3. YXTK 13-1806 Recovered Materials Determination Form (Green Procurement).pdf

PDF 745 KB Posted

Attached to
YXTK 13-1806 Repair Electrical Distribution Lines, Feeder 5, Ascension Auxiliary Airfield (AAAF), South Atlantic Ocean
Solicitation number
FA252125B0009
Issued by

About this file

This document is a Recovered Materials Determination Form for a procurement titled YXTK 13-1806 RPR Elect Dist AAAF – Feeder 5. The form addresses EPA-designated items and recycled content requirements for the procurement action. Specifically, the form indicates that for construction products, the procurement includes cement and concrete containing coal fly ash and ground granulated blast furnace slag, and for transportation products, it includes traffic barricades and traffic cones.

The form demonstrates compliance with Federal Acquisition Regulation (FAR) requirements for environmentally preferable and energy-efficient products. In Part 1, Russell Twardowski certified that EPA recycled content requirements have been specified for all designated guideline items. In Part 2, the same individual confirmed that EPA recycled content requirements were met for all designated items specified in the procurement action. The form provides mechanisms for potential exemptions if recycled content items are not competitively available, meet performance standards, or are prohibitively expensive.

View the file

Other files

File Type Posted
FA252125B0009 SF1409.pdf PDF
24. Geology Study-Investigation (1997) (Ref Only).pdf PDF
23. YXTK 13-1806 RPR FDR 5 Design Analysis (Section 5) (Ref Only)).pdf PDF
22. Government Response to Contractor Submitted Questions.pdf PDF
FA252125B0009 A004.pdf PDF
FA252125B0009 A003.pdf PDF
FA252125B0009 A002.pdf PDF
Solicitation Amendment FA252125B00090001 SF 30.pdf PDF
16. Enivronmental Final Governing Standards Ascension Island.pdf PDF
14. YXTK 13-1806 DWG E-409 (RevA).pdf PDF
6. CECC Form 3052 Template.xlsx XLSX spreadsheet
4. Contractor HAZMAT Usage Worksheet.xlsx XLSX spreadsheet
19. Ascension Island PSD.pdf PDF
18. Catherine Point PSD (Services Distribution).pdf PDF
17. Installation Facility Standards Ascension Auxiliary Airfield.pdf PDF
13. YXTK 13-1806 (FY23 Historical Contractor Question-Govt Responses).pdf PDF
2. YXTK 13-1806 Specifications.pdf PDF
1. YXTK 13-1806 DWG.pdf PDF
20. Fiber Wall Mount Dist Cabinets Photos.pdf PDF
15. Concrete Mix Design (Local Aggregate).pdf PDF
12. MH 42 Photos.pdf PDF
11. Site Visit Procedures.pdf PDF
5. Record of EqmtMat List Template (OM Database).xlsx XLSX spreadsheet
21. Facility 800 Photos.pdf PDF
10. QA Template.docx DOCX document
7. Contractor Travel Request Form.pdf PDF
FA252125B0009 (YXTK 13-1806 RPR Electrical Dist Sys (Feeder 5)) IFB.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C-1

UNCLASSIFIED

RECOVERED MATERIALS DETERMINATION FORM

(Part 1) Design/Procurement

INSTRUCTIONS

This form is to be completed by the requiring activity when EPA-designated items are applicable to the requirement. For questions on whether the product counts as “EPA-designated” or what the required recycled content is, refer to product descriptions on EPA’s website at www.epa.gov/cpg/products.htm.

This form is not required for construction item purchases less than $2,000, or for other purchases less than $3,000. The completed form becomes part of the contracting office contract file.

PROCUREMENT TITLE: YXTK 13-1806 RPR Elect Dist AAAF – Feeder 5

PROCUREMENT REQUEST NO.

PART 1: RECOVERED MATERIALS DETERMINATION

Part 1 shall be completed by the specifying authority when requesting a procurement action.

EPA-DESIGNATED ITEMS

(Place a check mark next to each product that applies to this procurement)

Construction Products:

Building insulation Polyester carpet Carpet cushion

Cement & concrete containing:

- Coal fly ash

- Ground granulated blast furnace slag

- Cenospheres

- Silica fume Floor tiles (rubber & plastic) Flowable fill Latex paint Laminated paperboard Modular threshold ramps Nonpressure pipe Patio blocks Railroad grade crossings/surfaces Roofing materials Shower & restroom dividers/partitions Structural fiberboard

Landscaping Products:

Compost from yard trimmings or food waste

Garden and soaker hoses Hydraulic mulch Lawn and garden edging Plastic lumber landscaping timbers and posts

Park & Recreation Products:

Park and recreational furniture

Playground equipment Playground surfaces Running tracks Plastic fencing (snow or erosion control, safety barriers)

Non-paper Office Products:

Binders (paper, solid plastic or plastic covered)

Plastic clipboards Plastic file folders Plastic clip portfolios Plastic presentation folders Office furniture Office recycling containers Office waste receptacles Plastic desktop accessories Plastic envelopes Plastic trash bags Printer ribbons Toner cartridges

Paper & Paper Products:

Commercial/industrial sanitary tissue products

Miscellaneous papers Newsprint

Paperboard and packaging Printing and writing papers Tray liners

Vehicular Products:

Engine coolants Rebuilt vehicular parts Re-refined lubricating oils Retread tires

Transportation Products

Channelizers Delineators Flexible delineators Parking stops Traffic barricades Traffic cones

Miscellaneous Products:

Awards and plaques Bike racks Blasting grit Industrial drums Mats Pallets Signage Sorbents Strapping

GREEN PROCUREMENT FORMS

RECOVERED MATERIALS DETERMINATION FORM

(PART 1) Design/Procurement (Cont’d)

PROCUREMENT TITLE: YXTK 13-1806 RPR Elect Dist AAAF – Feeder 5

PROCUREMENT REQUEST NO.

FAR 11.002(c) requires the establishment of statements of work and specification requirements for the procurement of products containing recovered materials and environmentally preferable and energy-efficient products and services.

If no EPA designated items were checked on page 1, than check box A:

A.

I hereby certify that no EPA designated guideline items are included in this procurement action

If any EPA designated items are checked on page 1, than mark box B or C:

B.

I hereby certify that the EPA recycled content requirements have been specified for all of the designated guideline items in this procurement action

OR

C.

I hereby certify that the EPA recycled content requirements have been specified for all but the following designated guideline items for which compliance with EPA standards is not attainable

If Box C is checked, list each designated item and the corresponding justification number from the list below for each exemption being claimed. Attach the supporting documentation for each waiver.

The exemption being claimed for this purchase is:

1. The product is not available competitively (from two or more sources) within a reasonable time frame;

2. The product is only available at an unreasonable price (based on a life-cycle cost analysis);

3. The product does not meet appropriate performance standards (in accordance with

National Institute of Standards and Technology (NIST) guidelines.)

Designated Item Justification #

1.

2.

3.

Design/Specifying Agent Signature Date

Requiring Organization’s Technical Representative Signature

Date

Russell Twardowski

RECOVERED MATERIALS DETERMINATION FORM

(PART 2) Construction

PROCUREMENT TITLE: YXTK 13-1806 RPR Elect Dist AAAF – Feeder 5

PROCUREMENT REQUEST NO.

Part 2 of this certification is to be completed upon receipt of the purchase goods and services.

If EPA designated items were specified in this procurement action, the contractor/supplying agent shall complete Part 2 of this certification upon delivery of the products or services.

Attach supporting documentation identifying percentage of recovered material content used in each designated item. NOTE: A designated item is specified if no exemptions were prepared and identified in Part 1.C of this form during the development of this procurement action.

Check the appropriate box:

A.

EPA recycled content requirements have been met for all designated items specified in this procurement action.

OR

B.

EPA recycled content requirements have been met for all but the following EPA designated guideline item(s) for which compliance with EPA standards was not attainable.

If Box B is checked, list each designated item and the corresponding justification number from the list below for each exemption claimed. Attach the supporting documentation for each waiver item listed.

The exemption being claimed for this purchase is:

1. The product is not available competitively (from two or more sources) within a reasonable time frame;

2. The product is only available at an unreasonable price (based on a life-cycle cost analysis);

3. The product does not meet appropriate performance standards (in accordance with

National Institute of Standards and Technology (NIST) guidelines.)

Designated Item Justification #

1.

2.

3.

Contractor/Supplying Agent Signature Date

Requiring Organization’s Technical Representative Signature

Date

MATERIALS DETERMINATION FORM

Waiver Form

PROCUREMENT TITLE: YXTK 13-1806 RPR Elect Dist AAAF – Feeder 5

PROCUREMENT REQUEST NO.

The technical authority shall prepare a separate justification for each designated item purchased that does not meet EPA standards as part of this procurement action:

The following item does not comply with EPA standards for recycled/recovered materials:

The exemption being claimed for this purchase is:

The product is not available competitively (from two or more sources) within a reasonable time frame;

The product does not meet appropriate performance standards (in accordance with National Institute of Standards and Technology (NIST) guidelines);

The product is only available at an unreasonable price (based on a price analysis that considers life-cycle cost). The recycled-content product costs $ per and the non-recycled-content product costs $ per .

This written justification is made in accordance with 42USC 6962(c)(1):

Design/Specifying Agent’s Signature Date

Requiring Organization’s Technical Representative Signature Date

Contracting Officer’s Signature Date

Rationale for exemption: (Please provide the rationale upon which this justification was based. Include vendor names, points of contact, life-cycle cost analysis and any other documentation that supports this decision.)

2021-12-09T17:51:23-0800
Agreement certified by Adobe Sign

File details come from the government source that posted it. Updated .