B8. IRA Project Submittal_ Reporting Form (Reference Doc for Post-Award).xlsx

XLSX spreadsheet 3 MB Posted

Attached to
General Construction of Land Port of Entry Facility GSA PBS Region 2 in Rouses Point, New York
Solicitation number
47PC0624R0001
Issued by

About this file

This document appears to be an Excel spreadsheet titled "B8. IRA Project Submittal_ Reporting Form" which is a reference document for a post-award federal contract opportunity.

The key details of the related federal contract opportunity are:

Solicitation Number: 47PC0624R0001

Name: General Construction of Land Port of Entry Facility GSA PBS Region 2 in Rouses Point, New York

Agency: General Services Administration (GSA) Public Buildings Service Region 2

Scope: Construction of a new approximately 13,000 square foot U.S. Land Port of Entry (LPOE) facility in Rouses Point, New York to replace the existing LPOE. Construction requirements include commercial and non-commercial vehicle inspection facilities, railways, utilities, site work, and sustainability features targeting LEED Gold certification.

Procurement Approach: Best Value Tradeoff Source Selection with non-price factors more important than Total Evaluated Price. Key evaluation factors include Sustainability (Inflation Reduction Act), Project Labor Agreement, and Subcontracting Methodology.

Pricing: Firm-Fixed Price contract, with a magnitude between $25-35 million. Bid guarantee (bond) of 20% of bid price or $3 million required.

Proposal Due Date: June 12, 2024 by 5:30pm ET.

View the file

Other files

File Type Posted
C3. Questions & Answers from RFI Period 3_rev070124.pdf PDF
C3. Questions & Answers from RFI Period 3_v062824.pdf PDF
C5. 47PC0624R0001 Solicitation Rouses LPOE General Construction vJune2024.pdf PDF
C2. Attachment 5 - IRA Sustainability Factor Table_rev060524 w GSA weights.xlsx XLSX spreadsheet
C1. RFP Amendment 2_Latest Changes and Attachments.pdf PDF
C6. SF30 47PC0624R0001 RFP Amendment03 - acknowledge by signing and returning.pdf PDF
B4. 47PC0624R0001 Rouses GC_Reps and Certs GC v0424 (Form C301).docx DOCX document
B5. SF30 47PC0624R0001 RFP Amendment02 - acknowledge by signing and returning.pdf PDF
B10. Instructions to SAM Entities Trying to Request Controlled Docs Access rev051524.pdf PDF
B1. RFP Amendment 2_ IRA link - Latest Changes - Table of Contents.pdf PDF
B6. Attachment 4 - IRA Weighted Score - addtl concrete_cement note added 053124.docx DOCX document
B3. 47PC0624R0001 Solicitation Rouses LPOE General Construction amend02_053124.pdf PDF
B11. Questions & Answers from RFI Period 2.pdf PDF
B9. IRA Project Submittal Form and Data Dictionary PDF.pdf (Reference Doc for Post-Award).pdf PDF
B7. Attachment 5 - IRA Sustainability Factor Table.xlsx XLSX spreadsheet
A4. Local Unions' Contact Information - Rouses Point, NY.pdf PDF
A2. SF30 47PC0624R0001 RFP Amendment01 - acknowledge by signing and returning.pdf PDF
A6. Rouses LPOE GC Contractor Deliverables Checklist_updated 8May2024.pdf PDF
A5. Instructions to SAM Entities Trying to Request Controlled Docs Access.pdf PDF
A1. Rouses GC RFP 47PC0624R0001 Amendment 01 table of contents - QA - Scope Considerations.pdf PDF
A3. SF1442 Corrected for 47PC0624R0001 v050824.pdf PDF
Pricing Proposal Attachments 47PC0624R0001.zip ZIP file
47PC0624R0001 Solicitation Rouses LPOE General Construction vApril2024.pdf PDF
47PC0624R0001 Rouses Point LPOE Proposals Checklist.xlsx XLSX spreadsheet
Technical Proposal Attachments 47PC0624R0001.zip ZIP file
47PC0624R0001 Rouses LPOE GC Draft Agreement vApril2024.pdf PDF
Reference Docs 47PC0624R0001.zip ZIP file
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

User Workflow

Click Here for User Workflow Chart https://docs.google.com/drawings/d/1oaECGj2-wo5r56G18gN6DX_vNrEJccTXl9yWmAqIlkI/edit LEC Instructions

#REF!

E&ST and HPGB Instructions

#REF!

Low Embodied Carbon Materials

RegionContractor NameProject Manager Name
Project Number (in Kahua)Contractor Email AddressProject Manager Email Address
Project Type (non-ESPC or ESPC?)Project Manager Approval Date
Enter Work Item Information Below:Design-Build or Construction Team: Enter LEC Installation Information & OutcomesConstruction Manager as Advisor (CMa) or Commissioning Provider (CxP)

Certify information below:

Combined WI IDRow Has Any ValueMin Requirements MetRow NumberRegionFirst Column AddressDuplicate CheckContractor NameContractor Email AddressProject Manager NameProject Manager Email AddressEnter your email addressMilestone StatusBuilding Number
: Location Code (from REXUS)Building NameProject # (Kahua)Accounting String ID (ASID)
: (8-digit alphanumeric string)Work Item (WI) #
: 4 digit numeric stringBudget Activity Code
: PG Code for LEC projects: PG24LEC Identifier
: Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO ScheduleLEC Material CategoryLEC Material SubcategoryDeclared UnitGWP Limit Specified in the Contract
: Top 20% of Contract Limits by Material SubcategoryNew GWP Limit Specified in the Contract (if Different than Previous Column)Reported Threshold TargetCalculated Threshold AchievedProvide link for Material EPDDescription of Material Installed

: Brief description of what material was used for on the project, supplier, mix type etc.

: Location Code (from REXUS) : (8-digit alphanumeric string) : 4 digit numeric string : PG Code for LEC projects: PG24

: Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO ScheduleQuantityQuantity Reporting UnitProduct Category Rule (PCR)Product Specific GWPConversion Factor AConversion Factor A UnitsConversion Factor BEmbodied Carbon Reduction (Calculated)
Upstream Scope 3Upstream Plant's ENERGY STAR Energy Performance Score

: For glass, upstream cement plant, and steel from integrated mills, ask manufacturer to generate and report their ENERGY STAR Energy Performance Score per: http://www.energystar.gov/epis

Any cement, glass, or integrated steel plant based in the U.S. can use the free ENERGY STAR Energy Performance Indicator tool to generate a score, even if the plant is not ENERGY STAR certified.

: Top 20% of Contract Limits by Material SubcategoryYear of plant's ENERGY STAR Energy Performance ScoreCertify information for this row is accurateCertify the embodied carbon calculations
: Certify that the quantity is accurate, and reported product-specific GWP matches the identified EPDEmail of Certifier
||||FALSEFALSE60L6FALSEFALSEFALSE
||||FALSEFALSE70L7FALSEFALSEFALSE
||||FALSEFALSE80L8FALSEFALSEFALSE
||||FALSEFALSE90L9FALSEFALSEFALSE
||||FALSEFALSE100L10FALSEFALSEFALSE
||||FALSEFALSE110L11FALSEFALSEFALSE
||||FALSEFALSE120L12FALSEFALSEFALSE
||||FALSEFALSE130L13FALSEFALSEFALSE
||||FALSEFALSE140L14FALSEFALSEFALSE
||||FALSEFALSE150L15FALSEFALSEFALSE
||||FALSEFALSE160L16FALSEFALSEFALSE
||||FALSEFALSE170L17FALSEFALSEFALSE
||||FALSEFALSE180L18FALSEFALSEFALSE
||||FALSEFALSE190L19FALSEFALSEFALSE
||||FALSEFALSE200L20FALSEFALSEFALSE
||||FALSEFALSE210L21FALSEFALSEFALSE

https://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edit EPD Compliance

Source:How to assess EPD compliance
**LEC Material Category**LEC Example **Select LEC Material Subcategory**Helper ColumnDeclared UnitQuantity Reporting UnitBetter Than Average Limit (kgCO2e/Declared Unit)Top 40% Limit (kgCO2e/Declared Unit)Top 20% Limit (kgCO2e/Declared Unit)Conversion Factors (To Metric)
Concrete (and cement or CMUs)**Select LEC Material Subcategory below**Concrete (and cement or CMUs)-**Select LEC Material Subcategory below**metric ton1
Concrete (and cement or CMUs)≤2499Concrete (and cement or CMUs)-≤2499cubic metercubic yard277261228cubic meter1
Concrete (and cement or CMUs)3000Concrete (and cement or CMUs)-3000cubic metercubic yard318291257U.S. ton0.907185
Concrete (and cement or CMUs)4000Concrete (and cement or CMUs)-4000cubic metercubic yard352326284cubic yard0.764555
Concrete (and cement or CMUs)5000Concrete (and cement or CMUs)-5000cubic metercubic yard382357305
Concrete (and cement or CMUs)6000Concrete (and cement or CMUs)-6000cubic metercubic yard407374319
Concrete (and cement or CMUs)≥7200Concrete (and cement or CMUs)-≥7200cubic metercubic yard402362321
Concrete (and cement or CMUs)HESC≤2499
: High early strength concrete should be avoided where possible. Is there a need for it in this project?Concrete (and cement or CMUs)-HESC≤2499cubic metercubic yard360.1339.3296.4
Concrete (and cement or CMUs)HESC3000
: HESC4000Concrete (and cement or CMUs)-HESC3000cubic metercubic yard413.4378.3334.1
Concrete (and cement or CMUs)HESC4000
: HESC4000Concrete (and cement or CMUs)-HESC4000cubic metercubic yard457.6423.8369.2
Concrete (and cement or CMUs)HESC5000
: HESC4000Concrete (and cement or CMUs)-HESC5000cubic metercubic yard496.6464.1396.5
Concrete (and cement or CMUs)HESC6000
: HESC4000Concrete (and cement or CMUs)-HESC6000cubic metercubic yard529.1486.2414.7
Concrete (and cement or CMUs)HESC≥7200
: HESC4000Concrete (and cement or CMUs)-HESC≥7200cubic metercubic yard522.6470.6417.3
Concrete (and cement or CMUs)Cement

: Cement may only be used where provision of qualifying concrete is impractical.

: High early strength concrete should be avoided where possible. Is there a need for it in this project?

: HESC4000

: HESC4000

: HESC4000

: HESC4000

: HESC4000Concrete (and cement or CMUs)-Cementmetric tonmetric ton858819751
Concrete (and cement or CMUs)Concrete Masonry UnitsConcrete (and cement or CMUs)-Concrete Masonry Unitscubic metercubic meter290256217
Asphalt**Select LEC Material Subcategory below**Asphalt-**Select LEC Material Subcategory below**
AsphaltAsphaltAsphalt-Asphaltmetric tonU.S. ton72.664.855.4
Steel**Select LEC Material Subcategory below**Steel-**Select LEC Material Subcategory below**
SteelRebar (fabricated)Steel-Rebar (fabricated)metric tonmetric ton850794728
SteelRebar (unfabricated)Steel-Rebar (unfabricated)metric tonmetric ton760716611
SteelHollow Structural Sections (fabricated)Steel-Hollow Structural Sections (fabricated)metric tonmetric ton1,89818541778
SteelHollow Structural Sections from Electric Arc Furnaces (unfabricated)Steel-Hollow Structural Sections from Electric Arc Furnaces (unfabricated)metric tonmetric ton1,65216201580
SteelHot-Rolled Sections (fabricated)Steel-Hot-Rolled Sections (fabricated)metric tonmetric ton1,16311281022
SteelHot-Rolled Sections (unfabricated)Steel-Hot-Rolled Sections (unfabricated)metric tonmetric ton869713686
SteelCold-Formed and Galvanized (stud, track, framing, etc.)Steel-Cold-Formed and Galvanized (stud, track, framing, etc.)metric tonmetric ton2,40823242228
SteelStructural Steel Plate from Electric Arc Furnaces (unfabricated)Steel-Structural Steel Plate from Electric Arc Furnaces (unfabricated)metric tonmetric ton1,1901152987
Glass**Select LEC Material Subcategory below**Glass-**Select LEC Material Subcategory below**
GlassFlat GlassGlass-Flat Glassmetric tonmetric ton1,40113701331

https://docs.google.com/presentation/d/10JM8-LF0kUJwtvaxAisV-IeyoZzLveKlUtMwCflCRQM/edit Emerging & Sustainable Tech and

RegionContractor NameProject Manager Name
Project Number (in Kahua)Contractor Email AddressProject Manager Email Address
Project Type (non-ESPC or ESPC?)Project Manager Approval Date
Enter Work Item Information Below:Design-Build or Construction Team: Enter E&ST / HPGB Installation Information and OutcomesConstruction Manager as Advisor (CMa) or Commissioning Provider (CxP): Validate technology Installation
Combined WI IDRow Has Any ValueMin Requirements MetRow NumberRegionFirst Column AddressDuplicate CheckContractor NameContractor Email AddressProject Manager NameProject Manager Email AddressEnter your email addressMilestone StatusBuilding Number
: Location Code (from REXUS)Building NameProject # (Kahua)Accounting String ID (ASID)
: 8-digit alphanumeric stringWork Item (WI) #
: 4 digit numeric string as reported in IRISBudget Activity Code

: PG Code for HPGB Projects: PG21

PG Code for E&ST Projects: PG27IRA Program (E&ST, HPGB)Select the guiding principle for the material or technologyDeep Energy RetrofitAll Electric BuildingNet Zero EnergySustainable BuildingEnergy Conservation Measure /Water Conservation Measure (ECM/WCM) Identifier
: Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO ScheduleECM/WCM Category
: AoA DropdownECM/WCM Technology
: AoA DropdownQuantity InstalledTO Schedule Technology
: Auto populates based on ECM Category and Technology SelectedEmerging & Sustainable Technology
: Auto populates based on ECM Category and Technology SelectedECM/WCM Default Design Life
: In yearsAlternative ECM Design Life
: In years. If different than default. Max of 30 year design lifePrimary Building Cooling FuelPrimary Building Heating FuelRefrigerant Involved in ECM?Refrigerant TypeRefrigerant Capacity (lbs)Initial ECM/WCM implementation cost ($)Estimated initial savings associated with ECM/WCM installation ($)

: ESPC estimated year one savings e.g. If you install a new high efficiency chiller instead of spending $10,000 to repair the old one, enter $10,000 here. Annual O&M Cost ($/year) : (Enter cost if O&M contracts will change due to ECM Implementation)

Enter negative value if there will be confirmed O&M savingsElectric Savings (kWh/year)
: Enter negative value if there will be an increase in energy useNatural Gas Savings (scf/year)

: Enter negative value if there will be an increase in energy use

1 mmBtu = 974.66 scf Fuel Oil Savings (gal/year) : Enter negative value if there will be an increase in energy use

1 mmBtu = 7.246376812 gal Steam Savings (mmBtu/year) : Enter negative value if there will be an increase in energy use

: Location Code (from REXUS)Chilled Water Savings (mmBtu/year)
: Enter negative value if there will be an increase in energy usePropane Fuel Savings (mmBtu/year)
: Enter negative value if there will be an increase in energy useWater Savings (gal/year)

: Enter negative value if there will be an increase in energy use : 8-digit alphanumeric string : 4 digit numeric string as reported in IRIS : PG Code for HPGB Projects: PG21 PG Code for E&ST Projects: PG27 : Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO Schedule : AoA Dropdown

: AoA DropdownAdditional notes about ECM/WCMCertify technology is installed and working properlyEmail of Certifier
||||FALSEFALSE60L6FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE70L7FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE80L8FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE90L9FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE100L10FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE110L11FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE120L12FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE130L13FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE140L14FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE150L15FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE160L16FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE170L17FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE180L18FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE190L19FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE200L20FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE210L21FALSEFALSEFALSEFALSEFALSE

https://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edit E&ST_HPGB Dropdowns #REF! Filtered Region Filtered Location Code Filtered Building Name #REF!

: Import range from ECM Design life tab. Any updates to E&S / TO alignment can be made in that sheet (https://docs.google.com/spreadsheets/d/1a_41ZddtVfM_VrZU2vYW7gQQUAp5gPwEolsrFzwPUTQ/edit#gid=339106882)

ECM type/category list aligns with CTSECM TechnologyFiltered IRA Milestones
#N/A#N/A

LEC_Dropdowns

#REF!Filtered RegionFiltered Location CodeFiltered Building Name#REF!LEC Material SubcategoriesUnit ConversionsFiltered IRA MilestonesEPD Compliance
#N/Acubic meter/cubic yard0.764555#N/A20%
metric ton/kilogram0.00140%
metric ton/U.S. ton0.907185Better Than Average
metric ton/metric ton1

: HESC4000

: HESC4000

: HESC4000

: HESC4000

: Cement may only be used where provision of qualifying concrete is impractical.

: High early strength concrete should be avoided where possible. Is there a need for it in this project?

: HESC4000

Metadata

LEC InformationE&ST Information