17. Installation Facility Standards Ascension Auxiliary Airfield.pdf

PDF 155 KB Posted

Attached to
YXTK 13-1806 Repair Electrical Distribution Lines, Feeder 5, Ascension Auxiliary Airfield (AAAF), South Atlantic Ocean
Solicitation number
FA252125B0009
Issued by

About this file

This document is an Installation Facilities Standards (IFS) for Space Launch Delta 45's Ascension Auxiliary Airfield, providing detailed construction and equipment specifications for facility development in an extremely corrosive maritime environment. The standards mandate specific requirements for structures, including using bare slip-face beige blocks, concrete precast fence posts, factory-coated aluminum roofing from Interlock lifetime systems, and Schlage brand locks. For HVAC systems, only Trane equipment is permitted, with units requiring a specialized aluminum-impregnated polyurethane coating rated for 10,000-hour salt spray protection. Electrical specifications call for Square D products and Schedule 80 PVC for all underground and above-ground installations. The document emphasizes using high-grade materials to mitigate corrosion challenges, noting the Ascension location's unique logistical constraints, such as limited shipping access and maintenance supply chain difficulties.

View the file

Other files

File Type Posted
FA252125B0009 SF1409.pdf PDF
24. Geology Study-Investigation (1997) (Ref Only).pdf PDF
23. YXTK 13-1806 RPR FDR 5 Design Analysis (Section 5) (Ref Only)).pdf PDF
22. Government Response to Contractor Submitted Questions.pdf PDF
FA252125B0009 A004.pdf PDF
FA252125B0009 A003.pdf PDF
FA252125B0009 A002.pdf PDF
Solicitation Amendment FA252125B00090001 SF 30.pdf PDF
19. Ascension Island PSD.pdf PDF
18. Catherine Point PSD (Services Distribution).pdf PDF
13. YXTK 13-1806 (FY23 Historical Contractor Question-Govt Responses).pdf PDF
2. YXTK 13-1806 Specifications.pdf PDF
1. YXTK 13-1806 DWG.pdf PDF
21. Facility 800 Photos.pdf PDF
10. QA Template.docx DOCX document
7. Contractor Travel Request Form.pdf PDF
FA252125B0009 (YXTK 13-1806 RPR Electrical Dist Sys (Feeder 5)) IFB.pdf PDF
16. Enivronmental Final Governing Standards Ascension Island.pdf PDF
14. YXTK 13-1806 DWG E-409 (RevA).pdf PDF
6. CECC Form 3052 Template.xlsx XLSX spreadsheet
4. Contractor HAZMAT Usage Worksheet.xlsx XLSX spreadsheet
3. YXTK 13-1806 Recovered Materials Determination Form (Green Procurement).pdf PDF
20. Fiber Wall Mount Dist Cabinets Photos.pdf PDF
15. Concrete Mix Design (Local Aggregate).pdf PDF
12. MH 42 Photos.pdf PDF
11. Site Visit Procedures.pdf PDF
5. Record of EqmtMat List Template (OM Database).xlsx XLSX spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Space Launch Delta 45 (Ascension Auxiliary Airfield) Installation Facilities Standards (IFS)

G02 SLD45 IFS Ascension Auxiliary Airfield Standards

Comply with Air Force Corporate Standards for Overview:

http://afcfs.wbdg.org/index.html

Summary of Sections in this Supplementary Document:

G02.0. General Overview G02.1. Structures G02.2. Heating Ventilation & Air Conditioning (HVAC) G02.3. Electrical G02.4. Reserved G02.5. Coordination & Approvals

G02.0. General Overview

1. Note: This Supplementary Document is provided as a supplement to the SLD45 IFS. If there are any discrepancies between this Supplementary Document and the requirements of the IFS, the IFS will govern.

2. This Supplementary Document supersedes all previous versions of Patrick AFB/Cape Canaveral AFS, or Patrick SFB/Cape Canaveral SFS Standards and 45th Space Wing Facilities Excellence plan/guide.

3. This is not intended to be all encompassing guidance. These standards also address corrosion concerns as outlined in UFC 01-200-01 with PSFB/CCSFS being rated the highest corrosive environment in DoD. The highest-grade material is to be used or exceeded. These create additional cost that can become very high. To alleviate these high costs, the following standards keep cost low with simple changes. These changes also will extend lifespan on all these systems.

The Standards listed in this supplement are in addition to requirements set forth in the following Unified Facilities Criteria; design must follow the latest:

a. UFC 1-200-01 DoD Building Code

b. UFC 1-200-02 High Performance and Sustainable Building Requirements

c. UFC 3-120-01 Design, Sign Standards.

4. The SLD45 IFS and supplements G.03 through G.17 will be the main standards to follow for Ascension AAF except as outlined in this G.02 IFS supplement.

5. Manufacturers (Mfr.) listed in this IFS are provided only to establish a level of quality for use when designers write the salient characteristics of the brand-name item in project specifications following Federal Acquisition Regulations (FAR).

6. Due to the austere location of Ascension in the middle of the Atlantic Ocean, it is imperative to only use the manufactures outlined in this supplement due to shipping cost to this location.

Maintenance crews cannot upkeep multiple brand name parts, since there is no access to a rapid supply chain at all.

http://afcfs.wbdg.org/index.html

G02.1. Structures

1. For Facility construction, use bare slip-face block with integral color factory beige. Do not paint block.

a.

2. Fence post must be concrete precast or composite. Do not use any form or metal or galvanized.

a. Cementex CCP4X4X8CP 4 x4 ince x 8 foot concrete post by cement precast products.

3. For roofing, use only factory coated aluminum roofing.

a. Interlock lifetime roofing systems.

4. Lock systems must use “Schlage” brand

5. Any exposed steel system must be coated with inorganic zinc.

6. Reserved

G02.2. Heating Ventilation & Air Conditioning systems

1. See SLD45 IFS appendix G10 for further details. Trane systems must only be used.

2. The unit must be equipped with a harsh environment protection through a factory-applied coating.

This coating, consisting of aluminum-impregnated polyurethane and rated for a 10,000-hour salt spray per ASTM B117, will cover all exposed areas of the unit, including all of the coils, (evaporator, condenser, hot gas re-heat, and liquid sub-cooling), compressors, interior and exterior panels, piping, and gas heaters. Coating must be applied from the point of outdoor air intake up to 12 inches past the coils to ensure maximum corrosive protection at vulnerable areas exposed to corrosive air.

3. All other exposed steel parts must be coated with inorganic zinc.

G02.3. Electrical.

1. Use Square D products. Refer to SLD45 IFS G14 for further directives.

2. Only use Schedule 80 PVC for underground and above ground.

G02.4. Reserved.

G02.5. Coordination & Approval

APPROVED:

Chief, Engineering Flight, 45 CES/CEN; 321-494-2129 SLD45 Building Official/ AHJ

End of Section

Summary of Sections
G02.0. General Overview
G02.1. Structures
G02.2. Heating Ventilation & Air Conditioning systems
G02.3. Electrical.
G02.4. Reserved.
G02.5. Coordination & Approval