This document is an amendment to a federal solicitation for construction services. The Department of Veterans Affairs Technology Acquisition Center Austin is seeking to upgrade EHRM infrastructure at Fort Meade. The amendment provides updated specifications and drawings for the project across 17 attachments related to areas such as specifications, drawings, limitations on subcontracting, wage rates, and contractor safety requirements. Offerors must acknowledge receipt of the amendment by one of several methods and submit any revised proposals prior to the deadline or their offer may be rejected. The incumbent contractor is not specified.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Training and Admin Space Support Construction - Kansas City VAMC, newest first.
File Type Posted
Addendum 01 Drawings and Specifications.pdf PDF
36C77623B0020 0003.docx DOCX document
71-02-C17 Pipe Trench.pdf PDF
Technical Questions - Responses.pdf PDF
Sign in Sheet - 36C77623B0020 EHRM Training and Admin Space - KC.pdf PDF
36C77623B0020 0002.docx DOCX document
Data Center Location.pdf PDF
Wage Rates 4-28-23.pdf PDF
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 15 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 10 - Mechanical - Drawings.pdf PDF
Attachment 9 - Plumbing - Drawings.pdf PDF
Attachment 5 - Civil - Drawings.pdf PDF
Attachment 14 - Wage Rates - 3-3-23.pdf PDF
Attachment 13 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 12 - Technology - Drawings.pdf PDF
Attachment 8 - Fire Protection - Drawings.pdf PDF
Attachment 6 - Structural - Drawings.pdf PDF
Attachment 4 - Hazardous - Drawings.pdf PDF
Attachment 2 - Specifications - Volume II - EHRM Training Support KC.pdf PDF
Attachment 1 - Specifications - Volume I - EHRM Training Support KC.pdf PDF
Attachment 17 - Site Map.pdf PDF
Attachment 7 - Architectural - Drawings.pdf PDF
Attachment 3 - General - Drawings.pdf PDF
Attachment 11 - Electrical - Drawings.pdf PDF
Attachment 4 - Drawings - EHRM Training and Support KC - 31-53.pdf PDF
Attachment 2 - Specifications - Volume II - EHRM Training Support KC - Final.pdf PDF
Attachment 5 - Drawings - EHRM Training and Support KC - 54 - 72.pdf PDF
36C77623B0020_1.docx DOCX document
Attachment 3 - Drawings - EHRM Training and Support KC - 1-30.pdf PDF
Attachment 10 - Site Map.pdf PDF
Attachment 8 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 7 - Wage Rates - 3-3-23.pdf PDF
Attachment 9 - Site Visit Instructions.pdf PDF
Attachment 6 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 1 - Specifications - Volume I - EHRM Training Support KC - Final.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 04-11-2023 589-21-702 36C776 John Fancella Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 00076 Department of Veterans Affairs Department of Veterans Affairs 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 To all Offerors/Bidders

36C77623B0020 04-11-2023

X X X N/A X

1 (ONE)

The purpose of this amendment is to provide the following:

The previous attachments 1 - 10 are no longer applicable. Please be advised that all solicitation attachments have been updated. These updated attachments 1 - 17, which have been posted with this amendment, are now the official specifications and drawings of record concerning this solicitation and will be incorpo rated into any contractual award.

Andrea Fink Contracting Officer

PCAC15L3-69262

EHRM Infrastructure Upgrades – Fort Meade See attached document: Attachment 1 - Specifications - Volume I - EHRM Training Support KC.

See attached document: Attachment 2 - Specifications - Volume II - EHRM Training Support KC.

See attached document: Attachment 3 - General - Drawings.

See attached document: Attachment 4 - Hazardous - Drawings.

See attached document: Attachment 5 - Civil - Drawings.

See attached document: Attachment 6 - Structural - Drawings.

See attached document: Attachment 7 - Architectural - Drawings.

See attached document: Attachment 8 - Fire Protection - Drawings.

See attached document: Attachment 9 - Plumbing - Drawings.

See attached document: Attachment 10 - Mechanical - Drawings.

See attached document: Attachment 11 - Electrical - Drawings.

See attached document: Attachment 12 - Technology - Drawings.

See attached document: Attachment 13 - Limitations on Subcontracting - Construction.

See attached document: Attachment 14 - Wage Rates - 3-3-23.

See attached document: Attachment 15 - Contractor Safety - Environmental Form.

See attached document: Attachment 16 - Site Visit Instructions.

See attached document: Attachment 17 - Site Map.

End of Document