589A7-18-302 Wichita Bid Drawings - 6_Plumbing 1 of 2.pdf

PDF 4 MB Posted

Attached to
Z2DA--589A7-18-302 FCA Install New Boilers, Building 13 (VA-22-00049186)
Solicitation number
36C25522R0079
Issued by

About this file

This solicitation is for a firm fixed-price construction contract to install new boilers at the Robert J. Dole VA Medical Center in Wichita, Kansas. The project involves replacing aging boilers in Building 13 with new high-efficiency models over three phases to maintain operations. Work includes removing existing equipment and piping back to mains, installing new boilers and associated systems, and commissioning the completed system. The solicitation was released by the Department of Veterans Affairs Veterans Health Administration VISN 15. The period of performance is 720 calendar days from Notice to Proceed with a projected award date in late 2022.

View the file

Other files

File Type Posted
36C25522R0079 0005.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 2_Civil 1 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil 2 of 3.pdf PDF
36C25522R0079 0004.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 2_Civil 3 of 3.pdf PDF
S02 Pre-Bid Questions Solicitation No 36C25522R0079_VA Response.pdf PDF
36C25522R0079 0003.docx DOCX document
589-18-302 Boiler Pre Bid Attendance.pdf PDF
PROPOSAL SUBMITTAL INSTRUCTIONS 589A7-18-302 REV 08052022.docx DOCX document
36C25522R0079 0002.pdf PDF
589A7-18-302 Wichita Bid Drawings - 3 Structural.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 2 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 3 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 6_Plumbing 2 of 2.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 1 of 4.pdf PDF
36C25522R0079 0001.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 2 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical 4 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 3_Structural (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 4_Architectural (SI) 2 of 2.pdf PDF
S02 P09 - 589A7-18-302 Wichita Bid Specs VOL 3 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 6_Plumbing (SI).pdf PDF
S02 P09 - 589A7-18-302 Wichita Bid Specs VOL 2 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 5 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 6 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 1 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical 3 of 6.pdf PDF
36C25522R0079_1.docx DOCX document
S02 ATTACMENT 3 Past Performance Questionnaire 36C25522R0079 Project 589A7-18-302.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 3 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 2 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 1_Hazardous Materials (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical (SI) 1 of 6.pdf PDF
589A7-18-302 Wichita Bid Drawings - 2_Civil (SI) 1 of 3.pdf PDF
589A7-18-302 Wichita Bid Drawings - 5_ Fire Protection (SI).pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 4 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 8_Electrical 4 of 6.pdf PDF
589A7-18-302 Wichita Bid Specs VOL 1 of 3 (800pgs).pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 2 of 4.pdf PDF
589A7-18-302 Wichita Bid Drawings - 4_Architectural (SI) 1 of 2.pdf PDF
589A7-18-302 Wichita Bid Drawings - 7_Mechanical (SI) 3 of 4.pdf PDF
P07 Wage Determination 20220708.docx DOCX document
589A7-18-302 Wichita Bid Drawings - 0_General (SI).pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 8

F

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

(N)3"DOMESTIC

WATER ENTRANCE

(N)6"FIRE WATER

ENTRANCE

4"ICW

S A N

3"DCW

6"F

S D

INV. ELEV. 1348.16'

INV. ELEV. 1342.96'

(MIN 1.00' BELOW FROST)

1 1/2"PC

3"DCW

6"NG

4"SAN

10"HPS

REFER TO SITE CIVIL

PLANS FOR CONTINUATION

REFER TO SITE CIVIL

PLANS FOR CONTINUATION

1 1/2"FOS

1 1/2"FOR

4"PC

(E)4"SAN

1 1/2"HPS

4"HPS10"HPS

3"PC

5"HPS

1 1/2"PC

1 1/2"HPS

3/4"FOR

3/4"FOS

1 1/2"FOS

1 1/2"FOR

INV. ELEV. 18.00'

(ABOVE FINISHED

FLOOR)

INV. ELEV. 1347.96'

(EXISTING FINISHED FLOOR)

6"NG

8"HPS

4"SAN

INV. ELEV. 1347.80'

INV. ELEV. 1351.38'

(FINISHED FLOOR)

INV. ELEV. 1346.08'

INV. ELEV. 1347.75'

(MIN 1.00' BELOW FROST)

INV. ELEV. 1347.38'

INV. ELEV. 1345.36'

(E)3"FM

(E)3"FM TURNED

DOWN TO GRADE

1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES

AND SYMBOLS.

2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.

3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.

4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.

GENERAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs \a tr e x le rm e y e rs

.M R

\D o c u m e n ts

\0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L -R a tr e x le rm e y e rs .r v t

/3

/2

:0

:1

A M

13-PS101

PLUMBING

NEW WORK PLAN

SITE UTILITIES

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 PD AHTM0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"1 PLUMBING PLAN - SITE UTILITIES ENTRANCES

UP

D

C

B

A

E1 E2 E3 E4 E5 E6 E7

EXISTING

PUMP ROOM

13-1

(E )3 F M

(E)3/4"DHW

(E)2"

PHASE 2

REFER TO SITE CIVIL PLANS FOR CONTINUATION

(T)3"WATER

(E)4"SAN UP TO

(E)FLOOR SINK

(E)1"DCW UP

(E)2"SAN UP

(T)3"DCW TO STAY IN

OPERATION UNTIL NEW

WATER ENTRANCE IS

COMISSIONED & IN

OPERATION.

(E)3"DCW

(E)3/4"DCW

(E)4"SAN (E)4"SAN(E)4"SAN

REFER TO SITE

CIVIL PLANS FOR

CONTINUATION

(E)SLEEVE

(N)SLEEVE

(E)4"SAN UP

(E)2"SAN UP

(E)4"SAN THRU

WALL

(E)4"V UP

(E)4"SAN

DROP

(E)WCO

(T)3"DCW RISE

(E)2"DCW

(E)3/4"DHW

(E)3"FM

(E)3"FM

(E)1/2"DHW UP

(E)1/2"DCW UP

(E)3"DCW UP

(E)3/4"DCW UP

(E)3/4"DHW UP

(E)TRASH SUMP PUMP

LOCATED ON BOILER FLOOR

(E)SHOP AIR COMPRESSOR

LOCATED ON BOILER FLOOR

(E)3"FM DROP

(E)3"FM RISE

(E)TRASH SUMP PIT

(E)V RISE

(E)3"FM RISE

(E)2"DCW UP

(E)3/4"DRAIN DROP

(E)2"DCW DROP

(E)2"DCW RISE

(E)2"RPZ

(E)3"FM TURN

DOWN TO

GRADE

(E)2"DCW

(E)1"DRAIN

(E)2"SAN

(E)2"SW

(E)REVERSE OSMOSIS

STORAGE TANK

(E)CHEMICAL TANK

(E)WATER SOFTENER &

BRINE TANK

(E)4"SAN

CONNECT (T)3"DCW

TO (E)2"DCW

(E)2"RPZ

(E)2"DCW RISE

(E)3"DCW UP&DN

(D)2"DCW MAIN

FROM SITE

FOR CONTINUATION

REFER TO

SITE/CIVIL

(T)3"DCW DROP

(T)3"DCW

(T)3"DCW

13-PP101.01

(E)4"SAN

SHOP LEVEL

0' - 0"

TUNNEL LEVEL

-6' - 0"

(E)2"DCW

(E)2"DCW

(T)2"DCW

(D)2"DCW

(T)3"DCW

(E)2"

(E)2"RPZ

(D)2"DCW WATER

ENTRANCE

(E)2"DCW TO

BOILERS

(T)3"DCW

1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES

AND SYMBOLS.

2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.

3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.

4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.

GENERAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs \a tr e x le rm e y e rs

.M R

\D o c u m e n ts

\0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L -R a tr e x le rm e y e rs .r v t

/3

/2

:5

:0

A M

13-PP101.01

PLUMBING

PIPING PLAN

TUNNEL & BSMT LEVELS, PHASE 1

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 Checker Author0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 PLUMBING PLAN - TUNNEL & BASEMENT LEVELS, PHASE 1

SCALE: 1/2" = 1'-0"2 TEMP WATER CONNECTION SECTION VIEW

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

S D

4"SAN

4"SAN

4"SD

4"SD

13-SSP-01,02

13-STP-01,02

SANITARY

DUPLEX

SUMP

PUMPS

STORM

DUPLEX

SUMP

PUMPS

4"FD-E

4"FD-M

4"FCO

4"FCO

4"FCO

6"F

3"DCW

3"DCW

6"F

6"SD

4"SAN4"SAN4"SAN

S A N

S A N

/8

S D

4"SAN UP

TO FD-E

4"SAN UP

TO FD-E

4"SAN UP

TO FD-E

4"SAN UP

TO FD-E

6"SAN UP

TO FD-E

4"SAN UP

TO FD-E

4"SAN UP

TO FD-E

4"SAN UP

TO FD-E

4"SAN UP

TO FD-E

4"FCO

EXISTING

PUMP ROOM

13-1

NEW PUMP

ROOM

B-3

4"SAN UP

TO FD

4"SAN

UP TO

FD

4"SAN

4"SAN

6"SAN6"SAN

3"DCW UP

2"FM UP

FROM

PUMPS

2"FM UP

FROM

PUMPS

2"V UP 2"V UP2"V UP

2"V UP

2"V 2"V 2"V

4"GCO

4"FCO

S A N

2"V

4"FD-E

4"FD-M

3"SAN UP TO MR

REFER TO SITE CIVIL PLANS FOR CONTINUATION

4"SAN

2"V UP 2"V UP

2"V UP

SLEEVE

SLEEVE

SLEEVE

SLEEVE

SLEEVE

SLEEVE

2"FM

2"FM

2"V UP

2"V UP

2"V DN&

RISE

/8

/8

1/8" / 1' - 0"

/8

2"FM DROP

INTO TOP OF

4"SAN.

2"FM DROP INTO

TOP OF 6"SD.

2"V UP

2"V UP

3"SAN DROP INTO

TOP OF PIPE

6"FD-E

4"SAN UP TO FCO

4"SAN UP TO

FD IN TRENCH

4"SAN UP TO

FD IN TRENCH

4"SAN UP

TO FCO

FUEL

OIL

INTERESEPTOR

13-OWS-01

2"SAN UP

6"SD

INV. ELEV. 1347.80'

3"V UP

3"SCW UP

3"SCW TO

MECHANICAL

EQUPMENT

4"SAN

4"SAN

4"SAN 4"SAN

4"SAN

4"SAN UP

TO FCO

1/8" / 1' - 0"

1/8" / 1' - 0"

/8

/8

INV. ELEV. 1348.16' INV. ELEV. 1347.75'

(MIN 1.00' BELOW FROST)

INV. ELEV. 1347.38'

3"SCW

/8

1/8" / 1' - 0"1/8" / 1' - 0"

OFFSET BELOW

TRENCH

OFFSET BELOW

TRENCH

6"SAN 6"SAN

13-PP101.01

1 1

6"SAN

4"SAN

3"SAN

UP

INV. ELEV.

1347.57'

INV. ELEV.

1347.46'

INV. ELEV.

1347.66'

INV. ELEV.

1348.38'

INV. ELEV.

1348.38'

INV. ELEV. 1348.52'

INV. ELEV.

1349.53'

1/8" / 1' - 0"

INV. ELEV.

1331.80'

INV. ELEV.

1331.30'

6"SD

INV. ELEV. 1348.00'

INV. ELEV. 1349.31'

INV. ELEV.

1347.94'

2"V UP

4"SAN UP

TO FCO

INV. ELEV. 1348.33'

4"SAN4"SAN

6"SAN

4"SAN

INV. ELEV. 1349.5'

INV. ELEV. 1348.11'

INV. ELEV. 1349.5'

INV. ELEV. 1347.96'

OFFSET BELOW

TRENCH

4"SAN DROP

INTO TOP OF

6"SAN

42"x42"x7'-0" DEEP SUMP PIT

2"V

3"SAN

2"V

36"x36"x5'-6" DEEP SUMP PIT

S A N

S A N

F M

F M

S A N

/8

4"SAN

2"V

4"SAN

S A N

S A N

S A N

S A N

S A N

S A N

V

6"SAN

4"SAN

6"SAN

1/8" / 1' - 0"

4"SAN

3"V

4"SAN

STORM SUMP PUMPS

CONTROL PANEL

SANITARY SUMP PUMPS

CONTROL PANEL

(T)1 1/2"DCW

(T)1 1/2"DCW

CONNECT (T)1 1/2"DCW TO (E)1 1/2" DCW.

(T)DCW WILL BE INSTALLED FOR THE EXISTING

TOILET ROOM, UNTIL PHASE 3 TOILET ROOM

IS OPERATION.

(T)1 1/2"DCW UP

1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES

AND SYMBOLS.

2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.

3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.

4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.

GENERAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs \a tr e x le rm e y e rs

.M R

\D o c u m e n ts

\0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L -R a tr e x le rm e y e rs .r v t

/3

/2

:5

:1

A M

13-PP101.02

PLUMBING

PIPING PLAN

TUNNEL & BSMT LEVELS, PHASE 2

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 PD AHTM0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 PLUMBING PLAN - TUNNEL & BASEMENT LEVELS, PHASE 2

SHEET KEYNOTES:

1. ALL SANITARY PIPING EXPOSED IN THE BASEMENT SHALL BE CAST IRON.

2. FLOOR ACCESS DOOR ABOVE TO CONTROL ROOM. COORDINATE PIPING TO

PROVIDE CLEAR PATH FOR RIGGING OF EQUIPMENT. REFER TO

ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR ADDITIONAL DETAILS

R E

F

DN

1 2 3 4 5 6 7 8

F

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

3/4"DCW6"FD-E

4"FCO

6"FD-E

4"FD-E

P-801

CONTROL

ROOM

BREAK

ROOM

BATH

ROOM

IT

GENERATOR

ROOM

M-15

TRANSFORMER

ROOM

M-14

I.T. ROOM

M-12

HAC

M-11

OFFICE

M-9

ELECTRICAL

M-13

CONTROL

ROOM

M-8

SECURITY

M-10

BOILER

ROOM

M-18

CORRIDOR

M-16

2"V UP &

DN

2"V UP &

DN

2"V UP &

DN

2"V UP &

DN

2"V UP &

DN ON

COLUMN

4"FCO

3/4"DCW UP

ON COLUMN

3/4"DCW RISE

& DROP

3/4"DCW

DROP IN WALL

4"FCO

P-502

3/4"DCW UP

ON COLUMN

3/4"DCW UP

ON COLUMN

2"V UP

3"DCW UP

3"DCW DN

2"V DN

2"V DN

2"V

2"V

3/4"DCW UP

ON COLUMN

PHASE 3

4"GCO

4"FD-E4"FD-E4"FD-E

4"FD-E4"FD-E

4"FD-E

4"FD-E

2"V UP &

DN

2"V UP &

DN

4"FD-E

3/4"DCW &

3/4"DHW DROP

IN WALL

1-1/2"V UP &

DN IN WALL

3/4"DCW &

3/4"DHW

UP & DROP IN

WALL

4"FD-D

4"FD-D

P-801 P-801

P-804 P-804

P-801

4"FCO

4"FCO

3"SCW UP

& DOWN

6" FP REFER TO FIRE

PROTECTION PLANS

FOR CONTINUATION

3/4"DCW UP

1"DCW &

1"DHW

3"V UP

TEMPORARY

WATER

SOFTENER

FUEL

OIL

INTERESEPTOR

13-WS-0T

13-OWS-01

P-707

P-708

3"V RISE

3"SAN DN

3"SAN UP

TO FD

3"V UP

3"V DN

1"BCA

1"BCA1"BCA1"BCA

1"BCA 1"BCA 1"BCA

1"BCA

RISE

13-BAC-01

3"RPZ

EQUIPMENT

ROOM

M-17

3"DCW UP

3"SCW UP

1"BCA DROP1"BCA DROP1"BCA

DROP

3" DCW UP

4"FCO

4"FCO

13-PP101.01

1-1/2"V UP &

2"SAN DN IN

WALL

3"V UP

3"CO

3/4"DCW

3"SAN

1"BCA

4"GCO

4"FCO

3"FCO

3/4"DCW

3"V

S A N

1"SCA

FOR CONTINUATION

SEE PHASE 3

1"SCA

1"SCA1"SCA

1"SCA

1"SCA

1"SCA

1"SCA

1"SCA DROP

TO HOSE

REEL

1"SCA

DROP TO

HOSE REEL

MAINTAIN OPERATORS AISLE

CLEARANCE DURING ALL

PHASES OF PROJECT.

4"FCO

2"V UP &

DN

(T)1 1/2"DCW DN

(T)1 1/2"DCW UP

1"SCA

1"SCA UP CAPPED

FOR FUTURE HOSE

REEL

1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES

AND SYMBOLS.

2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.

3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.

4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.

GENERAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs \a tr e x le rm e y e rs

.M R

\D o c u m e n ts

\0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L -R a tr e x le rm e y e rs .r v t

/3

/2

:5

:3

A M

13-PP111.02

PLUMBING

PIPING PLAN

SHOP & MAIN LEVELS, PHASE 2

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 PD AHTM0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 PLUMBING PLAN - SHOP & MAIN LEVELS, PHASE 2

SHEET KEYNOTES:

1. FLOOR ACCESS DOOR TO NEW PUMP ROOM BELOW. COORDINATE PIPING

BELOW TO PROVIDE CLEAR PATH FOR RIGGING OF EQUIPMENT. REFER TO

ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR ADDITIONAL DETAILS.

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

DOMESTIC

HOT

WATER

GENERATOR

3"SCW

D H W

2"DHW

2"V DN

2"V DN 2"V DN 2"V DN

2"V UP &

DN ON

COLUMN

3/4"DCW DN 3/4"DCW DN 3/4"DCW DN

3/4"DCW DN

ON COLUMN

2"V DN

2"V DN

V

V

V

3"V UP

4"V UP

VALVE & CAP

FOR PHASE 3

3"DCW 3"DCW

3"SCW

2"DHW

3"SCW

3"DCW

FOR CONTINUATION

SEE MECHANICAL PLANS

P-801

13-DHWG-01

1"DHW

PROVIDE FLUE VENT

UP THRU ROOF

FOR 13-DHWG-01

PHASE 3

S C W

R O S S C W

D H W

R O S S C W

D C W D H W

3"SCW

3"DCW

2"DHW

R O S

S C W

D C W

D H W

1"DHW

1 1/2"DCW

1"DHW

1 1/2"DCW 1 1/2"DCW

1"DHW

1 1/2"DCW

3"SCW

3"DCW

3"V

3"DCW &

3"SCW DN

4"V UP

3"V DN

3"SCW DN

1"DCW &

3/4"DHW DN

3/4"DCW

DROP

3"DCW DN

3/4"DHWR

1 1/2"DCW

1"DHW

BOILER

ROOM

M-18

STORAGE

13-42

3"DCW DN

1"DHW

2"DCW DN

FOR CONTINUATION

SEE PHASE 3

BYPASS

FOR CONTINUATION SEE

MECHANICAL PLANS

4"V UP 4"V UP

3"DCW

2"DHW

3"V UP

3"V DN

3"FD-E

PAN 4"HIGH SIDE BELOW THE

WATER HEATER. PROVIDE LEAK

DETECTION AND ALARM.

FOR CONTINUATION SEE

MECHANICAL PLANS

1/2"SCW

S C W

1/2"SCW

FOR CONTINUATION SEE

MECHANICAL PLANS

FOR CONTINUATION SEE

MECHANICAL PLANS

FOR CONTINUATION SEE

MECHANICAL PLANS

3/4"DHWR

3"V

13-DCP-01

13-DHP-01

13-ET-02

DOMESTIC

HOT

WATER

RECIRCULATION

PUMP

DOMESTIC

COLD

WATER

RECIRCULATION

PUMP

3/4"DCWR

DROP3/4"DCWR

DROP

2"DCW DROP

2"DCW

3"DCW

2"DHW DROP

3/4"DCWR

3/4"DCWR

3/4"DCWR

3/4"DCW DN

-1

13-PP131.02

(T)1 1/2"DCW

DN

(T)1 1/2"DCW DN.

(T)DCW WILL BE INSTALLED FOR THE EXISTING

TOILET ROOM, UNTIL PHASE 3 TOILET ROOM

IS OPERATION.

1"DCW &

2"DHW DN

1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES

AND SYMBOLS.

2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.

3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.

4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.

GENERAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs \a tr e x le rm e y e rs

.M R

\D o c u m e n ts

\0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L -R a tr e x le rm e y e rs .r v t

/3

/2

:1

:2

A M

13-PP121.02

PLUMBING

PIPING PLAN

EX CATWALK & CATWALK LVLS, PH 2

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 PD AHTM0499-0121

100% BID SET

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 PLUMBING PLAN - EXISTING CATWALK & CATWALK LEVELS, PHASE 2

SHEET KEYNOTES:

1. ALL REVERSE OSMOSIS PIPING, VALVES, FITTINGS AND EQUIPMENT TO BE

FABRICATED FROM 304 STAINLESS STEEL.

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

3"VTR

2"VTR

2"VTR

PHASE 3

3"VTR

4"VTR4"VTR4"VTR

3"VTR

4"VTR

3"VTR

1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES

AND SYMBOLS.

2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.

3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.

4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.

GENERAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs \a tr e x le rm e y e rs

.M R

\D o c u m e n ts

\0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L -R a tr e x le rm e y e rs .r v t

/3

/2

:0

:0

A M

13-PP131.02

PLUMBING

PIPING PLAN

ROOF, PHASE 2

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 PD AHTM0499-0121

100% BID SET

SCALE: 1/4" = 1'-0"1 PLUMBING PLAN - ROOF, PHASE 2

H

K

D

C

B

A

E

E1 E2 E3 E5 E6 E7

J

G

EXISTING

PUMP ROOM

B-1

(D)4"4"SAN

PHASE 2

(E)4"SAN(E)4"SAN (E)4"SAN

(E)4"SAN

(E)4"SAN

(E)4"SAN UP TO

(E)FLOOR SINK ON

BOILER FLOOR

(T)3"

(T)3"DCW RISE

(T)3"DCW

(E)SLEEVE

SLEEVE

(D)1"DCW UP

(D)2"SAN UP

(D)4"SAN UP

(D)2"SAN UP(E)4"SAN THRU

WALL. DISCONNECT

PIPING AT WALL

&CAP WITH (N)WCO

(D)4"V UP

(D)4"SAN

DROP

(D)CO

REFER TO SITE CIVIL PLANS FOR CONTINUATION

1/8" / 1' - 0"1/8" / 1' - 0"

(D)2"DCW

(T)3"

(D)3"FM

(D)3"FM

(D)3"FM

(D)3"DCW

(D)3"DCW

(D)SAN

(D)1/2"DHW

(D)3"FM

(R)TRASH

SUMP

PUMP

(E)SUMP PIT

(D)2"BFP

(D)2"DCW UP

(E)2"DCW UP

(E)2"DCW UP.

DISCONNECT

(E)2"BFP AND CAP

AT (T)2"WATER UP.

AFTER PHASE 2 DCW IS COMMISIONED

DISCONNECT & REMOVE TEMP PIPING

BACK SITE. PATCH WALL TO MATCH

EXISTING.(E)2"SCW

UP

(D)2 1/2"SW

CONNECT (T)1 1/2"DCW TO (E)1 1/2" DCW.

(T)DCW WILL BE INSTALLED FOR THE EXISTING

TOILET ROOM, UNTIL PHASE 3 TOILET ROOM

IS OPERATION.

(T)1 1/2"DCW UP

(T)1 1/2"DCW

1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES

AND SYMBOLS.

2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.

3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.

4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.

GENERAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs \a tr e x le rm e y e rs

.M R

\D o c u m e n ts

\0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L -R a tr e x le rm e y e rs .r v t

/3

/2

:5

:3

A M

13-PD101.03

PLUMBING

DEMOLITION PLAN

TUNNEL & BSMT LEVELS, PHASE 3

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 Checker Author0499-0121

100% BID SET

SCALE: 1/4" = 1'-0"1 PLUMBING DEMOLITION PLAN - TUNNEL & BASEMENT LEVELS, PHASE 3

H

K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J

G

GENERATOR

ROOM

M-15

TRANSFORMER

M-14

I.T. ROOM

M-12

ELECTRICAL

M-13

HAC

M-11

EQUIPMENT

ROOM

M-17

SECURITY

M-10

OFFICE

M-9

CONTROL

ROOM

M-8

CORRIDOR

M-16

CONTROL

ROOM

OFFICE

TOILETBREAK

ROOM

IT

ROOM

BOILER

ROOM

(D)REMOVE FIXTURE &

ALL PIPING BACK TO

MAINS AND CAP

(D)REMOVE FIXTURE &

ALL PIPING BACK TO

MAINS AND CAP

(D)REMOVE FIXTURE &

ALL PIPING BACK TO

MAINS AND CAP

P-801

PHASE 2

(D)2"SAN DN

(D)2"V RISE

(D)1 1/2"SAN DROP

(E)4"FLOOR SINK

ON BOILER FLOOR

(D)1"DCW DN

(D)3/4"DCW DN

(E)WATER SOFTENER, DISCONNECT AND REMOVE ALL PIPING

CONNECTED TO (E)BOILER EQUIPMENT. DO NOT DEMOLITION EXISTING

WATER SOFTENER AND RO UNDER AFTER NEW BOILERS AND

TEMPORARY WATER SOFTENER ARE COMMISIONED.

(D)3"DCW

(D)3"DCW

(D)3"DCW

(D)2"RO

(D)2"RO

(D)2"RO

(D)WATER

SOFTENER

SKID

(D)CHEMICAL

EQUIPMENT

(D)RO

STORAGE

TANK

(D)REMOVE EMERGENCY

FIXTURE & ALL

ASSOCIATED PIPING

(D)REMOVE SINK & ALL

ASSOCIATED PIPING

TEMPORARY

WATER

SOFTENER

FUEL

OIL

INTERESEPTOR

(D)3"DCW

(R)TRASH

SUMP

PUMP

(D)DHWG

(D)EXP

TANK

(D)1"DCW DN

(D)1"DHW DN

(D)2"DCW UP & DN

(D)2"DCW UP

(D)2"DCW UP

(D)2"RPZ

(T)1 1/2"DCW DN

(T)DCW WILL BE INSTALLED FOR THE EXISTING

TOILET ROOM, UNTIL PHASE 3 TOILET ROOM

IS OPERATION.

(T)1 1/2"DCW UP

1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES

AND SYMBOLS.

2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.

3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.

4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.

GENERAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs \a tr e x le rm e y e rs

.M R

\D o c u m e n ts

\0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L -R a tr e x le rm e y e rs .r v t

/3

/2

:5

:4

A M

13-PD111.03

PLUMBING

DEMOLITION PLAN

SHOP & MAIN LEVELS, PHASE 3

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 Checker Author0499-0121

100% BID SET

SCALE: 1/4" = 1'-0"1 PLUMBING DEMOLITION PLAN - SHOP & MAIN LEVELS, PHASE 3

F F

H H

K K

D

C

B

A

E

E1 E2 E3 E4 E5 E6 E7

J J

G G

PHASE 2

(D)2"DCW

(D)2"DCW (D)2"DCW

(D)2"DCW

(D)2"DCW

(D)2"V

(E)4"V

(D)2"DCW DN

(D)2"DCW DN

(D)2"DCW DN

(E)4"V UP

(D)2"V DN

(E)4"V DN

(T)1 1/2"DCW

(T)1 1/2"DCW DN.

(T)DCW WILL BE INSTALLED FOR THE EXISTING

TOILET ROOM, UNTIL PHASE 3 TOILET ROOM

IS OPERATION.

1. REFER TO DRAWING P-001 FOR PLUMBING ABBREVIATIONS, GENERAL NOTES

AND SYMBOLS.

2. REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS.

3. REFER TO DRAWING P-600 SERIES FOR PLUMBING SYSTEMS RISER DIAGRAMS.

4. REFER TO DRAWING P-701 FOR PLUMBING SCHEDULES.

GENERAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

MR PROJECT NO:

NORTHKEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

PROFESSIONAL ENGINEERING CONSULTANTS, P.A.

303 SOUTH TOPEKA, WICHITA, KS 67202

PHONE: (316)262-2691

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

ELECTRONIC SECURITY

MAGNA ENGINEERS

861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503

PHONE: (859)309-2990

PHYSICAL SECURITY

FORCE PROTECT

3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786

PHONE: (502)836-4232

C U s e rs \a tr e x le rm e y e rs

.M R

\D o c u m e n ts

\0

-0

-W ic h it a

B o ile rs

-M E

P -C

E N

T R

A L -R a tr e x le rm e y e rs .r v t

/3

/2

:5

:5

A M

13-PD121.03

PLUMBING

DEMOLITION PLAN

EXISTING CATWALK, PHASE 3

INSTALL NEW BOILERS IN

BUILDING 13

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

589A7-18-302

Project Director

2021-09-03 PD AHTM0499-0121

100% BID SET

SCALE: 1/4" = 1'-0"1 PLUMBING DEMOLITION PLAN - EXISTING CATWALK LEVEL