589A7-18-302 Wichita Bid Drawings - 0_General (SI).pdf

PDF 907 KB Posted

Attached to
Z2DA--589A7-18-302 FCA Install New Boilers, Building 13 (VA-22-00049186)
Solicitation number
36C25522R0079
Issued by

About this file

This package includes construction drawings and specifications for a project to install new boilers in Building 13 at the Robert J. Dole VA Medical Center in Wichita, Kansas. The project involves demolishing the existing boilers and installing two new high-efficiency boilers, with associated piping, controls, and other mechanical, electrical, and plumbing work. The drawings depict demolition plans, new equipment layouts, construction details, schedules and notes. They cover site utilities, structural elements, fire protection, HVAC, plumbing and electrical systems. Specification sections would provide additional requirements for materials, equipment, and construction.

The related federal contract opportunity is a solicitation issued by the Department of Veterans Affairs seeking offers to complete this boiler replacement project according to the specifications. Offerors are advised to review the attached drawings and documents thoroughly to understand the scope of work prior to submitting a proposal. The solicitation number and point of contact are provided for interested vendors to obtain more information or submit a bid by the specified closing date.

View the file

Other files

File Type Posted
36C25522R0079 0005.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 2_Civil 1 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil 2 of 3.pdf PDF
36C25522R0079 0004.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 2_Civil 3 of 3.pdf PDF
S02 Pre-Bid Questions Solicitation No 36C25522R0079_VA Response.pdf PDF
36C25522R0079 0003.docx DOCX document
589-18-302 Boiler Pre Bid Attendance.pdf PDF
PROPOSAL SUBMITTAL INSTRUCTIONS 589A7-18-302 REV 08052022.docx DOCX document
36C25522R0079 0002.pdf PDF
589A7-18-302 Wichita Bid Drawings - 3 Structural.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 2 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 3 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 6_Plumbing 1 of 2.pdf PDF
589A7-18-302 Wichita Bid Drawings - 6_Plumbing 2 of 2.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 1 of 4.pdf PDF
36C25522R0079 0001.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 2 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 4 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 3_Structural (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 4_Architectural (SI) 2 of 2.pdf PDF
S02 P09 - 589A7-18-302 Wichita Bid Specs VOL 3 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 6_Plumbing (SI).pdf PDF
S02 P09 - 589A7-18-302 Wichita Bid Specs VOL 2 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 5 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 6 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 1 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical 3 of 6.pdf PDF
36C25522R0079_1.docx DOCX document
S02 ATTACMENT 3 Past Performance Questionnaire 36C25522R0079 Project 589A7-18-302.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 3 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 2 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 1_Hazardous Materials (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 1 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 1 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 5_ Fire Protection (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 4 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical 4 of 6.pdf PDF
589A7-18-302 Wichita Bid Specs VOL 1 of 3 (800pgs).pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 2 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 4_Architectural (SI) 1 of 2.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 3 of 4.pdf PDF
P07 Wage Determination 20220708.docx DOCX document
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B

C

B

C

·!if 0

A

C

D

Q_

F c, C

C l [

' • NEW SALEM

itu_,,.

; 1 ,, . ' ' i

� UPTOWN -

� f i

• ., .... , ... JI

EAST FRONT

SUNNYSIDE

l° CQUNTRY

OVERLOOK ' "

SLEEPY HOLLOW r I g' f ,w __ ., . . � � ..

•-•SI �

LONGVIEW

! """StN

E O.ISIN

F flno,g!o, ho

COLLEGE HILL

i ..... ..,.. � , .

er.,,.,;,s. ,, EMmlo5'

4 5 6 7

INSTALL NEW BOILERS IN BUILDING 13

l

CROWN HEIGHTS

DEPARTMENT OF VETERANS AFFAIRS PROJECT NO. 589A7-18-302

ROBERT J, DOLE

VA MEDICAL CENTER

ROBERT J. DOLE VA MEDICAL CENTER

BUILDING 13

5500 EAST KELLOGG AVE

WICHITA, KS 67218

34, 34A

4 1l3

NORTH

LOCATION MAP PROJECT KEY PLAN

EB

DRAWING No, DRAWING TITLE

GENERAL

GI001 COVER SHEET

HAZARDOUS MATERIALS

13-HA111-03 ABATEMENT PLAN BUILDING-13

C-001

\IF101

CD10101

CD102.01

CS101-01

CS102.01

CS103.01

CS104.01

CS501

CS502

CS503

CG101.01

CG102.01

CG501

CG502

CG503

CG504

CG505

CU101.01

CU201.01

CU301.01

CU302.01

CU501

CU502

CU220

CU221.01

CU222.01

CU223.01

CU224

CU225

CU226

CU320

CU321.01

CU322

CU323

S-001 S-002 S-003 S-004

13-SB103-02

13-SB114.02

13-SF136,02

13-SF137.02

13-S-201-02 13-S-202,02 13-S-203.02 13-S-204.02

13-SB111-03

13-SF122.03

CIVIL

CIVIL GENERAL NOTES

EXIST ING CONDIT IONS

SITE DEMOLITION PLAN, PHASE 1

UTILITY DEMOLITION PLAN, PHASE 1

OVERALL SITE PLAN, PHASE 1

GEOMETRY PLAN, PHASE 1

PERIMETER FENCE GEOMETRY PLAN, PHASE 1

CONCRETE PAVEMENT JOINTING PLAN, PHASE 1

CONCRETE PAVEMENT DET PJLS

SECURITY BOLLARD DETAILS

PAVEMENT PATCHING DET PJLS

GRADING PLAN, PHASE 1

EROSION CONTROL PLAN, PHASE 1

BACK OF CURB PROTECTION AND CONSTRUCTION ENTRANCE

SLIT FENCE DITCH CHECK AND BARRIER DET PJLS

STRAW BALE DITCH CHECK PJND BARRIER DET PJLS

STREET IMPROVEMENT PROJECTS DETAILS

SUBDMSION DEVELOPMENT PROCESS DET PJLS

UTILITY PLPJN, PHASE 1

OVERALL WATER PLPJN, PHASE 1

RPJN LEADER PLAN, PHASE 1

MPJNHOLE SUMP PUMP PIPING PLAN, PHASE 1

ROOF DRPJN DET PJLS

PIPE INSTALLATION DET /lJLS

PPW TITLE SHEET

WATERLINE KEY MAP, PHASE 1

WATERLINE PLAN & PROFILE, LINE 1, PHASE 1

WATERLINE PLAN &PROFILE, LINE 2, PHASE 1

ST AN DPJRD WAT ER ASS EMBLY DET PJLS

MISC. WATER DET PJLS

MISC. WATERLINE DET PJLS 2

PPD Tri LE SHEET

STORM SEWER PLPJN & PROFILE, PHASE 1

PRECAST MANHOLE DETAILS

DROP INLET DET PJLS

STRUCTURAL

GENERAL NOTES

GENERAL NOTES

INSPECT ION TABLES

DRIFT PLAN AND TABLES

BASEMENT FOUNDATION PLAN PHASE 2

FOUNDATION/FRAMING PLAN PHASE 2

LOW ROOF PJND STORAGE FRAMING PLPJNS PHASE 2

HIGH ROOF FRAM ING PLAN PHASE 2

BRACE FRAME ELEVATIONS PHASE 2

WALL ELEVATIONS PHASE 2

WALL ELEVATIONS PHASE 2

WALL ELEVATIONS PHASE 2

FOUNDATION PLAN PHASE 3

MEZZPJNINE FRAM ING PLANS PHASE 3

SCALE: NTS

DRAWING No, DRAWING TITLE

STRUCTURAL (CONTINUED)

13-SF135 03 EXISTING ROOF PLAN PHASE 3

13-S-201.03 WALL ELEVATION PHASE 3

S-401 TYPICAL FOUNDATION DETAILS

S-402 FOUNDATION DETPJLS

S-403 FOUNDATION DETPJLS

S-501 TYPICAL MASONRY DET /\JLS

S-502 S-503 S-504 S-505 S-506 S-507 S-508 S-701 S-702 S-703 S-704

AE001

13-AE002

13-AE003

03-AE400.01

13-AE10102

13-AEI 11.02

13-AE121-02

13-AE 13102

13-AE201-02

13-AE202.02

13-AE203.02

13-AE204.02

13-AE302,02

13-AE311.02

13-AE312.02

13-AE313-02

13-AE401,02

13-AE402.02

13-PJD102 03

13-PJD103.03

13-PJD104.03

13-PJD201.03

13-PJD202 .03

13-AE102.03

13-AE112.03

13-AE132.03

13-AE205,03

13-AE206,03

13-AE30103

13-AE303.03

13-AE403,03

13-AE404.03

AE501

AE502

AE503

AE504

AE505

TYPICAL FRAMING DET /lJLS

FRAMING DET PJLS

FRAMING DET PJLS

FRAMING DET PJLS

FRAMING DET PJLS

FRAMING DETAILS

SECURITY FENCING DETAILS

COLUMN SCHEDULE

FOOT ING SCHEDULE PJND DET /\JLS

BRACED FRAME SCHEDULE AND DETAILS LIGHT

GAUGE FRAMING SCHEDULE AND DETAILS

ARCHITECTURAL

NOTES, SYMBOLS,

PJSBREv1ATIONS LIFE SAFETY PLPJNS

PHASING PLPJNS

BLDG 3 SECURITY EQ. CLOSET

BASEMENT PLAN, PHASE 2

MPJN LEVEL, PHASE 2

CATWALK LEVEL, PHASE 2

ROOF PLAN, PHASE 2

EXTERIOR ELEVATIONS

EXTERIOR ELEVATIONS

INTERIOR ELEVATIONS

INTERIOR ELEVATIONS

WALL SECT IONS

WALL SECT IONS

WALL SECT IONS

ENLARGED FLOOR PLPJNS

ENLPJRGED RCP

BOILER DEMOLITION PLAN

CATWALK DEMOLITION PLAN

ROOF DEMO LIT ION PLAN

EXTERIOR DEMO LIT ION ELEVATIONS

EXTERIOR DEMO LIT ION ELEVATIONS

BASEMENT/SHOP LEVEL, PHASE 3

M/\JN LEVEL. PHASE 3

ROOF PLAN, PHASE 3

INTERIOR ELEVATIONS

INTERIOR ELEVATIONS

BUILDING SECTIONS

BUILDING SECTIONS

BUILDING SECTIONS

ENLPJRGED FLOOR PLPJN/RCP

ENLPJRGED FLOOR PLPJN/RCP

ASSEMBLY TYPES & STAIR DET PJLS

WINDOW & ST PJR DET PJLS DETAILS

DET PJLS

DOOR DET PJLS

DRAWING INDEX

DRAWING No, DRAWING TITLE

ARCHITECTURAL (CONTINUED)

AE506 BLAST WALL DETAILS

AE507 DET /lJLS

AE508 ROOF DET PJLS

AE509 DET PJLS

AE701 DOOR AND WINDOW SCHEDULE

/lf601 FINISH SCHEDULE &SIGNAGE

PJ101

PJ102

PJ103

PJ501

FX001

FX101

FX111-02

FX121.02

FX111-03

FX121.03

FX301

FX401

FX501

P-001

13-PS101

13-PP101-01

13-PP10102

13-PP111-02

13-PP12102

13-PP131-02

13-PD101.03

13-PD111.03

13-PD121.03

13-PP101-03

13-PP11103

13-PP121-03

13-PP131-03

13-PP401-03

P-501 P-502 P-601 P-602 P-701

M-001

MS101

MS102

03-M-111

13-MH101 02

13-MH1 I 102

13-MH121 02

13-MP101,02

13-MP111-02

13-MP121.02

13-M-131,02

BASEMENT FLOOR SIGNAGE PLAN

FIRST FLOOR SIGNAGE PLAN

CATWALK SIGNAGE PLAN

BASE CPJSINET DET PJLS

FIRE SUPPRESSION

NOTES, SYMBOLS, AND PJSBREv1ATIONS

NEW WORK PLPJN TUNNEL & BSMT LEVELS

NEW WORK PLAN SHOP & MPJN LEVELS (PHASE 2)

NEW WORK CATWALK PLAN (PHASE 2)

NEW WORK PLAN SHOP & MPJN LEVELS (PHASE 3)

NEW WORK CATWALK PLAN (PHASE 3)

SECTIONS

ENLARGED PLANS

DETPJLS

PLUMBING

NOTES, PJSBREv1AT IONS & SYMBOLS

PLUMBING SITE PLPJN

PIPING PLPJN TUNNEL &BSMT LEVELS, PHASE 1

PIPING PLPJN TUNNEL & BSMT LEVELS, PHASE 2

PIPING PLAN SHOP & MPJN LEVELS, PHASE 2

PIPING PLPJN EX CATWALK & CATWALK LVI_S, PHASE 2

PIPING PLPJN ROOF, PHASE 2

DEMOLITION TUNNEL & BSMT LEVELS, PHASE 3

DEMOLITION PLAN SHOP & M/lJN LEVELS. PHASE 3

DEMOLITION PLAN EX CATWALK, PHASE 3

PIPING PLPJN TUNNEL &BSMT LEVELS, PHASE 3

PIPING PLPJN SHOP & MAIN LEVELS, PHASE 3

PIPING PLPJN EX CATWALK & CATWALK LVI_S, PHASE 3

PIPING PLAN ROOF, PHASE 3

ENLARGED PLUM BING PLPJN

PLUMBING DET /IJLS

PLUMBING DET PJLS

RISER DIAGRAMS

FLOW DIAGRAMS

SCHEDULES

MECHANICAL

ABBREv1AT IONS & SYMBOLS Sr!E PLAN Sr!E - STEAM TRENCH ARRANGEMENT PLAN & SECTIONS

BUILDING 3 SECURITY EQ_ CLOSET

DUCTWORK PLAN TUNNEL & BSMT LEVELS, PHASE 3

DUCTWORK PLAN SHOP & MPJN LEVELS, PHASE 3

DUCTWORK PLAN EX CATWALK & CATWALK L\ILS, PHASE 3

PIPING PLPJN TUNNEL & BSMT LEVELS, PHASE 2

PIPING PLPJN SHOP & MAIN LEVELS, PHASE 2

PIPING PLPJN EX CATWALK& CATWALK LVI_S, PHASE 2

NEW WORK PLAN ROOF, PHASE 2

SCALE: NTS

DRAWING No, DRAWING TITLE DRAWING No, DRAWING TITLE

MECHANICAL (CONTINUED) ELECTRICAL (CONTINUED)

13-MD101 03 DEMOLITION PLAN TUNNEL & BSMT LEVELS, PHASE 3 13-EP10l02 POWER & SYSTEMS PLPJN - TUNNEL & BSMT LEVELS, PHASE 2 13-MD111 .Q3 DEMOLITION PLAN SHOP & M/lJN LE\l'LS, PHASE 3 13-EP111 02 POWER & SYSTEMS PLPJN - SHOP & MAIN LEVELS, PHASE 2 13-MD121 03 DEMOLITION PLAN EX CATWALK & CATWALK LVI_S, PHASE 3 13-EP12102 POWER & SYSTEMS PLPJN - EX CATWALK &CATWALK LEVELS, PH 2 13-MD131.03 DEMOLITION PLAN ROOF, PHASE 3 13-EP13l02 POWER & SYSTEMS PLPJN - ROOF, PHASE 2 13-MH101 03 DUCTWORK PLAN TUNNEL & BSMT LEVELS, PHASE 3 13-E-401.02 ENLARGED CONTROL ROOM, IT ROOM & SECURITY ROOM, PHASE 2 13-MH111 03 DUCTWORK PLAN SHOP & MPJN LEVELS, PHASE 3 13-E-402.02 ENLARGED GENERATOR ROOM, PHASE 2

13-MH121.03

13-MP101-03

13-MP11103

13-MP121-03

13-M-13103 13-M-301 13-M-302 13-M-303 13-M-304 13-M-305 M-501 M-502 M-503 M-504 M-505 M-506 M-507

MP601

MP602

MP603

MP604

MP605

MP606

M-701 M-702 M-703 M-704 M-801 M-802 M-803

E-001 E-002

ES100

ES101

03-E-401-01

12-ED111.01

12-EP111-01

16-EP111-01

20-ED111.01

20-EP111-01

13-ED101-01

13-ED111.01

13-ED12101

13-EP101-01

13-EP111-01

13-EP121-01

13-EL101.02

13-EL 111.02

13-EL121.02

DUCT WORK PLAN EX CAT WALK & CATWALK L \/LS, PHASE 3

PIPING PLAN TUNNEL & BSMT LEVELS, PHASE 3

PIPING PLAN SHOP & MPJN LEVELS, PHASE 3

PIPING PLAN EX CATWALK & CATWALK LVI_S, PHASE 3

NEW WORK PLPJN ROOF, PHASE 3

SECTIONS

SECTIONS

SECTIONS

SECTIONS

SECTIONS

DET PJLS

DET /lJLS

DET PJLS

DET /lJLS

DETPJLS

13-E-403.02

13-ED101,03

13-ED111-03

13-ED121.03

13-ED13103

13-EL101.03

13-EL11103

13-EL12103

13-EL131-03

13-EP10l03

13-EP111 03

13-EP12103

13-EP13l03 13-E-401-03 E-501

DET PJLS E-502

DET /lJLS E-503

STEAM GENERATION FLOW DIAGRAM - BOILERS E-504

STEAM GENERATION FLOW DIAGRAM - DEAERATOR E-505

STEAM GENERATION FLOW DIAGRAM - CONDENSATE TANK E-506

STEAM GENERATION NATURAL GAS AND NO. 2 FUEL OIL FLOW DIAGRAM BOILERS E-600

STEAM GENERATION NO. 2 FUEL OIL FLOW DIAGRAMS EMERGENCY GENERATORS E-601

GAS SERv1CE MODIFICATION - BUILDING 17 E-602

SCHEDULES

SCHEDULES

SCHEDULES

SCHEDULES

CONTROLS

CONTROLS

CONTROLS

ELECTRICAL

PJSBREv1AT IONS & SYMBOLS

NOTES

SITE PLAN - DEMOLITION & TEMPORARY WORK

SITE PLAN - NEW WORK

GROUND FLOOR & FIRST FLOOR PLANS, PHASE 1

DEMOLITION PLAN· FIRST FLOOR, PHASE 1

POWER& SYSTEMS PLAN - FIRST FLOOR, PHASE 1

POWER& SYSTEMS PLAN - FIRST FLOOR, PHASE 1

DEMOLITION PLAN - FIRST FLOOR PHASE 1

POWER& SYSTEMS PLAN - FIRST FLOOR, PHASE 1

DEMOLITION PLAN - TUNNEL & BSMT LEVELS, PHASE 1

DEMOLITION PLAN - SHOP &MPJN LEVELS, PHASE 1

DEMOLITION PLAN - EX CATWALK & CATWALK LEVELS, PH 1

POWER& SYSTEMS PLAN - TUNNEL & BSMT LEVELS, PHASE 1

POWER& SYSTEMS PLAN - SHOP& MPJN LEVELS, PHASE 1

POWER& SYSTEMS PLAN - EX CATWALK & CATWALK LEVELS, PH 1

LIGHTING PLAN - TUNNEL & BSMT LEVELS, PHASE 2

LIGHTING PLAN - SHOP & MPJN LEVELS, PHASE 2

LIGHTING PLAN - EX CATWALK & CATWALK LEVELS, PH 2

E-603 E-604 E-605 E-701 E-702 E-703 E-704 E-705

EY001

EY101

01-EY101-02

01-EY11102

03-EY10102

03-EY111-02

13-EY101-01

13-EY111-02

13-EY111-03

13-EY131-02

16-EY11102

60-EY111-02

EY501

EY502

EY503

EY504

EY505

EY506

EY507

EY701

WATER STORAGE TANK, PHASE 2

DEMOLITION PLAN - TUNNEL & BSMT LEVELS, PHASE 3

DEMOLITION PLAN - SHOP & MPJN LEVELS, PHASE 3

DEMOLITION PLAN - EX CATWALK& CATWALK LEVELS, PH 3

DEMOLITION PLAN - ROOF, PHASE 3

LIGHTING PLAN - TUNNEL & BSMT LEVELS, PHASE 3

LIGHTING PLAN - SHOP & M/lJN LEVELS, PHASE 3

LIGHTING PLAN - EX CATWALK&CATWALK LEVELS, PH 3

LIGHTING PLAN - ROOF, PHASE 3

POWER & SYSTEMS PLPJN - TUNNEL & BSMT LEVELS, PHASE 3

POWER & SYSTEMS PLAN - SHOP & MAIN LEVELS, PHASE 3

POWER & SYSTEMS PLPJN - EX CATWALK & CATWALK LEVELS, PH 3

POWER & SYSTEMS PLPJN - ROOF, PHASE 3

STORAGE PART PLAN, PHASE 3

DETAILS

DETAILS

DETAILS

DETAILS

DETAILS

DETAILS

MV SINGLE LINE DIAGRAM

DEMOLITION SINGLE LINE DII\GRAM

NEW WORK SINGLE LINE DIAGRAM

NEW WORK SINGLE LINE DIAGRAM

TELECOM RISER DIAGRAM

FIRE ALARM RISER DIAGRAM

PANELBOARD SCHEDULES

PPJNELBOPJRD SCHEDULES

DEMOLITION PANELBOARD SCHEDULES (240\,)

DEMOLITION PANELBOARD SCHEDULES (208\,)

LIGHTING FIXTURE SCHEDULE & LIGHTING CONTROL SCHEDULE

SECURITY PLAN NOTES, LEGENDS, PJSBREVIATIONS

SITE PLAN SECURITY

SECURITY PLAN BUILDING 1 BASEMENT

SECURITY PLAN BUILDING 1 FIRST FLOOR

SECURITY PLAN BUILDING 3 BASEMENT

SECURITY PLAN BUILDING 3 FIRST FLOOR

SECURITY PLAN BUILDING 13 TUNNEL & BASEMENT LEVELS, PHASE 1

SECURITY PLAN SHOP & MAIN LEVELS, PHASE 2

SECURITY PLAN SHOP & MAIN LEVELS, PHASE 3

SECURITY PLAN BUILDING 13 MEZZANINE LEVEL, PHASE 2

SECURITY PLAN FIRST FLOOR, PHASE 2

SECURITY PLAN FIRST FLOOR, PHASE 2

SECURITY PLAN DET /\JL DRAWINGS

SECURITY PLAN DET /\JL DRAWINGS

SECURITY PLAN DETAIL DRAWINGS

SECURITY PLAN DET/\JL DRAWINGS

SECURITY PLAN DETAIL DRAWINGS

SECURITY PLAN DET /\JL DRAWINGS

SECURITY PLAN DET /\JL DRAWINGS

SECURITY PLAN CAMERA SCHEDULE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER CONSULTANTS ENGINEER OF RECORD

MILLER-REMICK LLC

PROFESSIONAL ENGINEER Office of Construction and Facilities Management

Drawing Title Phase

COVERSHEET

Project Tille

INSTALL NEW BOILERS IN

BUILDING 13

NO, DESCRIPTION DATE

HAZARDOUS MATERIALS FIRE SUPPRESSION ,,,,,,.,.,,,,.,,,,,,, MAssEn &ASsoc1ATEs, 1Nc_ KoFFEL Assoc1ATEs Miller-Remick LLC t, ...... ) ... ,, o"'I o P-1 '',,, 105 CENTRAL STREET, STONEHAM, MA 02180 8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045 MEP, & structural Engineering {sDVOsa l /•jp�·;cic'Nsfo._('.-1.;-',, PHONE: (781)275-6050 PHONE: (410)750-2246 A SeTVice Disabled Veteran Owned \ ./ t ""<': v \ -:.

CIVIL/ STRUCTURAL ELECTRONIC SECURITY Small Business '\,.

g ; ' °=

PROFESSIONAL ENGINEERING CONSULTANTS, PA MAGNA ENGINEERS ' ' ' : 13 : '

100% BID SET

Approved: Project Director 303 SOUTH TOPEKA, WICHITA, KS 67202 861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503 :;i�i::i��if.'.0:�1!��BOJ4 \ J \ : ft ff PHONE: (316)262-2691 PHONE: (859)309-2990 \ o"';_', k<iNsi's , ,'""0 / FU L LY Sp RI N KL ERE D

Location ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

OCULUS INC, FORCE PROTECT FAX: (B5BJ42i.-5oo2 ,,,,,,,�1ONAL <-�-----'' �� U.S. Department ''"1u11,n" 1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102 3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786 MR PROJECT NO: 0499-0121 ,-, , ] , 2D t,,/ of Veterans Affairs 2021-09-03 HWR

Project Number

589A7-18-302

Building Number

Drawing Number

GI001 ARCHITECTURAL PHYSICALSECURITY

PHONE:(BSBJ4294ooo ',,,,'&'------- (if o· Issue Date G]r:;Jrawn

PHONE: (314)367-6100 PHONE: (502)836-4232 --,

Q_L'::::====================-========================================================'=========='---_:--------'===========================================-'=====-============::::J

VA FORM 08-6231

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

File details come from the government source that posted it. Updated .