This is a solicitation for a firm fixed-price construction contract to install new boilers in Building 13 at the Robert J. Dole VA Medical Center in Wichita, Kansas. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 is seeking offers to provide all labor, materials, equipment and supervision necessary for the installation of new boilers. Offerors must submit pricing by January 15, 2023. The period of performance is 180 calendar days from NTP. The solicitation is set aside for verified service-disabled veteran-owned small businesses.

View the file

Other files

File Type Posted
36C25522R0079 0005.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 2_Civil 1 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil 2 of 3.pdf PDF
36C25522R0079 0004.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 2_Civil 3 of 3.pdf PDF
S02 Pre-Bid Questions Solicitation No 36C25522R0079_VA Response.pdf PDF
36C25522R0079 0003.docx DOCX document
589-18-302 Boiler Pre Bid Attendance.pdf PDF
PROPOSAL SUBMITTAL INSTRUCTIONS 589A7-18-302 REV 08052022.docx DOCX document
36C25522R0079 0002.pdf PDF
589A7-18-302 Wichita Bid Drawings - 3 Structural.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 2 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 3 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 6_Plumbing 1 of 2.pdf PDF
589A7-18-302 Wichita Bid Drawings - 6_Plumbing 2 of 2.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 1 of 4.pdf PDF
36C25522R0079 0001.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 2 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 4 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 3_Structural (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 4_Architectural (SI) 2 of 2.pdf PDF
S02 P09 - 589A7-18-302 Wichita Bid Specs VOL 3 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 6_Plumbing (SI).pdf PDF
S02 P09 - 589A7-18-302 Wichita Bid Specs VOL 2 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 5 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 6 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 1 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical 3 of 6.pdf PDF
36C25522R0079_1.docx DOCX document
S02 ATTACMENT 3 Past Performance Questionnaire 36C25522R0079 Project 589A7-18-302.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 3 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 2 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 1_Hazardous Materials (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 1 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 1 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 4 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical 4 of 6.pdf PDF
589A7-18-302 Wichita Bid Specs VOL 1 of 3 (800pgs).pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 2 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 4_Architectural (SI) 1 of 2.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 3 of 4.pdf PDF
P07 Wage Determination 20220708.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 0_General (SI).pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE SUPPRESSION ABBREVIATIONS

ABD AUTOMATIC BALL DRIP

ACT ACOUSTICAL CEILING TILE

AFF ABOVE FINISHED FLOOR

AS AUTOMATIC SPRINKLER

ATR ALL THREAD ROD

BFP BACKFLOW PREVENTER

BOB BOTTOM OF BEAM

CB CONCRETE BEAM

COL COLUMN

CONC CONCRETE

DI DUCTILE IRON

DN DOWN

DP DRY PENDENT (SPRINKLER)

DS DRY SIDEWALL (SPRINKLER)

EC EXTENDED COVERAGE (SPRINKLER)

EXP EXPOSED (NO CEILING)

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FHV FIRE HOSE VALVE

FS FLOW SWITCH

GALV GALVANIZED

GYP GYPSUM WALL BOARD

(SHEETROCK)

HT HIGH TEMPERATURE (SPRINKLER)

ITC INSPECTORS TEST CONNECTION

MAX MAXIMUM

MIN MINIMUM

MT METAL TILE

NIC NOT IN CONTRACT

NS NON-SPRINKLERED

NTS NOT TO SCALE

OSJ OPEN STEEL JOIST

PL PLASTER (CEILING)

POC POINT OF CONNECTION

PRV PRESSURE RELIEF VALVE

QR QUICK RESPONSE (SPRINKLER)

SCH SCHEDULE

SPL HIDDEN SPLINE (CEILING)

STL STEEL

TYP TYPICAL

TS TAMPER SWITCH

UNO UNLESS NOTED OTHERWISE

FIRE SUPPRESSION GENERAL NOTES:

1. PROVIDE DETAILED DESIGN, INSTALLATION, AND TESTING FOR A NEW FIRE SPRINKLER SYSTEM TO SERVE BUILDING 13, THE BOILER PLANT, AT THE VA MEDICAL CENTER IN WICHITA, KS. THE SYSTEM IS

SERVED BY EXISTING WATER MAINS NEAR THE BUILDING.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SPRINKLER WORK.

3. PROVIDE ALL NECESSARY MATERIALS AND LABOR TO FURNISH AND INSTALL THE SYSTEM AS

DESCRIBED IN THE PROJECT SPECIFICATIONS AND CONTRACT DRAWINGS.

4. PRELIMINARY HYDRANT FLOW TEST RESULTS INDICATE A WATER SUPPLY WITH A STATIC

PRESSURE OF 75 PSI AT HYDRANT #15 AND A RESIDUAL PRESSURE OF 59 PSI FLOWING 1,021 GPM AT

HYDRANT #16. CONTRACTOR SHALL USE CURRENT FLOW TEST DATA FOR DESIGN AND

CALCULATIONS PURPOSES.

5. PIPE AND EQUIPMENT SIZES AND LOCATIONS SHOWN ARE FOR REFERENCE ONLY. CONTRACTOR IS RESPONSIBLE FOR ALL DETAILED HYDRAULIC CALCULATIONS, SIZING AND LOCATION OF ALL PIPING, EQUIPMENT LAYOUT, ETC.

6. ALL REFERENCE TO THE AUTHORITY HAVING JURISDICTION (AHJ) SHALL MEAN THE DEPARTMENT

OF VA REGIONAL FIRE PROTECTION ENGINEER.

7. ALL REFERENCE TO THE ENGINEER SHALL MEAN KOFFEL ASSOCIATES, INC.

8. ALL REFERENCE TO THE OWNER SHALL MEAN THE DEPARTMENT OF VETERANS AFFAIRS (THE VA).

9. INSTALLATION OF THE FIRE SPRINKLER SYSTEM AND ASSOCIATED COMPONENTS SHALL BE IN

ACCORDANCE WITH THE FOLLOWING:

• VA FIRE PROTECTION DESIGN MANUAL (VAFPDM) - 2021 EDITION

• NFPA 101®, LIFE SAFETY CODE® (LSC) - 2021 EDITION

• NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS - 2019 EDITION

• NFPA 70, NATIONAL ELECTRICAL CODE - 2020 EDITION

• NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE - 2019 EDITION

• INTERNATIONAL BUILDING CODE (IBC) - 2021 EDITION (AS AMMENDED)

• OTHER RELEVANT NFPA DOCUMENTS AND MANUFACTURER REQUIREMENTS, AS APPLICABLE.

10. THE FOLLOWING DESIGN CRITERIA APPLIES:

• ORDINARY HAZARD GROUP 2 (OH2): 0.20 GPM/SQ FT OVER 1,500 SQ FT (8.2 MM/MIN OVER 140 SQ

M)

• EXTRA HAZARD GROUP 1 (EH1): 0.30 GPM/SQ FT OVER 2,500 SQ FT (12.2 MM/MIN OVER 230 SQ M)

PER VA BASE SPECIFICATIONS, BOILER PLANTS ARE CONSIDERED TO BE OH2 OCCUPANCIES. THE

ENTIRE AREA OF THE BOILER PLANT SHALL BE CONSIDERED OH2 EXCEPT FOR THE GENERATOR

ROOM, WHICH SHALL BE CONSIDERED EH1. SPRINKLER SPACING SHALL BE IN ACCORDANCE WITH

NFPA 13 REQUIREMENTS.

11. ALL WORK SHALL BE COORDINATED WITH ALL OTHER TRADES, INCLUDING COORDINATION WITH

STRUCTURAL LIMITATIONS.

12. ALL HYDRAULIC CALCULATIONS SHALL YIELD AT LEAST A 10 PERCENT SAFETY FACTOR FOR EACH

SPRINKLER DESIGN AREA, INCLUDING REQUIRED HOSE STREAMS, AS PER THE VAFPDM.

13. ALL NEW MATERIALS SHALL BE LISTED BY UNDERWRITERS LABORATORIES, INC. (U.L.) FOR USE ON COMMERCIAL FIRE PROTECTION SYSTEMS. UNO, SPRINKLERS SHALL ALSO BE FACTORY MUTUAL (FM)

APPROVED, PER SECTION 6.1.K OF THE VAFPDM.

14. SPRINKLER TYPES SHALL BE AS DESCRIBED IN THE PROJECT SPECIFICATIONS.

15. NEW SPRINKLERS IN AREAS WITH FINISHED CEILINGS SHALL BE LOCATED IN SUSPENDED CEILING TILES AS INDICATED ON THE DESIGN DRAWINGS. ARMOVERS AND DROPS TO INDIVIDUAL SPRINKLERS

SHALL BE FIELD CUT TO ENSURE PROPER SPRINKLER PLACEMENT.

16. NEW SPRINKLER PIPE SHALL MEET THE FOLLOWING CRITERIA:

• PIPE SIZES 2" (50 MM) AND SMALLER: SCHEDULE 40, BLACK STEEL, MEETING ASTM A53 (TYPE E

GRADE B) OR A795 (TYPE E GRADE A) SPECIFICATIONS, CONNECTED WITH THREADED FITTINGS.

• PIPE SIZES 2½" (63 MM) AND LARGER: SCHEDULE 10, BLACK STEEL, MEETING ASTM A135 OR A795

TYPE E GRADE A SPECIFICATIONS, CONNECTED WITH LISTED GROOVED COUPLINGS.

17. NEW PIPE FITTINGS SHALL INCLUDE:

• THREADED FITTINGS FOR SCHEDULE 40 PIPE SHALL CONFORM TO SECTION 6.4 OF NFPA 13.

• ROLL GROOVED FITTINGS FOR SCHEDULE 10 PIPE SHALL BE UL LISTED. COUPLINGS SHALL

COMPLY WITH ASTM A536, AND A183 SPECFICIATIONS WITH GRADE E, TYPE A GASKETS. ALL

COMPONENTS SHALL BE FROM A SINGLE MANUFACTURER.

18. ALL NECESSARY CONNECTIONS TO THE FIRE ALARM SYSTEM SHALL BE MADE BY AND

COORDINATED WITH THE FIRE ALARM CONTRACTOR. SYSTEM ACCEPTANCE TESTS SHALL BE

COORDINATED WITH THE FIRE ALARM CONTRACTOR AND WITNESSED BY THE OWNER.

19. ALL HANGERS SHALL BE U.L. LISTED FOR USE WITH FIRE SPRINKLER SYSTEMS. HANGER

INSTALLATION AND SPACING SHALL BE IN ACCORDANCE WITH NFPA 13. SEISMIC BRACING OF ALL

PIPING AND EQUIPMENT SHALL BE PROVIDED.

20. ALL SPRINKLER SYSTEM PIPING AND HANGERS SHALL BE CONCEALED WHEREVER POSSIBLE.

PROVIDE ACCESS PANELS FOR ALL VALVES, WHERE REQUIRED.

21. NEW FIRE SPRINKLER PIPE PENETRATIONS OF FIRE-RATED ASSEMBLIES SHALL BE SEALED WITH A U.L. CERTIFIED THROUGH-PENETRATION SYSTEM APPROPRIATE FOR THE MATERIALS INVOLVED AND

THE FIRE RATING OF THE WALL PENETRATED. REFER TO ARCHITECTURAL DRAWINGS FOR WALL

RATINGS.

22. ALL CONTRACTORS PREPARING BIDS FOR THE PROJECT ARE EXPECTED TO VISIT THE SITE PRIOR

TO SUBMITTING BIDS.

23. CONTRACTOR SHALL BE RESPONSIBLE FOR DEVELOPMENT OF SHOP DRAWINGS, HYDRAULIC

CALCULATIONS, PERMIT FEES, APPROVAL OF SHOP DRAWINGS, AND ACCEPTANCE OF THE SYSTEM

BY THE AHJ.

24. PRIOR TO SUBMITTING AN APPLICATION FOR SPRINKLER PERMIT TO THE AHJ, PROVIDE TWO COPIES OF ALL SHOP DRAWINGS, HYDRAULIC CALCULATIONS (WHERE REQUIRED), AND PRODUCT

DATA SHEETS TO THE OWNER FOR REVIEW AND COMMENT. PERMIT APPLICATION SHALL NOT BE

MADE UNTIL SUCH TIME THAT THE ENGINEER HAS COMPLETED A REVIEW OF THE SHOP DRAWING

PACKAGE.

25. UPON COMPLETION OF WORK, TESTING SHALL BE PERFORMED IN ACCORDANCE WITH VA, NFPA 13, NFPA 20, AND NFPA 25 REQUIREMENTS. ALL TESTING SHALL BE WITNESSED BY THE AHJ AND THE

OWNER’S DESIGNATED REPRESENTATIVE.

26. PROVIDE AUTOMATIC AIR VENTS AT ALL HIGH POINTS IN THE SPRINKLER SYSTEM IN ACCORDANCE

WITH NFPA 13 REQUIREMENTS. AIR VENTS SHALL NOT REQUIRE MANUAL DRAINING OF WATER.

27. THIS PROJECT IS PHASED. COORDINATE ALL WORK WITH PHASING AS NECESSARY. SEE

ARCHITECTURAL DRAWINGS FOR PHASING INFORMATION.

28. DRAIN LOCATIONS ARE NOT INDICATED ON DRAWINGS. CONTRACTOR SHALL PROVIDE ALL DRAINS

AS REQUIRED BY NFPA 13 AND THE VAFPDM. DRAINS SHALL BE PIPED TO THE EXTERIOR.

29. CONTRACTOR SHALL FIELD-COORDINATE WITH OTHER TRADES AND PROVIDE SPRINKLERS UNDER

ALL OBSTRUCTIONS AND OVERHANGS AS REQUIRED BY NFPA 13, INCLUDING UNDER STAIRS.

SPRINKLERS PROVIDED BELOW CEILING LEVEL IN THE BOILER ROOM AREA AND ALL AREAS WITH HIGH

TEMPERATURE STEAM SHALL BE STANDARD-RESPONSE, ULTRA-HIGH TEMPERATURE RATED.

30. SPRINKLERS AT THE CEILING LEVEL IN THE BOILER PLANT AREA AND ALL AREAS WITH HIGHT

TEMPERATURE STEAM SHALL BE QUICK-RESPONSE, HIGH TEMPERATURE RATED.

31. GUARDS SHALL BE PROVIDED ON ALL SPRINKLERS IN AREAS WITHOUT FINISHED CEILINGS. ALL

GUARDS SHALL BE APPROVED FOR USE WITH THE SELECTED SPRINKLERS.

32. PROVIDE A WALL-MOUNTED SPARE SPRINKLER CABINET IN THE EQUIPMENT ROOM NEAR THE

SPRINKLER WATER RISER, ALONG WITH ALL REQUIRED SPARE SPRINKLERS.

33. INSPECTION IS REQUIRED OF ALL CONSTRUCTION DELINEATED WITHIN THE FIRE SUPPRESSION DRAWINGS AND SPECIFICATIONS. PROVIDE TESTS AND INSPECTIONS IN COMPLIANCE WITH IBC REQUIREMENTS AND THE PROJECT SPECIFICATIONS. SPECIAL INSPECTIONS MUST BE PERFORMED

FOR THE SPRINKLER SYSTEM AND SEISMIC BRACING IN ACCORDANCE WITH SPECIFICATION

REQUIREMENTS.

34. DO NOT PROVIDE SPRINKLERS OR PIPING IN THE AREA ENCOMPASSED BY A VERTICALLY

ORIENTED CYLINDER OF SIX FEET IN DIAMETER DIRECTLY ABOVE BOILER STEAM RELEASE VENTS.

SEE MECHANICAL DRAWINGS AND DETAILS FOR MORE INFORMATION REGARDING LOCATIONS OF

THESE VENTS. WHILE SPRINKLERS THEMSELVES SHALL NOT BE LOCATED IN THE AREA NOTED

ABOVE, SPRINKLER COVERAGE MUST STILL BE PROVIDED FOR THIS AREA.

35. DO NOT PROVIDE SPRINKLERS OR PIPING IN THE AREA DIRECTLY BELOW ROOF VENTS, INTAKES, AND OTHER SIMILAR FEATURES THAT ARE DIRECTLY OPEN TO THE EXTERIOR. WHILE SPRINKLERS

THEMSELVES SHALL NOT BE LOCATED IN THE AREA NOTED ABOVE, SPRINKLER COVERAGE MUST

STILL BE PROVIDED FOR THE AREA BELOW THESE ROOF OPENINGS. SEE MECHANICAL AND

ARCHITECTURAL DRAWINGS FOR MORE INFORMATION.

36. SPRINKLER PIPING SIZE AND LOCATION IS FOR REFERENCE ONLY. CONTRACTOR IS RESPONSIBLE FOR APPROPRIATELY SIZING AND LAYING OUT THE SPRINKLER SYSTEM AT NO ADDITIONAL COST TO

THE OWNER. A LOOPED OR GRIDDED SPRINKLER SYSTEM MAY BE NECESSARY.

37. ALL FIRE SPRINKLER VALVES AND EQUIPMENT SHALL BE CLEARLY ANNOTATED ON THE

CONTRACTOR AS-BUILT DRAWINGS. TAGS SHALL BE AFFIXED TO ALL VALVES AND EQUIPMENT. THE CONTRACTOR IS REQUIRED TO PROVIDE A VALVE LIST IN A 3-RING BINDER, AND TO PLACE LAMINATED VALVE LISTS INTO PICTURE FRAMES AND ATTACH THEM TO THE WALLS IN EACH SPACE. AS-BUILT DRAWINGS INCLUDING ALL FIELD MODIFICATIONS SHALL BE PROVIDED IN REVIT AND AUTOCAD

FORMAT.

38. ALL AREAS BELOW THE NEW MEZZANINE FLOORS MUST BE SPRINKLED. IF THE FIRE SUPPRESSION PIPING IS INSTALLED TIGHT TO THE STEEL, UPRIGHT SPRINKLERS WILL BE REQUIRED IN EACH STRUCTURAL BAY. 18” CLEARANCE MUST BE MAINTAINED BELOW THE SPRINKLER HEADS TO ITEMS

BELOW.

UPRIGHT SPRINKLER

(SUBSCRIPT DENOTES

INTERMEDIATE OR HIGH

TEMPERATURE)

DRY PENDENT

EXTENDED COVERAGE

UPRIGHT SPRINKLER

PENDENT SPRINKLER;

ON DROP NIPPLE

SPRINKLER GUARD;

SHOWN ON UPRIGHT

SPRINKLER

UPRIGHT SPRINKLER

EXTENDED COVERAGE

PENDENT SPRINKLER;

ON DROP NIPPLE

NS

EC

NEW SYSTEM PIPING

EXISTING PIPING TO REMAIN

POINT OF CONNECTION

PIPE HANGER

SYSTEM RISER

HOSE VALVE

PIPE TEE DOWN

CONCENTRIC REDUCER

ECCENTRIC REDUCER

FLUSHING CONNECTION OR

CAP

CONTROL VALVE

CHECK VALVE

OS&Y GATE VALVE

BUTTERFLY VALVE

NON-INDICATING CONTROL

VALVE

PRESSURE REDUCING

BACKFLOW

PREVENTER; DOUBLE CHECK

TYPE

POST-INDICATING VALVE

ALARM CHECK VALVE

FIRE DEPARTMENT

CONNECTION

CALCULATED REMOTE AREA

SPRINKLER ZONE BOUNDARY

HYDRAULIC REFERENCE NODE

AREA NOT PART OF SPRINKLER

ZONE

NON-SPRINKLERED AREA

LOGITUDINAL SWAY BRACE

4-WAY SWAY BRACE

FIRE SUPPRESSION LEGEND:

XX

HT,IT

EC

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

KOFFEL ASSOCIATES

PROFESSIONAL ENGINEER

MR PROJECT NO:

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232 9/3/2021

C :\U se rs

\k cu st od io .K

O

FF

EL

AS

SO

C

\D oc um en ts \0

9-

-W ic hi ta

B oi le rs

-F ire

S up pr es si on

-R

_k cu st od io

VZ

5G H

.rv t

9/ 3/

:5

0:

P M

FX001

FIRE SUPPRESSION NOTES, SYMBOLS,

AND ABBREVIATIONS

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 MLD KLC0499-0121

100% BID SET

FULLY SPRINKLERED

NEW PUMP ROOM

B-4

EXISTING PUMP

ROOM

B-1

SPRINKLER ZONE 1

1170 SQ M (12,600 SQ FT)

(4

(4

(4

5 6

F

H

K

D

C

B

A

E

E6 E7

J

G

EX

(6

EX

(6

KEY NOTES:

100 (4") UP TO FLOOR ABOVE.1

SHEET NOTES:

PROVIDE SPRINKLER PROTECTION UNDER ALL

STAIRS.

SPRINKLERS AND SPRINKLER PIPING SHALL NOT BE

INSTALLED DIRECTLY ABOVE ELECTRICAL EQUIPMENT.

SPRINKLERS AND PIPING INSTALLED IN ELECTRICAL

EQUIPMENT AREAS SHALL BE INSTALLED IN

ACCORDANCE WITH NFPA 70 CLEARANCE

REQUIREMENTS. DRIP PANS AND OTHER SIMILAR

FEATURES SHALL BE PROVIDED WHEN REQUIRED BY

NFPA 70.

CONTRACTOR SHALL LOCATE AND INSTALL ALL DRAINS

AS REQUIRED BY THE APPLICABLE CODES AND

STANDARDS.

1.

2.

3.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

KOFFEL ASSOCIATES

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232 9/3/2021

C :\U se rs

\k cu st od io .K

O

FF

EL

AS

SO

C

\D oc um en ts \0

9-

-W ic hi ta

B oi le rs

-F ire

S up pr es si on

-R

_k cu st od io

VZ

5G H

.rv t

9/ 3/

:5

0:

P M

FX101

FIRE SUPPRESSION NEW WORK PLAN

TUNNEL & BSMT LEVELS

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 MLD KLC0499-0121

100% BID SET

FULLY SPRINKLERED

3/16" = 1'-0"FX101

BASEMENT PLAN - FIRE SUPPRESSION1

GENERATOR

ROOM

M-15

TRANSFORMER

M-14

I.T. ROOM

M-12

ELECTRICAL

M-13

HAC

M-11

BOILER ROOM

M-18

SECURITY

M-10

OFFICE

M-9

CONTROL ROOM

M-8

CORRIDOR

M-16

SPRINKLER ZONE 1

1170 SQ M (12,600 SQ FT)

100 (4")

100 (4")

(4

(4

(4

(4

100 (4")

71 2 3 4 5 6 7 8

F

H

K

D E

J

G

EQUIPMENT ROOM

M-17

8 8

KEY NOTES:

REFER TO FX401 FOR WORK IN THIS AREA.

100 (4") DOWN TO NEW PUMP ROOM.

100x65x65 (4"x2-1/2"x2-1/2") BACKFLOW TEST HEADER.

PROVIDE SIGNAGE ALONG EXTERIOR WALL THAT

READS 'BACKFLOW TEST' ABOVE TEST HEADER.

PROVIDE TEMPORARY CAP FOR PHASING. REFER TO

ARCHITECTURAL DRAWINGS FOR ADDITIONAL

PHASING INFORMATION.

100 (4") SPRINKLER MAIN UP. REFER TO DRAWING

FX121 FOR CONTINUATION.

GENERATOR ROOM SHALL BE DESIGNED AS AN

EXTRA HAZARD GROUP 1 OCCUPANCY.

100x65x65 (4"x2-1/2"x2-1/2") FDC HEADER. PROVIDE

SIGNAGE ALONG EXTERIOR WALL THAT READS 'FDC'

ABOVE HEADER.

PROVIDE PROPER SPACING FROM STEAM TEST

VALVES IN THIS AREA PER NFPA 13.

SHEET NOTES:

PROVIDE SPRINKLER PROTECTION UNDER ALL

STAIRS.

SPRINKLERS AND SPRINKLER PIPING SHALL NOT BE

INSTALLED DIRECTLY ABOVE ELECTRICAL EQUIPMENT.

SPRINKLERS AND PIPING INSTALLED IN ELECTRICAL

EQUIPMENT AREAS SHALL BE INSTALLED IN

ACCORDANCE WITH NFPA 70 CLEARANCE

REQUIREMENTS. DRIP PANS AND OTHER SIMILAR

FEATURES SHALL BE PROVIDED WHEN REQUIRED BY

NFPA 70.

CONTRACTOR SHALL LOCATE AND INSTALL ALL DRAINS

AS REQUIRED BY THE APPLICABLE CODES AND

STANDARDS.

1.

2.

3.

C

B

A

E1 E2 E3 E4 E5 E6 E7

EXISTING PLANT

2 HOUR FIRE BARRIER CONSTRUCTION

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

KOFFEL ASSOCIATES

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232 9/3/2021

C :\U se rs

\k cu st od io .K

O

FF

EL

AS

SO

C

\D oc um en ts \0

9-

-W ic hi ta

B oi le rs

-F ire

S up pr es si on

-R

_k cu st od io

VZ

5G H

.rv t

9/ 3/

:5

1:

P M

FX111.02

FIRE SUPPRESSION NEW WORK PLAN

SHOP & MAIN LEVELS (PHASE 2)

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 MLD KLC0499-0121

100% BID SET

FULLY SPRINKLERED

3/16" = 1'-0"FX111.02

FIRST FLOOR PLAN - FIRE SUPPRESSION (PHASE 2)2

1 2 3 4 5 6 7 8

F

H

K

D E

J

G

GENERATOR

ROOM

M-15

TRANSFORMER

M-14

I.T. ROOM

M-12

ELECTRICAL

M-13

HAC

M-11

BOILER ROOM

M-18

SECURITY

M-10

OFFICE

M-9

CONTROL ROOM

M-8

CORRIDOR

M-16

SPRINKLER ZONE 1

1170 SQ M (12,600 SQ FT)

100 (4")

100 (4")

(4

(4

(4

100 (4")

EQUIPMENT ROOM

M-17

(4

C

B

A

E1 E2 E3 E4 E5 E6 E7

PASSAGE

M-7

TOILET

M-1

LOCKER ROOM

M-3

EQUIPMENT

M-19

TOILET

M-2

SHOWER ROOM

M-4

CONTRACTOR

TOUCHDOWN

M-6

BREAK AREA

M-5

100 (4")

100 (4")

(4

(4

KEY NOTES:

REFER TO FX401 FOR WORK IN THIS AREA.

SPRINKLER PIPING BELOW RAISED FLOOR..

100x65x65 (4"x2-1/2"x2-1/2") BACKFLOW TEST HEADER.

PROVIDE SIGNAGE ALONG EXTERIOR WALL THAT

READS 'BACKFLOW TEST' ABOVE TEST HEADER.

100 (4") SPRINKLER MAIN DOWN. REFER TO DRAWING

FX101 FOR CONTINUATION.

100 (4") SPRINKLER MAIN UP. REFER TO DRAWING

FX121 FOR CONTINUATION.

GENERATOR ROOM SHALL BE DESIGNED AS AN

EXTRA HAZARD GROUP 1 OCCUPANCY.

100x65x65 (4"x2-1/2"x2-1/2") FDC HEADER. PROVIDE

SIGNAGE ALONG EXTERIOR WALL THAT READS 'FDC'

ABOVE HEADER.

PROVIDE SPRINKLERS UNDER RAISED FLOOR AREAS.

PROVIDE PROPER SPACING FROM STEAM TEST

VALVES IN THIS AREA PER NFPA 13.

REMOVE TEMPORARY CAP INSTALLED UNDER PHASE

2 AND CONNECT TO NEW PIPING INSTALLED UNDER

PHASE 3 (EXISTING BOILER RENOVATION ). REFER TO

ARCHITECTURAL DRAWINGS FOR ADDITIONAL

PHASING INFORMATION.

100 (4") DOWN TO NEW PUMP ROOM.

SPRINKLER PIPING DOWN TO STORAGE ROOM AREA

BELOW.

PROVIDE SPRINKLERS IN STORAGE ROOM AREA.

100 (4") SPRINKLER PIPING MAIN UP TO FLOOR ABOVE

AND DOWN TO RAISED FLOOR AREA.

SHEET NOTES:

PROVIDE SPRINKLER PROTECTION UNDER ALL

STAIRS.

SPRINKLERS AND SPRINKLER PIPING SHALL NOT BE

INSTALLED DIRECTLY ABOVE ELECTRICAL EQUIPMENT.

SPRINKLERS AND PIPING INSTALLED IN ELECTRICAL

EQUIPMENT AREAS SHALL BE INSTALLED IN

ACCORDANCE WITH NFPA 70 CLEARANCE

REQUIREMENTS. DRIP PANS AND OTHER SIMILAR

FEATURES SHALL BE PROVIDED WHEN REQUIRED BY

NFPA 70.

CONTRACTOR SHALL LOCATE AND INSTALL ALL DRAINS

AS REQUIRED BY THE APPLICABLE CODES AND

STANDARDS.

1.

2.

3.

2 HOUR FIRE BARRIER CONSTRUCTION

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

KOFFEL ASSOCIATES

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232 9/3/2021

C :\U se rs

\k cu st od io .K

O

FF

EL

AS

SO

C

\D oc um en ts \0

9-

-W ic hi ta

B oi le rs

-F ire

S up pr es si on

-R

_k cu st od io

VZ

5G H

.rv t

9/ 3/

:5

1:

P M

FX111.03

FIRE SUPPRESSION NEW WORK PLAN

SHOP & MAIN LEVELS (PHASE 3)

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 MLD KLC0499-0121

100% BID SET

FULLY SPRINKLERED

3/16" = 1'-0"FX111.03

FIRST FLOOR PLAN - FIRE SUPPRESSION (PHASE 3)1

1 2 3 4 5 6

F

H

K

D E

J

G

SPRINKLER ZONE 1

1170 SQ M (12,600 SQ FT)

2 2 2

2 22

100 (4")100 (4")

(4

C

B

A

E1 E2 E3 E4 E5 E6 E7

EXISTING PLANT

KEY NOTES:

PROVIDE TEMPORARY CAP FOR CONNECTION TO

EXISTING BOILER PLANT RENOVATION WORK UNDER

PHASE 3. REFER TO ARCHITECTURAL DRAWINGS FOR

ADDITIONAL PHASING INFORMATION.

PROVIDE SPRINKLER PROTECTION UNDER CATWALKS

GREATER THAN 1.2M (4 FEET WIDE) IN TWO

DIRECTIONS, IN ACCORDANCE WITH NFPA 13

SPRINKLER OBSTRUCTION REQUIREMENTS.

SPRINKLER PIPE DOWN. REFER TO DRAWING FX111

FOR CONTINUATION.

SHEET NOTES:

PROVIDE SPRINKLER PROTECTION UNDER ALL

STAIRS.

SPRINKLERS AND SPRINKLER PIPING SHALL NOT BE

INSTALLED DIRECTLY ABOVE ELECTRICAL EQUIPMENT.

SPRINKLERS AND PIPING INSTALLED IN ELECTRICAL

EQUIPMENT AREAS SHALL BE INSTALLED IN

ACCORDANCE WITH NFPA 70 CLEARANCE

REQUIREMENTS. DRIP PANS AND OTHER SIMILAR

FEATURES SHALL BE PROVIDED WHEN REQUIRED BY

NFPA 70.

CONTRACTOR SHALL LOCATE AND INSTALL ALL DRAINS

AS REQUIRED BY THE APPLICABLE CODES AND

STANDARDS.

1.

2.

3.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

KOFFEL ASSOCIATES

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232 9/3/2021

C :\U se rs

\k cu st od io .K

O

FF

EL

AS

SO

C

\D oc um en ts \0

9-

-W ic hi ta

B oi le rs

-F ire

S up pr es si on

-R

_k cu st od io

VZ

5G H

.rv t

9/ 3/

:5

1:

P M

FX121.02

FIRE SUPPRESSION NEW WORK

CATWALK PLAN (PHASE 2)

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 MLD KLC0499-0121

100% BID SET

FULLY SPRINKLERED

3/16" = 1'-0"FX121.02

CATWALK PLAN - FIRE SUPPRESSION (PHASE 2)1

STORAGE

C-1

SPRINKLER ZONE 1

1170 SQ M (12,600 SQ FT)

2 2 2

2 22

4"4"

1 2 3 4 5 6

F

H

K

D E

J

G

KEY NOTES:

100 (4") SPRINKLER MAIN DOWN TO FLOOR BELOW.

PROVIDE SPRINKLER PROTECTION UNDER CATWALKS

GREATER THAN 4 FEET WIDE IN TWO DIRECTIONS, IN

ACCORDANCE WITH NFPA 13 SPRINKLER

OBSTRUCTION REQUIREMENTS.

SPRINKLER PIPE DOWN. REFER TO DRAWING FX111

FOR CONTINUATION.

REMOVE TEMPORARY CAP INSTALLED UNDER PHASE

2 AND CONNECT TO NEW PIPING INSTALLED UNDER

PHASE 3 (EXISTING BOILER RENOVATION ). REFER TO

ARCHITECTURAL DRAWINGS FOR ADDITIONAL

PHASING INFORMATION.

SHEET NOTES:

PROVIDE SPRINKLER PROTECTION UNDER ALL

STAIRS.

SPRINKLERS AND SPRINKLER PIPING SHALL NOT BE

INSTALLED DIRECTLY ABOVE ELECTRICAL EQUIPMENT.

SPRINKLERS AND PIPING INSTALLED IN ELECTRICAL

EQUIPMENT AREAS SHALL BE INSTALLED IN

ACCORDANCE WITH NFPA 70 CLEARANCE

REQUIREMENTS. DRIP PANS AND OTHER SIMILAR

FEATURES SHALL BE PROVIDED WHEN REQUIRED BY

NFPA 70.

CONTRACTOR SHALL LOCATE AND INSTALL ALL DRAINS

AS REQUIRED BY THE APPLICABLE CODES AND

STANDARDS.

1.

2.

3.

C

B

A

E1 E2 E3 E4 E5 E6 E7

EXISTING PLANT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

KOFFEL ASSOCIATES

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232 9/3/2021

C :\U se rs

\k cu st od io .K

O

FF

EL

AS

SO

C

\D oc um en ts \0

9-

-W ic hi ta

B oi le rs

-F ire

S up pr es si on

-R

_k cu st od io

VZ

5G H

.rv t

9/ 3/

:5

1:

P M

FX121.03

FIRE SUPPRESSION NEW WORK

CATWALK PLAN (PHASE 3)

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 MLD KLC0499-0121

100% BID SET

FULLY SPRINKLERED

3/16" = 1'-0"FX121.03

CATWALK PLAN - FIRE SUPPRESSION (PHASE 3)1

MAIN LEVEL

9' - 5"

CATWALK LEVEL

20' - 1"

MEZZANINE LEVEL

10' - 11"

100 (4")

(6

6 6

K

(4

(4

(4

100 (4")

150 (6")

KEY NOTES:

150 (6") INCOMING WATER. REFER TO CIVL DRAWINGS

FOR CONTINUATION.

100x65x65 (4"x2-1/2"x2-1/2") BACKFLOW PREVENTER

TEST HEADER. PROVIDE SIGNAGE ALONG EXTERIOR

WALL THAT READS 'BACKFLOW PREVENTER TEST'

ABOVE TEST HEADER.

PIPE STAND (TYP).

150 (6") AMES MODEL COLT SERIES 2000SS DOUBLE

CHECK BACKFLOW PREVENTER ASSEMBLY, OR

APPROVED EQUAL INSTALLED IN HORIZONTAL WITH

OS&Y VALVES WITH SUPERVISORY SWITCHES.

OS&Y VALVE (NC) WITH SUPERVISORY SWITCH FOR

BACKFLOW PREVENTER TEST HEADER. INCLUDE

CHAIN OPERATOR MECHANISM AND CHAIN.

OS&Y VALVE WITH SUPERVISORY SWITCH.

50 (2") MAIN DRAIN TO EXTERIOR.

100x65x65 (4"x2-1/2"x2-1/2") FDC ADJACENT TO BFP

TEST HEADER. PROVIDE SIGNAGE ALONG EXTERIOR

WALL THAT READS 'FDC' ABOVE HEADER.

CHECK VALVE, PRESSURE GAUGE, TRIM, TEST AND

DRAIN ASSSEMBLY, AND FLOW SWITCH.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

KOFFEL ASSOCIATES

PROFESSIONAL ENGINEER

MR PROJECT NO:

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232 9/3/2021

C :\U se rs

\k cu st od io .K

O

FF

EL

AS

SO

C

\D oc um en ts \0

9-

-W ic hi ta

B oi le rs

-F ire

S up pr es si on

-R

_k cu st od io

VZ

5G H

.rv t

9/ 3/

:5

1:

P M

FX301

FIRE SUPPRESSION SECTIONS INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 MLD KLC0499-0121

100% BID SET

FULLY SPRINKLERED

1/2" = 1'-0"FX301

BACKFLOW PREVENTER - SECTION2

6"

FX301

3 6

(4

6"

K

J

EQUIPMENT ROOM

M-17

(4

(4

100 (4") 100 (4")

(4

KEY NOTES:

150 (6") INCOMING WATER. REFER TO CIVL DRAWINGS

FOR CONTINUATION.

150 (6") OS&Y CONTROL VALVE WITH SUPERVISORY

SWITCH.

100x65x65 (4"x2-1/2"x2-1/2") BACKFLOW PREVENTER

TEST HEADER. PROVIDE SIGNAGE ALONG EXTERIOR

WALL THAT READS 'BACKFLOW PREVENTER TEST'

ABOVE TEST HEADER.

150 (6") AMES MODEL COLT SERIES 2000SS DOUBLE

CHECK BACKFLOW PREVENTER ASSEMBLY, OR

APPROVED EQUAL INSTALLED IN VERTICAL (FLOW UP)

WITH OS&Y VALVES WITH SUPERVISORY SWITCHES,

OR APPROVED EQUAL.

OS&Y VALVE (NC) WITH SUPERVISORY SWITCH FOR

BACKFLOW PREVENTER TEST HEADER. INCLUDE

CHAIN OPERATOR MECHANISM AND CHAIN.

100x65x65 (4"x2-1/2"x2-1/2") FDC HEADER. PROVIDE

SIGNAGE ALONG EXTERIOR WALL THAT READS 'FDC'

ABOVE HEADER.

100 (4")SPRINKLER MAIN DOWN TO NEW PUMP ROOM.

100 (4") TO FDC AND BACKFLOW PREVENTER TEST

HEADER.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

KOFFEL ASSOCIATES

PROFESSIONAL ENGINEER

MR PROJECT NO:

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232 9/3/2021

C :\U se rs

\k cu st od io .K

O

FF

EL

AS

SO

C

\D oc um en ts \0

9-

-W ic hi ta

B oi le rs

-F ire

S up pr es si on

-R

_k cu st od io

VZ

5G H

.rv t

9/ 3/

:5

1:

P M

FX401

FIRE SUPPRESSION ENLARGED PLANS INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 MLD KLC0499-0121

100% BID SET

FULLY SPRINKLERED

1/2" = 1'-0"FX401

FIRE PUMP ROOM PLAN - FIRE SUPPRESSION1

R

EF

ER

T

O F

X1

REFER TO FX111

TOLCO FIG. 980

UNIVERSAL SWIVEL SWAY

BRACE ATTACHMENT

TYP.

STEEL PIPE

LATERAL BRACE

TOLCO FIG. 1001

SWAY BRACE

ATTACHMENT

STEEL PIPE

LATERAL BRACE

TOLCO FIG. 4L

LONGITUDINAL "IN-LINE"

SWAY BRACE ATTACHMENT

TOLCO FIG. 980

UNIVERSAL SWIVEL SWAY

BRACE ATTACHMENT

TYP.

NOTE: PROVIDE A SIGN READING 'AUTOSPRK AND STANDPIPE' IN

ACCORDANCE WITH SECTION 8.17.2.4.7 OF NFPA 13.

100 (4") CHECK VALVE

WITH 12 (1/2") BALL DRIP

100 (4") FROM

EQUIPMENT

ROOM M-17

FLUSH MOUNT 100x65x65 (4"x2-1/2"x2-1/2") FDC

MIN 0.5M (18")

MAX 1.2M (48")

NOTE:

TYPICAL ACOUSTIC CEILING PANEL.

LOCATE SPRINKLER WITHIN AREA

INDICATED.

150 (6")

150 (6") 500(20")

230 (9")

1.2M (48")

0.

6M x1 .2

M (2

FT

x

FT

) T

IL

E

230(9")

230 (9") 150 (6")

150 (6") 150 (6")

230(9")

150 (6")

230 (9")

0.

6M x1 .2

M (2

FT

x

FT

) T

IL

E

0.

6M x1 .2

M (2

FT

x

FT

) T

IL

E

1.2 (48") 0.6M (24")

150 (6")

150 (6") 230(9")

230(9")

0.

6M

(2 4"

0.

6M

(2 4"

0.

6M

(2 4"

THROUGH PENETRANT: ONE PIPE INSTALLED

CONCENTRICALLY OR ECCENTRICALLY WITHIN THE FIRESTOP

SYSTEM. PIPE TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF

WALL ASSEMBLY.

FILL MATERIAL: SEALANT - FILL MATERIAL (NOT SHOWN)

APPLIED WITHIN THE ANNULUS, FLUSH WITH BOTH SURFACES

OF WALL. BEAD OF FILL MATERIAL SHALL ALSO BE APPLIED

AT THE PIPE/WALL INTERFACE.

SPRINKLER SYSTEM PIPING

FIRE-RATED BARRIER/WALL

FILL MATERIAL

SCHEDULE 40 BLACK STEEL

PIPE SLEEVE

NOTE: PROVIDE U.L. LISTED

THROUGH-PENETRATION FIRESTOP

SYSTEM AT ALL RATED ASSEMBLIES.

REFER TO CS-SERIES DRAWINGS FOR

WALL RATINGS.

MAX DISTANCE BETWEEN HANGERS

D

IA

M

ET

ER 25(1") 3.6M (12'-0")

32(1-1/4") 3.6M (12'-0")

40(1-1/2") 4.6M(15'-0")

50(2") 4.6M (15-0")

65 (2-1/2") 4.6M (15'-0")

> 75(3") 4.6M (15'-0")

ALL THREAD ROD

C-CLAMP WITH

LOCKNUT

ADJUSTABLE

SWIVEL RING

HANGER NOTES:

1. MAXIMUM UNSUPPORTED ARMOVER LENGTH SHALL NOT BE GREATER

THAN 0.6M (24"). WHERE SYSTEM PRESSURES EXCEED 100 PSI, MAXIMUM

UNSUPPORTED LENGTH SHALL NOT EXCEED 12".

MIN _" ALL THREAD ROD FOR PIPE DIAMETERS 4" AND SMALLER.

DO NOT SUPPORT SPRINKLER PIPE FROM BOTTOM CHORDS OF BAR

JOIST OR FROM ROOF DECKING.

WHERE TRAPEZE HANGERS ARE USED, THEY SHALL BE INSTALLED

IN ACCORDANCE WITH NFPA 13, SECTION 9.1.1.6.

2.

3.

4.

I-BEAM

SWAY BRACING PATTERN FOR SINGLE HANGER PIPING

= TRANSVERSE (LATERAL) SWAY BRACE

= LONGITUDINAL SWAY BRACE

= 4-WAY (TRANSVERSE & LONGITUDINAL) SWAY BRACE

65 (2 1/2") AND LARGER

BRACED COMPONENT DESCRIPTION

TRAPEZE SUPPORTED EQUIPMENT

MAX. "S"

12M (40')

PLAN VIEW

MAX. "X" + "Y"

HORIZONTAL OFFSETS

STRAIGHT RUNS

S S

VERTICAL OFFSETS

Y

X S Z Z

12M (40')

12M (40') 12M (40')

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

KOFFEL ASSOCIATES

PROFESSIONAL ENGINEER

MR PROJECT NO:

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232 9/3/2021

C :\U se rs

\k cu st od io .K

O

FF

EL

AS

SO

C

\D oc um en ts \0

9-

-W ic hi ta

B oi le rs

-F ire

S up pr es si on

-R

_k cu st od io

VZ

5G H

.rv t

9/ 3/

:5

1:

P M

FX501

FIRE SUPPRESSION DETAILS INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 MLD KLC0499-0121

100% BID SET

FULLY SPRINKLERED

12" = 1'-0"

FIRE DEPARTMENT CONNECTION DETAIL

12" = 1'-0"

SPRINKLER PLACEMENT DETAIL

12" = 1'-0"

THROUGH WALL PENETRATION DETAIL

12" = 1'-0"

TYPICAL HANGER PLACEMENT DETAIL

12" = 1'-0"

SWAY BRACING SPACING

12" = 1'-0"

LATERAL SWAY BRACE

12" = 1'-0"

LOGITUDINAL SWAY BRACE

FX501

FX501

4 5 6 7

FX501

FX501 FX501 FX501 FX501

NOT TO SCALE NOT TO SCALE NOT TO SCALE

NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE

0499-0121-Wichita Boilers-Fire Suppression-R20_kcustodioVZ5GH - Sheet - FX001 - FIRE SUPPRESSION NOTES, SYMBOLS, AND ABBREVIATIONS
Sheets
FX001 - FIRE SUPPRESSION NOTES, SYMBOLS, AND ABBREVIATIONS
FX101 - FIRE SUPPRESSION NEW WORK PLAN TUNNEL & BSMT LEVELS
FX111.02 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 2)
FX111.03 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 3)
FX121.02 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 2)
FX121.03 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 3)
FX301 - FIRE SUPPRESSION SECTIONS
FX401 - FIRE SUPPRESSION ENLARGED PLANS
FX501 - FIRE SUPPRESSION DETAILS
0499-0121-Wichita Boilers-Fire Suppression-R20_kcustodioVZ5GH - Sheet - FX101 - FIRE SUPPRESSION NEW WORK PLAN TUNNEL & BSMT LEVELS
Sheets
FX001 - FIRE SUPPRESSION NOTES, SYMBOLS, AND ABBREVIATIONS
FX101 - FIRE SUPPRESSION NEW WORK PLAN TUNNEL & BSMT LEVELS
FX111.02 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 2)
FX111.03 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 3)
FX121.02 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 2)
FX121.03 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 3)
FX301 - FIRE SUPPRESSION SECTIONS
FX401 - FIRE SUPPRESSION ENLARGED PLANS
FX501 - FIRE SUPPRESSION DETAILS
0499-0121-Wichita Boilers-Fire Suppression-R20_kcustodioVZ5GH - Sheet - FX111-02 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 2)
Sheets
FX001 - FIRE SUPPRESSION NOTES, SYMBOLS, AND ABBREVIATIONS
FX101 - FIRE SUPPRESSION NEW WORK PLAN TUNNEL & BSMT LEVELS
FX111.02 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 2)
FX111.03 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 3)
FX121.02 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 2)
FX121.03 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 3)
FX301 - FIRE SUPPRESSION SECTIONS
FX401 - FIRE SUPPRESSION ENLARGED PLANS
FX501 - FIRE SUPPRESSION DETAILS
0499-0121-Wichita Boilers-Fire Suppression-R20_kcustodioVZ5GH - Sheet - FX111-03 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 3)
Sheets
FX001 - FIRE SUPPRESSION NOTES, SYMBOLS, AND ABBREVIATIONS
FX101 - FIRE SUPPRESSION NEW WORK PLAN TUNNEL & BSMT LEVELS
FX111.02 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 2)
FX111.03 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 3)
FX121.02 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 2)
FX121.03 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 3)
FX301 - FIRE SUPPRESSION SECTIONS
FX401 - FIRE SUPPRESSION ENLARGED PLANS
FX501 - FIRE SUPPRESSION DETAILS
0499-0121-Wichita Boilers-Fire Suppression-R20_kcustodioVZ5GH - Sheet - FX121-02 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 2)
Sheets
FX001 - FIRE SUPPRESSION NOTES, SYMBOLS, AND ABBREVIATIONS
FX101 - FIRE SUPPRESSION NEW WORK PLAN TUNNEL & BSMT LEVELS
FX111.02 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 2)
FX111.03 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 3)
FX121.02 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 2)
FX121.03 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 3)
FX301 - FIRE SUPPRESSION SECTIONS
FX401 - FIRE SUPPRESSION ENLARGED PLANS
FX501 - FIRE SUPPRESSION DETAILS
0499-0121-Wichita Boilers-Fire Suppression-R20_kcustodioVZ5GH - Sheet - FX121-03 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 3)
Sheets
FX001 - FIRE SUPPRESSION NOTES, SYMBOLS, AND ABBREVIATIONS
FX101 - FIRE SUPPRESSION NEW WORK PLAN TUNNEL & BSMT LEVELS
FX111.02 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 2)
FX111.03 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 3)
FX121.02 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 2)
FX121.03 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 3)
FX301 - FIRE SUPPRESSION SECTIONS
FX401 - FIRE SUPPRESSION ENLARGED PLANS
FX501 - FIRE SUPPRESSION DETAILS
0499-0121-Wichita Boilers-Fire Suppression-R20_kcustodioVZ5GH - Sheet - FX301 - FIRE SUPPRESSION SECTIONS
Sheets
FX001 - FIRE SUPPRESSION NOTES, SYMBOLS, AND ABBREVIATIONS
FX101 - FIRE SUPPRESSION NEW WORK PLAN TUNNEL & BSMT LEVELS
FX111.02 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 2)
FX111.03 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 3)
FX121.02 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 2)
FX121.03 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 3)
FX301 - FIRE SUPPRESSION SECTIONS
FX401 - FIRE SUPPRESSION ENLARGED PLANS
FX501 - FIRE SUPPRESSION DETAILS
0499-0121-Wichita Boilers-Fire Suppression-R20_kcustodioVZ5GH - Sheet - FX401 - FIRE SUPPRESSION ENLARGED PLANS
Sheets
FX001 - FIRE SUPPRESSION NOTES, SYMBOLS, AND ABBREVIATIONS
FX101 - FIRE SUPPRESSION NEW WORK PLAN TUNNEL & BSMT LEVELS
FX111.02 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 2)
FX111.03 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 3)
FX121.02 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 2)
FX121.03 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 3)
FX301 - FIRE SUPPRESSION SECTIONS
FX401 - FIRE SUPPRESSION ENLARGED PLANS
FX501 - FIRE SUPPRESSION DETAILS
0499-0121-Wichita Boilers-Fire Suppression-R20_kcustodioVZ5GH - Sheet - FX501 - FIRE SUPPRESSION DETAILS
Sheets
FX001 - FIRE SUPPRESSION NOTES, SYMBOLS, AND ABBREVIATIONS
FX101 - FIRE SUPPRESSION NEW WORK PLAN TUNNEL & BSMT LEVELS
FX111.02 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 2)
FX111.03 - FIRE SUPPRESSION NEW WORK PLAN SHOP & MAIN LEVELS (PHASE 3)
FX121.02 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 2)
FX121.03 - FIRE SUPPRESSION NEW WORK CATWALK PLAN (PHASE 3)
FX301 - FIRE SUPPRESSION SECTIONS
FX401 - FIRE SUPPRESSION ENLARGED PLANS
FX501 - FIRE SUPPRESSION DETAILS

File details come from the government source that posted it. Updated .