This is an architectural specification sheet for construction work on the second floor of a building, specifically addressing halls, walls, and elevator bays. The document provides detailed notes and requirements for multiple renovation tasks coded with numbered items that are color-coded on the accompanying floor plan.
The scope of work includes: furnishing and installing new 3-inch stainless steel corner guards with crimped edges and adhesive application throughout the project area; installing new stainless steel flat-faced wall-mounted handrails at 36 inches above finished floor (AFF), with a special requirement in the service elevator bay to install handrails at 8 inches AFF in place of existing resilient crash rails; demolishing existing flooring to the concrete deck and installing new luxury vinyl tile (LVT) flooring; and demolishing existing wall protection and resilient wall base with new installations as specified. Addendum #1 includes modifications to the service elevator bay, where existing wall tile is to remain in place without additional wall protection, though new resilient wall base installation is still required. The floor plan uses color-coded circles and lines to identify the locations of handrail assemblies and corner guards throughout the project area, with detailed cross-referencing between the specification notes and their corresponding locations on the architectural drawing.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A13
Second Floor Halls and Walls:
Main & Adjacent Corridors & Elevator Bays
Project Area 2 Coded Notes
Match Line 4
Addendum #1
1. Note omitted from 2nd Floor
2. Furnish and install New 3" Stainless Steel Corner Guards, crimped edge, adhesive applied
2.1. * denotes < 3" long-leg
3. Furnish and install new Stainless Steel Flat-Faced wall-mounted Handrail, 36" above finished floor (AFF) installation height, as specified
3.1. Addendum #1: Service Elevator Bay: Install new Stainless Steel Flat-Faced wall-mounted handrail in-place-of existing resilient crash rail, 8" AFF, as specified
4. Note omitted from 2nd Floor
5. Demolish existing flooring to concrete deck. Install new Luxury Vinyl Tile (LVT) flooring throughout project area as specified
6. Demolish existing wall protection and resilient wall base. Install new as specified
6.1. Addendum #1: Service Elevator Bay: Existing wall-tile to remain as-is; no wall-protection.
Install new resilient wall base as specified
Key:
Hand-Rail Assembly
Corner Guard
3.1
6.1