589A7-18-302 Wichita Bid Drawings - 4_Architectural (SI) 1 of 2.pdf
PDF 9 MB Posted
- Solicitation number
- 36C25522R0079
About this file
This solicitation is for a firm fixed-price construction contract to install new boilers in Building 13 at the Robert J. Dole VA Medical Center in Wichita, Kansas. The scope of work includes demolishing the existing boiler plant, constructing a new addition, and renovating portions of the existing building. The contractor will install new boilers and related equipment, connect new systems to campus infrastructure, and commission the new boiler plant. The solicitation provides construction documents including plans, elevations, sections and details. The response due date is October 15, 2022. The period of performance is 540 calendar days. The place of performance is the medical center. The estimated value is $7.5 million. The solicitation is unrestricted and set-asides do not apply. The contracting agency is the Veterans Health Administration within the Department of Veterans Affairs.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PULL
PULL
RADIOLOGY
RECORDS
RECOVERY
RECEPTION
M
MAINT
MECH
MACH MACHINE ROOM
MALE
MAINTENANCE
RECD
RECP
RECOV
RAD
ROOM
STAFF
REHABILITATION
SHOWER
SUPPLY
STAFF TOILET
SOILED UTILITY
SECRETARY
STAIRS
SUPPORT
STATION
STERILIZER
SERVICE
SWITCHGEAR
SUPERVISOR
SURGERY/ ICAL
STORAGE
MGR
MED
MRI
OFF
OR
ORTHO
OH
OB/GYN
OPERATING ROOM
MANAGER
OFFICE
MEDICATION/ MEDICAL
ORTHOPEDICS
OBSTETRICS/ GYNECOLOGY
ORAL HYGIENIST
MAGNETIC RESONANCE
IMAGING
SWGR
ST
STA
RM
S TLT
SVCE
SHR
S
STOR
SUPVR
SPRT
SPLY
SOIL
SECY
REHAB
STER
SURG
MECHANIC(AL)
EDUCATION
ELEVATOR
ELECTRIC(AL)
ED
ELEV
EMG
ELEC
ADMIN
ASSY
AUD
AMB
ASSEMBLY
ADMINISTRATION(OR)
AMBULATORY
AUDIOLOGY
"DN"
S
SIMILARSIM
SPEC
SF
SOUTH/ SINK
SQUARE FEET/ STOREFRONT
(NON - NCS ABBREVIATIONS ARE SHOWN
UNDERLINED) EXAMPLE:
ENDOSCOPY
EQUIPMENT
EXECUTIVE
ENDO
ENT
EQUIP
EXEC
FREEZER
FEMALE
FRZ
F
BALCONYBALC
CHEMICALCHEM
CHGN
CLASSCL
CHIRO CHIROPRACTOR
CHARGE NURSE
GENERAL
GYMNASIUM
GEN
GYM
HEAD
HOUSEKEEPINGHSKPG
HD
ICCU
HAZ MAT
CLERICAL
CLN
CLER
CLOSETCLO
CLRM CLASSROOM
CLEAN (ING)/ CLEAN UTILITY
COMM
CONF
CORRIDORCORR
COPY
COMMUNICATIONS
CONFERENCE
COPY/ WORK ROOM
COMMANDER/ COMMANDCMD
SQUARESQ
SST
STEEL
STC
STL
TREADT
THROUGHTHRU
TEMP
SOUND TRANSMISSION CLASS
STAINLESS STEEL
TEMPERATURE/ TEMPORARY
TOP OF
TOC
TO
TOF
TOM
TYPICALTYP
U
UC
TOS
HEAT TRANSFER COEFFICIENT
TOP OF FOOTING
TOP OF CONCRETE (CURB)
UNDERCUT
TOP OF MASONRY
TOP OF STEEL
SPECIFICATION(S)
HAZARDOUS MATERIALS
EAR NOSE THROAT
ELECTROMYOGRAPHY
INTENSIVE CARDIAC CARE UNIT
TECHNICIAN
TELEPHONE
TOILET
URINAL
TREATMENT
WAITING
WAREHOUSE
WATER CLOSET
WEIGHTS AND MEASURES
WEIGHT
WORK STATION, WORK ROOM
EXECUTIVE OFFICER
VESTIBULE
P
PHAR
PHYS
PEDS
PO
PSRDM
PRIN
PREP
POST OFFICE
PRINCIPAL
PHARMACY
PATIENT
PREPARATION
PEDIATRICS
PHYSICAL
PHYSICAL SECURITY RISK MITIGATION DESIGN
PROCTO
PROC
PUB
PT/OT
PULMO
PUBLIC
PHYSICAL / OCCUPATIONAL
THERAPY
PROCTOLOGY
PROCEDURE
PULMONARY
PARKINGPRKG
WT
WHSE
WAIT
VEST
UR
WORK
TRT
TECH
XO
WC
W & M
TEL
TLT
INFORMATION
ISOLATION
INJECTION
INFO
ICU
ISO
INJ
JANITOR
KITCHEN
JAN
JC
KIT
CSR
CT
CONTROLCTRL
CENTRAL STERILE ROOM
CAT SCAN
DRESSING
DEPT
D
DIRECTOR
DICTATION
DIR
DICT
DEPARTMENT
LAUNDRY
LABORATORY
LAU
LAB
LDRP
LCPO
LIBRARY
LOCKER
LIT/ FORMS
LIB
LPO
LKR
L/W
L/F
DOCTORDR
DOR
DRK
DTR
DARKROOM
DENTAL TREATMENT ROOM
DENTAL OPERATORY ROOM
DISP DISPENSING
UL
U/C/B
VACUUMV
U0N
VARIESVAR
VCT
VERTICAL
VTR
VERT
VENT THRU ROOF
UNLESS OTHERWISE NOTED
UNDERWRITERS LABORATORY
VINYL COMPOSITION TILE
UNDER COUNTER BASE
W
WITHW/
W
WITHOUT
WOOD
W/0
WD
WEIGHTWT
WP
WH WALL HUNG/ WATER HEATER
WEST /WATT
WATERPROOF / WORKING POINT
WIDTH /WIDE FLANGE
VWC VINYL WALL COVERING
WWF WELDED WIRE FABRIC
JANITOR'S CLOSET
LABOR DELIVERY RECOVERY POST PARTUM
LEADING CHIEF PETTY OFFICER
LEADING PETTY OFFICER
LITTER WHEELCHAIR
INTENSIVE CARE UNIT
KILOPASCAL
POUND
ANGLE
KPA
L
LB
EACH
ELEVATION
EACH END
EXPANSION JOINT
EA
EJ
EL
EE
AND&
DOLLAR (USD)
@ AT
NUMBER / POUND
NATIONAL CAD STANDARD ABBREVIATIONS
LINEAR FEET
METERS
MAXIMUM
LF
M
MAX
MINIMUM
MILLIMETERS
MISCELLANEOUS
MASONRY OPENING
MIN
MM
MISC
MO
ET CETERA
EQUAL
EYE WASH STATION
ELECTRIC WATER COOLER
EXISTING
FILLER
NORTH
NOT APPLICABLE
NUMBER
NOT IN CONTRACT
NA
N
NO
NIC
NOT TO SCALE
OXYGEN
ON CENTER
NTS
OC
O
NOMINALNOM
FACSIMILE
FIRE EXTINGUISHER
FINISHED FLOOR
FIRE EXTINGUISHER CABINET
FLOOR
FACE OF
FIBERGLASS REINFORCED POLYMER
FACE OF SLAB (STUD)
FIRE HOSE CABINET
EQ
F
A/C
A/E
ADA
ACT
AHJ
AHU
AFF
ALUM
AUTHORITY HAVING JURISDICTION
AMERICANS WITH DISABILITY ACT
ACOUSTICAL CEILING TILE
ABOVE FINISHED FLOOR
AIR HANDLING UNIT
ALUMINUM
ARCHITECT-ENGINEER
AIR CONDITIONED
FE
FF
FLR
FO
FRP
BEAM
BLDG
BM
BOS
BO
CG
CCT
CL
CJ
BUILDING
BOTTOM OF STEEL
CENTER LINE
CONTROL/ CONSTRUCTION JOINT
CORNER GUARD
BY OWNER/ BOTTOM OF
CUBICLE CURTAIN TRACK
FOS
FAX
EWS
ETC
FEC
FHC
EXIST
EWC
OPPOSITE HAND
OUTSIDE DIAMETER
PLATE
OPENING
OPH
OD
PL
OPNG
PAIR
PLASTIC LAMINATEPLAM
PR
PSI
PSF
GAS
GRAB BAR
GALVANIZED
GAGE
HIGH
GYPSUM BOARD
GENERAL CONTRACTOR
QUANTITY
PTS
QTY
RISER/RADIUS
REQUIRED
ROUGH OPENING
RENOVATE(TION)
R
RAL
RO
REQ
RENOHARDWARE
HOUR
HOLLOW METAL
INTERCOM
INTRAVENOUS
INCH(ES)
INSIDE DIAMETER
PT
HANDICAP
G
GB
GA
GC
H
CLL
CLG
CM
CMU
CLR CLEAR
CONC
CO2
CONT
CTJ
CENTIMETER
CONCRETE
COLUMN LINE
CONTINUED (OUS)
CONCRETE MASONRY UNIT
CEILING
CONTRACTION JOINT
CARBON DIOXIDE
HM
HR
ID
IC
IV
INCTR
DBA
D
DEG
DIA
DR
DWG
DN DOWN
DEGREE
UNIT OF SOUND
CENTER
DEEP/ DEPTH
DIAMETER
DOOR/
DRAWING(S)
COORDINATECOORD
HC
HDW
GALV
GYP BD
ROICC
JOINTJT
DWR DRAWER
PAINT
POUNDS/SQUARE FOOT
POUNDS/SQUARE INCH
RESIDENT OFFICER IN CHARGE
OF CONST
FEDERAL COLOR PALETTE
PNEUMATIC TUBE STATION VOL VOLUNTEER
ASSISTANTAST
COMPUTERCOMP
COORD COORDINATOR
CLIN CLINIC (AL)
PERSONNELPERS
MANAGEMENTMGNT
ANALYSISTANLST
COMPR COMPTROLLER
CUBICLESCBCL
DEGREE(S)°
AIR
A
/ DIVIDE BY, PER
EQUALS, EQUAL TO
' FOOT, FEET
> GREATER THAN
> GREATER THAN OR EQUAL TO
INCH(ES)"
MINUS, NEGATIVE
< LESS THAN
LESS THAN OR EQUAL TO
MULTIPLY BY, BYX
% PERCENT
PLUS
+/- PLUS OR MINUS
NATIONAL CAD STANDARD ROOM NAME ABBREVIATIONS
"DN"
(NON - NCS ABBREVIATIONS ARE SHOWN
UNDERLINED) EXAMPLE:
FOOT/FEETFT
TELEVISIONT.V.
P.T. PRESSURE TREATED
MOUNTEDMNTD
FIRE RETARDANTF.R.
SS STAINLESS STEEL
WHEELCHAIRW/C
FIRE TREATEDF.T.
ABA ARCHITECTURAL BARRIERS ACT
SAB SOUND ATTENUATION BATTS
EXPOSEDEXP
VERIFY IN FIELDVIF
VERIFY IN FIELDVIF
PYSCH PSYCHOLOGY
A101
SIM
A101
SIM
A101
SIM
BUILDING ELEVATION/SECTIONDetail No.
Sheet No.
Reference Label
Detail No.
Sheet No.
Reference Label
Detail No.
Sheet No.
Reference Label
Room No.
Room Area
Door/Room No.
Partition Configuration
Partition Configuration
Key Note No.
ALIGN
WALL SECTION
DETAIL SECTION/CALLOUT
ROOM TAG
DOOR TAG
PARTITION TAG
KEYNOTE
ALIGNED SURFACES
Room Name
Area
AREA TAG
Area NameArea Name
150 SF
WL
2S 86
SCOPE OF PROJECT
Project Limit Line
Grid No.
CENTERLINE
COLUMN GRID LINE
SPOT ELEVATIONSpot Elevation AFF
Level/Datum Elevation AFF
LEVEL MARKER
Level/Datum Name
Window Type WINDOW TYPE TAG01
CL
Highpoint @ Tail SLOPE INDICATOR
Starting Point @ Center DIMENSION CROSSHAIR
NORTH ARROW
Plan North Reference Label
Name Elevation
Revision Reference Number
Revision Cloud Depicting Area Revised
REVISION
CEILING TAG1'-0" Clg Height
? Finish FINISH TAG
Casework / Furniture
CASEWORK TAG1i
FURNITURE TAG
Room Name
150 SF
WAL-1
BAS-1
FLR-1
Room Wall Finish
Room Wall Base
Room Floor Finish
ROOM FINISH TAG
FIRE
EXTINGUISHER
WALL MOUNTED
CABINET
FIRE ALARM
PULL BOX
m m
4'
M
A X
IM
U
M m m
4'
M
A X
IM
U
M m m
4'
M
A X
IM
U
M m m
3'
FIRE
EXTINGUISHER
WALL HUNG
FIRE
EXTINGUISHER
IN RECESSED
CABINET
FIRE EXTINGUISHER
AND FIRE HOSE
VALVE IN RECESSED
CABINET
FIRE EXTINGUISHER,
FIRE HOSE VALVE
AND FIRE
DEPARTMENT VALVE
IN RECESSED
CABINET
FIRE DEPARTMENT
VALVE IN
RECESSED
CABINET
m m
3'
FIREFIGHTERS
HANDSET
FH
267 mm (10 1/2") m m
1' m m
3'
M A
X
8" 8"7
AUDIO/VISUAL
FIRE ALARM
EXIT SIGN WALL
SWITCH
WALL
PHONE
JACK
FIRE ALARM
PULL STATION
(GENERALLY
LOCATE UNDER
A/V ALARM)
W
IT
H O
W N
E R
C O
O R
D
IN
A T
E0' - 8"
COMBINATION
POWER/SIGNAL/OUTLET
FOR WALL MOUNTED
TELEVISION OR
MONITOR
CLOCK
(PLACED ON WALL
WITH NO VISUAL
BOARDS
MOUNTED BELOW)
DOUBLE-SIDED
PROJECTED
CLOCK
M
IN
C E
IL
IN
G H
E I G
H T
U
.N .O
S
P A
C E
S W
IT
H
T.V./DATA/
PHONE
POWER
RECEPTACLES
LIGHT
SWITCHES
DOME
LIGHT
OCCUPANCY
SENSOR
CARD
READER
THERMOSTAT
POWER
DISCONNECT
REMOTE DOOR
RELEASE
D/V L
TV
D/V
TV E
E
ED/V
L L OS CR T DR
AREA OF
REFUGE
INTERCOM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C L o ca l R e vi t F ile s\
-1
-K
S
W ic h ita V
A M
C B o ile rs E rm in
.r vt
/3
/2
:4
:4
P M
AE001
ARCHITECTURAL NOTES, SYMBOLS,
ABBREVIATIONS
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
2021-09-03 JBS/MKL EXB/JTK553-19-KS
100% BID SHEET
FULLY SPRINKLERED
ABBREVIATIONS PLAN SYMBOLS
FIRE PROTECTION EQUIPMENT
ELECTRICAL CONTROL DEVICES
UP
UP
DN
R E
F
DN
UP
DN
DN
DN
2667 SF
U - UTILITY
587 SF
S - STORAGE
798 SF
UNOCCUPIED
PATH
ID'S:
4C
PATH
ID'S:
4C
PATH
ID'S:
8A
EL. -11'-4"
EL. -6'-0"
EL. 6'-8"
EL. 0'-0"
FE
FE
FE
352 SF
S - STORAGE
1289 SF
S - STORAGE
279 SF
UNOCCUPIED
PATH
ID'S:
1A, 5B, 8A
PATH
ID'S:
3B
PATH
ID'S:
2B, 3B
PATH
ID'S:
2B
PATH
ID'S:
1A
B - BUSINESS
S - STORAGE
U - UTILITY
UNOCCUPIED
5901 SF
U - UTILITY
993 SF
B - BUSINESS
EL. 6'-8"
EL. 6'-8"
EL. 0'-0"
EL. 6'-8"EL. 8'-2"
EL. 6'-8"
FE FE
FE
FE
FE
PATH OF TRAVEL (FEET)
VOICE/ALARM SYSTEM THROUGHOUT
(COORDINATE W/ ELECTRICAL)
EXIT FLOW
PATH TAG
EXIT SIGN
(COORDINATE W/ ELECTRICAL)
PORTABLE FIRE EXTINGUISHER
DRY-CHEMICAL ABC CLASSIFICATION
(COORDINATE W/ FIRE MARSHAL)
TWO HOUR FIRE BARRIER
CONSTRUCTION
PATH
ID'S:
X# X# X# X#
FE
2909 SF
UNOCCUPIED
3053 SF
UNOCCUPIED
487 SF
S - STORAGE
PATH
ID'S:
5A, 5B
PATH
ID'S:
6A
PATH
ID'S:
7A
EL. 17'-4"
EL. 17'-4"
EL. 17'-8"
FE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C L o c a l R e v it F ile s \5
-1
-K
S
W ic h it a V
A M
C B o ile rs E rm in
.r v t
/3
/2
:3
:5
P M
13-AE002
LIFE SAFETY PLANS INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
2021-09-03 JBS/MKL EXB/JTK553-19-KS
100% BID SHEET
FULLY SPRINKLERED
APPLICABLE CODES _________________
2018 INTERNATIONAL BUILDING CODE (IBC)(ONLY WHEN SPECIFICALLY REFERENCED IN
VA DESIGN DOCUMENTS)
2018 EDITION NFPA 101 LIFE SAFETY CODE
2015 VA FIRE PROTECTION DESIGN GUIDE 7TH EDITION
2018 NFPA NATIONAL FIRE CODE (EXCEPTION OF NFPA 5000 AND NFPA 900)
2020 NATIONAL ELECTRICAL CODE (NEC)
2018 INTERNATIONAL PLUMBING CODE (IPC)
ENERGY POLICY ACT OF 2005 (EPACT)
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS:
MEMORANDUM OF UNDERSTANDING (MOU)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND
TRANSPORTATION MANAGEMENT
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNAGE
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD 62.1 -2004
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)
NFPA 85: BOILER AND COMBUSTION SYSTEMS HAZARD CODE
ASME B31.1 POWER PIPING
UNIFIED FACILITIES CRITERIA (UFC3-430-08N) CENTRAL HEATING PLANTS
BUILDING HEIGHT AND AREA LIMITATIONS (IBC CHAPTER 5):
USE & OCCUPANCY CLASSIFICATION: F1 - MOD. HZD. INDUSTRIAL
TYPE OF CONSTRUCTION: II-B / TYPE-II (000)
ALLOWABLE HT IN FEET (TABLE 504.3): 75' (S)
ACTUAL HEIGHT ABOVE GRADE: 42'-0"
ALLOWABLE STORIES ABOVE GRADE (TABLE 504.): 3 (S)
ACTUAL STORIES ABOVE GRADE: 1
ALOWABLE AREA (TABLE 506.2): 62,000 sqft (S1)
ACTUAL AREA: 8,815 sqft
PER IBC CHAPTER 5: TYPE 2B NON COMBUSTIBLE, FULLY SPRINKLERED BUILDING WITH
AN F1 MODERATE HAZARD INDUSTRIAL OCCUPANCY IS PERMITTED TO BE UP TO 75’
TALL, THREE STORIES, WITH 62,000 SQFT OF ALLOWABLE AREA.
AS DEFINED BY TABLE 601 THE BUILDING ELEMENTS ARE REQUIRED TO CARRY
THE FOLLOWING FIRE RESISTANCE RATINGS IN TYPE II-B CONSTRUCTION:
PRIMARY STRUCTURAL FRAME: 0 HRS
EXTERIOR BEARING WALLS: 0 HRS
INTERIOR BEARING WALLS: 0 HRS
EXTERIOR NON-BEARING WALLS: 0 HRS
INTERIOR NON-BEARING WALLS: 0 HRS
FLOOR CONSTRUCTION AND
SECONDARY MEMBERS: 0 HRS
ROOF CONSTRUCTION AND
SECONDARY MEMBERS: 0 HRS
PER NFPA 5000 TABLE 7.4.1, A TYPE II, (000), FULLY SPRINKLERED, ORDINARY HAZARD
INDUSTRIAL OCCUPANCY IS PERMITTED TO BE UP TO 75’ TALL, THREE STORIES, WITH
15,500 SQFT OF FOOTPRINT.
AS DEFINED BY TABLE 7.2.1.1, CONSTRUCTION ELEMENTS ARE REQUIRED TO
CARRY THE FOLLOWING FIRE RESISTANCE RATINGS IN TYPE-II (000)
CONSTRUCTION:
EXTERIOR BEARING WALLS:
SUPPORTING MORE THAN ONE FLOOR: 0 HRS
SUPPORTING ONLY ONE FLOOR: 0 HRS
SUPPORTING ROOF ONLY: 0 HRS
INTERIOR BEARING WALLS:
SUPPORTING MORE THAN ONE FLOOR: 0 HRS
SUPPORTING ONLY ONE FLOOR: 0 HRS
SUPPORTING ROOF ONLY: 0 HRS
COLUMNS:
SUPPORTING MORE THAN ONE FLOOR: 0 HRS
SUPPORTING ONLY ONE FLOOR: 0 HRS
SUPPORTING ROOF ONLY: 0 HRS
BEAMS, GIRDERS, TRUSSES, AND ARCHES:
SUPPORTING MORE THAN ONE FLOOR: 0 HRS
SUPPORTING ONLY ONE FLOOR: 0 HRS
SUPPORTING ROOF ONLY: 0 HRS
FLOOR/CEILING ASSEMBLIES: 0 HRS
ROOF/CEILING ASSEMBLIES: 0 HRS
INTERIOR NON-BEARING WALLS: 0 HRS
EXTERIOR NON-BEARING WALLS: 0 HRS
NFPA 101 OCCUPANCY & ASSOCIATED CHAPTER
• BOILER BUILDING, MAIN LEVEL : INDUSTRIAL OCCUPANCY (NFPA 101 : 2015,
CHAPTER 40)
• BOILER BUILDING, BOILER LEVEL : INDUSTRIAL OCCUPANCY (NFPA 101 : 2015,
CHAPTER 40)
• OFFICE / CONTROL AREAS ASSUMED TO BE NON-SEPARATED, ANCILLARY
FACILITIES PER PROVISIONS OF (A.6.1.14.1.3)
• STORAGE UTILITY AREAS ASSUMED TO BE NON-SEPERATED, ANCILLARY
FACILITIES PER PROVISIONS OF (A.6.1.14.1.3)
40.2.5.3.1 INDUSTRIAL EQUIPMENT ACCESS DIMENSIONAL CRITERIA:
MINIMUM HORIZONTAL DIMENSION OF ANY WALKWAY: 22” CLEAR
MINIMUM STAIR OR RAMP WIDTH: 22” @ RAILS
MINIMUM TREAD WIDTH: 22” CLEAR
MINIMUM TREAD DEPTH: 10”
MAXIMUM RISER HEIGHT: 9”
MAX HT. BETWEEN LANDINGS: 12’-0”
MINIMUM HEADROOM: 6’-8”
MINIMUM WIDTH OF DOOR OPENINGS: 22”
LIFE SAFETY LEGEND
GENERAL SHEET NOTES
1. THE MINIMUM WIDTH OF EACH DOOR OPENING SHALL BE
SUFFICIENT FOR THE OCCUPANT LOAD THEREOF AND
SHALL PROVIDE A CLEAR WIDTH OF NOT LESS THAN 32
INCHES. THE HEIGHT OF DOORS SHALL NOT BE LESS
THAN 80 INCHES.
2. EGRESS DOORS SHALL BE READILY OPERABLE FROM THE
EGRESS SIDE WITHOUT THE USE OF A KEY OR ANY
SPECIAL KNOWLEDGE OR EFFORT. ALL EGRESS DOORS
TO HAVE PANIC HARDWARE. PANIC HARDWARE SHALL
NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING
OF THE WRIST. FORCE REQUIRED TO ACTIVATE
OPERABLE PARTS SHALL BE 5 POUNDS MAXIMUM.
3. THE MEANS OF EGRESS, AND EXIT DISCHARGE, SHALL BE
ILLUMINATED AT ANY TIME THE BUILDING IS OCCUPIED
WITH A LIGHT INTENSITY OF NOT LESS THAN 1 FOOT-
CANDLE AT THE WALKING SURFACE LEVEL.
4. THE EGRESS PATH SHALL REMAIN FREE AND CLEAR OF
ALL OBSTRUCTIONS AT ALL TIMES. NO STORAGE IS
PERMITTED IN ANY EGRESS PATHS.
5. PER DIRECTION OF THE PROJECT CONTRACTING
OFFICER , AND PER GUIDANCE OF ABAAS SCOPING
REQUIREMNTS (F203.6 MACHINERY SPACES) PORTIONS
OF THE PLAN INCLUDING DEDICATED MECHANICAL
SPACES AND LOCKER AND BREAK ROOM FACILITIES
6. ACCESSED ONLY BY PLANT OPERATIONS PERSONNEL
ARE NOT REQUIRED TO BE REACHABLE BY CONTINUOUS
ACCESSIBLE PATHS.
7. CONTRACTOR TO SUBMIT TEMPORARY LIFE SAFETY
PLANS IN THE EVENT REQUIRED EXITS ARE BLOCKED
DURING CONSTRUCTION.
PROJECT CODE SUMMARY
1" = 10'-0"F1 LEVEL 1 - OCCUPANT LOAD
1" = 10'-0"F3 FIRST FLOOR - OCCUPANT LOAD
PATH "1A"
COMMON
PATH
DISTANCE
ALLOWABLE
COMMON
PATH
ACTUAL
TRAVEL
DISTANCE
ALLOWABLE
TRAVEL
DISTANCE
31' - 10" 100'-0" 111' - 9" 400'-0"
PATH "3B"
COMMON
PATH
DISTANCE
ALLOWABLE
COMMON
PATH
ACTUAL
TRAVEL
DISTANCE
ALLOWABLE
TRAVEL
DISTANCE
25' - 9" 100'-0" 36' - 9" 400'-0"
PATH "2B"
COMMON
PATH
DISTANCE
ALLOWABLE
COMMON
PATH
ACTUAL
TRAVEL
DISTANCE
ALLOWABLE
TRAVEL
DISTANCE
0' - 0" 100'-0" 32' - 7" 400'-0"
OCCUPANCY LEGEND
EGRESS TRAVEL DISTANCES:
PATH "4C"
COMMON
PATH
DISTANCE
ALLOWABLE
COMMON
PATH
ACTUAL
TRAVEL
DISTANCE
ALLOWABLE
TRAVEL
DISTANCE
0' - 0" 100'-0" 74' - 2" 400'-0"
EGRESS TRAVEL DISTANCES:
EGRESS TRAVEL DISTANCES:
1" = 10'-0"C3 CATWALK LEVEL
PATH "5A"
COMMON
PATH
DISTANCE
ALLOWABLE
COMMON
PATH
ACTUAL
TRAVEL
DISTANCE
ALLOWABLE
TRAVEL
DISTANCE
17' - 2" 100'-0" 107' - 0" 400'-0"
PATH "6A"
COMMON
PATH
DISTANCE
ALLOWABLE
COMMON
PATH
ACTUAL
TRAVEL
DISTANCE
ALLOWABLE
TRAVEL
DISTANCE
23' - 2" 100'-0" 88' - 0" 400'-0"
PATH "7A"
COMMON
PATH
DISTANCE
ALLOWABLE
COMMON
PATH
ACTUAL
TRAVEL
DISTANCE
ALLOWABLE
TRAVEL
DISTANCE
37' - 10" 100'-0" 74' - 3" 400'-0"
PATH "8A"
COMMON
PATH
DISTANCE
ALLOWABLE
COMMON
PATH
ACTUAL
TRAVEL
DISTANCE
ALLOWABLE
TRAVEL
DISTANCE
92' - 11" 100'-0" 146' - 7" 400'-0"
OCCUPANT SCHEDULE
Name Area Area Per Occupant
OCCUPANT LOAD
PRESCRIBED CALCULATED
B - BUSINESS 993 SF 150 SF 0 7
S - STORAGE 2716 SF 500 SF 0 6
U - UTILITY 8568 SF 10 0
UNOCCUPIED 7100 SF 0
OCCUPANT LOAD (40.1.7):
• "MAXIMUM PROBABLE NUMBER OF OCCUPANTS PRESENT
AT ANY TIME" PER TABLE 7.3.1.2 - NO PRESCRIPTIVE
OCCUPANCY CALCULATION BASED ON AREA:
• ASSUMED UTILITY OCCUPANCY PER DIRECTION FROM
END USER IS NO GREATER THAN 10 OCCUPANTS.
TRAVEL DISTANCE (40.2.6.1) AND
COMMON PATH OF TRAVEL (40.2.5.1):
INDUSTRIAL (EXISTING):
MAX TRAVEL DISTANCE:
FULLY SPRINKLERED 400' - 0"
MAX COMMON PATH OF TRAVEL:
FULLY SPRINKLERED = 100' - 0"
R E
F
DN
R E
F
R E
F
R E
F
65432
D D
C
B
A
E E
F F
G G
E7E6E5E4E3E2E1
H H
J J
K K
PHASE 1 CONSTRUCTION AREA
NOT UNDER CONSTRUCTION
IN THIS PHASE
65432
D D
C
B
A
E E
F F
G G
E7E6E5E4E3E2E1
H H
J J
K K
PHASE 2 CONSTRUCTION AREA
NOT UNDER CONSTRUCTION
IN THIS PHASE
65432
D D
C
B
A
E E
F F
G G
E7E6E5E4E3E2E1
H H
J J
K K
PHASE 3A CONSTRUCTION
AREA
NOT UNDER CONSTRUCTION
IN THIS PHASE
PHASE 3A
CONSTRUCTION AREA
TEMP. DUST
PARTITION
65432
D D
C
B
A
E E
F F
G G
E7E6E5E4E3E2E1
H H
J J
K K
NOT UNDER CONSTRUCTION
IN THIS PHASE
PHASE 3A
CONSTRUCTION AREANOT UNDER CONSTRUCTION
IN THIS PHASE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C L o c a l R e v it F ile s \5
-1
-K
S
W ic h it a V
A M
C B o ile rs E rm in
.r v t
/7
/2
:5
:3
P M
13-AE003
PHASING PLANS INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
2021-09-03 JBS/MKL EXB/JTK553-19-KS
100% BID SHEET
FULLY SPRINKLERED
1" = 10'-0"C1 PHASE 1 - SURROUNDING SITEWORK
1" = 10'-0"F1 PHASE 2 - BOILER PLANT ADDITION
1" = 10'-0"C6 PHASE 3A - EXISTING PLANT RENOVATION
PHASE 1 CONSISTS OF THE FOLLOWING WORK:
A. ISOLATE NORTH HPS AND PC LINES AND
DEMOLISH PIPING AND PIPE TRENCH BACK TO
THE NORTHEAST CORNER OF BUILDING 20.
B. DECOMMISSION, CLEAN, AND REMOVE THE
E-85 FUEL STORAGE TANK LOCATED AT THE
NORTHWEST CORNER OF BUILDING
13. REMOVE ALL ASSOCIATED POWER /
CONTROLS, FOUNDATIONS, ETC., AND TURN
OVER TANK TO THE VA FOR STORAGE /
REUSE.
C. REROUTE MEDIUM VOLTAGE DUCTBANK
CURRENTLY IN THE FOOTPRINT OF THE NEW
BUILDING 13 ADDITION. SEE ELECTRICAL
DRAWINGS FOR DETAILS.
D. REMOVE / REROUTE ALL EXISTING
ELECTRICAL PANELS AND ASSOCIATED
CONDUITS THAT ARE IN THE FOOTPRINT OF
THE NEW BUILDING 13 ADDITION. REFER TO
ELECTRICAL DRAWINGS FOR DETALS.
E. REROUTE EXISTING FIRE WATER LINE
ENTERING THE NORTHEAST CORNER OF
BUILDING 13. REFER TO CIVIL DRAWINGS FOR
DETAILS.
F. REROUTE EXISTING GAS LINE ENTERING THE
NORTH WALL OF BUILDING 13. REFER TO
MECHANICAL DRAWINGS FOR DETAILS.
G. REROUTE STORM WATER PIPING CURRENTLY
LOCATED IN THE FOOTPRINT OF THE NEW
BUILDING 13 ADDITION. REFER TO CIVIL
DRAWINGS FOR DETAILS.
H. REROUTE DOMESTIC WATER LINE ENTERING
THE NORTH WALL OF BUILDING 13. REFER TO
CIVIL DRAWINGS FOR DETAILS.
PHASE 2 CONSISTS OF THE FOLLOWING WORK:
CONSTRUCTION OF BOILER PLANT ADDITION
A. CONSTRUCTION OF ADDITION STRUCTURE,
SHELL AND INTERIOR.
B. INSTALLATION OF NEW BOILER PLANT
EQUIPMENT AND SUPPORT.
C. CONNECTION OF NEW SYSTEMS TO CAMPUS
INFRASTRUCTURE.
D. COMISSIONING OF NEW BOILER PLANT
EQUIPMENT AND START TRANSITION FROM
EXISTING BOILER PLANT EQUIPMENT.
E. INSTALL FURNISHINGS OF ADDITION
INTERIOR.
F. COMPLETE TRANSFER FROM EXISTING
EQUIPMENT AND SYSTEMS TO NEW.
PHASE 3A CONSISTS OF THE FOLLOWING WORK:
RENOVATION AND RECONFIGURATION OF THE
EXISTING BOILER PLANT
A. SELECTIVE DEMOLITION OF EXISTING SHELL
ELEMENTS.
B. DECOMISSIONING AND REMOVAL OF
EXISTING EQUIPMENT AND SYSTEMS.
C. UPGRADES TO THE EXISTING BUILDING TO
MEET PSRDM REQUIREMENTS INCLUDING
BUT NOT LIMITED TO REPLACEMENT OF
EXTERIOR WINDOWS.
D. CONSTRUCTION OF NEW BREAK AREA,
EMPLOYEE LOCKER AND STORAGE ROOM.
E. CONSTRUCTION OF NEW ELEVATED
PLATFORM IN FORMER BOILER PLANT.
F. CONVERT EXISTING LOCKER ROOM TO NEW
TOILET ROOM. CONTRACTOR TO MAINTAIN
ACCESS TO EXISTING TOILET ROOM
THROUGHOUT THIS PHASE.
G. RENOVATE PORTION OF NEW CONTRACTOR
TOUCHDOWN AREA. CONSTRUCT TEMP.
DUST PARTITION WALL. CONTRACTOR TO
MAINTAIN EGRESS PATH OF TRAVEL
THROUGHOUT THIS PHASE.
1" = 10'-0"F6 PHASE 3B - EXISTING PLANT RENOVATION
PHASE 3 CONSISTS OF THE FOLLOWING WORK:
RENOVATION OF, RECONFIGURATION OF, AND
CONNECTION TO THE EXISTING BOILER PLANT
A. SELECTIVE DEMOLITION OF EXISTING SHELL
ELEMENTS.
B. UPGRADES TO THE EXISTING BUILDING TO
MEET PSRDM REQUIREMENTS INCLUDING
BUT NOT LIMITED TO REPLACEMENT OF
EXTERIOR WINDOWS.
C. RENOVATED EXISTING TOILET ROOM.
CONTRACTOR TO MAINTAIN ACCESS TO
ADJACENT TOILET ROOM THROUGHOUT THIS
PHASE.
D. RENOVATE REMAINING PORTION OF NEW
CONTRACTOR TOUCHDOWN AREA.
CONTRACTOR TO MAINTAIN EGRESS PATH OF
TRAVEL THROUGHOUT THIS PHASE.
166 SF
EQUIPMENT
102A-3
P-1
VB
EXIST.
A
-3
3810 mm (12' - 6") m m
/4
610 mm (2' - 0")
CL
G3d
1 X
G3d
1 X
142142
14 SF
EQ. CLOSET
102-3
4.00
4646 47
EQUIPMENT
102A-3
OPEN
ABOVE
151 151
151 151
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C L o c a l R e v it F ile s \5
-1
-K
S
W ic h it a V
A M
C B o ile rs E rm in
.r v t
/7
/2
:0
:4
P M
03-AE400.01
BLDG 3 SECURITY EQ. CLOSET INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
2021-09-03 JBS/MKL EXB/JTK553-19-KS
100% BID SHEET
FULLY SPRINKLERED
1/4" = 1'-0"F1 BUILDING 3 SECURITY EQ. CLOSET
GENERAL NOTES
KEYED NOTES
4 DEMOLISH EXISTING CASEWORK WITHIN ROOM; SCHEDULE
WITH OWNER REMOVAL OF EXIST. FURNITURE
5 DEMOLISH PORTION OF EXISTING WALL; PREP AREA FOR
NEW FINISH.
44 PATCH FLOORING TO MATCH EXISTING
45 REMOVE EXISTING (3) LIGHT PENDANT FIXTURES AND
SALVAGE ON SITE AS DIRECTED BY VA COR; REPLACE ACT
TILES
46 DEMOLISH EXISTING ACT CEILING ONLY AT NEW CLOSET
AREA, PREP AREA FOR NEW FINISH
47 DEMOLISH EXISTING WINDOW IN ENTIRETY
50 PROVIDE TEMPORARY DUST PARTITION BARRIERS DURING
CONSTRUCTION; REF. SHEET AE503 FOR DETAILS
141 WINDOW OPENING INFILL TO MATCH EXISING WALL
CONSTRUCTION ON INTERIOR AND EXTERIOR SIDE
142 PATCH FLOOR AND MATCH EXISTING FINISH
151 LIGHT FIXTURE; REF. ELEC. DWGS
1. REFER TO SHEET AE701 FOR DOOR AND HARDWARE INFORMATION.
2. REFER TO SHEET AE501 FOR PARTITION ASSEMBLY TYPES.
3. REFER TO SHEET AF601 FOR SIGNAGE TYPES AND SCHEDULE.
1/4" = 1'-0"C1 BUILDING 3 SECURITY EQ. CLOSET DEMOLITION
1/4" = 1'-0"F4 BUILDING 3 SECURITY EQ. CLOSET RCP
65432
D D
E E
F F
G G
NEW BOILER
ADDITION ABOVE
OUTLINE OF
ADDITION
FOUNDATION
OUTLINE OF
ADDITION
FOUNDATION
NEW ADDITION ABOVE
13-AE401.02
F1
D1
13-AE301.03
D1
13-AE301.03
B5
13-AE302.02
B5
13-AE302.02
F1
13-AE302.02
F1
13-AE302.02
F5
13-AE302.02
F5
13-AE302.02
H H
J J
K K
AE501
C4
D3
AE502
AE502
C2
NEW PUMP
ROOM
B-3
FE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C L o c a l R e v it F ile s \5
-1
-K
S
W ic h it a V
A M
C B o ile rs E rm in
.r v t
/3
/2
:4
:0
P M
13-AE101.02
BASEMENT PLAN, PHASE 2 INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
2021-09-03 JBS/MKL EXB/JTK553-19-KS
100% BID SHEET
FULLY SPRINKLERED
1/4" = 1'-0"D1 BASEMENT PLAN, PHASE 2
GENERAL NOTES
KEYED NOTES
103 STEEL GRATE OPEN STAIRS AND LANDING
118 ACCESS LADDER ATTACHED TO WALL
1. WHERE NEW WORK IS INDICATED TO MATCH EXISTING, PROVIDE
EQUAL MATERIALS, COLORS AND FINISHES AND PERFORM WORK
IN MANNER TO ELIMINATE EVIDENCE OF NEW WORK.
2. DIMENSIONS ARE TO FINISHED FACE OF WALL OR GRIDLINE. DO
NOT SCALE DRAWINGS.
3. PROTECT EXISTING SURFACES AND MATERIALS INDICATED TO
REMAIN FROM DAMAGE OR DETERIORATION DUE TO
PERFORMANCE OF WORK. PATCH AND REPAIR EXISTING
MATERIALS AND SURFACES DAMAGED OR AFFECTED BY
PERFORMANCE OF THE WORK.
4. WORK INCLUDES PREPARATION OF EXISTING SURFACES TO
RECEIVE NEW WORK WHERE INDICATED.
5. ALL ANGLES ARE 90 DEGREES UNLESS NOTED OTHERWISE.
6. COORDINATE FIRE EXTINGUISHER, FIRE ALARM STROBES AND
PULL STATION LOCATIONS WITH COR. MOUNT IN ACCORDANCE
WITH FEDERAL ABAAS STANDARDS.
7. VERIFY DIMENSIONS AND LOCATIONS OF OPENINGS, BASES AND
SUPPORTS FOR EQUIPMENTS, DUCTS, PIPING , CONDUITS, ETC.
WHERE REQUIRED FOR NEW WORK, NEATLY CUT OPENINGS IN
EXISTING CONSTRUCTION. DO NOT USE IMPACT TOOLS. REVIEW
OPENING LOCATIONS WITH COR PRIOR TO STARTING WORK.
KEEP OPENINGS TO MINIMUM REQUIRED TO ALLOW FOR NEW
WORK. PROVIDE FIRE STOPPING AS REQUIRED.
8. OBTAIN HOT WORK PERMIT FROM COR PRIOR TO PERFORMING
ANY WORK REQUIRING OPEN FLAME.
9. PROVIDE FIRE RETARDANT TREATED WOOD FOR BLOCKING AND
ROUGH BUCKS. COORDINATE LOCATIONS WITH EQUIPMENT AND
DOOR INSTALLER. INSTALL PRIOR TO CLOSING WALLS.
10. PREPARE SURFACES IN ACCORDANCE WITH MANUFACTURER’S
INSTRUCTIONS AND RECOMMENDATIONS FOR APPLICATIONS
INDICATED WHERE NEW MATERIALS ARE TO BE INSTALLED ON
EXISTING SUBSTRATE.
11. WHERE FLOOR FINISHES CHANGE PLACE TRANSITION UNDER
CENTER OF DOOR OR FINISHED OPENING.
12. EXPOSED CMU TO BE FILLED AND PAINTED, SEE SPECS.
65432
D
E
F
G
7 8
2642 mm (8' - 8") 1016 mm (3' - 4") 1626 mm (5' - 4") 3048 mm (10' - 0") 1626 mm (5' - 4") 3048 mm (10' - 0") 1829 mm (6' - 0") 3048 mm (10' - 0") 1626 mm (5' - 4") 1016 mm (3' - 4") 3861 mm (12' - 8") 1930 mm (6' - 4") 406 mm (1' - 4")1016 mm (3' - 4") 4166 mm (13' - 8") 1930 mm (6' - 4") 2540 mm (8' - 4") m m m m
8' m m
752 mm (2' - 5 1/2") 3727 mm (12' - 2 3/4") 4686 mm (15' - 4 1/2") 9602 mm (31' - 6") 5105 mm (16' - 9") 5874 mm (19' - 3 1/4") 5874 mm (19' - 3 1/4") 753 mm (2' - 5 3/4")
D1
13-AE301.03
D1
13-AE301.03
B5
13-AE302.02
B5
13-AE302.02
F1
13-AE302.02
F1
13-AE302.02
F5
13-AE302.02
F5
13-AE302.02
AE507
B1
AE503
B8 m m
/4
F7
13-AE311.02
F7
13-AE312.02
F5
13-AE311.02
F3
13-AE313.02
13-AE203.02
C1 m m
/4 m m
6' m m
6' m m
8' m m
5' m m
6'
/4 m m
3' m m
1'
/4 m m
9'
3/
4"
3658 mm (12' - 0")
13-AE204.02B6
13-AE203.02
F1
13-AE203.02C6
4978 mm (16' - 4")3658 mm (12' - 0")2858 mm (9' - 4 1/2") m m
5'
/2 m m
3/ 4" m m m m
6'
1016 mm (3' - 4")
7518 mm (24' - 8")1626 mm (5' - 4")5486 mm (18' - 0")
8322 mm (27' - 3 3/4") m m
5' m m
/4
635 mm (2' - 1")
1626 mm (5' - 4") 10058 mm (33' - 0") m m
/2
E7E6E5E4E3E2E1
H
13-AE203.02F6
290 SF
EQUIPMENT
ROOM
M-17
383 SF
GENERATOR
ROOM
M-15
256 SF
CORRIDOR
M-16
472 SF
TRANSFORMER
ROOM
M-14
120 SF
I.T. ROOM
M-12
128 SF
ELECTRICAL
M-13
97 SF
OFFICE
M-9
44 SF
SECURITY
M-10
44 SF
HAC
M-11
289 SF
CONTROL
ROOM
M-8
2854 SF
BOILER
ROOM
M-18 F3
13-AE311.02
213A
228 227
12319 mm (40' - 5")
100100
102102
100100
105 105 105
106 106
107107107107
108108
UP
DN
D6
B3
J
K
AE503
B5
M8d
M8d
M8d
M8d
M8d
M8d
M8d
M8d
M8d
M8d
M8d
M8d
M8d
AE501
C1
206 mm (8") m m
2'
FE
C1
36373 mm (119' - 4")
202 202
CT-1
CT-2
F2d
F2d
F2d
T
F2d
T
13-AE401.02
C4
M8d
M8d
M8d
M8d
M8d
B4
AE502
AE502E1
13-AE401.02
F5
M8d
FEFE
m m
1'
/4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C L o c a l R e v it F ile s \5
-1
-K
S
W ic h it a V
A M
C B o ile rs E rm in
.r v t
/3
/2
:4
:2
P M
13-AE111.02
MAIN LEVEL, PHASE 2 INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
2021-09-03 JBS/MKL EXB/JTK553-19-KS
100% BID SHEET
FULLY SPRINKLERED
1/4" = 1'-0"E1 FIRST FLOOR, PHASE 2
NEW WORK GENERAL NOTESKEYED NOTES
1. DIMENSIONS ARE TO FINISHED FACE OF WALL OR GRIDLINE. DO NOT SCALE
DRAWINGS.
2. PROTECT EXISTING SURFACES AND MATERIALS INDICATED TO REMAIN FROM
DAMAGE OR DETERIORATION DUE TO PERFORMANCE OF WORK. PATCH AND
REPAIR EXISTING MATERIALS AND SURFACES DAMAGED OR AFFECTED BY
PERFORMANCE OF THE WORK.
3. PREPARE EXISTING SURFACES TO RECEIVE NEW WORK.
4. ALL ANGLES ARE 90 DEGREES UNLESS NOTED OTHERWISE.
5. COORDINATE FIRE EXTINGUISHER, FIRE ALARM STROBES AND PULL STATION
LOCATIONS WITH COR. MOUNT IN ACCORDANCE WITH FEDERAL ABAAS
STANDARDS.
6. VERIFY DIMENSIONS AND LOCATIONS OF OPENINGS, BASES AND SUPPORTS FOR
EQUIPMENTS, DUCTS, PIPING, CONDUITS, ETC. WHERE REQUIRED FOR NEW
WORK, NEATLY CUT OPENINGS IN EXISTING CONSTRUCTION USING POWER SAWS
OR CORE DRILLS. DO NOT USE IMPACT TOOLS. REVIEW OPENING LOCATIONS
WITH COR PRIOR TO STARTING WORK. KEEP OPENINGS TO MINIMUM REQUIRED
TO ALLOW FOR NEW WORK. PROVIDE FIRE STOPPING AS REQUIRED.
7. OBTAIN BURN PERMIT FROM COR PRIOR TO PERFORMING ANY WORK REQUIRING
OPEN FLAME.
8. EXAMINE EXISTING SUBSTRATES TO RECEIVE NEW MATERIAL OR FINISH.
PREPARE SUBSTRATE AS REQUIRED TO MEET MANUFACTURER'S INSTRUCTIONS
OR RECOMMENDATIONS FOR PROPER APPLICATION OF NEW MATERIALS.
9. WHERE FLOOR FINISHES CHANGE, PLACE TRANSITION UNDER CENTER OF DOOR
OR FINISHED OPENING.
10. EXPOSED CMU TO BE FILLED AND PAINTED, SEE SPECS.
11. REFER TO SHEET AE501 FOR PARTITION ASSEMBLY TYPES.
12. REFER TO SHEET AE701 FOR DOOR AND HARDWARE INFORMATION.
100 CONCRETE FLOOR; RE STRUCTURAL DWGS
102 SLAB TRENCH; RE STRUCTURAL/MECHANICAL
103 STEEL GRATE OPEN STAIRS AND LANDING
104 GUARDRAIL AT STAIR OPENING
105 ROOF HATCH; REF. DETAILS
106 12" CMU WALL WITH FACE BRICK TO MATCH EXISTING. RE WALL SECTIONS, RE
STRUCTURAL
107 BLAST-RATED HMF EXTERIOR DOOR. DOUBLE-LEAF DOORS TO HAVE
REMOVABLE ASTRAGAL. RE DOOR SCHEDULE
108 BLAST-RATED EXTERIOR OHD. RE DOOR SCHEDULE
109 BLAST-RATED WINDOW.
110 BLAST-RATED LOUVER.
112 BLAST-RATED HMF DOOR
113 INTERIOR WINDOW WALL WITH TEMPERED GLAZING
114 COUNTERTOP WITH CONTROL PANEL; RE MECHANICAL
115 MOP SINK; RE PLUMBING
124 EXISTING MASONRY WALL
129 FLOOR ACCESS HATCH, CLEAR OPENING MUST BE 3'-6" WIDE BY 4'-0" LONG; REF.
STRUC. DWGS
202 PRE-FINISHED STAINLESS STEEL CONDUCTOR HEAD
NUMBER NAME FLOOR BASE WALL CEILING COMMENTS
102-A3 EQUIPMENT EXIST. VB P-1 - BLDG.3 LOCATION
B-1 EXISTING PUMP ROOM C-1 - CMU/P-1 -
B-2 STORAGE C-1 - CMU/P-1 -
B-3 PIPE STORAGE C-1 - CMU/P-1 -
B-4 NEW PUMP ROOM C-1 - CMU/P-1 -
C-1 STORAGE C-1 - CMU/P-1 -
M-1 TOILET CT-1 CT-2 CT-2 ACT
M-2 TOILET CT-1 CT-2 CT-2 ACT
M-3 LOCKER ROOM C-1 VB CMU/GWB/P-1 ACT
M-4 SHOWER ROOM C-1 - CMU/GWB/P-1 GWB/P-WHITE SLIP RESISTANT FLOOR
M-5 BREAK AREA C-1 VB AT GWB CMU/GWB/P-1 ACT
M-6 CONTRACTOR TOUCHDOWN C-1 VB AT GWB CMU/GWB/P-1 ACT
M-7 PASSAGE C-1 VB AT GWB CMU/GWB/P-1 ACT
M-8 CONTROL ROOM C-1 - CMU/P-1 ACT
M-9 OFFICE C-1 VB AT GWB CMU/GWB/P-1 ACT
M-10 SECURITY C-1 - CMU/P-1 GWB/P-WHITE
M-11 HAC C-1 - CMU/P-1 -
M-12 I.T. ROOM C-1 - CMU/P-1 GWB/P-WHITE
M-13 ELECTRICAL C-1 - CMU/P-1 -
M-14 TRANSFORMER C-1 - CMU/P-1 -
M-15 GENERATOR ROOM C-1 - CMU/P-1 -
M-16 CORRIDOR C-1 - CMU/P-1 -
M-17 EQUIPMENT ROOM C-1 - CMU/P-1 -
M-18 BOILER ROOM C-1 - CMU/P-1 -
M-19 EQUIPMENT C-1 - CMU/P-1 -
ROOM FINISH SCHEDULE
DN
DN
UP
65432
D D
E E
F F
G G
7 8
D1
13-AE301.03
D1
13-AE301.03
B5
13-AE302.02
B5
13-AE302.02
F1
13-AE302.02
F5
13-AE302.02
752 mm (2' - 5 1/2") 3727 mm (12' - 2 3/4") 4686 mm (15' - 4 1/2") 9602 mm (31' - 6") 5105 mm (16' - 9") 5874 mm (19' - 3 1/4") 5874 mm (19' - 3 1/4") 753 mm (2' - 5 3/4")
F7
13-AE311.02
F7
13-AE312.02
F5
13-AE311.02
F3
13-AE313.02
m m
/4 m m
3/
4" m m m m
3/
4" m m
1'
/4
36373 mm (119' - 4")
H
F3
13-AE311.02
J
K
132132
132132 132132
132132
132132
109 109 109 109 109
122122
F7
13-AE313.02
1321 mm (4' - 4") 1829 mm (6' - 0") 2743 mm (9' - 0") 1829 mm (6' - 0") 2845 mm (9' - 4") 1829 mm (6' - 0") 3048 mm (10' - 0") 1829 mm (6' - 0") 3251 mm (10' - 8") 1829 mm (6' - 0") 2005 mm (6' - 7") m m
9' m m
6' m m m m
6' m m
8'
B4
AE502
110 109 108 107 106 105 104 103 102 101
FE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C L o c a l R e v it F ile s \5
-1
-K
S
W ic h it a V
A M
C B o ile rs E rm in
.r v t
/3
/2
:4
:4
P M
13-AE121.02
CATWALK LEVEL, PHASE 2 INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
2021-09-03 JBS/MKL EXB/JTK553-19-KS
100% BID SHEET
FULLY SPRINKLERED
1/4" = 1'-0"D1 CATWALK LEVEL
NEW WORK GENERAL NOTES
KEYED NOTES
103 STEEL GRATE OPEN STAIRS AND LANDING
109 BLAST-RATED WINDOW.
118 ACCESS LADDER ATTACHED TO WALL
122 NEW ROOF EQUIPMENT; REF. MECHANICAL
127 METAL GUARDRAIL
132 CATWALK PLATFORM; REF. STUC. DWGS
202 PRE-FINISHED STAINLESS STEEL CONDUCTOR HEAD
208 MANUF. LIMESTONE COPING
NUMBER NAME FLOOR BASE WALL CEILING COMMENTS
102-A3 EQUIPMENT EXIST. VB P-1 - BLDG.3 LOCATION
B-1 EXISTING PUMP ROOM C-1 - CMU/P-1 -
B-2 STORAGE C-1 - CMU/P-1 -
B-3 PIPE STORAGE C-1 - CMU/P-1 -
B-4 NEW PUMP ROOM C-1 - CMU/P-1 -
C-1 STORAGE C-1 - CMU/P-1 -
M-1 TOILET CT-1 CT-2 CT-2 ACT
M-2 TOILET CT-1 CT-2 CT-2 ACT
M-3 LOCKER ROOM C-1 VB CMU/GWB/P-1 ACT
M-4 SHOWER ROOM C-1 - CMU/GWB/P-1 GWB/P-WHITE SLIP RESISTANT FLOOR
M-5 BREAK AREA C-1 VB AT GWB CMU/GWB/P-1 ACT
M-6 CONTRACTOR TOUCHDOWN C-1 VB AT GWB CMU/GWB/P-1 ACT
M-7 PASSAGE C-1 VB AT GWB CMU/GWB/P-1 ACT
M-8 CONTROL ROOM C-1 - CMU/P-1 ACT
M-9 OFFICE C-1 VB AT GWB CMU/GWB/P-1 ACT
M-10 SECURITY C-1 - CMU/P-1 GWB/P-WHITE
M-11 HAC C-1 - CMU/P-1 -
M-12 I.T. ROOM C-1 - CMU/P-1 GWB/P-WHITE
M-13 ELECTRICAL C-1 - CMU/P-1 -
M-14 TRANSFORMER C-1 - CMU/P-1 -
M-15 GENERATOR ROOM C-1 - CMU/P-1 -
M-16 CORRIDOR C-1 - CMU/P-1 -
M-17 EQUIPMENT ROOM C-1 - CMU/P-1 -
M-18 BOILER ROOM C-1 - CMU/P-1 -
M-19 EQUIPMENT C-1 - CMU/P-1 -
ROOM FINISH SCHEDULE
1. WHERE NEW WORK IS INDICATED TO MATCH EXISTING, PROVIDE
EQUAL MATERIALS, COLORS AND FINISHES AND PERFORM WORK
IN MANNER TO ELIMINATE EVIDENCE OF NEW WORK.
2. DIMENSIONS ARE TO FINISHED FACE OF WALL OR GRIDLINE. DO
NOT SCALE DRAWINGS.
3. PROTECT EXISTING SURFACES AND MATERIALS INDICATED TO
REMAIN FROM DAMAGE OR DETERIORATION DUE TO
PERFORMANCE OF WORK. PATCH AND REPAIR EXISTING
MATERIALS AND SURFACES DAMAGED OR AFFECTED BY
PERFORMANCE OF THE WORK.
4. WORK INCLUDES PREPARATION OF EXISTING SURFACES TO
RECEIVE NEW WORK WHERE INDICATED.
5. ALL ANGLES ARE 90 DEGREES UNLESS NOTED OTHERWISE.
6. COORDINATE FIRE EXTINGUISHER, FIRE ALARM STROBES AND
PULL STATION LOCATIONS WITH COR. MOUNT IN ACCORDANCE
WITH FEDERAL ABAAS STANDARDS.
7. VERIFY DIMENSIONS AND LOCATIONS OF OPENINGS, BASES AND
SUPPORTS FOR EQUIPMENTS, DUCTS, PIPING , CONDUITS, ETC.
WHERE REQUIRED FOR NEW WORK, NEATLY CUT OPENINGS IN
EXISTING CONSTRUCTION. DO NOT USE IMPACT TOOLS. REVIEW
OPENING LOCATIONS WITH COR PRIOR TO STARTING WORK. KEEP
OPENINGS TO MINIMUM REQUIRED TO ALLOW FOR NEW WORK.
PROVIDE FIRE STOPPING AS REQUIRED.
8. OBTAIN HOT WORK PERMIT FROM COR PRIOR TO PERFORMING
ANY WORK REQUIRING OPEN FLAME.
9. PROVIDE FIRE RETARDANT TREATED WOOD FOR BLOCKING AND
ROUGH BUCKS. COORDINATE LOCATIONS WITH EQUIPMENT AND
DOOR INSTALLER. INSTALL PRIOR TO CLOSING WALLS.
10. PREPARE SURFACES IN ACCORDANCE WITH MANUFACTURER’S
INSTRUCTIONS AND RECOMMENDATIONS FOR APPLICATIONS
INDICATED WHERE NEW MATERIALS ARE TO BE INSTALLED ON
EXISTING SUBSTRATE.
11. WHERE FLOOR FINISHES CHANGE PLACE TRANSITION UNDER
CENTER OF DOOR OR FINISHED OPENING.
12. EXPOSED CMU TO BE FILLED AND PAINTED, SEE SPECS.
13. REFER TO SHEET AE501 FOR PARTITION ASSEMBLY TYPES.
14. REFER TO SHEET AE701 FOR DOOR AND HARDWARE
INFORMATION.
DN
UP
65432
D D
E E
F F
G G
7 8
H H
35935 mm (117' - 10 3/4")
752 mm (2' - 5 1/2") 3727 mm (12' - 2 3/4") 4686 mm (15' - 4 1/2") 4686 mm (15' - 4 1/2") 4916 mm (16' - 1 1/2") 5105 mm (16' - 9") 5874 mm (19' - 3 1/4") 5874 mm (19' - 3 1/4") 314 mm (1' - 0 1/2") m m
/4
122 122 122
/4
R
O O
F S
L O
P E
/4
R
O O
F S
L O
P E
/4
R
O O
F S
L O
P E
128128128
1/8" / 1'-0"
CRICKET SLOPE
1/8" / 1'-0
CRIC
KET S
LOPE
1/8" / 1'-0"
CRICKET SLOPE
1/8" / 1'-0
CRIC
KET S
LOPE
1/8" / 1'-0"
CRICKET SLOPE
1/8" / 1'-0
CRIC
KET S
LOPE
123 123 123 123
123 123 123
123 123
120120
120120
202 202 202201
14390 mm (47' - 2 1/2") 10877 mm (35' - 8 1/4")
J J
K K
122122
128128 128128
128128
152152
152152 152
152 152 152 m m
3"
T Y
P
AE509
F1 m m
6' m m
6'
76 mm (3") TYP.
123 123
/4
R
O O
F S
L O
P E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C L o c a l R e v it F ile s \5
-1
-K
S
W ic h it a V
A M
C B o ile rs E rm in
.r v t
/3
/2
:4
:5
P M
13-AE131.02
ROOF PLAN, PHASE 2 INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
2021-09-03 JBS/MKL EXB/JTK553-19-KS
100% BID SHEET
FULLY SPRINKLERED
1/4" = 1'-0"D1 ROOF PLAN, PHASE 2
1. CONTRACTOR IS NOT TO SCALE CONSTRUCTION DOCUMENTS.
ARCHITECT AND OWNER ARE TO BE NOTIFIED IN THE EVENT A
DISCREPANCY IS FOUND IN EITHER SPECIFICATION OR
CONSTRUCTION DOCUMENTS AT THE EARLIEST PRACTICAL
OPPORTUNITY.
2. GENERAL CONTRACTOR SHALL OBSERVE ALL REGULATIONS
IMPOSED BY GOVERNING BODIES.
3. IF CONFLICT BETWEEN DRAWINGS, SPECIFICATIONS, AND
REQUIREMENTS OF THE BUILDING OWNER AND OR OPERATIONS
ARISE, THEY SHALL BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT AND OWNER IMMEDIATELY.
4. THE CONTRACTOR SHALL CONTAIN ALL CONSTRUCTION ACTIVITY,
INCLUDING STORAGE OR MATERIAL AND EQUIPMENT WITHIN
CONTRACT LIMITS, AT ALL TIMES BEING RESPONSIBLE FOR AND
ABIDING BY THE RULES AND REGULATIONS OF THE OWNER.
5. GENERAL CONTRACTOR IS TO BE RESPONSIBLE FOR REPAIRING
ANY AND ALL SURFACES DAMAGED BY HIMSELF OR
SUBCONTRACTORS UNDER HIS CONTROL. REPAIRS ARE TO
MATCH EXISTING MATERIAL AND MUST BE ACCEPTABLE TO THE
OWNER.
6. GENERAL CONTRACTOR SHALL REMOVE ALL CONSTRUCTION
DEBRIS FROM JOBSITE. ALL CONSTRUCTION DEBRIS SHALL BE
CONTAINED WITHIN CONSTRUCTION LIMITS.
7. FURNISH AND INSTALL U.L. APPROVED FIRE STOPPING
ASSEMBLIES AT ALL PENETRATIONS THROUGH EXISTING AND
NEW FIRE RATED CONSTRUCTION REQUIRED TO BY THE SCOPE
OF THIS PROJECT. THE CONTRACTOR SHALL ALSO BE
RESPONSIBLE TO FURNISH AND INSTALL FIRE STOPPING
ASSEMBLIES AT APPLICABLE CONSTRUCTION JOINTS TO ACHIEVE
THE IDENTIFIED RATING REQUIREMENTS.
8. ALL ROOFING DETAILS SHOWN ARE DIAGRAMMATIC IN NATURE
DUE TO THE NUMBER AND VARYING CONDITIONS ON THE ROOF.
CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS PRIOR TO
CONSTRUCTION.
9. ALL ROOF FLASHING SHALL BE 8" MIN. ABOVE THE NEW ROOF.
10. REFERENCE ROOF DETAILS SHEET FOR TYPICAL ROOF
CONDITIONS.
11. GENERAL CONTRACTOR TO REFERENCE 25-YEAR SPECIFICATION
REQUIREMENTS FOR TPO ROOF.
NEW WORK GENERAL NOTES
KEYED NOTES
120 WHITE TPO MEMBRANE ROOF - REF. SPECIFICATIONS
122 NEW ROOF EQUIPMENT; REF. MECHANICAL
123 BUILT-UP ROOF CRICKET W/ LIGHTWEIGHT CONCRETE FORM AND
TPO MEMBRANE
128 PROVIDE FLASHING FOR NEW ROOF PENETRATING PIPE
152 TIE-DOWN ROOF ANCHOR; REF. STRUCTURAL
153 MEMBRANE WALKWAY PADS. PROVIDE SLIP RESISTANT SURFACE.
FINAL LOCATION TO BE COORDINATED WITH FINAL EQUIPMENT
LOCATION
154 SAFETY GUARDRAIL
201 PRE-FINISHED OVERFLOW SCUPPER
202 PRE-FINISHED STAINLESS STEEL CONDUCTOR HEAD
208 MANUF. LIMESTONE COPING
MAIN LEVEL
6'-8"
6 5 4 3 2 1
LOW PARAPET
24'-0"
UPPER ROOF PARAPET
41'-11 3/4" m m m m m m
205 205 205
227 228 229
223222221
210209
109 110108107
207 208
106105
205 206
103 104
204203
101 102
202201
209209
209209
215 215
230 230230
230 230
215 215
215 215
215 215215
215 215 215
610 mm (2' - 0") 610 mm (2' - 0")3048 mm (10' - 0")1575 mm (5' - 2")3150 mm (10' - 4")1524 mm (5' - 0")3150 mm (10' - 4")1727 mm (5' - 8")3150 mm (10' - 4")1575 mm (5' - 2")4267 mm (14' - 0")
610 mm (2' - 0") 3861 mm (12' - 8") 4166 mm (13' - 8") 3353 mm (11' - 0")
232232 232232 232232
SHOP LEVEL
0"
INTERM. ROOF PARAPET
30'-10 1/2"
MAIN LEVEL
6'-8"
D
C B A
EFG
UPPER ROOF PARAPET
41'-11 3/4"
ADDITION
H
114113
213 214212211
111 112
209209
JK
223223223
215 216 m m
7'
/8
+/- 1626 mm (5' - 4")
215 215
610 mm (2' - 0")
610 mm (2' - 0") 5334 mm (17' - 6") 2540 mm (8' - 4") 4826 mm (15' - 10") 610 mm (2' - 0")
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C L o c a l R e v it F ile s \5
-1
-K
S
W ic h it a V
A M
C B o ile rs E rm in
.r v t
/3
/2
:4
:0
P M
13-AE201.02
EXTERIOR ELEVATIONS INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
2021-09-03 JBS/MKL EXB/JTK553-19-KS
100% BID SHEET
FULLY SPRINKLERED
1/4" = 1'-0"C1 NORTH ELEVATION
1/4" = 1'-0"F1 WEST ELEVATION
KEYED NOTES
201 PRE-FINISHED OVERFLOW SCUPPER
202 PRE-FINISHED STAINLESS STEEL CONDUCTOR HEAD
205 OVERHEAD DOOR, BLAST RATED; REF. SPECIFICATIONS
208 MANUF. LIMESTONE COPING
209 FACE BRICK-MATCH EXISTING
215 MASONRY CONTROL JOINT WITH BACKER ROD. COLOR TO
MATCH MASONRY, REF. STRUCTURAL
216 EXPANSION JOINT WITH BACKER ROD. COLOR TO MATCH
223 BRICK INFILL TO MATCH EXISING WALL CONSTRUCTION
224 GRADE LINE; REF. CIVIL DWGS
229 MANUF. LIMESTONE BAND
230 NEW LIGHT FIXTURE; REF. ELEC. DWGS
232 H-FRAME WITH HSS STRUCTURAL MEMBERS; REF. STRUCTURAL
233 LIMESTONE CONTROL JOINT WITH BACKER ROD. COLOR TO
MATCH LIMESTONE
SHOP LEVEL
0"
INTERM. ROOF PARAPET
30'-10 1/2"
MAIN LEVEL
6'-8"
MAIN LEVEL
6'-8"
7 8
LOW PARAPET
24'-0"
UPPER ROOF PARAPET
41'-11 3/4"
E7E6E5E4E3E2E1
209209
209209
215 215
116 117116
223223
217 218 219 220 221 222 223 224
115 116 117 118 119 120 121
122 123
40 40 40 41
215 215
234 234 234 234 234
610 mm (2' - 0") 7823 mm (25' - 8") 7518 mm (24' - 8") 7823 mm (25' - 8") 610 mm (2' - 0")
610 mm (2' - 0")6807 mm (22' - 4")3658 mm (12' - 0")1219 mm (4' - 0")
SHOP LEVEL
0"
INTERM. ROOF PARAPET
30'-10 1/2"
MAIN LEVEL
6'-8"
MAIN LEVEL
6'-8"
D
CBA
E F G
LOW PARAPET
24'-0"
UPPER ROOF PARAPET
41'-11…