About this file

This is a specification and design document for interior finishes and safety improvements on the Second Floor Halls and Walls, Main & Adjacent Corridors & Elevator Bays (Project Area 2). The document provides coded notes and a floor plan indicating the locations and types of work to be performed.

The project requires furnishing and installing new 3-inch stainless steel corner guards with crimped edges and adhesive application throughout the project area, excluding some locations on the 2nd Floor. Stainless steel flat-faced wall-mounted handrails must be installed at 36 inches above finished floor (AFF) height as specified in the contract documents, with an exception in the Service Elevator Bay where a new handrail will replace the existing resilient crash rail and be installed at 8 inches AFF per Addendum #1. The work also includes demolition of existing flooring to the concrete deck and installation of new luxury vinyl tile (LVT) flooring throughout the project area. Additionally, existing wall protection and resilient wall base must be demolished and replaced with new materials as specified, except in the Service Elevator Bay where existing wall tile will remain and only new resilient wall base will be installed per Addendum #1. The floor plan uses color-coded symbols to identify handrail assembly and corner guard locations across multiple corridors and elevator bays.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A09

Second Floor Halls and Walls:

Main & Adjacent Corridors & Elevator Bays

Project Area 2 Coded Notes

Addendum #1

1. Note omitted from 2nd Floor

2. Furnish and install New 3" Stainless Steel Corner Guards, crimped edge, adhesive applied

2.1. * denotes < 3" long-leg

3. Furnish and install new Stainless Steel Flat-Faced wall-mounted Handrail, 36" above finished floor (AFF) installation height, as specified

3.1. Addendum #1: Service Elevator Bay: Install new Stainless Steel Flat-Faced wall-mounted handrail in-place-of existing resilient crash rail, 8" AFF, as specified

4. Note omitted from 2nd Floor

5. Demolish existing flooring to concrete deck. Install new Luxury Vinyl Tile (LVT) flooring throughout project area as specified

6. Demolish existing wall protection and resilient wall base. Install new as specified

6.1. Addendum #1: Service Elevator Bay: Existing wall-tile to remain as-is; no wall-protection.

Install new resilient wall base as specified

Key:

Hand-Rail Assembly

Corner Guard

3.1

6.1

File details come from the government source that posted it. Updated .