053 1 H45 First Floor Addition Ductwork Plan.pdf
PDF 868 KB Posted
- Solicitation number
- 36C24526B0003
About this file
This is an architectural drawing set for TAG-VVKR, a First Floor Addition Softwork Plan and Technical Addition and Alterations project located in Lewisburg, West Virginia. The document is stamped as drawing number H-145, dated 7/18/06, and prepared by Rubin Kemp Diehl (RKD) Architecture Engineering Planning.
The drawing provides comprehensive floor plans, electrical layouts, plumbing configurations, HVAC systems, and structural details for the addition and renovation work. Key elements include fire and sound-rated graphic symbol legends indicating 1-hour/3-hour walls, fire-rated windows, non-rated standard partitions, and rated partitions. The plan contains multiple reference callouts (marked A through O) directing builders to specific technical notes and construction details. A legend of material specifications and construction notes is provided in the upper left corner of the plan. The document includes standard architectural conventions for doors, windows, walls, mechanical systems, and utility connections. This is a technical construction document used by builders and contractors to execute the physical improvements to the facility rather than a solicitation or contract opportunity document.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .