VALVES, ETC. IN ITS ENTIRETY.
6 EXISTING HPS AND PC TO/FROM BUILDING 20 THRU EXISTING PIPE TRENCH TO REMAIN AS IS.
7 TEMPORARY NATURAL GAS MAIN TO BE PURGED AND DISCONNECTED AND REMOVED. CAP PIPE.
8 DISCONNECT AND REMOVE ALL EXISTING UNIT HEATER AND ASSOCIATED PIPING.
9 DISCONNECT AND REMOVE EXISTING 127 HPS WITHIN EXISTING BOILER PLANT.
10 EXISTING LPG TANK AND ENCLOSURE TO REMAIN AS IS. REFER TO DRAWING MP604 FOR
ADDITIONAL DETAILS.
11 EXISTING NATURAL GAS PIPING FEEDING THE EXISTING BOILERS AMD DOMESTIC HOT WATER
HEATER TO BE PURGED AND DISCONNECTED AND REMOVED.
12 EXISTING SUMP PUMP. REFER TO PLUMBING DRAWINGS FOR SCOPE.
13 DISCONNECT AND RELOCATE SHOP AIR COMPRESSOR. REFER TO DRAWING MP111.03 FOR NEW
LOCATION.
14 EXISTING 102 DIA HPS SHALL BE DISCONNECTED AND REMOVED. REFER TO DETAIL 9 ON
DRAWING M-502 FOR ADDITIONAL DETAILS.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.
5. ALL VALVE HANDLES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE
LOCATION WITH ALL TRADES.
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
BOILER
ROOM
M-18
STORAGE
C-1
DN. TO
BLDG 20
38HPS
PHASE 2
(E)102 NATURAL GAS LINE
UP FROM BELOW
(E)38HPS
(E)38PC 1
(E)38HPS
INSTALLED IN PHASE 2
254HPS
TO REMAIN AS IS
(E)38PC DN.
(E)19LPG
(E)38HPS
(E)19LPG DN.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4
:1
A
M
13-MD121.03
MECHANICAL
DEMOLITION PLAN
EX CATWALK & CATWALK LVLS, PH 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481
MECHANICAL DEMOLITION PLAN - EXISTING CATWALK & CATWALK
LEVELS, PHASE 3
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 EXISTING UTILITY RACK TO REMAIN AS IS. PROTECT DURING CONSTRUCTION.
2 EXISTING STEAM PIPING IN EXISTING BOILER PLANT TO BE DEACTIVATED, DISCONNECTED AND
REMOVED.
3 EXISTING BOILER STACK TO BE DISCONNECTED AND REMOVED.
4 CONTRACTOR SHALL DISCONNECT AND REMOVED EXISTING HVAC FOR EXISTING CONTROL ROOM, RESTROOM AND OFFICE INCLUDING EQUIPMENT, CONTROLS, DUCTWORK, HANGERS, SUPPORTS, AIR DEVICES, AND ASSOCIATED PIPING, VALVES, ETC. IN ITS ENTIRETY.
5 EXISTING 254 DIA HPS DOWN TO LOWER LEVEL TO REMAIN AS IS. EXISTING CONDENSATE DRIP
TRAP PIPING TO BE CONNECTED INTO NEW CONDENSATE SYSTEM. REFER TO DETAIL 8 ON
DRAWING M-502.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
PHASE 2
(E)DUCT
GOOSENECK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4
:1
A
M
13-MD131.03
MECHANICAL
DEMOLITION PLAN
ROOF, PHASE 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481 MECHANICAL DEMOLITION PLAN - ROOF, PHASE 3
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 DISCONNECT AND REMOVE EXISTING ROOF MOUNTED EXHAUST FANS, STEAM SILENCER, BOILER
EXHAUST STACKS AND ALL STEAM VENT PIPING AND ASSOCIATED SUPPORTS. FILL IN ALL
ROOF OPENINGS AND PATCH ROOF. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS
FOR DETAILS.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
1 2 3 4 5 6
H
K
D
C
B
A
E
E1 E2 E3 E5 E6 E7
J
G
EXISTING
PUMP ROOM
B-1
PHASE 2
REFER TO ROOM STORAGE
B-2 ABOVE THIS AREA.
REF. PLAN THIS SHEET
NEW PUMP
ROOM
B-4
CO
CO
(E)FIRE MAIN
TO REMAIN AS IS
C
B
A
E5 E6
STORAGE
B-2
305x152
SG-1
94 L/s
102x305UP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4
:1
A
M
13-MH101.03
MECHANICAL
DUCTWORK PLAN
TUNNEL & BSMT LEVELS, PHASE 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481 DUCTWORK PLAN - TUNNEL & BASEMENT LEVELS, PHASE 3
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
SCALE: 1 : 482 DUCTWORK PLAN - STORAGE B-2, PHASE 3
SHEET KEYNOTES:
1 MOUNT CO DETECTORS 1372 AFF. CONFIRM QUANITY AND LOCATION OF SENSORS W/ GAS
DETECTION VENDOR TO ENSURE COMPLETE COVERAGE.
R E
F
13-M-301
1 2 3 4 5 6 7 8
F
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
13-FOM-1
CONTRACTOR
TOUCHDOWN
M-6
TOILET
M-2
TOILET
M-1
PASSAGE
M-7
LOCKER
ROOM
M-3
EQUIPMENT
M-19
SHOWER
ROOM
M-4
BREAK
AREA
M-5
13-RO-01
CD-4
142 L/s
CD-4
142 L/s
CD-1
71 L/s
CD-1
71 L/s
ER-2
24 L/s
ER-3
83 L/s
CD-2
94 L/s
ER-1
47 L/s
ER-1
59 L/s
CD-3
47 L/s
CD-3
35 L/s
PHASE 2
13-M-301
CO NG
T
13-AC-4
ER-1
24 L/s
RG-3
295 L/s
T
13-UH-12/13
T13-EF-3/4
13-M-305
13-TNK-03
13-TNK-04
13-TNK-05
13-TNK-06
102x305
SA
UP/DN
RG-3
295 L/s
REFER TO SHEET
13-MH121.03 FOR
DUCTWORK PLAN ABOVE.
T
13-UH-10/11
CO 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4
:4
A
M
13-MH111.03
MECHANICAL
DUCTWORK PLAN
SHOP & MAIN LEVELS, PHASE 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481 DUCTWORK PLAN - SHOP & MAIN LEVELS, PHASE 3
SHEET KEYNOTES:
1 MOUNT CO DETECTORS 1372 AFF. CONFIRM QUANITY AND LOCATION OF SENSORS W/ GAS
DETECTION VENDOR TO ENSURE COMPLETE COVERAGE.
2 MOUNT NATURAL GAS DETECTOR 305 BELOW CEILING. CONFIRM QUANITY AND LOCATION OF
SENSORS WITH GAS DECTECTION VENDOR TO ENSURE COMPLETE COVERAGE.
3 INSTALL THERMOSTAT 1321 AFF.
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
13-M-301
1 2 3 4 5 6 7 8
F
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
BOILER
ROOM
M-18
STORAGE
C-1
305x305 OA
UP TO 13-
GRV-6
457x305
152Ø
152Ø
305x305 EA UP
TO 13-GRV-7
152x152
PHASE 2
13-M-301
13-UH-11
13-UH-10
305x305
203Ø
SA UP TO
13-SF-3
762x762
UP TO
13-EF-4
13-ERV-2
864x203
762x762
EA UP TO
13-EF-3
914x914
SA UP TO
13-SF-4
914x914
152x152
152x152
U P
13-M-305
152x152
152x203
203x203
13-AC-4
914x406
SG-2
1055 L/s
660Ø 508Ø
660Ø508Ø
Ø
Ø
914x406
SG-2
1055 L/s
TYP(3)
TYP(3)
254x254 x x
Ø
Ø
SAOA
RA EA
(N)RS/RL
(N)19CD
ON MEZZ. PLATFORM,
HUNG FROM ABOVE
305x102
MEZZANINE ABOVE
CONTRACTOR TOUCHDOWN AREA
13-UH-12
13-UH-13
102x305
SA DN
(N)RS/RL
FC
FC
19CD
REFER TO SHEET
13-MH111.03 FOR AIR
DEVICE CONNECTIONS
BELOW.
13-ACCU-4
ON LOW ROOF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:0
:5
A
M
13-MH121.03
MECHANICAL
DUCTWORK PLAN
EX CATWALK & CATWALK LVLS, PH 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481 DUCTWORK PLAN - EXISTING CATWALK & CATWALK LEVELS, PHASE 3
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 19 DIA CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM 1%.
ROUTE DOWN TO MOP SINK. TERMINATE WITH AIR GAP.
2 REFRIGERANT PIPING (SUCTION & LIQUID) UP THRU ROOF PIPE PORTAL. PROVIDE SEPARATE
BOOT FOR EACH PIPE. ROUTE PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE SUPPORTS
AS REQUIRED.
3 MAINTAIN LADDER ACCESS CLEARANCE TO EXISTING ROOF HATCH ABOVE.
4 GENERATOR EXHAUST MUFFLER.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
1 2 3 4 5 6
H
K
D
C
B
A
E
E1 E2 E3 E5 E6 E7
J
G
EXISTING
PUMP ROOM
B-1
(E) 254HPS DOWN
FROM MAIN LEVEL
51FOS
51FOR
19FOS/FOR
51FOS
51FOR
PHASE 2
REFER TO DRAWINGS
MP101.03, MP604 & MP605
FOR ADDITIONAL DETAILS
102PC
(E)38PC
EXISTING 254HPS
51PC
REFER TO DETAIL 9
ON DRAWING MP502
REFER TO 2/MP101.03
FOR CONTINUATION
(E)FUEL OIL
PIPING
D
C
B
A
E
E5 E6
13-FOM-1
STORAGE
B-2
RELOCATED SHOP
AIR COMPRESSOR
REFER TO DRAWINGS
MP101.03, MP605 & MP606
FOR PIPING DETAILS
REFER TO
DRAWING MP101.03
FOR PIPING
254HPS DOWN
FROM MAIN LEVEL
38FOR
38FOS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4
:1
A
M
13-MP101.03
MECHANICAL
PIPING PLAN
TUNNEL & BSMT LEVELS, PHASE 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481 PIPING PLAN - TUNNEL & BASEMENT LEVELS, PHASE 3
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 INSTALL NEW FUEL-OIL FILTRATION SKID. PROVIDE 152 HIGH CONCRETE HOUSEKEEPING PAD.
2 INSTALL NEW 38FOS & 38FOR THROUGH STORAGE AREA. KEEP PIPING TIGHT TO BOTTOM
STRUCTURE ABOVE.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
5. ALL VALVE HANDLES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE
SCALE: 1 : 482 PIPING PLAN - STORAGE B-2, PHASE 3
R E
F
1 2 3 4 5 6 7 8
F
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
13-FOM-1
CONTROL
ROOM
M-8
BOILER
ROOM
M-18
CONTRACTOR
TOUCHDOWN
M-6
TOILET
M-2
TOILET
M-1
PASSAGE
M-7
LOCKER
ROOM
M-3
EQUIPMENT
M-19
SHOWER
ROOM
M-4
BREAK
AREA
M-5
PHASE 2
REFER TO DRAWING
MP605 & MP606
FOR PIPING DETAILS
CONTROL
ROOM
M-8
REFER TO
2/MP101.03
FOR PIPING
(E)38HPS
TO BLDG 20
(E)32PC
FROM BLDG 20
(E)38HPS
FROM ABOVE
(E)32PC DOWN TO
EXISTING TRENCH.
REFER TO MD111.02 FOR CONTINUATION
REFER TO 2/MP101.03
FOR CONTINUATION
(E)254HPS
UP/DN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4
:1
A
M
13-MP111.03
MECHANICAL
PIPING PLAN
SHOP & MAIN LEVELS, PHASE 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481 PIPING PLAN - SHOP & MAIN LEVELS, PHASE 3
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 INSTALL NEW FUEL-OIL FILTRATION SKID. PROVIDE 152 HIGH CONCRETE HOUSEKEEPING PAD.
2 REFER TO MH SERIES DRAWINGS FOR GAS DETECTION SENSOR LOCATIONS.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
BOILER
ROOM
M-18
STORAGE
C-1
38HPS
38HPS
(E)254DIA. HPS DN.
(SOUTH TUNNEL)
PHASE 2
51HPS DOWN
REFER TO DRAWING
MP111.02 FOR CONTINUATION
(E)38HPS
TO BUILDING 12
(E)38PC
13-UH-11
13-UH-10
(E)38 PC DOWN
REF. MP111.03
ON MEZZ. PLATFORM
HUNG FROM ABOVE
19LPR
19HPS
25LPR (E)38HPS
PLATFORM ABOVE
CONTRACTOR
TOUCHDOWN AREA
(E)254HPS
13-AC-4
254HPS DOWN
13-UH-12
13-UH-13
32LPS
19LPS
19LPR
19LPG
32LPS 25LPR
19LPG
13-ACCU-4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4
:1
A
M
13-MP121.03
MECHANICAL
PIPING PLAN
EX CATWALK & CATWALK LVLS, PH 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481 PIPING PLAN - EXISTING CATWALK & CATWALK LEVELS, PHASE 3
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
13-M-301
1 2 3 4 5 6 7 8
F
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
13-M-301
13-GRV-7
PHASE 2
EXISTING
ROOF ACCESS HATCH
13-EF-3 13-EF-4
13-SF-4
13-SF-3
13-M-305
13-GRV-8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4
:4
A
M
13-M-131.03
MECHANICAL
NEW WORK PLAN
ROOF, PHASE 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481 MECHANICAL NEW WORK PLAN - ROOF, PHASE 3
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.
MAIN LEVEL
CATWALK LEVEL
UPPER ROOF -
LOW POINT
12060
FHK DJ G
13-GRV-2
254 DIA.
MAIN STEAM HEADER
76FWPD
76FWPD
203HPS 13-FHX-2
13-UH-2
76NG
152SV
152SV
38 FOS
38 FOR
76HPS
254 HPS
BYPASS LINE 38HPS
BOILER STACK
MIN. 3048 ABOVE ROOF.
51FWPD
DOUBLE CONE
RAIN CAP
NATURAL GAS
TRAIN VENTS
BOILER
ROOM
M-18
13-SF-1
(N)25SBO
609 DIA.
BOILER FLUE
STACK
19LPR
102PC
203HPS
6 (TYP.)
x
13-B-2
19LPS
SHOP LEVEL
TUNNEL LEVEL
-1829
INTERMEDIATE
ROOF PARAPET
MAIN LEVEL
CATWALK LEVEL
E5 E6
E7
51FOS
51FOR
EXISTING ROOF STRUCTURE
(E) 254 HPS
(E)152FIRE
NEW 101 PC
(E)CONDENSATE PUMP
(E)CONDENSATE RECEIVER
BREAK
ROOM
BATH
ROOM
EXISTING
PUMP ROOM
13-1
SHOP LEVEL
INTERMEDIATE
ROOF - HIGH
POINT
MAIN LEVEL
E3 E4
EQUIPMENT
M-19
13-SF-3
914x914
13-UH-12
19LPS
19LPR
SHOP LEVEL
INTERMEDIATE
ROOF - LOW
POINT
E3 E4
13-SF-4
914x914
EQUIPMENT
M-19
13-UH-1319LPS
19LPR
762Ø
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4
:4
A
M
13-M-301
MECHANICAL
SECTIONS
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 MH GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481 MECHANICAL SECTION @ BOILER 2
SCALE: 1 : 482 PHASE 2 - HPS CONNECTION TO SOUTH LOOP
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 COORDINATE ROUTING OF NEW FUEL OIL PIPING IN LOWER LEVEL WITH EXISTING CONDITIONS
AND ALL TRADES.
2 EXTEND EXISTING 102 CONDENSATE PIPE (PC) TO NEW PUMP ROOM. PIPING TO BE INSTALLED
IN PHASE 2. KEEP PIPE AS CLOSE TO WALL AS POSSIBLE, COORDINATE ROUTING WITH
EXISTING CONDITIONS.
3 GAS TRAIN VENTS UP THROUGH ROOF. VENTS MUST BE A MINIMUM OF 3048 FROM ANY
INTAKES. SIZE VENTS PER SCHEDULE ON DETAIL #2 ON DRAWING MP504.
4 REFER TO DETAIL 2 ON DRAWING M-504 FOR ADDITIONAL GAS TRAIN DETAILS.
5 REFER TO DETAIL 2 ON DRAWING M-502 FOR ADDITIONAL INFORMATION.
6 INSTALL NEW PIPE ANCHOR ATTACHED TO FOUNDATION WALL. REFER TO DETAIL 15 ON
STRUCUTRAL DRAWING S-502.
SCALE: 1 : 483 SECTION SUPPLY FAN DUCT RISER
SCALE: 1 : 484 SECTION - SUPPLY FAN DUCT RISER
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.