589A7-18-302 Wichita Bid Drawings - 6_Plumbing 2 of 2.pdf

PDF 5 MB Posted

Attached to
Z2DA--589A7-18-302 FCA Install New Boilers, Building 13 (VA-22-00049186)
Solicitation number
36C25522R0079
Issued by

About this file

This document package includes construction drawings and specifications for a federal construction project to install new boilers at the Robert J. Dole VA Medical Center in Wichita, Kansas. The project involves replacing existing boilers in Building 13 on the medical center campus. The construction drawings show existing and proposed plumbing plans and details for the boiler installation work at the basement, main floor, roof, and other levels of the building. Specification sections address plumbing, valves, fittings and other requirements. The solicitation is for a firm fixed-price construction contract to be awarded by the Department of Veterans Affairs Veterans Health Administration. The projected award date is not specified.

View the file

Other files

File Type Posted
36C25522R0079 0005.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 2_Civil 1 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil 2 of 3.pdf PDF
36C25522R0079 0004.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 2_Civil 3 of 3.pdf PDF
S02 Pre-Bid Questions Solicitation No 36C25522R0079_VA Response.pdf PDF
36C25522R0079 0003.docx DOCX document
589-18-302 Boiler Pre Bid Attendance.pdf PDF
PROPOSAL SUBMITTAL INSTRUCTIONS 589A7-18-302 REV 08052022.docx DOCX document
36C25522R0079 0002.pdf PDF
589A7-18-302 Wichita Bid Drawings - 3 Structural.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 2 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 3 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 6_Plumbing 1 of 2.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 1 of 4.pdf PDF
36C25522R0079 0001.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 2 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 4 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 3_Structural (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 4_Architectural (SI) 2 of 2.pdf PDF
S02 P09 - 589A7-18-302 Wichita Bid Specs VOL 3 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 6_Plumbing (SI).pdf PDF
S02 P09 - 589A7-18-302 Wichita Bid Specs VOL 2 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 5 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 6 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 1 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical 3 of 6.pdf PDF
36C25522R0079_1.docx DOCX document
S02 ATTACMENT 3 Past Performance Questionnaire 36C25522R0079 Project 589A7-18-302.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 3 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 2 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 1_Hazardous Materials (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 1 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 1 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 5_ Fire Protection (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 4 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical 4 of 6.pdf PDF
589A7-18-302 Wichita Bid Specs VOL 1 of 3 (800pgs).pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 2 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 4_Architectural (SI) 1 of 2.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 3 of 4.pdf PDF
P07 Wage Determination 20220708.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 0_General (SI).pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 8

F

F

H H

K K

D

D

CC

BB

AA

E

E

E1 E2 E3 E4 E5 E6 E7

J J

G G

NEW PUMP

ROOM

B-4

EXISTING

PUMP ROOM

B-1

3"SAN

4"ICW

STORAGE

B-2

INV. ELEV. -5.00'

(MIN 1.00' BELOW FROST)

4"SAN

DROP TO

4"V UP

PHASE 2

4" SAN DN

W/WCO 18"

ABOVE FINISHED

FLOOR

4"SAN UP

TO FD

4"SAN UP

TO FD

4"SAN UP

TO FD

4"SAN

4"SAN

S A N

S A N

S A N

4"SAN

4"SAN UP

TO FD

4"SAN UP

TO FD

4"SAN UP

TO FD

4"SAN

4"SAN UP

TO FD

3"SAN UP

TO FD

3"SAN UP

TO FD

2"SAN UP

TO FD

2"SAN UP

S A N

CONNECT 4"SAN

TO (E)4"SAN

CONNECT 4"WCO

TO (E)4"SAN &

CAP 4"GCO

2"V UP

4"SAN UP

(E)4"SAN UP

TO (N)FD-E

1 1/2"V UP

4"SAN UP

TO FD

4"SAN UP

TO FD

4"SAN UP

TO FD

4"SAN UP

TO FCO

4"V UP

4"SAN

4"SAN

1/8" / 1' - 0"

1/8" / 1' - 0"

4"V UP

3"SAN

3"SAN

3"FM

3"FM

2 1/2"

(E)SUMP

PIT

3"SAN UP

TO FD

CONNECT 4"SAN

TO (E)4"SAN

4"SAN

4"SAN

2"SAN UP

PIPE LOCATED ABOVE

EXISTING SLAB, BELOW

NEW MEZZANINE

PIPE LOCATED ABOVE

EXISTING SLAB, BELOW

NEW MEZZANINE

PIPE LOCATED ABOVE

EXISTING SLAB, BELOW

NEW MEZZANINE

/8

3"SAN

4"SAN

3"SAN

3"FM

CONNECT 3"FM

TO (E)3"FM &

EXTEND

CONNECT 4"V TO

(E)4"V &RISE

(R)TRASH

PUMP

(E)4"SAN(E)4"SAN(E)4"SAN

(T)1 1/2"DCW WILL BE IN USE FOR THE

EXISTING TOILET ROOM, UNTIL PHASE 3

TOILET ROOM IS OPERATION. AFTER TOILET

ROOM HAS BEEN INSTALLED, (T)1 1/2"DCW

WILL BE REMOVED BACK TO MAIN & CAPPED

AT SOV.

(T)1 1/2"DCW UP

(T)1 1/2"DCW

4"SAN UP

TO FD

4"SAN UP

TO FD

4"SAN

4"SAN1/4" / 1' - 0"1

/8

1/8" / 1' - 0"

1/4" /1'-0"

1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES

AND SYMBOLS.

2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.

3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.

4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.

GENERAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs \a tr e x le rm e y e rs

.M R

\D o c u m e n ts

\0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L -R a tr e x le rm e y e rs .r v t

/3

/2

:5

:2

A M

13-PP101.03

PLUMBING

PIPING PLAN

TUNNEL & BSMT LEVELS, PHASE 3

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 PD AHTM0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 PLUMBING PLAN - TUNNEL & BASEMENT LEVELS, PHASE 3

R E

F

1 2 3 4 5 6 7 8

F

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

GENERATOR

ROOM

M-15

TRANSFORMER

M-14

I.T. ROOM

M-12

ELECTRICAL

M-13

HAC

M-11

EQUIPMENT

ROOM

M-17

SECURITY

M-10

OFFICE

M-9

CONTROL

ROOM

M-8

CORRIDOR

M-16

PASSAGE

M-7

TOILET

M-1

TOILET

M-2

CONTRACTOR

TOUCHDOWN

M-6

BOILER

ROOM

M-18

LOCKER

ROOM

M-3

EQUIPMENT

M-19

SHOWER

ROOM

M-4

BREAK

AREA

M-5

PHASE 2

4"FD-E

4"FD-E

2"V UP

1"SCA UP&

DROP TO HOSE

REEL FOR WORK

BENCH

(R)SHOP AIR

COMPRESSOR

13-PP401.03

13-PP401.03

1"SCA UP

(T)WATER SOFTENER, DISCONNECT AND

REMOVE ALL PIPING BACK TO MAIN &

CAP.

DO NOT DEMOLITION TEMPORARY WATER

SOFTENER UNTIL AFTER NEW BOILERS

AND NEW WATER TREATMENT EQUIPMENT

ARE COMMISIONED.

4"FCO

1"SCA UP

REFER TO

PHASE 2 FOR

CONTINUATION

OPEN VALVE

4"FD-E

4"FD-E

LOCATED

UNDER

PLATFORM

(T)1 1/2"DCW DN.

(T)DCW WILL BE INSTALLED FOR THE EXISTING

TOILET ROOM, UNTIL PHASE 3 TOILET ROOM

IS OPERATION.

(T)1 1/2"DCW UP

1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES

AND SYMBOLS.

2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.

3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.

4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.

GENERAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs \a tr e x le rm e y e rs

.M R

\D o c u m e n ts

\0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L -R a tr e x le rm e y e rs .r v t

/3

/2

:5

:4

A M

13-PP111.03

PLUMBING

PIPING PLAN

SHOP & MAIN LEVELS, PHASE 3

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 PD AHTM0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 PLUMBING PLAN - SHOP & MAIN LEVELS, PHASE 3

4"FCO

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

OPEN VALVE

& EXTEND

V

V

4"V

2"V RISE &

DN

4"VTR

4"V RISE &

DN

4"V DN

4"V DN

4"V UP

2"DCW &

3/4"DHW DN

1/2"DCW &

1/2"DHW DN

1/2"DCW &

1/2"DHW DN

(E)4"V UP

4"V DN

1 1/2"V DN

2"DHW DN

3"DCW DN

3"ROS DN

3"SCW DN

FOR CONTINUATION

SEE 13-PP401.03

1 1/2"DHW

2"DCW

REFER TO

ENLARGED

PLANS FOR

CONTINUATION

1"SCA

1"SCA DN

1"SCA DN

OPEN VALVE

& EXTEND

4"V UP

2"V

2"DCW

1 1/2"DHW

1"DHW

1 1/2"DCW

4"V

1 1/2"DHW

4"V

1"DHW

1 1/2"DCW

1"DHW

1 1/2"DCW

4"V DN

1 1/2"V DN

3/4"DCW DN

1"SCA

1/2"SCA

1"SCA

1"SCW DN

SEE PHASE 2 FOR

CONTINUATION

1 1/2"DHW

2"DCW

(T)1 1/2"DCW DN.

(T)DCW WILL BE INSTALLED FOR THE EXISTING

TOILET ROOM, UNTIL PHASE 3 TOILET ROOM

IS OPERATION.

(T)1 1/2"DCW

1/2"SCA TO RO PNUEMATIC VALVE.

SEE 13-PP401.03 FOR CONTINUATION.

1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES

AND SYMBOLS.

2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.

3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.

4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.

GENERAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs \a tr e x le rm e y e rs

.M R

\D o c u m e n ts

\0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L -R a tr e x le rm e y e rs .r v t

/3

/2

:5

:5

A M

13-PP121.03

PLUMBING

PIPING PLAN

EX CATWALK & CATWALK LVLS, PH 3

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 PD AHTM0499-0121

100% BID SET

SCALE: 1/4" = 1'-0"1 PLUMBING PLAN - EXISTING CATWALK & CATWALK LEVELS, PHASE 3

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

PHASE 2

4"VTR

4"VTR

(E)4"VTR

4"VTR

1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES

AND SYMBOLS.

2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.

3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.

4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.

GENERAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs \a tr e x le rm e y e rs

.M R

\D o c u m e n ts

\0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L -R a tr e x le rm e y e rs .r v t

/3

/2

:0

:0

A M

13-PP131.03

PLUMBING

PIPING PLAN

ROOF, PHASE 3

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 PD AHTM0499-0121

100% BID SET

SCALE: 1/4" = 1'-0"1 PLUMBING PLAN - ROOF, PHASE 3

1 2 3

D

C

B

A

E1 E2 E3

4"FD-E

4"FD-P

4"FD-P

4"FD-P

4"FD-P

4"FD-P

4"FD-P

4"V UP

4"VTR

1-1/2"V RISE

2"SAN DN

1/2"DCW

1/2"DHW DROP

IN WALL

1"DCW

1"DHW DROP

ON WALL

4"FD-P

P-707

P-531

4"ICW DN

4"V

DN&RISE

4"ICW

DROP

NC

NC

B Y P A S S

3"DCW

DROP

3"DCW

1 1/2"DHW

3"ROS

2"DHW

3"DCW

1 1/2"DCW

1 1/2"DHW

1"ROS

3"ROS

2"V

1"DHW

1"DCW

13-TNK-02

13-TNK-01

13-PWP-01

13-CFS-01 13-CFS-02

13-RO-01

13-BR-0113-WS-01

3"SCW

3"SCW

3"SCW

3"SCW3"ICW

4"V

3"ICW

4"ICW

3"DCW

3"ROS

3"SCW

3"SCW

CARBON

FILTER

SKID

CARBON

FILTER

SKID

RO

SKID

RO

PUMP

SKID

GAL.

RO

STORAGE

TANK

GAL.

RO

STORAGE

TANK

PROCESS

WATER

PUMP

SKID

WATER

SOFTENER

SKID

BRINE

TANK

SCISSOR

LIFT

4"RPZ

3"RPZ

3"DCW

1 1/2"DHW

2"DCW

1 1/2"DHW

ANTISCALANT

BIOCIDE

1 1/2"DHW

3"DCW

13-ROP-01,02

3"SCW

3"SCW

3"DCW

1 1/2"DHW &

2"DCW FOR

CONTINUATION

SEE PP121.03

2"DHW UP

3"DCW UP

3"ROS UP

3"SCW UP

FOR CONTINUATION

SEE 13-PP401.03

2"V

CAUSTIC

3"ROS

1/2"SCA DROP

TO AIR FILTER

AND SOLENOID

VALVE

1"SCA FOR

CONTINUATION

SEE PP121.03

UV

LIGHT

1"ROS

1"ROS

BY-PASS

3"SCW

EXPANSION

TANK

3"SCW

1"SCA

1/2"SCA

3"ROS

R O S

R O S

3"ROS

3"ROS

3"ROS

3"SCW

3"ROS

1/2"SCA

AIR FILTER

13-ET-01

1"SCA

B

A

E5 E6 E7

P-528

P-103

P-418

P-103

P-4182"FD-C

P-701

P-609

2"DCW &

3/4"DHW

UP IN WALL

1/2"DCW &

1/2"DHW UP IN

WALL

1/2"DCW &

1/2"DHW UP

IN WALL

3"FD-C

3"FD-C

3"FD-C

P-801

1"DCW RISE

IN CHASE

1/2"DCW

RISE IN CHASE

1/2"DCW &

1/2" DHW

RISE IN CHASE

1 1/2"V UP

2"SAN DN

IN WALL

LOCKER

ROOM

M-3

SHOWER

ROOM

M-4

BREAK

AREA

M-5

CONTRACTOR

TOUCHDOWN

M-6

TOILET

M-2

TOILET

M-1

3/4"DCW UP

IN WALL

1 1/2"V

UP&DN

IN WALL

1 1/2"V

UP&DN

IN WALL

1 1/2"V RISE

2"SAN DROP

IN CHASE

4"V RISE

4"SAN DN

IN CHASE

1/2"DCW &

1/2" DHW

RISE IN CHASE

1 1/2"V RISE

2"SAN DROP

IN CHASE

4"V

UP&DN

IN CHASE

1 1/2"V

RISE&DN

IN CHASE

2"V

3/4"DCW

3/4"DHW

2"SAN

1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES

AND SYMBOLS.

2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.

3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.

4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.

GENERAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs \a tr e x le rm e y e rs

.M R

\D o c u m e n ts

\0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L -R a tr e x le rm e y e rs .r v t

/3

/2

:0

:1

A M

13-PP401.03

ENLARGED PIPING PLAN INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 MH AHTM0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/2" = 1'-0"1 ENLARGED VIEW - TREATMENT ROOM

SCALE: 1/2" = 1'-0"2 ENLARGED VIEW - TOILET ROOMS & BREAK ROOM

SHEET KEYNOTES:

1. ALL REVERSE OSMOSIS PIPING, VALVES, FITTINGS AND EQUIPMENT TO BE

FABRICATED FROM 304 STAINLESS STEEL.

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

NO. DESCRIPTION DATE

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0121

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

100% BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANTS INSTALL NEW BOILERS IN

BUILDING 13

589A7-18-302

Project Director

2021-09-03

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

PLUMBING

DETAILS

P-502

AHTMPD

File details come from the government source that posted it. Updated .