This document provides details for a federal contract solicitation to install new boilers at a VA medical center in Wichita, Kansas. The solicitation number is 36C25522R0079 and is seeking bids to install new boilers in Building 13 at the Wichita VA Medical Center. The opportunity is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. Bids are due based on the attached bid drawings and specifications, which include mechanical drawings and specifications for the new boiler installation. The contract would involve removing the existing boilers and replacing them with new models, including all necessary mechanical and control systems.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL ABBREVIATIONS
& SYMBOLS
M-001
GDSJJM
2 3
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
NO. DESCRIPTION DATE
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0121
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
100% BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANTS INSTALL NEW BOILERS IN
BUILDING 13
589A7-18-302
Project Director
2021-09-03
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
U E
G G G G G G G
W W W
W
W
W W
W W
W W
W W
W
W
WW W W W W W W W
W W
W W
W W
W W
W
W
W W W W W W W W W
W W W W W W W W W W W
W W
W W
W
W
W
W W
W
W W
CITY R.O.W.
U E
W W
W W
W
W W W W W W W W W W W W W W
W W
G G
G G G
W
W
W
W W W
W
F F
F W
W
W
W
W
W
W W
G
G G G G G G G G G G
G
G
G G G G G G G G G G G
G
G
BUILDING 13BUILDING 20
BUILDING 11
BUILDING 12
BUILDING 10 BUILDING 16
PROPOSED BUILDING ADDITION
BUILDING 17
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
NO. DESCRIPTION DATE
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0121
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
100% BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANTS INSTALL NEW BOILERS IN
BUILDING 13
589A7-18-302
Project Director
2021-09-03
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
ENERGY CMPLX
20 12
34, 34A
1B
2A
5B
1A
7A
1C
5A
3A
KEYPLAN
MECHANICAL
SITE PLAN
MS101
GDSMH
EXISTING BUILDING 20
PROPOSED BUILDING 13 ADDITION
EXISTING BUILDING 13
W W
W W
W W
W W
W W
W
W W W W W W W W W W
G G
G G
G G G G G G
W
W
W W W W W W W
W W
W
W
F F
F F
F F
F
W
W W
W W
W W
W
W
W
W W
W
W
W
W
W
W W
W W
W
G
G G G G G G G G G G G
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
NO. DESCRIPTION DATE
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0121
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
100% BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANTS INSTALL NEW BOILERS IN
BUILDING 13
589A7-18-302
Project Director
2021-09-03
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
20 12
34, 34A
1B
2A
5B
1A
7A
1C
5A
3A
MECHANICAL SITE
STEAM TRENCH
ARRANGMENT PLAN & SECTION
MS102
GDSAP
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
NO. DESCRIPTION DATE
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0121
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
100% BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANTS INSTALL NEW BOILERS IN
BUILDING 13
589A7-18-302
Project Director
2021-09-03
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
20 12
34, 34A
1B
2A
5B
1A
7A
1C
5A
3A
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
NO. DESCRIPTION DATE
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0121
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
100% BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANTS INSTALL NEW BOILERS IN
BUILDING 13
589A7-18-302
Project Director
2021-09-03
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
20 12
34, 34A
1B
2A
5B
1A
7A
1C
5A
3A
3-UH-1(E)
RCP(D)
RCP(D)
T
T
T
3-CV-1(E)
3-CV-1(E)
3-UH-1(E)
T
(E)3/4"HWS & HWR UP
CD(E)
CD(E)
TYP(2)
TYP(2)
(D)10"Ø
(D)8"Ø
(D)8"Ø
(E)10"Ø
3-ACCU-1
EQUIPMENT
102-A3
3-UH-1(E)
T
3-CV-1(E)
(E)10"Ø
T
T
(N)RS/RL DN
CD-2
150 CFM
8"Ø
8"Ø
(E)3/4"HWS & HWR UP
CO
3-CV-1(E)
3-UH-1(E)
CD-2
150 CFM
CD(E)
CD(E)
CFM
(N)3/4"PC
3-AC-1
3-AC-1
14x12
3-ACCU-1A
03-AC-1A
3/4"PC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:3 :1
A
M
03-M-111
MECHANICAL
BUILDING 3
SECURITY EQ. CLOSET
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP MK0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 MECHANICAL DEMOLITION PLAN - FIRST FLOOR
SCALE: 1/4" = 1'-0"2 MECHANICAL NEW WORK PLAN - FIRST FLOOR
SHEET KEYNOTES:
1 DISCONNECT AND REMOVE EXISTING RADIANT CEILING PANEL, ASSOCIATED PIPING, VALVES, CONTROLS, THERMOSTAT. REMOVE PIPING BACK TO RESPECTIVE MAINS. PROVIDE BALL VALVES
WITH CAPS/PLUGS.
2 DISCONNECT AND REMOVE AIR DEVICE AND ASSOCAITED SUPPLY BRANCH DUCTWORK BACK TO
POINT SHOWN FOR CONNECTION IN NEW WORK.
3 3/4" DIA CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM 1/8
INCH PER FOOT. ROUTE TO NEW INDIRECT WASTE DRAIN ABOVE CEILING IN TOILET 109A-3.
TERMINATE TO SANITARY DISCHARGE WITH AIR GAP.
4 PROVIDE 6" CONCRETE EQUIPMENT PAD ON GRADE. REFER TO MECHANICAL DETAIL FOR
ADDITIONAL INFORMATION.
5 REFRIGERANT PIPING (SUCTION & LIQUID) THRU WALL SLEEVE ABOVE CEILING. ROUTE PER
MANUFACTURER'S RECOMMENDATIONS. PROVIDE SUPPORTS AS REQUIRED. SEAL WEATHERTIGHT.
6 REBALANCE EXISTING TERMINAL REHEAT UNIT TO AIRFLOW INDICATED.
7 CONTRACTOR SHALL PROVIDE (N+1) COMPLETE HVAC SYSTEMS FOR SECURITY EQUIPMENT
ROOM 102-X.
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
5. ALL VALVE HANDLES LOCATED GREATER THAN 7'-0" ABOVE ANY WALKING SURFACE
SHALL BE FITTED WITH A CHAIN WHEEL OPERATOR AND CHAIN. PROVIDE HOOKS TO
STORE CHAIN IN SUITABLE LOCATION.
1 2 3 4 5 6
H
K
D
C
B
A
E
E1 E2 E3 E5 E6 E7
EXISTING
PUMP ROOM
13-1
J
G
NEW PUMP
ROOM
B-3
13-M-301
PHASE 3
13-M-303
13-CRU-1
10x20
EA UP
OED W/WMS
1200 CFM CO
CO
13-BDT-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4 :2
A
M
13-MH101.02
MECHANICAL
DUCTWORK PLAN
TUNNEL & BSMT LEVELS, PHASE 2
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 DUCTWORK PLAN - TUNNEL & BASEMENT LEVELS, PHASE 2
GENERAL SHEET NOTES:
1 MOUNT CO DETECTORS 4'-6" AFF. CONFIRM QUANITY AND LOCATION OF SENSORS W/ GAS
DETECTION VENDOR TO ENSURE COMPLETE COVERAGE.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
SHEET KEYNOTES:
R
F
1 2 3 4 5 6 7 8
F
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
13-FHX-1 13-FHX-2 13-FHX-3
13-CS-1
13-DA-1
EQUIPMENT
ROOM
M-17
CORRIDOR
M-16
GENERATOR
ROOM
M-15
TRANSFORMER
ROOM
M-14
I.T. ROOM
M-12
ELECTRICAL
M-13
OFFICE
M-9
SECURITY
M-10
HAC
M-11
CONTROL
ROOM
M-8
BOILER
ROOM
M-18
13-FWP-1
13-FWP-2
13-FWP-3
IT
TYP(3)
EA DN/UP
TO 13-EF-5
20x6
SG-1
430 CFM
x x
RG-1
225 CFM
CD-2
225 CFM
CD-2
225 CFM
13-DT-1
PHASE 3
RG-2
450 CFM
13-FOP-3/4
13-FOP-1/2
CD-2
225 CFM
13-CTP-2
13-CTP-1
24x14
CO CO CO2 2
18x18
SG-2
1300 CFM
18x18
SG-2
1300 CFM
28x20 SA
DUCT UP
18x18
SG-2
1300 CFM
18x18
SG-2
1300 CFM
24x24
SG-2
2400 CFM
BOD
10'-6"
AFF
BOD 8'-0"
AFF
TYP
16x8
8"Ø
8"Ø
T
13-UH-7
HUNG FROM
STRUCTURE ABOVE
13-L-1
T
T
13-UH-8
13-AC-3
TD OED
W/WMS
ER-2
150 CFM
13-BAC-01
13-UH-8
13-EF-7
13-AC-1
T
T
13-AC-2
10x20
8"Ø
CD-2
225 CFM
(BELOW)
(BELOW)
(BELOW)
(BELOW)
(BELOW)
UP TO
13-EF-7
20x6
SG-1
400 CFM
T
T
13-UH-9
13-RTU-1
ATC
FD
EA UP/DN
13-UH-9
T 13-RTU-1
24x12
24x12
RG-4
1200 CFM
RG-2
225 CFM
13-AC-2
14x12
20x6
RG-4
FD
FD
14x12
BOD 8'-0"
AFF
28x20 SA UP/DN
SA UP
13-AC-1
8x6
RG-4
10x6
8x8
DN
18x8
UP
UP 8x8 RA DN TO RG
12x12
8"Ø
T T13-UH-1/2 13-UH-3/4
28x20
28x20
SA UP
TYP
48x84
OA UP
TO
13-GRV-4
12x12
FC
FC
FC
SD
13-M-305
RA UP
RL/RS
7CO
RL/RS 1
x
3/4"CD
3/4"CD
RL/RS
8x8
8x6 x
EA UP TO
13-GRV-6
8x8
8x8 OA DN. FROM
13-GRV-5
UP
8x6
OVERHEAD DOOR
42x10
OED
WMS
14x24
SA UP
16x18
13-ERV-1
SA OA
RA EA
13-AC-1A
13-AC-2A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4 :4
A
M
13-MH111.02
MECHANICAL
DUCTWORK PLAN
SHOP & MAIN LEVELS, PHASE 2
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 DUCTWORK PLAN - SHOP & MAIN LEVELS, PHASE 2
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 INSTALL NEW TEMPORARY 4" DIA NATURAL GAS PIPING IN PHASE 1. REFER TO CIVIL
DRAWINGS FOR CONTINUATION. NATURAL GAS PIPE TO BE A MINIMUM OF 24" BELOW RAMP
FOOTINGS, COORDINATE WITH STRUCTURAL DRAWINGS.
2 MOUNT CO DETECTORS 4'-6" AFF. CONFIRM QUANITY AND LOCATION OF SENSORS W/ GAS
DETECTION VENDOR TO ENSURE COMPLETE COVERAGE.
3 BOTTOM OF DUCTWORK AND SUPPLY GRILLE SHALL BE MOUNTED MINIMUM 8'-0" AFF. DIRECT
SUPPLY GRILLE AIR DOWNWARD 45 DEG. TOWARD FLOOR.
4 3/4" DIA CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM 1/8
INCH PER FOOT. ROUTE DOWN TO MOP SINK. TERMINATE WITH AIR GAP.
5 TRANSITION DUCTED LOUVER CONNECTION TO NEW GENERATOR PER MANUFACTURER'S
RECOMMENDATIONS. FILED VERIFY OFFSET AND FINAL DIMENSIONS. REFER TO CONTROLS DETAIL
FOR ADDITIONAL INFORMATION.
6 PROVIDE NEW ATC PANEL WITH DEDICATED POWER THIS LOCATION. REFER TO ELECTRICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
7 REFRIGERANT PIPING (SUCTION & LIQUID) UP THRU ROOF PIPE PORTAL. PROVIDE SEPARATE
BOOT FOR EACH PIPE. ROUTE PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE SUPPORTS
AS REQUIRED.
8 BOTTOM OF DUCT TO BE 6 INCHES ABOVE THE TOP OF THE OVERHEAD DOOR.
9 INSTALL THERMOSTAT 52" AFF.
10 CONTRACTOR SHALL PROVIDE (N+1) COMPLETE HVAC SYSTEMS FOR SECURITY M-10 AND IT
ROOM M-12.
11 GENERATOR EXHAUST MUFFLER.
12 GENERATOR EXHAUST DISCHARGES UP. REFER TO DETAIL 12 ON DRAWING M-503. REFER TO
STRUCTURAL DRAWINGS FOR SUPPORT DETAILS.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
5. ALL VALVE HANDLES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE
LOCATION WITH ALL TRADES.
1 2 3 4 5 6 7
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
13-M-301
13-M-302
STORAGE
13-42
BOILER
ROOM
M-18
13-CS-1
13-DA-1
13-UH-5
13-UH-1 13-UH-2 13-UH-3
13-UH-4
13-FHX-1
13-FHX-2
13-FHX-3
13-UH-6
13-M-303
PHASE 3
13-M-302
13-M-304
13-M-304
(ABOVE
PLATFORM)
NG
NG
CO
20x28 30x30 20x28 x
20x28 DN
DN28x20
28x20
DN
CO
10x20
DN
T13-UH-6
13-EF-1
VFD
T
42x42 SA UP 42x42
13-SF-1
VFD
13-SF-2
VFD
13-EF-2
VFD
24x24
SG-2
2400 CFM
SA UP
T
12x12
EA UP TO
13-EF-5
13-M-305
24x24
SG-4
2400 CFM
18x18
SG-12
1300 CFM
18x18
SG-9
1300 CFM
28x20 DN
18x18
SG-2
1300 CFM
18x18
SG-2
1300 CFM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4 :1
A
M
13-MH121.02
MECHANICAL
DUCTWORK PLAN
EX CATWALK & CATWALK LVLS, PH 2
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 DUCTWORK PLAN - EXISTING CATWALK & CATWALK LEVELS, PHASE 2
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 MOUNT CO DETECTORS 4'-6" AFF. CONFIRM QUANITY AND LOCATION OF SENSORS
W/ GAS DETECTION VENDOR TO ENSURE COMPLETE COVERAGE.
2 MOUNT NATURAL GAS DETECTOR 12" BELOW CEILING. CONFIRM QUANITY AND
LOCATION OF SENSORS WITH GAS DECTECTION VENDOR TO ENSURE COMPLETE
COVERAGE.
3 INSTALL CO DETECTS AT BREATHING LEVEL ABOVE THE NEW CATWALK. CONFIRM
QUANITY AND LOCATION OF SENSORS WITH GAS DECTECTION VENDOR TO ENSURE
COMPLETE COVERAGE.
4 COORDINATE ROUTING OF DUCTWORK WILL ALL TRADES.
5 PROVIDE 3" DIA INTAKE AND EXHAUST CPVC PIPE CONNECTIONS TO 4" DIA CPVC
CONCENTRIC VENT KIT FOR NEW CONDENSING HOT WATER HEATER. ROUTE AND
INSTALL PER HOT WATER HEATER MANUFACTURER'S RECOMMENDATIONS AND
INTERNATIONAL FUEL GAS CODE. EXTEND THRU ROOF MINIMUM 12". TERMINATE
WITH RAIN CAP.
6 REFER TO SHEET 13-M-131.02 FOR ROOF PLAN NEW WORK THIS AREA.
7 INSTALL THERMOSTAT 52" AFF.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
1 2 3 4 5 6
H
K
D
C
B
A
E
E1 E2 E3 E5 E6 E7
J
G
13-M-301
13-M-303
EXISTING
PUMP ROOM
13-1
NEW PUMP
ROOM
B-3
4" PC UP
6"SV UP
2" BD
DOWN FROM
MAIN LEVEL
PIPING IN BOILER
ROOM TRENCH
REFER TO DRAWING
MP111.02 FOR CONTINUATION
2"FOR
2"FOS
3"PC
PHASE 3
(E)10"HPS DOWN
FROM MAIN LEVEL
(E)4"HPS
(E)4"CR
2"FOS
4"PC
2"FOR
(E)3/4"FOS/FOR
2"FOS
2"FOR
(E) 1-1/2"FOS & 1-1/2"FOR
REFER TO DRAWINGS
MP121.02, MP604 & MP605 FOR
ADDITIONAL DETAILS
(E)8"HPS DOWN FROM
MAIN LEVEL
REFER TO MP101.03
FOR SCOPE OF WORK
REFER TO DRAWINGS
MS101, MS102
& CIVIL DRAWINGS FOR
CONTINUATION
8"HPS DOWN
FROM MAIN LEVEL
3"PC
3"V
3"V UP
1 1/2"PC
2"PC
13-CRU-1
(E)10"HPS
4"PC
4"PC
(E)8" FP MAIN
TO REMAIN AS
REFER TO DETAIL 9
ON DRAWING M-502
FOR PIPING DETAILS IN
THIS AREA
1 1/2"FOS
1 1/2"FOR
5"V UP
5"V UP
6"SV
4"PC
1 1/2"FOS
1 1/2"FOR
5"HPS
STEAM TRAP
8"HPS
(E)3/4"FOS/3/4"FOR
2"FOS
2"FOR
TO EMERGENCY
GENERATOR
DRIP LEG
5"PC 5"PC
5"PC
13-BDT-1
2"BD
4" OFL
DOWN FROM
MAIN LEVEL
4"OFL PIPING
IN TRENCH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C T e m p \R
E V
IT
B A
K \0
-0
-W ic h it a
B o ile rs
-M E
P -C
E N
T R
A L
-R
H
W R y a n J r.
rv t
/2
/2
:0
:0
P M
13-MP101.02
MECHANICAL
PIPING PLAN
TUNNEL & BSMT LEVELS, PHASE 2
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 PIPING PLAN - TUNNEL & BASEMENT LEVELS, PHASE 2
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
5. ALL VALVE HANDLES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE
LOCATION WITH ALL TRADES.
SHEET KEYNOTES:
1 EXTEND EXISTING 4" CONDENSATE PIPE (PC) TO NEW PUMP ROOM. PIPING TO BE INSTALLED
IN PHASE 2. KEEP PIPE AS CLOSE TO WALL AS POSSIBLE, COORDINATE ROUTING WITH
EXISTING CONDITIONS.
2 CONNECT EXISTING 3/4"FOS & 3/4"FOR TO RELOCATED EMERGENCY GENERATOR. PIPING TO
BE INSTALLED IN PHASE 2. PROVIDE NEW STEEL PIPE SLEEVES & LINK SEAL IN ANNUAL
SPACE. REFER TO ELECTRICAL DRAWING 13-EP101.01 FOR GENERATOR RELOCATION SCOPE.
3 EXISTING 8" DIA HPS SERVING THE NORTH LOOP. REFER TO MPD101.03 FOR SCOPE OF WORK
DETAILS.
4 EXTEND EXISTING CONDENSATE RETURN LINE FROM EXIT OF EXISTING TRENCH AT FOUNDATION
WALL TO NEW 4" CR MAIN.
5 INSTALL NEW 1-1/2" DIA. PC FROM THE BOTTOM OF THE EXISTING PC RISER NEXT TO THE
STAIRS DOWN TO LOWER LEVEL, CONNECT INTO THE EXTENDED 4" PC IN LOWER LEVEL AND
TO PC FROM BUILDING 12. REFER TO DRAWING MP603 FOR ADDITIONAL DETAILS.
6 PIPES THROUGH FOUNDATION WALL. PROVIDE SCH 40 PIPE SLEEVE AND LINK SEAL IN
ANNULAR SPACE. REFER TO DETAIL 6 ON DRAWING M-506.
7 2" FOR DOWN FROM 13-FOP-1/2 TO STORAGE TANKS.
8 2" FOS FROM STORAGE TANKS UP.
9 1-1/2" FOS DOWN FROM 13-FOP-1/2 TO BOILER FUEL OIL LOOP.
10 1-1/2" FOR FROM BOILERS FUEL OIL LOOP UP.
11 4" DIA VALVED TAP FOR FUTURE. PROVIDE BLIND FLANGE.
12 FLOOR ACCESS DOOR ABOVE TO CONTROL ROOM. COORDINATE PIPING TO PROVIDE CLEAR PATH
FOR RIGGING OF EQUIPMENT. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR
ADDITIONAL DETAILS.
13 INSTALL NEW PIPE ANCHOR ATTACHED TO FOUNDATION WALL. REFER TO DETAIL 15 ON
STRUCUTRAL DRAWING S-502.
14 REFER TO MH SERIES DRAWINGS FOR GAS DETECTION SENSOR LOCATIONS.
15 4" OFL TO SEPARATE BLOWDOWN TANK CONNECTION. REFER TO DRAWING MP601 AND MP-603
FOR ADDITIONAL DETAILS.
R
F
1 2 3 4 5 6 7 8
F
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
13-M-301
13-M-302
13-M-303
13-M-303
13-M-302
13-M-304
13-M-304
13-CS-1
13-DA-1
EQUIPMENT
ROOM
M-17
CORRIDOR
M-16
GENERATOR
ROOM
M-15
TRANSFORMER
ROOM
M-14
I.T. ROOM
M-12
ELECTRICAL
M-13
OFFICE
M-9
SECURITY
M-10
HAC
M-11
CONTROL
ROOM
M-8
BOILER
ROOM
M-18
13-FWP-1
13-FWP-2
13-FWP-3
EXISTING
NATURAL GAS TRAIN
CONTROL
ROOM
BREAK
ROOM
BATH
ROOM
IT
ROUTE PIPING ALONG WALL
ON UNISTRUT
2"FOS & 2"FOR DN.
1"FOS/1"FOR
DOWN FROM ABOVE
13-DT-1
6"SV UP FROM
BELOW
6"SV UP TO ROOF
4"PC UP
FROM BELOW
8" HPS UP/DN
5"V UP
FROM BELOW
UP TO ROOF
2"
BFW UP
2"
BFW UP
2"
BFW RISE
UP
3"NG
3"NG
3"
BFW UP
6" SV-1 & SV-2
UP THRU ROOF 6" SV-3 & SV-4
UP THRU ROOF
6" SV-5 & SV-6
UP THRU ROOF
PHASE 3
3"V
UP/DN
13-FOP-3/4
13-FOP-1/2
1 1/2"FOR
1 1/2"FOS
4" TEMPORARY
NAT. GAS UP
13-CTP-2
13-CTP-1
8" HPS DOWN
FROM ABOVE
4"PC DOWN TO
13-CS-1
(SURGE TANK)
4" SV UP
THRU ROOF
PC DOWN
FROM
ABOVE
1-1/2"FOS/
1-1/2"FOR DOWN
FROM ABOVE
6"NG DOWN
TO MAIN LEVEL
3/4" MPC
UP
3/4" LPS
DOWN FROM ABOVE
13-UH-7
2"BD
2"BD2"BD
2"SBO
2"SBO
13-UH-8
13-BAC-01
3/4"MPR
13-AC-1
13-AC-2
1-1/2"FOS & 2"FOR
DN.
(BELOW)
(BELOW)
(BELOW)
(BELOW)
(BELOW)
6 7
13-UH-9
(TYP.)
FUEL OIL PIPING
IN TRENCH
(IN TRENCH)
1 1/2"FOS
1-1/2"FOS/1-1/2"FOR
DOWN TO 13-FOP-3/4
2"BD 2"BD
2"BD
TO DRAIN
3" DAY TANK VENT
UP THRU ROOF
(E)1-1/4"PC
IN TRENCH TO
REMAIN AS IS
4"OFL
DOWN FROM ABOVE
4 4
2"BFW DN. 2"BFW DN.2"BFW DN.
4"BD/OFL
REFER TO
DRAWING MP121.02
FOR CONTINUATION
(TYP.)
(E)LPG UP
(E)LPG
SHUT-OFF
VALVE
(E)LPG
CYLINDER
W/REGULATOR
2"BD
DOWN1717
(TYP.)
13-B-313-B-213-B-1
CO
13-AC-1A
13-AC-2A20
4"OFL
2"BD
2"BD
4"OFL
4"OFL
DOWN FROM ABOVE
4"OFL DOWN
4"OFL DOWN TO TRENCH
EXHAUST MUFFLER
REFER TO MH111.02
FOR ADDITIONAL DETAILS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/3
/2
:2
:4
A
M
13-MP111.02
MECHANICAL
PIPING PLAN
SHOP & MAIN LEVELS, PHASE 2
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 PIPING PLAN - SHOP & MAIN LEVELS, PHASE 2
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 NEW PIPING TRENCH. REFER TO ARCHITECTURAL/STRUCTURAL DRAWINGS FOR DETAILS.
2 INSTALL NEW TEMPORARY 4" DIA NATURAL GAS PIPING IN PHASE 1. REFER TO CIVIL
DRAWINGS FOR CONTINUATION. NATURAL GAS PIPE TO BE A MINIMUM OF 24" BELOW RAMP
FOOTINGS, COORDINATE WITH STRUCTURAL DRAWINGS.
3 CONNECTIONS FOR FUTURE TEMPORARY BOILER. ALL CONNECTIONS SHALL BE PROVIDED WITH
ISOLATION VALVE AND BLIND FLANGE. COORDINATE LOCATION WITH ALL TRADES.
4 GAS TRAIN VENTS UP THROUGH ROOF. VENTS MUST BE A MINIMUM OF 10 FEET FROM ANY
INTAKES. SIZE VENTS PER SCHEDULE ON DETAIL #2 ON DRAWING MP504.
5 NEW 6" UNDERGROUND NATURAL GAS MAIN. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION.
6 6" DIA NATURAL GAS UP.
7 6" DIA MAXON VALVE. REFER TO DRAWING MP604 FOR ADDITIONAL DETAILS.
8 4" TANK SURGE TANK BYPASS CONNECT TO CONDENSATE TRANSFER PUMP SUCTION HEADER.
PROVIDE SEPARATE VALVED PIPE TO DRAIN. REFER TO DRAWING MP603 FOR ADDTIONAL
DETAILS.
9 REFER TO DRAWINGS MP604 & MP605 FOR FUEL OIL FLOW DIAGRAMS.
10 PROVIDE DRIP PAN ELBOW PER DETAIL 8 ON DRAWING M-503.
11 BOILER MASTER CONTROL PANEL.
12 FUEL OIL PIPING IN TRENCH. REFER TO DRAWING MP101.02 FOR CONTINUATION.
13 TEMPORARY 4" NATURAL GAS DOWN FROM ABOVE. REFER TO DRAWING MP121.02. PIPING
INSTALLED IN PHASE 1.
14 INDICATES BOILER CLEARANCE REQUIREMENTS.
15 FLOOR ACCESS DOOR TO NEW PUMP ROOM BELOW. COORDINATE PIPING BELOW TO PROVIDE
CLEAR PATH FOR RIGGING OF EQUIPMENT. REFER TO ARCHITECTURAL AND STRUCTURAL
DRAWINGS FOR ADDITIONAL DETAILS.
16 BOILER SAFETY RELIEF VALVES. REFER TO DRAWING MP601 FOR ADDITIONAL DETAILS.
17 FEEDWATER PIPING UP TO FLUE STACK ECONOMIZER. REFER TO DRAWINGS MP121.02 AND
MP601 FOR ADDTIONAL DETAILS.
18 TEMPORARY WATER TREATMENT SKID. REFER TO PLUMBING DRAWINGS FOR ADDITIONAL
INFORMATIONS.
19 1-1/2"FOS/FOR UP. REFER TO DRAWING MP121.02 FOR CONTINUATION.
20 CONTRACTOR SHALL PROVIDE (N+1) COMPLETE HVAC SYSTEMS FOR SECURITY M-10 AND IT
ROOM M-12.
21 REFER TO MH SERIES DRAWINGS FOR GAS DETECTION SENSOR LOCATIONS.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.
1 2 3 4 5 6 7
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
13-M-301
13-M-301
13-M-302
13-M-303
13-M-303
13-M-302
13-M-304
13-M-304
STORAGE
13-42
BOILER
ROOM
M-18
8" HPS DOWN
TO MAIN LEVEL
4"PC DOWN TO 13-CS-1
(SURGE TANK)
4" SV UP THRU ROOF
13-CS-1
SAFETY RELIEF VALVE
6" SV UP
THRU ROOF
13-DA-1
1 1/2" SV UP
THRU ROOF
3" FWPD
RISER
4" SV UP
THRU ROOF
SAFETY RELIEF VALVE SV-11
REFER TO DETAIL 8/M-503
1/3-2/3 PRV STATION
FOR 13-DA-1
13-UH-5
13-UH-1 13-UH-2 13-UH-3
13-UH-4
6" SV-1 & SV-2
UP THRU ROOF
6" SV-3 & SV-4
UP THRU ROOF
6" SV-5 & SV-6
UP THRU ROOF
UP FROM BOILER
13-B-1
UP FROM BOILER
13-B-2
UP FROM
BOILER
13-B-3
3"NG 3"NG 3"NG
4"HPS
13-FHX-1
13-FHX-2
13-FHX-3
24" STACK UP
THRU ROOF
24" STACK UP
THRU ROOF
24" STACK UP
THRU ROOF
(BYPASS)
3"HPS
1 1/2"HPS
10"HPS
1 1/2"HPS
1 1/2"HPS
13-UH-6
1 1/2"HPS
PHASE 3
6"SV UP FROM
BELOW
6"SV UP TO ROOF
4"PC UP
FROM BELOW
8" HPS DN
1 1/4"LPR
(E)PIPING ON RACK
TO BUILDING 12
3"HPS
1 1/4"LPR
10"HPS
1"LPR
(E)1-1/2"HPS
(E)1-1/2"PC
2"SV UP
FROM CRU-1
4"PC
PC DOWN
TO MAIN LEVEL
1-1/2"FOS/FOR
DOWN TO MAIN LEVEL
2"SV VTR
NEW 4" NATURAL GAS LINE
UP FROM BELOW
13-STS-1
22"HPS
UP THRU ROOF
2"FWPD
1 1/4"LPR
1 1/2"LPR3/4"LPR
3/4"LPR
6"NG
6"NG DOWN
TO MAIN LEVEL
10"HPS
(ABOVE
PLATFORM)
10"HPS DOWN
3"CPTD
3"FWPD
2"FWPD
3"FWPD 2"FWPD
3/4"LPR
NG
DN
DN
3/4" LPR
UP FROM EQUIP.
ROOM
PIPE
RISE
3/4"LPR
PIPING IN
CEILING SPACE
PIPING BELOW
STAIRS
PIPE
RISE
2"V
2"V
(UP)
2"V
1"SBO
1"SBO
12 (TYP)
12(TYP) (TYP)
DN. TO TRENCH
DN. TO TRENCH
2"V
2"V
2"V
6"NG
6"NG
(TYP.)
4"PC
5"V UP FROM
BELOW, VTR
1" NG DOWN TO
13-DHWG-1
13-EF-2
1"NG
(E)1-1/2"HPS DN.
(E)1-1/2"HPS
10"HPS
6"LPS
8"HPS
H P S
6"NG
10"HPS
8"HPS
8"HPS
8"HPS
8"HPS
(TYP.)
8"HPS8"HPS
2"LPS
4"OFL DN.
TO MAIN LEVEL
13-PRV-2
13-SV-11
2"HPS
2"LPS
10"HPS
8"HPS
3/4"LPS
1 1/4"LPS
REFER TO DRAWING MP111.02
FOR CONTINUATION
8"HPS
3/4"LPG
(E)1" LPG
DOWN
4"NG
4"NG DOWN
18 2"V
3"SV UP
THRU ROOF
1 1/2"FOS
1 1/2"FOR
REFER TO SHEET 13-M-131.02
FOR WORK THIS AREA.
2"LPS
1 1/2"LPS
1 1/4"LPS
3"CPTD
(2)
10"HPS
(STACKED)
4"OFL
4"OFL DOWN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C T e m p \R
E V
IT
B A
K \0
-0
-W ic h it a
B o ile rs
-M E
P -C
E N
T R
A L
-R
H
W R y a n J r.
rv t
/2
/2
:0
:1
P M
13-MP121.02
MECHANICAL
PIPING PLAN
EX CATWALK & CATWALK LVLS, PH 2
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 PIPING PLAN - EXISTING CATWALK & CATWALK LEVELS, PHASE 2
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 EXISTING UTILITY RACK TO REMAIN AS IS. PROTECT DURING CONSTRUCTION.
2 CONNECT NEW 1-1/2" DIA HPS TO EXISTING STEAM FEEDING BUILDING 12.
3 CONNECT NEW 1-1/2" HPS TO EXISTING 1-1/2" HPS FEEDING BUILDING 20. COORDINATE
ROUTING WITH EXISTING CONDITIONS.
4 COORDINATE ROUTING OF TEMPORARY 4" DIA. GAS LINE THROUGH EXISTING PLANT WITH
EXISTING CONDITIONS.
5 SLOPE DEARATOR OVERFLOW TO CONDENSATE SURGE TANK. SLOPE 1/8" PER FT.
6 DOWN TO FEEDWATER PUMP SUCTION HEADER. (DEAERATOR BYPASS). REFER TO DRAWING
MP602 FOR ADDITIONAL DETAILS.
7 4"PC (SURGE TANK BYPASS TO DEAERATOR). REFER TO DRAWING MP602 & MP603 FOR
ADDITIONAL DETAILS.
8 4" DIA SURGE TANK BYPASS. REFER TO DRAWING MP603 FOR ADDITIONAL DETAILS.
9 ALL ISOLATION VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE.
10 INSTALL PIPE THROUGH THE WALL INTO THE EXISTING PLANT IN PHASE 2. PROVIDE
TEMPORARY CAP.
11 MOUNT NATURAL GAS DETECTOR 12" BELOW CEILING. CONFIRM QUANITY AND LOCATION OF
SENSORS WITH GAS DECTECTION VENDOR TO ENSURE COMPLETE COVERAGE.
12 1/4" STAINLESS STEEL TUBING CONNECTIONG FOR SAMPLE COOLER LOCATED AT SINK.
13 6" DIA NATURAL GAS PIPE UP FROM BELOW.
14 PROVIDE DRIP PAN ELBOW PER DETAIL 8 ON DRAWING M-503.
15 4" TANK SURGE TANK BYPASS CONNECT TO CONDENSATE TRANSFER PUMP SUCTION HEADER.
PROVIDE SEPARATE VALVED PIPE TO DRAIN. REFER TO DRAWING MP603 FOR ADDTIONAL
DETAILS.
16 NATURAL GAS PRESSURE REGULATOR 10 PSIG TO 12" W.C. FOR 13-DHWG-01. PROVIDE
RELIEF VENT UP THROUGH ROOF.
17 REFER TO PLUMBING DRAWINGS FOR VENTING FOR GAS FIRED DOMESTIC WATER HEATER.
18 GAS TRAIN VENTS UP THROUGH ROOF. VENTS MUST BE A MINIMUM OF 10 FEET FROM ANY
INTAKES. SIZE VENTS PER SCHEDULE ON DETAIL #2 ON DRAWING MP504.
19 PRV STATION FOR DEAERATOR. REFER TO DRAWING MP602 FOR FLOW DIAGRAM.
20 6" DIA VALVED SPARE CONNECTION WITH 300# BLIND FLANGE.
21 STEAM FLOW METER. REFER TO DRAWING MP601 FOR PIPING DETAILS. INSTALL SHALL MEET
THE MANUFACTURERS REQUIREMENTS FOR UPSTREAM AND DOWNSTREAM STRIAGHT PIPE.
22 CONNECT TO EXISTING 10" DIA HPS LINE AT THE ELBOW AT THE TOP OF RISER. WORK TO BE
PERFORMED AFTER THE NORTH LOOP WORK HAS BEEN COMPLETED AND PLACED IN SERVICE.
23 CONTRACTOR SHALL EXTEND THE EXISTING LPG GAS PIPING, AS INDICATED ON THE PLANS IN
THE EXISTING BOILER PLANT TO NEW BOILERS. REFER TO DETAIL 2 ON DRAWING MP604 FOR
ADDITIONAL DETAILS. ALL LPG PIPING SHALL MEET ALL NFPA 58 REQUIREMENTS. COORDINATE
ROUTING WITH EXISTING CONDITIONS.
24 ALL MAIN STEAM VALVES TO HAVE 1" BYPASS LINE WITH GLOBE VALVE FOR WARM-UP. NOT
SHOWN FOR CLARITY.
25 1-1/2"FOS/FOR UP. REFER TO DRAWING MP111.02 FOR CONTINUATION.
26 3" CTPD - DA TANK BYPASS DOWN TO FEEDWATER PUMP SUCTION HEADER.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
1 2 3 4 5 6 7 8
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
13-M-301
13-M-302
13-M-303
13-M-303
13-M-302
13-EF-1
13-EF-224" BOILER STACK
22" HPS
(SILENCER DISCHARGE)
24" BOILER STACK24" BOILER STACK
13-GRV-1 13-GRV-2 13-GRV-3
13-GRV-4
6"SV
UP FROM BELOW
4"SV UP
FROM BELOW
DA PRV RELIEF VALVE
6"SV UP FROM
SV-1 & SV-2 13-EF-6
6"SV UP
FROM SV-11
ON 13-DA-1
4" VENT UP
FROM 13-CS-1
RE:DRAWING MP121.02
6"SV UP FROM
SV-3 & SV-4
6"SV UP FROM
SV-5 & SV-6
13-RTU-1
PHASE 3
1-1/2"SV UP
FROM DA
3"V UP
FROM BELOW1
TYP(10)
13-SF-213-SF-1
2" VENT UP FROM
BOILER GAS TRAIN
13-GRV-5
13-GRV-6
13-EF-7
3/4" SAFETY RELIEF
VENT
UP FROM NATURAL GAS
REGULATOR
5"SV
UP FROM BELOW
2" VENT UP FROM
BOILER GAS TRAIN
2" VENT UP FROM
BOILER GAS TRAIN
(TYP)
(LOW ROOF)
(HIGH ROOF)
3"SV
RL/RS DN
(N)RL/RS
8 8 8
4"Ø
CONENTRIC
VENT UP
FROM
BELOW
13-EF-5
3"SV UP
FROM PRV-2
13-ACCU-3
13-ACCU-1
13-ACCU-2
13-ACCU-1A 13-ACCU-2A 9
12"x12" EA
UP FROM BELOW
8"x8" EA
UP FROM BELOW
12"x12" EA
UP FROM BELOW
8"x8" OA
DOWN
GENERATOR
EXHAUST STACK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/3
/2
:4 :0
A
M
13-M-131.02
MECHANICAL
NEW WORK PLAN
ROOF, PHASE 2
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 MECHANICAL NEW WORK PLAN - ROOF, PHASE 2
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 REFER TO DETAIL 8 ON DRAWING M-503 FOR SAFTEY RELIEF VALVE VENT TERMINATION.
2 PROVIDE 18" HIGH WIND RATED EQUIPMENT RAIL.
3 GAS TRAIN VENTS UP THROUGH ROOF. VENTS MUST BE A MINIMUM OF 10 FEET FROM ANY
INTAKES. SIZE VENTS PER SCHEDULE ON DETAIL #2 ON DRAWING MP504.
4 REFER TO DETAIL 1 ON DRAWING M-502 FOR ADDITIONAL INFORMATION.
5 REFER TO DETAIL 2 ON DRAWING M-502 FOR ADDITIONAL INFORMATION.
6 PROVIDE CONDENSATE DRAIN PIPING WITH 4" DEEP TRAP. DISCHARGE TO CONCRETE SPLASH
BLOCK WITH EPDM SLIP SHEET.
7 REFRIGERANT PIPING (SUCTION & LIQUID) UP THRU ROOF PIPE PORTAL. PROVIDE SEPARATE
BOOT FOR EACH PIPE. ROUTE PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE SUPPORTS
AS REQUIRED.
8 EQUIPMENT HEIGHT SHALL BE ATTACHED TO ROOF STRUCTURE WITH 120 MPH RATED
GALVANIZED STEEL CABLE GUY WIRES. ANCHOR AT THREE POINTS.
9 CONTRACTOR SHALL PROVIDE (N+1) COMPLETE HVAC SYSTEMS FOR SECURITY M-10 AND IT
ROOM M-12.
10 GENERATOR EXHAUST DISCHARGES UP. REFER TO DETAIL 12 ON DRAWING M-503. REFER TO
STRUCTURAL DRAWINGS FOR SUPPORT DETAILS.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.
1 2 3 4 5 6 7 8
H
K
D
C
B
A
E
E1 E2 E3 E5 E6 E7
J
G
NEW PUMP
ROOM
B-4
EXISTING
PUMP ROOM
B-1
PHASE 2
(E)1-1/2"HPS
TO BLDG 20
IN EXISTING TRENCH
(E)1-1/4"PC
TO BLDG 20
(E)1-1/2"FOR
(E)10"HPS DOWN
FROM MAIN LEVEL
(E)1-1/2"PC
(E)4"PC TO
REMAIN AS IS
2"PC INSTALLED
IN PHASE 2
(E)1-1/2"FOS
(D)4"N.G. UP
EXISTING 4"PC
(BELOW)
EXISTING 4"PC
EXISTING 10"HPS
EXISTING 8" FP
MAIN BELOW
TO REMAIN AS
REFER TO DRAWING
MD111.03 FOR
CONTINUATION
EXISTING TUNNEL
(D)5"HPS
(E)2"FOR
(E)2"FOS(D)5"HPS
(E)2"FOR
(E)2"FOS
(E)1-1/4"PC DOWN TO
EXISTING TRENCH.
REFER TO MD111.03 FOR CONTINUATION
(E)3/4"FOR
(E)3/4"FOS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:3 :2
A
M
13-MD101.03
MECHANICAL
DEMOLITION PLAN
TUNNEL & BSMT LEVELS, PHASE 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1
MECHANICAL DEMOLITION PLAN - TUNNEL & BASEMENT LEVELS,
PHASE 3
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 EXISTING FUEL OIL PIPING TO EXISTING EXTERIOR GENERATOR SHALL BE DISCONNECTED AND
REMOVED. GENERATOR TO BE RELOCATED. REFER TO ELECTRICAL DRAWINGS 13-ED101.01 AND
13-EP111 FOR GENERATOR RELOCATION SCOPE.
2 EXISTING 1-1/2"HPS DOWN FROM ABOVE INTO EXISTING PIPE TRENCH TO BUILDING 20. REFER
TO PHASE 2 DRAWING MP101.02 FOR NEW WORK SCOPE.
3 EXISTING 4" DIA HPS SHALL BE DISCONNECTED AND REMOVED. REFER TO DETAIL 9 ON
DRAWING M-502 FOR ADDITIONAL DETAILS.
4 AFTER THE NORTH LOOP IS OPERATIONAL FROM THE NEW BOILER PLANT HEADER, DISCONNECT
AND REMOVE EXISTING 5"HPS AND ASSOCIATED CONDENSATE PIPING WITHIN THE EXISTING
BOILER PLANT TO POINT OF CONNECTION FROM NEW.
5 UNDERGROUND FUEL-OIL PIPING TO BE DOUBLE CONTAINMENT.
6 ONCE NEW BOILER PLANT IS OPERATIONAL AND PRIOR TO INSTALLATION OF NEW RAMP,
DISCONNECT AND REMOVE EXISTING 4" DIA NATURAL GAS BACK TO SHUTOFF VALVE AND
CAP.REFER TO DRAWING MP101.02 FOR ADDITIONAL DETAILS.
7 EXSTING FUEL OIL PIPING IN LOWER LEVEL INSTALLED IN PHASE 2.
8 DISCONNECT AND REMOVE EXISTING CONDENSATE RECEIVER, PUMPS AND ASSOCIATED PIPING.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.