This document is a solicitation for a construction contract to build a new U.S. Land Port of Entry (LPOE) facility in Rouses Point, New York. The project scope includes constructing an approximately 13,000 square foot main LPOE building, vehicle inspection facilities, pedestrian and vehicular roadways, utilities, and a railway platform. The construction will occur within a regulated wetland and adjacent to an active railroad track.
The solicitation is being issued under FAR Part 15 using a best value trade-off method, with non-price factors more important than price. Key evaluation factors include sustainability (related to Inflation Reduction Act requirements), project labor agreement, and small business subcontracting. The estimated price range is $25-35 million, and a 20% bid bond is required. Proposals are due by 5:30pm ET on June 12, 2024. The General Services Administration's Public Buildings Service Region 2 is the procuring agency.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSA Solicitation No. 47PC0624R0001
Construction Contract for: General Construction services for the Rouses Point U.S. Land Port of Entry
The Solicitation
Note: The Inflation Reduction Act of 2022 (IRA), Pub. L. No. 117-169, enacted in August 2022, provided GSA with significant funding for (a) measures necessary to convert facilities to high-performance green buildings, (b) acquisition and installation of construction materials and products with substantially lower levels of embodied greenhouse gas emissions, and (c) emerging and sustainable technologies. The Contract resulting from this Solicitation will be funded in part by IRA appropriations, and it contains numerous IRA-specific requirements. Requirements include, but are not limited to, requirements regarding pricing, invoicing, submittals, materials and construction. In addition, please note that this Solicitation contains an evaluation factor favoring certain construction materials with the lowest possible levels of embodied carbon. Offerors shall carefully review this Solicitation, the Agreement, the Statement of Work, the Specifications and the Drawings. Offerors are responsible for accurately pricing and, if successful, fully performing all Contract requirements.
Document: C201-GC/SEPTEMBER 2023 (The Solicitation)
Table of Contents
I. General Information A. The Solicitation and Contract B. List of Solicitation Documents C. Authorized Representatives D. Pre-Proposal Conference E. Estimated Price Range F. FAR 52.228-1 Bid Guarantee G. FAR 52.236-27 Site Visit – Construction H. Receipt of Offers
II. Proposals A. Proposal Contents B. Proposal Format C. Price Proposal D. Technical Proposal E. Other Information to be Submitted with Proposal F. Requirements of Joint Venture Offerors
III. General Provisions A. Availability of Funds B. Requests for Clarification or Interpretation C. Notice to Small Business Firms D. Information Concerning the Disclosure of Solicitation Results E. Affirmative Procurement Program F. Notice Concerning Preparation of Proposals G. Bond Requirements H. Contractor Performance Information I. Safeguarding and Dissemination of Controlled Unclassified Information
(CUI) Building Information
J. INFORM
IV. FAR/GSAR Solicitation Provisions
Document: C201-GC/SEPTEMBER 2023
A. FAR 52.211-1 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR 101-29
B. FAR 52.211-3, Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Items Description
C. FAR 52.216-1 Type Of Contract D. FAR 52.222-5 Construction Wage Rate Requirements-Secondary Site of
Work E. FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure
Equal Employment Opportunity for Construction F. Buy American Requirements G. Buy American Exceptions H. FAR 52.233-2 Service of Protest I. FAR 52.252-1 Solicitation Provisions Incorporated by Reference J. GSAR 552.102 Incorporating Provisions and Clauses by Reference K. GSAR 552.252-5 Authorized Deviations in Provisions (Nov 2021)
(DEVIATION FAR 52.252-5)
L. Small Business Subcontracting Plan M. Project Labor Agreement N. Certified Cost or Pricing Data O. Additional Provisions
(i) GSAR 552.236-74, Evaluation of Options (Mar 2019)
(ii) GSAR Clause 552.236-77, Government’s Right to Exercise Options (Mar 2019)
V. Instructions to Offerors and Clauses A. FAR 52.215-1 Instructions to Offerors – Competitive Acquisition B. Security Requirements C. Additional Clauses
VI. Method Of Award A. Evaluation of Offers B. Determination of Responsibility C. Price Reasonableness/Price Realism D. Unbalanced Price E. Total Evaluated Price F. Non-Price Factors G. Evaluation of Joint Venture Offers
Document: C201-GC/SEPTEMBER 2023
I. General Information
I.A. The Solicitation and Contract
(1) This Solicitation sets forth requirements for proposals for a Contract to construct the Project described in the Solicitation Documents. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein. The Government will award the Contract to the selected offeror, subject to the conditions set forth herein.
(2) Neither the Solicitation nor any part of an offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein by the Contracting Officer.
(3) The offeror's proposal submitted in response to this Solicitation shall constitute a firm offer. No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an offeror, and delivered to the Contractor a copy of the SF 1442 with original signatures together with the Agreement reflecting the offeror's proposed prices.
I.B. List of Solicitation Documents The Solicitation Documents are comprised of:
(1) The Solicitation
(2) The Agreement and Attachments to the Agreement
(3) Standard Form (SF) 1442 – Solicitation Offer and Award
(4) Pricing Sheet
(5) Standard Form (SF) 527 Contractor’s Qualifications and Financial Information
(6) Standard Form (SF) 24 - Bid Bond
(7) Attachments 1-4 for technical proposal
(8) Reference Documents - Wage determinations and post-award contract deliverables checklist (draft)
I.C. Authorized Representatives
The following individuals are designated as the authorized GSA representatives under this Solicitation:
Document: C201-GC/SEPTEMBER 2023
Authorized Representative Information:
Contracting Officer’s Information
Name: Sonah Lee
Address: 1 World Trade Center, New York, NY 10007
Telephone: 347-205-1469
Email: Sonah.Lee@gsa.gov
Alternate POC Information
Name: Winnie Eng
Address: 1 World Trade Center, New York, NY 10007
Telephone: 646-285-3102
Email: Winnie.Eng@gsa.gov
Document: C201-GC/SEPTEMBER 2023 (The Solicitation) mailto:Sonah.Lee@gsa.gov mailto:Winnie.Eng@gsa.gov
I.D. Pre-Proposal Conference
Date: Wednesday May 15, 2024
Time: 12:30 pm to 2:00 pm ET (An on-site visit will proceed between 2:45 pm to 3:45 pm ET following the above meeting. Note: vehicles will be required for this part of the tour.)
Location: 237 West Service Road, Champlain, NY 12919 (Cargo Building - click link for Google Maps location).
Please park in the employee parking lot.
Please RSVP to the Contracting Officer Sonah.Lee@gsa.gov to attend the pre-proposal conference and subsequent site visit.
To allow GSA sufficient time to prepare for your visit, please send your notice to attend by close-of-business on 05/13/2024 with the following information :
● Full Legal Name
● Company Name (indicate if you’re the subcontractor of a prime contractor)
● Email & Phone Number
In-person attendance is not a requirement of this solicitation, but is recommended.
See Section I.G. Site Visit requirements, companies are limited to a total of four (4) representatives.
Virtual access by Zoom will be available for interested contractors who cannot attend in-person and will be provided by the Contracting Officer.
Questions are due in writing by submission to Google forms links posted on the SAM.gov solicitation by the following dates:
First Round: Before the conference and visit, by close-of-business Wednesday May 1st, 2024.
Second Round: After the conference and visit, by close-of-business Wednesday May 22nd, 2024.
Third Round: by close-of-business on Thursday June 13th, 2024
Document: C201-GC/SEPTEMBER 2023 (The Solicitation) https://maps.app.goo.gl/vK8NyexQdyFivZfs6 mailto:Sonah.Lee@gsa.gov
Document: C201-GC/SEPTEMBER 2023
The route to the employee parking lot would look like if starting from the Duty Free Americas location on the map above.
Document: C201-GC/SEPTEMBER 2023
I.E. Estimated Price Range The estimated price range for the Project is $25,000,000 to $35,000,000.
I.F. FAR 52.228-1 Bid Guarantee (Sep 96)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids;
and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
I.G. FAR 52.236-27 Site Visit – Construction (Feb 95)
(1) The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors are urged and expected to inspect the site where the work will be performed.
(2) Site visits will be held at the following dates and times:
Date: Wednesday May 15th, 2024
Time: 2:45 - 3:45 pm ET
Document: C201-GC/SEPTEMBER 2023 (The Solicitation) https://www.acquisition.gov/far/part-52#FAR_52_236_2 https://www.acquisition.gov/far/part-52#FAR_52_236_3
(3) Pre-registration is required for all attendees to the pre-proposal Site Visit. The Site Visit shall be limited to not more than four (4) representatives from each offeror. Offerors shall submit a Visit Authorization Request (VAR) identifying all attendees from their respective team. Participants must have a valid, Government issued picture identification, driver’s license preferred, to gain access for the pre-proposal Site Visit.
Notification of the location of entry, where attendees are required to meet, and all other requirements for the Site Visit will be issued to the offerors. Submit the VAR to the point of contact listed below.
For further information about the site visit or access requirements, please contact:
Name: Kevin Gregory
Telephone: 518-570-6984
Email: Kevin.Gregory@gsa.gov
I.H. Receipt of Offers
(1) In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following email addresses, timestamped no later than 5:00 pm local time ET on the following date:
Date: Monday, July 8th, 2024 Email Addresses: sonah.lee@gsa.gov and CC: allan.preston@gsa.gov winnie.eng@gsa.gov
(2) Offers will not be accepted by physical mail.
II. Proposals
II.A. Proposal Contents
Proposals shall consist of the following documents, completed and executed in accordance with this Solicitation:
1. Price Proposal
a. Signed Standard Form 1442 and all amendments acknowledged
b. Pricing Sheet
c. SF 527 Contractor's Qualifications and Financial Information
d. SF 24, Bid Bond
2. Technical Proposal
a. Factor 1 - Experience Forms for each contract reference
Document: C201-GC/SEPTEMBER 2023 (The Solicitation) mailto:Kevin.Gregory@gsa.gov mailto:sonah.lee@gsa.gov mailto:allan.preston@gsa.gov mailto:winnie.eng@gsa.gov
b. Factor 1 - Joint-Venture Agreement, if applicable
c. Factor 2 - Project Execution Narrative
d. Factor 2 - Staffing Plan, Organizational Chart, Key Personnel Resumes
e. Factor 3 - Past Performance Questionnaires
f. Factor 3 - Performance recognition documents (awards, letters, commendations, etc), if applicable
g. Factor 4 - Small Business Utilization Form
h. Factor 5 - Sustainability: IRA-Eligible Materials Self-Scoring Table
i. Factor 6 - Project Labor Agreement(s), if applicable
II.B. Proposal Format
1. The Technical and Price proposal must be submitted by the deadline established in the solicitation via email to the CO and the CS.
2. All proposal contents listed above shall be submitted as separate PDF (Portable Document Format) attachments, one marked “Technical Proposal” and a second marked “Price Proposal.” Paper submissions will not be accepted.
3. Files shall not contain classified data. The use of hyperlinks in proposals is prohibited.
4. The proposal should clearly demonstrate that the offeror has a thorough understanding of the project. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal.
5. Proprietary information shall be clearly marked.
6. Submission of marketing brochures is not acceptable unless provided as supplementary information only.
7. The submission shall be clearly indexed and logically assembled.
8. Each proposal shall be clearly identified. No pricing information is to be embedded into the Technical Proposal. And Technical Proposal information must not be embedded into the Pricing Proposal to avoid the maximum page limit.
9. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer. A Table of Contents should be included.
10.The Proposal Package shall consist of the following:
a. Price Proposal
i. Signed Standard Form 1442 and all amendments acknowledged
Document: C201-GC/SEPTEMBER 2023
ii. Pricing Sheet - please fill in your firm’s name and identify any pricing that is subject to Project Labor Agreement(s). GSA requests that all proposal pricing sheets be submitted with supporting documentation that breaks down the total proposed sums of each LEC Material CLIN.
(Added with RFP Amendment 3)
iii. SF 527 Contractor's Qualifications and Financial Information
iv. SF 24, Bid Bond - the amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less, see Section I.F.
b. Technical Proposal
i. Factor 1 - Experience on Similar Projects (30% Weight)
ii. Factor 2 - Project Execution (20% Weight)
iii. Factor 3 - Past Performance on Relevant Projects (15% Weight)
iv. Factor 4 - Subcontracting Methodology (10% Weight)
v. Factor 5 - Sustainability (15% Weight)
vi. Factor 6 - Project Labor Agreement (10%) Weight)
Non-Price Factors, when combined, are significantly more important than the Total Evaluated Price.
The technical proposal must contain all of the necessary information to address the evaluation factors as set forth in the solicitation, in addition to the required documents listed above in section II.A. Proposal Contents.
The maximum page limit for the technical proposal submission is seventy-five (75) pages with a minimum font size of eleven (11). If a technical proposal is more than seventy-five (75) pages submitted, only the first seventy-five (75) pages will be evaluated.
Note: The PBS Past Performance Questionnaire (Attachment 2), Small Business Utilization Form (Attachment 3), IRA Weighted Score (Attachment 4), Joint-Venture Agreement (if applicable), Project Labor Agreement (PLA) if applicable are excluded from the page limitation. All other pages (including cover page), are included in the page limitation. All pages in the technical proposal must be 8.5 inches by 11 inches. Pages that differ from these page dimensions will not be evaluated, with the exception of schedules which should be 11 inches by 17 inches.
II.C. Price Proposal
(1) Contents
The Price Proposal shall consist of the SF 1442 and the Agreement, with prices and/or rates indicated for each price element shown on the pricing form included in Section II of the Agreement. Indicate the Base Contract Price, or if no such distinction is made, Document: C201-GC/SEPTEMBER 2023 the Contract Price, in Block 17 of the SF 1442, which must be fully executed by the offeror.
(2) Qualifications, Exclusions and Conditions
If the offeror communicates in its proposal any qualifications, exclusions, or conditions to the proposed prices not provided for in the Contract Documents, the Contracting Officer may reject the proposal and exclude the offeror from further discussions.
(3) Project Labor Agreement
Offerors may submit a price proposal subject to the Project Labor Agreement (PLA) requirements set forth in this solicitation (a PLA proposal), a price proposal not subject to the PLA requirements set forth in this solicitation, or both. Any price proposal submitted shall clearly identify whether it is subject to such PLA requirements.
(4) Additional Proposal Requirements
GSA is required to track spending for each of the three appropriations it received under the Inflation Reduction Act of 2022 (IRA) -- for low-embodied carbon (LEC) materials, emerging and sustainable technologies, and high-performance green building measures -- and has established “budget activities” for each of these appropriations. A contract line item number (CLIN) for each of these budget activities has been included in the Agreement as necessary. In addition, subCLINs will be used to track spending on each of the LEC materials designated for IRA funding -- asphalt, concrete, glass, and steel. Offerors must include separate prices for IRA work under the corresponding IRA CLINs and subCLINs.
Amounts for each IRA CLIN should reflect all expenses necessary to accomplish acquisition and installation of IRA work elements. Scope elements’ guiding principles:
● Expenses of acquiring and transporting products and materials required for IRA-funded work to the construction site;
● Labor, general and administrative expenses, and overhead and profit reasonably attributable to installation of IRA-funded work;
● Expenses for materials, tools, riggings and equipment (including safety equipment) required to install IRA-funded work;
● Design, submittal and documentation expenses reasonably attributable to IRA-funded work;
● Demolition and disposal expenses reasonably necessary for and attributable to IRA-funded work;
Document: C201-GC/SEPTEMBER 2023
● Expenses necessary to return space to its condition preceding IRA-funded work;
● Environmental remediation expenses required in execution of IRA-funded work; and
● Phasing and commissioning expenses reasonably attributable to IRA-funded work.
A list of possible LEC and Emerging and Sustainable Technology (EST) expenses follows below; this list is not exhaustive.
Low-Embodied Carbon Materials:
Concrete
● Cost of submittals preparation
● Reinforcing steel, incl. Shop drawings, fabrication, delivery, installation
● Formwork, formwork erection, takedown, handling, and accessories.
● Concrete joints, joint assemblies, and sealants
● Concrete admixtures, curing compounds and materials, bonding agents
● Concrete finishing and polishing
● Light weight concrete topping
● Testing and inspections
● Embedded conduits serving IRA Emerging and Sustainable Technologies equipment (in accordance with electric vehicle supply equipment (EVSE) Guidance)
● Precast concrete products (added with RFP amendment 02)
● Concrete Masonry Units (CMU) (added with RFP amendment 02)
Steel
● Cost of submittals preparation
● Shop drawings, fabrication, delivery, installation
● Fabrication and Installation
○ On-site power generation for welding
○ Field quality assurance and control (QA/QC)
○ Galvanizing and finishing
○ Rigging and personnel lifting equipment
○ Fasteners and miscellaneous connections
○ Welding
○ Fall protection for installation of LEC steel
Glazing
● Cost of submittals preparation
Document: C201-GC/SEPTEMBER 2023
● Shop drawings, fabrication, delivery, installation
● Framing and support components
● Sealants, stops, gasketing
● Rigging
● Films, ultraviolet (UV) and bird safe coatings
● Material handling
Asphalt
● Cost of submittals preparation
● Shop drawings, fabrication, delivery, installation
● Tack coat
● Testing and inspections
● Geotech stabilization materials
● Reclaimed asphalt, aggregates, constituent components of LEC asphalt
● Rebate joining to existing roadways
● Bonding agents and adhesives
Emerging and Sustainable Technologies:
Plumbing:
● Domestic Hot Water Heating (Served from variable refrigerant flow (VRF) system)
● Water Meters
Electric:
● Electric Charging Stations for Vehicles
● Lighting Controls
● Networked LED Light Fixtures
● Solar Panels (contract option)
● PV battery storage (contract option)
HVAC:
● Geothermal Heating and Cooling System and associated heat pumps
● Variable refrigerant flow (VRF) systems
● Duct Sealing, Balancing and commissioning
● Electric Resistance Boilers
● Smart Building Automation System (BAS)
II.D. Technical Proposal
FACTOR 1 – EXPERIENCE ON SIMILAR PROJECTS ( 30%):
Document: C201-GC/SEPTEMBER 2023
This factor will measure the breadth, depth and relevance of an offeror’s prior experience in performing projects similar in size, scope and complexity to the one described in this solicitation.
I. The offeror shall demonstrate experience as a prime contractor on contracts currently being performed or completed within the past ten (10) years. If submitting information for current contracts, the contract must provide the percentage completed by the time of the closing date of this solicitation in order for those contracts to be considered. The offeror shall submit three (3) projects for evaluation. Projects of similar size, scope, and complexity will be determined more relevant and rated more favorably than projects that are less similar. Complexity includes schedule constraints, management and administrative requirements, security requirements, applicable design criteria, coordination requirements, local conditions, and technical complexity. More recent performance may be deemed to have greater importance than less recent performance.
A single project identical in all aspects to this project may not exist, and therefore the Government will consider the totality of experience demonstrated by the submitted projects. The totality of experience should include all of the characteristics of relevant experience, identified above. Significantly more weight will be given to individual projects meeting all characteristics.
Note for Joint-Venture Offerors: If relying on past experience and performance of the individual firms, at least one (1) relevant project must be presented for each joint-venture partner. All members of the joint-venture will be required to be signatory to the contract. Greater weight will be given to projects that demonstrate prior teaming of the joint-venture partners.
A Joint-Venture and Teaming Arrangement are NOT synonymous. If a teaming arrangement is proposed, only the offeror (prime contractor) will be evaluated against this factor. It should be noted that if an offeror demonstrates a strong reliance on the experience of subcontractors, the absence of a formal joint venture agreement with such subcontractor(s) may result in an unfavorable evaluation. Offerors shall provide a copy of the agreement as part of their proposal for this factor. Please note the copy of this agreement is excluded from the stated page limitation.
II. Offerors are encouraged to identify projects involving any of the following characteristics. Projects involving such characteristics may be rated more favorably under this factor. The characteristics, in no order of preference, are as follows:
Document: C201-GC/SEPTEMBER 2023
● Construction projects valued at fifteen million dollars ($15 million) or higher;
● New construction on an undeveloped site.
● Projects performed in a regulated wetlands;
● Projects performed on / around railroads;
● Previous Land Port of Entry experience or Federal construction contracting experience;
● Projects that involved working on a New York State Department of
Transportation Right of Way;
● Projects that require or achieved a LEED certification (Projects that are currently undergoing LEED certification review process may be considered).
III. Experience Form - The offeror shall complete an Experience Form (Attachment
1) for each reference contract submitted.
FACTOR 2 - PROJECT EXECUTION (20%):
I. Project Execution Narrative
The offeror must submit a written narrative demonstrating its project execution plan. The offeror shall include in its narrative all factors and conditions it deems relevant to the successful completion of the work under this contract. At a minimum, the offeror must address its procurement and teaming approach for all major subcontracts. The narrative must also address the offeror’s plan to mitigate schedule delays including (but limited
to) differing or unforeseen conditions, supply chain and adequate labor resources.
The offerors will also be required to submit an organization chart, which details the relationships between the proposed project team. The chart should graphically present the relationships between the General Contractor; major subcontractors, GSA, Army Corps of Engineers, NYSDEC, New York State Department of Transportation, local utility service providers, affected local private railroad companies, the Construction Manager-as-Agent and Architect and Engineer.
This narrative shall not exceed more than five (5) pages. If the information submitted for the narrative exceeds the page limitations, only the first five (5) pages will be evaluated.
The organization chart will not count against the page limit.
Document: C201-GC/SEPTEMBER 2023
Note for Joint-Venture Offerors: Joint-venture participant’s contribution to the organization should be commensurate with their skills and background and should be described in the project execution plan.
II. Staffing Plan
The offeror’s staffing plan should include a detailed description of how it intends to accomplish the requirements of the contract using in-house and subcontracted resources. The staffing plan should include:
a. General description of the overall staffing that will be provided to successfully meet the requirements of the specifications, including a breakdown/ratio of where the key personnel will perform their duties (home/field);
b. Organizational Chart and Line of Authority for both the design phase, construction phase and construction closeout (or post construction);
c. Resumes for all proposed key personnel, at a minimum key personnel includes:
1. Project Executive
2. Project Manager
3. Superintendent
4. Building Information Modeling (BIM) Manager
d. Resumes of key personnel should include (not to exceed two (2) pages, if more than two (2) pages are provided only the first two (2) will be reviewed):
1. Name
2. Title/Position
3. Employment history
4. Responsibilities/Duties
5. Experience (minimum of five (5) years in the listed position)
6. Licenses/Professional Certifications (eg; Engineer, Certified
Construction Manager, U.S. Department of Labor - Occupational Safety and Health Administration Certifications).
7. Education (All positions must have a degree or certification related to the construction industry).
8. References (with contact email and telephone number)
e. Description of how the offeror plans to recruit and retain personnel, particularly key personnel and major trade partners.
f. Communication plan between home and field office personnel.
Expected Qualifications for Key Personnel:
● Project Executive - The Project Executive for this contract shall have, at a minimum, a Bachelor's degree in an Architecture, Engineering or Construction
Document: C201-GC/SEPTEMBER 2023 discipline. The Project Executive should have ten (10) years of construction project management experience. The Project Executive should have experience managing projects relevant to this contract. The Project Executive should have experience with electronic project management tools.
● Project Manager: The Project Manager for this contract shall have, at a minimum, a Bachelor’s degree in an Architecture, Engineering, or Construction discipline. The Project Manager should have at least ten (10) years of construction project management experience having managed projects relevant to this contract. The Project Manager should have experience with electronic project management tools.
● Superintendent: The Project Superintendent shall have a minimum of ten
(10) years of construction experience as a superintendent on projects relevant to this contract. The Project Superintendent should have experience with electronic project management tools.
● Building Information Modeling Manager: The BIM Manager for this contract shall have, at a minimum, a Bachelor's degree in an Architecture, Engineering, or Construction discipline. The BIM Manager shall have a minimum of five (5) years of construction modeling technology experience.
No changes to specific personnel proposed for key positions may be made without the Government’s consent. Preference will be given to offerors that propose Key Personnel that clearly demonstrate successful experience on work that is similar in size, scope and complexity to this project requirement. The Government may contact references regarding the proposed Key Personnel and may use this information to assess the risk associated with the proposed Project Execution.
Note: The Government will reserve the right to invite offerors to give presentations to further demonstrate the offeror’s understanding of the project and abilities to complete the project, as well as augment the written information submitted in this Project Execution factor. The offerors will be expected to provide a clear and concise overview of the project in relation to the project requirements, and to provide clear and concise responses to pertinent questions posed by members of the Government's evaluation team. The presentation will not constitute discussions as defined in FAR 15.306(d), Exchanges with offerors after receipt of proposals.
No price information shall be included in the presentation narrative or mentioned during the presentation.
Document: C201-GC/SEPTEMBER 2023
*The Government reserves the right to NOT afford a presentation to any offeror whose proposal contains any factor rated “marginal” or “poor” if the offeror is given the proper notice.
FACTOR 3 – PAST PERFORMANCE ON RELEVANT PROJECTS (15%):
I. This factor will evaluate the quality of an offeror’s collective experience in performing projects similar in size, scope and complexity to those described in this solicitation.
II. The relevance of the projects submitted will be an additional consideration under this factor.
III. The offeror must submit a PBS Past Performance Questionnaire (PPQ) (Attachment 2), completed by the applicable client, for each project proposed in Factor 1, Experience on Similar Projects. Completed PPQs should be submitted with the proposal. Ensure correct and current phone numbers and email addresses are provided for the client point of contact. Offerors should follow-up with clients/references to ensure timely submission of questionnaires. If the offeror is unable to obtain a completed PPQ from a client for a project before the proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the project. If the client requests, the client may submit a questionnaire directly to the Government's point of contact, via email at sonah.lee@gsa.gov prior to the proposal closing date. Offerors may resubmit questionnaires previously submitted with other proposals or may obtain an updated/new PPQ from a client for any submission. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other Solicitations.
IV. Also include performance recognition documents received within the last ten (10) years such as awards, award fee determinations, customer letters of commendation and any other forms of performance recognition.
V. In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Contractor Performance Assessment Reporting System , using all Commercial and Government Entity Code/ Unique Entity ID numbers of team members (partnership, joint venture, teaming arrangement or parent company/subsidiary/affiliate) identified in the offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System, Electronic Subcontracting Reporting System, previously submitted PPQ information, and any other known sources not provided by the offeror. While the Government may elect to consider data from a variety of sources, the burden of providing detailed, current, accurate and complete past performance information
Document: C201-GC/SEPTEMBER 2023 (The Solicitation) mailto:sonah.lee@gsa.gov rests with the offeror. GSA does not maintain a database of PPQs submitted by offerors.
The Government has no obligation to ensure that an equal number of references are obtained for each offeror.
If the offeror has no record of relevant past performance or information on its past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance. The rating shall be characterized as “neutral.”
If proposing a joint-venture or teaming arrangement, offerors should first submit past performance records they have performed together as these experiences will receive more consideration than experiences performed separately. A Joint-Venture and Teaming Arrangement are NOT synonymous. If a teaming arrangement is proposed, the offeror (prime contractor) will be evaluated against this factor.
FACTOR 4 - SUBCONTRACTING METHODOLOGY (10%):
GSA is committed to providing, to the maximum extent practicable, for socio-economic businesses to receive Federal contracting opportunities. This factor is designed to ensure that this GSA commitment is brought to the attention of the prospective offerors.
This factor measures the extent to which the offeror will perform contract requirements utilizing small business concerns.
All business concerns (to include small businesses) shall address the extent of participation of small business concerns (SB) in performance of this contract. The offeror must provide its SB participation targets with its offer expressed as percentages of the total contract. Offerors shall submit the following to demonstrate the above:
1. Attachment 3, Small Business Utilization Form
Note: In accordance with FAR 19.702(a)(1), , the apparent successful offeror shall be required to submit an acceptable small business subcontracting plan prior to award.
Subcontracting plans are not required from small business concerns. Please see the row for GSA’s FY2024 Small Business Subcontracting Goals for reference here:
https://www.sba.gov/sites/default/files/2024-01/FY24_Final_Goals_508.pdf.
FACTOR 5 - SUSTAINABILITY (15%)
Background and Overview This project is funded in part by Section 60503 of the Inflation Reduction Act of 2022 (IRA), which provides funding for purchase of construction materials with substantially lower levels of embodied greenhouse gas emissions.
Document: C201-GC/SEPTEMBER 2023 (The Solicitation) https://www.sba.gov/sites/default/files/2024-01/FY24_Final_Goals_508.pdf
GSA’s IRA Low Embodied Carbon asphalt, concrete (and cement), glass and steel requirements establish numeric global warming potential (GWP) limits for certain EPA-approved construction materials: concrete (and cement), asphalt, steel, and glass (IRA-Eligible Materials). For each material, GWP limits have been established for the best performing 20% of materials in terms of embodied carbon (Top 20% Limits), the best performing 40% of materials in terms of embodied carbon (Top 40% Limits), and better than industry average (Better Than Average Limit).
This Evaluation Factor calls for offeror commitments to furnishing IRA-Eligible Materials with the lowest possible GWP values. IRA Limit commitments proposed under this evaluation factor will be incorporated into the successful offeror’s resultant contract.
Individual materials’ GWP values may be found on individual manufacturers’ environmental product declarations (EPDs). EPDs must meet the standards reflected in GSA’s IRA Low Embodied Carbon asphalt, concrete (and cement), glass and steel requirements (see Compliance Documentation criteria listed for each IRA-Eligible Material).
Technical Acceptability and Scoring Offerors will only meet the standard for technical acceptability under this Factor if they commit to furnish all required IRA-Eligible Materials with a GWP better (lower) than each IRA-Eligible Material’s Better Than Average Limit.
Offerors meeting the standard for technical acceptability will receive a number of Raw Scores, one for each IRA-Eligible Material required by the Contract:
● Offerors will receive a Raw Score of 100 for each IRA-Eligible Material commitment that is better (lower) than GSA’s Top 20% Limits.
● Offerors will receive a Raw Score of 40 for each IRA-Eligible Material commitment that is only better (lower) than GSA’s Top 40% Limits.
● Offerors will receive a Raw Score of 20 for each IRA-Eligible Material commitment that is only better (lower) than GSA’s Better Than Average Limit.
Offerors shall self-score* this Factor by filling out the table below with: the applicable IRA Limit they commit to meet for each IRA-Eligible Material; the associated Raw Score; and the Weighted Score.
IRA-Eligible Material** IRA Limit Commitment
Raw Score
LEC
Materials
Weighted Score
Document: C201-GC/SEPTEMBER 2023 (The Solicitation) https://www.gsa.gov/system/files/Asphalt%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Concrete%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Glass%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Steel%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Asphalt%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Concrete%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Glass%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Steel%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf
(i.e., Top 20% Limit, Top 40% Limit, Better Than Average Limit)
(i.e., 100, 40, or 20)
Evaluation Weight (must add up to 100)
(multiply the material’s Raw Score by its LEC Materials Evaluation Weight)
Concrete Specified concrete strength class (compressive strength [f'c] in pounds per square inch [PSI])
≤ 2499 PSI
3000 PSI
4000 PSI
5000 PSI
6000 PSI
≥7200 PSI
Cement*** 26
Concrete Masonry Units
Asphalt 25
Steel
Fabricated Rebar 5
Unfabricated Rebar
Hollow Structural Sections (fabricated)
Hollow Structural Sections from Electric Arc Furnaces
Document: C201-GC/SEPTEMBER 2023
(unfabricated)
Hot-Rolled Sections (fabricated)
Hot-Rolled Sections (unfabricated)
Cold-Formed and Galvanized (stud, track, framing, etc.)
Structural Steel Plate from Electric Arc Furnaces (unfabricated)
Flat Glass 16
Total Weighted Score (sum of Weighted Scores)
* The Weighted Score for each material must be rounded to the nearest hundredth decimal (i.e., two decimal places to the right of the whole number).
The Total Weighted Score (sum of Weighted Scores) must be rounded to the nearest whole number in accordance with generally accepted rounding methods (i.e., numbers 5 through 9 are rounded up to the next whole number; numbers 1 through 4 are rounded down to the next whole number).
** Required construction product assemblies (such as window assemblies) are included in IRA-Eligible Materials categories and will be bound by IRA Limit Commitments. At least 80% of the assembly’s total cost or total weight must be composed of compliant IRA-Eligible Materials.
*** Where provision of concrete that qualifies under these GSA IRA Limits is impractical, GSA’s IRA limits for cement may be applied to the cement being used in the concrete mix.
In addition, for each IRA-Eligible Material identified in the table above, offerors shall submit compliant EPDs listing that material’s GWP.
Note: By submitting an offer, offerors consent to GSA sharing supplier names and the GWP values associated with supplier materials with the successful offeror. Technical solutions, supplier pricing and supplier-offeror terms and conditions will not be shared.
Document: C201-GC/SEPTEMBER 2023
Factor 6 - Project Labor Agreement (10%) This factor relates to a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions for a specific construction project and is an agreement described in 29 U.S.C. 158(f). It is the policy of the Federal Government for agencies to use project labor agreements in connection with large-scale construction projects to promote economy and efficiency in Federal procurement.
Whether to submit a proposal subject to PLA requirements is at the discretion of the offeror:
1. A proposal submitted subject to the PLA requirements set forth in this solicitation will receive full credit under this evaluation factor;
2. A proposal submitted not subject to such PLA requirements will receive no credit under this evaluation factor.
II.E. Other Information to Submit with Proposal
(1) Representations and Certifications
Offerors are reminded their SAM registration status must be “Active”, at the time their offer is submitted, to be considered for award (see FAR 52.204-7). Offerors submitting a proposal in response to this Solicitation shall complete electronic Annual Representations and Certifications in conjunction with required Entity registration in System for Award Management (SAM), accessed via System for Award Management.
Offerors shall also submit with their proposal, the Annual Representations and Certifications (FAR 52.204-8), and the Offeror’s Representations and Certifications (C301) form may be requested to the Contracting Officer.
(2) Qualifications of Offerors
Offerors submitting a proposal in response to this Solicitation shall submit with their proposal evidence of their financial responsibility and capacity to perform the Contract.
Offerors shall submit this information on GSA Form 527 – Contractor’s Qualifications and Financial Information. Where applicable, point of contact, including names and telephone numbers, are required for all contracts listed.
II.F. Requirements of Joint Venture Offerors
(1) All offers submitted by joint ventures must include a copy of an executed joint venture agreement (with original signatures) which fully discloses the legal identity of each member of the joint venture, the relationship between the members, the form of ownership of each member, and any limitations on liability or authority for each member.
(2) An authorized representative of each member of the joint venture must sign the SF 1442 accompanying an offer regardless of any agency relationship established between the members.
Document: C201-GC/SEPTEMBER 2023 (The Solicitation) https://www.sam.gov/
(3) In the case of corporations that are joint venture members, the corporation secretary must certify that the corporation is authorized to participate in the joint venture, either by certifying in the joint venture agreement, or by submitting a separate certification to the Government. The joint venture must also provide a certificate that identifies a principal representative of the joint venture with full authority to bind the joint venture.
(4) Representations and certifications, financial information, and past performance information must be submitted for each member of the joint venture.
III. General Provisions
III.A. Availability of Funds
Issuance of this Solicitation does not warrant that funds are presently available for award of a Contract. Award of the contract shall be subject to the availability of appropriated funds, and the Government shall incur no obligation under this Solicitation in advance of such time as funds are made available to the Contracting Officer for the purpose of contract award.
III.B. Requests for Clarification or Interpretation
The Government will attempt to answer all requests for clarifications or interpretations of the Solicitation Documents prior to the date set for receipt of offers, but do not warrant that all such requests will be answered within 15 calendar days. Prospective offerors should make such requests not less than 15 calendar days prior to the date set for receipt of offers.
III.C. Notice to Small Business Firms
A program for the purpose of assisting qualified small business concerns in obtaining certain bid, payment, or performance bonds that are otherwise not obtainable is available through the Small Business Administration (SBA) (Small Business Administration). For information concerning SBA's surety bond guarantee assistance, contact your SBA District Office.
III.D. Information Concerning the Disclosure of Solicitation Results
This acquisition is being conducted under the provisions of FAR Part 15 as a negotiated procurement. In accordance with FAR 3.104 and FAR 15.207, after receipt of proposals, no information regarding the identity of those submitting offers, the number of offers received, or the information contained in such offers will be made available until after award except as provided by FAR 15.503.
III.E. Affirmative Procurement Program
GSA has implemented an Affirmative Procurement Program (APP) intended to maximize the use of recovered materials, environmentally preferable, and bio-based
Document: C201-GC/SEPTEMBER 2023 (The Solicitation) http://www.sba.gov/ http://www.sba.gov/ products. Offerors should familiarize themselves with the requirements for using and reporting on the use of such materials in performance as set forth in the Agreement.
Refer to Clause FAR 52.223-10 encouraging vendors to practice waste reduction.
III.F. Notice Concerning Preparation of Proposals
Offerors are cautioned to carefully read the entire Solicitation and the Agreement to be included in the Contract contemplated by the Solicitation in order to be fully aware of all requirements and clauses in the contemplated Contract. Verify that all blanks requiring information to be supplied in an Offer have been properly filled out, that all pricing and other numerical data is accurately calculated, and that all copies of the Offer contain the same information.
III.G. Bond Requirements
If a bid guarantee is required to be submitted with your offer, any contract awarded will require a performance bond and payment bond as specified in the Agreement. Offerors who utilize individual sureties should note the requirement for a certified, audited, financial statement for each person acting as an individual surety under clause FAR 52.228-1 Bid Guarantee and the requirements of clause FAR 52.228-11 Pledge of Assets.
III.H. Contractor Performance Information
(1) Evaluating Contractor Performance: The General Services Administration is using the Contractor Performance Assessment Reporting System (CPARS) module as the secure, confidential, information management tool to facilitate the performance evaluation process. CPARS enables a comprehensive evaluation by capturing comments from both GSA and the contractor. The website for CPARS is Contractor Performance Assessment Completed CPARS evaluations may then be used by the Federal acquisition community for use in making source selection decisions. CPARS assists acquisition officials by serving as the single source for contractor past performance data.
(2) CPARS Registration: Each award requiring an evaluation must be registered in CPARS. The contractor will receive several automated emails. Within thirty days of award, the contractor will receive an e-mail that contains user account information, as well as the applicable contract and order number(s) assigned. Contractors will be granted one user account to access all evaluations.
(3) Contractor CPARS Training: Contractors may sign up for CPARS training. A schedule of classes will be posted to the CPARS training site (CPARS Training) and updated as needed.
(4) Contractor Representative (CR) Role: All evaluations will be sent to the Contractor Representative (CR) named on your award. The CR will be able to access CPARS to review and comment on the evaluation. If your CR is not already in the CPARS system, the Contracting Officer will request the name and email address of the person that will be responsible for the CR role on your award.
Document: C201-GC/SEPTEMBER 2023 (The Solicitation) http://www.cpars.gov/ http://www.cpars.gov/ https://www.cpars.gov/lc.htm
Once an evaluation is ready to be released the CR will receive an email alerting them the evaluation is ready for their review and comment. The email will indicate the time frame the CR has to respond to the evaluation; however, the CR may return the evaluation earlier than this date.
GSA shall provide for review at a level above the Contracting Officer (i.e., contracting director) to consider any disagreement between GSA and the contractor regarding GSA’s evaluation of the contractor. Based on the review, the individual at a level above the Contracting Officer will issue the ultimate conclusion on the performance evaluation.
Copies of the evaluations, contractor responses, and review comments, if any, will be retained as part of the contract file.
III.I. Safeguarding and Dissemination of Controlled Unclassified Information (CUI) Building Information
Certain information contained in the Solicitation Documents may have been designated as Controlled Unclassified Information (CUI) building information. With respect to such information, offerors shall agree to the terms for receipt of such information, as set forth in the provision “Administrative Matters” in Section III of the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .