540-26-110 Halls and Walls Bid Set 2.pdf

PDF 18 MB Posted

Attached to
Z1DA-- Halls and Walls (SECVA) - Construction Project Number 540-26-110
Solicitation number
36C24526B0003
Issued by

About this file

This document is a set of architectural and construction plans for renovation work on the second floor of a healthcare facility, specifically the main and adjacent corridors and elevator bays. The project scope encompasses approximately 5,438 square feet with a perimeter of 1,341 linear feet. The work includes six primary tasks: removal and on-site storage of existing wall and ceiling pictures, frames, signage, and hangings; demolition and replacement of existing flooring with new Luxury Vinyl Tile (LVT); demolition of existing corner guards, hand-rails, and crash guards with installation of new stainless steel equivalents; demolition and replacement of resilient wall base and wall protection with new materials; refinishing of drywall where necessary with priming and painting; and coordination of all temporary restructuring and routing of items within the scope area, including furniture and equipment. All work classified as ICRA Class III and above must occur outside normal facility operational hours.

The document includes detailed floor plans across four match lines showing the specific locations of required installations, color-coded by work type. Key elements specify 3-inch stainless steel corner guards with crimped edges and adhesive application, flat-faced wall-mounted handrails installed 36 inches above finished floor height, and comprehensive flooring replacement to concrete deck. An Infection Control Risk Assessment table categorizes scoped work by ICRA classification, indicating varying risk levels between the first and second floors, with demolition activities classified as ICRA Class II-IV and installation activities as ICRA Class I-III depending on location and patient risk category. Existing condition photographic documentation is provided for reference across multiple match lines and project areas.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Second Floor Halls and Walls:

Main & Adjacent Corridors & Elevator Bays

Square Footage: Approx. 5438 SF Scope Perimeter: Approx. 1341 LF

Project Area 2 General Notes

1. Remove existing wall and ceiling pictures, frames, signage, and hangings, coordinate with COR for on-site storage,and re-install immediately after respective phase substantial completion.

2. Demolish existing flooring; install new as specified.

3. Demolish existing corner guards, hand-rails, and crash guards; install new stainless steel hand-rails and corner guards as specified.

4. Demolish existing resilient wall base and wainscoting covering/protection; install new as specified.

5. Refinish drywall where necessary and prime and paint all walls, unless otherwise noted, as specified.

6. All work ICRA Class III and above to occur outside normal facility operational hours.

7. Contractor shall be responsible for all temporary restructuring and routing of items within scope area, to include all furniture, seating,tables, desks, waste bins, vending equipment, and miscellaneous items. On-site storage of items within phase is to be coordinated with the COR.

Key:

Project Area Scope A08

A09

Main & Adjacent Corridors & Elevator Bays

Project Area 2 Coded Notes

1. Note omitted from 2nd Floor

2. Furnish and install New 3" Stainless Steel Corner Guards, crimped edge, adhesive applied

2.1. * denotes < 3" long-leg

3. Furnish and install new Stainless Steel Flat-Faced wall-mounted Handrail, 36" above finished floor (AFF) installation height, as specified

4. Note omitted from 2nd Floor

5. Demolish existing flooring to concrete deck. Install new Luxury Vinyl Tile (LVT) flooring throughout project area as specified

6. Demolish existing wall protection and resilient wall base. Install new as specified

Key:

Hand-Rail Assembly

Corner Guard3

A10

Main & Adjacent Corridors & Elevator Bays

Project Area 2 Coded Notes

Match Line 1

1. Note omitted from 2nd Floor

2. Furnish and install New 3" Stainless Steel Corner Guards, crimped edge, adhesive applied

2.1. * denotes < 3" long-leg

3. Furnish and install new Stainless Steel Flat-Faced wall-mounted Handrail, 36" above finished floor (AFF) installation height, as speci2

4. Note omitted from 2nd Floor

5. Demolish existing flooring to concrete deck. Install new Luxury Vinyl Tile (LVT) flooring throughout project area as specified

6. Demolish existing wall protection and resilient wall base. Install new as specified

Key:

Hand-Rail Assembly

Corner Guard

A11

Main & Adjacent Corridors & Elevator Bays

Project Area 2 Coded Notes

Match Line 2

1. Note omitted from 2nd Floor

2. Furnish and install New 3" Stainless Steel Corner Guards, crimped edge, adhesive applied

2.1. * denotes < 3" long-leg

3. Furnish and install new Stainless Steel Flat-Faced wall-mounted Handrail, 36" above finished floor (AFF) installation height, as speci2

4. Note omitted from 2nd Floor

5. Demolish existing flooring to concrete deck. Install new Luxury Vinyl Tile (LVT) flooring throughout project area as specified

6. Demolish existing wall protection and resilient wall base. Install new as specified

Key:

Hand-Rail Assembly

Corner Guard

A12

Main & Adjacent Corridors & Elevator Bays

Project Area 2 Coded Notes

Match Line 3

1. Note omitted from 2nd Floor

2. Furnish and install New 3" Stainless Steel Corner Guards, crimped edge, adhesive applied

2.1. * denotes < 3" long-leg

3. Furnish and install new Stainless Steel Flat-Faced wall-mounted Handrail, 36" above finished floor (AFF) installation height, as speci2

4. Note omitted from 2nd Floor

5. Demolish existing flooring to concrete deck. Install new Luxury Vinyl Tile (LVT) flooring throughout project area as specified

6. Demolish existing wall protection and resilient wall base. Install new as specified

Key:

Hand-Rail Assembly

Corner Guard

A13

Main & Adjacent Corridors & Elevator Bays

Project Area 2 Coded Notes

Match Line 4

1. Note omitted from 2nd Floor

2. Furnish and install New 3" Stainless Steel Corner Guards, crimped edge, adhesive applied

2.1. * denotes < 3" long-leg

3. Furnish and install new Stainless Steel Flat-Faced wall-mounted Handrail, 36" above finished floor (AFF) installation height, as speci2

4. Note omitted from 2nd Floor

5. Demolish existing flooring to concrete deck. Install new Luxury Vinyl Tile (LVT) flooring throughout project area as specified

6. Demolish existing wall protection and resilient wall base. Install new as specified

Key:

Hand-Rail Assembly

Corner Guard

2nd Floor Main & Adjacent Corridors & Elevator Bays

Project Existing Condition Photographic Directory

Match Line 1

A14

Project Existing Condition Photographic Directory

Match Line 2

A15

Project Existing Condition Photographic Directory

Match Line 3

A16

Project Existing Condition Photographic Directory

Match Line 4

A17

Appendix

Type Scoped Work ICRA Category

Location (floor)

Patient Risk Category ICRA Class

Demo

Incidental Abatement – Floor Mastic C

1st Highest IV

2nd

Incidental Abatement – Lead Paint C

1st Highest IV

2nd

Flooring C 1st Medium III 2nd Low II

Wall Guards, Hand Rail, Corner Guards, Cove Base, Wall Covering B

1st Medium II

2nd Low I

Acoustical Ceilings, Light Fixtures, HVAC diffusers/intakes C 1st Medium III

Outlet/Switch Plate Covers A 1st Medium I 2nd Low I

Prep Flooring – Surface repair C

1st Medium III 2nd Low II

Wall – Surface repair / intermediate sanding C

1st Medium III 2nd Low. II

Install

Flooring B 1st Medium II 2nd Low II

Wall Covering, Hand Rails, Corner Guards, Cove Base B

1st Medium II

2nd Low II Ceiling Grid, Acoustical Ceilings, HVAC diffusers/intakes, Lighting

C 1st Medium III

Outlet/Switch Plate Covers A 1st Medium I 2nd Low I

Painting A 1st Medium I 2nd Low I

Infection Control Risk Assessment - Scoped Work Class Table

A18

1st Floor Emergency Department Waiting Area & Adjacent Corridors

Project Existing Condition Photographic Directory

1 2 3 4 5

6 7 8 9 10

11 12 13 14 15 A19

540-26-110 Halls and Walls Bid Set 2
Project Area 2 General Notes.pdf
Sheets and Views
1st Floor Coded Set-Model
2nd Floor Detail ml.pdf
Sheets and Views
1st Floor Coded Set-Model
2nd Floor Coded Set 1 notes.pdf
Sheets and Views
1st Floor Coded Set-Model
2nd Floor Coded Set 2 notes.pdf
Sheets and Views
1st Floor Coded Set-Model
2nd Floor Coded Set 3 notes.pdf
Sheets and Views
1st Floor Coded Set-Model
2nd Floor Coded Set 4 notes.pdf
Sheets and Views
1st Floor Coded Set-Model

540-26-110 Halls and Walls Bid Set 3

File details come from the government source that posted it. Updated .