The document is a Hazardous Materials (HAZMAT) Usage Worksheet and instructions for contractors working on Department of the Air Force Space Command projects at Space Launch Delta 45 installations. The worksheet requires contractors to submit comprehensive details about any hazardous materials they plan to use, including Safety Data Sheets (SDS), product trade names, manufacturer information, container types and sizes, and total quantities. Contractors must obtain prior approval from the 45 CES/CEIE Hazardous Materials Program Manager (Richard Blanton or Thomas Powers) before bringing any hazardous materials onto the installation, and must track and report material usage quarterly.
Specific requirements include separately identifying different coating types, container sizes, and providing detailed information for each material line item. Contractors must submit the completed worksheet to Mr. Blanton and Mr. Powers, with additional cc recipients, and comply with Air Force regulations such as AFMAN 32-7002 Environmental Compliance and Pollution Prevention. The worksheet will be tracked in the Air Force's EESOH-MIS data system, and contractors must update the document throughout the project, with a final updated submission at project completion. This process applies to all materials including paint, oil, grease, adhesives, and sealants used in the project.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions AF Requirements for HAZMAT Submittal Review/Approval Process by Mr. Thomas Powers, 45 CES/CEIE
| All Hazardous Materials shall be reviewed and approved prior to be brought on to any SLD 45 Installation. SDSs shall be submitted to 45 CES/CEIE Hazardous Materials Program Manager, Mr. Richard Blanton (richard.blanton.2@spaceforce.mil) and Mr. Thomas Powers (POC) (richard.blanton.2@spaceforce.mil) using form “Transient Contractors HAZMAT Worksheet”. Please note, these material SDSs shall be initially submitted for approval and, depending on the project’s duration, quarterly submitted so usage can be tracked. Per Mr. Powers, preferably GCs shall submit all HAZMAT SDS at the beginning of the project. Refer to Mr. Thomas’s explanation. |
| “The prime contractor and any subcontractors must comply with, but not limited to: AFMAN 32-7002 Environmental Compliance and Pollution Prevention, February 2020 and the 45th SW HAZMAT Tracking Procedures for Construction and Service Contractors. No hazardous materials such as paint, oil, grease, adhesive, sealant, etc. are allowed to be brought on to any 45 SW Installation without prior approval. The contractor must contact the 45 CES/CEIE Hazardous Materials Program Manager, Richard Blanton or Tom Powers, POC to review hazardous materials authorization procedures prior to hazardous materials being brought on to SLD 45 facilities. Submit the following for each hazardous material brought on site to the 45 CES/CEIE Hazardous Program Manager: A Safety Data Sheet, material type, container size, and quantity of hazardous materials. |
| The Transient Contractors HAZMAT Worksheet for contractors to submit the aforementioned required information will be uploaded by Tom Powers and tracked into the AF Data System, EESOH-MIS. |
| The contractor will be asked to submit their initial submittal of materials to Mr. Blanton or Tom Powers and eventually at least quarterly so usage can be tracked, depending on the project duration. CE PM shall ensure contactors use this worksheet to include all materials. If the contractor needs to add additional materials during the course of the project, they can add them to the worksheet to be tracked.” |
| Additional Info regarding the Transient Contractors HAZMAT Worksheet: |
| - Materials need to be indicated separately in the worksheet. Example for coatings: |
| o If there are different coating types, each one needs to be identified separately |
| o If there are different types of containers and/or container sizes for the same coating type, then each one needs to be identified separately |
| o For each line item, you need to provide the requested information per each column |
| o Try to provide all materials that you know will be used on the project. If there is additional material not included on original submittal, notify the CE PM to get instructions on how to proceed. |
| o At the end of project an updated worksheet will need to be submitted with any additional information. |
| o For any other item, refer to Mr. Thomas’s explanation. |
| Form shall be submitted to Mr. Blanton and Mr. Powers and cc Heather Taylor Janise (taylor.janise.1@spaceforce.mil), Heather Goslin (heather.goslin.1@usspacecom.mil) and CE PM. For material submittals that have already been approved, please verify if those submittals included HAZMAT SDSs and submit as indicated. |
Transient KTR HAZMAT Usage
| SLD 45 | US Space Force | PSFB/CCSFS |
| PSFB/CCSFS Transient Contractor HAZMAT Usage Worksheet |
Return this form to the Contract/Project Manager (not later than the last business day of each month until term of contract)
| Shop Code: | Contractor Name: | Date of Report: | Reporting Period: | |||
| Contractor POC for Haz Mat Information Name: | Phone: | Email: | ||||
| Contract# | Project#: | Location: | Project Start/End Date:: | |||
| Safety Data Sheet (SDS) Product | ||||||
| Trade Name | Part No. | Manufacturer | Type of | |||
| Container | Size of | |||||
| Container | Total Qty | |||||
| Used | EESOH MSN (to be added by |
Base Environmental Office)