589A7-18-302 Wichita Bid Drawings - 7_Mechanical 2 of 4.pdf

PDF 7 MB Posted

Attached to
Z2DA--589A7-18-302 FCA Install New Boilers, Building 13 (VA-22-00049186)
Solicitation number
36C25522R0079
Issued by

About this file

This solicitation is for the installation of new boilers at the Robert J. Dole VA Medical Center in Wichita, Kansas. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 is seeking a contractor to install new boilers in Building 13 to replace existing equipment. The contractor will be responsible for removing existing boilers, ductwork, piping and related systems before installing the new boilers and connecting them to steam and condensate systems. The solicitation includes drawings depicting demolition plans, new mechanical, ductwork and piping layouts to guide interested offerors. The closing date for proposals was not provided. The solicitation aims to procure a qualified contractor to modernize the boiler plant at the Wichita VA Medical Center facility.

View the file

Other files

File Type Posted
36C25522R0079 0005.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 2_Civil 1 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil 2 of 3.pdf PDF
36C25522R0079 0004.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 2_Civil 3 of 3.pdf PDF
S02 Pre-Bid Questions Solicitation No 36C25522R0079_VA Response.pdf PDF
36C25522R0079 0003.docx DOCX document
589-18-302 Boiler Pre Bid Attendance.pdf PDF
PROPOSAL SUBMITTAL INSTRUCTIONS 589A7-18-302 REV 08052022.docx DOCX document
36C25522R0079 0002.pdf PDF
589A7-18-302 Wichita Bid Drawings - 3 Structural.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 2 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 3 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 6_Plumbing 1 of 2.pdf PDF
589A7-18-302 Wichita Bid Drawings - 6_Plumbing 2 of 2.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 1 of 4.pdf PDF
36C25522R0079 0001.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 4 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 3_Structural (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 4_Architectural (SI) 2 of 2.pdf PDF
S02 P09 - 589A7-18-302 Wichita Bid Specs VOL 3 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 6_Plumbing (SI).pdf PDF
S02 P09 - 589A7-18-302 Wichita Bid Specs VOL 2 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 5 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 6 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 1 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical 3 of 6.pdf PDF
36C25522R0079_1.docx DOCX document
S02 ATTACMENT 3 Past Performance Questionnaire 36C25522R0079 Project 589A7-18-302.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 3 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 2 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 1_Hazardous Materials (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 1 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 1 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 5_ Fire Protection (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 4 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical 4 of 6.pdf PDF
589A7-18-302 Wichita Bid Specs VOL 1 of 3 (800pgs).pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 2 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 4_Architectural (SI) 1 of 2.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 3 of 4.pdf PDF
P07 Wage Determination 20220708.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 0_General (SI).pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 8

F

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

(TYP.)

CONTROL

ROOM

OFFICE

TOILETBREAK

ROOM

IT

ROOM

BOILER

ROOM

(E) 1-1/2"FOS & 1-1/2"FOR

REFER TO DRAWING MP121.02

FOR CONTINUATION

REFER TO MP101.02

FOR CONTINUATION

10 (E)1-1/4"PC

IN TRENCH TO REMAIN AS IS

(E)1-1/2"PC

DOWN TO REMAIN

AS IS

(E)1-1/2"HPS

TO BLDG 20

IN EXISTING TRENCH

(E)1-1/4"PC DOWN TO

EXISTING TRENCH.

REFER TO MD111.03 FOR CONTINUATION

EXISTING WATER TREATMENT

EQUIPMENT. REFER TO PLUMBING DRAWINGS

FOR SCOPE.

(E)10"HPS DOWN

FROM MAIN LEVEL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs

\g s tr o h \D o c u m e n ts

\0 -0

-W ic h it a B o ile rs -M

E P

-C E

N T

R A

L -R g s tr o h Q

H E

Z

.r v t

/9

/2

:3 :5

A

M

13-MD111.03

MECHANICAL

DEMOLITION PLAN

SHOP & MAIN LEVELS, PHASE 3

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 Checker Author0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 MECHANICAL DEMOLITION PLAN - SHOP & MAIN LEVELS, PHASE 3

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 ONCE THE FUEL-OIL (FOS/FOR) PIPING FROM THE EXISTING UNDERGROUND TANKS HAS BEEN

EXTEND TO NEW FUEL-OIL EQUIPMENT IN THE NEW BOILER PLANT. THE EXISTING FUEL-OIL

PUMPS SHALL BE DISCONNECTED AND REMOVED.

2 ONCE NEW BOILERS ARE OPERATIONAL THE EXISTING BOILERS SHALL BE DECOMMISSIONED,

DISCONNECTED AND REMOVED

3 EXISTING DEAERATOR AND CONDENSATE TANKS SHALL BE DISCONNECTED AND REMOVED IN ITS

ENTIRETY.

4 EXISTING STEAM PIPING WITHIN EXISTING BOILER PLANT SHALL BE DISCONNECTED AND

REMOVED AS INDICATED ON THE DRAWINGS.

5 CONTRACTOR SHALL DISCONNECT AND REMOVED EXISTING HVAC FOR EXISTING CONTROL ROOM, RESTROOM AND OFFICE INCLUDING EQUIPMENT, CONTROLS, DUCTWORK, HANGERS, SUPPORTS, AIR DEVICES, AND ASSOCIATED PIPING, VALVES, ETC. IN ITS ENTIRETY.

6 EXISTING HPS AND PC TO/FROM BUILDING 20 THRU EXISTING PIPE TRENCH TO REMAIN AS IS.

7 TEMPORARY NATURAL GAS MAIN TO BE PURGED AND DISCONNECTED AND REMOVED. CAP PIPE.

8 DISCONNECT AND REMOVE ALL EXISTING UNIT HEATER AND ASSOCIATED PIPING.

9 DISCONNECT AND REMOVE EXISTING 5" HPS WITHIN EXISTING BOILER PLANT.

10 EXISTING LPG TANK AND ENCLOSURE TO REMAIN AS IS. REFER TO DRAWING MP604 FOR

ADDITIONAL DETAILS.

11 EXISTING NATURAL GAS PIPING FEEDING THE EXISTING BOILERS AMD DOMESTIC HOT WATER

HEATER TO BE PURGED AND DISCONNECTED AND REMOVED.

12 EXISTING SUMP PUMP. REFER TO PLUMBING DRAWINGS FOR SCOPE.

13 DISCONNECT AND RELOCATE SHOP AIR COMPRESSOR. REFER TO DRAWING MP111.03 FOR NEW

LOCATION.

14 EXISTING 4" DIA HPS SHALL BE DISCONNECTED AND REMOVED. REFER TO DETAIL 9 ON

DRAWING M-502 FOR ADDITIONAL DETAILS.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW

DIAGRAMS.

3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE

STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.

5. ALL VALVE HANDLES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE

LOCATION WITH ALL TRADES.

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

BOILER

ROOM

M-18

STORAGE

C-1

DN. TO

BLDG 20

1 1/2"HPS

PHASE 2

4"

(E)4" NATURAL GAS LINE

UP FROM BELOW

4"

(E)1-1/2"HPS

(E)1-1/2"PC 1

(E)1-1/2"HPS

INSTALLED IN PHASE 2

10"HPS

TO REMAIN AS IS

(E)1-1/2"PC DN.

(E)3/4"LPG

(E)1-1/2"HPS

(E)3/4"LPG DN.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs

\g s tr o h \D o c u m e n ts

\0 -0

-W ic h it a B o ile rs -M

E P

-C E

N T

R A

L -R g s tr o h Q

H E

Z

.r v t

/9

/2

:4 :2

A

M

13-MD121.03

MECHANICAL

DEMOLITION PLAN

EX CATWALK & CATWALK LVLS, PH 3

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 AP GDS0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

MECHANICAL DEMOLITION PLAN - EXISTING CATWALK & CATWALK

LEVELS, PHASE 3

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 EXISTING UTILITY RACK TO REMAIN AS IS. PROTECT DURING CONSTRUCTION.

2 EXISTING STEAM PIPING IN EXISTING BOILER PLANT TO BE DEACTIVATED, DISCONNECTED AND

REMOVED.

3 EXISTING BOILER STACK TO BE DISCONNECTED AND REMOVED.

4 CONTRACTOR SHALL DISCONNECT AND REMOVED EXISTING HVAC FOR EXISTING CONTROL ROOM, RESTROOM AND OFFICE INCLUDING EQUIPMENT, CONTROLS, DUCTWORK, HANGERS, SUPPORTS, AIR DEVICES, AND ASSOCIATED PIPING, VALVES, ETC. IN ITS ENTIRETY.

5 EXISTING 10" DIA HPS DOWN TO LOWER LEVEL TO REMAIN AS IS. EXISTING CONDENSATE DRIP

TRAP PIPING TO BE CONNECTED INTO NEW CONDENSATE SYSTEM. REFER TO DETAIL 8 ON

DRAWING M-502.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW

DIAGRAMS.

3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE

STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

PHASE 2

(E)DUCT

GOOSENECK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C T e m p \R

E V

IT

B A

K \0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L

-R

H

W R y a n J r.

rv t

/2

/2

:0

:4

P M

13-MD131.03

MECHANICAL

DEMOLITION PLAN

ROOF, PHASE 3

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 AP GDS0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 MECHANICAL DEMOLITION PLAN - ROOF, PHASE 3

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 DISCONNECT AND REMOVE EXISTING ROOF MOUNTED EXHAUST FANS, STEAM SILENCER, BOILER

EXHAUST STACKS AND ALL STEAM VENT PIPING AND ASSOCIATED SUPPORTS. FILL IN ALL

ROOF OPENINGS AND PATCH ROOF. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS

FOR DETAILS.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW

DIAGRAMS.

3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE

STEAM OR STEAM CONDENSATE SYSTEM.

1 2 3 4 5 6

H

K

D

C

B

A

E

E1 E2 E3 E5 E6 E7

J

G

EXISTING

PUMP ROOM

B-1

PHASE 2

REFER TO ROOM STORAGE

B-2 ABOVE THIS AREA.

REF. PLAN THIS SHEET

NEW PUMP

ROOM

B-4

CO

CO

(E)FIRE MAIN

TO REMAIN AS IS

C

B

A

E5 E6

STORAGE

B-2

12x6

SG-1

200 CFM

4x12 UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs

\g s tr o h \D o c u m e n ts

\0 -0

-W ic h it a B o ile rs -M

E P

-C E

N T

R A

L -R g s tr o h Q

H E

Z

.r v t

/9

/2

:4 :3

A

M

13-MH101.03

MECHANICAL

DUCTWORK PLAN

TUNNEL & BSMT LEVELS, PHASE 3

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 AP GDS0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 DUCTWORK PLAN - TUNNEL & BASEMENT LEVELS, PHASE 3

GENERAL SHEET NOTES:

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

SCALE: 1/4" = 1'-0"2 DUCTWORK PLAN - STORAGE B-2, PHASE 3

SHEET KEYNOTES:

1 MOUNT CO DETECTORS 4'-6" AFF. CONFIRM QUANITY AND LOCATION OF SENSORS W/ GAS

DETECTION VENDOR TO ENSURE COMPLETE COVERAGE.

R E

F

13-M-301

1 2 3 4 5 6 7 8

F

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

13-FOM-1

CONTRACTOR

TOUCHDOWN

M-6

TOILET

M-2

TOILET

M-1

PASSAGE

M-7

LOCKER

ROOM

M-3

EQUIPMENT

M-19

SHOWER

ROOM

M-4

BREAK

AREA

M-5

13-RO-01

CD-4

300 CFM

CD-4

300 CFM

CD-1

150 CFM

CD-1

150 CFM

ER-2

50 CFM

ER-3

175 CFM

CD-2

200 CFM

ER-1

100 CFM

ER-1

125 CFM

CD-3

100 CFM

CD-3

75 CFM

PHASE 2

13-M-301

CO NG

T

13-AC-4

ER-1

50 CFM

RG-3

625 CFM

T

13-UH-12/13

T13-EF-3/4

13-M-305

13-TNK-03

13-TNK-04

13-TNK-05

13-TNK-06

4x12

SA

UP/DN

RG-3

625 CFM

REFER TO SHEET

13-MH121.03 FOR

DUCTWORK PLAN ABOVE.

T

13-UH-10/11

CO 1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs

\g s tr o h \D o c u m e n ts

\0 -0

-W ic h it a B o ile rs -M

E P

-C E

N T

R A

L -R g s tr o h Q

H E

Z

.r v t

/9

/2

:4 :5

A

M

13-MH111.03

MECHANICAL

DUCTWORK PLAN

SHOP & MAIN LEVELS, PHASE 3

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 AP GDS0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 DUCTWORK PLAN - SHOP & MAIN LEVELS, PHASE 3

SHEET KEYNOTES:

1 MOUNT CO DETECTORS 4'-6" AFF. CONFIRM QUANITY AND LOCATION OF SENSORS W/ GAS

DETECTION VENDOR TO ENSURE COMPLETE COVERAGE.

2 MOUNT NATURAL GAS DETECTOR 12" BELOW CEILING. CONFIRM QUANITY AND LOCATION OF

SENSORS WITH GAS DECTECTION VENDOR TO ENSURE COMPLETE COVERAGE.

3 INSTALL THERMOSTAT 52" AFF.

GENERAL SHEET NOTES:

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW

DIAGRAMS.

3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE

STEAM OR STEAM CONDENSATE SYSTEM.

13-M-301

1 2 3 4 5 6 7 8

F

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

BOILER

ROOM

M-18

STORAGE

C-1

12x12 OA UP

TO 13-GRV-6

18x12

6"Ø

6"Ø

12x12 EA UP

TO 13-GRV-7

6x6

PHASE 2

13-M-301

13-UH-11

13-UH-10

12x12

8"Ø

SA UP TO

13-SF-3

30x30

UP TO

13-EF-4

13-ERV-2

34x8

30x30

EA UP TO

13-EF-3

36x36

SA UP TO

13-SF-4

36x36

6x6

6x6

U P

13-M-305

6x6

6x8

8x8

13-AC-4

36x16

SG-2

2235 CFM

26"Ø 20"Ø

26"Ø20"Ø

Ø

Ø

36x16

SG-2

2235 CFM

TYP(3)

TYP(3)

10x10 x x

Ø

Ø

SAOA

RA EA

(N)RS/RL

(N)3/4"CD

ON MEZZ. PLATFORM,

HUNG FROM ABOVE

12x4

MEZZANINE ABOVE

CONTRACTOR TOUCHDOWN AREA

13-UH-12

13-UH-13

4x12

SA DN

(N)RS/RL

FC

FC

3/4"CD

REFER TO SHEET

13-MH111.03 FOR AIR

DEVICE CONNECTIONS

BELOW.

13-ACCU-4

ON LOW ROOF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs

\g s tr o h \D o c u m e n ts

\0 -0

-W ic h it a B o ile rs -M

E P

-C E

N T

R A

L -R g s tr o h Q

H E

Z

.r v t

/9

/2

:4 :1

A

M

13-MH121.03

MECHANICAL

DUCTWORK PLAN

EX CATWALK & CATWALK LVLS, PH 3

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 AP GDS0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 DUCTWORK PLAN - EXISTING CATWALK & CATWALK LEVELS, PHASE 3

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 3/4" DIA CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM 1/8

INCH PER FOOT. ROUTE DOWN TO MOP SINK. TERMINATE WITH AIR GAP.

2 REFRIGERANT PIPING (SUCTION & LIQUID) UP THRU ROOF PIPE PORTAL. PROVIDE SEPARATE

BOOT FOR EACH PIPE. ROUTE PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE SUPPORTS

AS REQUIRED.

3 MAINTAIN LADDER ACCESS CLEARANCE TO EXISTING ROOF HATCH ABOVE.

4 GENERATOR EXHAUST MUFFLER.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW

DIAGRAMS.

3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE

STEAM OR STEAM CONDENSATE SYSTEM.

1 2 3 4 5 6

H

K

D

C

B

A

E

E1 E2 E3 E5 E6 E7

J

G

EXISTING

PUMP ROOM

B-1

(E) 10"HPS DOWN

FROM MAIN LEVEL

2"FOS

2"FOR

3/4"FOS/FOR

2"FOS

2"FOR

PHASE 2

REFER TO DRAWINGS

MP101.03, MP604 & MP605

FOR ADDITIONAL DETAILS

4"PC

(E)1-1/2"PC

EXISTING 10"HPS

2"PC

REFER TO DETAIL 9

ON DRAWING MP502

REFER TO 2/MP101.03

FOR CONTINUATION

13-M-305

(E)FUEL OIL

PIPING

D

C

B

A

E

E5 E6

13-FOM-1

STORAGE

B-2

RELOCATED SHOP

AIR COMPRESSOR

REFER TO DRAWINGS

MP101.03, MP605 & MP606

FOR PIPING DETAILS

REFER TO

DRAWING MP101.03

FOR PIPING

10"HPS DOWN

FROM MAIN LEVEL

1 1/2"FOR

1 1/2"FOS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C T e m p \R

E V

IT

B A

K \0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L

-R

H

W R y a n J r.

rv t

/2

/2

:0

:1

P M

13-MP101.03

MECHANICAL

PIPING PLAN

TUNNEL & BSMT LEVELS, PHASE 3

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 AP GDS0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 PIPING PLAN - TUNNEL & BASEMENT LEVELS, PHASE 3

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 INSTALL NEW FUEL-OIL FILTRATION SKID. PROVIDE 6" HIGH CONCRETE HOUSEKEEPING PAD.

2 INSTALL NEW 1-1/2"FOS & 1-1/2"FOR THROUGH STORAGE AREA. KEEP PIPING TIGHT TO

BOTTOM STRUCTURE ABOVE.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW

DIAGRAMS.

3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE

STEAM OR STEAM CONDENSATE SYSTEM.

5. ALL VALVE HANDLES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE

SCALE: 1/4" = 1'-0"2 PIPING PLAN - STORAGE B-2, PHASE 3

R E

F

1 2 3 4 5 6 7 8

F

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

13-FOM-1

CONTROL

ROOM

M-8

BOILER

ROOM

M-18

CONTRACTOR

TOUCHDOWN

M-6

TOILET

M-2

TOILET

M-1

PASSAGE

M-7

LOCKER

ROOM

M-3

EQUIPMENT

M-19

SHOWER

ROOM

M-4

BREAK

AREA

M-5

PHASE 2

REFER TO DRAWING

MP605 & MP606

FOR PIPING DETAILS

CONTROL

ROOM

M-8

REFER TO

2/MP101.03

FOR PIPING

(E)1-1/2"HPS

TO BLDG 20

(E)1-1/4"PC

FROM BLDG 20

(E)1-1/2"HPS

FROM ABOVE

(E)1-1/4"PC DOWN TO

EXISTING TRENCH.

REFER TO MD111.02 FOR CONTINUATION

REFER TO 2/MP101.03

FOR CONTINUATION

(E)10"HPS

UP/DN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs

\g s tr o h \D o c u m e n ts

\0 -0

-W ic h it a B o ile rs -M

E P

-C E

N T

R A

L -R g s tr o h Q

H E

Z

.r v t

/3

/2

:2

:0

A

M

13-MP111.03

MECHANICAL

PIPING PLAN

SHOP & MAIN LEVELS, PHASE 3

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 AP GDS0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 PIPING PLAN - SHOP & MAIN LEVELS, PHASE 3

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 INSTALL NEW FUEL-OIL FILTRATION SKID. PROVIDE 6" HIGH CONCRETE HOUSEKEEPING PAD.

2 REFER TO MH SERIES DRAWINGS FOR GAS DETECTION SENSOR LOCATIONS.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW

DIAGRAMS.

3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE

STEAM OR STEAM CONDENSATE SYSTEM.

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

BOILER

ROOM

M-18

STORAGE

C-1

1 1/2"HPS

1 1/2"HPS

(E)10"DIA. HPS DN.

(SOUTH TUNNEL)

PHASE 2

2”HPS DOWN

REFER TO DRAWING

MP111.02 FOR CONTINUATION

(E)1-1/2”HPS

TO BUILDING 12

(E)1-1/2"PC

13-UH-11

13-UH-10

(E)1 1/2" PC DOWN

REF. MP111.03

ON MEZZ. PLATFORM

HUNG FROM ABOVE

3/4"LPR

3/4"HPS

1"LPR (E)1-1/2"HPS

PLATFORM ABOVE

CONTRACTOR

TOUCHDOWN AREA

(E)10"HPS

13-AC-4

10"HPS DOWN

13-UH-12

13-UH-13

1 1/4"LPS

3/4"LPS

3/4"LPR

3/4"LPG

1 1/4"LPS 1"LPR

3/4"LPG

13-ACCU-4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C T e m p \R

E V

IT

B A

K \0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L

-R

H

W R y a n J r.

rv t

/2

/2

:0

:5

P M

13-MP121.03

MECHANICAL

PIPING PLAN

EX CATWALK & CATWALK LVLS, PH 3

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 AP GDS0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 PIPING PLAN - EXISTING CATWALK & CATWALK LEVELS, PHASE 3

GENERAL SHEET NOTES:

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW

DIAGRAMS.

3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE

STEAM OR STEAM CONDENSATE SYSTEM.

13-M-301

1 2 3 4 5 6 7 8

F

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

13-M-301

13-GRV-7

PHASE 2

EXISTING

ROOF ACCESS HATCH

13-EF-3 13-EF-4

13-SF-4

13-SF-3

13-M-305

13-GRV-8

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C T e m p \R

E V

IT

B A

K \0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L

-R

H

W R y a n J r.

rv t

/2

/2

:0

:2

P M

13-M-131.03

MECHANICAL

NEW WORK PLAN

ROOF, PHASE 3

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 AP GDS0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 MECHANICAL NEW WORK PLAN - ROOF, PHASE 3

GENERAL SHEET NOTES:

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW

DIAGRAMS.

3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE

STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.

MAIN LEVEL

6' - 8"

CATWALK LEVEL

17' - 4"

UPPER ROOF -

LOW POINT

39' - 6 13/16"

FHK DJ G

13-GRV-2

10"DIA.

MAIN STEAM HEADER

3"FWPD

3"FWPD

8"HPS 13-FHX-2

13-UH-2

3"NG

6"SV

6"SV

1-1/2" FOS

1-1/2" FOR

3"HPS

10"HPS

BYPASS LINE 1 1/2"HPS

BOILER STACK

MIN. 10FT ABOVE ROOF.

2"FWPD

DOUBLE CONE

RAIN CAP

NATURAL GAS

TRAIN VENTS

BOILER

ROOM

M-18

13-SF-1

(N)1"SBO

24"DIA.

BOILER FLUE

STACK

3/4"LPR

4"PC

8"HPS

(TYP.)

x

13-B-2

3/4"LPS

SHOP LEVEL

0' - 0"

TUNNEL LEVEL

-6' - 0"

INTERMEDIATE

ROOF PARAPET

30' - 10 3/8"

MAIN LEVEL

6' - 8"

CATWALK LEVEL

17' - 4"

E5 E6

E7

2"FOS

2"FOR

EXISTING ROOF STRUCTURE

(E) 10"HPS

(E)6"FIRE

NEW 4"PC

(E)CONDENSATE PUMP

(E)CONDENSATE RECEIVER

BREAK

ROOM

BATH

ROOM

EXISTING

PUMP ROOM

13-1

SHOP LEVEL

0' - 0"

INTERMEDIATE

ROOF - HIGH

POINT

29' - 2 7/16"

MAIN LEVEL

6' - 8"

E3 E4

EQUIPMENT

M-19

13-SF-3

36x36

13-UH-12

3/4"LPS

3/4"LPR

SHOP LEVEL

0' - 0"

INTERMEDIATE

ROOF - LOW

POINT

28' - 2 7/16"

E3 E4

13-SF-4

36x36

EQUIPMENT

M-19

13-UH-133/4"LPS

3/4"LPR

30"Ø

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C T e m p \R

E V

IT

B A

K \0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L

-R

H

W R y a n J r.

rv t

/2

/2

:0

:3

P M

13-M-301

MECHANICAL

SECTIONS

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 MH GDS0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 MECHANICAL SECTION @ BOILER 2

SCALE: 1/4" = 1'-0"2 PHASE 2 - HPS CONNECTION TO SOUTH LOOP

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 COORDINATE ROUTING OF NEW FUEL OIL PIPING IN LOWER LEVEL WITH EXISTING CONDITIONS

AND ALL TRADES.

2 EXTEND EXISTING 4" CONDENSATE PIPE (PC) TO NEW PUMP ROOM. PIPING TO BE INSTALLED

IN PHASE 2. KEEP PIPE AS CLOSE TO WALL AS POSSIBLE, COORDINATE ROUTING WITH

EXISTING CONDITIONS.

3 GAS TRAIN VENTS UP THROUGH ROOF. VENTS MUST BE A MINIMUM OF 10 FEET FROM ANY

INTAKES. SIZE VENTS PER SCHEDULE ON DETAIL #2 ON DRAWING MP504.

4 REFER TO DETAIL 2 ON DRAWING M-504 FOR ADDITIONAL GAS TRAIN DETAILS.

5 REFER TO DETAIL 2 ON DRAWING M-502 FOR ADDITIONAL INFORMATION.

6 INSTALL NEW PIPE ANCHOR ATTACHED TO FOUNDATION WALL. REFER TO DETAIL 15 ON

STRUCUTRAL DRAWING S-502.

SCALE: 1/4" = 1'-0"3 SECTION SUPPLY FAN DUCT RISER

SCALE: 1/4" = 1'-0"4 SECTION - SUPPLY FAN DUCT RISER

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW

DIAGRAMS.

3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT

SCHEDULES.

4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE

STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.