C1. RFP Amendment 2_Latest Changes and Attachments.pdf

PDF 111 KB Posted

Attached to
General Construction of Land Port of Entry Facility GSA PBS Region 2 in Rouses Point, New York
Solicitation number
47PC0624R0001
Issued by

About this file

This document is an amendment to a Request for Proposals (RFP) for a federal contract opportunity. The amendment extends the deadline for proposal submissions, requests additional pricing information, and incorporates several new attachments including an updated IRA Sustainability Factor Table, Questions and Answers from the RFI period, an amendment to the specifications and drawings, and a form for acknowledging the amendment.

The underlying federal contract opportunity is for the general construction of a new Land Port of Entry (LPOE) facility in Rouses Point, New York. The project scope includes constructing an approximately 13,000 square foot main LPOE building, site work, utilities, and a railway platform system. The contract will be awarded on a best value trade-off basis, with non-price factors such as sustainability, project labor agreement, and subcontracting methodology being significantly more important than price. A bid guarantee and 100% performance and payment bonds will be required. Proposals are due by 5:30 pm ET on June 12th, 2024.

View the file

Other files

File Type Posted
C3. Questions & Answers from RFI Period 3_rev070124.pdf PDF
C3. Questions & Answers from RFI Period 3_v062824.pdf PDF
C5. 47PC0624R0001 Solicitation Rouses LPOE General Construction vJune2024.pdf PDF
C2. Attachment 5 - IRA Sustainability Factor Table_rev060524 w GSA weights.xlsx XLSX spreadsheet
C6. SF30 47PC0624R0001 RFP Amendment03 - acknowledge by signing and returning.pdf PDF
B4. 47PC0624R0001 Rouses GC_Reps and Certs GC v0424 (Form C301).docx DOCX document
B5. SF30 47PC0624R0001 RFP Amendment02 - acknowledge by signing and returning.pdf PDF
B10. Instructions to SAM Entities Trying to Request Controlled Docs Access rev051524.pdf PDF
B8. IRA Project Submittal_ Reporting Form (Reference Doc for Post-Award).xlsx XLSX spreadsheet
B1. RFP Amendment 2_ IRA link - Latest Changes - Table of Contents.pdf PDF
B6. Attachment 4 - IRA Weighted Score - addtl concrete_cement note added 053124.docx DOCX document
B3. 47PC0624R0001 Solicitation Rouses LPOE General Construction amend02_053124.pdf PDF
B11. Questions & Answers from RFI Period 2.pdf PDF
B9. IRA Project Submittal Form and Data Dictionary PDF.pdf (Reference Doc for Post-Award).pdf PDF
B7. Attachment 5 - IRA Sustainability Factor Table.xlsx XLSX spreadsheet
A4. Local Unions' Contact Information - Rouses Point, NY.pdf PDF
A2. SF30 47PC0624R0001 RFP Amendment01 - acknowledge by signing and returning.pdf PDF
A6. Rouses LPOE GC Contractor Deliverables Checklist_updated 8May2024.pdf PDF
A5. Instructions to SAM Entities Trying to Request Controlled Docs Access.pdf PDF
A1. Rouses GC RFP 47PC0624R0001 Amendment 01 table of contents - QA - Scope Considerations.pdf PDF
A3. SF1442 Corrected for 47PC0624R0001 v050824.pdf PDF
Pricing Proposal Attachments 47PC0624R0001.zip ZIP file
47PC0624R0001 Solicitation Rouses LPOE General Construction vApril2024.pdf PDF
47PC0624R0001 Rouses Point LPOE Proposals Checklist.xlsx XLSX spreadsheet
Technical Proposal Attachments 47PC0624R0001.zip ZIP file
47PC0624R0001 Rouses LPOE GC Draft Agreement vApril2024.pdf PDF
Reference Docs 47PC0624R0001.zip ZIP file
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Issuance Date 06/28/24

Amendment no. 3 of solicitation 47PC0624R0001 is being issued to

Incorporate the following changes, highlighted in yellow in the Solicitation

1. The deadline for submission of proposals is being extended to Monday July 8th, 2024, no later than 5:00 pm EST.

2. GSA requests that all proposal pricing sheets be submitted with supporting documentation that breaks down the total proposed sums of each LEC Material CLIN. The intention is to be prepared in advance for discussions regarding price.

Issuance Date 06/28/24

3. Three additional provisions incorporated by reference

4. The following attachments are incorporated into the RFP:

C2. Updated IRA Sustainability Factor Table (with weights embedded and locked in for offeror’s use and submission)

C3. Questions and Answers from RFI Period 3

C4. Amendment 03 of Specifications, Drawings, and a Sketch

C5. 47PC0624R0001 Solicitation Rouses LPOE General Construction vJune2024

C6. SF30 form for acknowledgement of RFP amendment 03.

File details come from the government source that posted it. Updated .