The file appears to be a named PDF document related to a construction project for upgrading a Cath Lab at the Minneapolis VA Medical Center. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside procurement with a project scope of upgrading and reconfiguring Cardiac Cath Lab #4 to prepare for new medical equipment replacement. The project involves general construction, site preparation, demolition, and removal of existing structures, with specific coordination required for x-ray system vendor installation.
Key procurement details include a planned Invitation for Bid (IFB) issuance on May 7, 2025, with an award expected within 90 calendar days of bid opening. The project is categorized under NAICS code 236220 with a small business size standard of $45.0 million. The contract will be a firm fixed-price construction contract with a performance period of 240 calendar days from Notice to Proceed. Bidders must be registered and certified in the Veteran Small Business Certification (VetCert) database, and the estimated project magnitude is between $1,000,000 and $2,000,000. Solicitation documents will be available on the System for Award Management (SAM) Contract Opportunities website.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 70
PROJECT AREA:
3RD LEVEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT NAME:
SITE ADDRESS:
VA PROJECT NUMBER:
OWNER AND CONSULTANTS:
VICINITY MAP:
DESIGNER OF RECORD
AREA MAP: SITE LOCATION MAP:
CONSTRUCTION DOCUMENTS
C U s e rs
\p c h o i\ D o c u m e n ts \1
U p g ra d e
C a th L a b
R
Y e u n y o u n g
.r v t
/2
/2
:2
:5
P
M
GI000
COVER SHEET UPGRADE CATH LAB #4
VA Minneapolis Health Care System
618-CSI-230
BUILDING 70
01/31/2025 JU PC
UPGRADE CATH LAB #4
1 VETERAN DRIVE MINNEAPOLIS, MN
618-CSI-230
17179
VA COR:
CONTACT:
ADDRESS:
PHONE:
CHRIS WEBERG
ONE VETERAN DRIVE
MINNEAOLIS, MN 55417
612-467-5805
ARCHITECT:
NAME:
ADDRESS:
CONTACT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
JESSE ULLAND
PHONE: 763-412-4000
STRUCTURAL ENGINEER:
NAME:
ADDRESS:
CONTACT:
ANDERSON ENGINEERING OF MN, LLC
417 MAIN AVE. N. SUITE 210
FARGO, ND 58103
ADAM ADAMS
PHONE: 701-365-0418
MECHANICAL/PLUMBING ENGINEER:
NAME:
ADDRESS:
CONTACT:
DUNHAM ASSOCIATES, INC
50 SOUTH SIXTH STREET, SUITE 1100
MINNEAPOLIS, MN 55402
JASON GOTTWALT
PHONE: 612-465-7273
SHEET INDEX - ARCHITECTURAL
SHEET NO. SHEET TITLE 3
5%
S D
RE
VI
EW
4/
/2
5%
D D
RE
VI
EW
1/
/2
C D
RE
VI
EW
1/
/2
C
D
RE
VI
EW
2/
/2
D
ES
IG
N
SU
BM
IS
SI
O
N
/2 9/
C O
NS
TR
UC
TI
O N
DO
CU
M
EN
TS
1/
/2
AD131 THIRD LEVEL DEMOLITION PLAN █ █ █ █ █ █
AD132 THIRD LEVEL REFLECTED CEILING DEMOLITION PLAN █
AE131 THIRD LEVEL FLOOR PLAN █ █ █ █ █ █
AE132 THIRD LEVEL REFLECTED CEILING PLAN █
AE211 INTERIOR ELEVATIONS █ █ █ █ █ █
AE601 PARTITION TYPES, DOOR SCHEDULE AND DETAILS █ █ █ █ █
AF101 FINISH PLAN, SCHEDULE, & DETAILS, & MOUNTING HEIGHTS █ █ █ █ █
QH130 THIRD LEVEL EXISTING & NEW EQUIPMENT PLAN AND SCHEDULE █ █ █ █ █
SHEET INDEX - GENERAL
SHEET NO. SHEET TITLE 3
5%
S D
RE
VI
EW
/2
1/
D D
RE
VI
EW
1/
/2
C D
RE
VI
EW
1/
/2
C
D
RE
VI
EW
2/
/2
D
ES
IG
N
SU
BM
IS
SI
O
N
/2 9/
NS
TR
UC
TI
O N
DO
CU
M
EN
TS
1/
/2
GI000 COVER SHEET █ █ █ █ █ █
GI002 ABBREVIATIONS █ █ █ █ █
GI131 THIRD LEVEL LIFE SAFETY PLAN █ █ █ █ █
GC131 THIRD LEVEL INFECTION CONTROL & PHASING PLANS █ █ █ █ █
GC132 THIRD LEVEL CONSTRUCTION ACCESS ROUTE █ █ █ █
KEYPLAN
ELETRICAL ENGINEER:
NAME:
ADDRESS:
CONTACT:
DUNHAM ASSOCIATES, INC
50 SOUTH SIXTH STREET, SUITE 1100
MINNEAPOLIS, MN 55402
BEN ZURN
PHONE: 612-465-7626
PROJECT AREA:
3RD LEVEL
SHEET INDEX - STRUCTURAL
SHEET NO. SHEET TITLE 3
5%
S D
RE
VI
EW
4/
/2
D D
RE
VI
EW
1/
/2
C D
RE
VI
EW
1/
/2
C
D
RE
VI
EW
2/
/2
D
ES
IG
N
SU
BM
IS
SI
O
N
/2 9/
NS
TR
UC
TI
O N
DO
CU
M
EN
TS
1/
/2
S001 NOTE SHEET █ █ █ █ █
S101 THIRD LEVEL FLOOR FRAMING PLAN █ █ █
S201 THIRD LEVEL INTERSTITIAL FRAMING PLAN █ █ █ █ █
SHEET INDEX - ELECTRICAL
SHEET NO. SHEET TITLE 3
5%
S D
RE
VI
EW
4/
/2
D D
RE
VI
EW
1/
/2
C D
RE
VI
EW
1/
/2
C
D
RE
VI
EW
2/
/2
D
ES
IG
N
SU
BM
IS
SI
O
N
/2 9/
NS
TR
UC
TI
O N
DO
CU
M
EN
TS
1/
/2
E001 ELECTRICAL TITLE SHEET █ █ █ █ █
E131 ELECTRICAL ORIENTATION PLAN █ █ █ █
EL131 THIRD LEVEL ELECTRICAL LIGHTING PLAN █ █ █ █ █
EP131 THIRD LEVEL ELECTRICAL POWER PLAN █ █ █ █ █
ES131 THIRD LEVEL ELECTRICAL SYSTEMS PLAN █ █ █ █ █
E300 ELECTRICAL ONE LINE DIAGRAM █ █ █ █ █
E500 ELECTRICAL DETAILS █ █ █ █ █
E600 ELECTRICAL SCHEDULES █ █ █ █ █
SHEET INDEX - MECHANICAL
SH
EE
T
NO
SHEET TITLE 3
5%
S D
RE
VI
EW
4/
/2
D D
RE
VI
EW
1/
/2
C D
RE
VI
EW
1/
/2
C
D
RE
VI
EW
2/
/2
D
ES
IG
N
SU
BM
IS
SI
O
N
/2 9/
NS
TR
UC
TI
O N
DO
CU
M
EN
TS
1/
/2
M000 MECHANICAL TITLE SHEET █ █ █ █ █
MHD103 THIRD LEVEL DEMOLITION HVAC PLAN █ █ █ █ █
MH103 THIRD LEVEL HVAC PLAN █ █ █ █ █
MH103.1 THIRD LEVEL INTERSTITIAL HVAC PLAN (FOR DUCT CLEANING) █ █ █ █ █
M200 MECHANICAL DETAILS AND SCHEDULES █ █ █ █ █
SHEET INDEX - PLUMBING
SHEET NO. SHEET TITLE 3
5%
S D
RE
VI
EW
4/
/2
D D
RE
VI
EW
1/
/2
5%
C D
RE
VI
EW
1/
/2
C
D
RE
VI
EW
2/
/2
D
ES
IG
N
SU
BM
IS
SI
O
N
/2 9/
NS
TR
UC
TI
O N
DO
CU
M
EN
TS
1/
/2
PPD103 THIRD LEVEL DEMOLITION PLUMBING PLAN █ █ █ █ █
FX103 THIRD LEVEL FIRE PROTECTION PLAN █
PP103 THIRD LEVEL MEDICAL GAS PLAN █ █ █ █ █
PP103.1 THIRD LEVEL INTERSTITIAL PLUMBING/MEDICAL GAS █ █ █ █ █
P200 PLUMBING DETAILS AND SCHEDULES █ █ █ █ █
Revisions: Date:
Name
Date Reg. No.
Jason R. Gottwalt, P.E.
41360
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.
e or under my direct Licensed Architect Minnesota.
Tom Olesak
License No.:1815701/31/2025
ARCHITECTURAL ABBREVIATIONS
A/C
A/C UNIT
A/E
AAMA
AAP
AB
ABC
ACC
ACI
ACT
ACS DR
ACS FLR
ACS PNL
ACST
AD
ADA
ADC
ADDL
ADDN
ADH
ADJ
ADMIN
AFF
AFG
AFS
AGC
AGGR
AHJ
AHR
AHU
AIA
AISC
ALT
ALT NO
ALUM
AMT
ANOD
ANSI
ANT
AP
APA
APC
APPD
APPROX
AR
ARCH
ASB
ASI
ASKLR
ASPH
ASSN
ASTM
ATCH
ATM
AUTO
AUX
AV
AVG
AW
AWI
AWPA
AWS
B PL
BAT
BD
BD FT
BEV
BHMA
BI FLD DR
BITUM
BKG
BLD
BLDG
BM
BOT
BRCG
BRDG
BRDG JST
BRG
BRG PL
BRKT
BRZ
BSMT
BTWN
BUR
C CONC
C TO C
CAB
CAC
CB
CBB
CCD
CCTV
CCW
CD
CEM
CEM PLAS
CER
CF
CF/CI
CF/OI
CFLG
CFMF
CG
CGSFU
CH
CHEM
CHFR
CHK
CI
CIP
CIR
CIRC
CJ
CL
CLDG
CLG
CLR
CM
CMU
AIR CONDITION
AIR CONDITIONING UNIT
ARCHITECT/ENGINEER
AMERICAN ARCHITECTURAL MANUFACTURERS ASSN
ALARM ANNUNCIATOR PANEL
ANCHOR BOLT
AGGREGATE BASE COURSE
ACCESSIBLE
AMERICAN CONCRETE INSTITUTE
ACOUSTICAL CEILING TILE
ACCESS DOOR
ACCESS FLOOR
ACCESS PANEL
ACOUSTIC
AREA DRAIN
AMERICANS WITH DISABILITIES ACT
AUTOMATIC DOOR CLOSER
ADDITIONAL
ADDITION
ADHESIVE
ADJACENT, ADJOINING, OR ADJUSTABLE
ADMINISTRATION
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ABOVE FINISHED SLAB
ASSOCIATED GENERAL CONTRACTORS
AGGREGATE
AUTHORITY HAVING JURISDICTION
ANCHOR
AIR HANDLING UNIT
AMERICAN INSTITUTE OF ARCHITECTS
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALTERNATE
ALTERNATE NUMBER
ALUMINUM
AMOUNT
ANODIZE
AMERICAN NATIONAL STANDARDS INSTITUTE
ANTENNA
ACCESS PANEL
AMERICAN PLYWOOD ASSOCIATION
ARCHITECTURAL PRECAST CONCRETE
APPROVED
APPROXIMATE
AS REQUIRED
ARCHITECT
ASBESTOS
ARCHITECT'S SUPPLEMENTAL INSTRUCTION
AUTOMATIC SPRINKLER
ASPHALT
ASSOCIATION
AMERICAN SOCIETY FOR TESTING AND MATERIALS
ATTACHMENT
AUTOMATIC TELLER MACHINE
AUTOMATIC
AUXILIARY
AUDIO VISUAL
AVERAGE
ACID WASTE
ARCHITECTURAL WOODWORKING INSTITUTE
AMERICAN WOOD PRESERVERS' ASSOCIATION
AMERICAN WELDING SOCIETY
BASE PLATE
BATTEN
BOARD
BOARD FEET (FOOT)
BEVEL
BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION
BIFOLDING DOORS
BITUMINOUS
BACKING
BUILD
BUILDING
BEAM OR BENCHMARK
BOTTOM
BRACING
BRIDGING
BRIDGING JOIST
BEARING
BEARING PLATE
BRACKET
BRONZE
BASEMENT
BETWEEN
BUILT-UP ROOFING
CAST CONCRETE
CENTER TO CENTER
CABINET
CEILING ATTENUATION CLASS
CATCH BASIN OR CORNER BEAD
CEMENTITIOUS (BACKER) BOARD
CONSTRUCTION CHANGE DIRECTIVE
CLOSED CIRCUIT TELEVISION
COUNTERCLOCKWISE
CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS
CEMENT
CEMENT PLASTER
CERAMIC
CONTRACTOR FURNISHED
CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CONTRACTOR FURNISHED/OWNER INSTALLED
COUNTERFLASHING
COLD-FORMED METAL FRAMING
CORNER GUARD
CERAMIC GLAZED STRUCTURAL FACING UNITS
COAT HOOK
CHEMICAL
CHAMFER
CHECK
CAST IRON
CAST-IN-PLACE
CIRCLE
CIRCULAR
CONSTRUCTION JOINT OR CONTROL JOINT
CENTER LINE
CLADDING
CEILING
CLEAR
CONSTRUCTION MANAGEMENT
CONCRETE MASONRY UNIT
CNR
CNTR
CRTP
CO
CO2
COL
COM
COMB
COMM
COMP
CONC
CONC FLR
COND
CONF
CONN
CONSTR
CONT
CONTR
COORD
CORR
CPM
CPRS
CR
CRS
CRSI
CSB
CSG
CSI
CSK
CSMT
CSWK
CTG
CTR
CTRL
CTV
CU FT
CU IN
CU YD
CURT
CYL
CYL L
D
DAT
DBL
DBL GLZ
DCS
DP
DEG
DEL
DEMO
DEPT
DET
DF
DIA
DIAG
DIFF
DIM
DIR
DISP
DIST
DIV
DL
DOC
DR
DR CL
DR FR
DR OPNG
DS
DSGN
DW
DWG
E
EA
EFF
EFS
EIFS
EJ
EL
ELAST
ELEC
ELEC DR OP
ELEV
EMER
EMER SHR
ENCL
ENGR
ENVIR
EO
EPA
EPDM
EPO
EPS
EQ
EQL SP
EQUIP
EQUIV
ERD
ESC
ESMT
ESP
EST
ETC
EW
EWC
EWS
EXH
EXIST
EXP
EXP BT
EXST GR
EXT
EXT GR
CORNER
COUNTER
COUNTERTOP
CARBON MONOXIDE
CARBON DIOXIDE
COLUMN
COMMON
COMBINATION, COMBINED
COMMUNICATION
COMPONENT
CONCRETE
CONCRETE FLOOR
CONDENSER OR CONDITION
CONFERENCE
CONNECT
CONSTRUCTION
CONTINUE
CONTRACTOR
COORDINATE
CORRIDOR
CRITICAL PATH METHOD
COMPRESSIBLE
CARD READER
COLD ROLLED STEEL
CONCRETE REINFORCING STEEL INSTITUTE
CONCRETE SPLASH BLOCK
CASING
CONSTRUCTION SPECIFICATIONS INSTITUTE
COUNTER SUNK
CASEMENT
CASEWORK
COATING
CENTER
CONTROL
CABLE TELEVISION
CUBIC FEET
CUBIC INCH
CUBIC YARD
CURTAIN
CYLINDER
CYLINDER LOCK
DEPTH OR PENNY (NAIL)
DATUM
DOUBLE
DOUBLE GLAZE
DIAPER CHANGING STATION
DECORATIVE PANEL
DEGREE
DELETE
DEMOLITION
DEPARTMENT
DETAIL
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIFFERENCE OR DIFFUSER
DIMENSION
DIRECTION
DISPENSER
DISTANCE
DIVIDE OR DIVISION
DEAD LOAD
DOCUMENT
DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DOOR CLOSER
DOOR FRAME
DOOR OPENING
DOWNSPOUT
DESIGN
DISHWASHER
DRAWING
EAST
EACH
EFFICIENCY
EXTERIOR FINISH SYSTEM
EXTERIOR INSULATION AND FINISH SYSTEM
EXPANSION JOINT
ELEVATION
ELASTOMERIC
ELECTRIC
ELECTRIC DOOR OPENER
ELEVATOR
EMERGENCY
EMERGENCY SHOWER
ENCLOSURE
ENGINEER
ENVIRONMENT
ELECTRICAL OUTLET
ENVIRONMENTAL PROTECTION AGENCY
ETHYLENE PROPYLENE DIENE MONOMER
EMERGENCY POWER OFF
EXPANDED POLYSTYRENE BOARD (INSULATION)
EQUAL
EQUALLY SPACED
EQUIPMENT
EQUIVALENT
EXISTING ROOF DRAIN
ESCAPE OR ESCUTCHEON
EASEMENT
ESPECIALLY
ESTIMATE
AND SO FORTH OR ET CETERA
EACH WAY
ELECTRIC WATER COOLER
EYE WASH STATION
EXHAUST
EXISTING
EXPANSION OR EXPOSED
EXPANSION BOLT
EXISTING GRADE
EXTERIOR, EXTERNAL, OR EXTINGUISHER
EXTERIOR GRADE
F
FA
FAB
FAC
FACIL
FAS
FAS BD
FCU
FCO
FCTY
FD
FDC
FDTN
FE
FEC
FF
FF EL
FF&E
FHC
FHP
FIG
FIL
FIN
FIN FLR
FIN GR
FIN WD
FIXT
FL
FLASH
FLDG
FLEX
FLG
FLR
FLR FIN
FLR SK
FLUOR
FLUOR FIX
FM
FM-G
FO
FOC
FOF
FOM
FOS
FOUNT
FOW
FP
FR
FR SNK
FREQ
FRMG
FRP
FRZ
FS
FSB
FSTNR
FT
FTG
FURG
FURN
FUT
FVC
GA
GAL
GALV
GALV STL
GB
GC
GD
GDR
GEN
GFRC
GFRG
GFRP
GI
GL
GL BLK
GLU LAM
GP
GR FL
GRAN
GRTG
GSB
GSM
GSU
GT
GUAR
GUT
GYP
GYP BD
GYP PLAS
H
HAZ MAT
HB
HC
HCWD
HDBD
HDO
HDR
HDW
HDWD
HEPA
HEX
HGR
HM
HMD
HMDF
HMF
HNDRL
HO
HORIZ
HOSP
HP
HPD
HPDL
HQ
HS
HSE
HSKPG
FAHRENHEIT OR FEMALE
FIRE ALARM
FABRIC
FACTOR
FACILITY
FASCIA
FASCIA BOARD
FAN COIL UNIT
FLOOR CLEANOUT
FACTORY
FLOOR DRAIN
FIRE DEPARTMENT CONNECTION
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FINISH FACE
FINISH FLOOR ELEVATION
FURNITURE, FIXTURE, AND EQUIPMENT
FIRE HOSE CABINET
FULL HEIGHT PARTITION
FIGURE
FILLET
FINISH
FINISH FLOOR
FINISH GRADE
FINISH WOOD
FIXTURE
FLOORLINE
FLASHING
FOLDING
FLEXIBLE
FLOORING
FLOOR
FLOOR FINISH
FLOOR SINK
FLUORESCENT
FLUORESCENT FIXTURE
FACTORY MUTUAL
FACTORY MUTUAL GLOBAL
FINISHED OPENING
FACE OF CONCRETE OR FACE OF CURB
FACE OF FINISH
FACE OF MASONRY
FACE OF SLAB OR FACE OF STUD
FOUNTAIN
FACE OF WALL
FIRE PROTECTION OR FIREPROOF
FIRE RATING, FIRE RESISTANT, OR FRAME
FLUSHING RIM SINK
FREQUENCY
FRAMING
FIBERGLASS REINFORCED PLASTIC
FREEZER
FEDERAL SPECIFICATION
FOLDING SHOWER BENCH
FASTENER
FEET OR FOOT
FOOTING
FURRING
FURNISH OR FURNITURE
FUTURE
FIRE VALVE CABINET
GAGE OR GYPSUM ASSOCIATION
GALLON
GALVANIC OR GALVANIZED
GALVANIZED STEEL
GRAB BAR
GENERAL CONTRACTOR
GUARD
GUARD RAIL
GENERAL OR GENERATOR
GLASS-FIBER-REINFORCED CONCRETE
GLASS-FIBER-REINFORCED GYPSUM
GLASS-FIBER-REINFORCED PLASTIC
GALVANIZED IRON
GLASS
GLASS BLOCK
GLUED LAMINATED WOOD
GRAB BAR
GROUND FLOOR
GRANITE
GRATING
GYPSUM SHEATHING BOARD
GALVANIZED SHEET METAL
GLAZED STRUCTURAL UNIT
GROUT
GUARANTEE
GUTTER
GYPSUM
GYPSUM BOARD
GYPSUM PLASTER
HIGH OR HUMIDISTAT
HAZARDOUS MATERIALS
HOSE BIBB
HOLLOW CORE
HOLLOW CORE WOOD DOOR
HARDBOARD
HIGH DENSITY OVERLAY
HEADER
HARDWARE
HARDWOOD
HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEXAGON
HANGER
HOLLOW METAL
HOLLOW METAL DOOR
HOLLOW METAL DOOR AND FRAME
HOLLOW METAL FRAME
HANDRAIL
HOLD OPEN
HORIZONTAL
HOSPITAL
HIGH PRESSURE
HYGIENE PRODUCT DISPOSAL
HIGH PRESSURE DECORATIVE LAMINATE
HEADQUARTERS
HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH
HOUSE
HOUSEKEEPING
HST
HSS
HT
HTC
HVAC
HVY
HW
HYD
HYDR
IAQ
IBC
IC
ICW
ID
ID NO
ILLUM
INCL
IND
INFO
INSUL
INT
INTL
IWH
JAN
KD
KIT
KO
KPL
LAB
LAD
LAM
LAM GL
LAU
LAV
LBR
LBS
LCS
LD BRG
LDR
LED
LF
LIB
LIN
LIQ
LKR
LKR RM
LL
LMST
LRG
LRV
LS
LT
LT GA
LT WT
LTG
LTNG
LVD
LVR
LWC
LWIC
LYR
MACH
MACH RM
MAINT
MAN
MATL
MATV
MAX
MBD
MCB
MD
ME
MEAS
MECH
MECH RM
MED
MEK
MEMB
MEMO
MEZZ
MF
MFD
MFG
MFR
MFR REC
MGT
MIC
MID
MIL STD
MIN
MIR
MISC
MIT
MKR
ML
MLDG
MLWK
mm
MO
MOD
MOD BIT
MON
MOPR
MR
MS
MTD
MTG
MTL
MULL
MW
MWP
HOIST
HOLLOW STRUCTURAL STEEL
HEIGHT
HEAT TRANSFER COEFFICIENT
HEATING, VENTILATING, AND AIR CONDITIONING
HEAVY
HOT WATER
HYDRANT
HYDRAULIC
INDOOR AIR QUALITY
INTERNATIONAL BUILDING CODE
INFECTION CONTROL
INFECTION CONTROL WALL
INSIDE DIAMETER
IDENTIFICATION NUMBER
ILLUMINATION
INCLUDED
INDEPENDENT OR INDUSTRIAL
INFORMATION
INSULATION
INTERIOR
INTERNATIONAL
INSTANTANEOUS WATER HEATER
JANITOR
KILN DRIED OR KNOCKED DOWN
KITCHEN
KNOCKOUT
KICKPLATE
ANGLE
LABORATORY
LADDER
LAMINATE
LAMINATED GLASS
LAUNDRY
LAVATORY
LUMBER
POUND
LOCKABLE CHARTING STATION/MED CABINET
LOAD-BEARING
LEADER
LIGHT EMITTING DIODE
LINEAR FEET (FOOT)
LIBRARY
LINEAR
LIQUID
LOCKER
LOCKER ROOM
LEAD LINED
LIMESTONE
LARGE
LOUVERED ROOF VENT
LIGHT SWITCH
LIGHT
LIGHT GAGE
LIGHTWEIGHT
LIGHTING
LIGHTNING
LOUVERED
LOUVER
LIGHTWEIGHT CONCRETE
LIGHTWEIGHT INSULATING CONCRETE
LAYER
MACHINE
MACHINE ROOM
MAINTENANCE
MANUAL
MATERIAL
MASTER ANTENNA TELEVISION SYSTEM
MAXIMUM
MARKER BOARD
METAL CORNER BEAD
DECK
MECHANICAL ENGINEER
MEASURE
MECHANICAL
MECHANICAL ROOM
MEDICAL, MEDIUM
METHYL ETHYL KETONE
MEMBRANE
MEMORANDUM
MEZZANINE
MILL FINISH
MANUFACTURED
MANUFACTURING
MANUFACTURER
MANUFACTURER'S RECOMMENDATION
MANAGEMENT
MICROPHONE
MIDDLE
MILITARY STANDARD
MINIMUM
MIRROR
MISCELLANEOUS
MITER
MARKER
METAL LATH
MOLDING (MOULDING)
MILLWORK
MILLIMETER
MASONRY OPENING
MODEL, MODIFY OR MODULE
MODIFIED BITUMEN
MONITOR
MOP RACK
MOISTURE RESISTANT
MOP SINK
MOUNTED
MOUNTING
METAL
MULLION
MICROWAVE
MEMBRANE WATERPROOFING
N
NA
NAT
NATL
NC
NCOMBL
NEC
NEG
NEMA
NEUT
NFC
NFPA
NIC
NO
NOM
NR
NRC
NRCA
NRP
NS
NUM
O/O O
OA
OC
OCC
OCT
OD
OD
OF/CI
OFD
OFF
OF/OI
OH
OH DR
OPH
OPNG
OPP
OPR
OPT
OR
ORD
ORG
ORIG
ORN
OSHA
OUT
OZ
P
PAR
PARA
PART
PAT
PB
PBD
PC
PCA
PCC
PCCP
PCD
PCF
PCP
PCT
PED
PEN
PEND
PERF
PERIM
PERP
PHAR
PHOTO
PKG
PL
PL GL
PLAM
PLAS
PLBG
PLYWD
PMTL
PNEU
PNL
PO
POLY
PP
PR
PRCST
PREFAB
PREFIN
PRELIM
PREP
PRESS
PREV
PRKG
PRMLD
PROJ
PROP
PSF
PSI
PT
PTD
PTN
PTS
PVC
PVG
PWR
QA
QC
QRY
QTR
QTY
QUAD
QUAL
R
RA
RAD
RBM
RBR
NORTH
NOT APPLICABLE
NATURAL
NATIONAL
NOISE CRITERIA OR NURSE CALL
NONCOMBUSTIBLE
NATIONAL ELECTRICAL CODE
NEGATIVE
NATIONAL ELECTRICAL MANUFACTURERS ASSN
NEUTRAL
NATIONAL FIRE CODE
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NUMBER
NOMINAL
NOISE REDUCTION
NOISE REDUCTION COEFFICIENT
NATIONAL ROOFING CONTRACTORS ASSOCIATION
NONREMOVABLE
NARROW STILE
NUMERAL
OUT TO OUT
OXYGEN
OUTSIDE AIR OR OVERALL
ON CENTER
OCCUPY
OCTAGON
OUTSIDE DIAMETER, OUTSIDE DIMENSION
OUTSIDE DIAMETER/OUTSIDE DIMENSION
OWNER FURNISHED/CONTRACTOR INSTALLED
OVERFLOW DRAIN
OFFICE
OWNER FURNISHED/OWNER INSTALLED
OVERHANG
OVERHEAD (COILING) DOOR
OPPOSITE HAND
OPENING
OPPOSITE
OPERABLE
OPTIONAL
OPERATING ROOM OR OUTSIDE RADIUS
ORDNANCE OR OVERFLOW ROOF DRAIN
ORGANIC
ORIGINAL
ORNAMENTAL
OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION
OUTLET
OUNCE
PAINT
PARALLEL OR PARAPET
PARAGRAPH
PARTIAL
PATTERN
PUSHBUTTON
PARTICLEBOARD
PIECE, POLYCARBONATE OR PORTLAND CEMENT
PORTLAND CEMENT ASSOCIATION
PRECAST CONCRETE
CONCRETE PAVEMENT
PAPER CUP DISPENSER
POUNDS PER CUBIC FOOT
PORTLAND CEMENT PLASTER
PRIVACY CURTAIN TRACK
PEDESTAL
PENETRATE
PENDANT
PERFORATED
PERIMETER
PERPENDICULAR
PHARMACY
PHOTOGRAPH
PACKAGE
PROPERTY LINE
PLATE GLASS
PLASTIC LAMINATE
PLASTER OR PLASTIC
PLUMBING
PLYWOOD
PAINTED METAL
PNEUMATIC
PANEL
POST OFFICE, PURCHASE ORDER
POLYETHYLENE (PLASTIC)
PUSH PLATE
PAIR
PRECAST
PREFABRICATE
PREFINISH
PRELIMINARY
PREPARATION
PRESSURE
PREVIOUS
PARKING
PREMOLDED
PROJECT
PROPERTY
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PORCELAIN TILE OR PRESSURE TREATED
PAPER TOWEL DISPENSER
PARTITION
PNEUMATIC TUBE STATION
POLYVINYL CHLORIDE (PLASTIC)
PAVING
POWER
QUALITY ASSURANCE
QUALITY CONTROL
QUARRY
QUARTER
QUANTITY
QUADRANT
QUALITY
RADIUS OR RISER
RETURN AIR
RADIATOR
REINFORCED BRICK MASONRY
RUBBER
RC
RCP
RCVR
RD
REC
RECD
RECPT
RECT
REF
REFR
REG
REINF
REP
REPL
REQ
REQD
RET
REV
RFG
RFI
RFP
RFS
RL
RLG
RM
RM LT
RND
RO
ROW
RS
RSV
RT
RV
RVS
RWL
S
SA
SALV
SAMP
SAN
SB
SBS
SBSTR
SC
SCH
SCHED
SCHEM
SCP
SCRN
SCT
SCWD
SD
SDG
SECT
SEG
SEL
SEP
SF
SFTWD
SGD
SGL
SHR
SHR HD
SHRD
SHT
SHTHG
SHV
SIM
SJ
SJI
SK
SKLT
SLDG
SLNT
SM
SMK
SND INS
SPEC
SPKLR
SPKR
SPLY
SPR
SQ
SQ IN
SQ YD
SST
ST
STC
STD
STIF
STL JST
STL LNTL
STL PL
STL RF DK
STL TB
STL TR
STNLS
STOR
STR
STRUCT
STRUCT STL
SUB
SURF
SUSP
SUSP CLG
SW
SWDR
SYM
SYNTH
SYS
REMOTE CONTROL
REFLECTED CEILING PLAN
RECEIVER
ROAD OR ROOF DRAIN
RECESSED
RECEIVED
RECEPTACLE
RECTANGLE
REFERENCE OR REFRIGERATOR
REFRACTORY, REFRIGERATION
REGISTER
REINFORCE
REPAIR
REPLACE
REQUIRE
REQUIRED
RETURN
REVISION
ROOFING
REQUEST FOR INFORMATION
REQUEST FOR PROPOSAL
ROOM FINISH SCHEDULE
ROOF LEADER
RAILING
ROOM
NURSE CALL LIGHT/ROOM LIGHT
ROUND
ROUGH OPENING
RIGHT OF WAY
ROUGH SAWN
RESILIENT SHEET VINYL
RIGHT
ROOF VENT
REVERSE
RAIN WATER LEADER
SOLID SURFACE
SUPPLY AIR
SALVAGE
SAMPLE
SANITARY
SPLASH BLOCK
STYRENE BUTADIEN STYRENE
SUBSTRATE
SHARPS CONTAINER
SCHOOL
SCHEDULE
SCHEMATIC
SCUPPER
SCREEN
SHOWER CURTAIN TRACK
SOLID CORE WOOD DOOR
SMOKE DETECTOR/SOAP DISPENSER
SIDING
SECTION
SEGMENT
SELECT
SEPARATE
SQUARE FOOT (FEET)
SOFTWOOD
SLIDING GLASS DOOR
SINGLE
SHOWER
SHOWER HEAD
SHOWER DRAIN
SHEET
SHEATHING
SHELVING
SIMILAR
SCORED JOINT
STEEL JOIST INSTITUTE
SKETCH
SKYLIGHT
SLIDING
SEALANT
SHEET METAL
SMOKE
SOUND INSULATION
SPECIFICATION
SPRINKLER
SPEAKER
SUPPLY
SINGLE PLY ROOF SYSTEM
SQUARE
SQUARE INCH
SQUARE YARD
STAINLESS STEEL
STAIRS OR STREET
SOUND TRANSMISSION CLASS
STANDARD
STIFFENER
STEEL JOIST
STEEL LINTEL
STEEL PLATE
STEEL ROOF DECK
STEEL TUBE
STEEL TRUSS
STAINLESS
STORAGE
STRINGERS
STRUCTURAL
STRUCTURAL STEEL
SUBSTITUTE
SURFACE
SUSPEND
SUSPENDED CEILING
SWITCH
SWING DOOR
SYMBOL
SYNTHETIC
SYSTEM
T T&M
TB
TBD
TECH
TEL
TEMP
THERM
THK
THRES
THRU
THRUOUT
TMPD
TMPD GL
TN
TO
TO FDN
TOB
TOM
TOP
TOS
TOW
TPD
TRANS
TRTD
TS
TSTAT
TV
TYP
UC
UGND
UL
ULT
UNFIN
UNO
UPS
UR
UTIL
UV
VAC
VAR
VEH
VENT
VERT
VEST
VFD
VIC
VID
VIF
VNR
VOC
VOL
VR
VTR
W/ W/O
WBL
WC
WD
WDW
WF
WFR
WFS
WH
WHSE
WP
WPM
WR
WS
WSCT
WT
X BRACE
XPS
YD
TREAD OR THERMOSTAT
TIME AND MATERIALS
TOWEL BAR
TACK BOARD
TECHNICAL
TELEPHONE
TEMPERATURE OR TEMPORARY
THERMAL
THICKNESS
THRESHOLD
THROUGH
THROUGHOUT
TEMPERED
TEMPERED GLASS
TRUE NORTH
TOP OF ___
TOP OF FOUNDATION
TOP OF BEAM
TOP OF MASONRY
TOP OF PARAPET
TOP OF STEEL
TOP OF WALL
TOILET PAPER DISPENSER
TRANSOM
TREATED
TUBE STEEL
THERMOSTAT
TELEVISION
TYPICAL
UNDERCUT
UNDERGROUND
UNDERWRITERS LABORATORIES
ULTIMATE
UNFINISH
UNLESS NOTED OTHERWISE
UNINTERRUPTIBLE POWER SUPPLY
URINAL
UTILITY
ULTRAVIOLET
VACUUM
VARIES
VEHICLE
VENTILATION
VERTICAL
VESTIBULE
VARIABLE FREQUENCY DRIVE
VICINITY
VIDEO
VERIFY IN FIELD
VENEER
VOLATILE ORGANIC COMPOUND
VOLUME
VAPOR RETARDER
VENT THROUGH ROOF
WITH
WITHOUT
WOOD BLOCKING
WATER CLOSET
WOOD
WINDOW
WIDE FLANGE
WOOD FRAME
WOOD FURRING STRIPS
WATER HEATER
WAREHOUSE
WATERPROOFING
WATERPROOF MEMBRANE
WEATHER RESISTANT
WEATHERSTRIP OR WALL SCONCE
WAINSCOT
WEIGHT OR WINDOW TREATMENT
CROSS BRACE
EXTRUDED POLYSTYRENE BOARD
YARD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCTION DOCUMENTS
C U s e rs
\p c h o i\ D o c u m e n ts \1
U p g ra d e
C a th L a b
R
Y e u n y o u n g
.r v t
/2
/2
:2
:5
P
M
GI002
ABBREVIATIONS UPGRADE CATH LAB #4
VA Minneapolis Health Care System
618-CSI-230
BUILDING 70
01/31/2025 JU PC
17179
Revisions: Date:
Name
Date Reg. No.
Jason R. Gottwalt, P.E.
41360
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.
e or under my direct Licensed Architect Minnesota.
EA
SCZ-3-62
14,432SF
PCNSS
1,572SF
799 SF
3J-140
CATH LAB
#4
223 SF
C3-84
SUITE
PASSAGEWAY
595 SF
3J-139
CATH
HOLDING
142 SF
3J-140A
EQUIPMENT
SMOKE TIGHT ASSEMBLY
AND 1/2" HOUR FIRE
BARRIER
EXIT ACCESS CORRIDOR
129 SF
3J-142
SCRUB
120 SF
3J-142A
EQUIPMENT
121 SF
3J-141
ELECTRONIC
EQUIPMENT
158 SF
3J-141A
SUPPLY
806 SF
3J-143
CATH LAB
#3
FEC
FEC
EA
EA
C3-92
CORRIDOR
251 SF
3J-138
WAITING
116 SF
3J-138A
ECHO
OFFICE
292 SF
3J-138B
ECHO
WORKROOM
EXIT
LIGHT
3P-1183P-1173P-116
C3-97
3J-124
3J-124C
3J -1
D
3J-124A
3J-124B
S- 9
S- 10
C3-96
C3-95
3J-121
3J-120 3J-119 3J-116 3J-115 3J-114 3J-111 3J-110
3J-109
3J-108 3J-1123J-1133J-1173J-118
3J-1223J-123
C3-96
C3 -1
C3 -9
3J-105 3J-104
3J-101
3J-102 3J-103
3J-107 3J-107A 3J-106
C3 -1
3H-105B
3H-105A
3H-105
3H-105C
3H-104
3H-100
3S-6
C3-66
C3-68
C3-63
C3-63
ELEV
3H-122
3H-121
3H-1203H-121
3H-114 3H-115 3H-118
3H-113 3H-116 3H-117
3H-121 3H-117B
3H-117A 3H-117C
3K-101 3K-1023K-138
3H-11D
3K-137
3K-137A
3H-110
3H-111
S- 8
ELEV
3J-125
3J-128
3J-126
3J-127
3J-130
3J-131
3J-132
3J-126A
3J-129 3J-133 3J-134
3J-136
3J-137
3J-135
C3-93
C3-90
C8
3K -1
A
C O
M M
O N
P A
T H
O F
T R
A V
E L
T O
T A
L T
R A
V E
L D
IS
T
A N
C E
TOTAL TRAVEL DISTANCE
176'-6"
PCNSS
1,929SF
PCNSS
1,948SFNPCS
1,109SF
MSCZ-3-J
5,608SF
PCNSS
5,011SF
SCZ-3-61
9,129SF
PCNSS
1,245SF
EACOMMON PATH OF TRAVEL
77'-0"
EXIT
LIGHT
EXIT
LIGHT
EXIT
LIGHT
NOYES
APPLICABLE REGULATIONS
GENERAL TYPE OF PROJECT
NFPA NATIONAL FIRE CODES (EXCEPTION: NFPA 5000 & 900)
VA DESIGN GUIDELINES
2021 NFPA 101 (LIFE SAFETY CODE)
ABA STANDARDS (2015) (ABAAS)
REMODEL
ADDITION
NEW BUILDING
PROJECT DESCRIPTION
CODE SUMMARY
MINOR INTERIOR RENOVATION TO SUPPORT CATH LAB
EQUIPMENT REPLACEMENT
VA BARRIER FREE DESIGN STANDARD (PG-18-13)
NOYESAUTHORITIES HAVING JURISDICTION (AHJ's)
THE JOINT COMMISSION (JC)
CENTER FOR MEDICARE/MEDICAID SERVICES (CMS)
TESTRATING (HRS)
EXTERIOR DOORS AND WINDOWS
SHAFTS AND EXIT PASSAGEWAYS
OTHER
ROOF CONSTRUCTION
PRIME & SEC. FLOOR BEAMS, JOISTS
FLOOR/CEILING ASSEMBLY
FLOOR CONSTRUCTION
INTERIOR
NON-BEARING WALLS AND PARTITIONS
BEARING WALLS
COLUMNS
GIRDERS
TRUSSES
ROOF/CEILING ASSEMBLY
PRIME & SEC. ROOF BEAMS, JOISTS
EXTERIOR
INTERIOR BEARING WALLS
EXTERIOR BEARING WALLS
STRUCTURAL FRAME
AREA SEPARATIONS / FIRE WALLS
FIRE-RESISTIVE REQUIREMENTS
TYPE(S) OF CONSTRUCTION
CONSTRUCTION TYPE(S)
SEE LIFE SAFETY PLANS
See Life Safety Plans OCCUPANT LOAD OF BUILDING
SF/OCCUPANT OCCUPANTS
TOTAL BUILDING OCCUPANT LOAD:
ACTUAL AREAAREA LOCATION
THIRD LEVEL 1,146 100 12
N/A
3 ASTM E119
(NAPA 220 TABLE 4.1.1)
OSHA STANDARDS
VA SEISMIC DESIGN REQUIREMENTS H-18-8
2023 NATIONAL ELECTRIC CODE (NEC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,
AMERICAN CONCRETE INSTITUTE AND COMETARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
ENERGY POLICY ACT OF 2005 (EPAct)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS
FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE
RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL
BUILDINGS, 10 CFR PARTS 433,434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE
BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
EXECUTIVE ORDER 13834
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED
IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA
MASTER CONSTRUCTION SPECIFICATION
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE
STANDARD 62.1-2004
SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE
STANDARD 15 -2007
VA FIRE PROTECTION DESIGN MANUAL
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA
NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER
GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)
NOYES
(Section 8.3)
CHANGE OF OCCUPANCY?
SEPARATED OCCUPANCIES?
FIRE BARRIER RATING(S) SEE LIFE SAFETY PLANS
OCCUPANCY CLASSIFICATION(S)
OCCUPANCIES
(If Remodeling)
2021 LSC (TABLE 6.1.14.1)
(LSC CH 12-42)
NOYES
FIRE RESISTIVE CORRIDORS?
SMOKE TIGHT CORRIDORS (SMOKE PARTITIONS)
INCIDENTAL USE AREA RATING(S) SEE PLANS
MISCELLANEOUS
INTERIOR FINISHES CLASSIFICATION XEXITS
X EXIT ACCESS CORRIDORS
XOTHER SPACES
VA PHYSICAL SECURITY AND RESILIENCE DESIGN MANUAL (PSRDM)
U.S. DEPARTMENT OF VETERANS AFFAIRS (VA)
CODE PLAN GENERAL NOTES
1. MAINTAIN EXISTING FIRE RATINGS, ASSEMBLIES AND
SEPARATIONS/COMPARTMENTS THROUGHOUT CONSTRUCTION.
2. INTERSTITIAL FLOOR SLAB IS A 1-HOUR RATED FIRE BARRIER.
3. STRUCTURAL FLOOR IS A 2-HOUR RATED FIRE BARRIER.
4. WHERE EXISTING FIRE STOPPED PENERTRATIONS ARE DISTURBED
BY THIS WORK, REMOVE FIRESTOPPING ASSEMBLY IN ITS ENTIRETY
AND REPLACE WITH NEW UL TESTED FIRESOPPING ASSEMBLY USING
MATERIALS FROM A SINGLE MANUFATURER.
HEALTHCARE
OCCUPANCY
I (332)
1 1/2
ASTM E119
ASTM E119
ASTM E119
ASTM E119
ASTM E119
ASTM E119
ASTM E119
ASTM E119
ASTM E119
ASTM E119
ASTM E119
2025 NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE
2025 NFPA 13 STANDARD FOR THE INSTALLATION OF
SPRINKLER SYSTEMS
LIFE SAFETY SYMBOLS
SMOKE TIGHT
ASSEMBLY
1 HOUR FIRE
BARRIER
2 HOUR FIRE
BARRIER
3 HOUR FIRE
BARRIER
1/2 HOUR FIRE &
SMOKE BARRIER
2 HOUR FIRE &
SMOKE BARRIER
3 HOUR FIRE &
SMOKE BARRIER
HE
TRAVEL DISTANCE
100'-10"
TRAVEL DISTANCE
EA
EDEXIT EXIT
HORIZONTAL EXIT
EXIT DISCHARGE
EXIT ACCESS
FIRE
EXTINGUISHER
FE
FIRE
EXTINGUISHER
CABINET
FEC
LIMITS OF
CONSTRUCTION
HEALTH CARE
SUITE
NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN
SHAFT
ADJACENT SYMBOLS SHOW PARTITION RATING AND
DAMPER REQUIREMENTS
HAZARDOUS USE
ADJACENT SYMBOLS SHOW PARTITION RATING.
OPENINGS REQUIRE CLOSER & LATCH
EXIT PASSAGEWAY
RATE AS STAIR
ALL OPENINGS TO BE RATED AS STAIR SHAFT
CORRIDOR
WALLS TO LIMIT THE TRANSFER OF SMOKE
ADJUNCT CORRIDOR or PSYCHIATRIC AREA or CONSTRUCTED WITH MIN. 4'-0" CLEAR
WITH (PER CHAPTER 19)
EXIT LIGHT,
SEE ELECTRICAL
DRAWINGS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCTION DOCUMENTS
C U s e rs
\p c h o i\ D o c u m e n ts \1
U p g ra d e
C a th L a b
R
Y e u n y o u n g
.r v t
/2
/2
:3
:0
P
M
GI131
THIRD LEVEL LIFE SAFETY PLAN UPGRADE CATH LAB #4
VA Minneapolis Health Care System
618-CSI-230
BUILDING 70
01/31/2025 JU PC
17179
1/8" = 1'-0"1 THIRD LEVEL - LIFE SAFETY PLAN
0 8' 16'4'
Revisions: Date:
Name
Date Reg. No.
Jason R. Gottwalt, P.E.
41360
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.
e or under my direct Licensed Architect Minnesota.
PHASE 1:
CONSTRUCTION PROJECT ACTIVITY TYPE - C
INFECTION CONTROL RISK GROUP - GROUP 4: HEGHEST RISK
CONTROL PROCEDURE CLASS - IV
PHASE 2 :
CONSTRUCTION PROJECT ACTIVITY TYPE - D
INFECTION CONTROL RISK GROUP - GROUP 4: HEGHEST RISK
CONTROL PROCEDURE CLASS - IV
PHASE 3:
CONSTRUCTION PROJECT ACTIVITY TYPE - C
INFECTION CONTROL RISK GROUP - GROUP 4: HIGHEST RISK
CONTROL PROCEDURE CLASS - IV
PHASE 4:
CONSTRUCTION PROJECT ACTIVITY TYPE - C
INFECTION CONTROL RISK GROUP - GROUP 4: HIGHEST RISK
CONTROL PROCEDURE CLASS - IV
INFECTION CONTROL RISK ASSESSMENT
(ICRA) BY PROJECT AREA USE AND PHASE
CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)
TYPE A
TYPE B
TYPE C
TYPE D
INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT NOT
LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION
LIMITED TO 1 TILE PER 50 SQUARE FEET, PAINTING BUT NOT SANDING
WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND
ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF
WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL
DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE
AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF
WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.
FLOOR COVERING REMOVAL (WITHOUT SANDING OR GRINDING).
ANY WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR
REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO,
SANDING OF WALL FOR PAINTING OR WALLCOVERING, REMOVAL OF
FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL
CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE
CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH
CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT. FLOOR
COVERING REMOVAL (WITH SANDING OR GRINDING).
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS
NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK
SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE
CEILING SYSTEM, FLOORING AND NEW CONSTRUCTION.
GROUP 1
LOW RISK
• MECHANICAL SPACES: AREAS NOT DIRECTLY ADJACENT TO PATIENT
CARE, INCLUDING INTERSTITIAL SPACES.
• ENGINEERING OR EMS OFFICE/WORK AREAS
• OFFICE AREAS: AREAS NOT ATTACHED TO/ADJOINING PATIENT CARE
AREAS, NOT USED FOR PATIENT INTERVIEWS, EVALUATIONS OR
EXAMINATIONS.
• PUBLIC CORRIDORS: SPACES NOT ON OR DIRECTLY ATTACHED TO
PATIENT UNITS OR TREATMENT LOCATIONS.
GROUP 2
MEDIUM
RISK
• OUTPATIENT AREAS:
1. PRIMARY CARE OR SPECIALTY CARE CLINIC AREAS
2. BEHAVIORAL/MENTAL HEALTH AREAS
3. EXTENDED CARE / REHAB CLINIC AREAS
4. COMMUNITY BASED OUT PATIENT CLINICS (CBOC’S)
GROUP 3
HIGH RISK
• IN-PATIENT UNITS:
1. INCLUDING, BUT NOT LIMITED TO: EMERGENCY DEPT.; NURSING
UNITS; RADIOLOGY/MRI/CT/ULTRASOUND; NUCLEAR MEDICINE;
CAFETERIA/KITCHEN/CANTEEN; LABORATORIES; RADIATION /
ONCOLOGY; DIALYSIS
GROUP 4
HIGHEST
RISK
• ICU/SICU
• OR/PACU/ENDOSCOPY
• GI
• STERILE PROCESSING SERVICES (SPS)
• PHARMACY
• CATH LAB
CLASS
I
KEEP AREAS FREE OF DEBRIS, TRASH
EXECUTE WORK TO MINIMIZE OF DUST MIGRATION (E.G. WET MOPPING, HEPA VACUUM)
IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION
(INVOLVING MINOR DEMOLITION IN MAINTENANCE OR REMODELING.)
CLASS
II
SAME AS CLASS I PLUS:
1. ESTABLISH MATERIAL AND DEBRIS ROUTE USING NON-PATIENT/VISITOR PATHWAY
2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE CUTTING OR DRILLING.
3. BLOCK OFF AND SEAL AIR VENTS
4. SEAL UNUSED DOORS WITH PLASTIC SHEATHING AND DUCT TAPE.
5. CREATE BARRIERS AS DEFINED BY INFECTION PREVENTION
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINER; TAPE COVERING UNLESS SOLID LID.
7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
8. PLACE STICKY MAT AT ALL WORK AREA ENTRANCES AND EXITS.
9. REMOVE OR ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA
CLASS
III
SAME AS CLASS I AND II PLUS:
1. ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA TO PREVENT DUCT SYSTEM CONTAMINATION
2. COMPLETE CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, PLASTIC) AT ALL CONSTRUCTION ENTRIES AND EXITS; MONITOR FOR SEAL AND TAKE IMMEDIATE
CORRECTIVE ACTION AS NEEDED
3. MAINTAIN AND MONITOR NEGATIVE AIR PRESSURE WITHIN CONSTRUCTION SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
4. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING PERFORMED.
5. CHECK AND REPLACE AIR FILTERS AS NEEDED REGULARLY
6. DO NOT REMOVE BARRIERS FROM WORK SITE UNTIL PROJECT IS COMPLETE & HAS BEEN THOROUGHLY CLEANED; REMOVE BARRIERS CAREFULLY TO MINIMIZE
SPREADING DUST. DEBRIS.
7. VACUUM WORK WITH HEPA FILTERED VACUUM.
8. WET MOP AREA WITH CLEANER/DISINFECTANT.
9. MITIGATE VIBRATION AND NOISE TO LOWEST IMPACT WHERE POSSIBLE.
10. DISPLAY ICRA AT SITE
11. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES.
CLASS
IV
SAME AS CLASS I, II AND III PLUS:
1. INSPECT ADJACENT AREAS FOR DUST MIGRATION; TAKE IMMEDIATE CORRECTIVE AS NEEDED
2. USE HEPA VACUUM IN AREA PRIOR TO START OF CONSTRUCTION
3. CONSTRUCT ANTE ROOM; ALL PERSONNEL MUST ENTER THROUGH IT TO BE VACUUMED USING HEPA VACUUM BEFORE LEAVING OR TO DON/DOFF PPE
INFECTION CONTROL & CONSTRUCTION
BARRIER GENERAL NOTES
1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL
INFORMATION
2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND
PARTICULATE MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA
PERIMETER NEEDS TO BE SEALED COMPLETELY WITH SHEET PLASTIC AS
SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE PERMITTED BY CLASS.
ICRA - CONSTRUCTION BARRIER TO BE PROVIDED AS SPECIFIED AND LISTED IN
ICRA CLASS.
3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS
AS SPECIFIED. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN
CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.
4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON,
PROVIDE A REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE
VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE
OF CONSTRUCTION. PROVIDE AT LEAST TEN (10) WORKING DAYS NOTICE FOR
EACH PERMIT.
5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM FLOOR
TO DECK/FLOOR ABOVE. EXCEPTION. IF BARRIER IS ADJACENT TO SMOKE, FIRE,
OR EXISTING WALL CONSTRUCTION WHICH WILL NOT BE DEMOLISHED AND
TERMINATES TO FLOOR/DECK ABOVE, THEN CONSTRUCT DUST PROOF IC
BARRIER, SEE DETAIL(S). TAPE, MUD, SAND JOINTS AND PAINT ON NON-
CONSTRUCTION SIDE OF BARRIER.
6. INFECTION CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY
BEFORE 7:00 AM AND AFTER 8:00 PM OR DIRECTED BY COR
7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE
NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF,
(2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR
AREAS BETWEEN 5000 SF AND 10000 SF.
8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO
COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL
TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF
UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE
REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE
ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE
NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR.
PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE AND/OR
EMERGENCY IN AN ADJACENT AREA.
10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS,
CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER
PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE
BARRIER.
CONSTRUCTION PHASING GENERAL NOTES
1. THE WORK UNDER THIS CONTRACT SHALL BE DIVIDED INTO PHASES. A PHASE
CAN INVOLVE MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00
1.6.G PHASING.
2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING AND SEQUENCING
WITH ALL TRADES AND THE OWNER. THE GENERAL CONTRACTOR SHALL PROVIDE
A WRITTEN NARRATIVE TO OUTLINE CONSTRUCTION PHASING AND SEQUENCE
PLANS, VALIDATING AND ELABORATING ON THIS PHASING DESCRIPTION.
3. THE GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH THE OWNER SO
WORK MAY BE CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR
DELAYING WORK UNDER THIS CONTRACT, OR OTHER CONTRACTS ON THE
PROJECT SITE OR WORK BY OWNER.
4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL INDICATE THE
SEQUENCE, COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND
APPROVAL DATES AND MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL
FOR ALL PHASES OF THE WORK.
5. THE GENERAL CONTRACTOR SHALL PERFORM THE WORK IN EACH PHASE IN THE
SEQUENCE SHOWN ON THE PHASING PLAN DRAWING(S) AND CONSTRUCTION
PHASING DESCRIPTION.
6. THE GENERAL CONTRACTOR MUST COMPLETE ALL WORK IN EACH PHASE WITH
THE VA INSPECTING AND ACCEPTING THE WORK PRIOR TO VA OCCUPANCY AND
THE CONTRACTOR PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON
COMPLETION OF A PARTICULAR PHASE, THE ENTIRE AREA COVERED BY THAT
PHASE CAN BE OCCUPIED BY THE VA PERSONNEL WITH ALL SYSTEMS
FUNCTIONING PROPERLY.
7. BEFORE COMMENCING WORK ON EACH SUCCESSIVE PHASE, THE GENERAL
CONTRACTOR SHALL SUBMIT AN UPDATED COPY OF THE SCHEDULE.
8. ANY DUST PARTITIONS OR ICRA-CONSTRUCION BARRIERS CONSTRUCTED BY THE
CONTRACTOR PRIOR TO THE START OF DEMOLITION MUST REMAIN IN PLACE UNTIL
THE COMPLETION OF THAT PHASE OR SUBSEQUENT PHASE WHERE REQUIRED.
9. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO VA OCCUPIED
AREAS IN SUCH A MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED
USE OF ALL OCCUPIED AREAS, INCLUDING THE APPLICABLE MECHANICAL AND
ELECTRICAL SYSTEMS SERVING THESE AREAS.
10. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL
DRAWING(S) AND DEMOLITION PLANS.
11. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENTS IS
FOR ARCHITECT-OWNER PLANNING PURPOSES ONLY.
12. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS
OF EGRESS THROUGHOUT ALL PHASING.
13. THE CONTRACTOR SHALL PLAN FOR A MINIMUM OF 4 WEEKS' TIME BETWEEN
PHASES TO ALLOW THE VA TO OCCUPY THE NEWLY ACCEPTED SPACE AND
VACATE THE FOLLOW-ON PHASES. THE VA WILL ACCELERATE THIS TIME WHEN
POSSIBLE AND WILL NOTIFY THE CONTRACTOR IF THIS OCCURS.
3J-139
CATH
HOLDING
3J-140A
EQUIPMENT
C3-84
SUITE
PASSAGEWAY
3J-140
CATH LAB
#4
IC7
IC8
IC8
C3-92
CORRIDOR
3J-138
WAITING
3J-138A
ECHO
OFFICE
3J-138B
ECHO
WORKROOM
3J-139A
TOILET
B3
IC12
IC15
IC16
IC17
3J-139
TEMP.
STORAGE
3J-140
CATH LAB
#4
C3-84
SUITE
PASSAGEWAY
3J-140A
EQUIPMENT
3'- 0"
IC1
2'- 0"
IC2
IC3
B3b
B3b
IC4
IC5
6'-2"
3J-139A
TOILET
C3-92
CORRIDOR
3J-138
WAITING
3J-138A
ECHO
OFFICE
3J-138B
ECHO
WORKROOM
6"
IC11
C3-84
IC13
IC14
IC15
IC16
IC11
IC17
3J-139
TEMP.
STORAGE
3J-138B
ECHO
WORKROOM
3J-138A
ECHO
OFFICE
3J-138
WAITING
C3-92
CORRIDOR
3J-140A
EQUIPMENT3J-140
CATH LAB
#4
C3-84
SUITE
PASSAGEWAY
IC6
4'- 6"
3J-139A
TOILET
IC10
IC10
IC10
IC14
IC15
IC16
IC17
INFECTION CONTROL & CONSTRUCTION
BARRIER KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
IC1
REMOVE PORTION OF EXISTING CASEWORK INCLUDING COUNTERTOP,
WALL & BASE CABINETS AND ASSOICATED BRACKETS, SALVAGE FOR
REINSTALLATION AFTER CATH LAB REMODEL IS COMPLETE
IC2 PROVIDE TEMPORARY PRE-MANUFACTURED CONSTRUCTION BARRIER AND
DOOR WITHOUT DAMAGING THE FINISH FLOOR
IC3 REMOVE EXISTING LEAD APRON RACKS. SALVGE FOR REUSE
IC4 PROVIDE 1 HR FIRE RATED CONSTRUCTION BARRIER, SEE DETAIL .
PROVIDE BACKING FOR LEAD APRON RACKS
IC5 REINSTALL EXISTING LEAD APRON RACK TEMPORARILY ON CONSTRUCTION
BARRIER WALL
IC6 REMOVE CONSTRUCTION BARRIER. PATCH/RESTORE FLOOR, WALLS &
CEILING TO MATCH EXISTING
IC7 INFILL TEMPORARY WALL OPENING TO MATCH EXISTING ADJACENT
CONSTRUCTION. PROVIDE WALL BACKING FOR LEAD APRON RACKS
IC8 REMOVE CONSTRUCTION BARRIER
IC9 RE-INSTALL EXISTING CASEWORK(WALL & BASE CABINETS) AND
COUNTERTOP. MATCH ORIGINAL CONFIGURATION
IC10 PERFORM ALL CATH LAB CONSTRUCTION DURING THIS PHASE INCLUDING
EQUIPMENT INSTALLATION
IC11 TEMPORARILY REMOVE AND RELOCATE PUSH BUTTON FOR DOOR (C3-84)
DURING CONSTRUCTION
/5 GC131
IC12 REINSTALL AND CONNECT DOOR OPERATOR PUSH BUTTON IN ORIGINAL
LOCATION
IC13
EXISTING FLOOR FINISH TO REMAIN IN PLACE. TAKE CARE TO MAINTIAN
CONDITION OF EXISTING FLOOR FINISH TO PERMIT THE INSTALLATION OF
NEW INTEGRAL BASE AT CASEWORK.
IC14 TEMP. STORAGE 3J-139 SHALL ONLY BE USED FOR CONSTRUCTION
STORAGE/STAGING
IC15 SEAL DOOR TO PREVENT ALL DUST FROM PASSING THROUGH DURING
CONSTRUCTION. PROVIDE SIGNAGE TO NOT USE DOOR
IC16 USE WINDOW FOR CONSTRUCTION EXHAUST
IC17
ALL WORK IN THIS ENTRY AREA WILL NEED TO BE DONE ON OFF HOURS
AND /OR WEEKEND SCHEDULES. THE ENTRY SPACE NEEDS TO REMAIN
FUNTIONAL DURING BUSINESS HOURS. COORDINATE TIME WITH VA COR
3J-139
CATH
HOLDING3J-138
WAITING
3J-138A
ECHO
OFFICE
3J-138B
ECHO
WORKROOM
3J-140
CATH LAB
#4
C3-84
SUITE
PASSAGEWAY
3J-140A
EQUIPMENT
3J-139A
TOILET
C3-92
CORRIDOR
IC9
IC15
IC16
IC17
EXISTING
STRUCTURE
ABOVE
SOUND
ATTENUATING
INSULATION
FIRE SEALANT
BOTH SIDES
EXISTING
FINISHED
FLOOR
(1) LAYER 5/8" TYPE "X" GYP
BD EACH SIDE. FINISH
OCCUPIED SIDE WITH GLOSS
PAINT. SEE SPECIFICATIONS.
3 5/8" STEEL STUDS @ 16" OC
WITH SOUND ATTENUATING
INSULATION FULL HEIGHT
CLOSE OPEN DUCTS
WITH 6 MIL
POLYETHYLENE
BARRIER.
SEAL EDGES WITH
CONTINUOUS DUCT TAPE
CONSTRUCTION
SIDE OF BARRIER
OCCUPIED
SIDE OF
BARRIER
REMOVE PORTION OF
CEILING OR ENTIRE CEILING
AS REQUIRED ON
CONSTRUCTION SIDE OF
BARRIER TO INSTALL
CONSTRUCTION /ICRA
BARRIER.
REMOVE PORTION OF
CEILING AS REQUIRED TO
INSTALL
CONSTRUCTION/ICRA
BARRIER. MODIFY
CEILING AT BARRIER ON
OCCUPIED SIDE
FIRE SEALANT
BOTH SIDES
SOUND
ATTENUATING
INSULATION
3J-143A
CONTROL
3H-111
3H-110
CONSULT
C3-63
CORRIDOR
3J-143A
CONTROL
3H-111
3H-110
CONSULT
C3-63
CORRIDOR
3J-143A
CONTROL
3H-111
3H-110
CONSULT
C3-63
CORRIDOR
3J-143A
CONTROL
3H-111
3H-110
CONSULT
C3-63
CORRIDOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCTION DOCUMENTS
C U s e rs
\p c h o i\ D o c u m e n ts \1
U p g ra d e
C a th L a b
R
Y e u n y o u n g
.r v t
/2
/2
:2
:4
P
M
GC131
THIRD LEVEL INFECTION
CONTROL & PHASING PLANS
UPGRADE CATH LAB #4
VA Minneapolis Health Care System
618-CSI-230
BUILDING 70
01/31/2025 JU PC
17179
1/8" = 1'-0"3 THIRD LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN - PHASE 3
1/8" = 1'-0"1 THIRD LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN - PHASE 1
1/8" = 1'-0"2 THIRD LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN - PHASE 2
0 8' 16'4'
1/8" = 1'-0"4 THIRD LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN - PHASE 4
0 8' 16'4'
0 8' 16'4' 0 8' 16'4'
1/2" = 1'-0"5 1-HR CONSTRUCTION /ICRA BARRIER (TYP)
0 2' 4'1'
Revisions: Date:
Name
Date Reg. No.
Jason R. Gottwalt, P.E.
41360
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.
e or under my direct Licensed Architect Minnesota.
CA1
CA2
CA3
CA3
CA3
CA3
CA2
CA3 CA4 CA5
CONSTRUCTION ACCESS ROUTE
KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
CA1 FREIGHT ELEVATOR TO BE USED DURING CONSTRUCTION
CA2 KEYPAD ACCESS
CA3 CONSTRUCTION ACCESS ROUTE
CA4 CONSTRUCTION AREA
CA5 POTENTIAL EXHAUST POINT ICRA PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCTION DOCUMENTS
C U s e rs
\p c h o i\ D o c u m e n ts \1
U p g ra d e
C a th L a b
R
Y e u n y o u n g
.r v t
/2
/2
:2
:5
P
M
GC132
THIRD LEVEL CONSTRUCTION
ACCESS ROUTE
UPGRADE CATH LAB #4
VA Minneapolis Health Care System
618-CSI-230
BUILDING 70
01/31/2025 JU Author 17179
1/32" = 1'-0"1 THIRD LEVEL CONSTRUCTION ACCESS ROUTE
0 32' 64'16'
Revisions: Date:
Name
Date Reg. No.
Jason R. Gottwalt, P.E.
41360
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.
e or under my direct Licensed Architect Minnesota.
VWXYZ
C3-84
SUITE
PASSAGEWAY
3J-139A
TOILET
3J-139
TEMP.
STORAGE
3J-140
CATH LAB
#4
3J-140A
EQUIPMENT
3J-142A
EQUIP
3J-143D
SINK ROOM
3J-143
SCRUB
DE6
DE5
DE7
DE5
DE9
DE8
DE5
DE5
DE1
DE2
DE2
DE2
DE4
DE3
DE12
DE12
DE11
DE11
DE11
DE13
DE14
DE15
DE16
TEMP
CONSTRUCTION
WALL
DE11
DE2
DE11
3J-143
CATH LAB #3
3J-143A
CONTROL
3H-111
3H-110
CONSULT
C3-63
CORRIDOR
STAIR
DE17
3J-141A
SUPPLY
DEMOLITION GENERAL NOTES
1. GENERAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK, PHASING
AND SEQUENCING WITH THE OWNER. ANY INFORMATION REGARDING SEQUENCING
PROVIDED IN THESE DOCUMENTS IS FOR ARCHITECT - OWNER PLANNING
PURPOSES ONLY, UNLESS NOTED OTHERWISE.
2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH ALL
TRADES FOR THE DEMOLITION WORK REQUIRED FOR THIS PROJECT.
3. WHERE PARTITIONS ARE INDICATED TO BE REMOVED, REMOVE PARTITION ALONG
WITH ALL ITEMS CONTAINED WITHIN, INCLUDING DOORS, FRAMES, HARDWARE,
SIDELIGHTS, WINDOWS, MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. TO
STRUCTURE ABOVE, UNLESS NOTED OTHERWISE.
4. WHERE FLOOR FINISH IS INDICATED TO BE DEMOLISHED, REMOVE FINISH TO
FLOOR SLAB AS REQUIRED AND PREPARE SLAB SURFACE FOR SCHEDULED
FINISHES WITHIN AREA TO BE REMODELED, UNLESS NOTED OTHERWISE. SEE FINISH
SCHEDULE FOR EXISTING FLOOR FINISHES TO REMAIN UNDISTURBED.
5. WHERE CEILING IS INDICATED TO BE DEMOLISHED, REMOVE CEILING SUSPENSION
SYSTEM ALONG WITH ALL ASSOCIATED MECHANICAL AND ELECTRICAL ITEMS,
UNLESS NOTED OTHERWISE. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
EXTENT OF CONDUIT, PIPING AND DUCTWORK DEMOLITION WITHIN AREA TO BE
REMODELED.
6. WHERE INDICATED, REMOVE ALL WALL/PARTITION EXISTING FINISHES AND
PREPARE THE SURFACES FOR SCHEDULED FINISHES, SEE FINISH SCHEDULE FOR
FINISHES.
7. ALL DISTURBED AREAS, WALLS, PARTITIONS, FLOORS, ETC, DAMAGED BY
DEMOLITION WORK SHALL BE PATCHED TO MATCH ADJACENT AREA.
8. OWNER RESERVES THE RIGHT OF FIRST REFUSAL OF ALL SALVAGED ITEMS SUCH
AS: DOORS, LIGHT FIXTURES, PLUMBING FIXTURES ETC.
9. SALVAGED ITEMS SCHEDULED FOR REUSE SHALL BE CLEANED, RESTORED AND/OR
REFINISHED TO LIKE NEW CONDITION, UNLESS NOTED OTHERWISE.
10. DO NOT REMOVE ANY EXISTING STRUCTURAL SUPPORT MEMBERS SUCH AS
COLUMNS, BEAMS, JOISTS, LOAD-BEARING PARTITIONS ETC, UNTIL ADEQUATE
PERMANENT OR TEMPORARY SUPPORT IS IN PLACE. ALL EXISTING STRUCTURAL
MEMBERS SHALL BE ADEQUATELY PROTECTED, COORDINATE WITH STRUCTURAL
ENGINEER.
11. SEE STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR RELATED
DEMOLITION AND PREP WORK.
12. WALL AND CEILING MOUNTED ITEMS SHOWN DASHED, SUCH AS WALL CABINETS,
SHELVING, CUBICLE CURTAIN TRACKS, PROJECTION SCREENS ETC, SHALL BE
REMOVED, UNLESS NOTED OTHERWISE.
13. WITHIN ALL EXISTING ROOMS/SPACES RECEIVING SCHEDULED FLOOR, OR WALL,
OR CEILING FINISHES, REMOVE ALL EXISTING FLOOR, OR WALL, OR CEILING
FINISHES DOWN TO THE SUBSTRATE. INCLUDE THE REMOVAL OF ALL ITEMS
LOCATED WITHIN THE EXISTING FINISH REMOVALS UNO PATCH AND PREP ALL
SUBSTRATES TO RECEIVE SCHEDULED FINISHES. FOR ADDITIONAL INFORMATION,
SEE KEYNOTED ITEMS, FINISH PLANS AND/OR SCHEDULES, STRUCTURAL,
MECHANICAL AND ELECTRICAL.
DEMOLITION PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
DE1 REMOVE EXISTING ROOM IDENTIFICATION SIGN AND SALVAGE FOR
REINSTALLATION
DE2 REMOVE FLOOR FINISH AND BASE IN IT'S ENTIRITY AND PREP FLOOR FOR
NEW FINISH
DE3 REMOVE EXISTING DOOR, FRAME AND HARDWARE
DE4 REMOVE EXISTING JCI PANEL AND SALVAGE FOR REUSE. REFER TO MECH
DRAWINGS FOR ADDITIONAL INFORMATION
DE5 REMOVE EXISTING CASEWORK INCLUDING COUNTERTOP, WALL & BASE
CABINETS AND ASSOICATED BRACKETS
DE6 REMOVE EXISTING CABINETS AND ALL ASSOCIATED SUPPORTS
DE7 REMOVE EXISTING SHELVES AND ALL ASSOCIATED SUPPORTS
DE8 REMOVE EXISTING SCRUB SINK
DE9
TEMPORARILY REMOVE STAINLESS STEEL SHELF, PAPER TOWEL HOLDER
AND SOAP DISPENSOR, SALVGE FOR REUSE EXISTING STAINLESS SHELF
TO REMAIN
DE10 NOT USED
DE11
REMOVE EXISTING GYPSUM BOARD TO EXPOSE FRAMING FOR MEP WORK.
REFER TO MECHANICAL/PLUMBING/ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION
DE12 REMOVE STAINLESS STEEL CORNER GUARDS FOR NEW CONSTRUCTION
AND/OR NEW FINISHES
DE13 REMOVE EXISTING EYEWASH STATION. REFER TO PLUMBING DRAWINGS
FOR ADDITIONAL INFOMATION
DE14
REMOVE EXISTING GYPSUM BOARD EACH SIDE OF ROUGH OPENING TO
INSTALL REINFORCED STEEL ANGLE SUPPORT FOR DOOR AND HEADER
FOR DOOR. SEE DETAILS AND/1 AE601 /2 AE601
DE15 REMOVE EXISTING SHUT-OFF SWITCHS FOR RELOCATE. REFER TO
ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION
DE16 REMOVE EXISTING SHELVES AND STORAGE BINS TO RETURN OWNERS
STOCK
DE17 REMOVE AND SALVAGE EXISTING LEAD APRON RACKS FOR REINSTALL
DEMOLITION PLAN SYMBOLS
EXISTING WALL TO
REMAIN
WALL OR
PARTITION TO BE
REMOVED
EXISTING DOOR
AND FRAME TO
REMAIN
KEY NOTE
A
GRIDLINE
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
EXISTING DOOR
AND FRAME TO BE
DEMOLISHED
DASHED LINE
INDICATES ITEM TO
BE REMOVED (UNO)
DE10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCTION DOCUMENTS
C U s e rs
\p c h o i\ D o c u m e n ts \1
U p g ra d e
C a th L a b
R
Y e u n y o u n g
.r v t
/2
/2
:2
:2
P
M
AD131
THIRD LEVEL DEMOLITION PLAN UPGRADE CATH LAB #4
VA Minneapolis Health Care System
618-CSI-230
BUILDING 70
01/31/2025 JU PC
17179
0 4' 8'2'
1/4" = 1'-0"1 THIRD LEVEL - DEMOLITION PLAN
Revisions: Date:
Name
Date Reg. No.
Jason R. Gottwalt, P.E.
41360
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.
e or under my direct Licensed Architect Minnesota.
3J-139
TEMP.
STORAGE
3J-139A
TOILET
C3-84
SUITE
PASSAGEWAY
3J-143
SCRUB
3J-143D
SINK ROOM
3J-140A
EQUIPMENT
3J-140
CATH LAB
#4
1'-7"
DC1
DC3
DC2
DC3
DC4
DC5
DC4
DC6
DC7
TEMP
CONSTRUCTION
WALL
DC8
DC8
3J-143
CATH LAB #3
3H-111
3H-110
CONSULT
C3-63
CORRIDOR
STAIR
3J-142A
EQUIP
3J-141
SUPPLY
DEMOLITION RCP KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
DC1 REMOVE ACT AND GRID IN IT'S ENTIRITY
DC2 EXISTING ACT TO REMAIN
DC3 EXISTING GYPSUM BOARD CEILING TO REMAIN
DC4 REMOVE PORTION OF EXISITNG GYPSUM BOARD CEILING
DC5 REMOVE EXISITNG GYPSUM BOARD SOFFIT
DC6 EQUIPMENT VENDOR TO REMOVE EQUIPMENT C-ARM AND CEILING
MOUNTED TRACKS, EXISTING UNISTRUCT TO REMAIN
DC7 REMOVE DIFFUSER, SEE MECH DRAWINGS FOR ADDITIONAL INFORMATION
DC8 TEMPORARLY MODIFY EXISTING CEILING TILE AND GRID FOR
CONSTRUCTION BARRIER WALL
DEMOLITION GENERAL NOTES
1. GENERAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK, PHASING
AND SEQUENCING WITH THE OWNER. ANY INFORMATION REGARDING SEQUENCING
PROVIDED IN THESE DOCUMENTS IS FOR ARCHITECT - OWNER PLANNING
PURPOSES ONLY, UNLESS NOTED OTHERWISE.
2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH ALL
TRADES FOR THE DEMOLITION WORK REQUIRED FOR THIS PROJECT.
3. WHERE PARTITIONS ARE INDICATED TO BE REMOVED, REMOVE PARTITION ALONG
WITH ALL ITEMS CONTAINED WITHIN, INCLUDING DOORS, FRAMES, HARDWARE,
SIDELIGHTS, WINDOWS, MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. TO
STRUCTURE ABOVE, UNLESS NOTED OTHERWISE.
4. WHERE FLOOR FINISH IS INDICATED TO BE DEMOLISHED, REMOVE FINISH TO
FLOOR SLAB AS REQUIRED AND PREPARE SLAB SURFACE FOR SCHEDULED
FINISHES WITHIN AREA TO BE REMODELED, UNLESS NOTED OTHERWISE. SEE FINISH
SCHEDULE FOR EXISTING FLOOR FINISHES TO REMAIN UNDISTURBED.
5. WHERE CEILING IS INDICATED TO BE DEMOLISHED, REMOVE CEILING SUSPENSION
SYSTEM ALONG WITH ALL ASSOCIATED MECHANICAL AND ELECTRICAL ITEMS,
UNLESS NOTED OTHERWISE. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
EXTENT OF CONDUIT, PIPING AND DUCTWORK DEMOLITION WITHIN AREA TO BE
REMODELED.
6. WHERE INDICATED, REMOVE ALL WALL/PARTITION EXISTING FINISHES AND
PREPARE THE SURFACES FOR SCHEDULED FINISHES, SEE FINISH SCHEDULE FOR
FINISHES.
7. ALL DISTURBED AREAS, WALLS, PARTITIONS, FLOORS, ETC, DAMAGED BY
DEMOLITION WORK SHALL BE PATCHED TO MATCH ADJACENT AREA.
8. OWNER RESERVES THE RIGHT OF FIRST REFUSAL OF ALL SALVAGED ITEMS SUCH
AS: DOORS, LIGHT FIXTURES, PLUMBING FIXTURES ETC.
9. SALVAGED ITEMS SCHEDULED FOR REUSE SHALL BE CLEANED, RESTORED AND/OR
REFINISHED TO LIKE NEW CONDITION, UNLESS NOTED OTHERWISE.
10. DO NOT REMOVE ANY EXISTING STRUCTURAL SUPPORT MEMBERS SUCH AS
COLUMNS, BEAMS, JOISTS, LOAD-BEARING PARTITIONS ETC, UNTIL ADEQUATE
PERMANENT OR TEMPORARY SUPPORT IS IN PLACE. ALL EXISTING STRUCTURAL
MEMBERS SHALL BE ADEQUATELY PROTECTED, COORDINATE WITH STRUCTURAL
ENGINEER.
11. SEE STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR RELATED
DEMOLITION AND PREP WORK.
12. WALL AND CEILING MOUNTED ITEMS SHOWN DASHED, SUCH AS WALL CABINETS,
SHELVING, CUBICLE CURTAIN TRACKS, PROJECTION SCREENS ETC, SHALL BE
REMOVED, UNLESS NOTED OTHERWISE.
13. WITHIN ALL EXISTING ROOMS/SPACES RECEIVING SCHEDULED FLOOR, OR WALL,
OR CEILING FINISHES, REMOVE ALL EXISTING FLOOR, OR WALL, OR CEILING
FINISHES DOWN TO THE SUBSTRATE. INCLUDE THE REMOVAL OF ALL ITEMS
LOCATED WITHIN THE EXISTING FINISH REMOVALS UNO PATCH AND PREP ALL
SUBSTRATES TO RECEIVE SCHEDULED FINISHES. FOR ADDITIONAL INFORMATION,
SEE KEYNOTED ITEMS, FINISH PLANS AND/OR SCHEDULES, STRUCTURAL,
MECHANICAL AND ELECTRICAL.
DEMOLITION PLAN SYMBOLS
EXISTING WALL TO
REMAIN
WALL OR
PARTITION TO BE
REMOVED
EXISTING DOOR
AND FRAME TO
REMAIN
KEY NOTE
A
GRIDLINE
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
EXISTING DOOR
AND FRAME TO BE
DEMOLISHED
DASHED LINE
INDICATES ITEM TO
BE REMOVED (UNO)
DE10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .