This solicitation is for the installation of new boilers at the Robert J. Dole VA Medical Center in Wichita, Kansas. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 is seeking a contractor to install new boilers in Building 13 to replace existing equipment. The contractor will be responsible for removing existing boilers, ductwork, piping and related systems before installing the new boilers and connecting them to steam and condensate systems. The solicitation includes drawings depicting demolition plans, new mechanical, ductwork and piping layouts to guide interested offerors. The closing date for proposals was not provided. The solicitation aims to procure a qualified contractor to modernize the boiler plant at the Wichita VA Medical Center facility.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8
F
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
(TYP.)
CONTROL
ROOM
OFFICE
TOILETBREAK
ROOM
IT
ROOM
BOILER
ROOM
(E) 1-1/2"FOS & 1-1/2"FOR
REFER TO DRAWING MP121.02
FOR CONTINUATION
REFER TO MP101.02
FOR CONTINUATION
10 (E)1-1/4"PC
IN TRENCH TO REMAIN AS IS
(E)1-1/2"PC
DOWN TO REMAIN
AS IS
(E)1-1/2"HPS
TO BLDG 20
IN EXISTING TRENCH
(E)1-1/4"PC DOWN TO
EXISTING TRENCH.
REFER TO MD111.03 FOR CONTINUATION
EXISTING WATER TREATMENT
EQUIPMENT. REFER TO PLUMBING DRAWINGS
FOR SCOPE.
(E)10"HPS DOWN
FROM MAIN LEVEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:3 :5
A
M
13-MD111.03
MECHANICAL
DEMOLITION PLAN
SHOP & MAIN LEVELS, PHASE 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 Checker Author0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 MECHANICAL DEMOLITION PLAN - SHOP & MAIN LEVELS, PHASE 3
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 ONCE THE FUEL-OIL (FOS/FOR) PIPING FROM THE EXISTING UNDERGROUND TANKS HAS BEEN
EXTEND TO NEW FUEL-OIL EQUIPMENT IN THE NEW BOILER PLANT. THE EXISTING FUEL-OIL
PUMPS SHALL BE DISCONNECTED AND REMOVED.
2 ONCE NEW BOILERS ARE OPERATIONAL THE EXISTING BOILERS SHALL BE DECOMMISSIONED,
DISCONNECTED AND REMOVED
3 EXISTING DEAERATOR AND CONDENSATE TANKS SHALL BE DISCONNECTED AND REMOVED IN ITS
ENTIRETY.
4 EXISTING STEAM PIPING WITHIN EXISTING BOILER PLANT SHALL BE DISCONNECTED AND
REMOVED AS INDICATED ON THE DRAWINGS.
5 CONTRACTOR SHALL DISCONNECT AND REMOVED EXISTING HVAC FOR EXISTING CONTROL ROOM, RESTROOM AND OFFICE INCLUDING EQUIPMENT, CONTROLS, DUCTWORK, HANGERS, SUPPORTS, AIR DEVICES, AND ASSOCIATED PIPING, VALVES, ETC. IN ITS ENTIRETY.
6 EXISTING HPS AND PC TO/FROM BUILDING 20 THRU EXISTING PIPE TRENCH TO REMAIN AS IS.
7 TEMPORARY NATURAL GAS MAIN TO BE PURGED AND DISCONNECTED AND REMOVED. CAP PIPE.
8 DISCONNECT AND REMOVE ALL EXISTING UNIT HEATER AND ASSOCIATED PIPING.
9 DISCONNECT AND REMOVE EXISTING 5" HPS WITHIN EXISTING BOILER PLANT.
10 EXISTING LPG TANK AND ENCLOSURE TO REMAIN AS IS. REFER TO DRAWING MP604 FOR
ADDITIONAL DETAILS.
11 EXISTING NATURAL GAS PIPING FEEDING THE EXISTING BOILERS AMD DOMESTIC HOT WATER
HEATER TO BE PURGED AND DISCONNECTED AND REMOVED.
12 EXISTING SUMP PUMP. REFER TO PLUMBING DRAWINGS FOR SCOPE.
13 DISCONNECT AND RELOCATE SHOP AIR COMPRESSOR. REFER TO DRAWING MP111.03 FOR NEW
LOCATION.
14 EXISTING 4" DIA HPS SHALL BE DISCONNECTED AND REMOVED. REFER TO DETAIL 9 ON
DRAWING M-502 FOR ADDITIONAL DETAILS.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.
5. ALL VALVE HANDLES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE
LOCATION WITH ALL TRADES.
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
BOILER
ROOM
M-18
STORAGE
C-1
DN. TO
BLDG 20
1 1/2"HPS
PHASE 2
4"
(E)4" NATURAL GAS LINE
UP FROM BELOW
4"
(E)1-1/2"HPS
(E)1-1/2"PC 1
(E)1-1/2"HPS
INSTALLED IN PHASE 2
10"HPS
TO REMAIN AS IS
(E)1-1/2"PC DN.
(E)3/4"LPG
(E)1-1/2"HPS
(E)3/4"LPG DN.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4 :2
A
M
13-MD121.03
MECHANICAL
DEMOLITION PLAN
EX CATWALK & CATWALK LVLS, PH 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1
MECHANICAL DEMOLITION PLAN - EXISTING CATWALK & CATWALK
LEVELS, PHASE 3
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 EXISTING UTILITY RACK TO REMAIN AS IS. PROTECT DURING CONSTRUCTION.
2 EXISTING STEAM PIPING IN EXISTING BOILER PLANT TO BE DEACTIVATED, DISCONNECTED AND
REMOVED.
3 EXISTING BOILER STACK TO BE DISCONNECTED AND REMOVED.
4 CONTRACTOR SHALL DISCONNECT AND REMOVED EXISTING HVAC FOR EXISTING CONTROL ROOM, RESTROOM AND OFFICE INCLUDING EQUIPMENT, CONTROLS, DUCTWORK, HANGERS, SUPPORTS, AIR DEVICES, AND ASSOCIATED PIPING, VALVES, ETC. IN ITS ENTIRETY.
5 EXISTING 10" DIA HPS DOWN TO LOWER LEVEL TO REMAIN AS IS. EXISTING CONDENSATE DRIP
TRAP PIPING TO BE CONNECTED INTO NEW CONDENSATE SYSTEM. REFER TO DETAIL 8 ON
DRAWING M-502.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
PHASE 2
(E)DUCT
GOOSENECK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C T e m p \R
E V
IT
B A
K \0
-0
-W ic h it a
B o ile rs
-M E
P -C
E N
T R
A L
-R
H
W R y a n J r.
rv t
/2
/2
:0
:4
P M
13-MD131.03
MECHANICAL
DEMOLITION PLAN
ROOF, PHASE 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 MECHANICAL DEMOLITION PLAN - ROOF, PHASE 3
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 DISCONNECT AND REMOVE EXISTING ROOF MOUNTED EXHAUST FANS, STEAM SILENCER, BOILER
EXHAUST STACKS AND ALL STEAM VENT PIPING AND ASSOCIATED SUPPORTS. FILL IN ALL
ROOF OPENINGS AND PATCH ROOF. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS
FOR DETAILS.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
1 2 3 4 5 6
H
K
D
C
B
A
E
E1 E2 E3 E5 E6 E7
J
G
EXISTING
PUMP ROOM
B-1
PHASE 2
REFER TO ROOM STORAGE
B-2 ABOVE THIS AREA.
REF. PLAN THIS SHEET
NEW PUMP
ROOM
B-4
CO
CO
(E)FIRE MAIN
TO REMAIN AS IS
C
B
A
E5 E6
STORAGE
B-2
12x6
SG-1
200 CFM
4x12 UP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4 :3
A
M
13-MH101.03
MECHANICAL
DUCTWORK PLAN
TUNNEL & BSMT LEVELS, PHASE 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 DUCTWORK PLAN - TUNNEL & BASEMENT LEVELS, PHASE 3
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
SCALE: 1/4" = 1'-0"2 DUCTWORK PLAN - STORAGE B-2, PHASE 3
SHEET KEYNOTES:
1 MOUNT CO DETECTORS 4'-6" AFF. CONFIRM QUANITY AND LOCATION OF SENSORS W/ GAS
DETECTION VENDOR TO ENSURE COMPLETE COVERAGE.
R E
F
13-M-301
1 2 3 4 5 6 7 8
F
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
13-FOM-1
CONTRACTOR
TOUCHDOWN
M-6
TOILET
M-2
TOILET
M-1
PASSAGE
M-7
LOCKER
ROOM
M-3
EQUIPMENT
M-19
SHOWER
ROOM
M-4
BREAK
AREA
M-5
13-RO-01
CD-4
300 CFM
CD-4
300 CFM
CD-1
150 CFM
CD-1
150 CFM
ER-2
50 CFM
ER-3
175 CFM
CD-2
200 CFM
ER-1
100 CFM
ER-1
125 CFM
CD-3
100 CFM
CD-3
75 CFM
PHASE 2
13-M-301
CO NG
T
13-AC-4
ER-1
50 CFM
RG-3
625 CFM
T
13-UH-12/13
T13-EF-3/4
13-M-305
13-TNK-03
13-TNK-04
13-TNK-05
13-TNK-06
4x12
SA
UP/DN
RG-3
625 CFM
REFER TO SHEET
13-MH121.03 FOR
DUCTWORK PLAN ABOVE.
T
13-UH-10/11
CO 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4 :5
A
M
13-MH111.03
MECHANICAL
DUCTWORK PLAN
SHOP & MAIN LEVELS, PHASE 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 DUCTWORK PLAN - SHOP & MAIN LEVELS, PHASE 3
SHEET KEYNOTES:
1 MOUNT CO DETECTORS 4'-6" AFF. CONFIRM QUANITY AND LOCATION OF SENSORS W/ GAS
DETECTION VENDOR TO ENSURE COMPLETE COVERAGE.
2 MOUNT NATURAL GAS DETECTOR 12" BELOW CEILING. CONFIRM QUANITY AND LOCATION OF
SENSORS WITH GAS DECTECTION VENDOR TO ENSURE COMPLETE COVERAGE.
3 INSTALL THERMOSTAT 52" AFF.
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
13-M-301
1 2 3 4 5 6 7 8
F
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
BOILER
ROOM
M-18
STORAGE
C-1
12x12 OA UP
TO 13-GRV-6
18x12
6"Ø
6"Ø
12x12 EA UP
TO 13-GRV-7
6x6
PHASE 2
13-M-301
13-UH-11
13-UH-10
12x12
8"Ø
SA UP TO
13-SF-3
30x30
UP TO
13-EF-4
13-ERV-2
34x8
30x30
EA UP TO
13-EF-3
36x36
SA UP TO
13-SF-4
36x36
6x6
6x6
U P
13-M-305
6x6
6x8
8x8
13-AC-4
36x16
SG-2
2235 CFM
26"Ø 20"Ø
26"Ø20"Ø
Ø
Ø
36x16
SG-2
2235 CFM
TYP(3)
TYP(3)
10x10 x x
Ø
Ø
SAOA
RA EA
(N)RS/RL
(N)3/4"CD
ON MEZZ. PLATFORM,
HUNG FROM ABOVE
12x4
MEZZANINE ABOVE
CONTRACTOR TOUCHDOWN AREA
13-UH-12
13-UH-13
4x12
SA DN
(N)RS/RL
FC
FC
3/4"CD
REFER TO SHEET
13-MH111.03 FOR AIR
DEVICE CONNECTIONS
BELOW.
13-ACCU-4
ON LOW ROOF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4 :1
A
M
13-MH121.03
MECHANICAL
DUCTWORK PLAN
EX CATWALK & CATWALK LVLS, PH 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 DUCTWORK PLAN - EXISTING CATWALK & CATWALK LEVELS, PHASE 3
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 3/4" DIA CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM 1/8
INCH PER FOOT. ROUTE DOWN TO MOP SINK. TERMINATE WITH AIR GAP.
2 REFRIGERANT PIPING (SUCTION & LIQUID) UP THRU ROOF PIPE PORTAL. PROVIDE SEPARATE
BOOT FOR EACH PIPE. ROUTE PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE SUPPORTS
AS REQUIRED.
3 MAINTAIN LADDER ACCESS CLEARANCE TO EXISTING ROOF HATCH ABOVE.
4 GENERATOR EXHAUST MUFFLER.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
1 2 3 4 5 6
H
K
D
C
B
A
E
E1 E2 E3 E5 E6 E7
J
G
EXISTING
PUMP ROOM
B-1
(E) 10"HPS DOWN
FROM MAIN LEVEL
2"FOS
2"FOR
3/4"FOS/FOR
2"FOS
2"FOR
PHASE 2
REFER TO DRAWINGS
MP101.03, MP604 & MP605
FOR ADDITIONAL DETAILS
4"PC
(E)1-1/2"PC
EXISTING 10"HPS
2"PC
REFER TO DETAIL 9
ON DRAWING MP502
REFER TO 2/MP101.03
FOR CONTINUATION
13-M-305
(E)FUEL OIL
PIPING
D
C
B
A
E
E5 E6
13-FOM-1
STORAGE
B-2
RELOCATED SHOP
AIR COMPRESSOR
REFER TO DRAWINGS
MP101.03, MP605 & MP606
FOR PIPING DETAILS
REFER TO
DRAWING MP101.03
FOR PIPING
10"HPS DOWN
FROM MAIN LEVEL
1 1/2"FOR
1 1/2"FOS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C T e m p \R
E V
IT
B A
K \0
-0
-W ic h it a
B o ile rs
-M E
P -C
E N
T R
A L
-R
H
W R y a n J r.
rv t
/2
/2
:0
:1
P M
13-MP101.03
MECHANICAL
PIPING PLAN
TUNNEL & BSMT LEVELS, PHASE 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 PIPING PLAN - TUNNEL & BASEMENT LEVELS, PHASE 3
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 INSTALL NEW FUEL-OIL FILTRATION SKID. PROVIDE 6" HIGH CONCRETE HOUSEKEEPING PAD.
2 INSTALL NEW 1-1/2"FOS & 1-1/2"FOR THROUGH STORAGE AREA. KEEP PIPING TIGHT TO
BOTTOM STRUCTURE ABOVE.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
5. ALL VALVE HANDLES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE
SCALE: 1/4" = 1'-0"2 PIPING PLAN - STORAGE B-2, PHASE 3
R E
F
1 2 3 4 5 6 7 8
F
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
13-FOM-1
CONTROL
ROOM
M-8
BOILER
ROOM
M-18
CONTRACTOR
TOUCHDOWN
M-6
TOILET
M-2
TOILET
M-1
PASSAGE
M-7
LOCKER
ROOM
M-3
EQUIPMENT
M-19
SHOWER
ROOM
M-4
BREAK
AREA
M-5
PHASE 2
REFER TO DRAWING
MP605 & MP606
FOR PIPING DETAILS
CONTROL
ROOM
M-8
REFER TO
2/MP101.03
FOR PIPING
(E)1-1/2"HPS
TO BLDG 20
(E)1-1/4"PC
FROM BLDG 20
(E)1-1/2"HPS
FROM ABOVE
(E)1-1/4"PC DOWN TO
EXISTING TRENCH.
REFER TO MD111.02 FOR CONTINUATION
REFER TO 2/MP101.03
FOR CONTINUATION
(E)10"HPS
UP/DN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/3
/2
:2
:0
A
M
13-MP111.03
MECHANICAL
PIPING PLAN
SHOP & MAIN LEVELS, PHASE 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 PIPING PLAN - SHOP & MAIN LEVELS, PHASE 3
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 INSTALL NEW FUEL-OIL FILTRATION SKID. PROVIDE 6" HIGH CONCRETE HOUSEKEEPING PAD.
2 REFER TO MH SERIES DRAWINGS FOR GAS DETECTION SENSOR LOCATIONS.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
BOILER
ROOM
M-18
STORAGE
C-1
1 1/2"HPS
1 1/2"HPS
(E)10"DIA. HPS DN.
(SOUTH TUNNEL)
PHASE 2
2”HPS DOWN
REFER TO DRAWING
MP111.02 FOR CONTINUATION
(E)1-1/2”HPS
TO BUILDING 12
(E)1-1/2"PC
13-UH-11
13-UH-10
(E)1 1/2" PC DOWN
REF. MP111.03
ON MEZZ. PLATFORM
HUNG FROM ABOVE
3/4"LPR
3/4"HPS
1"LPR (E)1-1/2"HPS
PLATFORM ABOVE
CONTRACTOR
TOUCHDOWN AREA
(E)10"HPS
13-AC-4
10"HPS DOWN
13-UH-12
13-UH-13
1 1/4"LPS
3/4"LPS
3/4"LPR
3/4"LPG
1 1/4"LPS 1"LPR
3/4"LPG
13-ACCU-4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C T e m p \R
E V
IT
B A
K \0
-0
-W ic h it a
B o ile rs
-M E
P -C
E N
T R
A L
-R
H
W R y a n J r.
rv t
/2
/2
:0
:5
P M
13-MP121.03
MECHANICAL
PIPING PLAN
EX CATWALK & CATWALK LVLS, PH 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 PIPING PLAN - EXISTING CATWALK & CATWALK LEVELS, PHASE 3
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
13-M-301
1 2 3 4 5 6 7 8
F
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
13-M-301
13-GRV-7
PHASE 2
EXISTING
ROOF ACCESS HATCH
13-EF-3 13-EF-4
13-SF-4
13-SF-3
13-M-305
13-GRV-8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C T e m p \R
E V
IT
B A
K \0
-0
-W ic h it a
B o ile rs
-M E
P -C
E N
T R
A L
-R
H
W R y a n J r.
rv t
/2
/2
:0
:2
P M
13-M-131.03
MECHANICAL
NEW WORK PLAN
ROOF, PHASE 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 MECHANICAL NEW WORK PLAN - ROOF, PHASE 3
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.
MAIN LEVEL
6' - 8"
CATWALK LEVEL
17' - 4"
UPPER ROOF -
LOW POINT
39' - 6 13/16"
FHK DJ G
13-GRV-2
10"DIA.
MAIN STEAM HEADER
3"FWPD
3"FWPD
8"HPS 13-FHX-2
13-UH-2
3"NG
6"SV
6"SV
1-1/2" FOS
1-1/2" FOR
3"HPS
10"HPS
BYPASS LINE 1 1/2"HPS
BOILER STACK
MIN. 10FT ABOVE ROOF.
2"FWPD
DOUBLE CONE
RAIN CAP
NATURAL GAS
TRAIN VENTS
BOILER
ROOM
M-18
13-SF-1
(N)1"SBO
24"DIA.
BOILER FLUE
STACK
3/4"LPR
4"PC
8"HPS
(TYP.)
x
13-B-2
3/4"LPS
SHOP LEVEL
0' - 0"
TUNNEL LEVEL
-6' - 0"
INTERMEDIATE
ROOF PARAPET
30' - 10 3/8"
MAIN LEVEL
6' - 8"
CATWALK LEVEL
17' - 4"
E5 E6
E7
2"FOS
2"FOR
EXISTING ROOF STRUCTURE
(E) 10"HPS
(E)6"FIRE
NEW 4"PC
(E)CONDENSATE PUMP
(E)CONDENSATE RECEIVER
BREAK
ROOM
BATH
ROOM
EXISTING
PUMP ROOM
13-1
SHOP LEVEL
0' - 0"
INTERMEDIATE
ROOF - HIGH
POINT
29' - 2 7/16"
MAIN LEVEL
6' - 8"
E3 E4
EQUIPMENT
M-19
13-SF-3
36x36
13-UH-12
3/4"LPS
3/4"LPR
SHOP LEVEL
0' - 0"
INTERMEDIATE
ROOF - LOW
POINT
28' - 2 7/16"
E3 E4
13-SF-4
36x36
EQUIPMENT
M-19
13-UH-133/4"LPS
3/4"LPR
30"Ø
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C T e m p \R
E V
IT
B A
K \0
-0
-W ic h it a
B o ile rs
-M E
P -C
E N
T R
A L
-R
H
W R y a n J r.
rv t
/2
/2
:0
:3
P M
13-M-301
MECHANICAL
SECTIONS
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 MH GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 MECHANICAL SECTION @ BOILER 2
SCALE: 1/4" = 1'-0"2 PHASE 2 - HPS CONNECTION TO SOUTH LOOP
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 COORDINATE ROUTING OF NEW FUEL OIL PIPING IN LOWER LEVEL WITH EXISTING CONDITIONS
AND ALL TRADES.
2 EXTEND EXISTING 4" CONDENSATE PIPE (PC) TO NEW PUMP ROOM. PIPING TO BE INSTALLED
IN PHASE 2. KEEP PIPE AS CLOSE TO WALL AS POSSIBLE, COORDINATE ROUTING WITH
EXISTING CONDITIONS.
3 GAS TRAIN VENTS UP THROUGH ROOF. VENTS MUST BE A MINIMUM OF 10 FEET FROM ANY
INTAKES. SIZE VENTS PER SCHEDULE ON DETAIL #2 ON DRAWING MP504.
4 REFER TO DETAIL 2 ON DRAWING M-504 FOR ADDITIONAL GAS TRAIN DETAILS.
5 REFER TO DETAIL 2 ON DRAWING M-502 FOR ADDITIONAL INFORMATION.
6 INSTALL NEW PIPE ANCHOR ATTACHED TO FOUNDATION WALL. REFER TO DETAIL 15 ON
STRUCUTRAL DRAWING S-502.
SCALE: 1/4" = 1'-0"3 SECTION SUPPLY FAN DUCT RISER
SCALE: 1/4" = 1'-0"4 SECTION - SUPPLY FAN DUCT RISER
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.