About this file

This is an architectural drawing (Sheet A24) detailing construction specifications for building flooring systems and wall treatments. The document provides technical specifications and visual details for the First and Second Floor Halls and Walls, specifically covering the Emergency Department (ED), Waiting Area & Adjacent Corridors, Second Floor Main Corridor, and Elevator Bays.

The drawing includes three primary detail sections: Floor Transition Details (Detail 2), Floor Expansion Joint Cover Details (Detail 2), and Wall/Ceiling Expansion Joint Cover Details (Detail 3). Key specifications outlined include flooring tie-in requirements at all transitions between new and existing flooring, installation of expansion joints at all building expansions as specified, transition strip applications, concrete subfloor and terrazzo finishing systems, door frame installations, rubber/vinyl base trim treatments, and stainless steel transition strip specifications. The notes emphasize precise installation of flooring transitions and expansion joints, particularly on the Second Floor. The drawing references multiple construction materials and methods including shielded thetic transition strips, concrete subfloors, terrazzo finishes, porcelain tile, and various attachment details for wall and ceiling elements.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A24

First and 2nd Floor Halls and Walls:

Emergency Department (ED) Waiting Area & Adjacent Corridors, 2nd Floor Main Corridor and Elevator Bays

Flooring Transition and Expansion Joint Details

Notes:

Install flooring tie-in at all transitions between new and existing flooring as specified and detailed.

Install expansion joints at all building expansions as specified and detailed (2nd Floor Only).