589A7-18-302 Wichita Bid Drawings - 6_Plumbing 1 of 2.pdf
PDF 4 MB Posted
- Solicitation number
- 36C25522R0079
About this file
This solicitation is for a firm fixed-price construction contract to install new boilers at the Robert J. Dole VA Medical Center in Wichita, Kansas. The project involves replacing aging boilers in Building 13 with new high-efficiency models over three phases to maintain operations. Work includes removing existing equipment and piping back to mains, installing new boilers and associated systems, and commissioning the completed system. The solicitation was released by the Department of Veterans Affairs Veterans Health Administration VISN 15. The period of performance is 720 calendar days from Notice to Proceed with a projected award date in late 2022.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8
F
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
(N)3"DOMESTIC
WATER ENTRANCE
(N)6"FIRE WATER
ENTRANCE
4"ICW
S A N
3"DCW
6"F
S D
INV. ELEV. 1348.16'
INV. ELEV. 1342.96'
(MIN 1.00' BELOW FROST)
1 1/2"PC
3"DCW
6"NG
4"SAN
10"HPS
REFER TO SITE CIVIL
PLANS FOR CONTINUATION
REFER TO SITE CIVIL
PLANS FOR CONTINUATION
1 1/2"FOS
1 1/2"FOR
4"PC
(E)4"SAN
1 1/2"HPS
4"HPS10"HPS
3"PC
5"HPS
1 1/2"PC
1 1/2"HPS
3/4"FOR
3/4"FOS
1 1/2"FOS
1 1/2"FOR
INV. ELEV. 18.00'
(ABOVE FINISHED
FLOOR)
INV. ELEV. 1347.96'
(EXISTING FINISHED FLOOR)
6"NG
8"HPS
4"SAN
INV. ELEV. 1347.80'
INV. ELEV. 1351.38'
(FINISHED FLOOR)
INV. ELEV. 1346.08'
INV. ELEV. 1347.75'
(MIN 1.00' BELOW FROST)
INV. ELEV. 1347.38'
INV. ELEV. 1345.36'
(E)3"FM
(E)3"FM TURNED
DOWN TO GRADE
1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES
AND SYMBOLS.
2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.
3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.
4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.
GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs \a tr e x le rm e y e rs
.M R
\D o c u m e n ts
\0
-0
-W ic h it a
B o ile rs
-M E
P -C
E N
T R
A L -R a tr e x le rm e y e rs .r v t
/3
/2
:0
:1
A M
13-PS101
PLUMBING
NEW WORK PLAN
SITE UTILITIES
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 PD AHTM0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"1 PLUMBING PLAN - SITE UTILITIES ENTRANCES
UP
D
C
B
A
E1 E2 E3 E4 E5 E6 E7
EXISTING
PUMP ROOM
13-1
(E )3 F M
(E)3/4"DHW
(E)2"
PHASE 2
REFER TO SITE CIVIL PLANS FOR CONTINUATION
(T)3"WATER
(E)4"SAN UP TO
(E)FLOOR SINK
(E)1"DCW UP
(E)2"SAN UP
(T)3"DCW TO STAY IN
OPERATION UNTIL NEW
WATER ENTRANCE IS
COMISSIONED & IN
OPERATION.
(E)3"DCW
(E)3/4"DCW
(E)4"SAN (E)4"SAN(E)4"SAN
REFER TO SITE
CIVIL PLANS FOR
CONTINUATION
(E)SLEEVE
(N)SLEEVE
(E)4"SAN UP
(E)2"SAN UP
(E)4"SAN THRU
WALL
(E)4"V UP
(E)4"SAN
DROP
(E)WCO
(T)3"DCW RISE
(E)2"DCW
(E)3/4"DHW
(E)3"FM
(E)3"FM
(E)1/2"DHW UP
(E)1/2"DCW UP
(E)3"DCW UP
(E)3/4"DCW UP
(E)3/4"DHW UP
(E)TRASH SUMP PUMP
LOCATED ON BOILER FLOOR
(E)SHOP AIR COMPRESSOR
LOCATED ON BOILER FLOOR
(E)3"FM DROP
(E)3"FM RISE
(E)TRASH SUMP PIT
(E)V RISE
(E)3"FM RISE
(E)2"DCW UP
(E)3/4"DRAIN DROP
(E)2"DCW DROP
(E)2"DCW RISE
(E)2"RPZ
(E)3"FM TURN
DOWN TO
GRADE
(E)2"DCW
(E)1"DRAIN
(E)2"SAN
(E)2"SW
(E)REVERSE OSMOSIS
STORAGE TANK
(E)CHEMICAL TANK
(E)WATER SOFTENER &
BRINE TANK
(E)4"SAN
CONNECT (T)3"DCW
TO (E)2"DCW
(E)2"RPZ
(E)2"DCW RISE
(E)3"DCW UP&DN
(D)2"DCW MAIN
FROM SITE
FOR CONTINUATION
REFER TO
SITE/CIVIL
(T)3"DCW DROP
(T)3"DCW
(T)3"DCW
13-PP101.01
(E)4"SAN
SHOP LEVEL
0' - 0"
TUNNEL LEVEL
-6' - 0"
(E)2"DCW
(E)2"DCW
(T)2"DCW
(D)2"DCW
(T)3"DCW
(E)2"
(E)2"RPZ
(D)2"DCW WATER
ENTRANCE
(E)2"DCW TO
BOILERS
(T)3"DCW
1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES
AND SYMBOLS.
2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.
3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.
4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.
GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs \a tr e x le rm e y e rs
.M R
\D o c u m e n ts
\0
-0
-W ic h it a
B o ile rs
-M E
P -C
E N
T R
A L -R a tr e x le rm e y e rs .r v t
/3
/2
:5
:0
A M
13-PP101.01
PLUMBING
PIPING PLAN
TUNNEL & BSMT LEVELS, PHASE 1
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 Checker Author0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 PLUMBING PLAN - TUNNEL & BASEMENT LEVELS, PHASE 1
SCALE: 1/2" = 1'-0"2 TEMP WATER CONNECTION SECTION VIEW
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
S D
4"SAN
4"SAN
4"SD
4"SD
13-SSP-01,02
13-STP-01,02
SANITARY
DUPLEX
SUMP
PUMPS
STORM
DUPLEX
SUMP
PUMPS
4"FD-E
4"FD-M
4"FCO
4"FCO
4"FCO
6"F
3"DCW
3"DCW
6"F
6"SD
4"SAN4"SAN4"SAN
S A N
S A N
/8
S D
4"SAN UP
TO FD-E
4"SAN UP
TO FD-E
4"SAN UP
TO FD-E
4"SAN UP
TO FD-E
6"SAN UP
TO FD-E
4"SAN UP
TO FD-E
4"SAN UP
TO FD-E
4"SAN UP
TO FD-E
4"SAN UP
TO FD-E
4"FCO
EXISTING
PUMP ROOM
13-1
NEW PUMP
ROOM
B-3
4"SAN UP
TO FD
4"SAN
UP TO
FD
4"SAN
4"SAN
6"SAN6"SAN
3"DCW UP
2"FM UP
FROM
PUMPS
2"FM UP
FROM
PUMPS
2"V UP 2"V UP2"V UP
2"V UP
2"V 2"V 2"V
4"GCO
4"FCO
S A N
2"V
4"FD-E
4"FD-M
3"SAN UP TO MR
REFER TO SITE CIVIL PLANS FOR CONTINUATION
4"SAN
2"V UP 2"V UP
2"V UP
SLEEVE
SLEEVE
SLEEVE
SLEEVE
SLEEVE
SLEEVE
2"FM
2"FM
2"V UP
2"V UP
2"V DN&
RISE
/8
/8
1/8" / 1' - 0"
/8
2"FM DROP
INTO TOP OF
4"SAN.
2"FM DROP INTO
TOP OF 6"SD.
2"V UP
2"V UP
3"SAN DROP INTO
TOP OF PIPE
6"FD-E
4"SAN UP TO FCO
4"SAN UP TO
FD IN TRENCH
4"SAN UP TO
FD IN TRENCH
4"SAN UP
TO FCO
FUEL
OIL
INTERESEPTOR
13-OWS-01
2"SAN UP
6"SD
INV. ELEV. 1347.80'
3"V UP
3"SCW UP
3"SCW TO
MECHANICAL
EQUPMENT
4"SAN
4"SAN
4"SAN 4"SAN
4"SAN
4"SAN UP
TO FCO
1/8" / 1' - 0"
1/8" / 1' - 0"
/8
/8
INV. ELEV. 1348.16' INV. ELEV. 1347.75'
(MIN 1.00' BELOW FROST)
INV. ELEV. 1347.38'
3"SCW
/8
1/8" / 1' - 0"1/8" / 1' - 0"
OFFSET BELOW
TRENCH
OFFSET BELOW
TRENCH
6"SAN 6"SAN
13-PP101.01
1 1
6"SAN
4"SAN
3"SAN
UP
INV. ELEV.
1347.57'
INV. ELEV.
1347.46'
INV. ELEV.
1347.66'
INV. ELEV.
1348.38'
INV. ELEV.
1348.38'
INV. ELEV. 1348.52'
INV. ELEV.
1349.53'
1/8" / 1' - 0"
INV. ELEV.
1331.80'
INV. ELEV.
1331.30'
6"SD
INV. ELEV. 1348.00'
INV. ELEV. 1349.31'
INV. ELEV.
1347.94'
2"V UP
4"SAN UP
TO FCO
INV. ELEV. 1348.33'
4"SAN4"SAN
6"SAN
4"SAN
INV. ELEV. 1349.5'
INV. ELEV. 1348.11'
INV. ELEV. 1349.5'
INV. ELEV. 1347.96'
OFFSET BELOW
TRENCH
4"SAN DROP
INTO TOP OF
6"SAN
42"x42"x7'-0" DEEP SUMP PIT
2"V
3"SAN
2"V
36"x36"x5'-6" DEEP SUMP PIT
S A N
S A N
F M
F M
S A N
/8
4"SAN
2"V
4"SAN
S A N
S A N
S A N
S A N
S A N
S A N
V
6"SAN
4"SAN
6"SAN
1/8" / 1' - 0"
4"SAN
3"V
4"SAN
STORM SUMP PUMPS
CONTROL PANEL
SANITARY SUMP PUMPS
CONTROL PANEL
(T)1 1/2"DCW
(T)1 1/2"DCW
CONNECT (T)1 1/2"DCW TO (E)1 1/2" DCW.
(T)DCW WILL BE INSTALLED FOR THE EXISTING
TOILET ROOM, UNTIL PHASE 3 TOILET ROOM
IS OPERATION.
(T)1 1/2"DCW UP
1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES
AND SYMBOLS.
2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.
3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.
4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.
GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs \a tr e x le rm e y e rs
.M R
\D o c u m e n ts
\0
-0
-W ic h it a
B o ile rs
-M E
P -C
E N
T R
A L -R a tr e x le rm e y e rs .r v t
/3
/2
:5
:1
A M
13-PP101.02
PLUMBING
PIPING PLAN
TUNNEL & BSMT LEVELS, PHASE 2
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 PD AHTM0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 PLUMBING PLAN - TUNNEL & BASEMENT LEVELS, PHASE 2
SHEET KEYNOTES:
1. ALL SANITARY PIPING EXPOSED IN THE BASEMENT SHALL BE CAST IRON.
2. FLOOR ACCESS DOOR ABOVE TO CONTROL ROOM. COORDINATE PIPING TO
PROVIDE CLEAR PATH FOR RIGGING OF EQUIPMENT. REFER TO
ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR ADDITIONAL DETAILS
R E
F
DN
1 2 3 4 5 6 7 8
F
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
3/4"DCW6"FD-E
4"FCO
6"FD-E
4"FD-E
P-801
CONTROL
ROOM
BREAK
ROOM
BATH
ROOM
IT
GENERATOR
ROOM
M-15
TRANSFORMER
ROOM
M-14
I.T. ROOM
M-12
HAC
M-11
OFFICE
M-9
ELECTRICAL
M-13
CONTROL
ROOM
M-8
SECURITY
M-10
BOILER
ROOM
M-18
CORRIDOR
M-16
2"V UP &
DN
2"V UP &
DN
2"V UP &
DN
2"V UP &
DN
2"V UP &
DN ON
COLUMN
4"FCO
3/4"DCW UP
ON COLUMN
3/4"DCW RISE
& DROP
3/4"DCW
DROP IN WALL
4"FCO
P-502
3/4"DCW UP
ON COLUMN
3/4"DCW UP
ON COLUMN
2"V UP
3"DCW UP
3"DCW DN
2"V DN
2"V DN
2"V
2"V
3/4"DCW UP
ON COLUMN
PHASE 3
4"GCO
4"FD-E4"FD-E4"FD-E
4"FD-E4"FD-E
4"FD-E
4"FD-E
2"V UP &
DN
2"V UP &
DN
4"FD-E
3/4"DCW &
3/4"DHW DROP
IN WALL
1-1/2"V UP &
DN IN WALL
3/4"DCW &
3/4"DHW
UP & DROP IN
WALL
4"FD-D
4"FD-D
P-801 P-801
P-804 P-804
P-801
4"FCO
4"FCO
3"SCW UP
& DOWN
6" FP REFER TO FIRE
PROTECTION PLANS
FOR CONTINUATION
3/4"DCW UP
1"DCW &
1"DHW
3"V UP
TEMPORARY
WATER
SOFTENER
FUEL
OIL
INTERESEPTOR
13-WS-0T
13-OWS-01
P-707
P-708
3"V RISE
3"SAN DN
3"SAN UP
TO FD
3"V UP
3"V DN
1"BCA
1"BCA1"BCA1"BCA
1"BCA 1"BCA 1"BCA
1"BCA
RISE
13-BAC-01
3"RPZ
EQUIPMENT
ROOM
M-17
3"DCW UP
3"SCW UP
1"BCA DROP1"BCA DROP1"BCA
DROP
3" DCW UP
4"FCO
4"FCO
13-PP101.01
1-1/2"V UP &
2"SAN DN IN
WALL
3"V UP
3"CO
3/4"DCW
3"SAN
1"BCA
4"GCO
4"FCO
3"FCO
3/4"DCW
3"V
S A N
1"SCA
FOR CONTINUATION
SEE PHASE 3
1"SCA
1"SCA1"SCA
1"SCA
1"SCA
1"SCA
1"SCA
1"SCA DROP
TO HOSE
REEL
1"SCA
DROP TO
HOSE REEL
MAINTAIN OPERATORS AISLE
CLEARANCE DURING ALL
PHASES OF PROJECT.
4"FCO
2"V UP &
DN
(T)1 1/2"DCW DN
(T)1 1/2"DCW UP
1"SCA
1"SCA UP CAPPED
FOR FUTURE HOSE
REEL
1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES
AND SYMBOLS.
2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.
3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.
4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.
GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs \a tr e x le rm e y e rs
.M R
\D o c u m e n ts
\0
-0
-W ic h it a
B o ile rs
-M E
P -C
E N
T R
A L -R a tr e x le rm e y e rs .r v t
/3
/2
:5
:3
A M
13-PP111.02
PLUMBING
PIPING PLAN
SHOP & MAIN LEVELS, PHASE 2
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 PD AHTM0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 PLUMBING PLAN - SHOP & MAIN LEVELS, PHASE 2
SHEET KEYNOTES:
1. FLOOR ACCESS DOOR TO NEW PUMP ROOM BELOW. COORDINATE PIPING
BELOW TO PROVIDE CLEAR PATH FOR RIGGING OF EQUIPMENT. REFER TO
ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR ADDITIONAL DETAILS.
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
DOMESTIC
HOT
WATER
GENERATOR
3"SCW
D H W
2"DHW
2"V DN
2"V DN 2"V DN 2"V DN
2"V UP &
DN ON
COLUMN
3/4"DCW DN 3/4"DCW DN 3/4"DCW DN
3/4"DCW DN
ON COLUMN
2"V DN
2"V DN
V
V
V
3"V UP
4"V UP
VALVE & CAP
FOR PHASE 3
3"DCW 3"DCW
3"SCW
2"DHW
3"SCW
3"DCW
FOR CONTINUATION
SEE MECHANICAL PLANS
P-801
13-DHWG-01
1"DHW
PROVIDE FLUE VENT
UP THRU ROOF
FOR 13-DHWG-01
PHASE 3
S C W
R O S S C W
D H W
R O S S C W
D C W D H W
3"SCW
3"DCW
2"DHW
R O S
S C W
D C W
D H W
1"DHW
1 1/2"DCW
1"DHW
1 1/2"DCW 1 1/2"DCW
1"DHW
1 1/2"DCW
3"SCW
3"DCW
3"V
3"DCW &
3"SCW DN
4"V UP
3"V DN
3"SCW DN
1"DCW &
3/4"DHW DN
3/4"DCW
DROP
3"DCW DN
3/4"DHWR
1 1/2"DCW
1"DHW
BOILER
ROOM
M-18
STORAGE
13-42
3"DCW DN
1"DHW
2"DCW DN
FOR CONTINUATION
SEE PHASE 3
BYPASS
FOR CONTINUATION SEE
MECHANICAL PLANS
4"V UP 4"V UP
3"DCW
2"DHW
3"V UP
3"V DN
3"FD-E
PAN 4"HIGH SIDE BELOW THE
WATER HEATER. PROVIDE LEAK
DETECTION AND ALARM.
FOR CONTINUATION SEE
MECHANICAL PLANS
1/2"SCW
S C W
1/2"SCW
FOR CONTINUATION SEE
MECHANICAL PLANS
FOR CONTINUATION SEE
MECHANICAL PLANS
FOR CONTINUATION SEE
MECHANICAL PLANS
3/4"DHWR
3"V
13-DCP-01
13-DHP-01
13-ET-02
DOMESTIC
HOT
WATER
RECIRCULATION
PUMP
DOMESTIC
COLD
WATER
RECIRCULATION
PUMP
3/4"DCWR
DROP3/4"DCWR
DROP
2"DCW DROP
2"DCW
3"DCW
2"DHW DROP
3/4"DCWR
3/4"DCWR
3/4"DCWR
3/4"DCW DN
-1
13-PP131.02
(T)1 1/2"DCW
DN
(T)1 1/2"DCW DN.
(T)DCW WILL BE INSTALLED FOR THE EXISTING
TOILET ROOM, UNTIL PHASE 3 TOILET ROOM
IS OPERATION.
1"DCW &
2"DHW DN
1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES
AND SYMBOLS.
2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.
3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.
4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.
GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs \a tr e x le rm e y e rs
.M R
\D o c u m e n ts
\0
-0
-W ic h it a
B o ile rs
-M E
P -C
E N
T R
A L -R a tr e x le rm e y e rs .r v t
/3
/2
:1
:2
A M
13-PP121.02
PLUMBING
PIPING PLAN
EX CATWALK & CATWALK LVLS, PH 2
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 PD AHTM0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 PLUMBING PLAN - EXISTING CATWALK & CATWALK LEVELS, PHASE 2
SHEET KEYNOTES:
1. ALL REVERSE OSMOSIS PIPING, VALVES, FITTINGS AND EQUIPMENT TO BE
FABRICATED FROM 304 STAINLESS STEEL.
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
3"VTR
2"VTR
2"VTR
PHASE 3
3"VTR
4"VTR4"VTR4"VTR
3"VTR
4"VTR
3"VTR
1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES
AND SYMBOLS.
2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.
3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.
4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.
GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs \a tr e x le rm e y e rs
.M R
\D o c u m e n ts
\0
-0
-W ic h it a
B o ile rs
-M E
P -C
E N
T R
A L -R a tr e x le rm e y e rs .r v t
/3
/2
:0
:0
A M
13-PP131.02
PLUMBING
PIPING PLAN
ROOF, PHASE 2
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 PD AHTM0499-0121
100% BID SET
SCALE: 1/4" = 1'-0"1 PLUMBING PLAN - ROOF, PHASE 2
H
K
D
C
B
A
E
E1 E2 E3 E5 E6 E7
J
G
EXISTING
PUMP ROOM
B-1
(D)4"4"SAN
PHASE 2
(E)4"SAN(E)4"SAN (E)4"SAN
(E)4"SAN
(E)4"SAN
(E)4"SAN UP TO
(E)FLOOR SINK ON
BOILER FLOOR
(T)3"
(T)3"DCW RISE
(T)3"DCW
(E)SLEEVE
SLEEVE
(D)1"DCW UP
(D)2"SAN UP
(D)4"SAN UP
(D)2"SAN UP(E)4"SAN THRU
WALL. DISCONNECT
PIPING AT WALL
&CAP WITH (N)WCO
(D)4"V UP
(D)4"SAN
DROP
(D)CO
REFER TO SITE CIVIL PLANS FOR CONTINUATION
1/8" / 1' - 0"1/8" / 1' - 0"
(D)2"DCW
(T)3"
(D)3"FM
(D)3"FM
(D)3"FM
(D)3"DCW
(D)3"DCW
(D)SAN
(D)1/2"DHW
(D)3"FM
(R)TRASH
SUMP
PUMP
(E)SUMP PIT
(D)2"BFP
(D)2"DCW UP
(E)2"DCW UP
(E)2"DCW UP.
DISCONNECT
(E)2"BFP AND CAP
AT (T)2"WATER UP.
AFTER PHASE 2 DCW IS COMMISIONED
DISCONNECT & REMOVE TEMP PIPING
BACK SITE. PATCH WALL TO MATCH
EXISTING.(E)2"SCW
UP
(D)2 1/2"SW
CONNECT (T)1 1/2"DCW TO (E)1 1/2" DCW.
(T)DCW WILL BE INSTALLED FOR THE EXISTING
TOILET ROOM, UNTIL PHASE 3 TOILET ROOM
IS OPERATION.
(T)1 1/2"DCW UP
(T)1 1/2"DCW
1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES
AND SYMBOLS.
2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.
3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.
4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.
GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs \a tr e x le rm e y e rs
.M R
\D o c u m e n ts
\0
-0
-W ic h it a
B o ile rs
-M E
P -C
E N
T R
A L -R a tr e x le rm e y e rs .r v t
/3
/2
:5
:3
A M
13-PD101.03
PLUMBING
DEMOLITION PLAN
TUNNEL & BSMT LEVELS, PHASE 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 Checker Author0499-0121
100% BID SET
SCALE: 1/4" = 1'-0"1 PLUMBING DEMOLITION PLAN - TUNNEL & BASEMENT LEVELS, PHASE 3
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
GENERATOR
ROOM
M-15
TRANSFORMER
M-14
I.T. ROOM
M-12
ELECTRICAL
M-13
HAC
M-11
EQUIPMENT
ROOM
M-17
SECURITY
M-10
OFFICE
M-9
CONTROL
ROOM
M-8
CORRIDOR
M-16
CONTROL
ROOM
OFFICE
TOILETBREAK
ROOM
IT
ROOM
BOILER
ROOM
(D)REMOVE FIXTURE &
ALL PIPING BACK TO
MAINS AND CAP
(D)REMOVE FIXTURE &
ALL PIPING BACK TO
MAINS AND CAP
(D)REMOVE FIXTURE &
ALL PIPING BACK TO
MAINS AND CAP
P-801
PHASE 2
(D)2"SAN DN
(D)2"V RISE
(D)1 1/2"SAN DROP
(E)4"FLOOR SINK
ON BOILER FLOOR
(D)1"DCW DN
(D)3/4"DCW DN
(E)WATER SOFTENER, DISCONNECT AND REMOVE ALL PIPING
CONNECTED TO (E)BOILER EQUIPMENT. DO NOT DEMOLITION EXISTING
WATER SOFTENER AND RO UNDER AFTER NEW BOILERS AND
TEMPORARY WATER SOFTENER ARE COMMISIONED.
(D)3"DCW
(D)3"DCW
(D)3"DCW
(D)2"RO
(D)2"RO
(D)2"RO
(D)WATER
SOFTENER
SKID
(D)CHEMICAL
EQUIPMENT
(D)RO
STORAGE
TANK
(D)REMOVE EMERGENCY
FIXTURE & ALL
ASSOCIATED PIPING
(D)REMOVE SINK & ALL
ASSOCIATED PIPING
TEMPORARY
WATER
SOFTENER
FUEL
OIL
INTERESEPTOR
(D)3"DCW
(R)TRASH
SUMP
PUMP
(D)DHWG
(D)EXP
TANK
(D)1"DCW DN
(D)1"DHW DN
(D)2"DCW UP & DN
(D)2"DCW UP
(D)2"DCW UP
(D)2"RPZ
(T)1 1/2"DCW DN
(T)DCW WILL BE INSTALLED FOR THE EXISTING
TOILET ROOM, UNTIL PHASE 3 TOILET ROOM
IS OPERATION.
(T)1 1/2"DCW UP
1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES
AND SYMBOLS.
2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.
3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.
4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.
GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs \a tr e x le rm e y e rs
.M R
\D o c u m e n ts
\0
-0
-W ic h it a
B o ile rs
-M E
P -C
E N
T R
A L -R a tr e x le rm e y e rs .r v t
/3
/2
:5
:4
A M
13-PD111.03
PLUMBING
DEMOLITION PLAN
SHOP & MAIN LEVELS, PHASE 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 Checker Author0499-0121
100% BID SET
SCALE: 1/4" = 1'-0"1 PLUMBING DEMOLITION PLAN - SHOP & MAIN LEVELS, PHASE 3
F F
H H
K K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J J
G G
PHASE 2
(D)2"DCW
(D)2"DCW (D)2"DCW
(D)2"DCW
(D)2"DCW
(D)2"V
(E)4"V
(D)2"DCW DN
(D)2"DCW DN
(D)2"DCW DN
(E)4"V UP
(D)2"V DN
(E)4"V DN
(T)1 1/2"DCW
(T)1 1/2"DCW DN.
(T)DCW WILL BE INSTALLED FOR THE EXISTING
TOILET ROOM, UNTIL PHASE 3 TOILET ROOM
IS OPERATION.
1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES
AND SYMBOLS.
2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.
3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.
4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.
GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs \a tr e x le rm e y e rs
.M R
\D o c u m e n ts
\0
-0
-W ic h it a
B o ile rs
-M E
P -C
E N
T R
A L -R a tr e x le rm e y e rs .r v t
/3
/2
:5
:5
A M
13-PD121.03
PLUMBING
DEMOLITION PLAN
EXISTING CATWALK, PHASE 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 PD AHTM0499-0121
100% BID SET
SCALE: 1/4" = 1'-0"1 PLUMBING DEMOLITION PLAN - EXISTING CATWALK LEVEL
File details come from the government source that posted it. Updated .