4c TCC Finding and Observations.pdf

PDF 370 KB Posted

Attached to
H130--Amendment to Answer Questions for the Electrical Power Distribution System
Solicitation number
36C25925Q0292
Issued by

About this file

This document is a Time-Current Curves (TCC) Findings and Observations report for electrical systems at various buildings, likely part of the Grand Junction VA Medical Center. The report identifies multiple electrical protection and coordination issues across different building sections, including E-1 Medium Voltage Distribution System, E-2 Building 1 North, E-3 Building 1 South, E-4 Buildings 1, 5, 6, 8, 12, 13, 33, 35, 36, 37, and E-5 Building 9. Key findings include: transformer primary fuses not completely protecting transformers in the thermal range, low voltage breakers failing to achieve selective coordination in the instantaneous region, and ground relay configuration problems that could potentially de-energize entire systems during downstream ground faults. The report recommends specific actions such as increasing transformer primary fuse sizes, adding ground fault relaying to feeder breakers, and further investigating protective device coordination to improve electrical system safety and reliability.

View the file

Other files

File Type Posted
P09 - Final SOW 9 Sep 25.docx DOCX document
36C25925Q0292 0009_1.docx DOCX document
36C25925Q0292 0009.docx DOCX document
36C25925Q0292 0008_1.docx DOCX document
36C25925Q0292 0008.docx DOCX document
S02 36C25925Q0292 0007_1.docx DOCX document
36C25925Q0292 0007.docx DOCX document
36C25925Q0292 0005.docx DOCX document
36C25925Q0292 0005_1.docx DOCX document
36C25925Q0292 0004.docx DOCX document
P09 Final SOW.docx DOCX document
S02 36C25925Q0292 0003.docx DOCX document
36C25925Q0292 0003_1.docx DOCX document
36C25925Q0292 0002_1.docx DOCX document
36C25925Q0292 0002.docx DOCX document
2022 GJ VA Triennial Electrical Vol2.pdf PDF
20220911 Electrical One Line Diagram Final.pdf PDF
6b Disclaimer.pdf PDF
4b Coordination Study Reports Interpretation.pdf PDF
3d Equipment Duty Reports Findings.pdf PDF
3b Short Circuit LV Monentary Report Interpretation.pdf PDF
3a Short Circuit Study Opening Section.pdf PDF
2 Executive Summary.pdf PDF
36C25925Q0292 0001.docx DOCX document
7 Building Division Index.pdf PDF
6a Glossary of Terms.pdf PDF
5b Arc Flash Concepts.pdf PDF
3c Short Circuit Equipment Duty Interpretation.pdf PDF
0 Grand Junction VA Table of Contents Vol 1.pdf PDF
2022 GJ VA Combined Triennial Electrical Report.pdf PDF
4a Coordination Study Opening Section.pdf PDF
5c Arc Flash Study Reports Interpretation.pdf PDF
5a Arc Flash Study Opening Section.pdf PDF
1 Introduction.pdf PDF
36C25925Q0292 0001_1_01.docx DOCX document
S02_ 36C25925Q0292_1.docx DOCX document
36C25925Q0292.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Time-Current Curves (TCC) Finding and Observations

E-1 MV (Medium Voltage Distribution System)

TCC-1 – The Utility line fuse and VA’s ATO fuses do not obtain selectively coordinate.

In the event of a fault either set of fuses could open.

Transformer T-1 North primary fuses do not completely protect the transformer in the thermal range.

E-2 --- Bldg 1 North

TCC-1 thru 10- The transformer’s primary fuses do not completely protect the transformer in the thermal range.

The main breaker and the transformer’s primary fuses do not achieve selective coordination.

Low voltage breakers do not achieve selective coordination.

TCC-1G – Switchboard MSA main breaker is equipped with a ground relay. Typically the associated feeder breakers should be equipped with ground fault relaying too. In the present condition the main’s ground relay can trip for a downstream ground fault de-energizing everything fed by MSA. Feeder breakers with ground relaying would allow for a single feeder to be opened rather than the entire system.

E-3 --- Bldg 1 South, 20

TCC-1 thru 6 -- Low voltage breakers do not achieve selective coordination in the instantaneous region.

TCC-7 thru 10 – The transformer’s primary fuse do not completely protect the transformer in the thermal range.

Low voltage breakers do not achieve selective coordination in the instantaneous region.

E-4 --- Bldg 1, 39, 45

TCC-1 – The transformer’s primary fuses provide reasonable protection based on the thermal damage curve and selective coordinate with the secondary main breaker.

Low voltage breakers do not achieve selective coordination in the instantaneous region.

TCC-2 -- The transformer’s primary fuses provide reasonable protection based on the thermal damage curve and selective coordinate with the secondary main breaker.

TCC-3 --- Overall protective devices achieve reasonable selective coordination.

TCC-4 --- Consideration should be given to increasing the transformer’s primary fuse to a 65E. The present fuse does not coordinate with the secondary main breaker and encroaches on the instantaneous range of the low voltage breakers.

Low voltage breakers do not achieve selective coordination in the instantaneous region.

E-4 --- Bldg 5, 6, 8, 12, 13, 33, 35, 36, 37

TCC-1, 4, 5, and 6 – The transformer’s primary fuses do not completely protect the transformer in the thermal range.

Low voltage breakers do not achieve selective coordination in the instantaneous region.

TCC-2 – The transformer’s primary fuses do not completely protect the transformer in the thermal range.

TCC-3 - Overall protective devices achieve reasonable selective coordination.

E-5 --- Bldg 9

TCC-1 thru 6 - Low voltage breakers do not achieve selective coordination in the instantaneous region.

TCC-1G – Switchboard 9-ECP-2 main breaker is equipped with a ground relay.

Typically the associated feeder breakers should be equipped with ground fault relaying too. In the present condition the main’s ground relay can trip for a downstream ground fault de-energizing everything fed by 9-ECP-2. Feeder breakers with ground relaying would allow for a single feeder to be opened rather than the entire system.