This document provides details for a federal contract solicitation for mechanical services. The solicitation number is 36C25522R0079 and seeks bids to install new boilers at Building 13 of the Wichita VA Medical Center in Wichita, Kansas. The opportunity type is listed as a solicitation issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. Bids are due based on the response date specified in the solicitation for mechanical services that include installing new boilers at the identified VA medical center location.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL ABBREVIATIONS
& SYMBOLS
M-001
GDSJJM
2 3
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
NO. DESCRIPTION DATE
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0121
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
100% BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANTS INSTALL NEW BOILERS IN
BUILDING 13
589A7-18-302
Project Director
2021-09-03
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
U E
G G G G G G G
W W W
W
W
W W
W W
W W
W W
W
W
WW W W W W W W W
W W
W W
W W
W W
W
W
W W W W W W W W W
W W W W W W W W W W W
W W
W W
W
W
W
W W
W
W W
CITY R.O.W.
U E
W W
W W
W
W W W W W W W W W W W W W W
W W
G G
G G G
W
W
W
W W W
W
F F
F W
W
W
W
W
W
W W
G
G G G G G G G G G G
G
G
G G G G G G G G G G G
G
G
BUILDING 13BUILDING 20
BUILDING 11
BUILDING 12
BUILDING 10 BUILDING 16
PROPOSED BUILDING ADDITION
BUILDING 17
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
NO. DESCRIPTION DATE
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0121
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
100% BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANTS INSTALL NEW BOILERS IN
BUILDING 13
589A7-18-302
Project Director
2021-09-03
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
ENERGY CMPLX
20 12
34, 34A
1B
2A
5B
1A
7A
1C
5A
3A
KEYPLAN
MECHANICAL
SITE PLAN
MS101
GDSMH
EXISTING BUILDING 20
PROPOSED BUILDING 13 ADDITION
EXISTING BUILDING 13
W W
W W
W W
W W
W W
W
W W W W W W W W W W
G G
G G
G G G G G G
W
W
W W W W W W W
W W
W
W
F F
F F
F F
F
W
W W
W W
W W
W
W
W
W W
W
W
W
W
W
W W
W W
W
G
G G G G G G G G G G G
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
NO. DESCRIPTION DATE
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0121
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
100% BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANTS INSTALL NEW BOILERS IN
BUILDING 13
589A7-18-302
Project Director
2021-09-03
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
20 12
34, 34A
1B
2A
5B
1A
7A
1C
5A
3A
MECHANICAL SITE
STEAM TRENCH
ARRANGMENT PLAN & SECTION
MS102
GDSAP
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
NO. DESCRIPTION DATE
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0121
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
100% BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANTS INSTALL NEW BOILERS IN
BUILDING 13
589A7-18-302
Project Director
2021-09-03
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
20 12
34, 34A
1B
2A
5B
1A
7A
1C
5A
3A
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
NO. DESCRIPTION DATE
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0121
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
100% BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANTS INSTALL NEW BOILERS IN
BUILDING 13
589A7-18-302
Project Director
2021-09-03
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
20 12
34, 34A
1B
2A
5B
1A
7A
1C
5A
3A
3-UH-1(E)
RCP(D)
RCP(D)
T
T
T
3-CV-1(E)
3-CV-1(E)
3-UH-1(E)
T
(E)19HWS & HWR UP
CD(E)
CD(E)
TYP(2)
TYP(2)
(D)254Ø
(D)203Ø
(D)203Ø
(E)254Ø
3-ACCU-1
EQUIPMENT
102-A3
3-UH-1(E)
T
3-CV-1(E)
(E)254Ø
T
T
(N)RS/RL DN
CD-2
71 L/s
203Ø
203Ø
(E)19 HWS & HWR UP
CO
3-CV-1(E)
3-UH-1(E)
CD-2
71 L/s
CD(E)
CD(E)
(N)19PC
3-AC-1
3-AC-1
356x305
3-ACCU-1A
03-AC-1A
19PC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4
:3
A
M
03-M-111
MECHANICAL
BUILDING 3
SECURITY EQ. CLOSET
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP MK0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481 MECHANICAL DEMOLITION PLAN - FIRST FLOOR
SCALE: 1 : 482 MECHANICAL NEW WORK PLAN - FIRST FLOOR
SHEET KEYNOTES:
1 DISCONNECT AND REMOVE EXISTING RADIANT CEILING PANEL, ASSOCIATED PIPING, VALVES, CONTROLS, THERMOSTAT. REMOVE PIPING BACK TO RESPECTIVE MAINS. PROVIDE BALL VALVES
WITH CAPS/PLUGS.
2 DISCONNECT AND REMOVE AIR DEVICE AND ASSOCAITED SUPPLY BRANCH DUCTWORK BACK TO
POINT SHOWN FOR CONNECTION IN NEW WORK.
3 19 DIA CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM 1%.
ROUTE TO NEW INDIRECT WASTE DRAIN ABOVE CEILING IN TOILET 109A-3. TERMINATE TO
SANITARY DISCHARGE WITH AIR GAP.
4 PROVIDE 152 CONCRETE EQUIPMENT PAD ON GRADE. REFER TO MECHANICAL DETAIL FOR
ADDITIONAL INFORMATION.
5 REFRIGERANT PIPING (SUCTION & LIQUID) THRU WALL SLEEVE ABOVE CEILING. ROUTE PER
MANUFACTURER'S RECOMMENDATIONS. PROVIDE SUPPORTS AS REQUIRED. SEAL WEATHERTIGHT.
6 REBALANCE EXISTING TERMINAL REHEAT UNIT TO AIRFLOW INDICATED.
7 CONTRACTOR SHALL PROVIDE (N+1) COMPLETE HVAC SYSTEMS FOR SECURITY EQUIPMENT
ROOM 102-X.
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
5. ALL VALVE HANDLES LOCATED GREATER THAN 2134 ABOVE ANY WALKING SURFACE
SHALL BE FITTED WITH A CHAIN WHEEL OPERATOR AND CHAIN. PROVIDE HOOKS TO
STORE CHAIN IN SUITABLE LOCATION.
1 2 3 4 5 6
H
K
D
C
B
A
E
E1 E2 E3 E5 E6 E7
EXISTING
PUMP ROOM
13-1
J
G
NEW PUMP
ROOM
B-3
13-M-301
PHASE 3
13-M-303
13-CRU-1
254x508
EA UP
OED W/WMS
566 L/s CO
CO
13-BDT-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4
:1
A
M
13-MH101.02
MECHANICAL
DUCTWORK PLAN
TUNNEL & BSMT LEVELS, PHASE 2
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481 DUCTWORK PLAN - TUNNEL & BASEMENT LEVELS, PHASE 2
GENERAL SHEET NOTES:
1 MOUNT CO DETECTORS 1372 AFF. CONFIRM QUANITY AND LOCATION OF SENSORS W/ GAS
DETECTION VENDOR TO ENSURE COMPLETE COVERAGE.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
SHEET KEYNOTES:
R
F
1 2 3 4 5 6 7 8
F
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
13-FHX-1 13-FHX-2 13-FHX-3
13-CS-1
13-DA-1
EQUIPMENT
ROOM
M-17
CORRIDOR
M-16
GENERATOR
ROOM
M-15
TRANSFORMER
ROOM
M-14
I.T. ROOM
M-12
ELECTRICAL
M-13
OFFICE
M-9
SECURITY
M-10
HAC
M-11
CONTROL
ROOM
M-8
BOILER
ROOM
M-18
13-FWP-1
13-FWP-2
13-FWP-3
IT
TYP(3)
EA DN/UP
TO 13-EF-5
508x152
SG-1
203 L/s x x
RG-1
106 L/s
CD-2
106 L/s
CD-2
106 L/s
13-DT-1
PHASE 3
RG-2
212 L/s
13-FOP-3/4
13-FOP-1/2
CD-2
106 L/s
13-CTP-2
13-CTP-1
610x356
CO CO CO2 2
457x457
SG-2
614 L/s 457x457
SG-2
614 L/s
28x20 SA
DUCT UP
457x457
SG-2
614 L/s
457x457
SG-2
614 L/s
610x610
SG-2
1133 L/s
BOD
AFF
BOD 2438
AFF
TYP
406x203
203Ø
203Ø
T
13-UH-7
HUNG FROM
STRUCTURE ABOVE
13-L-1
T
T
13-UH-8
13-AC-3
TD OED
W/WMS
ER-2
71 L/s
13-BAC-01
13-UH-8
13-EF-7
13-AC-1
T
T
13-AC-2
254x508
203Ø
CD-2
106 L/s
(BELOW)
(BELOW)
(BELOW)
(BELOW)
(BELOW)
UP TO
13-EF-7
508x152
SG-1
189 L/s
T
T
13-UH-9
13-RTU-1
ATC
FD
EA UP/DN
13-UH-9
T 13-RTU-1
610x305
610x305
RG-4
566 L/s
RG-2
106 L/s
13-AC-2
356x305
508x152
RG-4
189 L/s
FD
FD
356x305
BOD 2438
AFF
711x508
SA UP/DN
SA UP
13-AC-1
203x152
RG-4
254x152
192x192
DN
457x203
UP
UP
203x203
RA DN TO RG
305x305
203Ø
T T13-UH-1/2 13-UH-3/4
711x508
711x508
SA UP
TYP
1219x2134
OA UP
TO
13-GRV-4
305x305
FC
FC
FC
SD
13-M-305
RA UP
RL/RS
8CO
RL/RS
x
19CD
19CD
RL/RS
192x192
203x152 x
EA UP TO
13-GRV-6
203x203
203x203
OA DN. FROM
13-GRV-5
UP
203x152
OVERHEAD DOOR
1067x254
OED
WMS
356x610
SA UP
394x457
13-ERV-1
SA OA
RA EA
13-AC-1A
13-AC-2A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4
:3
A
M
13-MH111.02
MECHANICAL
DUCTWORK PLAN
SHOP & MAIN LEVELS, PHASE 2
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481 DUCTWORK PLAN - SHOP & MAIN LEVELS, PHASE 2
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 INSTALL NEW TEMPORARY 102 DIA NATURAL GAS PIPING IN PHASE 1. REFER TO CIVIL
DRAWINGS FOR CONTINUATION. NATURAL GAS PIPE TO BE A MINIMUM OF 2102 BELOW RAMP
FOOTINGS, COORDINATE WITH STRUCTURAL DRAWINGS.
2 MOUNT CO DETECTORS 1372 AFF. CONFIRM QUANITY AND LOCATION OF SENSORS W/ GAS
DETECTION VENDOR TO ENSURE COMPLETE COVERAGE.
4 LOCATE SUPPLY GRILLE WITHIN 305 AFF.
5 19 DIA CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM 1%.
ROUTE DOWN TO MOP SINK. TERMINATE WITH AIR GAP.
6 TRANSITION DUCTED LOUVER CONNECTION TO NEW GENERATOR PER MANUFACTURER'S
RECOMMENDATIONS. FILED VERIFY OFFSET AND FINAL DIMENSIONS. REFER TO CONTROLS DETAIL
FOR ADDITIONAL INFORMATION.
7 PROVIDE NEW ATC PANEL WITH DEDICATED POWER THIS LOCATION. REFER TO ELECTRICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
8 REFRIGERANT PIPING (SUCTION & LIQUID) UP THRU ROOF PIPE PORTAL. PROVIDE SEPARATE
BOOT FOR EACH PIPE. ROUTE PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE SUPPORTS
AS REQUIRED.
9 BOTTOM OF DUCT TO BE 152 ABOVE THE TOP OF THE OVERHEAD DOOR.
10 INSTALL THERMOSTAT 1321 AFF.
11 CONTRACTOR SHALL PROVIDE (N+1) COMPLETE HVAC SYSTEMS FOR SECURITY M-10 AND IT
ROOM M-12.
12 GENERATOR EXHAUST MUFFLER.
13 GENERATOR EXHAUST DISCHARGES UP. REFER TO DETAIL 12 ON DRAWING M-503. REFER TO
STRUCTURAL DRAWINGS FOR SUPPORT DETAILS.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
5. ALL VALVE HANDLES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE
LOCATION WITH ALL TRADES.
1 2 3 4 5 6 7
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
13-M-301
13-M-302
STORAGE
13-42
BOILER
ROOM
M-18
13-CS-1
13-DA-1
13-UH-5
13-UH-1 13-UH-2 13-UH-3
13-UH-4
13-FHX-1
13-FHX-2
13-FHX-3
13-UH-6
13-M-303
PHASE 3
13-M-302
13-M-304
13-M-304
(ABOVE
PLATFORM)
NG
NG
CO
508x711 762x762 508x711 x
508x711DN
DN
711x508
711x508
DN
CO
254x508
DN
T13-UH-6
13-EF-1
VFD
T
1067x1067 SA UP 1067x1067
13-SF-1
VFD
13-SF-2
VFD
13-EF-2
VFD
610x610
SG-2
1133 L/s
SA UP
T
305x305
EA UP TO
13-EF-5
13-M-305
610x610
SG-4
1133 L/s
457x457
SG-12
614 L/s 457x457
SG-9
614 L/s
711x508
DN
457x457
SG-2
614 L/s
457x457
SG-2
614 L/s
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:0
:0
A
M
13-MH121.02
MECHANICAL
DUCTWORK PLAN
EX CATWALK & CATWALK LVLS, PH 2
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481 DUCTWORK PLAN - EXISTING CATWALK & CATWALK LEVELS, PHASE 2
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 MOUNT CO DETECTORS 1372 AFF. CONFIRM QUANITY AND LOCATION OF SENSORS
W/ GAS DETECTION VENDOR TO ENSURE COMPLETE COVERAGE.
2 MOUNT NATURAL GAS DETECTOR 305 BELOW CEILING. CONFIRM QUANITY AND
LOCATION OF SENSORS WITH GAS DECTECTION VENDOR TO ENSURE COMPLETE
COVERAGE.
3 INSTALL CO DETECTS AT BREATHING LEVEL ABOVE THE NEW CATWALK. CONFIRM
QUANITY AND LOCATION OF SENSORS WITH GAS DECTECTION VENDOR TO ENSURE
COMPLETE COVERAGE.
4 COORDINATE ROUTING OF DUCTWORK WILL ALL TRADES.
5 PROVIDE 76 DIA INTAKE AND EXHAUST CPVC PIPE CONNECTIONS TO 102 DIA
CPVC CONCENTRIC VENT KIT FOR NEW CONDENSING HOT WATER HEATER. ROUTE
AND INSTALL PER HOT WATER HEATER MANUFACTURER'S RECOMMENDATIONS AND
INTERNATIONAL FUEL GAS CODE. EXTEND THRU ROOF MINIMUM 305. TERMINATE
WITH RAIN CAP.
6 REFER TO SHEET 13-M-131.02 FOR ROOF PLAN NEW WORK THIS AREA.
7 INSTALL THERMOSTAT 1321 AFF.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
1 2 3 4 5 6
H
K
D
C
B
A
E
E1 E2 E3 E5 E6 E7
J
G
13-M-301
13-M-303
EXISTING
PUMP ROOM
13-1
NEW PUMP
ROOM
B-3
102" PC UP
152 SV UP
51 BD
DOWN FROM
MAIN LEVEL
PIPING IN BOILER
ROOM TRENCH
REFER TO DRAWING
MP111.02 FOR CONTINUATION
51FOR
51FOS
76PC
PHASE 3
(E)254 HPS DOWN
FROM MAIN LEVEL
(E)102HPS
(E)102CR
51FOS
102PC
51FOR
(E)19 FOS/FOR
51FOS
51FOR
(E) 38 FOS & 38 FOR
REFER TO DRAWINGS
MP121.02, MP604 & MP605 FOR
ADDITIONAL DETAILS
(E)203 HPS DOWN FROM
MAIN LEVEL
REFER TO MP101.03
FOR SCOPE OF WORK
REFER TO DRAWINGS
MS101, MS102
& CIVIL DRAWINGS FOR
CONTINUATION
203HPS DOWN
FROM MAIN LEVEL
76PC
76V
76V UP
38PC
51PC
13-CRU-1
(E)254HPS
102PC
102PC
(E)203FP MAIN
TO REMAIN AS
REFER TO DETAIL 9
ON DRAWING M-502
FOR PIPING DETAILS IN
THIS AREA
38FOS
38FOR
102V UP
102V UP
152SV
102PC
38FOS
38FOR
127HPS
STEAM TRAP
203HPS
(E)19FOS 19"FOR
51FOS
51FOR
TO EMERGENCY
GENERATOR
DRIP LEG
127PC 127PC
127PC
13-BDT-1
51BD
102 OFL
DOWN FROM
MAIN LEVEL
102 OFL PIPING
IN TRENCH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4
:1
A
M
13-MP101.02
MECHANICAL
PIPING PLAN
TUNNEL & BSMT LEVELS, PHASE 2
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481 PIPING PLAN - TUNNEL & BASEMENT LEVELS, PHASE 2
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
5. ALL VALVE HANDLES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE
LOCATION WITH ALL TRADES.
SHEET KEYNOTES:
1 EXTEND EXISTING 102 CONDENSATE PIPE (PC) TO NEW PUMP ROOM. PIPING TO BE INSTALLED
IN PHASE 2. KEEP PIPE AS CLOSE TO WALL AS POSSIBLE, COORDINATE ROUTING WITH
EXISTING CONDITIONS.
2 CONNECT EXISTING 19FOS & 19FOR TO RELOCATED EMERGENCY GENERATOR. PIPING TO BE
INSTALLED IN PHASE 2. PROVIDE NEW STEEL PIPE SLEEVES & LINK SEAL IN ANNUAL SPACE.
REFER TO ELECTRICAL DRAWING 13-EP101.01 FOR GENERATOR RELOCATION SCOPE.
3 EXISTING 203 DIA HPS SERVING THE NORTH LOOP. REFER TO MPD101.03 FOR SCOPE OF
WORK DETAILS.
4 EXTEND EXISTING CONDENSATE RETURN LINE FROM EXIT OF EXISTING TRENCH AT FOUNDATION
WALL TO NEW 102 CR MAIN.
5 INSTALL NEW 38 DIA. PC FROM THE BOTTOM OF THE EXISTING PC RISER NEXT TO THE STAIRS
DOWN TO LOWER LEVEL, CONNECT INTO THE EXTENDED 102 PC IN LOWER LEVEL AND TO PC
FROM BUILDING 12. REFER TO DRAWING MP603 FOR ADDITIONAL DETAILS.
6 PIPES THROUGH FOUNDATION WALL. PROVIDE SCH 40 PIPE SLEEVE AND LINK SEAL IN
ANNULAR SPACE. REFER TO DETAIL 6 ON DRAWING M-506.
7 51 FOR DOWN FROM 13-FOP-1/2 TO STORAGE TANKS.
8 51 FOS FROM STORAGE TANKS UP.
9 38 FOS DOWN FROM 13-FOP-1/2 TO BOILER FUEL OIL LOOP.
10 38 FOR FROM BOILERS FUEL OIL LOOP UP.
11 102 DIA VALVED TAP FOR FUTURE. PROVIDE BLIND FLANGE.
12 FLOOR ACCESS DOOR ABOVE TO CONTROL ROOM. COORDINATE PIPING TO PROVIDE CLEAR PATH
FOR RIGGING OF EQUIPMENT. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR
ADDITIONAL DETAILS.
13 INSTALL NEW PIPE ANCHOR ATTACHED TO FOUNDATION WALL. REFER TO DETAIL 15 ON
STRUCUTRAL DRAWING S-502.
14 REFER TO MH SERIES DRAWINGS FOR GAS DETECTION SENSOR LOCATIONS.
15 102 OFL TO SEPARATE BLOWDOWN TANK CONNECTION. REFER TO DRAWING MP601 AND
MP-603 FOR ADDITIONAL DETAILS.
R
F
1 2 3 4 5 6 7 8
F
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
13-M-301
13-M-302
13-M-303
13-M-303
13-M-302
13-M-304
13-M-304
13-CS-1
13-DA-1
EQUIPMENT
ROOM
M-17
CORRIDOR
M-16
GENERATOR
ROOM
M-15
TRANSFORMER
ROOM
M-14
I.T. ROOM
M-12
ELECTRICAL
M-13
OFFICE
M-9
SECURITY
M-10
HAC
M-11
CONTROL
ROOM
M-8
BOILER
ROOM
M-18
13-FWP-1
13-FWP-2
13-FWP-3
EXISTING
NATURAL GAS TRAIN
CONTROL
ROOM
BREAK
ROOM
BATH
ROOM
IT
ROUTE PIPING ALONG WALL
ON UNISTRUT
51FOS & 51FOR DN.
25FOS/25FOR
DOWN FROM ABOVE
13-DT-1
152SV UP FROM
BELOW
152SV UP TO ROOF
102PC UP
FROM BELOW
203 HPS UP/DN
102V UP
FROM BELOW
UP TO ROOF
BFW UP
BFW UP
BFW RISE
UP
76NG
76NG
BFW UP
152 SV-1 & SV-2
UP THRU ROOF 152 SV-3 &
SV-4
UP THRU ROOF
152 SV-5 & SV-6
UP THRU ROOF
PHASE 3
76V
UP/DN
13-FOP-3/4
13-FOP-1/2
38FOR
38FOS
102 TEMPORARY
NAT. GAS UP
13-CTP-2
13-CTP-1
203 HPS DOWN
FROM ABOVE
102PC DOWN TO
13-CS-1
(SURGE TANK)
102 SV UP
THRU ROOF
PC DOWN
FROM
ABOVE
38FOS/ 38FOR
DOWN FROM
ABOVE
152NG DOWN
TO MAIN LEVEL
19 MPC
UP
19 LPS
DOWN FROM ABOVE
13-UH-7
51BD
51BD51BD
51SBO
51SBO
13-UH-8
13-BAC-01
19MPR
13-AC-1
13-AC-2
38FOS & 51FOR DN.
(BELOW)
(BELOW)
(BELOW)
(BELOW)
(BELOW)
6 7
13-UH-9
(TYP.)
FUEL OIL PIPING
IN TRENCH
(IN TRENCH)
38FOS
38FOS/38FOR
DOWN TO 13-FOP-19
51BD 51BD
51BD
TO DRAIN
76 DAY TANK VENT
UP THRU ROOF
(E)32PC
IN TRENCH TO
REMAIN AS IS
4 4
51BFW DN. 51BFW DN.51BFW DN.
51BD
REFER TO
DRAWING MP121.02
FOR CONTINUATION
(TYP.)
(E)LPG UP
(E)LPG
SHUT-OFF
VALVE
(E)LPG
CYLINDER
W/REGULATOR
51BD
DOWN1717
(TYP.)
13-B-313-B-213-B-1
CO
13-AC-1A
13-AC-2A20
102OFL
51BD
51BD
102OFL
102OFL
DOWN FROM ABOVE
102OFL DOWN
102OFL DOWN TO TRENCH
EXHAUST MUFFLER
REFER TO MH111.02
FOR ADDITIONAL DETAILS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4
:4
A
M
13-MP111.02
MECHANICAL
PIPING PLAN
SHOP & MAIN LEVELS, PHASE 2
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481 PIPING PLAN - SHOP & MAIN LEVELS, PHASE 2
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 NEW PIPING TRENCH. REFER TO ARCHITECTURAL/STRUCTURAL DRAWINGS FOR DETAILS.
2 INSTALL NEW TEMPORARY 102 DIA NATURAL GAS PIPING IN PHASE 1. REFER TO CIVIL
DRAWINGS FOR CONTINUATION. NATURAL GAS PIPE TO BE A MINIMUM OF 2102 BELOW RAMP
FOOTINGS, COORDINATE WITH STRUCTURAL DRAWINGS.
3 CONNECTIONS FOR FUTURE TEMPORARY BOILER. ALL CONNECTIONS SHALL BE PROVIDED WITH
ISOLATION VALVE AND BLIND FLANGE. COORDINATE LOCATION WITH ALL TRADES.
4 GAS TRAIN VENTS UP THROUGH ROOF. VENTS MUST BE A MINIMUM OF 3048 FROM ANY
INTAKES. SIZE VENTS PER SCHEDULE ON DETAIL #2 ON DRAWING MP504.
5 NEW 152 UNDERGROUND NATURAL GAS MAIN. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION.
6 152 DIA NATURAL GAS UP.
7 152 DIA MAXON VALVE. REFER TO DRAWING MP604 FOR ADDITIONAL DETAILS.
8 102 TANK SURGE TANK BYPASS CONNECT TO CONDENSATE TRANSFER PUMP SUCTION HEADER.
PROVIDE SEPARATE VALVED PIPE TO DRAIN. REFER TO DRAWING MP603 FOR ADDTIONAL
DETAILS.
9 REFER TO DRAWINGS MP604 & MP605 FOR FUEL OIL FLOW DIAGRAMS.
10 PROVIDE DRIP PAN ELBOW PER DETAIL 8 ON DRAWING M-503.
11 BOILER MASTER CONTROL PANEL.
12 FUEL OIL PIPING IN TRENCH. REFER TO DRAWING MP101.02 FOR CONTINUATION.
13 TEMPORARY 102 NATURAL GAS DOWN FROM ABOVE. REFER TO DRAWING MP121.02. PIPING
INSTALLED IN PHASE 1.
14 INDICATES BOILER CLEARANCE REQUIREMENTS.
15 FLOOR ACCESS DOOR TO NEW PUMP ROOM BELOW. COORDINATE PIPING BELOW TO PROVIDE
CLEAR PATH FOR RIGGING OF EQUIPMENT. REFER TO ARCHITECTURAL AND STRUCTURAL
DRAWINGS FOR ADDITIONAL DETAILS.
16 BOILER SAFETY RELIEF VALVES. REFER TO DRAWING MP601 FOR ADDITIONAL DETAILS.
17 FEEDWATER PIPING UP TO FLUE STACK ECONOMIZER. REFER TO DRAWINGS MP121.02 AND
MP601 FOR ADDTIONAL DETAILS.
18 TEMPORARY WATER TREATMENT SKID. REFER TO PLUMBING DRAWINGS FOR ADDITIONAL
INFORMATIONS.
19 38FOS/FOR UP. REFER TO DRAWING MP121.02 FOR CONTINUATION.
20 CONTRACTOR SHALL PROVIDE (N+1) COMPLETE HVAC SYSTEMS FOR SECURITY M-10 AND IT
ROOM M-12.
21 REFER TO MH SERIES DRAWINGS FOR GAS DETECTION SENSOR LOCATIONS.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.
1 2 3 4 5 6 7
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
13-M-301
13-M-301
13-M-302
13-M-303
13-M-303
13-M-302
13-M-304
13-M-304
STORAGE
13-42
BOILER
ROOM
M-18
203 HPS DOWN
TO MAIN LEVEL
102PC DOWN TO 13-CS-1
(SURGE TANK)
102 SV UP THRU ROOF
13-CS-1
SAFETY RELIEF VALVE
152 SV UP
THRU ROOF
13-DA-1
38 SV UP
THRU ROOF
76 FWPD
RISER
102 SV UP
THRU ROOF
SAFETY RELIEF VALVE SV-11
REFER TO DETAIL 8/M-503
1/3-2/3 PRV STATION
FOR 13-DA-1
13-UH-5
13-UH-1 13-UH-2 13-UH-3
13-UH-4
152 SV-1 & SV-2
UP THRU ROOF
152 SV-3 & SV-4
UP THRU ROOF
152 SV-5 & SV-6
UP THRU ROOF
UP FROM BOILER
13-B-1
UP FROM BOILER
13-B-2
UP FROM
BOILER
13-B-3
76NG 76NG 76NG
102HPS
13-FHX-1
13-FHX-2
13-FHX-3
610 STACK UP
THRU ROOF
610 STACK UP
THRU ROOF
610 STACK UP
THRU ROOF
(BYPASS)
76HPS 38HPS
254HPS
38HPS
38HPS
13-UH-6
38HPS
PHASE 3
152SV UP FROM
BELOW
152SV UP TO ROOF
102PC UP
FROM BELOW
203 HPS DN
32LPR
(E)PIPING ON RACK
TO BUILDING 12
76HPS
32LPR
254HPS
25LPR
(E)38HPS
(E)38PC
51SV UP
FROM CRU-1
102PC
PC DOWN
TO MAIN LEVEL
38FOS/FOR
DOWN TO MAIN LEVEL
51SV VTR
NEW 102 NATURAL GAS LINE
UP FROM BELOW
13-STS-1
559HPS
UP THRU ROOF
51FWPD
32LPR
38LPR19LPR
19LPR
152NG
152NG DOWN
TO MAIN LEVEL
254HPS
(ABOVE
PLATFORM)
254HPS DOWN
76CPTD
76FWPD
51FWPD
76FWPD 51FWPD
19LPR
NG
DN
DN
19 LPR
UP FROM EQUIP.
ROOM
PIPE
RISE
19LPR
PIPING IN
CEILING SPACE
PIPING BELOW
STAIRS
PIPE
RISE
51V
51V
(UP)
51V
25SBO
25SBO
12 (TYP)
12(TYP) (TYP)
DN. TO TRENCH
DN. TO TRENCH
51V
51V
51V
152NG
152NG
(TYP.)
102PC
102V UP FROM
BELOW, VTR
25 NG DOWN TO
13-DHWG-1
13-EF-2
25NG
(E)38HPS DN.
(E)38HPS
254HPS
152LPS
203HPS
H P S
152NG
254HPS
203HPS
203HPS
203HPS
203HPS
(TYP.)
203HPS203HPS
51LPS
102OFL DN.
TO MAIN LEVEL
13-PRV-2
13-SV-11
51HPS
51LPS
254HPS
203HPS
19LPS
32LPS
REFER TO DRAWING MP111.02
FOR CONTINUATION
203HPS
19LPG
(E)25 LPG
DOWN
102NG
102NG DOWN
18 51V
76SV UP
THRU ROOF
38FOS
38FOR
REFER TO SHEET 13-M-131.02
FOR WORK THIS AREA.
51LPS
38LPS
32LPS
76CPTD
(2)
254HPS
(STACKED)
102OFL
102OFL DOWN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4
:4
A
M
13-MP121.02
MECHANICAL
PIPING PLAN
EX CATWALK & CATWALK LVLS, PH 2
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481 PIPING PLAN - EXISTING CATWALK & CATWALK LEVELS, PHASE 2
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 EXISTING UTILITY RACK TO REMAIN AS IS. PROTECT DURING CONSTRUCTION.
2 CONNECT NEW 38 DIA HPS TO EXISTING STEAM FEEDING BUILDING 12.
3 CONNECT NEW 38 HPS TO EXISTING 38 HPS FEEDING BUILDING 20. COORDINATE ROUTING
WITH EXISTING CONDITIONS.
4 COORDINATE ROUTING OF TEMPORARY 102 DIA. GAS LINE THROUGH EXISTING PLANT WITH
EXISTING CONDITIONS.
5 SLOPE DEARATOR OVERFLOW TO CONDENSATE SURGE TANK. SLOPE 1%.
6 DOWN TO FEEDWATER PUMP SUCTION HEADER. (DEAERATOR BYPASS). REFER TO DRAWING
MP602 FOR ADDITIONAL DETAILS.
7 102PC (SURGE TANK BYPASS TO DEAERATOR). REFER TO DRAWING MP602 & MP603 FOR
ADDITIONAL DETAILS.
8 102 DIA SURGE TANK BYPASS. REFER TO DRAWING MP603 FOR ADDITIONAL DETAILS.
9 ALL ISOLATION VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE.
10 INSTALL PIPE THROUGH THE WALL INTO THE EXISTING PLANT IN PHASE 2. PROVIDE
TEMPORARY CAP.
11 MOUNT NATURAL GAS DETECTOR 305 BELOW CEILING. CONFIRM QUANITY AND LOCATION OF
SENSORS WITH GAS DECTECTION VENDOR TO ENSURE COMPLETE COVERAGE.
12 6 STAINLESS STEEL TUBING CONNECTION FOR SAMPLE COOLER LOCATED AT SINK.
13 152 DIA NATURAL GAS PIPE UP FROM BELOW.
14 PROVIDE DRIP PAN ELBOW PER DETAIL 8 ON DRAWING M-503.
15 102 TANK SURGE TANK BYPASS CONNECT TO CONDENSATE TRANSFER PUMP SUCTION HEADER.
PROVIDE SEPARATE VALVED PIPE TO DRAIN. REFER TO DRAWING MP603 FOR ADDTIONAL
DETAILS.
16 NATURAL GAS PRESSURE REGULATOR 10 PSIG TO 305 W.C. FOR 13-DHWG-01. PROVIDE
RELIEF VENT UP THROUGH ROOF.
17 REFER TO PLUMBING DRAWINGS FOR VENTING FOR GAS FIRED DOMESTIC WATER HEATER.
18 GAS TRAIN VENTS UP THROUGH ROOF. VENTS MUST BE A MINIMUM OF 3048 FROM ANY
INTAKES. SIZE VENTS PER SCHEDULE ON DETAIL #2 ON DRAWING MP504.
19 PRV STATION FOR DEAERATOR. REFER TO DRAWING MP602 FOR FLOW DIAGRAM.
20 152 DIA VALVED SPARE CONNECTION WITH 300# BLIND FLANGE.
21 STEAM FLOW METER. REFER TO DRAWING MP601 FOR PIPING DETAILS. INSTALL SHALL MEET
THE MANUFACTURERS REQUIREMENTS FOR UPSTREAM AND DOWNSTREAM STRIAGHT PIPE.
22 CONNECT TO EXISTING 254 DIA HPS LINE AT THE ELBOW AT THE TOP OF RISER. WORK TO BE
PERFORMED AFTER THE NORTH LOOP WORK HAS BEEN COMPLETED AND PLACED IN SERVICE.
23 CONTRACTOR SHALL EXTEND THE EXISTING LPG GAS PIPING, AS INDICATED ON THE PLANS IN
THE EXISTING BOILER PLANT TO NEW BOILERS. REFER TO DETAIL 2 ON DRAWING MP604 FOR
ADDITIONAL DETAILS. ALL LPG PIPING SHALL MEET ALL NFPA 58 REQUIREMENTS. COORDINATE
ROUTING WITH EXISTING CONDITIONS.
24 ALL MAIN STEAM VALVES TO HAVE 25 BYPASS LINE WITH GLOBE VALVE FOR WARM-UP. NOT
SHOWN FOR CLARITY.
25 38FOS/FOR UP. REFER TO DRAWING MP111.02 FOR CONTINUATION.
26 76 CTPD - DA TANK BYPASS DOWN TO FEEDWATER PUMP SUCTION HEADER.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM.
1 2 3 4 5 6 7 8
H
K
D
C
B
A
E
E1 E2 E3 E4 E5 E6 E7
J
G
13-M-301
13-M-302
13-M-303
13-M-303
13-M-302
13-EF-1
13-EF-2609 BOILER STACK
558 HPS
(SILENCER DISCHARGE)
609 BOILER STACK609 BOILER STACK
13-GRV-1 13-GRV-2 13-GRV-3
13-GRV-4
152 SV
UP FROM BELOW
101 SV UP
FROM BELOW
DA PRV RELIEF VALVE
152 SV UP FROM
SV-1 & SV-2 13-EF-6
152 SV UP
FROM SV-11
ON 13-DA-1
101 VENT UP
FROM 13-CS-1
RE:DRAWING MP121.02
152 SV UP FROM
SV-3 & SV-4
152 SV UP FROM
SV-5 & SV-6
13-RTU-1
PHASE 3
38 SV UP
FROM DA
76 V UP
FROM BELOW1
TYP(10)
13-SF-213-SF-1
50 VENT UP FROM
BOILER GAS TRAIN
13-GRV-5
13-GRV-6
13-EF-7
19 SAFETY RELIEF
VENT
UP FROM NATURAL GAS
REGULATOR
102 SV
UP FROM BELOW
50 VENT UP FROM
BOILER GAS TRAIN
50 VENT UP FROM
BOILER GAS TRAIN
(TYP)
(LOW ROOF)
(HIGH ROOF)
76SV
RL/RS DN
(N)RL/RS
8 8 8
102Ø
CONENTRIC
VENT UP
FROM
BELOW
13-EF-5
76 SV UP
FROM PRV-2
13-ACCU-3
13-ACCU-1
13-ACCU-2
13-ACCU-1A 13-ACCU-2A 9
304x304 EA
UP FROM BELOW
203x203 EA
UP FROM BELOW
304x304 EA
UP FROM BELOW
203x203
OA DOWN
GENERATOR
EXHAUST STACK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4
:3
A
M
13-M-131.02
MECHANICAL
NEW WORK PLAN
ROOF, PHASE 2
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481 MECHANICAL NEW WORK PLAN - ROOF, PHASE 2
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 REFER TO DETAIL 8 ON DRAWING M-503 FOR SAFTEY RELIEF VALVE VENT TERMINATION.
2 PROVIDE 457 HIGH WIND RATED EQUIPMENT RAIL.
3 GAS TRAIN VENTS UP THROUGH ROOF. VENTS MUST BE A MINIMUM OF 3048 FROM ANY
INTAKES. SIZE VENTS PER SCHEDULE ON DETAIL #2 ON DRAWING MP504.
4 REFER TO DETAIL 1 ON DRAWING M-502 FOR ADDITIONAL INFORMATION.
5 REFER TO DETAIL 2 ON DRAWING M-502 FOR ADDITIONAL INFORMATION.
6 PROVIDE CONDENSATE DRAIN PIPING WITH 102 DEEP TRAP. DISCHARGE TO CONCRETE SPLASH
BLOCK WITH EPDM SLIP SHEET.
7 REFRIGERANT PIPING (SUCTION & LIQUID) UP THRU ROOF PIPE PORTAL. PROVIDE SEPARATE
BOOT FOR EACH PIPE. ROUTE PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE SUPPORTS
AS REQUIRED.
8 EQUIPMENT HEIGHT SHALL BE ATTACHED TO ROOF STRUCTURE WITH 193 KPH RATED
GALVANIZED STEEL CABLE GUY WIRES. ANCHOR AT THREE POINTS.
9 CONTRACTOR SHALL PROVIDE (N+1) COMPLETE HVAC SYSTEMS FOR SECURITY M-10 AND IT
ROOM M-12.
10 GENERATOR EXHAUST DISCHARGES UP. REFER TO DETAIL 12 ON DRAWING M-503. REFER TO
STRUCTURAL DRAWINGS FOR SUPPORT DETAILS.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.
1 2 3 4 5 6 7 8
H
K
D
C
B
A
E
E1 E2 E3 E5 E6 E7
J
G
NEW PUMP
ROOM
B-4
EXISTING
PUMP ROOM
B-1
PHASE 2
(E)38HPS
TO BLDG 20
IN EXISTING TRENCH
(E)32PC
TO BLDG 20
(E)38FOR
(E)254HPS DOWN
FROM MAIN LEVEL
(E)38PC
(E)102PC TO
REMAIN AS IS
51PC INSTALLED
IN PHASE 2
(E)38FOS
(D)102N.G. UP
EXISTING 102PC
(BELOW)
EXISTING 102PC
EXISTING 254HPS
EXISTING 203 FP
MAIN BELOW
TO REMAIN AS
REFER TO DRAWING
MD111.03 FOR
CONTINUATION
EXISTING TUNNEL
(D)102HPS
(E)51FOR
(E)51FOS(D)102HPS
(E)51FOR
(E)51FOS
(E)32PC DOWN TO
EXISTING TRENCH.
REFER TO MD111.03 FOR CONTINUATION
(E)19FOR
(E)19FOS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
MR PROJECT NO:
NORTHKEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
303 SOUTH TOPEKA, WICHITA, KS 67202
PHONE: (316)262-2691
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
ELECTRONIC SECURITY
MAGNA ENGINEERS
861 CORPORATE DRIVE, SUITE 210, LEXINGTON, KY 40503
PHONE: (859)309-2990
PHYSICAL SECURITY
FORCE PROTECT
3210 GULF BLVD, UNIT 304, BELLEAIR BEACH, FL 33786
PHONE: (502)836-4232
C U s e rs
\g s tr o h \D o c u m e n ts
\0 -0
-W ic h it a B o ile rs -M e tr ic M
E P
-C E
N T
R A
L -R g s tr o h Q
H E
Z
.r v t
/9
/2
:4
:0
A
M
13-MD101.03
MECHANICAL
DEMOLITION PLAN
TUNNEL & BSMT LEVELS, PHASE 3
INSTALL NEW BOILERS IN
BUILDING 13
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
589A7-18-302
Project Director
2021-09-03 AP GDS0499-0121
100% BID SET
FULLY SPRINKLERED
SCALE: 1 : 481
MECHANICAL DEMOLITION PLAN - TUNNEL & BASEMENT LEVELS,
PHASE 3
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 EXISTING FUEL OIL PIPING TO EXISTING EXTERIOR GENERATOR SHALL BE DISCONNECTED AND
REMOVED. GENERATOR TO BE RELOCATED. REFER TO ELECTRICAL DRAWINGS 13-ED101.01 AND
13-EP111 FOR GENERATOR RELOCATION SCOPE.
2 EXISTING 38HPS DOWN FROM ABOVE INTO EXISTING PIPE TRENCH TO BUILDING 20. REFER TO
PHASE 2 DRAWING MP101.02 FOR NEW WORK SCOPE.
3 EXISTING 102 DIA HPS SHALL BE DISCONNECTED AND REMOVED. REFER TO DETAIL 9 ON
DRAWING M-502 FOR ADDITIONAL DETAILS.
4 AFTER THE NORTH LOOP IS OPERATIONAL FROM THE NEW BOILER PLANT HEADER, DISCONNECT
AND REMOVE EXISTING 127HPS AND ASSOCIATED CONDENSATE PIPING WITHIN THE EXISTING
BOILER PLANT TO POINT OF CONNECTION FROM NEW.
5 UNDERGROUND FUEL-OIL PIPING TO BE DOUBLE CONTAINMENT.
6 ONCE NEW BOILER PLANT IS OPERATIONAL AND PRIOR TO INSTALLATION OF NEW RAMP,
DISCONNECT AND REMOVE EXISTING 102 DIA NATURAL GAS BACK TO SHUTOFF VALVE AND
CAP.REFER TO DRAWING MP101.02 FOR ADDITIONAL DETAILS.
7 EXSTING FUEL OIL PIPING IN LOWER LEVEL INSTALLED IN PHASE 2.
8 DISCONNECT AND REMOVE EXISTING CONDENSATE RECEIVER, PUMPS AND ASSOCIATED PIPING.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW
DIAGRAMS.
3. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT
SCHEDULES.
4. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE
STEAM OR STEAM CONDENSATE SYSTEM OR EQUIPMENT.