7 Building Division Index.pdf

PDF 130 KB Posted

Attached to
H130--Amendment to Answer Questions for the Electrical Power Distribution System
Solicitation number
36C25925Q0292
Issued by

About this file

The document is a Building/Study Division Index for an electrical power distribution system project. The index details six tabs of technical drawings and reports covering multiple buildings, with a focus on electrical system documentation. Each tab is associated with specific drawing numbers (E-1 through E-6) and covers various electrical engineering reports, including:

  • Medium Voltage Distribution System documentation (Tab 1)
  • Low Voltage (LV) Momentary Reports
  • Equipment Duty Reports
  • Time Current Curves (TCCs) Coordination Reports
  • Arc Flash Hazard Reports

The index covers electrical system documentation for Buildings 1 (North and South), and multiple other buildings numbered 5, 6, 8, 9, 12, 13, 20, 33, 35, 36, 37, 39, and 45. Tab 7 contains oneline drawings for the entire set of electrical system documentation. This index appears to be part of the electrical testing and documentation for the Grand Junction VA Medical Center electrical power distribution system project.

View the file

Other files

File Type Posted
P09 - Final SOW 9 Sep 25.docx DOCX document
36C25925Q0292 0009.docx DOCX document
36C25925Q0292 0009_1.docx DOCX document
36C25925Q0292 0008_1.docx DOCX document
36C25925Q0292 0008.docx DOCX document
S02 36C25925Q0292 0007_1.docx DOCX document
36C25925Q0292 0007.docx DOCX document
36C25925Q0292 0005.docx DOCX document
36C25925Q0292 0005_1.docx DOCX document
36C25925Q0292 0004.docx DOCX document
P09 Final SOW.docx DOCX document
S02 36C25925Q0292 0003.docx DOCX document
36C25925Q0292 0003_1.docx DOCX document
36C25925Q0292 0002_1.docx DOCX document
36C25925Q0292 0002.docx DOCX document
2022 GJ VA Triennial Electrical Vol2.pdf PDF
20220911 Electrical One Line Diagram Final.pdf PDF
6b Disclaimer.pdf PDF
4c TCC Finding and Observations.pdf PDF
4b Coordination Study Reports Interpretation.pdf PDF
3d Equipment Duty Reports Findings.pdf PDF
3b Short Circuit LV Monentary Report Interpretation.pdf PDF
3a Short Circuit Study Opening Section.pdf PDF
2 Executive Summary.pdf PDF
36C25925Q0292 0001.docx DOCX document
2022 GJ VA Combined Triennial Electrical Report.pdf PDF
4a Coordination Study Opening Section.pdf PDF
6a Glossary of Terms.pdf PDF
5b Arc Flash Concepts.pdf PDF
3c Short Circuit Equipment Duty Interpretation.pdf PDF
0 Grand Junction VA Table of Contents Vol 1.pdf PDF
5c Arc Flash Study Reports Interpretation.pdf PDF
5a Arc Flash Study Opening Section.pdf PDF
1 Introduction.pdf PDF
36C25925Q0292 0001_1_01.docx DOCX document
S02_ 36C25925Q0292_1.docx DOCX document
36C25925Q0292.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building / Study Division Index

TAB Drawing No. / Buildings

1 E-1 --- MV (Medium Voltage Distribution System) HV Momentary Report HV Interruption Report Equipment Duty TCCs Coordination Report

Arc Flash Hazard Report Time Current Curves (TCCs)

2 E-2 Bldg 1 North LV Momentary Report Equipment Duty Report

TCCs Coordination Report Arc Flash Hazard Report Oneline refer to TAB 7

3 E-3 Bldg 1 South, 20 Same as Tab #2

4 E-4 Bldg 1,39,45 Same as Tab #2

5 E-5 Bldg 5, 6, 8, 12, 13, 33, 35, 36, 37 Same as Tab #2

6 E-6 Bldg 9 Same as Tab #2

7 Oneline Drawings E-1 thru E-6

(Drawings in Pockets)

File details come from the government source that posted it. Updated .