36C25925Q0292 0001_1_01.docx

DOCX document 122 KB Posted

Attached to
H130--Amendment to Answer Questions for the Electrical Power Distribution System
Solicitation number
36C25925Q0292
Issued by

About this file

This document is an Amendment to a Solicitation for Electrical Power Distribution System Testing at the Grand Junction Veterans Affairs Medical Center (VAMC) in Colorado. The amendment extends the offer submission deadline to April 18, 2025, at 10:00 AM MDT, and provides responses to contractor questions. Key details include performing triennial services in May, with flexibility for scheduling annual and semi-annual services while avoiding summer months. The solicitation requires comprehensive electrical system inspection, testing, and surveying, covering components such as transformers, distribution boxes, automatic transfer switches, and panels. Attached documents include detailed diagrams, one-line electrical drawings, power system studies, and a comprehensive inventory of electrical distribution system components. The procurement is being conducted by the Department of Veterans Affairs Network Contracting Office (NCO) 19, located in Greenwood Village, Colorado, with offers to be submitted via email to crystal.volmar@va.gov.

View the file

Other files

File Type Posted
36C25925Q0292 0009_1.docx DOCX document
36C25925Q0292 0009.docx DOCX document
P09 - Final SOW 9 Sep 25.docx DOCX document
36C25925Q0292 0008.docx DOCX document
36C25925Q0292 0008_1.docx DOCX document
36C25925Q0292 0007.docx DOCX document
S02 36C25925Q0292 0007_1.docx DOCX document
36C25925Q0292 0005.docx DOCX document
36C25925Q0292 0005_1.docx DOCX document
36C25925Q0292 0004.docx DOCX document
36C25925Q0292 0003_1.docx DOCX document
S02 36C25925Q0292 0003.docx DOCX document
P09 Final SOW.docx DOCX document
36C25925Q0292 0002_1.docx DOCX document
36C25925Q0292 0002.docx DOCX document
20220911 Electrical One Line Diagram Final.pdf PDF
2022 GJ VA Triennial Electrical Vol2.pdf PDF
2022 GJ VA Combined Triennial Electrical Report.pdf PDF
5c Arc Flash Study Reports Interpretation.pdf PDF
36C25925Q0292 0001.docx DOCX document
3b Short Circuit LV Monentary Report Interpretation.pdf PDF
4a Coordination Study Opening Section.pdf PDF
1 Introduction.pdf PDF
5a Arc Flash Study Opening Section.pdf PDF
3a Short Circuit Study Opening Section.pdf PDF
6b Disclaimer.pdf PDF
4c TCC Finding and Observations.pdf PDF
2 Executive Summary.pdf PDF
4b Coordination Study Reports Interpretation.pdf PDF
3d Equipment Duty Reports Findings.pdf PDF
5b Arc Flash Concepts.pdf PDF
3c Short Circuit Equipment Duty Interpretation.pdf PDF
6a Glossary of Terms.pdf PDF
7 Building Division Index.pdf PDF
0 Grand Junction VA Table of Contents Vol 1.pdf PDF
36C25925Q0292.docx DOCX document
S02_ 36C25925Q0292_1.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment - Q&A Solicitation # 36C25925Q0292

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

36C259-25-AP-5297

575-25-1-6043-0004

36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111

36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders

36C25925Q0292 04-04-2025

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 04-18-2025 10:00 AM MDT See CONTINUATION Page x The purpose of this amendment is to:

Answers to questions received within the deadline are found on page 2 and all 19 pdf files attached.

Due to the question-and-answer amendment the submittal due date for all offers has been extended and must be received via email to crystal.volmar@va.gov no later than Friday April 18, 2025, at 10:00am MST.

CONTINUATION PAGE

ALSO SEE ATTACHMENT(S)

Answers in Blue

1. Could you please provide a single diagram or a detailed list of the devices at building sites (especially the relays) mentioned in the RFQ? Information is attached.

1. The Tri-annual Services will be performed in May. Can you specify which months the Annual and Semi-Annual services will be performed? Triennial is due every 36 months in May and the vendors can use this information to coordinate annual and semi-annual services. Otherwise, the contractor can choose consistent intervals but should avoid summer months.

1. For the base year and Year 3, is it possible to combine the Semi-Annual and Tri-Annual services into one trip? This was my thought for the base year and the following Triennial years. One of the annual inspections would also be an opportunity to complete the semi-annual requirements.

1. One-line and other informational drawings of the Electrical Power Distribution System. Information is attached.

1. Available Electrical Power System study information relevant to the scope of this effort, such as coordination study data, short-circuit analysis, arc-flash hazard analysis and available protective device setting information Triennial attached is the most comprehensive list available.

1. Prior Triennial Electrical Survey. Information is attached.

1. Excel format inventory of Electrical Power Distribution System components to be maintained, inspected, and tested under this Scope of Work. Numbers of transformers, distribution boxes, ATS, ATO, panels, etc are listed in the SOW and should be reflected in the previous survey / one lines. This list is comprehensive and should only have minor discrepancies. The VA expects the entire system to be inspected, tested and surveyed.

All Reports and Diagrams are attached as pdf

Page 1 of

File details come from the government source that posted it. Updated .