VAAR 852.236-92.pdf
VAAR Clause PDF 80 KB Posted
- Solicitation number
- 36C25722B0027
About this file
This document provides a provision addressing additive or deductive bid line items for federal construction contracts. The provision establishes procedures for evaluating bids that include additive or deductive line items to determine the low offeror. It specifies that bids will be evaluated based on the aggregate amount for the base line item plus any additional line items that can be awarded within available funds, skipping line items that would exceed available funds. An example demonstrates how the low offeror would be determined by including the base bid and first and fourth additive line items, but skipping the second and third line items that would cause the aggregate bid to exceed available funds. The provision aims to standardize the treatment of additive or deductive line items in bids to establish the low offeror and combination of items that can be awarded within available funds for the project.
The related federal contract opportunity is a solicitation to replace four elevators at a Veterans Affairs medical center. It provides the solicitation number, name identifying the project location and scope of work, and identifies the opportunity type as a solicitation. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration for elevator replacement work under a project number. No further details are provided on response dates, award dates, pricing terms, set asides, incumbents or other salient information.
View the file
Other versions and copies of VAAR 852.236-92
Who attaches VAAR 852.236-92
Other files
| File | Type | Posted |
|---|---|---|
| 36C25722B0027 0011.docx | DOCX document | |
| 36C25722B0027 0010.docx | DOCX document | |
| 36C25722B0027 0009.docx | DOCX document | |
| Supplemental Information.pdf | ||
| 36C25722B0027 0008.docx | DOCX document | |
| 36C25722B0027 0007.docx | DOCX document | |
| IMG_0415.pdf | ||
| 36C25722B0027 0006.docx | DOCX document | |
| 36C25722B0027 0005.docx | DOCX document | |
| IMG_0416.jpg | JPG image | |
| 36C25722B0027 0004.docx | DOCX document | |
| Sign-in-Sheet Pre-Bid Site Visit.pdf | ||
| 36C25722B0027 0003.docx | DOCX document | |
| 36C25722B0027 0002.docx | DOCX document | |
| Door Controller DC1000 Data Sheet.pdf | ||
| Dwg 6 Cfig 6 Selective Elevator Monitor Inside of Elev Rev3.pdf | ||
| Pre Bid - Sign In Sheet.pdf | ||
| 36C25722B0027 0001.docx | DOCX document | |
| 36C25722B0027_2.docx | DOCX document | |
| VA AM Elevator Replacement 100 CD Specifications.pdf | ||
| VA AM Elevator Replacement 100 CD Drawings 04192022 SM.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
852.236-92 Notice to Bidders–Additive or Deductive Bid Line Items.
As prescribed in 836.580, insert the following provision:
NOTICE TO BIDDERS–ADDITIVE OR DEDUCTIVE BID LINE ITEMS (APR 2019)
(a) Additive or deductive line items in the bid schedule shall be evaluated to determine the low offeror and the items to be awarded. The evaluation shall be made as follows—
(1) Prior to the opening of bids, the Government will determine the amount of funds available for the project.
(2) The low bid shall be the Bidder that—
(i) Is otherwise eligible for award; and
(ii) Offers the lowest aggregate amount for the first or base line item, plus or minus (in the order stated in the list of priorities in the bid schedule) those additive or deductive line items that provide the most features within the funds determined available.
(3) All bids shall be evaluated on the basis of the same additive or deductive line items.
(i) If adding another item from the bid schedule list of priorities would make the award exceed the available funds for all offerors, the Contracting Officer will skip that item and go to the next item from the bid schedule of priorities; and
(ii) Add that next item if an award may be made that includes that line item and is within the available funds.
(b) The Contracting Officer will use the list of priorities in the bid schedule only to determine the low offeror. After determining the low offeror, an award may be made on any combination of items if—
(1) It is in the best interest of the Government;
(2) Funds are available at the time of award; and
(3) The low offeror’s price for the combination to be awarded is less than the price offered by any other responsive, responsible offeror.
(c) Example: “The amount available is $100,000. Offeror A’s base bid and four additives (in the order stated in the list of priorities in the bid schedule) are $85,000, $10,000, $8,000, $6,000, and $4,000. Offeror B’s base bid and four additives are $80,000, $16,000, $9,000, $7,000, and
$4,000. Offeror A is the low offeror. The aggregate amount of offeror A’s bid for purposes of award would be $99,000, which includes a base bid plus the first and fourth additives. The second and third additives were skipped because each of them would cause the aggregate bid to exceed $100,000.“
(End of provision) https://www.va.gov/oal/library/vaar/vaar836.asp#836580