3d Equipment Duty Reports Findings.pdf

PDF 351 KB Posted

Attached to
H130--Amendment to Answer Questions for the Electrical Power Distribution System
Solicitation number
36C25925Q0292
Issued by

About this file

The document is an Equipment Duty Reports - Finding report detailing equipment status across multiple buildings and systems. The report breaks down equipment violations and warnings for six different areas: E-1 (Medium Voltage Distribution System), E-2 (Building 1 North), E-3 (Building 1 South, 20), E-4 (Building 1, 39, 45), E-5 (Buildings 5, 6, 8, 12, 13, 33, 35, 36, 37), and E-6 (Building 9). Most notable are Buildings 1 North and 1 South, which have the highest number of equipment in violations (18 each), with Building 1 North also having 13 equipment items in warning status. The report appears to be part of an electrical power distribution system testing assessment for the Grand Junction VA Medical Center, indicating a comprehensive review of equipment condition and potential maintenance needs.

View the file

Other files

File Type Posted
P09 - Final SOW 9 Sep 25.docx DOCX document
36C25925Q0292 0009.docx DOCX document
36C25925Q0292 0009_1.docx DOCX document
36C25925Q0292 0008_1.docx DOCX document
36C25925Q0292 0008.docx DOCX document
S02 36C25925Q0292 0007_1.docx DOCX document
36C25925Q0292 0007.docx DOCX document
36C25925Q0292 0005.docx DOCX document
36C25925Q0292 0005_1.docx DOCX document
36C25925Q0292 0004.docx DOCX document
P09 Final SOW.docx DOCX document
S02 36C25925Q0292 0003.docx DOCX document
36C25925Q0292 0003_1.docx DOCX document
36C25925Q0292 0002_1.docx DOCX document
36C25925Q0292 0002.docx DOCX document
2022 GJ VA Triennial Electrical Vol2.pdf PDF
20220911 Electrical One Line Diagram Final.pdf PDF
6b Disclaimer.pdf PDF
4c TCC Finding and Observations.pdf PDF
4b Coordination Study Reports Interpretation.pdf PDF
3b Short Circuit LV Monentary Report Interpretation.pdf PDF
3a Short Circuit Study Opening Section.pdf PDF
2 Executive Summary.pdf PDF
36C25925Q0292 0001.docx DOCX document
2022 GJ VA Combined Triennial Electrical Report.pdf PDF
4a Coordination Study Opening Section.pdf PDF
7 Building Division Index.pdf PDF
6a Glossary of Terms.pdf PDF
5b Arc Flash Concepts.pdf PDF
3c Short Circuit Equipment Duty Interpretation.pdf PDF
0 Grand Junction VA Table of Contents Vol 1.pdf PDF
5c Arc Flash Study Reports Interpretation.pdf PDF
5a Arc Flash Study Opening Section.pdf PDF
1 Introduction.pdf PDF
36C25925Q0292 0001_1_01.docx DOCX document
S02_ 36C25925Q0292_1.docx DOCX document
36C25925Q0292.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Equipment Duty Reports - Finding

E-1 --- MV (Medium Voltage Distribution System)

Number of equipment in Violations - 0

Number of equipment in Warning - 0

E-2 Bldg 1 North

Number of equipment in Violations - 18

Number of equipment in Warning - 13

E-3 Bldg 1 South, 20

Number of equipment in Violations - 18

Number of equipment in Warning - 4

E-4 Bldg 1,39,45

Number of equipment in Violations - 6

Number of equipment in Warning - 0

E-5 Bldg 5, 6, 8, 12, 13, 33, 35, 36, 37

Number of equipment in Violations - 10

Number of equipment in Warning - 0

E-6 Bldg 9

Number of equipment in Violations - 8

Number of equipment in Warning - 1

File details come from the government source that posted it. Updated .