S02_UPGRADE CATH LAB 4_FINAL CDs_DRAWINGS_01 31 2025r_34 Pages.pdf

PDF 24 MB Posted

Attached to
Z1DA--PN: 618-CSI-230, Upgrade Cath Lab (MPLS)
Solicitation number
36C26325B0017
Issued by

About this file

The file appears to be a named PDF document related to a construction project for upgrading a Cath Lab at the Minneapolis VA Medical Center. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside procurement with a project scope of upgrading and reconfiguring Cardiac Cath Lab #4 to prepare for new medical equipment replacement. The project involves general construction, site preparation, demolition, and removal of existing structures, with specific coordination required for x-ray system vendor installation.

Key procurement details include a planned Invitation for Bid (IFB) issuance on May 7, 2025, with an award expected within 90 calendar days of bid opening. The project is categorized under NAICS code 236220 with a small business size standard of $45.0 million. The contract will be a firm fixed-price construction contract with a performance period of 240 calendar days from Notice to Proceed. Bidders must be registered and certified in the Veteran Small Business Certification (VetCert) database, and the estimated project magnitude is between $1,000,000 and $2,000,000. Solicitation documents will be available on the System for Award Management (SAM) Contract Opportunities website.

View the file

Other files

File Type Posted
36C26325B0017 0001.docx DOCX document
S02_7__Attachment 1 Single Source Justification MPT to SAT - Fire Alarm System signed Redacted.pdf PDF
S02 NARA Language for Contracts.pdf PDF
S02_9__Attachment 1 Single Source Justification MPT to SAT - Scrub Sinks signed Redacted.pdf PDF
36C26325B0017_1.docx DOCX document
S02_VA6500 Appendix C 1 - 1 page.pdf PDF
S02_Construction SOW_3 Pages.pdf PDF
S02_4__Attachment 1 Single Source Justification MPT to SAT - Door Closer signed Redacted.pdf PDF
S02_1__Attachment 1 Single Source Justification MPT to SAT - BAS signed Redacted.pdf PDF
S02_2__Attachment 1 Single Source Justification MPT to SAT - Card Readers signed Redacted.pdf PDF
S02_5__Attachment 1 Single Source Justification MPT to SAT - Door Operators signed Redacted.pdf PDF
S02_UPGRADE CATH LAB 4_ FINAL CDs_SPEC VOL 1_01 31 2025r_316 Pages.pdf PDF
S02_UPGRADE CATH LAB 4_FINAL CDs_SPEC VOL 2_01 31 2025r_640 Pages.pdf PDF
S02_6__Attachment 1 Single Source Justification MPT to SAT - Electrical Distribution Panels signed Redacted.pdf PDF
S02_3__Attachment 1 Single Source Justification MPT to SAT - Data Jacks signed_Redacted.pdf PDF
S02_8__Attachment 1 Single Source Justification MPT to SAT - Nurse Call signed Redacted.pdf PDF
S02_Wage Determination_9 Pages_06.13.25.pdf PDF
36C26325B0017.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING 70

PROJECT AREA:

3RD LEVEL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

PROJECT NAME:

SITE ADDRESS:

VA PROJECT NUMBER:

OWNER AND CONSULTANTS:

VICINITY MAP:

DESIGNER OF RECORD

AREA MAP: SITE LOCATION MAP:

CONSTRUCTION DOCUMENTS

C U s e rs

\p c h o i\ D o c u m e n ts \1

U p g ra d e

C a th L a b

R

Y e u n y o u n g

.r v t

/2

/2

:2

:5

P

M

GI000

COVER SHEET UPGRADE CATH LAB #4

VA Minneapolis Health Care System

618-CSI-230

BUILDING 70

01/31/2025 JU PC

UPGRADE CATH LAB #4

1 VETERAN DRIVE MINNEAPOLIS, MN

618-CSI-230

17179

VA COR:

CONTACT:

ADDRESS:

PHONE:

CHRIS WEBERG

ONE VETERAN DRIVE

MINNEAOLIS, MN 55417

612-467-5805

ARCHITECT:

NAME:

ADDRESS:

CONTACT:

ANDERSON ENGINEERING OF MN, LLC

13605 1ST AVE NORTH, SUITE 100

PLYMOUTH, MN 55441

JESSE ULLAND

PHONE: 763-412-4000

STRUCTURAL ENGINEER:

NAME:

ADDRESS:

CONTACT:

ANDERSON ENGINEERING OF MN, LLC

417 MAIN AVE. N. SUITE 210

FARGO, ND 58103

ADAM ADAMS

PHONE: 701-365-0418

MECHANICAL/PLUMBING ENGINEER:

NAME:

ADDRESS:

CONTACT:

DUNHAM ASSOCIATES, INC

50 SOUTH SIXTH STREET, SUITE 1100

MINNEAPOLIS, MN 55402

JASON GOTTWALT

PHONE: 612-465-7273

SHEET INDEX - ARCHITECTURAL

SHEET NO. SHEET TITLE 3

5%

S D

RE

VI

EW

4/

/2

5%

D D

RE

VI

EW

1/

/2

C D

RE

VI

EW

1/

/2

C

D

RE

VI

EW

2/

/2

D

ES

IG

N

SU

BM

IS

SI

O

N

/2 9/

C O

NS

TR

UC

TI

O N

DO

CU

M

EN

TS

1/

/2

AD131 THIRD LEVEL DEMOLITION PLAN █ █ █ █ █ █

AD132 THIRD LEVEL REFLECTED CEILING DEMOLITION PLAN █

AE131 THIRD LEVEL FLOOR PLAN █ █ █ █ █ █

AE132 THIRD LEVEL REFLECTED CEILING PLAN █

AE211 INTERIOR ELEVATIONS █ █ █ █ █ █

AE601 PARTITION TYPES, DOOR SCHEDULE AND DETAILS █ █ █ █ █

AF101 FINISH PLAN, SCHEDULE, & DETAILS, & MOUNTING HEIGHTS █ █ █ █ █

QH130 THIRD LEVEL EXISTING & NEW EQUIPMENT PLAN AND SCHEDULE █ █ █ █ █

SHEET INDEX - GENERAL

SHEET NO. SHEET TITLE 3

5%

S D

RE

VI

EW

/2

1/

D D

RE

VI

EW

1/

/2

C D

RE

VI

EW

1/

/2

C

D

RE

VI

EW

2/

/2

D

ES

IG

N

SU

BM

IS

SI

O

N

/2 9/

NS

TR

UC

TI

O N

DO

CU

M

EN

TS

1/

/2

GI000 COVER SHEET █ █ █ █ █ █

GI002 ABBREVIATIONS █ █ █ █ █

GI131 THIRD LEVEL LIFE SAFETY PLAN █ █ █ █ █

GC131 THIRD LEVEL INFECTION CONTROL & PHASING PLANS █ █ █ █ █

GC132 THIRD LEVEL CONSTRUCTION ACCESS ROUTE █ █ █ █

KEYPLAN

ELETRICAL ENGINEER:

NAME:

ADDRESS:

CONTACT:

DUNHAM ASSOCIATES, INC

50 SOUTH SIXTH STREET, SUITE 1100

MINNEAPOLIS, MN 55402

BEN ZURN

PHONE: 612-465-7626

PROJECT AREA:

3RD LEVEL

SHEET INDEX - STRUCTURAL

SHEET NO. SHEET TITLE 3

5%

S D

RE

VI

EW

4/

/2

D D

RE

VI

EW

1/

/2

C D

RE

VI

EW

1/

/2

C

D

RE

VI

EW

2/

/2

D

ES

IG

N

SU

BM

IS

SI

O

N

/2 9/

NS

TR

UC

TI

O N

DO

CU

M

EN

TS

1/

/2

S001 NOTE SHEET █ █ █ █ █

S101 THIRD LEVEL FLOOR FRAMING PLAN █ █ █

S201 THIRD LEVEL INTERSTITIAL FRAMING PLAN █ █ █ █ █

SHEET INDEX - ELECTRICAL

SHEET NO. SHEET TITLE 3

5%

S D

RE

VI

EW

4/

/2

D D

RE

VI

EW

1/

/2

C D

RE

VI

EW

1/

/2

C

D

RE

VI

EW

2/

/2

D

ES

IG

N

SU

BM

IS

SI

O

N

/2 9/

NS

TR

UC

TI

O N

DO

CU

M

EN

TS

1/

/2

E001 ELECTRICAL TITLE SHEET █ █ █ █ █

E131 ELECTRICAL ORIENTATION PLAN █ █ █ █

EL131 THIRD LEVEL ELECTRICAL LIGHTING PLAN █ █ █ █ █

EP131 THIRD LEVEL ELECTRICAL POWER PLAN █ █ █ █ █

ES131 THIRD LEVEL ELECTRICAL SYSTEMS PLAN █ █ █ █ █

E300 ELECTRICAL ONE LINE DIAGRAM █ █ █ █ █

E500 ELECTRICAL DETAILS █ █ █ █ █

E600 ELECTRICAL SCHEDULES █ █ █ █ █

SHEET INDEX - MECHANICAL

SH

EE

T

NO

SHEET TITLE 3

5%

S D

RE

VI

EW

4/

/2

D D

RE

VI

EW

1/

/2

C D

RE

VI

EW

1/

/2

C

D

RE

VI

EW

2/

/2

D

ES

IG

N

SU

BM

IS

SI

O

N

/2 9/

NS

TR

UC

TI

O N

DO

CU

M

EN

TS

1/

/2

M000 MECHANICAL TITLE SHEET █ █ █ █ █

MHD103 THIRD LEVEL DEMOLITION HVAC PLAN █ █ █ █ █

MH103 THIRD LEVEL HVAC PLAN █ █ █ █ █

MH103.1 THIRD LEVEL INTERSTITIAL HVAC PLAN (FOR DUCT CLEANING) █ █ █ █ █

M200 MECHANICAL DETAILS AND SCHEDULES █ █ █ █ █

SHEET INDEX - PLUMBING

SHEET NO. SHEET TITLE 3

5%

S D

RE

VI

EW

4/

/2

D D

RE

VI

EW

1/

/2

5%

C D

RE

VI

EW

1/

/2

C

D

RE

VI

EW

2/

/2

D

ES

IG

N

SU

BM

IS

SI

O

N

/2 9/

NS

TR

UC

TI

O N

DO

CU

M

EN

TS

1/

/2

PPD103 THIRD LEVEL DEMOLITION PLUMBING PLAN █ █ █ █ █

FX103 THIRD LEVEL FIRE PROTECTION PLAN █

PP103 THIRD LEVEL MEDICAL GAS PLAN █ █ █ █ █

PP103.1 THIRD LEVEL INTERSTITIAL PLUMBING/MEDICAL GAS █ █ █ █ █

P200 PLUMBING DETAILS AND SCHEDULES █ █ █ █ █

Revisions: Date:

Name

Date Reg. No.

Jason R. Gottwalt, P.E.

41360

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

e or under my direct Licensed Architect Minnesota.

Tom Olesak

License No.:1815701/31/2025

ARCHITECTURAL ABBREVIATIONS

A/C

A/C UNIT

A/E

AAMA

AAP

AB

ABC

ACC

ACI

ACT

ACS DR

ACS FLR

ACS PNL

ACST

AD

ADA

ADC

ADDL

ADDN

ADH

ADJ

ADMIN

AFF

AFG

AFS

AGC

AGGR

AHJ

AHR

AHU

AIA

AISC

ALT

ALT NO

ALUM

AMT

ANOD

ANSI

ANT

AP

APA

APC

APPD

APPROX

AR

ARCH

ASB

ASI

ASKLR

ASPH

ASSN

ASTM

ATCH

ATM

AUTO

AUX

AV

AVG

AW

AWI

AWPA

AWS

B PL

BAT

BD

BD FT

BEV

BHMA

BI FLD DR

BITUM

BKG

BLD

BLDG

BM

BOT

BRCG

BRDG

BRDG JST

BRG

BRG PL

BRKT

BRZ

BSMT

BTWN

BUR

C CONC

C TO C

CAB

CAC

CB

CBB

CCD

CCTV

CCW

CD

CEM

CEM PLAS

CER

CF

CF/CI

CF/OI

CFLG

CFMF

CG

CGSFU

CH

CHEM

CHFR

CHK

CI

CIP

CIR

CIRC

CJ

CL

CLDG

CLG

CLR

CM

CMU

AIR CONDITION

AIR CONDITIONING UNIT

ARCHITECT/ENGINEER

AMERICAN ARCHITECTURAL MANUFACTURERS ASSN

ALARM ANNUNCIATOR PANEL

ANCHOR BOLT

AGGREGATE BASE COURSE

ACCESSIBLE

AMERICAN CONCRETE INSTITUTE

ACOUSTICAL CEILING TILE

ACCESS DOOR

ACCESS FLOOR

ACCESS PANEL

ACOUSTIC

AREA DRAIN

AMERICANS WITH DISABILITIES ACT

AUTOMATIC DOOR CLOSER

ADDITIONAL

ADDITION

ADHESIVE

ADJACENT, ADJOINING, OR ADJUSTABLE

ADMINISTRATION

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

ABOVE FINISHED SLAB

ASSOCIATED GENERAL CONTRACTORS

AGGREGATE

AUTHORITY HAVING JURISDICTION

ANCHOR

AIR HANDLING UNIT

AMERICAN INSTITUTE OF ARCHITECTS

AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ALTERNATE

ALTERNATE NUMBER

ALUMINUM

AMOUNT

ANODIZE

AMERICAN NATIONAL STANDARDS INSTITUTE

ANTENNA

ACCESS PANEL

AMERICAN PLYWOOD ASSOCIATION

ARCHITECTURAL PRECAST CONCRETE

APPROVED

APPROXIMATE

AS REQUIRED

ARCHITECT

ASBESTOS

ARCHITECT'S SUPPLEMENTAL INSTRUCTION

AUTOMATIC SPRINKLER

ASPHALT

ASSOCIATION

AMERICAN SOCIETY FOR TESTING AND MATERIALS

ATTACHMENT

AUTOMATIC TELLER MACHINE

AUTOMATIC

AUXILIARY

AUDIO VISUAL

AVERAGE

ACID WASTE

ARCHITECTURAL WOODWORKING INSTITUTE

AMERICAN WOOD PRESERVERS' ASSOCIATION

AMERICAN WELDING SOCIETY

BASE PLATE

BATTEN

BOARD

BOARD FEET (FOOT)

BEVEL

BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION

BIFOLDING DOORS

BITUMINOUS

BACKING

BUILD

BUILDING

BEAM OR BENCHMARK

BOTTOM

BRACING

BRIDGING

BRIDGING JOIST

BEARING

BEARING PLATE

BRACKET

BRONZE

BASEMENT

BETWEEN

BUILT-UP ROOFING

CAST CONCRETE

CENTER TO CENTER

CABINET

CEILING ATTENUATION CLASS

CATCH BASIN OR CORNER BEAD

CEMENTITIOUS (BACKER) BOARD

CONSTRUCTION CHANGE DIRECTIVE

CLOSED CIRCUIT TELEVISION

COUNTERCLOCKWISE

CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS

CEMENT

CEMENT PLASTER

CERAMIC

CONTRACTOR FURNISHED

CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CONTRACTOR FURNISHED/OWNER INSTALLED

COUNTERFLASHING

COLD-FORMED METAL FRAMING

CORNER GUARD

CERAMIC GLAZED STRUCTURAL FACING UNITS

COAT HOOK

CHEMICAL

CHAMFER

CHECK

CAST IRON

CAST-IN-PLACE

CIRCLE

CIRCULAR

CONSTRUCTION JOINT OR CONTROL JOINT

CENTER LINE

CLADDING

CEILING

CLEAR

CONSTRUCTION MANAGEMENT

CONCRETE MASONRY UNIT

CNR

CNTR

CRTP

CO

CO2

COL

COM

COMB

COMM

COMP

CONC

CONC FLR

COND

CONF

CONN

CONSTR

CONT

CONTR

COORD

CORR

CPM

CPRS

CR

CRS

CRSI

CSB

CSG

CSI

CSK

CSMT

CSWK

CTG

CTR

CTRL

CTV

CU FT

CU IN

CU YD

CURT

CYL

CYL L

D

DAT

DBL

DBL GLZ

DCS

DP

DEG

DEL

DEMO

DEPT

DET

DF

DIA

DIAG

DIFF

DIM

DIR

DISP

DIST

DIV

DL

DOC

DR

DR CL

DR FR

DR OPNG

DS

DSGN

DW

DWG

E

EA

EFF

EFS

EIFS

EJ

EL

ELAST

ELEC

ELEC DR OP

ELEV

EMER

EMER SHR

ENCL

ENGR

ENVIR

EO

EPA

EPDM

EPO

EPS

EQ

EQL SP

EQUIP

EQUIV

ERD

ESC

ESMT

ESP

EST

ETC

EW

EWC

EWS

EXH

EXIST

EXP

EXP BT

EXST GR

EXT

EXT GR

CORNER

COUNTER

COUNTERTOP

CARBON MONOXIDE

CARBON DIOXIDE

COLUMN

COMMON

COMBINATION, COMBINED

COMMUNICATION

COMPONENT

CONCRETE

CONCRETE FLOOR

CONDENSER OR CONDITION

CONFERENCE

CONNECT

CONSTRUCTION

CONTINUE

CONTRACTOR

COORDINATE

CORRIDOR

CRITICAL PATH METHOD

COMPRESSIBLE

CARD READER

COLD ROLLED STEEL

CONCRETE REINFORCING STEEL INSTITUTE

CONCRETE SPLASH BLOCK

CASING

CONSTRUCTION SPECIFICATIONS INSTITUTE

COUNTER SUNK

CASEMENT

CASEWORK

COATING

CENTER

CONTROL

CABLE TELEVISION

CUBIC FEET

CUBIC INCH

CUBIC YARD

CURTAIN

CYLINDER

CYLINDER LOCK

DEPTH OR PENNY (NAIL)

DATUM

DOUBLE

DOUBLE GLAZE

DIAPER CHANGING STATION

DECORATIVE PANEL

DEGREE

DELETE

DEMOLITION

DEPARTMENT

DETAIL

DRINKING FOUNTAIN

DIAMETER

DIAGONAL

DIFFERENCE OR DIFFUSER

DIMENSION

DIRECTION

DISPENSER

DISTANCE

DIVIDE OR DIVISION

DEAD LOAD

DOCUMENT

DOOR, DRAIN, DRESSING ROOM, OR DRIVE

DOOR CLOSER

DOOR FRAME

DOOR OPENING

DOWNSPOUT

DESIGN

DISHWASHER

DRAWING

EAST

EACH

EFFICIENCY

EXTERIOR FINISH SYSTEM

EXTERIOR INSULATION AND FINISH SYSTEM

EXPANSION JOINT

ELEVATION

ELASTOMERIC

ELECTRIC

ELECTRIC DOOR OPENER

ELEVATOR

EMERGENCY

EMERGENCY SHOWER

ENCLOSURE

ENGINEER

ENVIRONMENT

ELECTRICAL OUTLET

ENVIRONMENTAL PROTECTION AGENCY

ETHYLENE PROPYLENE DIENE MONOMER

EMERGENCY POWER OFF

EXPANDED POLYSTYRENE BOARD (INSULATION)

EQUAL

EQUALLY SPACED

EQUIPMENT

EQUIVALENT

EXISTING ROOF DRAIN

ESCAPE OR ESCUTCHEON

EASEMENT

ESPECIALLY

ESTIMATE

AND SO FORTH OR ET CETERA

EACH WAY

ELECTRIC WATER COOLER

EYE WASH STATION

EXHAUST

EXISTING

EXPANSION OR EXPOSED

EXPANSION BOLT

EXISTING GRADE

EXTERIOR, EXTERNAL, OR EXTINGUISHER

EXTERIOR GRADE

F

FA

FAB

FAC

FACIL

FAS

FAS BD

FCU

FCO

FCTY

FD

FDC

FDTN

FE

FEC

FF

FF EL

FF&E

FHC

FHP

FIG

FIL

FIN

FIN FLR

FIN GR

FIN WD

FIXT

FL

FLASH

FLDG

FLEX

FLG

FLR

FLR FIN

FLR SK

FLUOR

FLUOR FIX

FM

FM-G

FO

FOC

FOF

FOM

FOS

FOUNT

FOW

FP

FR

FR SNK

FREQ

FRMG

FRP

FRZ

FS

FSB

FSTNR

FT

FTG

FURG

FURN

FUT

FVC

GA

GAL

GALV

GALV STL

GB

GC

GD

GDR

GEN

GFRC

GFRG

GFRP

GI

GL

GL BLK

GLU LAM

GP

GR FL

GRAN

GRTG

GSB

GSM

GSU

GT

GUAR

GUT

GYP

GYP BD

GYP PLAS

H

HAZ MAT

HB

HC

HCWD

HDBD

HDO

HDR

HDW

HDWD

HEPA

HEX

HGR

HM

HMD

HMDF

HMF

HNDRL

HO

HORIZ

HOSP

HP

HPD

HPDL

HQ

HS

HSE

HSKPG

FAHRENHEIT OR FEMALE

FIRE ALARM

FABRIC

FACTOR

FACILITY

FASCIA

FASCIA BOARD

FAN COIL UNIT

FLOOR CLEANOUT

FACTORY

FLOOR DRAIN

FIRE DEPARTMENT CONNECTION

FOUNDATION

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

FINISH FACE

FINISH FLOOR ELEVATION

FURNITURE, FIXTURE, AND EQUIPMENT

FIRE HOSE CABINET

FULL HEIGHT PARTITION

FIGURE

FILLET

FINISH

FINISH FLOOR

FINISH GRADE

FINISH WOOD

FIXTURE

FLOORLINE

FLASHING

FOLDING

FLEXIBLE

FLOORING

FLOOR

FLOOR FINISH

FLOOR SINK

FLUORESCENT

FLUORESCENT FIXTURE

FACTORY MUTUAL

FACTORY MUTUAL GLOBAL

FINISHED OPENING

FACE OF CONCRETE OR FACE OF CURB

FACE OF FINISH

FACE OF MASONRY

FACE OF SLAB OR FACE OF STUD

FOUNTAIN

FACE OF WALL

FIRE PROTECTION OR FIREPROOF

FIRE RATING, FIRE RESISTANT, OR FRAME

FLUSHING RIM SINK

FREQUENCY

FRAMING

FIBERGLASS REINFORCED PLASTIC

FREEZER

FEDERAL SPECIFICATION

FOLDING SHOWER BENCH

FASTENER

FEET OR FOOT

FOOTING

FURRING

FURNISH OR FURNITURE

FUTURE

FIRE VALVE CABINET

GAGE OR GYPSUM ASSOCIATION

GALLON

GALVANIC OR GALVANIZED

GALVANIZED STEEL

GRAB BAR

GENERAL CONTRACTOR

GUARD

GUARD RAIL

GENERAL OR GENERATOR

GLASS-FIBER-REINFORCED CONCRETE

GLASS-FIBER-REINFORCED GYPSUM

GLASS-FIBER-REINFORCED PLASTIC

GALVANIZED IRON

GLASS

GLASS BLOCK

GLUED LAMINATED WOOD

GRAB BAR

GROUND FLOOR

GRANITE

GRATING

GYPSUM SHEATHING BOARD

GALVANIZED SHEET METAL

GLAZED STRUCTURAL UNIT

GROUT

GUARANTEE

GUTTER

GYPSUM

GYPSUM BOARD

GYPSUM PLASTER

HIGH OR HUMIDISTAT

HAZARDOUS MATERIALS

HOSE BIBB

HOLLOW CORE

HOLLOW CORE WOOD DOOR

HARDBOARD

HIGH DENSITY OVERLAY

HEADER

HARDWARE

HARDWOOD

HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HEXAGON

HANGER

HOLLOW METAL

HOLLOW METAL DOOR

HOLLOW METAL DOOR AND FRAME

HOLLOW METAL FRAME

HANDRAIL

HOLD OPEN

HORIZONTAL

HOSPITAL

HIGH PRESSURE

HYGIENE PRODUCT DISPOSAL

HIGH PRESSURE DECORATIVE LAMINATE

HEADQUARTERS

HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH

HOUSE

HOUSEKEEPING

HST

HSS

HT

HTC

HVAC

HVY

HW

HYD

HYDR

IAQ

IBC

IC

ICW

ID

ID NO

ILLUM

INCL

IND

INFO

INSUL

INT

INTL

IWH

JAN

KD

KIT

KO

KPL

LAB

LAD

LAM

LAM GL

LAU

LAV

LBR

LBS

LCS

LD BRG

LDR

LED

LF

LIB

LIN

LIQ

LKR

LKR RM

LL

LMST

LRG

LRV

LS

LT

LT GA

LT WT

LTG

LTNG

LVD

LVR

LWC

LWIC

LYR

MACH

MACH RM

MAINT

MAN

MATL

MATV

MAX

MBD

MCB

MD

ME

MEAS

MECH

MECH RM

MED

MEK

MEMB

MEMO

MEZZ

MF

MFD

MFG

MFR

MFR REC

MGT

MIC

MID

MIL STD

MIN

MIR

MISC

MIT

MKR

ML

MLDG

MLWK

mm

MO

MOD

MOD BIT

MON

MOPR

MR

MS

MTD

MTG

MTL

MULL

MW

MWP

HOIST

HOLLOW STRUCTURAL STEEL

HEIGHT

HEAT TRANSFER COEFFICIENT

HEATING, VENTILATING, AND AIR CONDITIONING

HEAVY

HOT WATER

HYDRANT

HYDRAULIC

INDOOR AIR QUALITY

INTERNATIONAL BUILDING CODE

INFECTION CONTROL

INFECTION CONTROL WALL

INSIDE DIAMETER

IDENTIFICATION NUMBER

ILLUMINATION

INCLUDED

INDEPENDENT OR INDUSTRIAL

INFORMATION

INSULATION

INTERIOR

INTERNATIONAL

INSTANTANEOUS WATER HEATER

JANITOR

KILN DRIED OR KNOCKED DOWN

KITCHEN

KNOCKOUT

KICKPLATE

ANGLE

LABORATORY

LADDER

LAMINATE

LAMINATED GLASS

LAUNDRY

LAVATORY

LUMBER

POUND

LOCKABLE CHARTING STATION/MED CABINET

LOAD-BEARING

LEADER

LIGHT EMITTING DIODE

LINEAR FEET (FOOT)

LIBRARY

LINEAR

LIQUID

LOCKER

LOCKER ROOM

LEAD LINED

LIMESTONE

LARGE

LOUVERED ROOF VENT

LIGHT SWITCH

LIGHT

LIGHT GAGE

LIGHTWEIGHT

LIGHTING

LIGHTNING

LOUVERED

LOUVER

LIGHTWEIGHT CONCRETE

LIGHTWEIGHT INSULATING CONCRETE

LAYER

MACHINE

MACHINE ROOM

MAINTENANCE

MANUAL

MATERIAL

MASTER ANTENNA TELEVISION SYSTEM

MAXIMUM

MARKER BOARD

METAL CORNER BEAD

DECK

MECHANICAL ENGINEER

MEASURE

MECHANICAL

MECHANICAL ROOM

MEDICAL, MEDIUM

METHYL ETHYL KETONE

MEMBRANE

MEMORANDUM

MEZZANINE

MILL FINISH

MANUFACTURED

MANUFACTURING

MANUFACTURER

MANUFACTURER'S RECOMMENDATION

MANAGEMENT

MICROPHONE

MIDDLE

MILITARY STANDARD

MINIMUM

MIRROR

MISCELLANEOUS

MITER

MARKER

METAL LATH

MOLDING (MOULDING)

MILLWORK

MILLIMETER

MASONRY OPENING

MODEL, MODIFY OR MODULE

MODIFIED BITUMEN

MONITOR

MOP RACK

MOISTURE RESISTANT

MOP SINK

MOUNTED

MOUNTING

METAL

MULLION

MICROWAVE

MEMBRANE WATERPROOFING

N

NA

NAT

NATL

NC

NCOMBL

NEC

NEG

NEMA

NEUT

NFC

NFPA

NIC

NO

NOM

NR

NRC

NRCA

NRP

NS

NUM

O/O O

OA

OC

OCC

OCT

OD

OD

OF/CI

OFD

OFF

OF/OI

OH

OH DR

OPH

OPNG

OPP

OPR

OPT

OR

ORD

ORG

ORIG

ORN

OSHA

OUT

OZ

P

PAR

PARA

PART

PAT

PB

PBD

PC

PCA

PCC

PCCP

PCD

PCF

PCP

PCT

PED

PEN

PEND

PERF

PERIM

PERP

PHAR

PHOTO

PKG

PL

PL GL

PLAM

PLAS

PLBG

PLYWD

PMTL

PNEU

PNL

PO

POLY

PP

PR

PRCST

PREFAB

PREFIN

PRELIM

PREP

PRESS

PREV

PRKG

PRMLD

PROJ

PROP

PSF

PSI

PT

PTD

PTN

PTS

PVC

PVG

PWR

QA

QC

QRY

QTR

QTY

QUAD

QUAL

R

RA

RAD

RBM

RBR

NORTH

NOT APPLICABLE

NATURAL

NATIONAL

NOISE CRITERIA OR NURSE CALL

NONCOMBUSTIBLE

NATIONAL ELECTRICAL CODE

NEGATIVE

NATIONAL ELECTRICAL MANUFACTURERS ASSN

NEUTRAL

NATIONAL FIRE CODE

NATIONAL FIRE PROTECTION ASSOCIATION

NOT IN CONTRACT

NUMBER

NOMINAL

NOISE REDUCTION

NOISE REDUCTION COEFFICIENT

NATIONAL ROOFING CONTRACTORS ASSOCIATION

NONREMOVABLE

NARROW STILE

NUMERAL

OUT TO OUT

OXYGEN

OUTSIDE AIR OR OVERALL

ON CENTER

OCCUPY

OCTAGON

OUTSIDE DIAMETER, OUTSIDE DIMENSION

OUTSIDE DIAMETER/OUTSIDE DIMENSION

OWNER FURNISHED/CONTRACTOR INSTALLED

OVERFLOW DRAIN

OFFICE

OWNER FURNISHED/OWNER INSTALLED

OVERHANG

OVERHEAD (COILING) DOOR

OPPOSITE HAND

OPENING

OPPOSITE

OPERABLE

OPTIONAL

OPERATING ROOM OR OUTSIDE RADIUS

ORDNANCE OR OVERFLOW ROOF DRAIN

ORGANIC

ORIGINAL

ORNAMENTAL

OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION

OUTLET

OUNCE

PAINT

PARALLEL OR PARAPET

PARAGRAPH

PARTIAL

PATTERN

PUSHBUTTON

PARTICLEBOARD

PIECE, POLYCARBONATE OR PORTLAND CEMENT

PORTLAND CEMENT ASSOCIATION

PRECAST CONCRETE

CONCRETE PAVEMENT

PAPER CUP DISPENSER

POUNDS PER CUBIC FOOT

PORTLAND CEMENT PLASTER

PRIVACY CURTAIN TRACK

PEDESTAL

PENETRATE

PENDANT

PERFORATED

PERIMETER

PERPENDICULAR

PHARMACY

PHOTOGRAPH

PACKAGE

PROPERTY LINE

PLATE GLASS

PLASTIC LAMINATE

PLASTER OR PLASTIC

PLUMBING

PLYWOOD

PAINTED METAL

PNEUMATIC

PANEL

POST OFFICE, PURCHASE ORDER

POLYETHYLENE (PLASTIC)

PUSH PLATE

PAIR

PRECAST

PREFABRICATE

PREFINISH

PRELIMINARY

PREPARATION

PRESSURE

PREVIOUS

PARKING

PREMOLDED

PROJECT

PROPERTY

POUNDS PER SQUARE FOOT

POUNDS PER SQUARE INCH

PORCELAIN TILE OR PRESSURE TREATED

PAPER TOWEL DISPENSER

PARTITION

PNEUMATIC TUBE STATION

POLYVINYL CHLORIDE (PLASTIC)

PAVING

POWER

QUALITY ASSURANCE

QUALITY CONTROL

QUARRY

QUARTER

QUANTITY

QUADRANT

QUALITY

RADIUS OR RISER

RETURN AIR

RADIATOR

REINFORCED BRICK MASONRY

RUBBER

RC

RCP

RCVR

RD

REC

RECD

RECPT

RECT

REF

REFR

REG

REINF

REP

REPL

REQ

REQD

RET

REV

RFG

RFI

RFP

RFS

RL

RLG

RM

RM LT

RND

RO

ROW

RS

RSV

RT

RV

RVS

RWL

S

SA

SALV

SAMP

SAN

SB

SBS

SBSTR

SC

SCH

SCHED

SCHEM

SCP

SCRN

SCT

SCWD

SD

SDG

SECT

SEG

SEL

SEP

SF

SFTWD

SGD

SGL

SHR

SHR HD

SHRD

SHT

SHTHG

SHV

SIM

SJ

SJI

SK

SKLT

SLDG

SLNT

SM

SMK

SND INS

SPEC

SPKLR

SPKR

SPLY

SPR

SQ

SQ IN

SQ YD

SST

ST

STC

STD

STIF

STL JST

STL LNTL

STL PL

STL RF DK

STL TB

STL TR

STNLS

STOR

STR

STRUCT

STRUCT STL

SUB

SURF

SUSP

SUSP CLG

SW

SWDR

SYM

SYNTH

SYS

REMOTE CONTROL

REFLECTED CEILING PLAN

RECEIVER

ROAD OR ROOF DRAIN

RECESSED

RECEIVED

RECEPTACLE

RECTANGLE

REFERENCE OR REFRIGERATOR

REFRACTORY, REFRIGERATION

REGISTER

REINFORCE

REPAIR

REPLACE

REQUIRE

REQUIRED

RETURN

REVISION

ROOFING

REQUEST FOR INFORMATION

REQUEST FOR PROPOSAL

ROOM FINISH SCHEDULE

ROOF LEADER

RAILING

ROOM

NURSE CALL LIGHT/ROOM LIGHT

ROUND

ROUGH OPENING

RIGHT OF WAY

ROUGH SAWN

RESILIENT SHEET VINYL

RIGHT

ROOF VENT

REVERSE

RAIN WATER LEADER

SOLID SURFACE

SUPPLY AIR

SALVAGE

SAMPLE

SANITARY

SPLASH BLOCK

STYRENE BUTADIEN STYRENE

SUBSTRATE

SHARPS CONTAINER

SCHOOL

SCHEDULE

SCHEMATIC

SCUPPER

SCREEN

SHOWER CURTAIN TRACK

SOLID CORE WOOD DOOR

SMOKE DETECTOR/SOAP DISPENSER

SIDING

SECTION

SEGMENT

SELECT

SEPARATE

SQUARE FOOT (FEET)

SOFTWOOD

SLIDING GLASS DOOR

SINGLE

SHOWER

SHOWER HEAD

SHOWER DRAIN

SHEET

SHEATHING

SHELVING

SIMILAR

SCORED JOINT

STEEL JOIST INSTITUTE

SKETCH

SKYLIGHT

SLIDING

SEALANT

SHEET METAL

SMOKE

SOUND INSULATION

SPECIFICATION

SPRINKLER

SPEAKER

SUPPLY

SINGLE PLY ROOF SYSTEM

SQUARE

SQUARE INCH

SQUARE YARD

STAINLESS STEEL

STAIRS OR STREET

SOUND TRANSMISSION CLASS

STANDARD

STIFFENER

STEEL JOIST

STEEL LINTEL

STEEL PLATE

STEEL ROOF DECK

STEEL TUBE

STEEL TRUSS

STAINLESS

STORAGE

STRINGERS

STRUCTURAL

STRUCTURAL STEEL

SUBSTITUTE

SURFACE

SUSPEND

SUSPENDED CEILING

SWITCH

SWING DOOR

SYMBOL

SYNTHETIC

SYSTEM

T T&M

TB

TBD

TECH

TEL

TEMP

THERM

THK

THRES

THRU

THRUOUT

TMPD

TMPD GL

TN

TO

TO FDN

TOB

TOM

TOP

TOS

TOW

TPD

TRANS

TRTD

TS

TSTAT

TV

TYP

UC

UGND

UL

ULT

UNFIN

UNO

UPS

UR

UTIL

UV

VAC

VAR

VEH

VENT

VERT

VEST

VFD

VIC

VID

VIF

VNR

VOC

VOL

VR

VTR

W/ W/O

WBL

WC

WD

WDW

WF

WFR

WFS

WH

WHSE

WP

WPM

WR

WS

WSCT

WT

X BRACE

XPS

YD

TREAD OR THERMOSTAT

TIME AND MATERIALS

TOWEL BAR

TACK BOARD

TECHNICAL

TELEPHONE

TEMPERATURE OR TEMPORARY

THERMAL

THICKNESS

THRESHOLD

THROUGH

THROUGHOUT

TEMPERED

TEMPERED GLASS

TRUE NORTH

TOP OF ___

TOP OF FOUNDATION

TOP OF BEAM

TOP OF MASONRY

TOP OF PARAPET

TOP OF STEEL

TOP OF WALL

TOILET PAPER DISPENSER

TRANSOM

TREATED

TUBE STEEL

THERMOSTAT

TELEVISION

TYPICAL

UNDERCUT

UNDERGROUND

UNDERWRITERS LABORATORIES

ULTIMATE

UNFINISH

UNLESS NOTED OTHERWISE

UNINTERRUPTIBLE POWER SUPPLY

URINAL

UTILITY

ULTRAVIOLET

VACUUM

VARIES

VEHICLE

VENTILATION

VERTICAL

VESTIBULE

VARIABLE FREQUENCY DRIVE

VICINITY

VIDEO

VERIFY IN FIELD

VENEER

VOLATILE ORGANIC COMPOUND

VOLUME

VAPOR RETARDER

VENT THROUGH ROOF

WITH

WITHOUT

WOOD BLOCKING

WATER CLOSET

WOOD

WINDOW

WIDE FLANGE

WOOD FRAME

WOOD FURRING STRIPS

WATER HEATER

WAREHOUSE

WATERPROOFING

WATERPROOF MEMBRANE

WEATHER RESISTANT

WEATHERSTRIP OR WALL SCONCE

WAINSCOT

WEIGHT OR WINDOW TREATMENT

CROSS BRACE

EXTRUDED POLYSTYRENE BOARD

YARD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCTION DOCUMENTS

C U s e rs

\p c h o i\ D o c u m e n ts \1

U p g ra d e

C a th L a b

R

Y e u n y o u n g

.r v t

/2

/2

:2

:5

P

M

GI002

ABBREVIATIONS UPGRADE CATH LAB #4

VA Minneapolis Health Care System

618-CSI-230

BUILDING 70

01/31/2025 JU PC

17179

Revisions: Date:

Name

Date Reg. No.

Jason R. Gottwalt, P.E.

41360

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

e or under my direct Licensed Architect Minnesota.

EA

SCZ-3-62

14,432SF

PCNSS

1,572SF

799 SF

3J-140

CATH LAB

#4

223 SF

C3-84

SUITE

PASSAGEWAY

595 SF

3J-139

CATH

HOLDING

142 SF

3J-140A

EQUIPMENT

SMOKE TIGHT ASSEMBLY

AND 1/2" HOUR FIRE

BARRIER

EXIT ACCESS CORRIDOR

129 SF

3J-142

SCRUB

120 SF

3J-142A

EQUIPMENT

121 SF

3J-141

ELECTRONIC

EQUIPMENT

158 SF

3J-141A

SUPPLY

806 SF

3J-143

CATH LAB

#3

FEC

FEC

EA

EA

C3-92

CORRIDOR

251 SF

3J-138

WAITING

116 SF

3J-138A

ECHO

OFFICE

292 SF

3J-138B

ECHO

WORKROOM

EXIT

LIGHT

3P-1183P-1173P-116

C3-97

3J-124

3J-124C

3J -1

D

3J-124A

3J-124B

S- 9

S- 10

C3-96

C3-95

3J-121

3J-120 3J-119 3J-116 3J-115 3J-114 3J-111 3J-110

3J-109

3J-108 3J-1123J-1133J-1173J-118

3J-1223J-123

C3-96

C3 -1

C3 -9

3J-105 3J-104

3J-101

3J-102 3J-103

3J-107 3J-107A 3J-106

C3 -1

3H-105B

3H-105A

3H-105

3H-105C

3H-104

3H-100

3S-6

C3-66

C3-68

C3-63

C3-63

ELEV

3H-122

3H-121

3H-1203H-121

3H-114 3H-115 3H-118

3H-113 3H-116 3H-117

3H-121 3H-117B

3H-117A 3H-117C

3K-101 3K-1023K-138

3H-11D

3K-137

3K-137A

3H-110

3H-111

S- 8

ELEV

3J-125

3J-128

3J-126

3J-127

3J-130

3J-131

3J-132

3J-126A

3J-129 3J-133 3J-134

3J-136

3J-137

3J-135

C3-93

C3-90

C8

3K -1

A

C O

M M

O N

P A

T H

O F

T R

A V

E L

T O

T A

L T

R A

V E

L D

IS

T

A N

C E

TOTAL TRAVEL DISTANCE

176'-6"

PCNSS

1,929SF

PCNSS

1,948SFNPCS

1,109SF

MSCZ-3-J

5,608SF

PCNSS

5,011SF

SCZ-3-61

9,129SF

PCNSS

1,245SF

EACOMMON PATH OF TRAVEL

77'-0"

EXIT

LIGHT

EXIT

LIGHT

EXIT

LIGHT

NOYES

APPLICABLE REGULATIONS

GENERAL TYPE OF PROJECT

NFPA NATIONAL FIRE CODES (EXCEPTION: NFPA 5000 & 900)

VA DESIGN GUIDELINES

2021 NFPA 101 (LIFE SAFETY CODE)

ABA STANDARDS (2015) (ABAAS)

REMODEL

ADDITION

NEW BUILDING

PROJECT DESCRIPTION

CODE SUMMARY

MINOR INTERIOR RENOVATION TO SUPPORT CATH LAB

EQUIPMENT REPLACEMENT

VA BARRIER FREE DESIGN STANDARD (PG-18-13)

NOYESAUTHORITIES HAVING JURISDICTION (AHJ's)

THE JOINT COMMISSION (JC)

CENTER FOR MEDICARE/MEDICAID SERVICES (CMS)

TESTRATING (HRS)

EXTERIOR DOORS AND WINDOWS

SHAFTS AND EXIT PASSAGEWAYS

OTHER

ROOF CONSTRUCTION

PRIME & SEC. FLOOR BEAMS, JOISTS

FLOOR/CEILING ASSEMBLY

FLOOR CONSTRUCTION

INTERIOR

NON-BEARING WALLS AND PARTITIONS

BEARING WALLS

COLUMNS

GIRDERS

TRUSSES

ROOF/CEILING ASSEMBLY

PRIME & SEC. ROOF BEAMS, JOISTS

EXTERIOR

INTERIOR BEARING WALLS

EXTERIOR BEARING WALLS

STRUCTURAL FRAME

AREA SEPARATIONS / FIRE WALLS

FIRE-RESISTIVE REQUIREMENTS

TYPE(S) OF CONSTRUCTION

CONSTRUCTION TYPE(S)

SEE LIFE SAFETY PLANS

See Life Safety Plans OCCUPANT LOAD OF BUILDING

SF/OCCUPANT OCCUPANTS

TOTAL BUILDING OCCUPANT LOAD:

ACTUAL AREAAREA LOCATION

THIRD LEVEL 1,146 100 12

N/A

3 ASTM E119

(NAPA 220 TABLE 4.1.1)

OSHA STANDARDS

VA SEISMIC DESIGN REQUIREMENTS H-18-8

2023 NATIONAL ELECTRIC CODE (NEC)

ASME BOILER AND PRESSURE VESSEL CODE

ASME CODE FOR PRESSURE PIPING

BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,

AMERICAN CONCRETE INSTITUTE AND COMETARY (ACI 318)

MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE

FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

ENERGY POLICY ACT OF 2005 (EPAct)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS

FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE

RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL

BUILDINGS, 10 CFR PARTS 433,434 AND 435

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE

BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

EXECUTIVE ORDER 13834

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED

IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA

MASTER CONSTRUCTION SPECIFICATION

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE

STANDARD 62.1-2004

SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE

STANDARD 15 -2007

VA FIRE PROTECTION DESIGN MANUAL

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA

NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER

GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)

NOYES

(Section 8.3)

CHANGE OF OCCUPANCY?

SEPARATED OCCUPANCIES?

FIRE BARRIER RATING(S) SEE LIFE SAFETY PLANS

OCCUPANCY CLASSIFICATION(S)

OCCUPANCIES

(If Remodeling)

2021 LSC (TABLE 6.1.14.1)

(LSC CH 12-42)

NOYES

FIRE RESISTIVE CORRIDORS?

SMOKE TIGHT CORRIDORS (SMOKE PARTITIONS)

INCIDENTAL USE AREA RATING(S) SEE PLANS

MISCELLANEOUS

INTERIOR FINISHES CLASSIFICATION XEXITS

X EXIT ACCESS CORRIDORS

XOTHER SPACES

VA PHYSICAL SECURITY AND RESILIENCE DESIGN MANUAL (PSRDM)

U.S. DEPARTMENT OF VETERANS AFFAIRS (VA)

CODE PLAN GENERAL NOTES

1. MAINTAIN EXISTING FIRE RATINGS, ASSEMBLIES AND

SEPARATIONS/COMPARTMENTS THROUGHOUT CONSTRUCTION.

2. INTERSTITIAL FLOOR SLAB IS A 1-HOUR RATED FIRE BARRIER.

3. STRUCTURAL FLOOR IS A 2-HOUR RATED FIRE BARRIER.

4. WHERE EXISTING FIRE STOPPED PENERTRATIONS ARE DISTURBED

BY THIS WORK, REMOVE FIRESTOPPING ASSEMBLY IN ITS ENTIRETY

AND REPLACE WITH NEW UL TESTED FIRESOPPING ASSEMBLY USING

MATERIALS FROM A SINGLE MANUFATURER.

HEALTHCARE

OCCUPANCY

I (332)

1 1/2

ASTM E119

ASTM E119

ASTM E119

ASTM E119

ASTM E119

ASTM E119

ASTM E119

ASTM E119

ASTM E119

ASTM E119

ASTM E119

2025 NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE

2025 NFPA 13 STANDARD FOR THE INSTALLATION OF

SPRINKLER SYSTEMS

LIFE SAFETY SYMBOLS

SMOKE TIGHT

ASSEMBLY

1 HOUR FIRE

BARRIER

2 HOUR FIRE

BARRIER

3 HOUR FIRE

BARRIER

1/2 HOUR FIRE &

SMOKE BARRIER

2 HOUR FIRE &

SMOKE BARRIER

3 HOUR FIRE &

SMOKE BARRIER

HE

TRAVEL DISTANCE

100'-10"

TRAVEL DISTANCE

EA

EDEXIT EXIT

HORIZONTAL EXIT

EXIT DISCHARGE

EXIT ACCESS

FIRE

EXTINGUISHER

FE

FIRE

EXTINGUISHER

CABINET

FEC

LIMITS OF

CONSTRUCTION

HEALTH CARE

SUITE

NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN

SHAFT

ADJACENT SYMBOLS SHOW PARTITION RATING AND

DAMPER REQUIREMENTS

HAZARDOUS USE

ADJACENT SYMBOLS SHOW PARTITION RATING.

OPENINGS REQUIRE CLOSER & LATCH

EXIT PASSAGEWAY

RATE AS STAIR

ALL OPENINGS TO BE RATED AS STAIR SHAFT

CORRIDOR

WALLS TO LIMIT THE TRANSFER OF SMOKE

ADJUNCT CORRIDOR or PSYCHIATRIC AREA or CONSTRUCTED WITH MIN. 4'-0" CLEAR

WITH (PER CHAPTER 19)

EXIT LIGHT,

SEE ELECTRICAL

DRAWINGS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCTION DOCUMENTS

C U s e rs

\p c h o i\ D o c u m e n ts \1

U p g ra d e

C a th L a b

R

Y e u n y o u n g

.r v t

/2

/2

:3

:0

P

M

GI131

THIRD LEVEL LIFE SAFETY PLAN UPGRADE CATH LAB #4

VA Minneapolis Health Care System

618-CSI-230

BUILDING 70

01/31/2025 JU PC

17179

1/8" = 1'-0"1 THIRD LEVEL - LIFE SAFETY PLAN

0 8' 16'4'

Revisions: Date:

Name

Date Reg. No.

Jason R. Gottwalt, P.E.

41360

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

e or under my direct Licensed Architect Minnesota.

PHASE 1:

CONSTRUCTION PROJECT ACTIVITY TYPE - C

INFECTION CONTROL RISK GROUP - GROUP 4: HEGHEST RISK

CONTROL PROCEDURE CLASS - IV

PHASE 2 :

CONSTRUCTION PROJECT ACTIVITY TYPE - D

INFECTION CONTROL RISK GROUP - GROUP 4: HEGHEST RISK

CONTROL PROCEDURE CLASS - IV

PHASE 3:

CONSTRUCTION PROJECT ACTIVITY TYPE - C

INFECTION CONTROL RISK GROUP - GROUP 4: HIGHEST RISK

CONTROL PROCEDURE CLASS - IV

PHASE 4:

CONSTRUCTION PROJECT ACTIVITY TYPE - C

INFECTION CONTROL RISK GROUP - GROUP 4: HIGHEST RISK

CONTROL PROCEDURE CLASS - IV

INFECTION CONTROL RISK ASSESSMENT

(ICRA) BY PROJECT AREA USE AND PHASE

CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)

TYPE A

TYPE B

TYPE C

TYPE D

INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT NOT

LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION

LIMITED TO 1 TILE PER 50 SQUARE FEET, PAINTING BUT NOT SANDING

WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND

ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF

WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.

SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL

DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE

AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF

WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.

FLOOR COVERING REMOVAL (WITHOUT SANDING OR GRINDING).

ANY WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR

REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING

COMPONENTS OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO,

SANDING OF WALL FOR PAINTING OR WALLCOVERING, REMOVAL OF

FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL

CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE

CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH

CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT. FLOOR

COVERING REMOVAL (WITH SANDING OR GRINDING).

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS

NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK

SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE

CEILING SYSTEM, FLOORING AND NEW CONSTRUCTION.

GROUP 1

LOW RISK

• MECHANICAL SPACES: AREAS NOT DIRECTLY ADJACENT TO PATIENT

CARE, INCLUDING INTERSTITIAL SPACES.

• ENGINEERING OR EMS OFFICE/WORK AREAS

• OFFICE AREAS: AREAS NOT ATTACHED TO/ADJOINING PATIENT CARE

AREAS, NOT USED FOR PATIENT INTERVIEWS, EVALUATIONS OR

EXAMINATIONS.

• PUBLIC CORRIDORS: SPACES NOT ON OR DIRECTLY ATTACHED TO

PATIENT UNITS OR TREATMENT LOCATIONS.

GROUP 2

MEDIUM

RISK

• OUTPATIENT AREAS:

1. PRIMARY CARE OR SPECIALTY CARE CLINIC AREAS

2. BEHAVIORAL/MENTAL HEALTH AREAS

3. EXTENDED CARE / REHAB CLINIC AREAS

4. COMMUNITY BASED OUT PATIENT CLINICS (CBOC’S)

GROUP 3

HIGH RISK

• IN-PATIENT UNITS:

1. INCLUDING, BUT NOT LIMITED TO: EMERGENCY DEPT.; NURSING

UNITS; RADIOLOGY/MRI/CT/ULTRASOUND; NUCLEAR MEDICINE;

CAFETERIA/KITCHEN/CANTEEN; LABORATORIES; RADIATION /

ONCOLOGY; DIALYSIS

GROUP 4

HIGHEST

RISK

• ICU/SICU

• OR/PACU/ENDOSCOPY

• GI

• STERILE PROCESSING SERVICES (SPS)

• PHARMACY

• CATH LAB

CLASS

I

KEEP AREAS FREE OF DEBRIS, TRASH

EXECUTE WORK TO MINIMIZE OF DUST MIGRATION (E.G. WET MOPPING, HEPA VACUUM)

IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION

(INVOLVING MINOR DEMOLITION IN MAINTENANCE OR REMODELING.)

CLASS

II

SAME AS CLASS I PLUS:

1. ESTABLISH MATERIAL AND DEBRIS ROUTE USING NON-PATIENT/VISITOR PATHWAY

2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE CUTTING OR DRILLING.

3. BLOCK OFF AND SEAL AIR VENTS

4. SEAL UNUSED DOORS WITH PLASTIC SHEATHING AND DUCT TAPE.

5. CREATE BARRIERS AS DEFINED BY INFECTION PREVENTION

6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINER; TAPE COVERING UNLESS SOLID LID.

7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.

8. PLACE STICKY MAT AT ALL WORK AREA ENTRANCES AND EXITS.

9. REMOVE OR ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA

CLASS

III

SAME AS CLASS I AND II PLUS:

1. ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA TO PREVENT DUCT SYSTEM CONTAMINATION

2. COMPLETE CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, PLASTIC) AT ALL CONSTRUCTION ENTRIES AND EXITS; MONITOR FOR SEAL AND TAKE IMMEDIATE

CORRECTIVE ACTION AS NEEDED

3. MAINTAIN AND MONITOR NEGATIVE AIR PRESSURE WITHIN CONSTRUCTION SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

4. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING PERFORMED.

5. CHECK AND REPLACE AIR FILTERS AS NEEDED REGULARLY

6. DO NOT REMOVE BARRIERS FROM WORK SITE UNTIL PROJECT IS COMPLETE & HAS BEEN THOROUGHLY CLEANED; REMOVE BARRIERS CAREFULLY TO MINIMIZE

SPREADING DUST. DEBRIS.

7. VACUUM WORK WITH HEPA FILTERED VACUUM.

8. WET MOP AREA WITH CLEANER/DISINFECTANT.

9. MITIGATE VIBRATION AND NOISE TO LOWEST IMPACT WHERE POSSIBLE.

10. DISPLAY ICRA AT SITE

11. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES.

CLASS

IV

SAME AS CLASS I, II AND III PLUS:

1. INSPECT ADJACENT AREAS FOR DUST MIGRATION; TAKE IMMEDIATE CORRECTIVE AS NEEDED

2. USE HEPA VACUUM IN AREA PRIOR TO START OF CONSTRUCTION

3. CONSTRUCT ANTE ROOM; ALL PERSONNEL MUST ENTER THROUGH IT TO BE VACUUMED USING HEPA VACUUM BEFORE LEAVING OR TO DON/DOFF PPE

INFECTION CONTROL & CONSTRUCTION

BARRIER GENERAL NOTES

1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL

INFORMATION

2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND

PARTICULATE MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA

PERIMETER NEEDS TO BE SEALED COMPLETELY WITH SHEET PLASTIC AS

SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE PERMITTED BY CLASS.

ICRA - CONSTRUCTION BARRIER TO BE PROVIDED AS SPECIFIED AND LISTED IN

ICRA CLASS.

3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS

AS SPECIFIED. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN

CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.

4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON,

PROVIDE A REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE

VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE

OF CONSTRUCTION. PROVIDE AT LEAST TEN (10) WORKING DAYS NOTICE FOR

EACH PERMIT.

5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM FLOOR

TO DECK/FLOOR ABOVE. EXCEPTION. IF BARRIER IS ADJACENT TO SMOKE, FIRE,

OR EXISTING WALL CONSTRUCTION WHICH WILL NOT BE DEMOLISHED AND

TERMINATES TO FLOOR/DECK ABOVE, THEN CONSTRUCT DUST PROOF IC

BARRIER, SEE DETAIL(S). TAPE, MUD, SAND JOINTS AND PAINT ON NON-

CONSTRUCTION SIDE OF BARRIER.

6. INFECTION CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY

BEFORE 7:00 AM AND AFTER 8:00 PM OR DIRECTED BY COR

7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE

NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF,

(2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR

AREAS BETWEEN 5000 SF AND 10000 SF.

8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.

9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO

COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL

TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF

UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE

REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE

ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE

NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR.

PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE AND/OR

EMERGENCY IN AN ADJACENT AREA.

10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS,

CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER

PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE

BARRIER.

CONSTRUCTION PHASING GENERAL NOTES

1. THE WORK UNDER THIS CONTRACT SHALL BE DIVIDED INTO PHASES. A PHASE

CAN INVOLVE MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00

1.6.G PHASING.

2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING AND SEQUENCING

WITH ALL TRADES AND THE OWNER. THE GENERAL CONTRACTOR SHALL PROVIDE

A WRITTEN NARRATIVE TO OUTLINE CONSTRUCTION PHASING AND SEQUENCE

PLANS, VALIDATING AND ELABORATING ON THIS PHASING DESCRIPTION.

3. THE GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH THE OWNER SO

WORK MAY BE CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR

DELAYING WORK UNDER THIS CONTRACT, OR OTHER CONTRACTS ON THE

PROJECT SITE OR WORK BY OWNER.

4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL INDICATE THE

SEQUENCE, COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND

APPROVAL DATES AND MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL

FOR ALL PHASES OF THE WORK.

5. THE GENERAL CONTRACTOR SHALL PERFORM THE WORK IN EACH PHASE IN THE

SEQUENCE SHOWN ON THE PHASING PLAN DRAWING(S) AND CONSTRUCTION

PHASING DESCRIPTION.

6. THE GENERAL CONTRACTOR MUST COMPLETE ALL WORK IN EACH PHASE WITH

THE VA INSPECTING AND ACCEPTING THE WORK PRIOR TO VA OCCUPANCY AND

THE CONTRACTOR PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON

COMPLETION OF A PARTICULAR PHASE, THE ENTIRE AREA COVERED BY THAT

PHASE CAN BE OCCUPIED BY THE VA PERSONNEL WITH ALL SYSTEMS

FUNCTIONING PROPERLY.

7. BEFORE COMMENCING WORK ON EACH SUCCESSIVE PHASE, THE GENERAL

CONTRACTOR SHALL SUBMIT AN UPDATED COPY OF THE SCHEDULE.

8. ANY DUST PARTITIONS OR ICRA-CONSTRUCION BARRIERS CONSTRUCTED BY THE

CONTRACTOR PRIOR TO THE START OF DEMOLITION MUST REMAIN IN PLACE UNTIL

THE COMPLETION OF THAT PHASE OR SUBSEQUENT PHASE WHERE REQUIRED.

9. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO VA OCCUPIED

AREAS IN SUCH A MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED

USE OF ALL OCCUPIED AREAS, INCLUDING THE APPLICABLE MECHANICAL AND

ELECTRICAL SYSTEMS SERVING THESE AREAS.

10. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL

DRAWING(S) AND DEMOLITION PLANS.

11. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENTS IS

FOR ARCHITECT-OWNER PLANNING PURPOSES ONLY.

12. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS

OF EGRESS THROUGHOUT ALL PHASING.

13. THE CONTRACTOR SHALL PLAN FOR A MINIMUM OF 4 WEEKS' TIME BETWEEN

PHASES TO ALLOW THE VA TO OCCUPY THE NEWLY ACCEPTED SPACE AND

VACATE THE FOLLOW-ON PHASES. THE VA WILL ACCELERATE THIS TIME WHEN

POSSIBLE AND WILL NOTIFY THE CONTRACTOR IF THIS OCCURS.

3J-139

CATH

HOLDING

3J-140A

EQUIPMENT

C3-84

SUITE

PASSAGEWAY

3J-140

CATH LAB

#4

IC7

IC8

IC8

C3-92

CORRIDOR

3J-138

WAITING

3J-138A

ECHO

OFFICE

3J-138B

ECHO

WORKROOM

3J-139A

TOILET

B3

IC12

IC15

IC16

IC17

3J-139

TEMP.

STORAGE

3J-140

CATH LAB

#4

C3-84

SUITE

PASSAGEWAY

3J-140A

EQUIPMENT

3'- 0"

IC1

2'- 0"

IC2

IC3

B3b

B3b

IC4

IC5

6'-2"

3J-139A

TOILET

C3-92

CORRIDOR

3J-138

WAITING

3J-138A

ECHO

OFFICE

3J-138B

ECHO

WORKROOM

6"

IC11

C3-84

IC13

IC14

IC15

IC16

IC11

IC17

3J-139

TEMP.

STORAGE

3J-138B

ECHO

WORKROOM

3J-138A

ECHO

OFFICE

3J-138

WAITING

C3-92

CORRIDOR

3J-140A

EQUIPMENT3J-140

CATH LAB

#4

C3-84

SUITE

PASSAGEWAY

IC6

4'- 6"

3J-139A

TOILET

IC10

IC10

IC10

IC14

IC15

IC16

IC17

INFECTION CONTROL & CONSTRUCTION

BARRIER KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

IC1

REMOVE PORTION OF EXISTING CASEWORK INCLUDING COUNTERTOP,

WALL & BASE CABINETS AND ASSOICATED BRACKETS, SALVAGE FOR

REINSTALLATION AFTER CATH LAB REMODEL IS COMPLETE

IC2 PROVIDE TEMPORARY PRE-MANUFACTURED CONSTRUCTION BARRIER AND

DOOR WITHOUT DAMAGING THE FINISH FLOOR

IC3 REMOVE EXISTING LEAD APRON RACKS. SALVGE FOR REUSE

IC4 PROVIDE 1 HR FIRE RATED CONSTRUCTION BARRIER, SEE DETAIL .

PROVIDE BACKING FOR LEAD APRON RACKS

IC5 REINSTALL EXISTING LEAD APRON RACK TEMPORARILY ON CONSTRUCTION

BARRIER WALL

IC6 REMOVE CONSTRUCTION BARRIER. PATCH/RESTORE FLOOR, WALLS &

CEILING TO MATCH EXISTING

IC7 INFILL TEMPORARY WALL OPENING TO MATCH EXISTING ADJACENT

CONSTRUCTION. PROVIDE WALL BACKING FOR LEAD APRON RACKS

IC8 REMOVE CONSTRUCTION BARRIER

IC9 RE-INSTALL EXISTING CASEWORK(WALL & BASE CABINETS) AND

COUNTERTOP. MATCH ORIGINAL CONFIGURATION

IC10 PERFORM ALL CATH LAB CONSTRUCTION DURING THIS PHASE INCLUDING

EQUIPMENT INSTALLATION

IC11 TEMPORARILY REMOVE AND RELOCATE PUSH BUTTON FOR DOOR (C3-84)

DURING CONSTRUCTION

/5 GC131

IC12 REINSTALL AND CONNECT DOOR OPERATOR PUSH BUTTON IN ORIGINAL

LOCATION

IC13

EXISTING FLOOR FINISH TO REMAIN IN PLACE. TAKE CARE TO MAINTIAN

CONDITION OF EXISTING FLOOR FINISH TO PERMIT THE INSTALLATION OF

NEW INTEGRAL BASE AT CASEWORK.

IC14 TEMP. STORAGE 3J-139 SHALL ONLY BE USED FOR CONSTRUCTION

STORAGE/STAGING

IC15 SEAL DOOR TO PREVENT ALL DUST FROM PASSING THROUGH DURING

CONSTRUCTION. PROVIDE SIGNAGE TO NOT USE DOOR

IC16 USE WINDOW FOR CONSTRUCTION EXHAUST

IC17

ALL WORK IN THIS ENTRY AREA WILL NEED TO BE DONE ON OFF HOURS

AND /OR WEEKEND SCHEDULES. THE ENTRY SPACE NEEDS TO REMAIN

FUNTIONAL DURING BUSINESS HOURS. COORDINATE TIME WITH VA COR

3J-139

CATH

HOLDING3J-138

WAITING

3J-138A

ECHO

OFFICE

3J-138B

ECHO

WORKROOM

3J-140

CATH LAB

#4

C3-84

SUITE

PASSAGEWAY

3J-140A

EQUIPMENT

3J-139A

TOILET

C3-92

CORRIDOR

IC9

IC15

IC16

IC17

EXISTING

STRUCTURE

ABOVE

SOUND

ATTENUATING

INSULATION

FIRE SEALANT

BOTH SIDES

EXISTING

FINISHED

FLOOR

(1) LAYER 5/8" TYPE "X" GYP

BD EACH SIDE. FINISH

OCCUPIED SIDE WITH GLOSS

PAINT. SEE SPECIFICATIONS.

3 5/8" STEEL STUDS @ 16" OC

WITH SOUND ATTENUATING

INSULATION FULL HEIGHT

CLOSE OPEN DUCTS

WITH 6 MIL

POLYETHYLENE

BARRIER.

SEAL EDGES WITH

CONTINUOUS DUCT TAPE

CONSTRUCTION

SIDE OF BARRIER

OCCUPIED

SIDE OF

BARRIER

REMOVE PORTION OF

CEILING OR ENTIRE CEILING

AS REQUIRED ON

CONSTRUCTION SIDE OF

BARRIER TO INSTALL

CONSTRUCTION /ICRA

BARRIER.

REMOVE PORTION OF

CEILING AS REQUIRED TO

INSTALL

CONSTRUCTION/ICRA

BARRIER. MODIFY

CEILING AT BARRIER ON

OCCUPIED SIDE

FIRE SEALANT

BOTH SIDES

SOUND

ATTENUATING

INSULATION

3J-143A

CONTROL

3H-111

3H-110

CONSULT

C3-63

CORRIDOR

3J-143A

CONTROL

3H-111

3H-110

CONSULT

C3-63

CORRIDOR

3J-143A

CONTROL

3H-111

3H-110

CONSULT

C3-63

CORRIDOR

3J-143A

CONTROL

3H-111

3H-110

CONSULT

C3-63

CORRIDOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCTION DOCUMENTS

C U s e rs

\p c h o i\ D o c u m e n ts \1

U p g ra d e

C a th L a b

R

Y e u n y o u n g

.r v t

/2

/2

:2

:4

P

M

GC131

THIRD LEVEL INFECTION

CONTROL & PHASING PLANS

UPGRADE CATH LAB #4

VA Minneapolis Health Care System

618-CSI-230

BUILDING 70

01/31/2025 JU PC

17179

1/8" = 1'-0"3 THIRD LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN - PHASE 3

1/8" = 1'-0"1 THIRD LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN - PHASE 1

1/8" = 1'-0"2 THIRD LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN - PHASE 2

0 8' 16'4'

1/8" = 1'-0"4 THIRD LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN - PHASE 4

0 8' 16'4'

0 8' 16'4' 0 8' 16'4'

1/2" = 1'-0"5 1-HR CONSTRUCTION /ICRA BARRIER (TYP)

0 2' 4'1'

Revisions: Date:

Name

Date Reg. No.

Jason R. Gottwalt, P.E.

41360

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

e or under my direct Licensed Architect Minnesota.

CA1

CA2

CA3

CA3

CA3

CA3

CA2

CA3 CA4 CA5

CONSTRUCTION ACCESS ROUTE

KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

CA1 FREIGHT ELEVATOR TO BE USED DURING CONSTRUCTION

CA2 KEYPAD ACCESS

CA3 CONSTRUCTION ACCESS ROUTE

CA4 CONSTRUCTION AREA

CA5 POTENTIAL EXHAUST POINT ICRA PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCTION DOCUMENTS

C U s e rs

\p c h o i\ D o c u m e n ts \1

U p g ra d e

C a th L a b

R

Y e u n y o u n g

.r v t

/2

/2

:2

:5

P

M

GC132

THIRD LEVEL CONSTRUCTION

ACCESS ROUTE

UPGRADE CATH LAB #4

VA Minneapolis Health Care System

618-CSI-230

BUILDING 70

01/31/2025 JU Author 17179

1/32" = 1'-0"1 THIRD LEVEL CONSTRUCTION ACCESS ROUTE

0 32' 64'16'

Revisions: Date:

Name

Date Reg. No.

Jason R. Gottwalt, P.E.

41360

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

e or under my direct Licensed Architect Minnesota.

VWXYZ

C3-84

SUITE

PASSAGEWAY

3J-139A

TOILET

3J-139

TEMP.

STORAGE

3J-140

CATH LAB

#4

3J-140A

EQUIPMENT

3J-142A

EQUIP

3J-143D

SINK ROOM

3J-143

SCRUB

DE6

DE5

DE7

DE5

DE9

DE8

DE5

DE5

DE1

DE2

DE2

DE2

DE4

DE3

DE12

DE12

DE11

DE11

DE11

DE13

DE14

DE15

DE16

TEMP

CONSTRUCTION

WALL

DE11

DE2

DE11

3J-143

CATH LAB #3

3J-143A

CONTROL

3H-111

3H-110

CONSULT

C3-63

CORRIDOR

STAIR

DE17

3J-141A

SUPPLY

DEMOLITION GENERAL NOTES

1. GENERAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK, PHASING

AND SEQUENCING WITH THE OWNER. ANY INFORMATION REGARDING SEQUENCING

PROVIDED IN THESE DOCUMENTS IS FOR ARCHITECT - OWNER PLANNING

PURPOSES ONLY, UNLESS NOTED OTHERWISE.

2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH ALL

TRADES FOR THE DEMOLITION WORK REQUIRED FOR THIS PROJECT.

3. WHERE PARTITIONS ARE INDICATED TO BE REMOVED, REMOVE PARTITION ALONG

WITH ALL ITEMS CONTAINED WITHIN, INCLUDING DOORS, FRAMES, HARDWARE,

SIDELIGHTS, WINDOWS, MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. TO

STRUCTURE ABOVE, UNLESS NOTED OTHERWISE.

4. WHERE FLOOR FINISH IS INDICATED TO BE DEMOLISHED, REMOVE FINISH TO

FLOOR SLAB AS REQUIRED AND PREPARE SLAB SURFACE FOR SCHEDULED

FINISHES WITHIN AREA TO BE REMODELED, UNLESS NOTED OTHERWISE. SEE FINISH

SCHEDULE FOR EXISTING FLOOR FINISHES TO REMAIN UNDISTURBED.

5. WHERE CEILING IS INDICATED TO BE DEMOLISHED, REMOVE CEILING SUSPENSION

SYSTEM ALONG WITH ALL ASSOCIATED MECHANICAL AND ELECTRICAL ITEMS,

UNLESS NOTED OTHERWISE. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR

EXTENT OF CONDUIT, PIPING AND DUCTWORK DEMOLITION WITHIN AREA TO BE

REMODELED.

6. WHERE INDICATED, REMOVE ALL WALL/PARTITION EXISTING FINISHES AND

PREPARE THE SURFACES FOR SCHEDULED FINISHES, SEE FINISH SCHEDULE FOR

FINISHES.

7. ALL DISTURBED AREAS, WALLS, PARTITIONS, FLOORS, ETC, DAMAGED BY

DEMOLITION WORK SHALL BE PATCHED TO MATCH ADJACENT AREA.

8. OWNER RESERVES THE RIGHT OF FIRST REFUSAL OF ALL SALVAGED ITEMS SUCH

AS: DOORS, LIGHT FIXTURES, PLUMBING FIXTURES ETC.

9. SALVAGED ITEMS SCHEDULED FOR REUSE SHALL BE CLEANED, RESTORED AND/OR

REFINISHED TO LIKE NEW CONDITION, UNLESS NOTED OTHERWISE.

10. DO NOT REMOVE ANY EXISTING STRUCTURAL SUPPORT MEMBERS SUCH AS

COLUMNS, BEAMS, JOISTS, LOAD-BEARING PARTITIONS ETC, UNTIL ADEQUATE

PERMANENT OR TEMPORARY SUPPORT IS IN PLACE. ALL EXISTING STRUCTURAL

MEMBERS SHALL BE ADEQUATELY PROTECTED, COORDINATE WITH STRUCTURAL

ENGINEER.

11. SEE STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR RELATED

DEMOLITION AND PREP WORK.

12. WALL AND CEILING MOUNTED ITEMS SHOWN DASHED, SUCH AS WALL CABINETS,

SHELVING, CUBICLE CURTAIN TRACKS, PROJECTION SCREENS ETC, SHALL BE

REMOVED, UNLESS NOTED OTHERWISE.

13. WITHIN ALL EXISTING ROOMS/SPACES RECEIVING SCHEDULED FLOOR, OR WALL,

OR CEILING FINISHES, REMOVE ALL EXISTING FLOOR, OR WALL, OR CEILING

FINISHES DOWN TO THE SUBSTRATE. INCLUDE THE REMOVAL OF ALL ITEMS

LOCATED WITHIN THE EXISTING FINISH REMOVALS UNO PATCH AND PREP ALL

SUBSTRATES TO RECEIVE SCHEDULED FINISHES. FOR ADDITIONAL INFORMATION,

SEE KEYNOTED ITEMS, FINISH PLANS AND/OR SCHEDULES, STRUCTURAL,

MECHANICAL AND ELECTRICAL.

DEMOLITION PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

DE1 REMOVE EXISTING ROOM IDENTIFICATION SIGN AND SALVAGE FOR

REINSTALLATION

DE2 REMOVE FLOOR FINISH AND BASE IN IT'S ENTIRITY AND PREP FLOOR FOR

NEW FINISH

DE3 REMOVE EXISTING DOOR, FRAME AND HARDWARE

DE4 REMOVE EXISTING JCI PANEL AND SALVAGE FOR REUSE. REFER TO MECH

DRAWINGS FOR ADDITIONAL INFORMATION

DE5 REMOVE EXISTING CASEWORK INCLUDING COUNTERTOP, WALL & BASE

CABINETS AND ASSOICATED BRACKETS

DE6 REMOVE EXISTING CABINETS AND ALL ASSOCIATED SUPPORTS

DE7 REMOVE EXISTING SHELVES AND ALL ASSOCIATED SUPPORTS

DE8 REMOVE EXISTING SCRUB SINK

DE9

TEMPORARILY REMOVE STAINLESS STEEL SHELF, PAPER TOWEL HOLDER

AND SOAP DISPENSOR, SALVGE FOR REUSE EXISTING STAINLESS SHELF

TO REMAIN

DE10 NOT USED

DE11

REMOVE EXISTING GYPSUM BOARD TO EXPOSE FRAMING FOR MEP WORK.

REFER TO MECHANICAL/PLUMBING/ELECTRICAL DRAWINGS FOR

ADDITIONAL INFORMATION

DE12 REMOVE STAINLESS STEEL CORNER GUARDS FOR NEW CONSTRUCTION

AND/OR NEW FINISHES

DE13 REMOVE EXISTING EYEWASH STATION. REFER TO PLUMBING DRAWINGS

FOR ADDITIONAL INFOMATION

DE14

REMOVE EXISTING GYPSUM BOARD EACH SIDE OF ROUGH OPENING TO

INSTALL REINFORCED STEEL ANGLE SUPPORT FOR DOOR AND HEADER

FOR DOOR. SEE DETAILS AND/1 AE601 /2 AE601

DE15 REMOVE EXISTING SHUT-OFF SWITCHS FOR RELOCATE. REFER TO

ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION

DE16 REMOVE EXISTING SHELVES AND STORAGE BINS TO RETURN OWNERS

STOCK

DE17 REMOVE AND SALVAGE EXISTING LEAD APRON RACKS FOR REINSTALL

DEMOLITION PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL OR

PARTITION TO BE

REMOVED

EXISTING DOOR

AND FRAME TO

REMAIN

KEY NOTE

A

GRIDLINE

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

EXISTING DOOR

AND FRAME TO BE

DEMOLISHED

DASHED LINE

INDICATES ITEM TO

BE REMOVED (UNO)

DE10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCTION DOCUMENTS

C U s e rs

\p c h o i\ D o c u m e n ts \1

U p g ra d e

C a th L a b

R

Y e u n y o u n g

.r v t

/2

/2

:2

:2

P

M

AD131

THIRD LEVEL DEMOLITION PLAN UPGRADE CATH LAB #4

VA Minneapolis Health Care System

618-CSI-230

BUILDING 70

01/31/2025 JU PC

17179

0 4' 8'2'

1/4" = 1'-0"1 THIRD LEVEL - DEMOLITION PLAN

Revisions: Date:

Name

Date Reg. No.

Jason R. Gottwalt, P.E.

41360

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

e or under my direct Licensed Architect Minnesota.

3J-139

TEMP.

STORAGE

3J-139A

TOILET

C3-84

SUITE

PASSAGEWAY

3J-143

SCRUB

3J-143D

SINK ROOM

3J-140A

EQUIPMENT

3J-140

CATH LAB

#4

1'-7"

DC1

DC3

DC2

DC3

DC4

DC5

DC4

DC6

DC7

TEMP

CONSTRUCTION

WALL

DC8

DC8

3J-143

CATH LAB #3

3H-111

3H-110

CONSULT

C3-63

CORRIDOR

STAIR

3J-142A

EQUIP

3J-141

SUPPLY

DEMOLITION RCP KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

DC1 REMOVE ACT AND GRID IN IT'S ENTIRITY

DC2 EXISTING ACT TO REMAIN

DC3 EXISTING GYPSUM BOARD CEILING TO REMAIN

DC4 REMOVE PORTION OF EXISITNG GYPSUM BOARD CEILING

DC5 REMOVE EXISITNG GYPSUM BOARD SOFFIT

DC6 EQUIPMENT VENDOR TO REMOVE EQUIPMENT C-ARM AND CEILING

MOUNTED TRACKS, EXISTING UNISTRUCT TO REMAIN

DC7 REMOVE DIFFUSER, SEE MECH DRAWINGS FOR ADDITIONAL INFORMATION

DC8 TEMPORARLY MODIFY EXISTING CEILING TILE AND GRID FOR

CONSTRUCTION BARRIER WALL

DEMOLITION GENERAL NOTES

1. GENERAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK, PHASING

AND SEQUENCING WITH THE OWNER. ANY INFORMATION REGARDING SEQUENCING

PROVIDED IN THESE DOCUMENTS IS FOR ARCHITECT - OWNER PLANNING

PURPOSES ONLY, UNLESS NOTED OTHERWISE.

2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH ALL

TRADES FOR THE DEMOLITION WORK REQUIRED FOR THIS PROJECT.

3. WHERE PARTITIONS ARE INDICATED TO BE REMOVED, REMOVE PARTITION ALONG

WITH ALL ITEMS CONTAINED WITHIN, INCLUDING DOORS, FRAMES, HARDWARE,

SIDELIGHTS, WINDOWS, MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. TO

STRUCTURE ABOVE, UNLESS NOTED OTHERWISE.

4. WHERE FLOOR FINISH IS INDICATED TO BE DEMOLISHED, REMOVE FINISH TO

FLOOR SLAB AS REQUIRED AND PREPARE SLAB SURFACE FOR SCHEDULED

FINISHES WITHIN AREA TO BE REMODELED, UNLESS NOTED OTHERWISE. SEE FINISH

SCHEDULE FOR EXISTING FLOOR FINISHES TO REMAIN UNDISTURBED.

5. WHERE CEILING IS INDICATED TO BE DEMOLISHED, REMOVE CEILING SUSPENSION

SYSTEM ALONG WITH ALL ASSOCIATED MECHANICAL AND ELECTRICAL ITEMS,

UNLESS NOTED OTHERWISE. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR

EXTENT OF CONDUIT, PIPING AND DUCTWORK DEMOLITION WITHIN AREA TO BE

REMODELED.

6. WHERE INDICATED, REMOVE ALL WALL/PARTITION EXISTING FINISHES AND

PREPARE THE SURFACES FOR SCHEDULED FINISHES, SEE FINISH SCHEDULE FOR

FINISHES.

7. ALL DISTURBED AREAS, WALLS, PARTITIONS, FLOORS, ETC, DAMAGED BY

DEMOLITION WORK SHALL BE PATCHED TO MATCH ADJACENT AREA.

8. OWNER RESERVES THE RIGHT OF FIRST REFUSAL OF ALL SALVAGED ITEMS SUCH

AS: DOORS, LIGHT FIXTURES, PLUMBING FIXTURES ETC.

9. SALVAGED ITEMS SCHEDULED FOR REUSE SHALL BE CLEANED, RESTORED AND/OR

REFINISHED TO LIKE NEW CONDITION, UNLESS NOTED OTHERWISE.

10. DO NOT REMOVE ANY EXISTING STRUCTURAL SUPPORT MEMBERS SUCH AS

COLUMNS, BEAMS, JOISTS, LOAD-BEARING PARTITIONS ETC, UNTIL ADEQUATE

PERMANENT OR TEMPORARY SUPPORT IS IN PLACE. ALL EXISTING STRUCTURAL

MEMBERS SHALL BE ADEQUATELY PROTECTED, COORDINATE WITH STRUCTURAL

ENGINEER.

11. SEE STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR RELATED

DEMOLITION AND PREP WORK.

12. WALL AND CEILING MOUNTED ITEMS SHOWN DASHED, SUCH AS WALL CABINETS,

SHELVING, CUBICLE CURTAIN TRACKS, PROJECTION SCREENS ETC, SHALL BE

REMOVED, UNLESS NOTED OTHERWISE.

13. WITHIN ALL EXISTING ROOMS/SPACES RECEIVING SCHEDULED FLOOR, OR WALL,

OR CEILING FINISHES, REMOVE ALL EXISTING FLOOR, OR WALL, OR CEILING

FINISHES DOWN TO THE SUBSTRATE. INCLUDE THE REMOVAL OF ALL ITEMS

LOCATED WITHIN THE EXISTING FINISH REMOVALS UNO PATCH AND PREP ALL

SUBSTRATES TO RECEIVE SCHEDULED FINISHES. FOR ADDITIONAL INFORMATION,

SEE KEYNOTED ITEMS, FINISH PLANS AND/OR SCHEDULES, STRUCTURAL,

MECHANICAL AND ELECTRICAL.

DEMOLITION PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL OR

PARTITION TO BE

REMOVED

EXISTING DOOR

AND FRAME TO

REMAIN

KEY NOTE

A

GRIDLINE

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

EXISTING DOOR

AND FRAME TO BE

DEMOLISHED

DASHED LINE

INDICATES ITEM TO

BE REMOVED (UNO)

DE10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .