This document is an electrical engineering design sheet (E-409) for the 45th Civil Engineer Squadron at Patrick Space Force Base (PSFB), Florida, specifically detailing an electrical distribution line repair project on Ascension Island under Contract No. FA2521-18-D-0002. The sheet provides a detailed electrical plan for repairing and rerouting overhead and underground electrical and communication lines, including transitioning medium voltage (MV) conductors, fiber optic cables, and copper communication cables between various utility poles, hand holes, and a facility (41011).

Key technical specifications include installing new concrete poles, routing new 72-strand fiber optic and 300-pair copper cables, splicing cables using specialized splice cases like PLP Armadillo SST and Coyote HI-Count SST, and establishing new communication infrastructure. The project involves precise cable routing from Pole F5/C42 to existing infrastructure like MH-573 and HH-12, with detailed instructions for cable transitions, splicing, and connections to a new communication rack and building entrance protectors in Facility 41011. The design incorporates specific technical notes referencing multiple engineering sheets for comprehensive project execution.

View the file

Other files

File Type Posted
FA252125B0009 SF1409.pdf PDF
FA252125B0009 A004.pdf PDF
24. Geology Study-Investigation (1997) (Ref Only).pdf PDF
23. YXTK 13-1806 RPR FDR 5 Design Analysis (Section 5) (Ref Only)).pdf PDF
22. Government Response to Contractor Submitted Questions.pdf PDF
FA252125B0009 A003.pdf PDF
FA252125B0009 A002.pdf PDF
Solicitation Amendment FA252125B00090001 SF 30.pdf PDF
19. Ascension Island PSD.pdf PDF
18. Catherine Point PSD (Services Distribution).pdf PDF
17. Installation Facility Standards Ascension Auxiliary Airfield.pdf PDF
13. YXTK 13-1806 (FY23 Historical Contractor Question-Govt Responses).pdf PDF
2. YXTK 13-1806 Specifications.pdf PDF
1. YXTK 13-1806 DWG.pdf PDF
20. Fiber Wall Mount Dist Cabinets Photos.pdf PDF
15. Concrete Mix Design (Local Aggregate).pdf PDF
12. MH 42 Photos.pdf PDF
11. Site Visit Procedures.pdf PDF
5. Record of EqmtMat List Template (OM Database).xlsx XLSX spreadsheet
16. Enivronmental Final Governing Standards Ascension Island.pdf PDF
6. CECC Form 3052 Template.xlsx XLSX spreadsheet
4. Contractor HAZMAT Usage Worksheet.xlsx XLSX spreadsheet
3. YXTK 13-1806 Recovered Materials Determination Form (Green Procurement).pdf PDF
21. Facility 800 Photos.pdf PDF
10. QA Template.docx DOCX document
7. Contractor Travel Request Form.pdf PDF
FA252125B0009 (YXTK 13-1806 RPR Electrical Dist Sys (Feeder 5)) IFB.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U G

E U

G E

UGEUGEUGEUGEUGEUGEUGEUGE

UGE

UGE

UGE UG

E

UGEUGEUGEUGEUGEUGEUGEUGE

U G

E

UG

E

UG

E

U G

E

UGE

UGE

UGE

UGEUGE

UGE

UGE

X X

X

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E

O

HE

O H

E O

H E

O H

E

XF

M

R

XF

M R

SDS

UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC

O

HE

O H

C O

H E

O H

C O

H E

O H

C O

H E

U G

E U

G E

U G

E

UG

E

UG

E

U G

C U

G C

U G

C U

G C

O H

E O

H C

O H

E

UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC

U G

E U

G E

UGEUGEUGEUGEUGEUGEUGEUGE

UGE

UGE

UGE UG

E

UGEUGEUGEUGEUGEUGEUGEUGE

U G

E

UG

E

UG

E

U G

E

UGE

UGE

UGE

UGEUGE

UGE

UGE

X X

X

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E

O

HE

O H

E O

H E

O H

E

XF

M

R

XF

M R

SDS

UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC

SPECIFIC NOTES:

GRAPHIC SCALE

A

B

2 3

C

D

1 2 3

4 5 6

AS

B

U

IL

T D

AT

E:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

D

AT

E:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

D

EL

IV

ER

Y N

O

Ne ls on En gi ne er in gCo rh od es b rit o

A

R

C

H

I T

E

T

S

AA

/0

3/

M . J

O H

N

SO

N

YX

TK

3-

YX

TK

3-

AS

C

EN

SI

O N

IS

LA

N D

R

EP

AI

R E

LE

C

TR

IC

AL

D

IS

TR

IB

U

TI

O

N L

IN

ES

FE

ED

ER

N

EL

SO

N

EN

G

IN

EE

R

IN

G

E-409

TR

AN

SM

IT

TE

R

S

- E

N

LA

R G

ED

E

LE

C

TR

IC

AL

P

LA

N

FLAG NOTES: #

EXISTING HH-12

SCALE:

TRANSMITTERS - ENLARGED ELECTRICAL PLAN

1" = 40' L

E-409

MH-573 (ETR)

EXISTING OVERHEAD

ELECTRICAL

1 POLE F5/C42

UNDERGROUND ELECTRICAL

(ETR)

POLE-F5/D1

SDS-9 (ETR)

FACILITY

41011

XFMR PM 5/10 (ETR)

XFMR PM 5/9 (ETR)

POLE F5/C41

KEY MAP

GEN

500KW GENERATOR

(ETR)

TRANSMITTER ROAD

PY

R

AM

ID

P O

IN

T

R O

AD

TO UTILITY POLE F5/D16 AND F5/D17 ON SHEET E-410

TO UTILITY POLES F5/C38 AND F5/C39 ON SHEET E-408

1. REFERENCE:

· MV SINGLE LINE DIAGRAM ON SHEET E-002 FOR FINAL CONFIGURATION

AND FOR LOCATION OF CUTOUT SWITCHES WITHIN FINAL

CONFIGURATION.

· MV INSTALLATION CABLE SCHEDULE ON SHEET E-002 FOR CABLE SIZES

AND ESTIMATED LENGTHS.

· COMMUNICATION SINGLE LINE DIAGRAM ON SHEET E-003 FOR FINAL

CONFIGURATION.

· COMMUNICATION INSTALLATION CABLE SCHEDULE ON SHEET E-003 FOR

NUMBER OF PAIRS/STRANDS AND ESTIMATED LENGTHS.

· CIVIL SHEETS FOR DEMOLITION OF EXISTING FEEDER 5 ELECTRICAL

POLES AND INSTALLATION OF DUCT BANKS, HAND HOLES, MANHOLES,

AND POLE LOCATIONS.

· INSTALLATION DETAILS ON SHEETS C-501 AND C-502 FOR DUCT BANKS,

CONCRETE POLES, AND HAND HOLES.

· INSTALLATION DETAILS ON SHEET E-501 AND E-502 FOR NEW

EQUIPMENT CONNECTIONS, OVERHEAD LINES, AND PAD GROUNDING

INFORMATION.

· GROUNDING NOTES ON SHEET E-001 FOR ADDITIONAL GROUNDING

INFORMATION.

· GROUNDING INSTALLATION DETAILS ON SHEET E-501 FOR INFORMATION

ON MANHOLE GROUND SYSTEM AND GROUNDING OF THE SOLID

DIELECTRIC SWITCHES.

· DEMOLITION NOTES ON SHEET E-101 FOR DEMOLITION OF MV

OVERHEAD LINES, COMMUNICATION CABLES, AND ASSOCIATED POLE

MOUNTED ELECTRICAL EQUIPMENT.

2. REFER TO CIVIL SHEETS C-401 THROUGH C-430 FOR ADDITIONAL INFORMATION

SHOWN OUTSIDE OF ENLARGE PLAN.

3. CONTRACTOR IS RESPONSIBLE FOR VERIFYING TYPE OF TERMINATION TO ALL

EXISTING EQUIPMENT PRIOR TO ORDERING AND SHIPPING MATERIALS.

C22F22 C23 F23

X25

X26

C21F21

E-408 L

THE FOLLOWING SEQUENCE OF CONSTRUCTION ALSO APPLIES TO FACILITY 16545

ON SHEET E-410.

RECONFIGURE FACILITIES 16545 AND 41011 FROM EXISTING FEEDER 5 TO NEW

FEEDER 5.

1. INSTALL NEW MV DUCT BANKS FROM NEW POLE F5/D32 TO MH-627 AND FROM

NEW POLE F5/C42 TO MH-573.

2. PROVIDE TEMPORARY POWER TO FACILITIES 16545 AND 41011 THROUGH

EXISTING PAD-MOUNTED GENERATORS LOCATED AT EACH FACILITY.

3. OPEN AND LOCKOUT/TAG OUT SDS-9 TO DE-ENERGIZE TRANSFORMERS PM

5/09 AND PM 5/11.

4. ENSURE NEW FUSED CUTOUT SWITCHES ON POLE F5/D32 ARE OPEN AND

LOCKOUT/TAG OUT IS APPLIED.

5. INSTALL AND ROUTE NEW FEEDER 5 MV CONDUCTORS FROM F5/D32 TO

MH-627. CUT AND SPLICE EXISTING FEEDER 5 MV CONDUCTORS TO NEW

FEEDER 5 MV CONDUCTORS IN MH-627.

6. DEMOLISH EXISTING MV CONDUCTORS FROM SDS-9/V2 TO EXISTING POLE 72.

INSTALL NEW MV DUCT BANK FROM MH-573 TO SDS-9 AND FROM SDS-9 TO NEW

POLE F5/D1. ROUTE AND TERMINATE NEW MV CONDUCTORS FROM NEW POLE

F5/C42 TO SDS-9/V2 AND FROM F5/D1 TO SDS-9/V3.

7. PERFORM NETA TESTING ON ALL MV CONDUCTORS, SPLICES, AND

TERMINATIONS.

8. REMOVE LOCKOUT/TAG OUT AT SDS-9 AND POLE F5/D32 TO ENERGIZE NEW

FEEDER 5 MV CONDUCTORS. TRANSFER FACILITIES 41011 AND 16545 FROM

GENERATOR POWER TO SDS-9.

FACILITY 41011 AND FACILITY 16545 POWER SEQUENCE OF CONSTRUCTION:

0 20 40 80

1"=40'

SCALE IN FEET

U G

N

(TYP)

1. TRANSITION MV CONDUCTORS FROM OVERHEAD TO UNDERGROUND AT POLE

F5/C42. ROUTE FROM POLE F5/C42 TO EXISTING SDS-9/V2 THROUGH NEW

DUCT BANK AND EXISTING MH-573.

2. ROUTE NEW MV CONDUCTORS FROM EXISTING SDS-9/S3 TO NEW POLE F5/B1

THROUGH EXISTING AND NEW DUCT BANK AND EXISTING MH-573. TRANSITION

AT POLE F5/D1 FROM UNDERGROUND TO OVERHEAD AND CONTINUE

ROUTING ON NEW CONCRETE POLES TO NEW POLE F5/D16 NEAR RADAR. SEE

SHEET E-410 FOR LOCATION.

3. TRANSITION NEW 72 STRAND FIBER OPTIC CABLE AND NEW 300 PAIR COPPER

CABLE FROM OVERHEAD TO UNDERGROUND AT POLE F5/C42. ROUTE FROM

POLE F5/C42 TO EXISTING HH-12 THROUGH NEW DUCT BANK.

4. SPLICE INCOMING 300 COPPER PAIR CABLE IN HH-12 USING SPLICE

CONNECTORS IN NEW PLP MODEL ARMADILLO SST SPLICE CASE, OR

APPROVED EQUIVALENT. SEAL AND PROTECT ALL SPARE PAIRS WITHIN THE

CABLE AND AT THE ARMADILLO SST SPLICE CASE. REFER TO HH-12 COPPER

SPLICE DIAGRAM ON THIS SHEET.

5. SPLICE INCOMING 72 STRAND FIBER OPTIC CABLE IN HH-12 USING FUSION

SPLICE CONNECTORS IN NEW PLP MODEL COYOTE HI-COUNT SST SPLICE

CASE, OR APPROVED EQUIVALENT. SEAL AND PROTECT ALL SPARE FIBERS

WITHIN THE CABLE AND AT THE COYOTE HI-COUNT SST SPLICE CASE. REFER

TO HH-12 FIBER SPLICE DIAGRAM ON THIS SHEET.

6. ROUTE NEW 24 STRAND FIBER OPTIC CABLE AND NEW 100 PAIR COPPER

CABLE FROM EXISTING HH-12 TO FACILITY 41011 THROUGH DIRECT BURIAL

CONDUIT AND NEW HH-C19.

7. ROUTE NEW 48 STRAND FIBER OPTIC CABLE AND NEW 200 PAIR COPPER

CABLE FROM EXISTING HH-12 TO NEW POLE F5/D1 THROUGH DUCT BANK.

TRANSITION BOTH SETS OF CABLES FROM UNDERGROUND TO OVERHEAD AT

POLE F5/D1 AND CONTINUE ROUTING OVERHEAD UNTIL NEW POLE F5/D32 AT

RADAR. SEE SHEET E-410 FOR LOCATION.

8. INSTALL NEW WALL-MOUNTED COMMUNICATION RACK IN FACILITY 41011 TO

HOUSE NEW BUILDING ENTRANCE PROTECTORS.

9. INSTALL NEW BUILDING ENTRANCE PROTECTOR TERMINAL, TII

TECHNOLOGIES MODEL 1581P2, OR APPROVED EQUAL, TO NEW FACILITY

41011 RACK.

10. CONNECT NEW FIBER OPTIC CABLES TO EXISTING PATCH PANEL AND

COPPER CABLES TO NEW BUILDING ENTRANCE PROTECTORS LOCATED IN

FACILITY 41011.

11. RETAIN EXISTING SEAGROUND SYSTEM ROUTED BENEATH EXISTING FEEDER

5 PATH.

12. CORE DRILL EXISTING CONCRETE BLOCK WALL FOR NEW FOUR (4)-INCH

COMMUNICATION CONDUIT. REFERENCE CONDUIT WALL PENETRATION

DETAIL ON SHEET C-502.

13. INSTALL NEW PRECAST COMMUNICATION HANHOLE PER MANUFACTURER'S

INSTRUCTIONS AND IN ACCORDANCE WITH TYPICAL HANDHOLE DETAIL ON

SHEET C-502.

COYOTE

SPLICE

CASE

48 STRAND CABLE

ACTIVE: 48

SPARE: 0

72 STRAND CABLE

ACTIVE: 72

SPARE: 0

24 STRAND CABLE

ACTIVE: 24

SPARE: 0

TO UTILITY POLE F5/D16 AND F5/D17 SHEET E-410

TO

FAC

ILITY 41011 O

N

TH

IS SH

EET

TO UTILITY POLES F5/C38 AND F5/C39 ON SHEET E-406

SCALE:

HH-12 FIBER SPLICE DIAGRAM

N.T.S.

N

SCALE:

HH-12 COPPER SPLICE DIAGRAM

N.T.S.

N

HH-12

ARMADILLO

SPLICE

CASE

200 PAIR CABLE

ACTIVE: 200

SPARE: 0

300 PAIR CABLE

ACTIVE: 300

SPARE: 0

100 PAIR CABLE

ACTIVE: 100

SPARE: 0

TO UTILITY POLE F5/D16 AND F5/D17 ON SHEET E-410

TO

FAC

ILITY 41011 O

N

TH

IS SH

EET

TO UTILITY POLES F5/C38 AND F5/C39 ON SHEET E-406

HH-12

EXISTING POLE 72

M .S

M

IT

H

B.

KO

LA

K

NEW HH-C1913

1. INSTALL NEW HH-C19 AND UNDERGROUND CONDUITS BETWEEN HH-12 AND

FACILITY 41011. NEW UNDERGROUND CONDUITS WILL TRANSITION TO ABOVE

GRADE OUTSIDE FACILITY 41011 AND PENETRATE THROUGH THE EXTERIOR

WALL OF FACILITY 41011.

2. INSTALL NEW COMMUNICATION RACK WITH BUILDING ENTRANCE PROTECTORS

IN FACILITY 41011.

3. INSTALL AND ROUTE NEW COMMUNICATION CABLES FROM HH-12 TO NEW

BUILDING ENTRANCE PROTECTOR AND EXISTING FIBER OPTIC PATCH PANEL IN

FACILITY 41011 THROUGH NEW HH-C19, NEW UNDERGROUND CONDUITS, AND

EXISTING FACILITY 41011 CABLE VAULT.

4. TEST NEW COMMUNICATION CABLES FOR ANY DAMAGES PRIOR TO

TERMINATING CABLES TO BUILDING ENTRANCE PROTECTOR AND FIBER OPTIC

PATCH PANEL.

5. CONNECT NEW COPPER COMMUNICATION CABLES TO NEW BUILDING

ENTRANCE PROTECTOR AND REMOVE EXISTING COPPER COMMUNICATION

CABLES. RETAIN EXISTING BUILDING ENTRANCE PROTECTORS FOR FUTURE

USAGE.

6. REMOVE EXISTING FIBER OPTIC CABLE FROM EXISTING FIBER OPTIC PATCH

PANEL AND TERMINATE NEW 24 STRAND FIBER OPTIC CABLE.

7. TRANSFER FACILITY 41011 TO NEW COMMUNICATION CABLES AND REMOVE

DISCONNECTED COMMUNICATION CABLES FROM FACILITY 41011 TO EXISTING

HH-12. CUT AND CAP EXISTING CONDUIT IN FACILITY 41011.

FACILITY 41011 COMMUNICATION SEQUENCE OF CONSTRUCTION:

A M

IS

SI

N G

B

AC

KG

R

O U

N D

R

EF

ER

EN

C E

/2

7/

BK

Sheets and Views
E-402

File details come from the government source that posted it. Updated .