This document provides details for a federal contract solicitation to install new boilers at a VA medical center in Wichita, Kansas. The solicitation number is 36C25522R0079 and is seeking bids to install new boilers in Building 13 at the Wichita VA Medical Center. The opportunity is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. Bids are due based on the attached bid drawings and specifications, which include mechanical drawings and specifications for the new boiler installation. The contract would involve removing the existing boilers and replacing them with new models, including all necessary mechanical and control systems.

View the file

Other files

File Type Posted
36C25522R0079 0005.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 2_Civil 1 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil 2 of 3.pdf PDF
36C25522R0079 0004.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 2_Civil 3 of 3.pdf PDF
S02 Pre-Bid Questions Solicitation No 36C25522R0079_VA Response.pdf PDF
36C25522R0079 0003.docx DOCX document
589-18-302 Boiler Pre Bid Attendance.pdf PDF
PROPOSAL SUBMITTAL INSTRUCTIONS 589A7-18-302 REV 08052022.docx DOCX document
36C25522R0079 0002.pdf PDF
589A7-18-302 Wichita Bid Drawings - 3 Structural.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 2 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 3 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 6_Plumbing 1 of 2.pdf PDF
589A7-18-302 Wichita Bid Drawings - 6_Plumbing 2 of 2.pdf PDF
36C25522R0079 0001.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 2 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 4 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 3_Structural (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 4_Architectural (SI) 2 of 2.pdf PDF
S02 P09 - 589A7-18-302 Wichita Bid Specs VOL 3 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 6_Plumbing (SI).pdf PDF
S02 P09 - 589A7-18-302 Wichita Bid Specs VOL 2 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 5 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 6 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 1 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical 3 of 6.pdf PDF
36C25522R0079_1.docx DOCX document
S02 ATTACMENT 3 Past Performance Questionnaire 36C25522R0079 Project 589A7-18-302.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 3 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 2 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 1_Hazardous Materials (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 1 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 1 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 5_ Fire Protection (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 4 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical 4 of 6.pdf PDF
589A7-18-302 Wichita Bid Specs VOL 1 of 3 (800pgs).pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 2 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 4_Architectural (SI) 1 of 2.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 3 of 4.pdf PDF
P07 Wage Determination 20220708.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 0_General (SI).pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MECHANICAL ABBREVIATIONS

& SYMBOLS

M-001

GDSJJM

2 3

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

NO. DESCRIPTION DATE

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0121

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

100% BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANTS INSTALL NEW BOILERS IN

BUILDING 13

589A7-18-302

Project Director

2021-09-03

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

U E

G G G G G G G

W W W

W

W

W W

W W

W W

W W

W

W

WW W W W W W W W

W W

W W

W W

W W

W

W

W W W W W W W W W

W W W W W W W W W W W

W W

W W

W

W

W

W W

W

W W

CITY R.O.W.

U E

W W

W W

W

W W W W W W W W W W W W W W

W W

G G

G G G

W

W

W

W W W

W

F F

F W

W

W

W

W

W

W W

G

G G G G G G G G G G

G

G

G G G G G G G G G G G

G

G

BUILDING 13BUILDING 20

BUILDING 11

BUILDING 12

BUILDING 10 BUILDING 16

PROPOSED BUILDING ADDITION

BUILDING 17

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

NO. DESCRIPTION DATE

NORTH

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0121

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

100% BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANTS INSTALL NEW BOILERS IN

BUILDING 13

589A7-18-302

Project Director

2021-09-03

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

ENERGY CMPLX

20 12

34, 34A

1B

2A

5B

1A

7A

1C

5A

3A

KEYPLAN

MECHANICAL

SITE PLAN

MS101

GDSMH

EXISTING BUILDING 20

PROPOSED BUILDING 13 ADDITION

EXISTING BUILDING 13

W W

W W

W W

W W

W W

W

W W W W W W W W W W

G G

G G

G G G G G G

W

W

W W W W W W W

W W

W

W

F F

F F

F F

F

W

W W

W W

W W

W

W

W

W W

W

W

W

W

W

W W

W W

W

G

G G G G G G G G G G G

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

NO. DESCRIPTION DATE

NORTH

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0121

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

100% BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANTS INSTALL NEW BOILERS IN

BUILDING 13

589A7-18-302

Project Director

2021-09-03

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

20 12

34, 34A

1B

2A

5B

1A

7A

1C

5A

3A

MECHANICAL SITE

STEAM TRENCH

ARRANGMENT PLAN & SECTION

MS102

GDSAP

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

NO. DESCRIPTION DATE

NORTH

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0121

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

100% BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANTS INSTALL NEW BOILERS IN

BUILDING 13

589A7-18-302

Project Director

2021-09-03

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

20 12

34, 34A

1B

2A

5B

1A

7A

1C

5A

3A

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

NO. DESCRIPTION DATE

NORTH

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0121

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

100% BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANTS INSTALL NEW BOILERS IN

BUILDING 13

589A7-18-302

Project Director

2021-09-03

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

20 12

34, 34A

1B

2A

5B

1A

7A

1C

5A

3A

3-UH-1(E)

RCP(D)

RCP(D)

T

T

T

3-CV-1(E)

3-CV-1(E)

3-UH-1(E)

T

(E)3/4"HWS & HWR UP

CD(E)

CD(E)

TYP(2)

TYP(2)

(D)10"Ø

(D)8"Ø

(D)8"Ø

(E)10"Ø

3-ACCU-1

EQUIPMENT

102-A3

3-UH-1(E)

T

3-CV-1(E)

(E)10"Ø

T

T

(N)RS/RL DN

CD-2

150 CFM

8"Ø

8"Ø

(E)3/4"HWS & HWR UP

CO

3-CV-1(E)

3-UH-1(E)

CD-2

150 CFM

CD(E)

CD(E)

CFM

(N)3/4"PC

3-AC-1

3-AC-1

14x12

3-ACCU-1A

03-AC-1A

3/4"PC

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs

\g s tr o h \D o c u m e n ts

\0 -0

-W ic h it a B o ile rs -M

E P

-C E

N T

R A

L -R g s tr o h Q

H E

Z

.r v t

/9

/2

:3 :1

A

M

03-M-111

MECHANICAL

BUILDING 3

SECURITY EQ. CLOSET

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 AP MK0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 MECHANICAL DEMOLITION PLAN - FIRST FLOOR

SCALE: 1/4" = 1'-0"2 MECHANICAL NEW WORK PLAN - FIRST FLOOR

SHEET KEYNOTES:

1 DISCONNECT AND REMOVE EXISTING RADIANT CEILING PANEL, ASSOCIATED PIPING, VALVES, CONTROLS, THERMOSTAT. REMOVE PIPING BACK TO RESPECTIVE MAINS. PROVIDE BALL VALVES

WITH CAPS/PLUGS.

2 DISCONNECT AND REMOVE AIR DEVICE AND ASSOCAITED SUPPLY BRANCH DUCTWORK BACK TO

POINT SHOWN FOR CONNECTION IN NEW WORK.

3 3/4" DIA CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM 1/8

INCH PER FOOT. ROUTE TO NEW INDIRECT WASTE DRAIN ABOVE CEILING IN TOILET 109A-3.

TERMINATE TO SANITARY DISCHARGE WITH AIR GAP.

4 PROVIDE 6" CONCRETE EQUIPMENT PAD ON GRADE. REFER TO MECHANICAL DETAIL FOR

ADDITIONAL INFORMATION.

5 REFRIGERANT PIPING (SUCTION & LIQUID) THRU WALL SLEEVE ABOVE CEILING. ROUTE PER

MANUFACTURER'S RECOMMENDATIONS. PROVIDE SUPPORTS AS REQUIRED. SEAL WEATHERTIGHT.

6 REBALANCE EXISTING TERMINAL REHEAT UNIT TO AIRFLOW INDICATED.

7 CONTRACTOR SHALL PROVIDE (N+1) COMPLETE HVAC SYSTEMS FOR SECURITY EQUIPMENT

ROOM 102-X.

GENERAL SHEET NOTES:

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW

DIAGRAMS.

3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE

STEAM OR STEAM CONDENSATE SYSTEM.

5. ALL VALVE HANDLES LOCATED GREATER THAN 7'-0" ABOVE ANY WALKING SURFACE

SHALL BE FITTED WITH A CHAIN WHEEL OPERATOR AND CHAIN. PROVIDE HOOKS TO

STORE CHAIN IN SUITABLE LOCATION.

1 2 3 4 5 6

H

K

D

C

B

A

E

E1 E2 E3 E5 E6 E7

EXISTING

PUMP ROOM

13-1

J

G

NEW PUMP

ROOM

B-3

13-M-301

PHASE 3

13-M-303

13-CRU-1

10x20

EA UP

OED W/WMS

1200 CFM CO

CO

13-BDT-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs

\g s tr o h \D o c u m e n ts

\0 -0

-W ic h it a B o ile rs -M

E P

-C E

N T

R A

L -R g s tr o h Q

H E

Z

.r v t

/9

/2

:4 :2

A

M

13-MH101.02

MECHANICAL

DUCTWORK PLAN

TUNNEL & BSMT LEVELS, PHASE 2

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 AP GDS0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 DUCTWORK PLAN - TUNNEL & BASEMENT LEVELS, PHASE 2

GENERAL SHEET NOTES:

1 MOUNT CO DETECTORS 4'-6" AFF. CONFIRM QUANITY AND LOCATION OF SENSORS W/ GAS

DETECTION VENDOR TO ENSURE COMPLETE COVERAGE.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

SHEET KEYNOTES:

R

F

1 2 3 4 5 6 7 8

F

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

13-FHX-1 13-FHX-2 13-FHX-3

13-CS-1

13-DA-1

EQUIPMENT

ROOM

M-17

CORRIDOR

M-16

GENERATOR

ROOM

M-15

TRANSFORMER

ROOM

M-14

I.T. ROOM

M-12

ELECTRICAL

M-13

OFFICE

M-9

SECURITY

M-10

HAC

M-11

CONTROL

ROOM

M-8

BOILER

ROOM

M-18

13-FWP-1

13-FWP-2

13-FWP-3

IT

TYP(3)

EA DN/UP

TO 13-EF-5

20x6

SG-1

430 CFM

x x

RG-1

225 CFM

CD-2

225 CFM

CD-2

225 CFM

13-DT-1

PHASE 3

RG-2

450 CFM

13-FOP-3/4

13-FOP-1/2

CD-2

225 CFM

13-CTP-2

13-CTP-1

24x14

CO CO CO2 2

18x18

SG-2

1300 CFM

18x18

SG-2

1300 CFM

28x20 SA

DUCT UP

18x18

SG-2

1300 CFM

18x18

SG-2

1300 CFM

24x24

SG-2

2400 CFM

BOD

10'-6"

AFF

BOD 8'-0"

AFF

TYP

16x8

8"Ø

8"Ø

T

13-UH-7

HUNG FROM

STRUCTURE ABOVE

13-L-1

T

T

13-UH-8

13-AC-3

TD OED

W/WMS

ER-2

150 CFM

13-BAC-01

13-UH-8

13-EF-7

13-AC-1

T

T

13-AC-2

10x20

8"Ø

CD-2

225 CFM

(BELOW)

(BELOW)

(BELOW)

(BELOW)

(BELOW)

UP TO

13-EF-7

20x6

SG-1

400 CFM

T

T

13-UH-9

13-RTU-1

ATC

FD

EA UP/DN

13-UH-9

T 13-RTU-1

24x12

24x12

RG-4

1200 CFM

RG-2

225 CFM

13-AC-2

14x12

20x6

RG-4

FD

FD

14x12

BOD 8'-0"

AFF

28x20 SA UP/DN

SA UP

13-AC-1

8x6

RG-4

10x6

8x8

DN

18x8

UP

UP 8x8 RA DN TO RG

12x12

8"Ø

T T13-UH-1/2 13-UH-3/4

28x20

28x20

SA UP

TYP

48x84

OA UP

TO

13-GRV-4

12x12

FC

FC

FC

SD

13-M-305

RA UP

RL/RS

7CO

RL/RS 1

x

3/4"CD

3/4"CD

RL/RS

8x8

8x6 x

EA UP TO

13-GRV-6

8x8

8x8 OA DN. FROM

13-GRV-5

UP

8x6

OVERHEAD DOOR

42x10

OED

WMS

14x24

SA UP

16x18

13-ERV-1

SA OA

RA EA

13-AC-1A

13-AC-2A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs

\g s tr o h \D o c u m e n ts

\0 -0

-W ic h it a B o ile rs -M

E P

-C E

N T

R A

L -R g s tr o h Q

H E

Z

.r v t

/9

/2

:4 :4

A

M

13-MH111.02

MECHANICAL

DUCTWORK PLAN

SHOP & MAIN LEVELS, PHASE 2

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 AP GDS0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 DUCTWORK PLAN - SHOP & MAIN LEVELS, PHASE 2

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 INSTALL NEW TEMPORARY 4" DIA NATURAL GAS PIPING IN PHASE 1. REFER TO CIVIL

DRAWINGS FOR CONTINUATION. NATURAL GAS PIPE TO BE A MINIMUM OF 24" BELOW RAMP

FOOTINGS, COORDINATE WITH STRUCTURAL DRAWINGS.

2 MOUNT CO DETECTORS 4'-6" AFF. CONFIRM QUANITY AND LOCATION OF SENSORS W/ GAS

DETECTION VENDOR TO ENSURE COMPLETE COVERAGE.

3 BOTTOM OF DUCTWORK AND SUPPLY GRILLE SHALL BE MOUNTED MINIMUM 8'-0" AFF. DIRECT

SUPPLY GRILLE AIR DOWNWARD 45 DEG. TOWARD FLOOR.

4 3/4" DIA CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM 1/8

INCH PER FOOT. ROUTE DOWN TO MOP SINK. TERMINATE WITH AIR GAP.

5 TRANSITION DUCTED LOUVER CONNECTION TO NEW GENERATOR PER MANUFACTURER'S

RECOMMENDATIONS. FILED VERIFY OFFSET AND FINAL DIMENSIONS. REFER TO CONTROLS DETAIL

FOR ADDITIONAL INFORMATION.

6 PROVIDE NEW ATC PANEL WITH DEDICATED POWER THIS LOCATION. REFER TO ELECTRICAL

DRAWINGS FOR ADDITIONAL INFORMATION.

7 REFRIGERANT PIPING (SUCTION & LIQUID) UP THRU ROOF PIPE PORTAL. PROVIDE SEPARATE

BOOT FOR EACH PIPE. ROUTE PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE SUPPORTS

AS REQUIRED.

8 BOTTOM OF DUCT TO BE 6 INCHES ABOVE THE TOP OF THE OVERHEAD DOOR.

9 INSTALL THERMOSTAT 52" AFF.

10 CONTRACTOR SHALL PROVIDE (N+1) COMPLETE HVAC SYSTEMS FOR SECURITY M-10 AND IT

ROOM M-12.

11 GENERATOR EXHAUST MUFFLER.

12 GENERATOR EXHAUST DISCHARGES UP. REFER TO DETAIL 12 ON DRAWING M-503. REFER TO

STRUCTURAL DRAWINGS FOR SUPPORT DETAILS.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW

DIAGRAMS.

3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE

STEAM OR STEAM CONDENSATE SYSTEM.

5. ALL VALVE HANDLES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE

LOCATION WITH ALL TRADES.

1 2 3 4 5 6 7

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

13-M-301

13-M-302

STORAGE

13-42

BOILER

ROOM

M-18

13-CS-1

13-DA-1

13-UH-5

13-UH-1 13-UH-2 13-UH-3

13-UH-4

13-FHX-1

13-FHX-2

13-FHX-3

13-UH-6

13-M-303

PHASE 3

13-M-302

13-M-304

13-M-304

(ABOVE

PLATFORM)

NG

NG

CO

20x28 30x30 20x28 x

20x28 DN

DN28x20

28x20

DN

CO

10x20

DN

T13-UH-6

13-EF-1

VFD

T

42x42 SA UP 42x42

13-SF-1

VFD

13-SF-2

VFD

13-EF-2

VFD

24x24

SG-2

2400 CFM

SA UP

T

12x12

EA UP TO

13-EF-5

13-M-305

24x24

SG-4

2400 CFM

18x18

SG-12

1300 CFM

18x18

SG-9

1300 CFM

28x20 DN

18x18

SG-2

1300 CFM

18x18

SG-2

1300 CFM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs

\g s tr o h \D o c u m e n ts

\0 -0

-W ic h it a B o ile rs -M

E P

-C E

N T

R A

L -R g s tr o h Q

H E

Z

.r v t

/9

/2

:4 :1

A

M

13-MH121.02

MECHANICAL

DUCTWORK PLAN

EX CATWALK & CATWALK LVLS, PH 2

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 AP GDS0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 DUCTWORK PLAN - EXISTING CATWALK & CATWALK LEVELS, PHASE 2

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 MOUNT CO DETECTORS 4'-6" AFF. CONFIRM QUANITY AND LOCATION OF SENSORS

W/ GAS DETECTION VENDOR TO ENSURE COMPLETE COVERAGE.

2 MOUNT NATURAL GAS DETECTOR 12" BELOW CEILING. CONFIRM QUANITY AND

LOCATION OF SENSORS WITH GAS DECTECTION VENDOR TO ENSURE COMPLETE

COVERAGE.

3 INSTALL CO DETECTS AT BREATHING LEVEL ABOVE THE NEW CATWALK. CONFIRM

QUANITY AND LOCATION OF SENSORS WITH GAS DECTECTION VENDOR TO ENSURE

COMPLETE COVERAGE.

4 COORDINATE ROUTING OF DUCTWORK WILL ALL TRADES.

5 PROVIDE 3" DIA INTAKE AND EXHAUST CPVC PIPE CONNECTIONS TO 4" DIA CPVC

CONCENTRIC VENT KIT FOR NEW CONDENSING HOT WATER HEATER. ROUTE AND

INSTALL PER HOT WATER HEATER MANUFACTURER'S RECOMMENDATIONS AND

INTERNATIONAL FUEL GAS CODE. EXTEND THRU ROOF MINIMUM 12". TERMINATE

WITH RAIN CAP.

6 REFER TO SHEET 13-M-131.02 FOR ROOF PLAN NEW WORK THIS AREA.

7 INSTALL THERMOSTAT 52" AFF.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW

DIAGRAMS.

3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE

STEAM OR STEAM CONDENSATE SYSTEM.

1 2 3 4 5 6

H

K

D

C

B

A

E

E1 E2 E3 E5 E6 E7

J

G

13-M-301

13-M-303

EXISTING

PUMP ROOM

13-1

NEW PUMP

ROOM

B-3

4" PC UP

6"SV UP

2" BD

DOWN FROM

MAIN LEVEL

PIPING IN BOILER

ROOM TRENCH

REFER TO DRAWING

MP111.02 FOR CONTINUATION

2"FOR

2"FOS

3"PC

PHASE 3

(E)10"HPS DOWN

FROM MAIN LEVEL

(E)4"HPS

(E)4"CR

2"FOS

4"PC

2"FOR

(E)3/4"FOS/FOR

2"FOS

2"FOR

(E) 1-1/2"FOS & 1-1/2"FOR

REFER TO DRAWINGS

MP121.02, MP604 & MP605 FOR

ADDITIONAL DETAILS

(E)8"HPS DOWN FROM

MAIN LEVEL

REFER TO MP101.03

FOR SCOPE OF WORK

REFER TO DRAWINGS

MS101, MS102

& CIVIL DRAWINGS FOR

CONTINUATION

8"HPS DOWN

FROM MAIN LEVEL

3"PC

3"V

3"V UP

1 1/2"PC

2"PC

13-CRU-1

(E)10"HPS

4"PC

4"PC

(E)8" FP MAIN

TO REMAIN AS

REFER TO DETAIL 9

ON DRAWING M-502

FOR PIPING DETAILS IN

THIS AREA

1 1/2"FOS

1 1/2"FOR

5"V UP

5"V UP

6"SV

4"PC

1 1/2"FOS

1 1/2"FOR

5"HPS

STEAM TRAP

8"HPS

(E)3/4"FOS/3/4"FOR

2"FOS

2"FOR

TO EMERGENCY

GENERATOR

DRIP LEG

5"PC 5"PC

5"PC

13-BDT-1

2"BD

4" OFL

DOWN FROM

MAIN LEVEL

4"OFL PIPING

IN TRENCH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C T e m p \R

E V

IT

B A

K \0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L

-R

H

W R y a n J r.

rv t

/2

/2

:0

:0

P M

13-MP101.02

MECHANICAL

PIPING PLAN

TUNNEL & BSMT LEVELS, PHASE 2

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 AP GDS0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 PIPING PLAN - TUNNEL & BASEMENT LEVELS, PHASE 2

GENERAL SHEET NOTES:

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW

DIAGRAMS.

3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE

STEAM OR STEAM CONDENSATE SYSTEM.

5. ALL VALVE HANDLES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE

LOCATION WITH ALL TRADES.

SHEET KEYNOTES:

1 EXTEND EXISTING 4" CONDENSATE PIPE (PC) TO NEW PUMP ROOM. PIPING TO BE INSTALLED

IN PHASE 2. KEEP PIPE AS CLOSE TO WALL AS POSSIBLE, COORDINATE ROUTING WITH

EXISTING CONDITIONS.

2 CONNECT EXISTING 3/4"FOS & 3/4"FOR TO RELOCATED EMERGENCY GENERATOR. PIPING TO

BE INSTALLED IN PHASE 2. PROVIDE NEW STEEL PIPE SLEEVES & LINK SEAL IN ANNUAL

SPACE. REFER TO ELECTRICAL DRAWING 13-EP101.01 FOR GENERATOR RELOCATION SCOPE.

3 EXISTING 8" DIA HPS SERVING THE NORTH LOOP. REFER TO MPD101.03 FOR SCOPE OF WORK

DETAILS.

4 EXTEND EXISTING CONDENSATE RETURN LINE FROM EXIT OF EXISTING TRENCH AT FOUNDATION

WALL TO NEW 4" CR MAIN.

5 INSTALL NEW 1-1/2" DIA. PC FROM THE BOTTOM OF THE EXISTING PC RISER NEXT TO THE

STAIRS DOWN TO LOWER LEVEL, CONNECT INTO THE EXTENDED 4" PC IN LOWER LEVEL AND

TO PC FROM BUILDING 12. REFER TO DRAWING MP603 FOR ADDITIONAL DETAILS.

6 PIPES THROUGH FOUNDATION WALL. PROVIDE SCH 40 PIPE SLEEVE AND LINK SEAL IN

ANNULAR SPACE. REFER TO DETAIL 6 ON DRAWING M-506.

7 2" FOR DOWN FROM 13-FOP-1/2 TO STORAGE TANKS.

8 2" FOS FROM STORAGE TANKS UP.

9 1-1/2" FOS DOWN FROM 13-FOP-1/2 TO BOILER FUEL OIL LOOP.

10 1-1/2" FOR FROM BOILERS FUEL OIL LOOP UP.

11 4" DIA VALVED TAP FOR FUTURE. PROVIDE BLIND FLANGE.

12 FLOOR ACCESS DOOR ABOVE TO CONTROL ROOM. COORDINATE PIPING TO PROVIDE CLEAR PATH

FOR RIGGING OF EQUIPMENT. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR

ADDITIONAL DETAILS.

13 INSTALL NEW PIPE ANCHOR ATTACHED TO FOUNDATION WALL. REFER TO DETAIL 15 ON

STRUCUTRAL DRAWING S-502.

14 REFER TO MH SERIES DRAWINGS FOR GAS DETECTION SENSOR LOCATIONS.

15 4" OFL TO SEPARATE BLOWDOWN TANK CONNECTION. REFER TO DRAWING MP601 AND MP-603

FOR ADDITIONAL DETAILS.

R

F

1 2 3 4 5 6 7 8

F

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

13-M-301

13-M-302

13-M-303

13-M-303

13-M-302

13-M-304

13-M-304

13-CS-1

13-DA-1

EQUIPMENT

ROOM

M-17

CORRIDOR

M-16

GENERATOR

ROOM

M-15

TRANSFORMER

ROOM

M-14

I.T. ROOM

M-12

ELECTRICAL

M-13

OFFICE

M-9

SECURITY

M-10

HAC

M-11

CONTROL

ROOM

M-8

BOILER

ROOM

M-18

13-FWP-1

13-FWP-2

13-FWP-3

EXISTING

NATURAL GAS TRAIN

CONTROL

ROOM

BREAK

ROOM

BATH

ROOM

IT

ROUTE PIPING ALONG WALL

ON UNISTRUT

2"FOS & 2"FOR DN.

1"FOS/1"FOR

DOWN FROM ABOVE

13-DT-1

6"SV UP FROM

BELOW

6"SV UP TO ROOF

4"PC UP

FROM BELOW

8" HPS UP/DN

5"V UP

FROM BELOW

UP TO ROOF

2"

BFW UP

2"

BFW UP

2"

BFW RISE

UP

3"NG

3"NG

3"

BFW UP

6" SV-1 & SV-2

UP THRU ROOF 6" SV-3 & SV-4

UP THRU ROOF

6" SV-5 & SV-6

UP THRU ROOF

PHASE 3

3"V

UP/DN

13-FOP-3/4

13-FOP-1/2

1 1/2"FOR

1 1/2"FOS

4" TEMPORARY

NAT. GAS UP

13-CTP-2

13-CTP-1

8" HPS DOWN

FROM ABOVE

4"PC DOWN TO

13-CS-1

(SURGE TANK)

4" SV UP

THRU ROOF

PC DOWN

FROM

ABOVE

1-1/2"FOS/

1-1/2"FOR DOWN

FROM ABOVE

6"NG DOWN

TO MAIN LEVEL

3/4" MPC

UP

3/4" LPS

DOWN FROM ABOVE

13-UH-7

2"BD

2"BD2"BD

2"SBO

2"SBO

13-UH-8

13-BAC-01

3/4"MPR

13-AC-1

13-AC-2

1-1/2"FOS & 2"FOR

DN.

(BELOW)

(BELOW)

(BELOW)

(BELOW)

(BELOW)

6 7

13-UH-9

(TYP.)

FUEL OIL PIPING

IN TRENCH

(IN TRENCH)

1 1/2"FOS

1-1/2"FOS/1-1/2"FOR

DOWN TO 13-FOP-3/4

2"BD 2"BD

2"BD

TO DRAIN

3" DAY TANK VENT

UP THRU ROOF

(E)1-1/4"PC

IN TRENCH TO

REMAIN AS IS

4"OFL

DOWN FROM ABOVE

4 4

2"BFW DN. 2"BFW DN.2"BFW DN.

4"BD/OFL

REFER TO

DRAWING MP121.02

FOR CONTINUATION

(TYP.)

(E)LPG UP

(E)LPG

SHUT-OFF

VALVE

(E)LPG

CYLINDER

W/REGULATOR

2"BD

DOWN1717

(TYP.)

13-B-313-B-213-B-1

CO

13-AC-1A

13-AC-2A20

4"OFL

2"BD

2"BD

4"OFL

4"OFL

DOWN FROM ABOVE

4"OFL DOWN

4"OFL DOWN TO TRENCH

EXHAUST MUFFLER

REFER TO MH111.02

FOR ADDITIONAL DETAILS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs

\g s tr o h \D o c u m e n ts

\0 -0

-W ic h it a B o ile rs -M

E P

-C E

N T

R A

L -R g s tr o h Q

H E

Z

.r v t

/3

/2

:2

:4

A

M

13-MP111.02

MECHANICAL

PIPING PLAN

SHOP & MAIN LEVELS, PHASE 2

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 AP GDS0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 PIPING PLAN - SHOP & MAIN LEVELS, PHASE 2

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 NEW PIPING TRENCH. REFER TO ARCHITECTURAL/STRUCTURAL DRAWINGS FOR DETAILS.

2 INSTALL NEW TEMPORARY 4" DIA NATURAL GAS PIPING IN PHASE 1. REFER TO CIVIL

DRAWINGS FOR CONTINUATION. NATURAL GAS PIPE TO BE A MINIMUM OF 24" BELOW RAMP

FOOTINGS, COORDINATE WITH STRUCTURAL DRAWINGS.

3 CONNECTIONS FOR FUTURE TEMPORARY BOILER. ALL CONNECTIONS SHALL BE PROVIDED WITH

ISOLATION VALVE AND BLIND FLANGE. COORDINATE LOCATION WITH ALL TRADES.

4 GAS TRAIN VENTS UP THROUGH ROOF. VENTS MUST BE A MINIMUM OF 10 FEET FROM ANY

INTAKES. SIZE VENTS PER SCHEDULE ON DETAIL #2 ON DRAWING MP504.

5 NEW 6" UNDERGROUND NATURAL GAS MAIN. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION.

6 6" DIA NATURAL GAS UP.

7 6" DIA MAXON VALVE. REFER TO DRAWING MP604 FOR ADDITIONAL DETAILS.

8 4" TANK SURGE TANK BYPASS CONNECT TO CONDENSATE TRANSFER PUMP SUCTION HEADER.

PROVIDE SEPARATE VALVED PIPE TO DRAIN. REFER TO DRAWING MP603 FOR ADDTIONAL

DETAILS.

9 REFER TO DRAWINGS MP604 & MP605 FOR FUEL OIL FLOW DIAGRAMS.

10 PROVIDE DRIP PAN ELBOW PER DETAIL 8 ON DRAWING M-503.

11 BOILER MASTER CONTROL PANEL.

12 FUEL OIL PIPING IN TRENCH. REFER TO DRAWING MP101.02 FOR CONTINUATION.

13 TEMPORARY 4" NATURAL GAS DOWN FROM ABOVE. REFER TO DRAWING MP121.02. PIPING

INSTALLED IN PHASE 1.

14 INDICATES BOILER CLEARANCE REQUIREMENTS.

15 FLOOR ACCESS DOOR TO NEW PUMP ROOM BELOW. COORDINATE PIPING BELOW TO PROVIDE

CLEAR PATH FOR RIGGING OF EQUIPMENT. REFER TO ARCHITECTURAL AND STRUCTURAL

DRAWINGS FOR ADDITIONAL DETAILS.

16 BOILER SAFETY RELIEF VALVES. REFER TO DRAWING MP601 FOR ADDITIONAL DETAILS.

17 FEEDWATER PIPING UP TO FLUE STACK ECONOMIZER. REFER TO DRAWINGS MP121.02 AND

MP601 FOR ADDTIONAL DETAILS.

18 TEMPORARY WATER TREATMENT SKID. REFER TO PLUMBING DRAWINGS FOR ADDITIONAL

INFORMATIONS.

19 1-1/2"FOS/FOR UP. REFER TO DRAWING MP121.02 FOR CONTINUATION.

20 CONTRACTOR SHALL PROVIDE (N+1) COMPLETE HVAC SYSTEMS FOR SECURITY M-10 AND IT

ROOM M-12.

21 REFER TO MH SERIES DRAWINGS FOR GAS DETECTION SENSOR LOCATIONS.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW

DIAGRAMS.

3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE

STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.

1 2 3 4 5 6 7

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

13-M-301

13-M-301

13-M-302

13-M-303

13-M-303

13-M-302

13-M-304

13-M-304

STORAGE

13-42

BOILER

ROOM

M-18

8" HPS DOWN

TO MAIN LEVEL

4"PC DOWN TO 13-CS-1

(SURGE TANK)

4" SV UP THRU ROOF

13-CS-1

SAFETY RELIEF VALVE

6" SV UP

THRU ROOF

13-DA-1

1 1/2" SV UP

THRU ROOF

3" FWPD

RISER

4" SV UP

THRU ROOF

SAFETY RELIEF VALVE SV-11

REFER TO DETAIL 8/M-503

1/3-2/3 PRV STATION

FOR 13-DA-1

13-UH-5

13-UH-1 13-UH-2 13-UH-3

13-UH-4

6" SV-1 & SV-2

UP THRU ROOF

6" SV-3 & SV-4

UP THRU ROOF

6" SV-5 & SV-6

UP THRU ROOF

UP FROM BOILER

13-B-1

UP FROM BOILER

13-B-2

UP FROM

BOILER

13-B-3

3"NG 3"NG 3"NG

4"HPS

13-FHX-1

13-FHX-2

13-FHX-3

24" STACK UP

THRU ROOF

24" STACK UP

THRU ROOF

24" STACK UP

THRU ROOF

(BYPASS)

3"HPS

1 1/2"HPS

10"HPS

1 1/2"HPS

1 1/2"HPS

13-UH-6

1 1/2"HPS

PHASE 3

6"SV UP FROM

BELOW

6"SV UP TO ROOF

4"PC UP

FROM BELOW

8" HPS DN

1 1/4"LPR

(E)PIPING ON RACK

TO BUILDING 12

3"HPS

1 1/4"LPR

10"HPS

1"LPR

(E)1-1/2"HPS

(E)1-1/2"PC

2"SV UP

FROM CRU-1

4"PC

PC DOWN

TO MAIN LEVEL

1-1/2"FOS/FOR

DOWN TO MAIN LEVEL

2"SV VTR

NEW 4" NATURAL GAS LINE

UP FROM BELOW

13-STS-1

22"HPS

UP THRU ROOF

2"FWPD

1 1/4"LPR

1 1/2"LPR3/4"LPR

3/4"LPR

6"NG

6"NG DOWN

TO MAIN LEVEL

10"HPS

(ABOVE

PLATFORM)

10"HPS DOWN

3"CPTD

3"FWPD

2"FWPD

3"FWPD 2"FWPD

3/4"LPR

NG

DN

DN

3/4" LPR

UP FROM EQUIP.

ROOM

PIPE

RISE

3/4"LPR

PIPING IN

CEILING SPACE

PIPING BELOW

STAIRS

PIPE

RISE

2"V

2"V

(UP)

2"V

1"SBO

1"SBO

12 (TYP)

12(TYP) (TYP)

DN. TO TRENCH

DN. TO TRENCH

2"V

2"V

2"V

6"NG

6"NG

(TYP.)

4"PC

5"V UP FROM

BELOW, VTR

1" NG DOWN TO

13-DHWG-1

13-EF-2

1"NG

(E)1-1/2"HPS DN.

(E)1-1/2"HPS

10"HPS

6"LPS

8"HPS

H P S

6"NG

10"HPS

8"HPS

8"HPS

8"HPS

8"HPS

(TYP.)

8"HPS8"HPS

2"LPS

4"OFL DN.

TO MAIN LEVEL

13-PRV-2

13-SV-11

2"HPS

2"LPS

10"HPS

8"HPS

3/4"LPS

1 1/4"LPS

REFER TO DRAWING MP111.02

FOR CONTINUATION

8"HPS

3/4"LPG

(E)1" LPG

DOWN

4"NG

4"NG DOWN

18 2"V

3"SV UP

THRU ROOF

1 1/2"FOS

1 1/2"FOR

REFER TO SHEET 13-M-131.02

FOR WORK THIS AREA.

2"LPS

1 1/2"LPS

1 1/4"LPS

3"CPTD

(2)

10"HPS

(STACKED)

4"OFL

4"OFL DOWN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C T e m p \R

E V

IT

B A

K \0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L

-R

H

W R y a n J r.

rv t

/2

/2

:0

:1

P M

13-MP121.02

MECHANICAL

PIPING PLAN

EX CATWALK & CATWALK LVLS, PH 2

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 AP GDS0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 PIPING PLAN - EXISTING CATWALK & CATWALK LEVELS, PHASE 2

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 EXISTING UTILITY RACK TO REMAIN AS IS. PROTECT DURING CONSTRUCTION.

2 CONNECT NEW 1-1/2" DIA HPS TO EXISTING STEAM FEEDING BUILDING 12.

3 CONNECT NEW 1-1/2" HPS TO EXISTING 1-1/2" HPS FEEDING BUILDING 20. COORDINATE

ROUTING WITH EXISTING CONDITIONS.

4 COORDINATE ROUTING OF TEMPORARY 4" DIA. GAS LINE THROUGH EXISTING PLANT WITH

EXISTING CONDITIONS.

5 SLOPE DEARATOR OVERFLOW TO CONDENSATE SURGE TANK. SLOPE 1/8" PER FT.

6 DOWN TO FEEDWATER PUMP SUCTION HEADER. (DEAERATOR BYPASS). REFER TO DRAWING

MP602 FOR ADDITIONAL DETAILS.

7 4"PC (SURGE TANK BYPASS TO DEAERATOR). REFER TO DRAWING MP602 & MP603 FOR

ADDITIONAL DETAILS.

8 4" DIA SURGE TANK BYPASS. REFER TO DRAWING MP603 FOR ADDITIONAL DETAILS.

9 ALL ISOLATION VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE.

10 INSTALL PIPE THROUGH THE WALL INTO THE EXISTING PLANT IN PHASE 2. PROVIDE

TEMPORARY CAP.

11 MOUNT NATURAL GAS DETECTOR 12" BELOW CEILING. CONFIRM QUANITY AND LOCATION OF

SENSORS WITH GAS DECTECTION VENDOR TO ENSURE COMPLETE COVERAGE.

12 1/4" STAINLESS STEEL TUBING CONNECTIONG FOR SAMPLE COOLER LOCATED AT SINK.

13 6" DIA NATURAL GAS PIPE UP FROM BELOW.

14 PROVIDE DRIP PAN ELBOW PER DETAIL 8 ON DRAWING M-503.

15 4" TANK SURGE TANK BYPASS CONNECT TO CONDENSATE TRANSFER PUMP SUCTION HEADER.

PROVIDE SEPARATE VALVED PIPE TO DRAIN. REFER TO DRAWING MP603 FOR ADDTIONAL

DETAILS.

16 NATURAL GAS PRESSURE REGULATOR 10 PSIG TO 12" W.C. FOR 13-DHWG-01. PROVIDE

RELIEF VENT UP THROUGH ROOF.

17 REFER TO PLUMBING DRAWINGS FOR VENTING FOR GAS FIRED DOMESTIC WATER HEATER.

18 GAS TRAIN VENTS UP THROUGH ROOF. VENTS MUST BE A MINIMUM OF 10 FEET FROM ANY

INTAKES. SIZE VENTS PER SCHEDULE ON DETAIL #2 ON DRAWING MP504.

19 PRV STATION FOR DEAERATOR. REFER TO DRAWING MP602 FOR FLOW DIAGRAM.

20 6" DIA VALVED SPARE CONNECTION WITH 300# BLIND FLANGE.

21 STEAM FLOW METER. REFER TO DRAWING MP601 FOR PIPING DETAILS. INSTALL SHALL MEET

THE MANUFACTURERS REQUIREMENTS FOR UPSTREAM AND DOWNSTREAM STRIAGHT PIPE.

22 CONNECT TO EXISTING 10" DIA HPS LINE AT THE ELBOW AT THE TOP OF RISER. WORK TO BE

PERFORMED AFTER THE NORTH LOOP WORK HAS BEEN COMPLETED AND PLACED IN SERVICE.

23 CONTRACTOR SHALL EXTEND THE EXISTING LPG GAS PIPING, AS INDICATED ON THE PLANS IN

THE EXISTING BOILER PLANT TO NEW BOILERS. REFER TO DETAIL 2 ON DRAWING MP604 FOR

ADDITIONAL DETAILS. ALL LPG PIPING SHALL MEET ALL NFPA 58 REQUIREMENTS. COORDINATE

ROUTING WITH EXISTING CONDITIONS.

24 ALL MAIN STEAM VALVES TO HAVE 1" BYPASS LINE WITH GLOBE VALVE FOR WARM-UP. NOT

SHOWN FOR CLARITY.

25 1-1/2"FOS/FOR UP. REFER TO DRAWING MP111.02 FOR CONTINUATION.

26 3" CTPD - DA TANK BYPASS DOWN TO FEEDWATER PUMP SUCTION HEADER.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW

DIAGRAMS.

3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE

STEAM OR STEAM CONDENSATE SYSTEM.

1 2 3 4 5 6 7 8

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

13-M-301

13-M-302

13-M-303

13-M-303

13-M-302

13-EF-1

13-EF-224" BOILER STACK

22" HPS

(SILENCER DISCHARGE)

24" BOILER STACK24" BOILER STACK

13-GRV-1 13-GRV-2 13-GRV-3

13-GRV-4

6"SV

UP FROM BELOW

4"SV UP

FROM BELOW

DA PRV RELIEF VALVE

6"SV UP FROM

SV-1 & SV-2 13-EF-6

6"SV UP

FROM SV-11

ON 13-DA-1

4" VENT UP

FROM 13-CS-1

RE:DRAWING MP121.02

6"SV UP FROM

SV-3 & SV-4

6"SV UP FROM

SV-5 & SV-6

13-RTU-1

PHASE 3

1-1/2"SV UP

FROM DA

3"V UP

FROM BELOW1

TYP(10)

13-SF-213-SF-1

2" VENT UP FROM

BOILER GAS TRAIN

13-GRV-5

13-GRV-6

13-EF-7

3/4" SAFETY RELIEF

VENT

UP FROM NATURAL GAS

REGULATOR

5"SV

UP FROM BELOW

2" VENT UP FROM

BOILER GAS TRAIN

2" VENT UP FROM

BOILER GAS TRAIN

(TYP)

(LOW ROOF)

(HIGH ROOF)

3"SV

RL/RS DN

(N)RL/RS

8 8 8

4"Ø

CONENTRIC

VENT UP

FROM

BELOW

13-EF-5

3"SV UP

FROM PRV-2

13-ACCU-3

13-ACCU-1

13-ACCU-2

13-ACCU-1A 13-ACCU-2A 9

12"x12" EA

UP FROM BELOW

8"x8" EA

UP FROM BELOW

12"x12" EA

UP FROM BELOW

8"x8" OA

DOWN

GENERATOR

EXHAUST STACK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs

\g s tr o h \D o c u m e n ts

\0 -0

-W ic h it a B o ile rs -M

E P

-C E

N T

R A

L -R g s tr o h Q

H E

Z

.r v t

/3

/2

:4 :0

A

M

13-M-131.02

MECHANICAL

NEW WORK PLAN

ROOF, PHASE 2

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 AP GDS0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 MECHANICAL NEW WORK PLAN - ROOF, PHASE 2

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 REFER TO DETAIL 8 ON DRAWING M-503 FOR SAFTEY RELIEF VALVE VENT TERMINATION.

2 PROVIDE 18" HIGH WIND RATED EQUIPMENT RAIL.

3 GAS TRAIN VENTS UP THROUGH ROOF. VENTS MUST BE A MINIMUM OF 10 FEET FROM ANY

INTAKES. SIZE VENTS PER SCHEDULE ON DETAIL #2 ON DRAWING MP504.

4 REFER TO DETAIL 1 ON DRAWING M-502 FOR ADDITIONAL INFORMATION.

5 REFER TO DETAIL 2 ON DRAWING M-502 FOR ADDITIONAL INFORMATION.

6 PROVIDE CONDENSATE DRAIN PIPING WITH 4" DEEP TRAP. DISCHARGE TO CONCRETE SPLASH

BLOCK WITH EPDM SLIP SHEET.

7 REFRIGERANT PIPING (SUCTION & LIQUID) UP THRU ROOF PIPE PORTAL. PROVIDE SEPARATE

BOOT FOR EACH PIPE. ROUTE PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE SUPPORTS

AS REQUIRED.

8 EQUIPMENT HEIGHT SHALL BE ATTACHED TO ROOF STRUCTURE WITH 120 MPH RATED

GALVANIZED STEEL CABLE GUY WIRES. ANCHOR AT THREE POINTS.

9 CONTRACTOR SHALL PROVIDE (N+1) COMPLETE HVAC SYSTEMS FOR SECURITY M-10 AND IT

ROOM M-12.

10 GENERATOR EXHAUST DISCHARGES UP. REFER TO DETAIL 12 ON DRAWING M-503. REFER TO

STRUCTURAL DRAWINGS FOR SUPPORT DETAILS.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW

DIAGRAMS.

3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE

STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.

1 2 3 4 5 6 7 8

H

K

D

C

B

A

E

E1 E2 E3 E5 E6 E7

J

G

NEW PUMP

ROOM

B-4

EXISTING

PUMP ROOM

B-1

PHASE 2

(E)1-1/2"HPS

TO BLDG 20

IN EXISTING TRENCH

(E)1-1/4"PC

TO BLDG 20

(E)1-1/2"FOR

(E)10"HPS DOWN

FROM MAIN LEVEL

(E)1-1/2"PC

(E)4"PC TO

REMAIN AS IS

2"PC INSTALLED

IN PHASE 2

(E)1-1/2"FOS

(D)4"N.G. UP

EXISTING 4"PC

(BELOW)

EXISTING 4"PC

EXISTING 10"HPS

EXISTING 8" FP

MAIN BELOW

TO REMAIN AS

REFER TO DRAWING

MD111.03 FOR

CONTINUATION

EXISTING TUNNEL

(D)5"HPS

(E)2"FOR

(E)2"FOS(D)5"HPS

(E)2"FOR

(E)2"FOS

(E)1-1/4"PC DOWN TO

EXISTING TRENCH.

REFER TO MD111.03 FOR CONTINUATION

(E)3/4"FOR

(E)3/4"FOS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs

\g s tr o h \D o c u m e n ts

\0 -0

-W ic h it a B o ile rs -M

E P

-C E

N T

R A

L -R g s tr o h Q

H E

Z

.r v t

/9

/2

:3 :2

A

M

13-MD101.03

MECHANICAL

DEMOLITION PLAN

TUNNEL & BSMT LEVELS, PHASE 3

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 AP GDS0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

MECHANICAL DEMOLITION PLAN - TUNNEL & BASEMENT LEVELS,

PHASE 3

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 EXISTING FUEL OIL PIPING TO EXISTING EXTERIOR GENERATOR SHALL BE DISCONNECTED AND

REMOVED. GENERATOR TO BE RELOCATED. REFER TO ELECTRICAL DRAWINGS 13-ED101.01 AND

13-EP111 FOR GENERATOR RELOCATION SCOPE.

2 EXISTING 1-1/2"HPS DOWN FROM ABOVE INTO EXISTING PIPE TRENCH TO BUILDING 20. REFER

TO PHASE 2 DRAWING MP101.02 FOR NEW WORK SCOPE.

3 EXISTING 4" DIA HPS SHALL BE DISCONNECTED AND REMOVED. REFER TO DETAIL 9 ON

DRAWING M-502 FOR ADDITIONAL DETAILS.

4 AFTER THE NORTH LOOP IS OPERATIONAL FROM THE NEW BOILER PLANT HEADER, DISCONNECT

AND REMOVE EXISTING 5"HPS AND ASSOCIATED CONDENSATE PIPING WITHIN THE EXISTING

BOILER PLANT TO POINT OF CONNECTION FROM NEW.

5 UNDERGROUND FUEL-OIL PIPING TO BE DOUBLE CONTAINMENT.

6 ONCE NEW BOILER PLANT IS OPERATIONAL AND PRIOR TO INSTALLATION OF NEW RAMP,

DISCONNECT AND REMOVE EXISTING 4" DIA NATURAL GAS BACK TO SHUTOFF VALVE AND

CAP.REFER TO DRAWING MP101.02 FOR ADDITIONAL DETAILS.

7 EXSTING FUEL OIL PIPING IN LOWER LEVEL INSTALLED IN PHASE 2.

8 DISCONNECT AND REMOVE EXISTING CONDENSATE RECEIVER, PUMPS AND ASSOCIATED PIPING.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW

DIAGRAMS.

3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE

STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.