Factor 2 - Key Personnel Qualifications Resumes.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Z1DA--640-13-134 PAD Hybrid Cath Lab OR Upgrades
Solicitation number
36C26121R0079
Issued by

About this file

This document package includes a federal contract opportunity and key personnel resume requirements file. The federal contract opportunity is a pre-solicitation notice for a project to complete construction of a new Catheterization Laboratory Hybrid Operating Room Suite and install a rooftop air handling unit at the VA Palo Alto Health Care System campus in Palo Alto, California. The project value is between $5-10 million. The period of performance is 365 days from notice to proceed. The solicitation is anticipated to be issued in November 2021 under NAICS code 236220 with a small business size standard of $39.5 million. Offerors must be registered in SAM and have an active ORCA registration by the solicitation due date and award date. The key personnel resumes file provides templates for offerors to submit resumes and project experience for proposed project manager, superintendent, quality control manager/team, and quality control/subject matter expert team members to address their qualifications.

View the file

Other files

File Type Posted
C01 - Award Notice - 36C26122C0022.pdf PDF
S06 - 36C26121R0079 - Amendment 0009.pdf PDF
S06 - 36C26121R0079 - 0009 - RFI 5 - Reissued AS601 for Correct Door Hardware Sets.pdf PDF
S06 - 36C26121R0079 - Amendment 0008.pdf PDF
S06 - 36C26121R0079 - Amendment 0007 - 2nd site visit sign-in.pdf PDF
S06 - 36C26121R0079 - Amendment 0007.pdf PDF
S06 - 36C26121R0079 - Amendment 0006.pdf PDF
S06 - 36C26121R0079 - Amendment 0006 - RFI 3 - 140602 Cath Lab Lead Shielding Modification Certification.pdf PDF
S06 - 36C26121R0079 - Amendment 0006 - RFI 3 - 140530 Lead Shielding Protective Barrier Recommendations.pdf PDF
S06 - 36C26121R0079 - Amendment 0005.docx DOCX document
S06 - 36C26121R0079 - Amendment 0004.docx DOCX document
S06 - 36C26121R0079 - Amendment 0003.docx DOCX document
S06 - 36C26121R0079 - Amendment 0003 - site visit sign-in sheet - 11-30-2021.pdf PDF
S06 - 36C26121R0079 - Amendment 0002.docx DOCX document
S06 - 36C26121R0079 - Amendment 0001.docx DOCX document
Cath Lab Spec Vol 1 2021_0423_.pdf PDF
RFP Presentation_VAPA Cath_211130.pdf PDF
640-13-134 Bid Set combined_.pdf PDF
Cath Lab Spec Vol 2 2021_0423_.pdf PDF
S02 - Exhibit A - QC Section 014500.pdf PDF
S02 - Exhibit B - QC Plan Review Checklist.pdf PDF
Factor 5 - Attachment B - Past Performance Questionnaire.docx DOCX document
S02 - Government Furnished Property List.pdf PDF
S02 - Large Business Subcontracting Plan Template.docx DOCX document
S02 - Small Business Participation Plan Template.docx DOCX document
Factor 5 - Attachment D - Sample Client Authorization Letter.docx DOCX document
Factor 5 - Attachment C - Consent Letter.docx DOCX document
S02 - DOL Wage Determination - CA20210018 - 10292021 - Santa Clara County.pdf PDF
Factor 1 - Prime Contractor Project Experience.xlsx XLSX spreadsheet
S02 - Solicitation 36C26121R0079 - FINAL.docx DOCX document
S02 - Name Brand Requirements List.pdf PDF
S02 - Request for Information (RFI) Form - 36C26121R0079.docx DOCX document
S02 - Construction Documents Bid Set 2 - DRAFT.pdf PDF
S02 - Construction Documents Bid Set 3 - DRAFT.pdf PDF
S02 - Cath Lab Spec Vol 1 20210115 - DRAFT.pdf PDF
S02 - Cath Lab Spec Vol 2 20210115 - DRAFT.pdf PDF
S02 - Construction Documents Bid Set 1 - DRAFT.pdf PDF
36C26121R0079_2.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANAGER

RFP # 36C26121R0079FACTOR # 2: KEY PERSONNEL RESUMES
PAD Hybrid OR Suite Construction Project

State Prime Contractor Name:

PROJECT MANAGER Complete all fields with sufficient detail.

PROJECT MANAGERProvide Response Here
Name:
Name of Firm, Position held, Dates of Employment:
Number of Years with other Firms, Position held, dates of employment:
Educational Background: (Year, Degree, Specialization, Name of U.S. Accredited University)
Current Employee of Prime Contractor? YES or NO. If no, include a Letter of Commitment stating this person will become an employee of Prime Contractor prior to issuance of Notice to Proceed.
Professional Registration (if any): (Year, State, Discipline)
Training Course Completed: (COE construction quality management, Safety, etc.)
State specific Safety Compliance and Sustainability training (type, dates completed), credentials (type, date completed), etc.:

Provide up to two (2) completed construction projects for Project Manager that are relevant in scope and complexity to this project and completed within last 6 years. If Project Manager has not worked on at least one relevant completed construction project within the last 6 years, provide a narrative explaining why/how this person is qualified and/or how your firm will mitigate performance risk with respect to this Key Personnel.

PROJECT 1:Provide Narrative Here
Contract No:
Title:
Contract Amount:
Contract Start/Completion Date:
Role in Project (PM, Sup, QC, Safety):
Relevant Work Experience (should include construction experience of Cardiovascular Catherization Imaging Laboratories, EP Laboratories, Interventional Radiology and Vascular Surgery Suites including radiation protection of said procedure rooms, suites, surgical operatories:
PROJECT 2:Provide Narrative Here
Contract No:
Title:
Contract Amount:
Contract Start/Completion Date:
Role in Project (PM, Sup, QC, Safety):
Relevant Work Experience (should include construction experience of Cardiovascular Catherization Imaging Laboratories, EP Laboratories, Interventional Radiology and Vascular Surgery Suites including radiation protection of said procedure rooms, suites, surgical operatories:

SUPERINTENDENT

RFP # 36C26121R0079FACTOR # 2: KEY PERSONNEL RESUMES
PAD Hybrid OR Suite Construction Project

State Prime Contractor Name:

SUPERINTENDENT Complete all fields with sufficient detail.

PROJECT SUPERINTENDENTProvide Response Here
Name:
Name of Firm, Position held, Dates of Employment:
Number of Years with other Firms, Position held, dates of employment:
Educational Background: (Year, Degree, Specialization, Name of U.S. Accredited University)
Current Employee of Prime Contractor? YES or NO. If no, include a Letter of Commitment stating this person will become an employee of Prime Contractor prior to issuance of Notice to Proceed.
Professional Registration (if any): (Year, State, Discipline)
Training Course Completed: (COE construction quality management, Safety, etc.)
State specific Safety Compliance and Sustainability training (type, dates completed), credentials (type, date completed), etc.:

Provide up to two (2) completed construction projects for Superintendent that are relevant in scope and complexity to this project and completed within last 6 years. If Superintendent has not worked on at least one relevant completed construction project within the last 6 years, provide a narrative explaining why/how this person is qualified and/or how your firm will mitigate performance risk with respect to this Key Personnel.

PROJECT 1:Provide Narrative Here
Contract No:
Title:
Contract Amount:
Contract Start/Completion Date:
Role in Project (PM, Sup, QC, Safety):
Relevant Work Experience (should include construction experience of Cardiovascular Catherization Imaging Laboratories, EP Laboratories, Interventional Radiology and Vascular Surgery Suites including radiation protection of said procedure rooms, suites, surgical operatories:
PROJECT 2:Provide Narrative Here
Contract No:
Title:
Contract Amount:
Contract Start/Completion Date:
Role in Project (PM, Sup, QC, Safety):
Relevant Work Experience (should include construction experience of Cardiovascular Catherization Imaging Laboratories, EP Laboratories, Interventional Radiology and Vascular Surgery Suites including radiation protection of said procedure rooms, suites, surgical operatories:

QC MANAGER or TEAM

RFP # 36C26121R0079FACTOR # 2: KEY PERSONNEL RESUMES
PAD Hybrid OR Suite Construction Project

State Prime Contractor Name:

QUALITY CONTROL (QC) MANAGER / TEAM*Complete all fields with sufficient detail.
*If you are proposing to utilize a QC Manager who is also the Subject Matter Specialist (SMS), complete the section below for QC Manager only. If you are proposing to utilize a QC Manager who will utilize a separate SMS for this project, complete the section below for QC Manager as well as the section for "QC/SMS Team Member" (below) for each QC/SMS member who will assist the QC Manager for this project.
QC MANAGERProvide Response Here
Name:
Name of Firm, Position held, Dates of Employment:
Number of Years with other Firms, Position held, dates of employment:
Educational Background: (Year, Degree, Specialization, Name of U.S. Accredited University)
Current Employee of Prime Contractor? YES or NO. If no, include a Letter of Commitment stating this person will become an employee of Prime Contractor prior to issuance of Notice to Proceed.
Professional Registration (if any): (Year, State, Discipline). Should include registered architect, professional engineer and/or any professional individual within the healthcare industry that has knowledge and experience in the construction of catheterization laboratories/hybrid operating rooms and/or endovascular suites:
Training Course Completed: (COE construction quality management, Safety, etc.)
State specific Safety Compliance and Sustainability training (type, dates completed), credentials (type, date completed), etc.:

Provide up to two (2) completed construction projects for QC Manager that are relevant in scope and complexity to this project and completed within last 6 years. If QC Manager has not worked on at least one relevant completed construction project within the last 6 years, provide a narrative explaining why/how this person is qualified and/or how your firm will mitigate performance risk with respect to this Key Personnel.

PROJECT 1:Provide Narrative Here
Contract No:
Title:
Contract Amount:
Contract Start/Completion Date:
Role in Project (PM, Sup, QC, Safety):
Relevant Work Experience (should include construction experience of Cardiovascular Catherization Imaging Laboratories, EP Laboratories, Interventional Radiology and Vascular Surgery Suites including radiation protection of said procedure rooms, suites, surgical operatories:
PROJECT 2:Provide Narrative Here
Contract No:
Title:
Contract Amount:
Contract Start/Completion Date:
Role in Project (PM, Sup, QC, Safety):
Relevant Work Experience (should include construction experience of Cardiovascular Catherization Imaging Laboratories, EP Laboratories, Interventional Radiology and Vascular Surgery Suites including radiation protection of said procedure rooms, suites, surgical operatories:

NOTE: The SMS team members shall have knowledge and experience in the construction of Complex Integrated Surgical Platforms. Examples of such experience include: 1) Complex Tertiary Quaternary/Academic Hospitals; 2) Integrated Interventional Surgical Suites, 3) Hybrid OR utilizing the following modality technology: Bi-Plane OR and Endovascular Suites; Monoplane OR and Endovascular Suites; Robotic OR and Endovascular Suites (Pheno and IGS 730/740).

QC/SMS Team Member (if applicable)Provide Response Here
Name:
Proposed Assignment to this Project:
Name of Firm, Position held, Dates of Employment:
Number of Years with other Firms, Position held, dates of employment:
Educational Background: (Year, Degree, Specialization, Name of U.S. Accredited University)
Current Employee of Prime Contractor? YES or NO. If no, include a Letter of Commitment stating this person will become an employee of Prime Contractor prior to issuance of Notice to Proceed.
Professional Registration (if any): (Year, State, Discipline). Should include registered architect, professional engineer and/or any professional individual within the healthcare industry that has knowledge and experience in the construction of catheterization laboratories/hybrid operating rooms and/or endovascular suites:
Training Course Completed: (COE construction quality management, Safety, etc.)
State specific Safety Compliance and Sustainability training (type, dates completed), credentials (type, date completed), etc.:

Provide up to two (2) completed construction projects for QC/SMS Team Member that are relevant in scope and complexity to this project and completed within last 6 years. If QC/SMS team member has not worked on at least one relevant completed construction project within the last 6 years, provide a narrative explaining why/how this person is qualified and/or how your firm will mitigate performance risk with respect to this Key Personnel.

PROJECT 1:Provide Narrative Here
Contract No:
Title:
Contract Amount:
Contract Start/Completion Date:
Role in Project (PM, Sup, QC, Safety):
Relevant Work Experience (should include construction experience of Cardiovascular Catherization Imaging Laboratories, EP Laboratories, Interventional Radiology and Vascular Surgery Suites including radiation protection of said procedure rooms, suites, surgical operatories:
PROJECT 2:Provide Narrative Here
Contract No:
Title:
Contract Amount:
Contract Start/Completion Date:
Role in Project (PM, Sup, QC, Safety):
Relevant Work Experience (should include construction experience of Cardiovascular Catherization Imaging Laboratories, EP Laboratories, Interventional Radiology and Vascular Surgery Suites including radiation protection of said procedure rooms, suites, surgical operatories:
QC/SMS Team Member (if applicable)Provide Response Here
Name:
Proposed Assignment to this Project:
Name of Firm, Position held, Dates of Employment:
Number of Years with other Firms, Position held, dates of employment:
Educational Background: (Year, Degree, Specialization, Name of U.S. Accredited University)
Current Employee of Prime Contractor? YES or NO. If no, include a Letter of Commitment stating this person will become an employee of Prime Contractor prior to issuance of Notice to Proceed.
Professional Registration (if any): (Year, State, Discipline). Should include registered architect, professional engineer and/or any professional individual within the healthcare industry that has knowledge and experience in the construction of catheterization laboratories/hybrid operating rooms and/or endovascular suites:
Training Course Completed: (COE construction quality management, Safety, etc.)
State specific Safety Compliance and Sustainability training (type, dates completed), credentials (type, date completed), etc.:

Provide up to two (2) completed construction projects for QC/SMS Team Member that are relevant in scope and complexity to this project and completed within last 6 years. If QC/SMS team member has not worked on at least one relevant completed construction project within the last 6 years, provide a narrative explaining why/how this person is qualified and/or how your firm will mitigate performance risk with respect to this Key Personnel.

PROJECT 1:Provide Narrative Here
Contract No:
Title:
Contract Amount:
Contract Start/Completion Date:
Role in Project (PM, Sup, QC, Safety):
Relevant Work Experience (should include construction experience of Cardiovascular Catherization Imaging Laboratories, EP Laboratories, Interventional Radiology and Vascular Surgery Suites including radiation protection of said procedure rooms, suites, surgical operatories:
PROJECT 2:Provide Narrative Here
Contract No:
Title:
Contract Amount:
Contract Start/Completion Date:
Role in Project (PM, Sup, QC, Safety):
Relevant Work Experience (should include construction experience of Cardiovascular Catherization Imaging Laboratories, EP Laboratories, Interventional Radiology and Vascular Surgery Suites including radiation protection of said procedure rooms, suites, surgical operatories: