589A7-18-302 Wichita Bid Drawings - 4_Architectural (SI) 1 of 2.pdf

PDF 9 MB Posted

Attached to
Z2DA--589A7-18-302 FCA Install New Boilers, Building 13 (VA-22-00049186)
Solicitation number
36C25522R0079
Issued by

About this file

This solicitation is for a firm fixed-price construction contract to install new boilers in Building 13 at the Robert J. Dole VA Medical Center in Wichita, Kansas. The scope of work includes demolishing the existing boiler plant, constructing a new addition, and renovating portions of the existing building. The contractor will install new boilers and related equipment, connect new systems to campus infrastructure, and commission the new boiler plant. The solicitation provides construction documents including plans, elevations, sections and details. The response due date is October 15, 2022. The period of performance is 540 calendar days. The place of performance is the medical center. The estimated value is $7.5 million. The solicitation is unrestricted and set-asides do not apply. The contracting agency is the Veterans Health Administration within the Department of Veterans Affairs.

View the file

Other files

File Type Posted
36C25522R0079 0005.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 2_Civil 1 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil 2 of 3.pdf PDF
36C25522R0079 0004.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 2_Civil 3 of 3.pdf PDF
S02 Pre-Bid Questions Solicitation No 36C25522R0079_VA Response.pdf PDF
36C25522R0079 0003.docx DOCX document
589-18-302 Boiler Pre Bid Attendance.pdf PDF
PROPOSAL SUBMITTAL INSTRUCTIONS 589A7-18-302 REV 08052022.docx DOCX document
36C25522R0079 0002.pdf PDF
589A7-18-302 Wichita Bid Drawings - 3 Structural.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 2 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 3 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 6_Plumbing 1 of 2.pdf PDF
589A7-18-302 Wichita Bid Drawings - 6_Plumbing 2 of 2.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 1 of 4.pdf PDF
36C25522R0079 0001.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 2 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 4 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 3_Structural (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 4_Architectural (SI) 2 of 2.pdf PDF
S02 P09 - 589A7-18-302 Wichita Bid Specs VOL 3 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 6_Plumbing (SI).pdf PDF
S02 P09 - 589A7-18-302 Wichita Bid Specs VOL 2 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 5 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 6 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 1 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical 3 of 6.pdf PDF
36C25522R0079_1.docx DOCX document
S02 ATTACMENT 3 Past Performance Questionnaire 36C25522R0079 Project 589A7-18-302.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 3 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 2 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 1_Hazardous Materials (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 1 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 1 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 5_ Fire Protection (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 4 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical 4 of 6.pdf PDF
589A7-18-302 Wichita Bid Specs VOL 1 of 3 (800pgs).pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 2 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 3 of 4.pdf PDF
P07 Wage Determination 20220708.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 0_General (SI).pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PULL

PULL

RADIOLOGY

RECORDS

RECOVERY

RECEPTION

M

MAINT

MECH

MACH MACHINE ROOM

MALE

MAINTENANCE

RECD

RECP

RECOV

RAD

ROOM

STAFF

REHABILITATION

SHOWER

SUPPLY

STAFF TOILET

SOILED UTILITY

SECRETARY

STAIRS

SUPPORT

STATION

STERILIZER

SERVICE

SWITCHGEAR

SUPERVISOR

SURGERY/ ICAL

STORAGE

MGR

MED

MRI

OFF

OR

ORTHO

OH

OB/GYN

OPERATING ROOM

MANAGER

OFFICE

MEDICATION/ MEDICAL

ORTHOPEDICS

OBSTETRICS/ GYNECOLOGY

ORAL HYGIENIST

MAGNETIC RESONANCE

IMAGING

SWGR

ST

STA

RM

S TLT

SVCE

SHR

S

STOR

SUPVR

SPRT

SPLY

SOIL

SECY

REHAB

STER

SURG

MECHANIC(AL)

EDUCATION

ELEVATOR

ELECTRIC(AL)

ED

ELEV

EMG

ELEC

ADMIN

ASSY

AUD

AMB

ASSEMBLY

ADMINISTRATION(OR)

AMBULATORY

AUDIOLOGY

"DN"

S

SIMILARSIM

SPEC

SF

SOUTH/ SINK

SQUARE FEET/ STOREFRONT

(NON - NCS ABBREVIATIONS ARE SHOWN

UNDERLINED) EXAMPLE:

ENDOSCOPY

EQUIPMENT

EXECUTIVE

ENDO

ENT

EQUIP

EXEC

FREEZER

FEMALE

FRZ

F

BALCONYBALC

CHEMICALCHEM

CHGN

CLASSCL

CHIRO CHIROPRACTOR

CHARGE NURSE

GENERAL

GYMNASIUM

GEN

GYM

HEAD

HOUSEKEEPINGHSKPG

HD

ICCU

HAZ MAT

CLERICAL

CLN

CLER

CLOSETCLO

CLRM CLASSROOM

CLEAN (ING)/ CLEAN UTILITY

COMM

CONF

CORRIDORCORR

COPY

COMMUNICATIONS

CONFERENCE

COPY/ WORK ROOM

COMMANDER/ COMMANDCMD

SQUARESQ

SST

STEEL

STC

STL

TREADT

THROUGHTHRU

TEMP

SOUND TRANSMISSION CLASS

STAINLESS STEEL

TEMPERATURE/ TEMPORARY

TOP OF

TOC

TO

TOF

TOM

TYPICALTYP

U

UC

TOS

HEAT TRANSFER COEFFICIENT

TOP OF FOOTING

TOP OF CONCRETE (CURB)

UNDERCUT

TOP OF MASONRY

TOP OF STEEL

SPECIFICATION(S)

HAZARDOUS MATERIALS

EAR NOSE THROAT

ELECTROMYOGRAPHY

INTENSIVE CARDIAC CARE UNIT

TECHNICIAN

TELEPHONE

TOILET

URINAL

TREATMENT

WAITING

WAREHOUSE

WATER CLOSET

WEIGHTS AND MEASURES

WEIGHT

WORK STATION, WORK ROOM

EXECUTIVE OFFICER

VESTIBULE

P

PHAR

PHYS

PEDS

PO

PSRDM

PRIN

PREP

POST OFFICE

PRINCIPAL

PHARMACY

PATIENT

PREPARATION

PEDIATRICS

PHYSICAL

PHYSICAL SECURITY RISK MITIGATION DESIGN

PROCTO

PROC

PUB

PT/OT

PULMO

PUBLIC

PHYSICAL / OCCUPATIONAL

THERAPY

PROCTOLOGY

PROCEDURE

PULMONARY

PARKINGPRKG

WT

WHSE

WAIT

VEST

UR

WORK

TRT

TECH

XO

WC

W & M

TEL

TLT

INFORMATION

ISOLATION

INJECTION

INFO

ICU

ISO

INJ

JANITOR

KITCHEN

JAN

JC

KIT

CSR

CT

CONTROLCTRL

CENTRAL STERILE ROOM

CAT SCAN

DRESSING

DEPT

D

DIRECTOR

DICTATION

DIR

DICT

DEPARTMENT

LAUNDRY

LABORATORY

LAU

LAB

LDRP

LCPO

LIBRARY

LOCKER

LIT/ FORMS

LIB

LPO

LKR

L/W

L/F

DOCTORDR

DOR

DRK

DTR

DARKROOM

DENTAL TREATMENT ROOM

DENTAL OPERATORY ROOM

DISP DISPENSING

UL

U/C/B

VACUUMV

U0N

VARIESVAR

VCT

VERTICAL

VTR

VERT

VENT THRU ROOF

UNLESS OTHERWISE NOTED

UNDERWRITERS LABORATORY

VINYL COMPOSITION TILE

UNDER COUNTER BASE

W

WITHW/

W

WITHOUT

WOOD

W/0

WD

WEIGHTWT

WP

WH WALL HUNG/ WATER HEATER

WEST /WATT

WATERPROOF / WORKING POINT

WIDTH /WIDE FLANGE

VWC VINYL WALL COVERING

WWF WELDED WIRE FABRIC

JANITOR'S CLOSET

LABOR DELIVERY RECOVERY POST PARTUM

LEADING CHIEF PETTY OFFICER

LEADING PETTY OFFICER

LITTER WHEELCHAIR

INTENSIVE CARE UNIT

KILOPASCAL

POUND

ANGLE

KPA

L

LB

EACH

ELEVATION

EACH END

EXPANSION JOINT

EA

EJ

EL

EE

AND&

DOLLAR (USD)

@ AT

NUMBER / POUND

NATIONAL CAD STANDARD ABBREVIATIONS

LINEAR FEET

METERS

MAXIMUM

LF

M

MAX

MINIMUM

MILLIMETERS

MISCELLANEOUS

MASONRY OPENING

MIN

MM

MISC

MO

ET CETERA

EQUAL

EYE WASH STATION

ELECTRIC WATER COOLER

EXISTING

FILLER

NORTH

NOT APPLICABLE

NUMBER

NOT IN CONTRACT

NA

N

NO

NIC

NOT TO SCALE

OXYGEN

ON CENTER

NTS

OC

O

NOMINALNOM

FACSIMILE

FIRE EXTINGUISHER

FINISHED FLOOR

FIRE EXTINGUISHER CABINET

FLOOR

FACE OF

FIBERGLASS REINFORCED POLYMER

FACE OF SLAB (STUD)

FIRE HOSE CABINET

EQ

F

A/C

A/E

ADA

ACT

AHJ

AHU

AFF

ALUM

AUTHORITY HAVING JURISDICTION

AMERICANS WITH DISABILITY ACT

ACOUSTICAL CEILING TILE

ABOVE FINISHED FLOOR

AIR HANDLING UNIT

ALUMINUM

ARCHITECT-ENGINEER

AIR CONDITIONED

FE

FF

FLR

FO

FRP

BEAM

BLDG

BM

BOS

BO

CG

CCT

CL

CJ

BUILDING

BOTTOM OF STEEL

CENTER LINE

CONTROL/ CONSTRUCTION JOINT

CORNER GUARD

BY OWNER/ BOTTOM OF

CUBICLE CURTAIN TRACK

FOS

FAX

EWS

ETC

FEC

FHC

EXIST

EWC

OPPOSITE HAND

OUTSIDE DIAMETER

PLATE

OPENING

OPH

OD

PL

OPNG

PAIR

PLASTIC LAMINATEPLAM

PR

PSI

PSF

GAS

GRAB BAR

GALVANIZED

GAGE

HIGH

GYPSUM BOARD

GENERAL CONTRACTOR

QUANTITY

PTS

QTY

RISER/RADIUS

REQUIRED

ROUGH OPENING

RENOVATE(TION)

R

RAL

RO

REQ

RENOHARDWARE

HOUR

HOLLOW METAL

INTERCOM

INTRAVENOUS

INCH(ES)

INSIDE DIAMETER

PT

HANDICAP

G

GB

GA

GC

H

CLL

CLG

CM

CMU

CLR CLEAR

CONC

CO2

CONT

CTJ

CENTIMETER

CONCRETE

COLUMN LINE

CONTINUED (OUS)

CONCRETE MASONRY UNIT

CEILING

CONTRACTION JOINT

CARBON DIOXIDE

HM

HR

ID

IC

IV

INCTR

DBA

D

DEG

DIA

DR

DWG

DN DOWN

DEGREE

UNIT OF SOUND

CENTER

DEEP/ DEPTH

DIAMETER

DOOR/

DRAWING(S)

COORDINATECOORD

HC

HDW

GALV

GYP BD

ROICC

JOINTJT

DWR DRAWER

PAINT

POUNDS/SQUARE FOOT

POUNDS/SQUARE INCH

RESIDENT OFFICER IN CHARGE

OF CONST

FEDERAL COLOR PALETTE

PNEUMATIC TUBE STATION VOL VOLUNTEER

ASSISTANTAST

COMPUTERCOMP

COORD COORDINATOR

CLIN CLINIC (AL)

PERSONNELPERS

MANAGEMENTMGNT

ANALYSISTANLST

COMPR COMPTROLLER

CUBICLESCBCL

DEGREE(S)°

AIR

A

/ DIVIDE BY, PER

EQUALS, EQUAL TO

' FOOT, FEET

> GREATER THAN

> GREATER THAN OR EQUAL TO

INCH(ES)"

MINUS, NEGATIVE

< LESS THAN

LESS THAN OR EQUAL TO

MULTIPLY BY, BYX

% PERCENT

PLUS

+/- PLUS OR MINUS

NATIONAL CAD STANDARD ROOM NAME ABBREVIATIONS

"DN"

(NON - NCS ABBREVIATIONS ARE SHOWN

UNDERLINED) EXAMPLE:

FOOT/FEETFT

TELEVISIONT.V.

P.T. PRESSURE TREATED

MOUNTEDMNTD

FIRE RETARDANTF.R.

SS STAINLESS STEEL

WHEELCHAIRW/C

FIRE TREATEDF.T.

ABA ARCHITECTURAL BARRIERS ACT

SAB SOUND ATTENUATION BATTS

EXPOSEDEXP

VERIFY IN FIELDVIF

VERIFY IN FIELDVIF

PYSCH PSYCHOLOGY

A101

SIM

A101

SIM

A101

SIM

BUILDING ELEVATION/SECTIONDetail No.

Sheet No.

Reference Label

Detail No.

Sheet No.

Reference Label

Detail No.

Sheet No.

Reference Label

Room No.

Room Area

Door/Room No.

Partition Configuration

Partition Configuration

Key Note No.

ALIGN

WALL SECTION

DETAIL SECTION/CALLOUT

ROOM TAG

DOOR TAG

PARTITION TAG

KEYNOTE

ALIGNED SURFACES

Room Name

Area

AREA TAG

Area NameArea Name

150 SF

WL

2S 86

SCOPE OF PROJECT

Project Limit Line

Grid No.

CENTERLINE

COLUMN GRID LINE

SPOT ELEVATIONSpot Elevation AFF

Level/Datum Elevation AFF

LEVEL MARKER

Level/Datum Name

Window Type WINDOW TYPE TAG01

CL

Highpoint @ Tail SLOPE INDICATOR

Starting Point @ Center DIMENSION CROSSHAIR

NORTH ARROW

Plan North Reference Label

Name Elevation

Revision Reference Number

Revision Cloud Depicting Area Revised

REVISION

CEILING TAG1'-0" Clg Height

? Finish FINISH TAG

Casework / Furniture

CASEWORK TAG1i

FURNITURE TAG

Room Name

150 SF

WAL-1

BAS-1

FLR-1

Room Wall Finish

Room Wall Base

Room Floor Finish

ROOM FINISH TAG

FIRE

EXTINGUISHER

WALL MOUNTED

CABINET

FIRE ALARM

PULL BOX

m m

4'

M

A X

IM

U

M m m

4'

M

A X

IM

U

M m m

4'

M

A X

IM

U

M m m

3'

FIRE

EXTINGUISHER

WALL HUNG

FIRE

EXTINGUISHER

IN RECESSED

CABINET

FIRE EXTINGUISHER

AND FIRE HOSE

VALVE IN RECESSED

CABINET

FIRE EXTINGUISHER,

FIRE HOSE VALVE

AND FIRE

DEPARTMENT VALVE

IN RECESSED

CABINET

FIRE DEPARTMENT

VALVE IN

RECESSED

CABINET

m m

3'

FIREFIGHTERS

HANDSET

FH

267 mm (10 1/2") m m

1' m m

3'

M A

X

8" 8"7

AUDIO/VISUAL

FIRE ALARM

EXIT SIGN WALL

SWITCH

WALL

PHONE

JACK

FIRE ALARM

PULL STATION

(GENERALLY

LOCATE UNDER

A/V ALARM)

W

IT

H O

W N

E R

C O

O R

D

IN

A T

E0' - 8"

COMBINATION

POWER/SIGNAL/OUTLET

FOR WALL MOUNTED

TELEVISION OR

MONITOR

CLOCK

(PLACED ON WALL

WITH NO VISUAL

BOARDS

MOUNTED BELOW)

DOUBLE-SIDED

PROJECTED

CLOCK

M

IN

C E

IL

IN

G H

E I G

H T

U

.N .O

S

P A

C E

S W

IT

H

T.V./DATA/

PHONE

POWER

RECEPTACLES

LIGHT

SWITCHES

DOME

LIGHT

OCCUPANCY

SENSOR

CARD

READER

THERMOSTAT

POWER

DISCONNECT

REMOTE DOOR

RELEASE

D/V L

TV

D/V

TV E

E

ED/V

L L OS CR T DR

AREA OF

REFUGE

INTERCOM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C L o ca l R e vi t F ile s\

-1

-K

S

W ic h ita V

A M

C B o ile rs E rm in

.r vt

/3

/2

:4

:4

P M

AE001

ARCHITECTURAL NOTES, SYMBOLS,

ABBREVIATIONS

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

2021-09-03 JBS/MKL EXB/JTK553-19-KS

100% BID SHEET

FULLY SPRINKLERED

ABBREVIATIONS PLAN SYMBOLS

FIRE PROTECTION EQUIPMENT

ELECTRICAL CONTROL DEVICES

UP

UP

DN

R E

F

DN

UP

DN

DN

DN

2667 SF

U - UTILITY

587 SF

S - STORAGE

798 SF

UNOCCUPIED

PATH

ID'S:

4C

PATH

ID'S:

4C

PATH

ID'S:

8A

EL. -11'-4"

EL. -6'-0"

EL. 6'-8"

EL. 0'-0"

FE

FE

FE

352 SF

S - STORAGE

1289 SF

S - STORAGE

279 SF

UNOCCUPIED

PATH

ID'S:

1A, 5B, 8A

PATH

ID'S:

3B

PATH

ID'S:

2B, 3B

PATH

ID'S:

2B

PATH

ID'S:

1A

B - BUSINESS

S - STORAGE

U - UTILITY

UNOCCUPIED

5901 SF

U - UTILITY

993 SF

B - BUSINESS

EL. 6'-8"

EL. 6'-8"

EL. 0'-0"

EL. 6'-8"EL. 8'-2"

EL. 6'-8"

FE FE

FE

FE

FE

PATH OF TRAVEL (FEET)

VOICE/ALARM SYSTEM THROUGHOUT

(COORDINATE W/ ELECTRICAL)

EXIT FLOW

PATH TAG

EXIT SIGN

(COORDINATE W/ ELECTRICAL)

PORTABLE FIRE EXTINGUISHER

DRY-CHEMICAL ABC CLASSIFICATION

(COORDINATE W/ FIRE MARSHAL)

TWO HOUR FIRE BARRIER

CONSTRUCTION

PATH

ID'S:

X# X# X# X#

FE

2909 SF

UNOCCUPIED

3053 SF

UNOCCUPIED

487 SF

S - STORAGE

PATH

ID'S:

5A, 5B

PATH

ID'S:

6A

PATH

ID'S:

7A

EL. 17'-4"

EL. 17'-4"

EL. 17'-8"

FE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C L o c a l R e v it F ile s \5

-1

-K

S

W ic h it a V

A M

C B o ile rs E rm in

.r v t

/3

/2

:3

:5

P M

13-AE002

LIFE SAFETY PLANS INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

2021-09-03 JBS/MKL EXB/JTK553-19-KS

100% BID SHEET

FULLY SPRINKLERED

APPLICABLE CODES _________________

2018 INTERNATIONAL BUILDING CODE (IBC)(ONLY WHEN SPECIFICALLY REFERENCED IN

VA DESIGN DOCUMENTS)

2018 EDITION NFPA 101 LIFE SAFETY CODE

2015 VA FIRE PROTECTION DESIGN GUIDE 7TH EDITION

2018 NFPA NATIONAL FIRE CODE (EXCEPTION OF NFPA 5000 AND NFPA 900)

2020 NATIONAL ELECTRICAL CODE (NEC)

2018 INTERNATIONAL PLUMBING CODE (IPC)

ENERGY POLICY ACT OF 2005 (EPACT)

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS:

MEMORANDUM OF UNDERSTANDING (MOU)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND

TRANSPORTATION MANAGEMENT

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNAGE

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD 62.1 -2004

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)

NFPA 85: BOILER AND COMBUSTION SYSTEMS HAZARD CODE

ASME B31.1 POWER PIPING

UNIFIED FACILITIES CRITERIA (UFC3-430-08N) CENTRAL HEATING PLANTS

BUILDING HEIGHT AND AREA LIMITATIONS (IBC CHAPTER 5):

USE & OCCUPANCY CLASSIFICATION: F1 - MOD. HZD. INDUSTRIAL

TYPE OF CONSTRUCTION: II-B / TYPE-II (000)

ALLOWABLE HT IN FEET (TABLE 504.3): 75' (S)

ACTUAL HEIGHT ABOVE GRADE: 42'-0"

ALLOWABLE STORIES ABOVE GRADE (TABLE 504.): 3 (S)

ACTUAL STORIES ABOVE GRADE: 1

ALOWABLE AREA (TABLE 506.2): 62,000 sqft (S1)

ACTUAL AREA: 8,815 sqft

PER IBC CHAPTER 5: TYPE 2B NON COMBUSTIBLE, FULLY SPRINKLERED BUILDING WITH

AN F1 MODERATE HAZARD INDUSTRIAL OCCUPANCY IS PERMITTED TO BE UP TO 75’

TALL, THREE STORIES, WITH 62,000 SQFT OF ALLOWABLE AREA.

AS DEFINED BY TABLE 601 THE BUILDING ELEMENTS ARE REQUIRED TO CARRY

THE FOLLOWING FIRE RESISTANCE RATINGS IN TYPE II-B CONSTRUCTION:

PRIMARY STRUCTURAL FRAME: 0 HRS

EXTERIOR BEARING WALLS: 0 HRS

INTERIOR BEARING WALLS: 0 HRS

EXTERIOR NON-BEARING WALLS: 0 HRS

INTERIOR NON-BEARING WALLS: 0 HRS

FLOOR CONSTRUCTION AND

SECONDARY MEMBERS: 0 HRS

ROOF CONSTRUCTION AND

SECONDARY MEMBERS: 0 HRS

PER NFPA 5000 TABLE 7.4.1, A TYPE II, (000), FULLY SPRINKLERED, ORDINARY HAZARD

INDUSTRIAL OCCUPANCY IS PERMITTED TO BE UP TO 75’ TALL, THREE STORIES, WITH

15,500 SQFT OF FOOTPRINT.

AS DEFINED BY TABLE 7.2.1.1, CONSTRUCTION ELEMENTS ARE REQUIRED TO

CARRY THE FOLLOWING FIRE RESISTANCE RATINGS IN TYPE-II (000)

CONSTRUCTION:

EXTERIOR BEARING WALLS:

SUPPORTING MORE THAN ONE FLOOR: 0 HRS

SUPPORTING ONLY ONE FLOOR: 0 HRS

SUPPORTING ROOF ONLY: 0 HRS

INTERIOR BEARING WALLS:

SUPPORTING MORE THAN ONE FLOOR: 0 HRS

SUPPORTING ONLY ONE FLOOR: 0 HRS

SUPPORTING ROOF ONLY: 0 HRS

COLUMNS:

SUPPORTING MORE THAN ONE FLOOR: 0 HRS

SUPPORTING ONLY ONE FLOOR: 0 HRS

SUPPORTING ROOF ONLY: 0 HRS

BEAMS, GIRDERS, TRUSSES, AND ARCHES:

SUPPORTING MORE THAN ONE FLOOR: 0 HRS

SUPPORTING ONLY ONE FLOOR: 0 HRS

SUPPORTING ROOF ONLY: 0 HRS

FLOOR/CEILING ASSEMBLIES: 0 HRS

ROOF/CEILING ASSEMBLIES: 0 HRS

INTERIOR NON-BEARING WALLS: 0 HRS

EXTERIOR NON-BEARING WALLS: 0 HRS

NFPA 101 OCCUPANCY & ASSOCIATED CHAPTER

• BOILER BUILDING, MAIN LEVEL : INDUSTRIAL OCCUPANCY (NFPA 101 : 2015,

CHAPTER 40)

• BOILER BUILDING, BOILER LEVEL : INDUSTRIAL OCCUPANCY (NFPA 101 : 2015,

CHAPTER 40)

• OFFICE / CONTROL AREAS ASSUMED TO BE NON-SEPARATED, ANCILLARY

FACILITIES PER PROVISIONS OF (A.6.1.14.1.3)

• STORAGE UTILITY AREAS ASSUMED TO BE NON-SEPERATED, ANCILLARY

FACILITIES PER PROVISIONS OF (A.6.1.14.1.3)

40.2.5.3.1 INDUSTRIAL EQUIPMENT ACCESS DIMENSIONAL CRITERIA:

MINIMUM HORIZONTAL DIMENSION OF ANY WALKWAY: 22” CLEAR

MINIMUM STAIR OR RAMP WIDTH: 22” @ RAILS

MINIMUM TREAD WIDTH: 22” CLEAR

MINIMUM TREAD DEPTH: 10”

MAXIMUM RISER HEIGHT: 9”

MAX HT. BETWEEN LANDINGS: 12’-0”

MINIMUM HEADROOM: 6’-8”

MINIMUM WIDTH OF DOOR OPENINGS: 22”

LIFE SAFETY LEGEND

GENERAL SHEET NOTES

1. THE MINIMUM WIDTH OF EACH DOOR OPENING SHALL BE

SUFFICIENT FOR THE OCCUPANT LOAD THEREOF AND

SHALL PROVIDE A CLEAR WIDTH OF NOT LESS THAN 32

INCHES. THE HEIGHT OF DOORS SHALL NOT BE LESS

THAN 80 INCHES.

2. EGRESS DOORS SHALL BE READILY OPERABLE FROM THE

EGRESS SIDE WITHOUT THE USE OF A KEY OR ANY

SPECIAL KNOWLEDGE OR EFFORT. ALL EGRESS DOORS

TO HAVE PANIC HARDWARE. PANIC HARDWARE SHALL

NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING

OF THE WRIST. FORCE REQUIRED TO ACTIVATE

OPERABLE PARTS SHALL BE 5 POUNDS MAXIMUM.

3. THE MEANS OF EGRESS, AND EXIT DISCHARGE, SHALL BE

ILLUMINATED AT ANY TIME THE BUILDING IS OCCUPIED

WITH A LIGHT INTENSITY OF NOT LESS THAN 1 FOOT-

CANDLE AT THE WALKING SURFACE LEVEL.

4. THE EGRESS PATH SHALL REMAIN FREE AND CLEAR OF

ALL OBSTRUCTIONS AT ALL TIMES. NO STORAGE IS

PERMITTED IN ANY EGRESS PATHS.

5. PER DIRECTION OF THE PROJECT CONTRACTING

OFFICER , AND PER GUIDANCE OF ABAAS SCOPING

REQUIREMNTS (F203.6 MACHINERY SPACES) PORTIONS

OF THE PLAN INCLUDING DEDICATED MECHANICAL

SPACES AND LOCKER AND BREAK ROOM FACILITIES

6. ACCESSED ONLY BY PLANT OPERATIONS PERSONNEL

ARE NOT REQUIRED TO BE REACHABLE BY CONTINUOUS

ACCESSIBLE PATHS.

7. CONTRACTOR TO SUBMIT TEMPORARY LIFE SAFETY

PLANS IN THE EVENT REQUIRED EXITS ARE BLOCKED

DURING CONSTRUCTION.

PROJECT CODE SUMMARY

1" = 10'-0"F1 LEVEL 1 - OCCUPANT LOAD

1" = 10'-0"F3 FIRST FLOOR - OCCUPANT LOAD

PATH "1A"

COMMON

PATH

DISTANCE

ALLOWABLE

COMMON

PATH

ACTUAL

TRAVEL

DISTANCE

ALLOWABLE

TRAVEL

DISTANCE

31' - 10" 100'-0" 111' - 9" 400'-0"

PATH "3B"

COMMON

PATH

DISTANCE

ALLOWABLE

COMMON

PATH

ACTUAL

TRAVEL

DISTANCE

ALLOWABLE

TRAVEL

DISTANCE

25' - 9" 100'-0" 36' - 9" 400'-0"

PATH "2B"

COMMON

PATH

DISTANCE

ALLOWABLE

COMMON

PATH

ACTUAL

TRAVEL

DISTANCE

ALLOWABLE

TRAVEL

DISTANCE

0' - 0" 100'-0" 32' - 7" 400'-0"

OCCUPANCY LEGEND

EGRESS TRAVEL DISTANCES:

PATH "4C"

COMMON

PATH

DISTANCE

ALLOWABLE

COMMON

PATH

ACTUAL

TRAVEL

DISTANCE

ALLOWABLE

TRAVEL

DISTANCE

0' - 0" 100'-0" 74' - 2" 400'-0"

EGRESS TRAVEL DISTANCES:

EGRESS TRAVEL DISTANCES:

1" = 10'-0"C3 CATWALK LEVEL

PATH "5A"

COMMON

PATH

DISTANCE

ALLOWABLE

COMMON

PATH

ACTUAL

TRAVEL

DISTANCE

ALLOWABLE

TRAVEL

DISTANCE

17' - 2" 100'-0" 107' - 0" 400'-0"

PATH "6A"

COMMON

PATH

DISTANCE

ALLOWABLE

COMMON

PATH

ACTUAL

TRAVEL

DISTANCE

ALLOWABLE

TRAVEL

DISTANCE

23' - 2" 100'-0" 88' - 0" 400'-0"

PATH "7A"

COMMON

PATH

DISTANCE

ALLOWABLE

COMMON

PATH

ACTUAL

TRAVEL

DISTANCE

ALLOWABLE

TRAVEL

DISTANCE

37' - 10" 100'-0" 74' - 3" 400'-0"

PATH "8A"

COMMON

PATH

DISTANCE

ALLOWABLE

COMMON

PATH

ACTUAL

TRAVEL

DISTANCE

ALLOWABLE

TRAVEL

DISTANCE

92' - 11" 100'-0" 146' - 7" 400'-0"

OCCUPANT SCHEDULE

Name Area Area Per Occupant

OCCUPANT LOAD

PRESCRIBED CALCULATED

B - BUSINESS 993 SF 150 SF 0 7

S - STORAGE 2716 SF 500 SF 0 6

U - UTILITY 8568 SF 10 0

UNOCCUPIED 7100 SF 0

OCCUPANT LOAD (40.1.7):

• "MAXIMUM PROBABLE NUMBER OF OCCUPANTS PRESENT

AT ANY TIME" PER TABLE 7.3.1.2 - NO PRESCRIPTIVE

OCCUPANCY CALCULATION BASED ON AREA:

• ASSUMED UTILITY OCCUPANCY PER DIRECTION FROM

END USER IS NO GREATER THAN 10 OCCUPANTS.

TRAVEL DISTANCE (40.2.6.1) AND

COMMON PATH OF TRAVEL (40.2.5.1):

INDUSTRIAL (EXISTING):

MAX TRAVEL DISTANCE:

FULLY SPRINKLERED 400' - 0"

MAX COMMON PATH OF TRAVEL:

FULLY SPRINKLERED = 100' - 0"

R E

F

DN

R E

F

R E

F

R E

F

65432

D D

C

B

A

E E

F F

G G

E7E6E5E4E3E2E1

H H

J J

K K

PHASE 1 CONSTRUCTION AREA

NOT UNDER CONSTRUCTION

IN THIS PHASE

65432

D D

C

B

A

E E

F F

G G

E7E6E5E4E3E2E1

H H

J J

K K

PHASE 2 CONSTRUCTION AREA

NOT UNDER CONSTRUCTION

IN THIS PHASE

65432

D D

C

B

A

E E

F F

G G

E7E6E5E4E3E2E1

H H

J J

K K

PHASE 3A CONSTRUCTION

AREA

NOT UNDER CONSTRUCTION

IN THIS PHASE

PHASE 3A

CONSTRUCTION AREA

TEMP. DUST

PARTITION

65432

D D

C

B

A

E E

F F

G G

E7E6E5E4E3E2E1

H H

J J

K K

NOT UNDER CONSTRUCTION

IN THIS PHASE

PHASE 3A

CONSTRUCTION AREANOT UNDER CONSTRUCTION

IN THIS PHASE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C L o c a l R e v it F ile s \5

-1

-K

S

W ic h it a V

A M

C B o ile rs E rm in

.r v t

/7

/2

:5

:3

P M

13-AE003

PHASING PLANS INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

2021-09-03 JBS/MKL EXB/JTK553-19-KS

100% BID SHEET

FULLY SPRINKLERED

1" = 10'-0"C1 PHASE 1 - SURROUNDING SITEWORK

1" = 10'-0"F1 PHASE 2 - BOILER PLANT ADDITION

1" = 10'-0"C6 PHASE 3A - EXISTING PLANT RENOVATION

PHASE 1 CONSISTS OF THE FOLLOWING WORK:

A. ISOLATE NORTH HPS AND PC LINES AND

DEMOLISH PIPING AND PIPE TRENCH BACK TO

THE NORTHEAST CORNER OF BUILDING 20.

B. DECOMMISSION, CLEAN, AND REMOVE THE

E-85 FUEL STORAGE TANK LOCATED AT THE

NORTHWEST CORNER OF BUILDING

13. REMOVE ALL ASSOCIATED POWER /

CONTROLS, FOUNDATIONS, ETC., AND TURN

OVER TANK TO THE VA FOR STORAGE /

REUSE.

C. REROUTE MEDIUM VOLTAGE DUCTBANK

CURRENTLY IN THE FOOTPRINT OF THE NEW

BUILDING 13 ADDITION. SEE ELECTRICAL

DRAWINGS FOR DETAILS.

D. REMOVE / REROUTE ALL EXISTING

ELECTRICAL PANELS AND ASSOCIATED

CONDUITS THAT ARE IN THE FOOTPRINT OF

THE NEW BUILDING 13 ADDITION. REFER TO

ELECTRICAL DRAWINGS FOR DETALS.

E. REROUTE EXISTING FIRE WATER LINE

ENTERING THE NORTHEAST CORNER OF

BUILDING 13. REFER TO CIVIL DRAWINGS FOR

DETAILS.

F. REROUTE EXISTING GAS LINE ENTERING THE

NORTH WALL OF BUILDING 13. REFER TO

MECHANICAL DRAWINGS FOR DETAILS.

G. REROUTE STORM WATER PIPING CURRENTLY

LOCATED IN THE FOOTPRINT OF THE NEW

BUILDING 13 ADDITION. REFER TO CIVIL

DRAWINGS FOR DETAILS.

H. REROUTE DOMESTIC WATER LINE ENTERING

THE NORTH WALL OF BUILDING 13. REFER TO

CIVIL DRAWINGS FOR DETAILS.

PHASE 2 CONSISTS OF THE FOLLOWING WORK:

CONSTRUCTION OF BOILER PLANT ADDITION

A. CONSTRUCTION OF ADDITION STRUCTURE,

SHELL AND INTERIOR.

B. INSTALLATION OF NEW BOILER PLANT

EQUIPMENT AND SUPPORT.

C. CONNECTION OF NEW SYSTEMS TO CAMPUS

INFRASTRUCTURE.

D. COMISSIONING OF NEW BOILER PLANT

EQUIPMENT AND START TRANSITION FROM

EXISTING BOILER PLANT EQUIPMENT.

E. INSTALL FURNISHINGS OF ADDITION

INTERIOR.

F. COMPLETE TRANSFER FROM EXISTING

EQUIPMENT AND SYSTEMS TO NEW.

PHASE 3A CONSISTS OF THE FOLLOWING WORK:

RENOVATION AND RECONFIGURATION OF THE

EXISTING BOILER PLANT

A. SELECTIVE DEMOLITION OF EXISTING SHELL

ELEMENTS.

B. DECOMISSIONING AND REMOVAL OF

EXISTING EQUIPMENT AND SYSTEMS.

C. UPGRADES TO THE EXISTING BUILDING TO

MEET PSRDM REQUIREMENTS INCLUDING

BUT NOT LIMITED TO REPLACEMENT OF

EXTERIOR WINDOWS.

D. CONSTRUCTION OF NEW BREAK AREA,

EMPLOYEE LOCKER AND STORAGE ROOM.

E. CONSTRUCTION OF NEW ELEVATED

PLATFORM IN FORMER BOILER PLANT.

F. CONVERT EXISTING LOCKER ROOM TO NEW

TOILET ROOM. CONTRACTOR TO MAINTAIN

ACCESS TO EXISTING TOILET ROOM

THROUGHOUT THIS PHASE.

G. RENOVATE PORTION OF NEW CONTRACTOR

TOUCHDOWN AREA. CONSTRUCT TEMP.

DUST PARTITION WALL. CONTRACTOR TO

MAINTAIN EGRESS PATH OF TRAVEL

THROUGHOUT THIS PHASE.

1" = 10'-0"F6 PHASE 3B - EXISTING PLANT RENOVATION

PHASE 3 CONSISTS OF THE FOLLOWING WORK:

RENOVATION OF, RECONFIGURATION OF, AND

CONNECTION TO THE EXISTING BOILER PLANT

A. SELECTIVE DEMOLITION OF EXISTING SHELL

ELEMENTS.

B. UPGRADES TO THE EXISTING BUILDING TO

MEET PSRDM REQUIREMENTS INCLUDING

BUT NOT LIMITED TO REPLACEMENT OF

EXTERIOR WINDOWS.

C. RENOVATED EXISTING TOILET ROOM.

CONTRACTOR TO MAINTAIN ACCESS TO

ADJACENT TOILET ROOM THROUGHOUT THIS

PHASE.

D. RENOVATE REMAINING PORTION OF NEW

CONTRACTOR TOUCHDOWN AREA.

CONTRACTOR TO MAINTAIN EGRESS PATH OF

TRAVEL THROUGHOUT THIS PHASE.

166 SF

EQUIPMENT

102A-3

P-1

VB

EXIST.

A

-3

3810 mm (12' - 6") m m

/4

610 mm (2' - 0")

CL

G3d

1 X

G3d

1 X

142142

14 SF

EQ. CLOSET

102-3

4.00

4646 47

EQUIPMENT

102A-3

OPEN

ABOVE

151 151

151 151

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C L o c a l R e v it F ile s \5

-1

-K

S

W ic h it a V

A M

C B o ile rs E rm in

.r v t

/7

/2

:0

:4

P M

03-AE400.01

BLDG 3 SECURITY EQ. CLOSET INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

2021-09-03 JBS/MKL EXB/JTK553-19-KS

100% BID SHEET

FULLY SPRINKLERED

1/4" = 1'-0"F1 BUILDING 3 SECURITY EQ. CLOSET

GENERAL NOTES

KEYED NOTES

4 DEMOLISH EXISTING CASEWORK WITHIN ROOM; SCHEDULE

WITH OWNER REMOVAL OF EXIST. FURNITURE

5 DEMOLISH PORTION OF EXISTING WALL; PREP AREA FOR

NEW FINISH.

44 PATCH FLOORING TO MATCH EXISTING

45 REMOVE EXISTING (3) LIGHT PENDANT FIXTURES AND

SALVAGE ON SITE AS DIRECTED BY VA COR; REPLACE ACT

TILES

46 DEMOLISH EXISTING ACT CEILING ONLY AT NEW CLOSET

AREA, PREP AREA FOR NEW FINISH

47 DEMOLISH EXISTING WINDOW IN ENTIRETY

50 PROVIDE TEMPORARY DUST PARTITION BARRIERS DURING

CONSTRUCTION; REF. SHEET AE503 FOR DETAILS

141 WINDOW OPENING INFILL TO MATCH EXISING WALL

CONSTRUCTION ON INTERIOR AND EXTERIOR SIDE

142 PATCH FLOOR AND MATCH EXISTING FINISH

151 LIGHT FIXTURE; REF. ELEC. DWGS

1. REFER TO SHEET AE701 FOR DOOR AND HARDWARE INFORMATION.

2. REFER TO SHEET AE501 FOR PARTITION ASSEMBLY TYPES.

3. REFER TO SHEET AF601 FOR SIGNAGE TYPES AND SCHEDULE.

1/4" = 1'-0"C1 BUILDING 3 SECURITY EQ. CLOSET DEMOLITION

1/4" = 1'-0"F4 BUILDING 3 SECURITY EQ. CLOSET RCP

65432

D D

E E

F F

G G

NEW BOILER

ADDITION ABOVE

OUTLINE OF

ADDITION

FOUNDATION

OUTLINE OF

ADDITION

FOUNDATION

NEW ADDITION ABOVE

13-AE401.02

F1

D1

13-AE301.03

D1

13-AE301.03

B5

13-AE302.02

B5

13-AE302.02

F1

13-AE302.02

F1

13-AE302.02

F5

13-AE302.02

F5

13-AE302.02

H H

J J

K K

AE501

C4

D3

AE502

AE502

C2

NEW PUMP

ROOM

B-3

FE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C L o c a l R e v it F ile s \5

-1

-K

S

W ic h it a V

A M

C B o ile rs E rm in

.r v t

/3

/2

:4

:0

P M

13-AE101.02

BASEMENT PLAN, PHASE 2 INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

2021-09-03 JBS/MKL EXB/JTK553-19-KS

100% BID SHEET

FULLY SPRINKLERED

1/4" = 1'-0"D1 BASEMENT PLAN, PHASE 2

GENERAL NOTES

KEYED NOTES

103 STEEL GRATE OPEN STAIRS AND LANDING

118 ACCESS LADDER ATTACHED TO WALL

1. WHERE NEW WORK IS INDICATED TO MATCH EXISTING, PROVIDE

EQUAL MATERIALS, COLORS AND FINISHES AND PERFORM WORK

IN MANNER TO ELIMINATE EVIDENCE OF NEW WORK.

2. DIMENSIONS ARE TO FINISHED FACE OF WALL OR GRIDLINE. DO

NOT SCALE DRAWINGS.

3. PROTECT EXISTING SURFACES AND MATERIALS INDICATED TO

REMAIN FROM DAMAGE OR DETERIORATION DUE TO

PERFORMANCE OF WORK. PATCH AND REPAIR EXISTING

MATERIALS AND SURFACES DAMAGED OR AFFECTED BY

PERFORMANCE OF THE WORK.

4. WORK INCLUDES PREPARATION OF EXISTING SURFACES TO

RECEIVE NEW WORK WHERE INDICATED.

5. ALL ANGLES ARE 90 DEGREES UNLESS NOTED OTHERWISE.

6. COORDINATE FIRE EXTINGUISHER, FIRE ALARM STROBES AND

PULL STATION LOCATIONS WITH COR. MOUNT IN ACCORDANCE

WITH FEDERAL ABAAS STANDARDS.

7. VERIFY DIMENSIONS AND LOCATIONS OF OPENINGS, BASES AND

SUPPORTS FOR EQUIPMENTS, DUCTS, PIPING , CONDUITS, ETC.

WHERE REQUIRED FOR NEW WORK, NEATLY CUT OPENINGS IN

EXISTING CONSTRUCTION. DO NOT USE IMPACT TOOLS. REVIEW

OPENING LOCATIONS WITH COR PRIOR TO STARTING WORK.

KEEP OPENINGS TO MINIMUM REQUIRED TO ALLOW FOR NEW

WORK. PROVIDE FIRE STOPPING AS REQUIRED.

8. OBTAIN HOT WORK PERMIT FROM COR PRIOR TO PERFORMING

ANY WORK REQUIRING OPEN FLAME.

9. PROVIDE FIRE RETARDANT TREATED WOOD FOR BLOCKING AND

ROUGH BUCKS. COORDINATE LOCATIONS WITH EQUIPMENT AND

DOOR INSTALLER. INSTALL PRIOR TO CLOSING WALLS.

10. PREPARE SURFACES IN ACCORDANCE WITH MANUFACTURER’S

INSTRUCTIONS AND RECOMMENDATIONS FOR APPLICATIONS

INDICATED WHERE NEW MATERIALS ARE TO BE INSTALLED ON

EXISTING SUBSTRATE.

11. WHERE FLOOR FINISHES CHANGE PLACE TRANSITION UNDER

CENTER OF DOOR OR FINISHED OPENING.

12. EXPOSED CMU TO BE FILLED AND PAINTED, SEE SPECS.

65432

D

E

F

G

7 8

2642 mm (8' - 8") 1016 mm (3' - 4") 1626 mm (5' - 4") 3048 mm (10' - 0") 1626 mm (5' - 4") 3048 mm (10' - 0") 1829 mm (6' - 0") 3048 mm (10' - 0") 1626 mm (5' - 4") 1016 mm (3' - 4") 3861 mm (12' - 8") 1930 mm (6' - 4") 406 mm (1' - 4")1016 mm (3' - 4") 4166 mm (13' - 8") 1930 mm (6' - 4") 2540 mm (8' - 4") m m m m

8' m m

752 mm (2' - 5 1/2") 3727 mm (12' - 2 3/4") 4686 mm (15' - 4 1/2") 9602 mm (31' - 6") 5105 mm (16' - 9") 5874 mm (19' - 3 1/4") 5874 mm (19' - 3 1/4") 753 mm (2' - 5 3/4")

D1

13-AE301.03

D1

13-AE301.03

B5

13-AE302.02

B5

13-AE302.02

F1

13-AE302.02

F1

13-AE302.02

F5

13-AE302.02

F5

13-AE302.02

AE507

B1

AE503

B8 m m

/4

F7

13-AE311.02

F7

13-AE312.02

F5

13-AE311.02

F3

13-AE313.02

13-AE203.02

C1 m m

/4 m m

6' m m

6' m m

8' m m

5' m m

6'

/4 m m

3' m m

1'

/4 m m

9'

3/

4"

3658 mm (12' - 0")

13-AE204.02B6

13-AE203.02

F1

13-AE203.02C6

4978 mm (16' - 4")3658 mm (12' - 0")2858 mm (9' - 4 1/2") m m

5'

/2 m m

3/ 4" m m m m

6'

1016 mm (3' - 4")

7518 mm (24' - 8")1626 mm (5' - 4")5486 mm (18' - 0")

8322 mm (27' - 3 3/4") m m

5' m m

/4

635 mm (2' - 1")

1626 mm (5' - 4") 10058 mm (33' - 0") m m

/2

E7E6E5E4E3E2E1

H

13-AE203.02F6

290 SF

EQUIPMENT

ROOM

M-17

383 SF

GENERATOR

ROOM

M-15

256 SF

CORRIDOR

M-16

472 SF

TRANSFORMER

ROOM

M-14

120 SF

I.T. ROOM

M-12

128 SF

ELECTRICAL

M-13

97 SF

OFFICE

M-9

44 SF

SECURITY

M-10

44 SF

HAC

M-11

289 SF

CONTROL

ROOM

M-8

2854 SF

BOILER

ROOM

M-18 F3

13-AE311.02

213A

228 227

12319 mm (40' - 5")

100100

102102

100100

105 105 105

106 106

107107107107

108108

UP

DN

D6

B3

J

K

AE503

B5

M8d

M8d

M8d

M8d

M8d

M8d

M8d

M8d

M8d

M8d

M8d

M8d

M8d

AE501

C1

206 mm (8") m m

2'

FE

C1

36373 mm (119' - 4")

202 202

CT-1

CT-2

F2d

F2d

F2d

T

F2d

T

13-AE401.02

C4

M8d

M8d

M8d

M8d

M8d

B4

AE502

AE502E1

13-AE401.02

F5

M8d

FEFE

m m

1'

/4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C L o c a l R e v it F ile s \5

-1

-K

S

W ic h it a V

A M

C B o ile rs E rm in

.r v t

/3

/2

:4

:2

P M

13-AE111.02

MAIN LEVEL, PHASE 2 INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

2021-09-03 JBS/MKL EXB/JTK553-19-KS

100% BID SHEET

FULLY SPRINKLERED

1/4" = 1'-0"E1 FIRST FLOOR, PHASE 2

NEW WORK GENERAL NOTESKEYED NOTES

1. DIMENSIONS ARE TO FINISHED FACE OF WALL OR GRIDLINE. DO NOT SCALE

DRAWINGS.

2. PROTECT EXISTING SURFACES AND MATERIALS INDICATED TO REMAIN FROM

DAMAGE OR DETERIORATION DUE TO PERFORMANCE OF WORK. PATCH AND

REPAIR EXISTING MATERIALS AND SURFACES DAMAGED OR AFFECTED BY

PERFORMANCE OF THE WORK.

3. PREPARE EXISTING SURFACES TO RECEIVE NEW WORK.

4. ALL ANGLES ARE 90 DEGREES UNLESS NOTED OTHERWISE.

5. COORDINATE FIRE EXTINGUISHER, FIRE ALARM STROBES AND PULL STATION

LOCATIONS WITH COR. MOUNT IN ACCORDANCE WITH FEDERAL ABAAS

STANDARDS.

6. VERIFY DIMENSIONS AND LOCATIONS OF OPENINGS, BASES AND SUPPORTS FOR

EQUIPMENTS, DUCTS, PIPING, CONDUITS, ETC. WHERE REQUIRED FOR NEW

WORK, NEATLY CUT OPENINGS IN EXISTING CONSTRUCTION USING POWER SAWS

OR CORE DRILLS. DO NOT USE IMPACT TOOLS. REVIEW OPENING LOCATIONS

WITH COR PRIOR TO STARTING WORK. KEEP OPENINGS TO MINIMUM REQUIRED

TO ALLOW FOR NEW WORK. PROVIDE FIRE STOPPING AS REQUIRED.

7. OBTAIN BURN PERMIT FROM COR PRIOR TO PERFORMING ANY WORK REQUIRING

OPEN FLAME.

8. EXAMINE EXISTING SUBSTRATES TO RECEIVE NEW MATERIAL OR FINISH.

PREPARE SUBSTRATE AS REQUIRED TO MEET MANUFACTURER'S INSTRUCTIONS

OR RECOMMENDATIONS FOR PROPER APPLICATION OF NEW MATERIALS.

9. WHERE FLOOR FINISHES CHANGE, PLACE TRANSITION UNDER CENTER OF DOOR

OR FINISHED OPENING.

10. EXPOSED CMU TO BE FILLED AND PAINTED, SEE SPECS.

11. REFER TO SHEET AE501 FOR PARTITION ASSEMBLY TYPES.

12. REFER TO SHEET AE701 FOR DOOR AND HARDWARE INFORMATION.

100 CONCRETE FLOOR; RE STRUCTURAL DWGS

102 SLAB TRENCH; RE STRUCTURAL/MECHANICAL

103 STEEL GRATE OPEN STAIRS AND LANDING

104 GUARDRAIL AT STAIR OPENING

105 ROOF HATCH; REF. DETAILS

106 12" CMU WALL WITH FACE BRICK TO MATCH EXISTING. RE WALL SECTIONS, RE

STRUCTURAL

107 BLAST-RATED HMF EXTERIOR DOOR. DOUBLE-LEAF DOORS TO HAVE

REMOVABLE ASTRAGAL. RE DOOR SCHEDULE

108 BLAST-RATED EXTERIOR OHD. RE DOOR SCHEDULE

109 BLAST-RATED WINDOW.

110 BLAST-RATED LOUVER.

112 BLAST-RATED HMF DOOR

113 INTERIOR WINDOW WALL WITH TEMPERED GLAZING

114 COUNTERTOP WITH CONTROL PANEL; RE MECHANICAL

115 MOP SINK; RE PLUMBING

124 EXISTING MASONRY WALL

129 FLOOR ACCESS HATCH, CLEAR OPENING MUST BE 3'-6" WIDE BY 4'-0" LONG; REF.

STRUC. DWGS

202 PRE-FINISHED STAINLESS STEEL CONDUCTOR HEAD

NUMBER NAME FLOOR BASE WALL CEILING COMMENTS

102-A3 EQUIPMENT EXIST. VB P-1 - BLDG.3 LOCATION

B-1 EXISTING PUMP ROOM C-1 - CMU/P-1 -

B-2 STORAGE C-1 - CMU/P-1 -

B-3 PIPE STORAGE C-1 - CMU/P-1 -

B-4 NEW PUMP ROOM C-1 - CMU/P-1 -

C-1 STORAGE C-1 - CMU/P-1 -

M-1 TOILET CT-1 CT-2 CT-2 ACT

M-2 TOILET CT-1 CT-2 CT-2 ACT

M-3 LOCKER ROOM C-1 VB CMU/GWB/P-1 ACT

M-4 SHOWER ROOM C-1 - CMU/GWB/P-1 GWB/P-WHITE SLIP RESISTANT FLOOR

M-5 BREAK AREA C-1 VB AT GWB CMU/GWB/P-1 ACT

M-6 CONTRACTOR TOUCHDOWN C-1 VB AT GWB CMU/GWB/P-1 ACT

M-7 PASSAGE C-1 VB AT GWB CMU/GWB/P-1 ACT

M-8 CONTROL ROOM C-1 - CMU/P-1 ACT

M-9 OFFICE C-1 VB AT GWB CMU/GWB/P-1 ACT

M-10 SECURITY C-1 - CMU/P-1 GWB/P-WHITE

M-11 HAC C-1 - CMU/P-1 -

M-12 I.T. ROOM C-1 - CMU/P-1 GWB/P-WHITE

M-13 ELECTRICAL C-1 - CMU/P-1 -

M-14 TRANSFORMER C-1 - CMU/P-1 -

M-15 GENERATOR ROOM C-1 - CMU/P-1 -

M-16 CORRIDOR C-1 - CMU/P-1 -

M-17 EQUIPMENT ROOM C-1 - CMU/P-1 -

M-18 BOILER ROOM C-1 - CMU/P-1 -

M-19 EQUIPMENT C-1 - CMU/P-1 -

ROOM FINISH SCHEDULE

DN

DN

UP

65432

D D

E E

F F

G G

7 8

D1

13-AE301.03

D1

13-AE301.03

B5

13-AE302.02

B5

13-AE302.02

F1

13-AE302.02

F5

13-AE302.02

752 mm (2' - 5 1/2") 3727 mm (12' - 2 3/4") 4686 mm (15' - 4 1/2") 9602 mm (31' - 6") 5105 mm (16' - 9") 5874 mm (19' - 3 1/4") 5874 mm (19' - 3 1/4") 753 mm (2' - 5 3/4")

F7

13-AE311.02

F7

13-AE312.02

F5

13-AE311.02

F3

13-AE313.02

m m

/4 m m

3/

4" m m m m

3/

4" m m

1'

/4

36373 mm (119' - 4")

H

F3

13-AE311.02

J

K

132132

132132 132132

132132

132132

109 109 109 109 109

122122

F7

13-AE313.02

1321 mm (4' - 4") 1829 mm (6' - 0") 2743 mm (9' - 0") 1829 mm (6' - 0") 2845 mm (9' - 4") 1829 mm (6' - 0") 3048 mm (10' - 0") 1829 mm (6' - 0") 3251 mm (10' - 8") 1829 mm (6' - 0") 2005 mm (6' - 7") m m

9' m m

6' m m m m

6' m m

8'

B4

AE502

110 109 108 107 106 105 104 103 102 101

FE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C L o c a l R e v it F ile s \5

-1

-K

S

W ic h it a V

A M

C B o ile rs E rm in

.r v t

/3

/2

:4

:4

P M

13-AE121.02

CATWALK LEVEL, PHASE 2 INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

2021-09-03 JBS/MKL EXB/JTK553-19-KS

100% BID SHEET

FULLY SPRINKLERED

1/4" = 1'-0"D1 CATWALK LEVEL

NEW WORK GENERAL NOTES

KEYED NOTES

103 STEEL GRATE OPEN STAIRS AND LANDING

109 BLAST-RATED WINDOW.

118 ACCESS LADDER ATTACHED TO WALL

122 NEW ROOF EQUIPMENT; REF. MECHANICAL

127 METAL GUARDRAIL

132 CATWALK PLATFORM; REF. STUC. DWGS

202 PRE-FINISHED STAINLESS STEEL CONDUCTOR HEAD

208 MANUF. LIMESTONE COPING

NUMBER NAME FLOOR BASE WALL CEILING COMMENTS

102-A3 EQUIPMENT EXIST. VB P-1 - BLDG.3 LOCATION

B-1 EXISTING PUMP ROOM C-1 - CMU/P-1 -

B-2 STORAGE C-1 - CMU/P-1 -

B-3 PIPE STORAGE C-1 - CMU/P-1 -

B-4 NEW PUMP ROOM C-1 - CMU/P-1 -

C-1 STORAGE C-1 - CMU/P-1 -

M-1 TOILET CT-1 CT-2 CT-2 ACT

M-2 TOILET CT-1 CT-2 CT-2 ACT

M-3 LOCKER ROOM C-1 VB CMU/GWB/P-1 ACT

M-4 SHOWER ROOM C-1 - CMU/GWB/P-1 GWB/P-WHITE SLIP RESISTANT FLOOR

M-5 BREAK AREA C-1 VB AT GWB CMU/GWB/P-1 ACT

M-6 CONTRACTOR TOUCHDOWN C-1 VB AT GWB CMU/GWB/P-1 ACT

M-7 PASSAGE C-1 VB AT GWB CMU/GWB/P-1 ACT

M-8 CONTROL ROOM C-1 - CMU/P-1 ACT

M-9 OFFICE C-1 VB AT GWB CMU/GWB/P-1 ACT

M-10 SECURITY C-1 - CMU/P-1 GWB/P-WHITE

M-11 HAC C-1 - CMU/P-1 -

M-12 I.T. ROOM C-1 - CMU/P-1 GWB/P-WHITE

M-13 ELECTRICAL C-1 - CMU/P-1 -

M-14 TRANSFORMER C-1 - CMU/P-1 -

M-15 GENERATOR ROOM C-1 - CMU/P-1 -

M-16 CORRIDOR C-1 - CMU/P-1 -

M-17 EQUIPMENT ROOM C-1 - CMU/P-1 -

M-18 BOILER ROOM C-1 - CMU/P-1 -

M-19 EQUIPMENT C-1 - CMU/P-1 -

ROOM FINISH SCHEDULE

1. WHERE NEW WORK IS INDICATED TO MATCH EXISTING, PROVIDE

EQUAL MATERIALS, COLORS AND FINISHES AND PERFORM WORK

IN MANNER TO ELIMINATE EVIDENCE OF NEW WORK.

2. DIMENSIONS ARE TO FINISHED FACE OF WALL OR GRIDLINE. DO

NOT SCALE DRAWINGS.

3. PROTECT EXISTING SURFACES AND MATERIALS INDICATED TO

REMAIN FROM DAMAGE OR DETERIORATION DUE TO

PERFORMANCE OF WORK. PATCH AND REPAIR EXISTING

MATERIALS AND SURFACES DAMAGED OR AFFECTED BY

PERFORMANCE OF THE WORK.

4. WORK INCLUDES PREPARATION OF EXISTING SURFACES TO

RECEIVE NEW WORK WHERE INDICATED.

5. ALL ANGLES ARE 90 DEGREES UNLESS NOTED OTHERWISE.

6. COORDINATE FIRE EXTINGUISHER, FIRE ALARM STROBES AND

PULL STATION LOCATIONS WITH COR. MOUNT IN ACCORDANCE

WITH FEDERAL ABAAS STANDARDS.

7. VERIFY DIMENSIONS AND LOCATIONS OF OPENINGS, BASES AND

SUPPORTS FOR EQUIPMENTS, DUCTS, PIPING , CONDUITS, ETC.

WHERE REQUIRED FOR NEW WORK, NEATLY CUT OPENINGS IN

EXISTING CONSTRUCTION. DO NOT USE IMPACT TOOLS. REVIEW

OPENING LOCATIONS WITH COR PRIOR TO STARTING WORK. KEEP

OPENINGS TO MINIMUM REQUIRED TO ALLOW FOR NEW WORK.

PROVIDE FIRE STOPPING AS REQUIRED.

8. OBTAIN HOT WORK PERMIT FROM COR PRIOR TO PERFORMING

ANY WORK REQUIRING OPEN FLAME.

9. PROVIDE FIRE RETARDANT TREATED WOOD FOR BLOCKING AND

ROUGH BUCKS. COORDINATE LOCATIONS WITH EQUIPMENT AND

DOOR INSTALLER. INSTALL PRIOR TO CLOSING WALLS.

10. PREPARE SURFACES IN ACCORDANCE WITH MANUFACTURER’S

INSTRUCTIONS AND RECOMMENDATIONS FOR APPLICATIONS

INDICATED WHERE NEW MATERIALS ARE TO BE INSTALLED ON

EXISTING SUBSTRATE.

11. WHERE FLOOR FINISHES CHANGE PLACE TRANSITION UNDER

CENTER OF DOOR OR FINISHED OPENING.

12. EXPOSED CMU TO BE FILLED AND PAINTED, SEE SPECS.

13. REFER TO SHEET AE501 FOR PARTITION ASSEMBLY TYPES.

14. REFER TO SHEET AE701 FOR DOOR AND HARDWARE

INFORMATION.

DN

UP

65432

D D

E E

F F

G G

7 8

H H

35935 mm (117' - 10 3/4")

752 mm (2' - 5 1/2") 3727 mm (12' - 2 3/4") 4686 mm (15' - 4 1/2") 4686 mm (15' - 4 1/2") 4916 mm (16' - 1 1/2") 5105 mm (16' - 9") 5874 mm (19' - 3 1/4") 5874 mm (19' - 3 1/4") 314 mm (1' - 0 1/2") m m

/4

122 122 122

/4

R

O O

F S

L O

P E

/4

R

O O

F S

L O

P E

/4

R

O O

F S

L O

P E

128128128

1/8" / 1'-0"

CRICKET SLOPE

1/8" / 1'-0

CRIC

KET S

LOPE

1/8" / 1'-0"

CRICKET SLOPE

1/8" / 1'-0

CRIC

KET S

LOPE

1/8" / 1'-0"

CRICKET SLOPE

1/8" / 1'-0

CRIC

KET S

LOPE

123 123 123 123

123 123 123

123 123

120120

120120

202 202 202201

14390 mm (47' - 2 1/2") 10877 mm (35' - 8 1/4")

J J

K K

122122

128128 128128

128128

152152

152152 152

152 152 152 m m

3"

T Y

P

AE509

F1 m m

6' m m

6'

76 mm (3") TYP.

123 123

/4

R

O O

F S

L O

P E

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C L o c a l R e v it F ile s \5

-1

-K

S

W ic h it a V

A M

C B o ile rs E rm in

.r v t

/3

/2

:4

:5

P M

13-AE131.02

ROOF PLAN, PHASE 2 INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

2021-09-03 JBS/MKL EXB/JTK553-19-KS

100% BID SHEET

FULLY SPRINKLERED

1/4" = 1'-0"D1 ROOF PLAN, PHASE 2

1. CONTRACTOR IS NOT TO SCALE CONSTRUCTION DOCUMENTS.

ARCHITECT AND OWNER ARE TO BE NOTIFIED IN THE EVENT A

DISCREPANCY IS FOUND IN EITHER SPECIFICATION OR

CONSTRUCTION DOCUMENTS AT THE EARLIEST PRACTICAL

OPPORTUNITY.

2. GENERAL CONTRACTOR SHALL OBSERVE ALL REGULATIONS

IMPOSED BY GOVERNING BODIES.

3. IF CONFLICT BETWEEN DRAWINGS, SPECIFICATIONS, AND

REQUIREMENTS OF THE BUILDING OWNER AND OR OPERATIONS

ARISE, THEY SHALL BE BROUGHT TO THE ATTENTION OF THE

ARCHITECT AND OWNER IMMEDIATELY.

4. THE CONTRACTOR SHALL CONTAIN ALL CONSTRUCTION ACTIVITY,

INCLUDING STORAGE OR MATERIAL AND EQUIPMENT WITHIN

CONTRACT LIMITS, AT ALL TIMES BEING RESPONSIBLE FOR AND

ABIDING BY THE RULES AND REGULATIONS OF THE OWNER.

5. GENERAL CONTRACTOR IS TO BE RESPONSIBLE FOR REPAIRING

ANY AND ALL SURFACES DAMAGED BY HIMSELF OR

SUBCONTRACTORS UNDER HIS CONTROL. REPAIRS ARE TO

MATCH EXISTING MATERIAL AND MUST BE ACCEPTABLE TO THE

OWNER.

6. GENERAL CONTRACTOR SHALL REMOVE ALL CONSTRUCTION

DEBRIS FROM JOBSITE. ALL CONSTRUCTION DEBRIS SHALL BE

CONTAINED WITHIN CONSTRUCTION LIMITS.

7. FURNISH AND INSTALL U.L. APPROVED FIRE STOPPING

ASSEMBLIES AT ALL PENETRATIONS THROUGH EXISTING AND

NEW FIRE RATED CONSTRUCTION REQUIRED TO BY THE SCOPE

OF THIS PROJECT. THE CONTRACTOR SHALL ALSO BE

RESPONSIBLE TO FURNISH AND INSTALL FIRE STOPPING

ASSEMBLIES AT APPLICABLE CONSTRUCTION JOINTS TO ACHIEVE

THE IDENTIFIED RATING REQUIREMENTS.

8. ALL ROOFING DETAILS SHOWN ARE DIAGRAMMATIC IN NATURE

DUE TO THE NUMBER AND VARYING CONDITIONS ON THE ROOF.

CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS PRIOR TO

CONSTRUCTION.

9. ALL ROOF FLASHING SHALL BE 8" MIN. ABOVE THE NEW ROOF.

10. REFERENCE ROOF DETAILS SHEET FOR TYPICAL ROOF

CONDITIONS.

11. GENERAL CONTRACTOR TO REFERENCE 25-YEAR SPECIFICATION

REQUIREMENTS FOR TPO ROOF.

NEW WORK GENERAL NOTES

KEYED NOTES

120 WHITE TPO MEMBRANE ROOF - REF. SPECIFICATIONS

122 NEW ROOF EQUIPMENT; REF. MECHANICAL

123 BUILT-UP ROOF CRICKET W/ LIGHTWEIGHT CONCRETE FORM AND

TPO MEMBRANE

128 PROVIDE FLASHING FOR NEW ROOF PENETRATING PIPE

152 TIE-DOWN ROOF ANCHOR; REF. STRUCTURAL

153 MEMBRANE WALKWAY PADS. PROVIDE SLIP RESISTANT SURFACE.

FINAL LOCATION TO BE COORDINATED WITH FINAL EQUIPMENT

LOCATION

154 SAFETY GUARDRAIL

201 PRE-FINISHED OVERFLOW SCUPPER

202 PRE-FINISHED STAINLESS STEEL CONDUCTOR HEAD

208 MANUF. LIMESTONE COPING

MAIN LEVEL

6'-8"

6 5 4 3 2 1

LOW PARAPET

24'-0"

UPPER ROOF PARAPET

41'-11 3/4" m m m m m m

205 205 205

227 228 229

223222221

210209

109 110108107

207 208

106105

205 206

103 104

204203

101 102

202201

209209

209209

215 215

230 230230

230 230

215 215

215 215

215 215215

215 215 215

610 mm (2' - 0") 610 mm (2' - 0")3048 mm (10' - 0")1575 mm (5' - 2")3150 mm (10' - 4")1524 mm (5' - 0")3150 mm (10' - 4")1727 mm (5' - 8")3150 mm (10' - 4")1575 mm (5' - 2")4267 mm (14' - 0")

610 mm (2' - 0") 3861 mm (12' - 8") 4166 mm (13' - 8") 3353 mm (11' - 0")

232232 232232 232232

SHOP LEVEL

0"

INTERM. ROOF PARAPET

30'-10 1/2"

MAIN LEVEL

6'-8"

D

C B A

EFG

UPPER ROOF PARAPET

41'-11 3/4"

ADDITION

H

114113

213 214212211

111 112

209209

JK

223223223

215 216 m m

7'

/8

+/- 1626 mm (5' - 4")

215 215

610 mm (2' - 0")

610 mm (2' - 0") 5334 mm (17' - 6") 2540 mm (8' - 4") 4826 mm (15' - 10") 610 mm (2' - 0")

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C L o c a l R e v it F ile s \5

-1

-K

S

W ic h it a V

A M

C B o ile rs E rm in

.r v t

/3

/2

:4

:0

P M

13-AE201.02

EXTERIOR ELEVATIONS INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

2021-09-03 JBS/MKL EXB/JTK553-19-KS

100% BID SHEET

FULLY SPRINKLERED

1/4" = 1'-0"C1 NORTH ELEVATION

1/4" = 1'-0"F1 WEST ELEVATION

KEYED NOTES

201 PRE-FINISHED OVERFLOW SCUPPER

202 PRE-FINISHED STAINLESS STEEL CONDUCTOR HEAD

205 OVERHEAD DOOR, BLAST RATED; REF. SPECIFICATIONS

208 MANUF. LIMESTONE COPING

209 FACE BRICK-MATCH EXISTING

215 MASONRY CONTROL JOINT WITH BACKER ROD. COLOR TO

MATCH MASONRY, REF. STRUCTURAL

216 EXPANSION JOINT WITH BACKER ROD. COLOR TO MATCH

223 BRICK INFILL TO MATCH EXISING WALL CONSTRUCTION

224 GRADE LINE; REF. CIVIL DWGS

229 MANUF. LIMESTONE BAND

230 NEW LIGHT FIXTURE; REF. ELEC. DWGS

232 H-FRAME WITH HSS STRUCTURAL MEMBERS; REF. STRUCTURAL

233 LIMESTONE CONTROL JOINT WITH BACKER ROD. COLOR TO

MATCH LIMESTONE

SHOP LEVEL

0"

INTERM. ROOF PARAPET

30'-10 1/2"

MAIN LEVEL

6'-8"

MAIN LEVEL

6'-8"

7 8

LOW PARAPET

24'-0"

UPPER ROOF PARAPET

41'-11 3/4"

E7E6E5E4E3E2E1

209209

209209

215 215

116 117116

223223

217 218 219 220 221 222 223 224

115 116 117 118 119 120 121

122 123

40 40 40 41

215 215

234 234 234 234 234

610 mm (2' - 0") 7823 mm (25' - 8") 7518 mm (24' - 8") 7823 mm (25' - 8") 610 mm (2' - 0")

610 mm (2' - 0")6807 mm (22' - 4")3658 mm (12' - 0")1219 mm (4' - 0")

SHOP LEVEL

0"

INTERM. ROOF PARAPET

30'-10 1/2"

MAIN LEVEL

6'-8"

MAIN LEVEL

6'-8"

D

CBA

E F G

LOW PARAPET

24'-0"

UPPER ROOF PARAPET

41'-11…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .