This solicitation is for EHRM infrastructure upgrades at Fort Meade. The Department of Veterans Affairs Technology Acquisition Center Austin is seeking proposals for construction services related to EHRM training and administrative space support at the Kansas City VAMC. Key details include construction of mechanical, electrical, and plumbing systems to support the training and administrative spaces. The response date is not provided. The solicitation involves upgrades to mechanical, electrical, and plumbing systems to support the specified spaces.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Training and Admin Space Support Construction - Kansas City VAMC, newest first.
File Type Posted
Addendum 01 Drawings and Specifications.pdf PDF
36C77623B0020 0003.docx DOCX document
Sign in Sheet - 36C77623B0020 EHRM Training and Admin Space - KC.pdf PDF
36C77623B0020 0002.docx DOCX document
Data Center Location.pdf PDF
Wage Rates 4-28-23.pdf PDF
71-02-C17 Pipe Trench.pdf PDF
Technical Questions - Responses.pdf PDF
Attachment 17 - Site Map.pdf PDF
Attachment 7 - Architectural - Drawings.pdf PDF
Attachment 3 - General - Drawings.pdf PDF
Attachment 11 - Electrical - Drawings.pdf PDF
36C77623B0020 0001.docx DOCX document
Attachment 14 - Wage Rates - 3-3-23.pdf PDF
Attachment 13 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 12 - Technology - Drawings.pdf PDF
Attachment 8 - Fire Protection - Drawings.pdf PDF
Attachment 6 - Structural - Drawings.pdf PDF
Attachment 4 - Hazardous - Drawings.pdf PDF
Attachment 2 - Specifications - Volume II - EHRM Training Support KC.pdf PDF
Attachment 1 - Specifications - Volume I - EHRM Training Support KC.pdf PDF
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 15 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 9 - Plumbing - Drawings.pdf PDF
Attachment 5 - Civil - Drawings.pdf PDF
Attachment 10 - Site Map.pdf PDF
Attachment 8 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 7 - Wage Rates - 3-3-23.pdf PDF
Attachment 9 - Site Visit Instructions.pdf PDF
Attachment 6 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 1 - Specifications - Volume I - EHRM Training Support KC - Final.pdf PDF
Attachment 5 - Drawings - EHRM Training and Support KC - 54 - 72.pdf PDF
36C77623B0020_1.docx DOCX document
Attachment 3 - Drawings - EHRM Training and Support KC - 1-30.pdf PDF
Attachment 4 - Drawings - EHRM Training and Support KC - 31-53.pdf PDF
Attachment 2 - Specifications - Volume II - EHRM Training Support KC - Final.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS

HVAC PIPING TYPES

GENERAL DUCT SYMBOLS

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACC AIR COOLED CONDENSER

ACU AIR CONDITIONING UNIT

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERAGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND REFRIGERATION

INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C

C CENTIGRADE (CELSIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CENT CENTRIFUGAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CI CAST IRON

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CARBON MONOXIDE

CO2 CARBON DIOXIDE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

A

F

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

E

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

ETR EXISTING TO REMAIN

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX. EXISTING

D

DB DECIBELS

Db DRY-BULB TEMPERATURE

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT EXCHANGER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOHX FUEL OIL HEAT EXCHANGER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

FSD COMBINATION FIRE / SMOKE DAMPER

G

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

K kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

J

J INTENTIONALLY LEFT BLANK

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTEGRATED PART LOAD VALUE

IRH INFRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

H

HU HUMIDIFIER

H&CW HOT & COLD WATER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPC HIGH PRESSURE STEAM CONDENSATE RETURN

HPS HIGH PRESSURE STEAM (61-300 PSIG)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HC HOT WATER HEATING COIL

HHP HEATING HOT WATER PUMP

HHR HEATING HOT WATER RETURN

HHS HEATING HOT WATER SUPPLY

HHUH HOT WATER UNIT HEATER

HX HEAT EXCHANGER

HZ HERTZ

I

L

L LITER

L/h LITERS PER HOUR (OR LITERS/HOUR) L/m LITERS PER MINUTE (OR LITERS/MINUTE) L/s LITERS PER SECOND (OR LITERS/SECOND)

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LPG LIQUID PROPANE GAS

LPC LOW PRESSURE STEAM CONDENSATE RETURN

CLPC LOW PRESSURE STEAM CONDENSATE (CLEAN)

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPS LOW PRESSURE STEAM (0-15 PSIG)

CLPS LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

N

NA NOT APPLICABLE

NC NOISE CRITERIA

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

NOAA NATIONAL OCEANIC & ATMOSPHERIC

ADMINISTRATION

M

M METER, SI UNIT

M/s METERS PER SECOND

(OR METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MERV MINIMUM EFFICIENCY REPORTING VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPC MEDIUM PRESSURE STEAM CONDENSATE

RETURN

MPS MEDIUM PRESSURE STEAM (16-60 PSIG)

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

P

P PUMP

PA PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PF PRE-FILTER

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER (SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR CONDITIONER

O

OA OUTSIDE AIR

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OSD ORGANIC SOIL FILTER

Q

Q INTENTIONALLY LEFT BLANK

T&PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCR SILICON CONTROLLED RECTIFIER

DSD DUCT SMOKE DETECTOR

SD SMOKE DAMPER

SEN SENSIBLE HEAT

SF SUPPLY FAN

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

SUH STEAM UNIT HEATER

SVS STEAM VENT SILENCER

SWHX STEAM TO WATER HEAT EXCHANGER

R

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD REFRIGERANT AIR DRYER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD REFRIGERANT DISCHARGE

REA RELIEF AIR

RF RETURN FAN

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

T

UC UNDER CUT

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

URV UPBLAST UNIT VENTILATOR

U

X INTENTIONALLY LEFT BLANK

W

W WATTS

WAG WASTE ANESTHESIA GAS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMPS

WCPU WATER COOLED PACKAGED UNIT

WF WATER FILTER

WFM WATER FLOWMETER

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VI VIBRATION ISOLATOR

VIV VARIABLE INLET VANES

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE) RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

X

V

GENERAL NOTES:

A. MECHANICAL PLANS AND SECTIONS ARE INTENDED TO ACCURATELY ILLUSTRATE THE

SCOPE OF WORK BUT ARE STILL DIAGRAMMATIC IN NATURE.

B. MECHANICAL DRAWINGS DO NOT SHOW ALL ACCESSORIES TO BE INSTALLED. THE

CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL SYSTEMS ARE FULLY

FUNCTIONAL AND COMPLIANT WITH APPLICABLE CODES.

C. THE EXISTING CONDITIONS DEPICTED IN THESE PLANS ARE BASED ON AS-BUILT

DOCUMENTATION AND INFORMATION OBTAINED FROM FIELD SURVEYS AND ARE AS

ACCURATE AS POSSIBLE. DUE TO OBSTRUCTIONS, CEILINGS, ETC., NOT ALL CONDITIONS

COULD BE VERIFIED. THE CONTRACTOR SHALL SURVEY THE SITE PRIOR TO BID AND

NOTIFY THE ARCHITECT/ENGINEER OF ANY CONFLICTS, OBSTRUCTIONS, OR

INCONSISTENCIES PREVENTING INSTALLATION OF THE MECHANICAL SYSTEM.

D. ALL EXPOSED UNINSULATED PIPING SHALL BE PAINTED PER THE SPECIFICATION SECTION

"PAINTING".

E. COORDINATE FAN COIL (FCU) AND TERMINAL UNIT (TU/VAV/CV) REHEAT COIL RIGHT OR

LEFT HAND COIL CONNECTIONS WITH PIPING PLANS.

F. ALL FLUE AND COMBUSTION AIR PIPING FROM GAS-FIRED EQUIPMENT SHALL BE SIZED BY

THE GAS-FIRED EQUIPMENT MANUFACTURER BASED ON THE SPECIFIC PIPE ROUTING AND

ELEVATIONS FOR THIS PROJECT. REFER TO MANUFACTURERS INSTALLATION MANUAL AND

LOCAL CODE REQUIREMENTS FOR REQUIRED FLUE AND COMBUSTION AIR PIPING

MATERIALS.

G. PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT

TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE.

H. PROVIDE VIBRATION ISOLATORS FOR ALL PIPING SUPPORTS CONNECTED TO AND WITHIN

50' OF ISOLATED EQUIPMENT (EXCEPT AT BASE ELBOW SUPPORTS AND ANCHOR POINTS)

THROUGHOUT MECHANICAL EQUIPMENT ROOMS. DO THE SAME FOR SUPPORTS OF STEAM

MAINS WITHIN 50' OF BOILER OR PRESSURE REDUCING VALVES.

I. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL,

STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENT

DRAWINGS.

J. MAINTAIN A MINIMUM OF 6′-8″ CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS,

SUSPENDED EQUIPMENT, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL ROOMS.

K. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING

INSULATION IS APPLIED.

L. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE

LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UP AND DOWNSTREAM AS

RECOMMENDED BY THE MANUFACTURER FOR GOOD ACCURACY.

M. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS CERTIFIED

DRAWINGS. COORDINATE AND PROVIDE ALL DUCT AND PIPING TRANSITIONS REQUIRED

FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND

COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE FABRICATION.

CWR

CWS

CD

LPC

LPS

MPC

MPS

HPC

HPS

CONDENSATE DRAIN

CONDENSER WATER SUPPLY

CONDENSER WATER RETURN

HIGH PRESSURE STEAM CONDENSATE

HIGH PRESSURE STEAM SUPPLY

MEDIUM PRESSURE STEAM CONDENSATE

MEDIUM PRESSURE STEAM SUPPLY

LOW PRESSURE STEAM CONDENSATE

LOW PRESSURE STEAM SUPPLY

VACUUM RETURN

FEEDWATER PUMP DISCHARGE

FEEDWATER PUMP SUCTION

VR

CONTINUOUS BLOWDOWN

CHEMICAL FEED

BOILER BLOWOFF BO

CF

CBD

FWPD

FWPS

A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO

INSTALL COMPLETE AND OPERABLE PIPING SYSTEMS AS INDICATED ON THE DRAWINGS, AS

SPECIFIED AND AS REQUIRED BY CODE.

B. ELEVATIONS AS SHOWN ON THE DRAWINGS ARE TO THE CENTERLINE OF ALL PRESSURE

PIPING AND TO THE INVERT OF ALL GRAVITY PIPING.

C. MAINTAIN A MINIMUM OF 3′-6″ OF GROUND COVER OVER ALL UNDERGROUND HVAC PIPING

(EDIT DEPTH OF GROUND COVER TO SUIT FROST LINE DEPTH AND PROJECT

REQUIREMENTS).

D. UNLESS OTHERWISE NOTED, ALL CHILLED WATER AND HEATING WATER PIPING SHALL BE

3/4" SIZE (EDIT SYSTEM TYPE OR PIPE SIZE TO SUIT PROJECT REQUIREMENTS).

E. PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH DROP IN THE HEATING WATER, CHILLED

WATER, AND OTHER CLOSED WATER PIPING SYSTEMS (EDIT SYSTEM TYPES TO SUIT

PROJECT REQUIREMENTS). ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAIN VALVES AT THE BOTTOM OF ALL RISERS AND LOW POINTS.

F. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO UNDERSIDE OF

STRUCTURE OR SLAB, WITH SPACE FOR INSULATION IF REQUIRED.

G. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND OTHER

APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.

H. ALL VALVES SHALL BE INSTALLED SO THAT VALVE REMAINS IN SERVICE WHEN EQUIPMENT

OR PIPING ON EQUIPMENT SIDE OF VALVE IS REMOVED.

I. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE PROVIDED WITH POSITION

INDICATORS AND MAXIMUM ADJUSTABLE STOPS (MEMORY STOPS).

J. PROVIDE CHAINWHEEL OPERATORS FOR ALL VALVES IN EQUIPMENT ROOMS MOUNTED

GREATER THAN 7′-0″ ABOVE FLOOR LEVEL; CHAIN SHALL EXTEND TO 7′-0″ ABOVE FLOOR

LEVEL.

K. ALL VALVES (EXCEPT CONTROL VALVES) AND STRAINERS SHALL BE FULL SIZE OF PIPE

BEFORE REDUCING SIZE TO MAKE CONNECTIONS TO EQUIPMENT AND CONTROLS.

L. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE OF EQUIPMENT, IN

BYPASSES, AND IN LONG PIPING RUNS (100' OR MORE) TO PERMIT DISASSEMBLY FOR

ALTERATION AND REPAIRS.

M. PITCH STEAM PIPING DOWNWARD IN THE DIRECTION OF FLOW 1/4" IN 10' (1" IN 40') MINIMUM.

PITCH ALL STEAM RETURN LINES DOWNWARD IN THE DIRECTION OF CONDENSATE FLOW

1/2" PER 10' (1" IN 20') MINIMUM. WHERE LENGTH OF BRANCH LINES ARE LESS THAN 8', PITCH

BRANCH LINES TOWARD MAINS 1/2" PER FOOT MINIMUM.

N. PITCH UP ALL STEAM AND CONDENSATE RUNOUTS TO RISERS AND EQUIPMENT 1/2" PER

FOOT. WHERE THIS PITCH CANNOT BE OBTAINED, RUNOUTS OVER 8' IN LENGTH SHALL BE

ONE SIZE LARGER THAN NOTED.

O. TAP ALL BRANCH LINES FROM TOP OF STEAM MAINS (45° PREFERRED, 90° ACCEPTABLE).

A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO

INSTALL COMPLETE AND OPERABLE HVAC SYSTEMS AS INDICATED ON THE DRAWINGS, AS

SPECIFIED AND AS REQUIRED BY CODE.

B. CERTAIN ITEMS SUCH AS RISES AND DROPS IN DUCTWORK, ACCESS DOORS, VOLUME

DAMPERS, ETC., ARE INDICATED ON THE CONTRACT DOCUMENT DRAWINGS FOR CLARITY

FOR A SPECIFIC LOCATION REQUIREMENT AND SHALL NOT BE INTERPRETED AS THE

EXTENT OF THE REQUIREMENTS FOR THESE ITEMS.

C. IN CORRIDORS WHERE CEILING SPEAKERS AND AIR DIFFUSERS ARE INDICATED BETWEEN

THE SAME LIGHT FIXTURES, INSTALL BOTH DEVICES AT THE QUARTER POINTS BETWEEN

THE SAME FIXTURE.

D. UNLESS OTHERWISE SHOWN, LOCATE ALL ROOM THERMOSTATS AND HUMIDISTATS 4′-0″

(CENTERLINE) ABOVE FINISHED FLOOR.

E. ALL DUCTWORK SHALL CLEAR DOORS AND WINDOWS.

F. ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR

DIMENSIONS AND DUCT SIZE SHALL BE INCREASED TO COMPENSATE FOR DUCT LINING

THICKNESS.

G. PROVIDE ALL 90° SQUARE ELBOWS WITH DOUBLE RADIUS TURNING VANES UNLESS

OTHERWISE INDICATED. ELBOWS IN DISHWASHER, KITCHEN, AND LAUNDRY EXHAUST

SHALL BE UNVANED SMOOTH RADIUS CONSTRUCTION WITH A RADIUS EQUAL TO 1.5 TIMES

THE WIDTH OF THE DUCT. PROVIDE ACCESS DOORS UPSTREAM OF ALL ELBOWS WITH

TURNING VANES.

H. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH ARCHITECTURAL

REFLECTED CEILING PLANS, LIGHTING, AND OTHER CEILING ITEMS AND MAKE MINOR DUCT

MODIFICATIONS TO SUIT.

I. FIELD ERECTED AND FACTORY ASSEMBLED AIR HANDLING UNIT COILS SHALL BE

ARRANGED FOR REMOVAL FROM THE UPSTREAM SIDE WITHOUT DISMANTLING SUPPORTS.

PROVIDE GALVANIZED STRUCTURAL STEEL SUPPORTS FOR ALL COILS (EXCEPT LOWEST

COIL) IN BANKS OVER TWO COILS HIGH TO PERMIT INDEPENDENT REMOVAL OF ANY COIL.

J. ALL AIR HANDLING UNITS SHALL OPERATE WITHOUT MOISTURE CARRYOVER.

K. LOCATE ALL MECHANICAL EQUIPMENT (SINGLE DUCT, DUAL DUCT, VARIABLE VOLUME,

CONSTANT VOLUME AND FAN POWERED BOXES, FAN COIL UNITS, CABINET HEATERS, UNIT

HEATERS, UNIT VENTILATORS, COILS, STEAM HUMIDIFIERS, ETC.) FOR UNOBSTRUCTED

ACCESS TO UNIT ACCESS PANELS, CONTROLS AND VALVING.

L. FINNED TUBE RADIATION ENCLOSURES SHALL BE WALL TO WALL UNLESS OTHERWISE

INDICATED.

M. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS (SUPPLY, RETURN, AND

EXHAUST) CONNECTED TO AIR HANDLING UNITS, FANS, AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT THE

POINT OF CONNECTION TO THE EQUIPMENT UNLESS OTHERWISE INDICATED.

PIPING GENERAL NOTES: HVAC/SHEET METAL GENERAL NOTES:

EXISTING TO BE DEMOLISHED

LIMIT OF DEMOLITION

CONNECT NEW TO EXISTINGEXISTING TO REMAIN

NEW DUCT (INSIDE DIMENSIONS: W" X D")

RS

RL

REFRIGERANT SUCTION

REFRIGERANT LIQUID

SUPPLY AIR DUCT UP

SUPPLY AIR DUCT DOWN

H

T

H

T

26-P-3

MH-100

PUMP NO. 3 IN BUILDING NO. 26

EQUIPMENT ABBREVIATION (PUMP)

DETAIL NUMBER

SHEET NUMBER

SHEET NUMBER

SECTION NUMBER

THERMOSTAT

HUMIDISTAT

TEMPERATURE SENSOR

HUMIDITY SENSOR

BUILDING NUMBER WHERE EQUIPMENT

IS LOCATED

26-TU-1-1

ITEM NUMBER (TERMINAL UNIT NO. 1)

ITEM (TERMINAL UNIT)

BUILDING NUMBER WHERE EQUIPMENT

IS LOCATED

SERVED BY AIR HANDLER UNIT NO. 1

TERMINAL UNIT TAG

MECHANICAL EQUIPMENT TAG

1 OWNER FURNISHED, CONTRACTOR

INSTALLED EQUIPMENT DESIGNATION

EXISTING TO BE DEMOLISHED

EXISTING TO REMAIN

NEW PIPE

CONNECT NEW TO EXISTING

LIMIT OF DEMOLITION

GENERAL PIPING SYMBOLS

GENERAL ANNOTATIONS

AV

STRAINERFLOAT & THERMOSTATIC

STEAM TRAP

INVERTED BUCKET

STEAM TRAP

FLANGE CONNECTION PIPE DROP

PIPE RISER TEE DOWN

TEE UP

UNION

PRESSURE REDUCING

VALVE

BALL VALVE

ANGLE GLOBE VALVE

SAFETY RELIEF VALVE

GLOBE VALVE

MANUAL OR

AUTOMATIC AIR VENT

EXPANSION JOINT

EJ

PRESSURE AND

TEMPERATURE TEST PLUG

QUICK-COUPLE HOSE

CONNECTOR

FLOW METER

HVAC PIPING SYMBOLS

CHILLED WATER RETURN

CHILLED WATER SUPPLY

CHR

CHS

HEATING HOT WATER RETURN

HEATING HOT WATER SUPPLY

HHR

HHS QV CRYOGEN VENT

DR DRIP RETURN

CAP

REDUCER (ECCENTRIC)

TYPE

AIRFLOW (CFM)

SD-1

TYPE

AIRFLOW (CFM)

RG-1

TYPE

AIRFLOW (CFM)

EG-1

SQUARE TO ROUND TRANSITION

ELBOW WITH TURNING

VANES

ROUND ELBOW

EXHAUST, RELIEF, MAKE UP, OR

OUTSIDE AIR DUCT DOWN

EXHAUST, RELIEF, MAKE UP, OR

OUTSIDE AIR DUCT UP

RETURN DUCT DOWN

RETURN DUCT UP

BRANCH DUCT WITH HIGH EFFICIENCY

TAKE-OFF (HETO) BRANCH FITTING &

MANUAL VOLUME DAMPER

BRANCH DUCT WITH CONICAL

FITTING & MANUAL VOLUME

DAMPER

DAMPERS: (BD, FD, FSD, MD, SD, VD)

BD

XX-XX

ANCHOR

TEEDIRECTION OF FLOW

S

N. CONCRETE HOUSEKEEPING PADS TO SUIT MECHANICAL EQUIPMENT SHALL BE SIZED AND

LOCATED BY THE MECHANICAL CONTRACTOR. MINIMUM CONCRETE PAD THICKNESS SHALL

BE 4". PAD SHALL EXTEND BEYOND THE EQUIPMENT A MINIMUM OF 4" ON EACH SIDE.

CONCRETE HOUSEKEEPING PADS SHALL BE PROVIDED BY THE GENERAL CONTRACTOR. IT

SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO COORDINATE SIZE

AND LOCATION OF CONCRETE HOUSEKEEPING PADS.

O. WHEN MECHANICAL WORK (HVAC, PLUMBING, SHEET METAL, ETC.) IS SUB-CONTRACTED, IT

SHALL BE THE MECHANICAL CONTRACTOR’S RESPONSIBILITY TO COORDINATE

SUBCONTRACTORS AND THE ASSOCIATED CONTRACTS. WHEN DISCREPANCIES ARISE

PERTAINING TO WHICH CONTRACTOR PROVIDES A PARTICULAR ITEM OF THE MECHANICAL

CONTRACT OR WHICH CONTRACTOR PROVIDES FINAL CONNECTIONS FOR A PARTICULAR

ITEM OF THE MECHANICAL CONTRACT, IT SHALL BE BROUGHT TO THE ATTENTION OF THE

MECHANICAL CONTRACTOR, WHOSE DECISION SHALL BE FINAL.

P. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE

SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE

ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND

RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE

APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE DRAWINGS.

Q. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND AS SHOWN

IN DETAILS FOR PIPING, DUCTWORK, AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL

BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.

R. PROVIDE ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS WHERE REQUIRED

TO SERVICE DAMPERS, VALVES, SMOKE DETECTORS, AND OTHER CONCEALED

MECHANICAL EQUIPMENT.

S. ALL DUCTWORK, PIPING AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL

BE COORDINATED WITH GENERAL CONTRACTOR. ALL ATTACHMENTS TO STEEL BAR

JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE AT PANEL POINTS. PROVIDE BEAM CLAMPS

MEETING MSS STANDARDS.WELDING TO STRUCTURAL MEMBERS SHALL NOT BE

PERMITTED. THE USE OF C-CLAMPS SHALL NOT BE PERMITTED.

T. ALL ROOF MOUNTED EQUIPMENT CURBS FOR EQUIPMENT PROVIDED BY THE MECHANICAL

CONTRACTOR SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR. COORDINATE

INSTALLATION WITH GENERAL CONTRACTOR.

U. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE

COORDINATED WITH ALL OTHER TRADES INVOLVED.

V. ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE

STOPPED WITH AN APPROVED FIRE STOPPING MATERIAL.

W. ALL AIR CONDITIONING CONDENSATE DRAIN LINES FROM EACH AIR HANDLING UNIT AND

ROOFTOP UNIT SHALL BE PIPED FULL SIZE OF THE UNIT DRAIN OUTLET, WITH P-TRAP, AND

PIPED TO NEAREST DRAIN. SEE DETAILS AND SPECIFICATIONS FOR DEPTH OF AIR

CONDITIONING CONDENSATE TRAP.

X. REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING, AND EQUIPMENT INSTALLATION.

P. PROVIDE AN END OF MAIN DRIP AT EACH RISE IN THE STEAM MAIN. PROVIDE CONDENSATE

DRIPS AT THE BOTTOM OF ALL STEAM RISERS, DOWNFED RUNOUTS TO EQUIPMENT,

RADIATORS, ETC., AT END OF MAINS AND LOW POINTS, AND AHEAD OF ALL PRESSURE

REGULATORS, CONTROL VALVES, ISOLATION VALVES, AND EXPANSION JOINTS.

Q. ON STRAIGHT STEAM PIPING RUNS WITH NO NATURAL DRAINAGE POINTS, INSTALL DRIP

LEGS AT INTERVALS NOT EXCEEDING 200' WHERE PIPE IS PITCHED DOWNWARD IN THE

DIRECTION OF STEAM FLOW AND A MAXIMUM OF 100' WHERE THE PIPE IS PITCHED UP SO

THAT CONDENSATE FLOW IS OPPOSITE OF STEAM FLOW.

R. STEAM TRAPS SHALL BE MINIMUM 3/4″ IN SIZE.

S. INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING.

T. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

U. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.

V. ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN

PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE

OWNER.

W. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS CONNECTED TO PUMPS,

CHILLERS, COOLING TOWERS, AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION

ISOLATION EXCEPT WATER COILS. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AS CLOSE

TO THE EQUIPMENT AS POSSIBLE OR AS INDICATED ON THE DRAWINGS.

X. SLOPE REFRIGERANT PIPING ONE PERCENT IN THE DIRECTION OF OIL RETURN. LIQUID

LINES MAY BE INSTALLED LEVEL.

Y. INSTALL HORIZONTAL REFRIGERANT HOT GAS DISCHARGE PIPING WITH 1/2″ PER 10'

DOWNWARD SLOPE AWAY FROM THE COMPRESSOR.

Z. INSTALL HORIZONTAL REFRIGERANT SUCTION LINES WITH 1/2″ PER 10' DOWNWARD SLOPE

TO THE COMPRESSOR, WITH NO LONG TRAPS OR DEAD ENDS WHICH MAY CAUSE OIL TO

SEPARATE FROM THE SUCTION GAS AND RETURN TO THE COMPRESSOR IN DAMAGING

SLUGS.

AA. PROVIDE LINE SIZE LIQUID INDICATORS IN MAIN LIQUID LINE LEAVING CONDENSER OR

RECEIVER. INSTALL MOISTURE LIQUID INDICATORS IN LIQUID LINES BETWEEN FILTER

DRYERS AND THERMOSTATIC EXPANSION VALVES AND IN LIQUID LINE TO RECEIVER.

BB. PROVIDE LINE SIZE STRAINER UPSTREAM OF EACH AUTOMATIC VALVE. PROVIDE SHUTOFF

VALVE ON EACH SIDE OF STRAINER.

CC. PROVIDE PERMANENT FILTER DRYERS IN LOW TEMPERATURE SYSTEMS AND SYSTEMS

USING HERMETIC COMPRESSORS.

DD. PROVIDE REPLACEABLE CARTRIDGE FILTER DRYERS WITH THREE-WAY VALVE BYPASS A

ASSEMBLY FOR SOLENOID VALVES, ADJACENT TO RECEIVERS.

EE. PROVIDE REFRIGERANT CHARGING VALVE CONNECTIONS IN LIQUID LINE BETWEEN

RECEIVER SHUTOFF VALVE AND EXPANSION VALVE.

N. UNLESS OTHERWISE NOTED, ALL DUCTWORK IS OVERHEAD, TIGHT TO THE UNDERSIDE OF

THE STRUCTURE, WITH SPACE FOR INSULATION IF REQUIRED.

M. RUNS OF FLEXIBLE DUCT SHALL NOT EXCEED 5' MAXIMUM LENGTH.

O. ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN

DUCTS, INCLUDING DIVIDED DUCTS AND TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE

PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

P. PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS FOR ALL SMOKE

DETECTORS, FIRE DAMPERS, SMOKE DAMPERS, VOLUME DAMPERS, HUMIDIFIERS, COILS,

AND OTHER ITEMS LOCATED IN THE DUCTWORK WHICH REQUIRE SERVICE AND/OR

INSPECTION.

Q. PROVIDE ACCESS DOORS IN DUCTWORK FOR OPERATION, ADJUSTMENT, AND

MAINTENANCE OF ALL FANS, VALVES, AND MECHANICAL EQUIPMENT.

R. ALL DUCTS SHALL BE GROUNDED ACROSS FLEXIBLE CONNECTIONS WITH FLEXIBLE

COPPER GROUNDING STRAPS. GROUNDING STRAPS SHALL BE BOLTED OR SOLDERED TO

BOTH THE EQUIPMENT AND THE DUCT.

S. SMOKE DETECTORS SHALL BE FURNISHED AND WIRED BY THE ELECTRICAL CONTRACTOR.

THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR MOUNTING THE SMOKE

DETECTOR IN DUCTWORK AS SHOWN ON THE DRAWINGS AND IN ACCORDANCE WITH

MANUFACTURER’S PRINTED INSTRUCTIONS.

T. TERMINATE GAS VENTS FOR UNIT HEATERS, WATER HEATERS, HIGH PRESSURE PARTS

WASHER, HIGH PRESSURE CLEANER, AND OTHER GAS APPLIANCES A MINIMUM OF 3′-0″

ABOVE ROOF WITH RAIN CAP (NOTE TO DESIGNER: EDIT APPLIANCES AND HEIGHT ABOVE

ROOF TO MEET CODE AND TO SUIT PROJECT REQUIREMENTS).

U. SEE SPECIFICATIONS FOR DUCTWORK GAUGES, BRACING, HANGERS, AND OTHER

REQUIREMENTS.

V. LOUVER SIZES, LOCATIONS, MOUNTING, AND DETAILS SHALL BE COORDINATED WITH

OTHER TRADES INVOLVED. REFER TO ARCHITECTURAL SPECIFICATIONS FOR DETAILED

DESCRIPTIONS.

DIRECTION OF PIPE

PITCH (DOWN)

FM

MV

HVAC VALVE SYMBOLS

PC PUMPED CONDENSATE

ROOM TAG

FLEXIBLE CONNECTOR

PUMP

REDUCER (CONCENTRIC)

GATE VALVE

BUTTERFLY VALVE

CHECK VALVE

THERMOMETER

PRESSURE GAUGE

STRAINER WITH BLOWOFF

AND HOSE CONNECTION

YR YEAR

Y

Z INTENTIONALLY LEFT BLANK

Z

M

CONTROL VALVE

CONTROL VALVE, THREE WAY

MOTOR CONTROLLED

VALVE

M

M

NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.

PS PUMP STATION

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF 71

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. AR 2012034754 EXP. 12/31/2023

ENGR REG. NO. PE 2014031351 EXP. 12/31/2023

CIVIL ENGINEER

OLSSON

550 ST LOUIS ST,

SPRINGFIELD, MO 65806

(417) 885-1736

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(913) 369-7200

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY-SPRINKLERED

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

HEALTHCARE PLANNER

ASPEN COMMUNICATIONS, LLC

7 KIJI-DAVA CIRCLE, SUITE A

PRESCOTT, AZ 85712

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

SPUR #:1794.13

/2

/2

:1

:2

A

M

MECHANICAL LEGEND, ABBREVIATIONS

AND GENERAL NOTES

SCP 45JRM

FINAL BID DOCUMENTS

EHRM TRAINING & ADMIN

SUPPORT

06/28/2022

589-21-702

VA MEDICAL CENTER

4801 LINWOOD BLVD

KANSAS CITY, MO 64128

M-000

No. REVISION DESCRIPTION DATE brenden.bond Rectangle brenden.bond Text Box

CP-1 CP-2

CWP-1

P-1

FCU-1D1

CWP-2

FT-1

ACU-1

AC-1

ACCU-1D2

18"x10"15"x10"

12"x8" 8"ø

18"x10" 15"x10"

12"x10" 10"ø 10"ø

9"ø 9"ø 8"ø

6"ø

4"ø

5"ø 6"ø8"ø

18"x10" 18"x12"

18"x10"

9"ø

5"ø

9"ø

6"ø

6"ø

18"x10"

9"ø

18"x10" 18"x10"

9"ø

9"ø

12"x10"

9"ø

10"x8"

9"ø

D10

D2

D8D8

D8D8 D8D8 D8D8

AHU-1

L-1

AHU-2

L-2

D3

D4

D3

D4

12"x24"12"x24"

16"x10"

14"x10"

10"x8"

21"x10"

7"ø

16"x10"

10"ø

14"x10"

7"ø 10"ø

12"x10"10"x8"

9"ø

6"ø

5"ø

9"ø

9"ø

12"x24" 12"x24"

16"x10"

12"x10" 10"x8"

16"x10" 8"ø8"ø

12"x10"

7"ø4"ø8"ø

10"x8"

8"ø

4"ø

6"ø

8"ø

D8D8 D8D8

EF-1D5

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF 71

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. AR 2012034754 EXP. 12/31/2023

ENGR REG. NO. PE 2014031351 EXP. 12/31/2023

CIVIL ENGINEER

OLSSON

550 ST LOUIS ST,

SPRINGFIELD, MO 65806

(417) 885-1736

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(913) 369-7200

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY-SPRINKLERED

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

HEALTHCARE PLANNER

ASPEN COMMUNICATIONS, LLC

7 KIJI-DAVA CIRCLE, SUITE A

PRESCOTT, AZ 85712

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

SPUR #:1794.13

/2

/2

:1

:4

A

M

MECHANICAL DUCT DEMOLITION PLANS

SCP 46JRM

FINAL BID DOCUMENTS

EHRM TRAINING & ADMIN

SUPPORT

06/28/2022

589-21-702

VA MEDICAL CENTER

4801 LINWOOD BLVD

KANSAS CITY, MO 64128

MD101

N

1/8" = 1'-0"

BASEMENT MECHANICAL DUCT DEMOLITION PLAN1N

1/8" = 1'-0"

LEVEL 1 MECHANICAL DUCT DEMOLITION PLAN2

N

1/8" = 1'-0"

LEVEL 2 MECHANICAL DUCT DEMOLITION PLAN3N

1/8" = 1'-0"

ROOF MECHANICAL DUCT DEMOLITION PLAN4

DEMOLITION KEYNOTES

D1 DEMOLISH FAN COIL UNIT AND ALL ASSOCIATED ACCESSORIES AND PIPING IN ITS ENTIRETY BACK TO THE MAIN.

D2 DEMOLISH OUTDOOR CONDENSING UNIT AND ALL ASSOCIATED PIPING AND ACCESSORIES IN ITS ENTIRETY.

D3 DEMOLISH AIR HANDLING UNIT AND ALL ASSOCIATED PIPING, DUCTWORK, AIR TERMINALS AND ACCESSORIES IN ITS ENTIRETY.

D4 DEMOLISH OUTSIDE AIR LOUVER AND ALL ASSOCIATED DUCTWORK AND ACCESSORIES IN ITS ENTIRETY. SEE ARCHITECTURAL DRAWINGS FOR WALL FINISH RESTORATION.

D5 DEMOLISH EXHAUST FAN AND ALL ASSOCIATED DUCTWORK, AIR TERMINALS AND ACCESSORIES IN ITS ENTIRETY.

D8 DEMOLISH SUPPLY, RETURN AND EXHAUST DUCTWORK, AIR TERMINALS, AND ASSOCIATED ACCESSORIES IN ITS ENTIRETY BACK TO THE ASSOCIATED MECHANICAL UNIT.

D10 DEMOLISH AIR CONDITIONING UNIT, ASSOCIATED DUCTWORK, PIPING AND ACCESSORIES IN ITS ENTIRETY.

No. REVISION DESCRIPTION DATE brenden.bond Rectangle brenden.bond

FCU-1

P-1

CWP-1

CP-1 CP-2

D1

CWP-2

2" LPC

2" LPS

2 1/2" CHS 2 1/2" CHR

D7

D12D12

FT-1

ACCU-1ACU-1

AC-1

D2

D10

D2

D7 D12D11

D7 D11 D12

D7 D11 D12 D7 D11 D12 D7 D12D11

AHU-2

AHU-1

L-2

L-1

D6

D6

D3

D3

D4

D4

D7 D11 D12 D7 D11 D12 D7 D11 D12

EF-1D5

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF 71

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. AR 2012034754 EXP. 12/31/2023

ENGR REG. NO. PE 2014031351 EXP. 12/31/2023

CIVIL ENGINEER

OLSSON

550 ST LOUIS ST,

SPRINGFIELD, MO 65806

(417) 885-1736

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(913) 369-7200

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY-SPRINKLERED

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

HEALTHCARE PLANNER

ASPEN COMMUNICATIONS, LLC

7 KIJI-DAVA CIRCLE, SUITE A

PRESCOTT, AZ 85712

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

SPUR #:1794.13

/2

/2

:1

:4

A

M

MECHANICAL PIPING DEMOLITION

PLANS

SCP 47JRM

FINAL BID DOCUMENTS

EHRM TRAINING & ADMIN

SUPPORT

06/28/2022

589-21-702

VA MEDICAL CENTER

4801 LINWOOD BLVD

KANSAS CITY, MO 64128

MD102

N

1/8" = 1'-0"

BASEMENT MECHANICAL PIPING DEMOLITION PLAN1N

1/8" = 1'-0"

LEVEL 1 MECHANICAL PIPING DEMOLITION PLAN2

N

1/8" = 1'-0"

LEVEL 2 MECHANICAL PIPING DEMOLITION PLAN3N

1/8" = 1'-0"

ROOF MECHANICAL PIPING DEMOLITION PLAN4

DEMOLITION KEYNOTES

D1 DEMOLISH FAN COIL UNIT AND ALL ASSOCIATED ACCESSORIES AND PIPING IN ITS ENTIRETY BACK TO THE MAIN.

D2 DEMOLISH OUTDOOR CONDENSING UNIT AND ALL ASSOCIATED PIPING AND ACCESSORIES IN ITS ENTIRETY.

D3 DEMOLISH AIR HANDLING UNIT AND ALL ASSOCIATED PIPING, DUCTWORK, AIR TERMINALS AND ACCESSORIES IN ITS ENTIRETY.

D4 DEMOLISH OUTSIDE AIR LOUVER AND ALL ASSOCIATED DUCTWORK AND ACCESSORIES IN ITS ENTIRETY. SEE ARCHITECTURAL DRAWINGS FOR WALL FINISH RESTORATION.

D5 DEMOLISH EXHAUST FAN AND ALL ASSOCIATED DUCTWORK, AIR TERMINALS AND ACCESSORIES IN ITS ENTIRETY.

D6 DEMOLISH CHILLED WATER COIL AND STEAM COIL ASSOCIATED WITH THE AIR HANDLING UNIT AND ALL ASSOCIATED ACCESSORIES AND PIPING IN ITS ENTIRETY BACK TO MAIN IN THE BASEMENT.

D7 DEMOLISH STEAM PIPING AND ASSOCIATED ACCESSORIES IN ITS ENTIRETY ALL THE WAY BACK TO THE 2" STEAM MAIN IN THE BASEMENT UTILITY TUNNEL. CAP THE MAIN AT THE TUNNEL ENTRANCE AND PREPARE FOR NEW

STEAM PIPE CONNECTION.

D10 DEMOLISH AIR CONDITIONING UNIT, ASSOCIATED DUCTWORK, PIPING AND ACCESSORIES IN ITS ENTIRETY.

D11 DEMOLISH CONDENSATE PIPING AND ASSOCIATED ACCESSORIES IN ITS ENTIRETY ALL THE WAY BACK TO THE 3" CONDENSATE MAIN IN THE BASEMENT UTILITY TUNNEL. CAP THE MAIN AT THE TUNNEL ENTRANCE FOR UTURE

USE.

D12 DEMOLISH CHILLED WATER SUPPLY AND RETURN PIPING AND ASSOCIATED ACCESSORIES IN ITS ENTIRETY ALL THE WAY BACK TO THE 2-1/2" CHILLED WATER SUPPLY AND RETURN MAIN IN THE BASEMENT CRAWL SPACE. CAP

THE MAIN AT THE CRAWL SPACE ENTRANCE FOR FUTURE USE.

No. REVISION DESCRIPTION DATE brenden.bond Rectangle brenden.bond

V D

V D

F D

VD

V D

V D

V D

VD

VD

V D

F D

VD

VD

V D

VD

MECH

B07A STAIR 1

CRAWLSPACE

CS2

MECHANICAL

B01

MECHANICAL

B07

CRAWLSPACE

CS1

MECHANICAL

B02CRAWLSPACE

CS3

CRAWLSPACE

CS4

CRAWLSPACE

CS5

CWP-1

P-1

CP-1

CP-2

CWP-2

ET-1

PGP-1

FT-1

PGT-1

HWP-1

HWP-2

HX-1

UH-1

CF-1

BT-1

WS-1

WS-2

PS-1

FCU-1

CLASSROOM / IV

TESTING

3-112

EX STOR

3-112B

EX STOR

3-112A

ADMIN

3-111 EX HAC CLOSET

3-111A

ADMIN

3-110

ADMIN

3-107

CORRIDOR

C1-3-1

TELECOM

3-108

MENS RR

3-106

WOMENS RR

3-104

CONFERENCE ROOM

3-102

EX ELEV MECH

3-100

EX ELEV

ELEV

STAIR 2

BREAKROOM

3-101

ADMIN

3-103

STAIR 1

EX ENTRY

3-105

CU-1

VRF-1-1-1

VRF-1-2

VRF-1-3

VRF-1-4

VRF-1-5

VRF-1-6

VRF-1-7

EG-1

EG-1

10"x8" OA

5"ø OA

5"ø OA

10"x10" EA

5"ø OA

5"ø OA

8"x8" OA 5"ø OA

SB-1

7 10

T

CU-211

5"ø EA

5"ø EA

FCU-2

VRF-1-1-2

VRF-1-8

9 22

UH-3

T

T

T

T

T

T

T

T

SOLO-1

SOLO-2

SOLO-4

SOLO-3

SOLO-5

SOLO-6

SOLO-7

M-201

EG-1

M-201

12"x10" OA

M-201

M-201

M-201

5"ø OA

5"ø OA

8"x8" OA

6"x6" EA

6"x6" EA

5"ø OA

8"x6" OA

5"ø OA

8"x6" OA

5"ø OA

5"ø EA

5"ø EA

8"x8" OA

5"ø OA

5"ø OA

5"ø EA

BREAKROOM

3-201

STAIR 2

EX ELEV

ELEV

CLASSROOM / IV

TESTING

3-200

CORRIDOR

C2-3-2

WAITING ROOM

3-203

STAIR 1

HAC

3-209

MENS RR

3-208

WOMENS RR

3-206

CLASSROOM / IV

TESTING

3-210

CLASSROOM / IV

TESTING

3-211

EG-1

EG-1

VRF-2-5

VRF-2-4

VRF-2-3VRF-2-1

VRF-2-2

5"ø OA

10"x10" EA

5"ø OA

5"ø OA

8"ø OA

5"ø OA

SB-2

ROOF

B07C T

T

T

T

T

VRF-2-6

VRF-2-7

UH-2

SOLO-9

SOLO-8

SOLO-10

SOLO-11

SOLO-12

M-201

EF-2

EG-1

5"ø EA

M-201

M-201

M-201

M-201

8"x8" OA

6"ø OA

6"x6" EA

6"x6" EA

5"ø OA

5"ø EA5"ø EA5"ø EA

10"x10" OA

10"x10" OA 5"ø OA5"ø OA 8"x8" OAEF-1

HRU-2HRU-1 DOAU-2DOAU-1

10"x10" OA

10"x10" OA

10"x10" OA

10"x10" OA

1 2 2

M-201

EF-3 3

M-201

M-201 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF 71

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. AR 2012034754 EXP. 12/31/2023

ENGR REG. NO. PE 2014031351 EXP. 12/31/2023

CIVIL ENGINEER

OLSSON

550 ST LOUIS ST,

SPRINGFIELD, MO 65806

(417) 885-1736

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(913) 369-7200

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY-SPRINKLERED

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

HEALTHCARE PLANNER

ASPEN COMMUNICATIONS, LLC

7 KIJI-DAVA CIRCLE, SUITE A

PRESCOTT, AZ 85712

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

SPUR #:1794.13

/2

/2

:1

:2

A

M

MECHANICAL DUCT PLANS

IHB 48JRM

FINAL BID DOCUMENTS

EHRM TRAINING & ADMIN

SUPPORT

06/28/2022

589-21-702

VA MEDICAL CENTER

4801 LINWOOD BLVD

KANSAS CITY, MO 64128

M-101

N

1/8" = 1'-0"

BASEMENT MECHANICAL DUCT PLAN1

N

1/8" = 1'-0"

LEVEL 1 MECHANICAL DUCT PLAN2

N

1/8" = 1'-0"

LEVEL 2 MECHANICAL DUCT PLAN3N

1/8" = 1'-0"

ROOF MECHANICAL DUCT PLAN4

KEYNOTES

1 PROVIDE DOAS UNIT ON THE ROOF AND INSTALL LEVEL FOR PROPER CONDENSATE DRAINAGE. PROVIDE WITH MANUFACTURER ROOF CURB. COORDINATE EXACT UNIT LOCATION WITH STRUCTURAL DRAWINGS. CONTRACTOR SHALL INSTALL THE UNIT TO MAINTAIN RECOMMENDED MAINTENANCE CLEARANCES AND SAFE SERVICE ACCESS. DISCONNECT BY ELECTRICAL CONTRACTOR.

2 PROVIDE OUTDOOR VRF HEAT RECOVERY UNIT ON ROOF WITH ROOF MOUNTED EQUIPMENT RAILS SECURED AT FOUR POINTS TO ROOF STRUCTURE STEEL. INSTALL UNIT LEVEL FOR PROPER OPERATION AND OIL RECOVERY.

INSTALL REFRIGERANT LINE SET, ASSOCIATED ACCESSORIES, AND WEATHERPROOF PIPE CURB ASSEMBLY AS APPLICABLE PER MANUFACTURER'S INSTRUCTIONS. SEAL PIPING PENETRATIONS THROUGH ROOF AS REQUIRED.

COORDINATE EXACT UNIT LOCATION WITH STRUCTURAL DRAWINGS. CONTRACTOR SHALL COORDINATE PIPE SIZES, PIPE LENGTHS, AND PIPE ROUTING WITH UNIT MANUFACTURER. PIPE ROUTING ON PLANS IS FOR REFERENCE ONLY. DISCONNECT BY ELECTRICAL CONTRACTOR. CONTRACTOR SHALL INSTALL THE UNIT TO MAINTAIN RECOMMENDED MAINTENANCE CLEARANCES AND SAFE SERVICE ACCESS.

3 PROVIDE AND INSTALL NEW EXHAUST FAN ON THE ROOF. COORDINATE EXACT UNIT LOCATION WITH STRUCTURAL DRAWINGS. CONTRACTOR SHALL INSTALL EXHAUST FAN A MINIMUM OF 10' AWAY FROM ANY OUTSIDE AIR INTAKE.

4 10" X 10" OUTSIDE AIR DUCT DOWN IN CHASE TO FLOOR BELOW. CONTRACTOR SHALL COORDINATE WITH OTHER TRADES AND INSTALL ALL OUTSIDE AIR DUCTWORK BEFORE NEW HYDRONIC, PLUMBING AND FIRE SPRINKLER

PIPING INSTALLATION.

5 PROVIDE VRU IN-CEILING CASSETTE SUPPORTED FROM STRUCTURE ABOVE WITH VIBRATION ISOLATORS. ROUTE REFRIGERANT PIPING TO CEILING CASSETTE FROM ASSOCIATED BRANCH SELECTOR BOX. INSTALL UNIT LEVEL FOR PROPER CONDENSATE DRAINAGE. MAINTAIN CLEARANCES FOR MAINTENANCE ACCESS AND OUTSIDE AIR DUCT CONNECTION.

6 DUCT DOWN IN DUCT CHASE TO THE FLOOR BELOW. REFER LEVEL 1 FLOOR PLAN FOR DUCT SIZES.

7 PROVIDE AND INSTALL NEW BRANCH SELECTOR BOX ABOVE THE CEILING. COORDINATE EXACT LOCATION WITH ELECTRICAL DRAWINGS. ROUTE REFRIGERANT PIPING TO THE BRANCH SELECTOR BOX FROM ASSOCIATED VRF

HEAT RECOVERY UNIT.

8 10" X 10" EXHAUST DUCT DOWN IN DUCT CHASE TO THE FLOOR BELOW. CONTRACTOR SHALL COORDINATE WITH OTHER TRADES AND INSTALL ALL EXHAUST AIR DUCTWORK BEFORE NEW HYDRONIC, PLUMBING AND FIRE

SPRINKLER PIPING INSTALLATION.

9 10" X 10" EXHAUST DUCT UP TO EXHAUST FAN EF-1A ON THE ROOF.

10 PROVIDE AND INSTALL NEW SPLIT SYSTEM FAN COIL UNIT. COORDINATE EXACT LOCATION WITH TELECOMMUNICATION DRAWINGS. PROVIDE REFRIGERANT PIPING FROM ASSOCIATED CONDENSING UNIT.

11 PROVIDE AND INSTALL NEW SPLIT SYSTEM CONDENSING UNIT. COORDINATE EXACT LOCATION WITH CIVIL DRAWINGS. PROVIDE REFRIGERANT PIPING TO ASSOCIATED FAN COIL UNIT.

21 10" X 10" OUTSIDE AIR DUCT DOWN THRU ROOF IN CHASE TO FLOOR BELOW. DUCT TRANSITIONS TO ROUND DUCT THEN BRANCHES OFF ONTO EACH FLOOR, SEE FLOOR VIEWS FOR ROUND DUCT SIZING. CONTRACTOR SHALL

PROVIDE SEALING AND LEAK PROTECTION FOR ROOF PENTRATIONS.

22 OUTSIDE AIR DUCT UP TO FLOOR ABOVE.

23 DUCT SIZES ARE LIMITED TO 5" ROUND WHEN RUNNING BETWEEN STRUCTUAL TRUSSES. MATCH OUTSIDE AIR DUCT SIZING TO WHAT IS SHOWN IN VRF CASSETTE SCHEDULE ON SHEET M-601 WHEN POSSIBLE.

KEYNOTES

25 PROVIDE AND INSTALL VERTICAL STEAM TO HOT WATER DOUBLE-WALL HEAT EXCHANGER WITH PUMPED GLYCOL IN LOCATION SHOWN.

26 PROVIDE AND INSTALL HOT WATER PUMP IN LOCATION SHOWN.

27 PROVIDE AND INSTALL GLYCOL TANK IN LOCATION SHOWN.

28 PROVIDE AND INSTALL GLYCOL PUMP IN LOCATION SHOWN.

29 PROVIDE AND INSTALL HOT WATER EXPANSION TANK IN LOCATION SHOWN.

30 PROVIDE AND INSTALL CARBON FILTER IN LOCATION SHOWN.

31 PROVIDE AND INSTALL BRINE TANK IN LOCATION SHOWN.

32 PROVIDE AND INSTALL WATER SOFTENER IN LOCATION SHOWN.

33 PROVIDE AND INSTALL PUMP STATION IN LOCATION SHOWN.

No. REVISION DESCRIPTION DATE brenden.bond Rectangle brenden.bond

CRAWLSPACE

CS2

CRAWLSPACE

CS1

MECHANICAL

B02

CRAWLSPACE

CS3

CRAWLSPACE

CS5

CRAWLSPACE

CS4

MECHANICAL

B01

STAIR 1

MECH

B07A

MECHANICAL

B07

CWP-1

P-1

CP-1

CP-2

CWP-2

2" LPC

2" LPS

2 1/2" CHS

2 1/2" CHR

FT-1

CF-1

BT-1WS-1

WS-2

PS-1

HX-1

HWP-2

HWP-1

PGT-1

ET-1

PGP-1

2" LPS

1 1/2" HHS 1 1/2" HHR

BREAKROOM

3-101

STAIR 2

EX ELEV

ELEV

EX ELEV MECH

3-100

CONFERENCE ROOM

3-102

ADMIN

3-103

CORRIDOR

C1-3-1

STAIR 1

EX ENTRY

3-105

ADMIN

3-107

CLASSROOM / IV

TESTING

3-112

EX STOR

3-112B

EX STOR

3-112A

ADMIN

3-111

EX HAC CLOSET

3-111A

ADMIN

3-110

TELECOM

3-108

MENS RR

3-106

WOMENS RR

3-104

FCU-1

CU-1

VRF-1-1-1

VRF-1-2

VRF-1-3

SB-1 VRF-1-4

VRF-1-5

VRF-1-6

VRF-1-7

RL

STAIR1

B07B

5 10

RL

1 1/2" CD

1" CD

CU-211

FCU-2

VRF-1-8

VRF-1-1-2

SOLO-1

SOLO-2

SOLO-4

SOLO-3

SOLO-6

SOLO-5

SOLO-7

M-201

M-201

3/ 4"

C D

3/ 4"

C D

1 1/2" CD

3/4" CD

1 1/2" CD

1" C

D

1" CD39

M-201

M-201

M-201

BREAKROOM

3-201

STAIR 2

EX ELEV

ELEV

WAITING ROOM

3-203

CORRIDOR

C2-3-2

CLASSROOM / IV

TESTING

3-200

WOMENS RR

3-206

MENS RR

3-208

STAIR 1

HAC

3-209

CLASSROOM / IV

TESTING

3-211

CLASSROOM / IV

TESTING

3-210

VRF-2-1

VRF-2-2

VRF-2-3

VRF-2-4

VRF-2-5

SB-2

ROOF

B07C

RL

VRF-2-6

VRF-2-7

UH-2

SOLO-9

SOLO-8

SOLO-10

SOLO-11

SOLO-12

M-201

M-201

3/ 4"

C D

1 1/2" CD 1 1/2" CD

3/4" CD

3/ 4"

C D

EF-23

M-201

M-201

M-201

EF-1

DOAU-1

HRU-1 HRU-2

DOAU-2

2" CD 2" CD

2 2

17 17

RL RL

1 1/2" HHR 1 1/2" HHS 1 1/2" HHR 1 1/2" HHS

EF-3 3

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF 71

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. AR 2012034754 EXP. 12/31/2023

ENGR REG. NO. PE 2014031351 EXP. 12/31/2023

CIVIL ENGINEER

OLSSON

550 ST LOUIS ST,

SPRINGFIELD, MO 65806

(417) 885-1736

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(913) 369-7200

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY-SPRINKLERED

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

HEALTHCARE PLANNER

ASPEN COMMUNICATIONS, LLC

7 KIJI-DAVA CIRCLE, SUITE A

PRESCOTT, AZ 85712

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

SPUR #:1794.13

/2

/2

:1

:3

A

M

MECHANICAL PIPING PLANS

IHB 49JRM

FINAL BID DOCUMENTS

EHRM TRAINING & ADMIN

SUPPORT

06/28/2022

589-21-702

VA MEDICAL CENTER

4801 LINWOOD BLVD

KANSAS CITY, MO 64128

M-102

N

1/8" = 1'-0"

BASEMENT MECHANICAL PIPING PLAN1N

1/8" = 1'-0"

LEVEL 1 MECHANICAL PIPING PLAN2

N

1/8" = 1'-0"

LEVEL 2 MECHANICAL PIPING PLAN3

N

1/8" = 1'-0"

ROOF MECHANICAL PIPING PLAN4

KEYNOTES

1 PROVIDE DOAS UNIT ON THE ROOF AND INSTALL LEVEL FOR PROPER CONDENSATE DRAINAGE. PROVIDE WITH MANUFACTURER ROOF CURB. COORDINATE EXACT UNIT LOCATION WITH STRUCTURAL DRAWINGS. CONTRACTOR SHALL INSTALL THE UNIT TO MAINTAIN RECOMMENDED MAINTENANCE CLEARANCES AND SAFE SERVICE ACCESS. DISCONNECT BY ELECTRICAL CONTRACTOR.

2 PROVIDE OUTDOOR VRF HEAT RECOVERY UNIT ON ROOF WITH ROOF MOUNTED EQUIPMENT RAILS SECURED AT FOUR POINTS TO ROOF STRUCTURE STEEL. INSTALL UNIT LEVEL FOR PROPER OPERATION AND OIL RECOVERY.

INSTALL REFRIGERANT LINE SET, ASSOCIATED ACCESSORIES, AND WEATHERPROOF PIPE CURB ASSEMBLY AS APPLICABLE PER MANUFACTURER'S INSTRUCTIONS. SEAL PIPING PENETRATIONS THROUGH ROOF AS REQUIRED.

COORDINATE EXACT UNIT LOCATION WITH STRUCTURAL DRAWINGS. CONTRACTOR SHALL COORDINATE PIPE SIZES, PIPE LENGTHS, AND PIPE ROUTING WITH UNIT MANUFACTURER. PIPE ROUTING ON PLANS IS FOR REFERENCE ONLY. DISCONNECT BY ELECTRICAL CONTRACTOR. CONTRACTOR SHALL INSTALL THE UNIT TO MAINTAIN RECOMMENDED MAINTENANCE CLEARANCES AND SAFE SERVICE ACCESS.

3 PROVIDE AND INSTALL NEW EXHAUST FAN ON THE ROOF. COORDINATE EXACT UNIT LOCATION WITH STRUCTURAL DRAWINGS. CONTRACTOR SHALL INSTALL EXHAUST FAN A MINIMUM OF 10' AWAY FROM ANY OUTSIDE AIR INTAKE.

5 PROVIDE VRU IN-CEILING CASSETTE SUPPORTED FROM STRUCTURE ABOVE WITH VIBRATION ISOLATORS. ROUTE REFRIGERANT PIPING TO CEILING CASSETTE FROM ASSOCIATED BRANCH SELECTOR BOX. INSTALL UNIT LEVEL FOR PROPER CONDENSATE DRAINAGE. MAINTAIN CLEARANCES FOR MAINTENANCE ACCESS AND OUTSIDE AIR DUCT CONNECTION.

7 PROVIDE AND INSTALL NEW BRANCH SELECTOR BOX ABOVE THE CEILING. COORDINATE EXACT LOCATION WITH ELECTRICAL DRAWINGS. ROUTE REFRIGERANT PIPING TO THE BRANCH SELECTOR BOX FROM ASSOCIATED VRF

HEAT RECOVERY UNIT.

10 PROVIDE AND INSTALL NEW SPLIT SYSTEM FAN COIL UNIT. COORDINATE EXACT LOCATION WITH TELECOMMUNICATION DRAWINGS. PROVIDE REFRIGERANT PIPING FROM ASSOCIATED CONDENSING UNIT.

11 PROVIDE AND INSTALL NEW SPLIT SYSTEM CONDENSING UNIT. COORDINATE EXACT LOCATION WITH CIVIL DRAWINGS. PROVIDE REFRIGERANT PIPING TO ASSOCIATED FAN COIL UNIT.

16 REFRIGERANT PIPING UP TO THE ROOF.

17 ROUTE 2" CONDENSATE DRAIN PIPING TO THE STORM DRAIN.

34 ROUTE 1-1/2" HEATING HOT WATER SUPPLY AND RETURN PIPING ALL THE WAY UP TO THE ROOF THROUGH THE CHASE.

35 ROUTE 1-1/2" HEATING HOT WATER SUPPLY AND RETURN PIPING TO EACH DOAU.

36 ROUTE FULL SIZE CONDENSATE DRAIN FROM THE FAN COIL UNIT/VRF CASSETTE AND CONNECT INTO THE EXISTING CONDENSATE SYSTEM IN THE BASEMENT.

37 ROUTE CONDENSATE PIPING TO MOP SINK.

38 ROUTE CONDENSATE PIPING TO BATHROOM PLUMBING WALL.

39 ROUTE CONDENSATE PIPING DOWN IN WALL AND AIR GAP TO FLOOR DRAIN BELOW COUNTER.

40 HUMIDIFICATION SYSTEM: CONDAIR MLP RO 300, PUMP STATION (PS-1): WATER PUMP - 208/3/60, 3.5KW, 20A, HIGH PRESSURE PUMP - 460/3/60, 3.4KW, 20A.

No. REVISION DESCRIPTION DATE brenden.bond Rectangle brenden.bond

LEVEL 1

0' - 0"

LEVEL 2

9' - 4"

ROOF

18' - 8"

PARAPET

21' - 2 3/8"

DOAU-1

CLASSROOM / IV

TESTING

3-210

CLASSROOM / IV

TESTING

3-211

10"x10" OA10"x10" OA

"x

O A

8" x8

O

A

VRF-1-3

SB-1

10"x12" OA

8"x8" OA

ADMIN

3-110

ADMIN

3-107

CORRIDOR

C1-3-1

10"x10" OA PLENUM BOX 10"x10" OA PLENUM BOX

LEVEL 1

0' - 0"

LEVEL 2

9' - 4"

ROOF

18' - 8"

PARAPET

21' - 2 3/8"

CLASSROOM / IV

TESTING

3-210

CORRIDOR

C2-3-2

CLASSROOM / IV

TESTING

3-211

TELECOM

3-108

ADMIN

3-107

CORRIDOR

C1-3-1

EF-1

HRU-1

EF-3

"x

E A

10"x10" EA

FCU-1

VRF-2-6SB-2

5"ø OA

LEVEL 1

0' - 0"

LEVEL 2

9' - 4"

ROOF

18' - 8"

PARAPET

21' - 2 3/8"

CLASSROOM / IV

TESTING

3-200

CORRIDOR

C2-3-2

WAITING ROOM

3-203

CONFERENCE ROOM

3-102

CORRIDOR

C1-3-1

ADMIN

3-103

10"x10" OA 10"x10" OA

10"x10" OA 6"ø OA 8"ø OA

8"x8" OA8"x8" OA

5"ø OA

VRF-2-3 VRF-2-4

5" ø

O A

8" x8

O

A

VRF-1-5 VRF-1-6

FCU-2

HRU-2

DOAU-2

LEVEL 1

0' - 0"

LEVEL 2

9' - 4"

ROOF

18' - 8"

PARAPET

21' - 2 3/8"

VRF-1-1-2

VRF-1-1-1

8"x10" OA8"x10" OA

CLASSROOM / IV

TESTING

3-112

CLASSROOM / IV

TESTING

3-112

LEVEL 1

0' - 0"

LEVEL 2

9' - 4"

ROOF

18' - 8"

PARAPET

21' - 2 3/8"

ADMIN

3-111

VRF-1-2

8"x8" EA

EG-1

EF-2

5"ø OA5"ø OA5"ø OA th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF 71

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. AR 2012034754 EXP. 12/31/2023

ENGR REG. NO. PE 2014031351 EXP. 12/31/2023

CIVIL ENGINEER

OLSSON

550 ST LOUIS ST,

SPRINGFIELD, MO 65806

(417) 885-1736

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(913) 369-7200

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY-SPRINKLERED

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

HEALTHCARE PLANNER

ASPEN COMMUNICATIONS, LLC

7 KIJI-DAVA CIRCLE, SUITE A

PRESCOTT, AZ 85712

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

SPUR #:1794.13

/2

/2

:1

:3

A

M

HVAC SECTION VIEWS

IHB 50JRM

FINAL BID DOCUMENTS

EHRM TRAINING & ADMIN

SUPPORT

06/28/2022

589-21-702

VA MEDICAL CENTER

4801 LINWOOD BLVD

KANSAS CITY, MO 64128

M-201

1/4" = 1'-0"

Section 411/4" = 1'-0"

Section 121/4" = 1'-0"

Section 53

1/4" = 1'-0"

Section 741/4" = 1'-0"

Section 85

No. REVISION DESCRIPTION DATE brenden.bond Rectangle brenden.bond

REFRIGERANT PIPING

1-1/4" O.D.

DRAIN PIPING

VENTILATION AIR

INTAKE HOLE

BRANCH DUCT

HOLE

BRANCH DUCT

HOLE

SERVICE ACCESS REQUIRED

MIN. 18"MIN. 18"

NOTE:

DETAIL BASED ON MITSUBISHI 4-WAY

THROW MODEL PLFY-P12NBMU-E.

NOTE:

DETAIL BASED ON MITSUBISHI

DUCTED MODEL PEFY-P12NMSU-E.

SERVICE AND

MAINTENANCE SPACE

ACCESS DOOR

CONTROL BOX

REFRIGERANT PIPING (GAS)

MORE THAN 11-13/16"

17-23/32"

17-23/32"

1-31/32"(TYP.)

MORE THAN 13/32"

1-31/32"(TYP.)

MORE THAN 13/16"

AIR IN

LET

AIR OUTLET

DRAIN PIPE

REFRIGERANT PIPING (LIQUID)

SERVICE SPACE

ACCESS DOOR

CONTROL BOX

27-9/16"

7-7/8"

CONNECTION PIPE OF

INDOOR UNIT (GAS) TYP.

CONNECTION PIPE OF

INDOOR UNIT (LIQUID) TYP.

17-23/32"(SQ.)

DRAIN PIPING

CONNECTION PIPE OF OUTDOOR/

WATER-SOURCE UNIT (HIGH PRESSURE)

CONNECTION PIPE OF OUTDOOR/

WATER-SOURCE UNIT (LOW PRESSURE)

NOTE:

DETAIL BASED ON MITSUBISHI

MODEL CMB-P1016NU-G.

DUCT SUPPORT

CHANNEL - ANGLE

BRACKET FRAME

UV RESISTANT

RUBBER BASE

NOTES:

1. SUPPORT STAND SHALL BE 1/4" HOT-ROLLED ZINC PLATED CARBON STEEL.

2. EXTERIOR DUCT INSULATION SHALL BE CONTINUOUS WITHIN STAND FRAME

AND PROTECTED WITH RIGID INSERTS AND SHIELDING.

3. VERIFY MAXIMUM LOADING WITH STAND MANUFACTURER AND STRUCTURAL

ENGINEER.

EXTERIOR

DUCTWORK

PROVIDE INSULATION SHIELD

& INSERT FOR ALL PIPING

(8" [200mm] MIN.)

BAND

1-5/8" [43mm] 12 GAUGE CHANNEL OR 2"x2"x1/4" [50x50x6.4mm] ANGLE

1/2" [15mm] DIA.

HANGER RODS WITH

36" [900mm] MAX.

SPACING ON EACH

CHANNEL

WELD

SADDLE

INSULATION SHIELD

AT HANGER

PROVIDE HIGH COMPRESSIVE

STRENGTH INSULATION (9 PSF

MIN. DENSITY) UNDER

INSULATION SHIELD

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR LOW

TEMPERATURE PIPE)

HANGER ROD

PIPE HANGER NOTES:

1. SEE STRUCTURAL SPECIFICATIONS AND

DRAWINGS FOR DETAILED HANGER

REQUIREMENTS AND SEISMIC RESTRAINTS

FOR PALO ALTO.

5 FT

THRU [20]

6 8 10

[32][25] [40]

[65]

[50]

[75]

-1312 14 -16 -

[125][100]

[150]

[250]

[200]

[300]

[400]

[350]

[450]

[600]

[500]

20 241814 16128 1064 532 2 1/21 1/21 1 1/4

[9100] [9600][8500][7600] [8200][7000][5800] [6700][5200][4100] [4900][3700][3000] [3400][2700][2100]

--- --[4900] -[4100][3700] [4000] -[3000][2400][1800][1500]

THRU 3/4

[2100] [2100]

[2100]

[2700]

[2400]

SIDE VIEW TRAPEZE HANGER FOR UP TO 1000

LB. [453KG] UNIFORM LOAD

ADJUSTABLE CLEVIS HANGER

TYPE 1 - SEE SPECIFICATIONS

ADJUSTABLE CLEVIS HANGERTYPE

43 - SEE…