This document is a solicitation for replacing four elevators at the Audie L. Murphy VA Medical Center located in San Antonio, Texas. The project involves replacing elevators P-14, P-15, P-11 and S-12 with new modernized components including oil interceptors, HVAC systems and elevator controls. Bids are due by August 18, 2022 and the contract is set aside for Service Disabled Veteran Owned Small Businesses. The base bid is for all required labor, materials and equipment to replace the four elevators. There are also three alternates that include replacing entrance assemblies and removing specific elevators from the scope of work. Performance and payment bonds are due within 10 days of award and the contractor must complete work within 365 calendar days.

View the file

Other files

File Type Posted
36C25722B0027 0011.docx DOCX document
36C25722B0027 0010.docx DOCX document
36C25722B0027 0009.docx DOCX document
Supplemental Information.pdf PDF
36C25722B0027 0008.docx DOCX document
36C25722B0027 0007.docx DOCX document
IMG_0415.pdf PDF
36C25722B0027 0006.docx DOCX document
36C25722B0027 0005.docx DOCX document
IMG_0416.jpg JPG image
36C25722B0027 0004.docx DOCX document
Sign-in-Sheet Pre-Bid Site Visit.pdf PDF
36C25722B0027 0003.docx DOCX document
36C25722B0027 0002.docx DOCX document
VAAR 852.236-92.pdf PDF
Door Controller DC1000 Data Sheet.pdf PDF
Dwg 6 Cfig 6 Selective Elevator Monitor Inside of Elev Rev3.pdf PDF
Pre Bid - Sign In Sheet.pdf PDF
36C25722B0027 0001.docx DOCX document
VA AM Elevator Replacement 100 CD Specifications.pdf PDF
VA AM Elevator Replacement 100 CD Drawings 04192022 SM.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25722B0027

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C25722B0027 X 07- -2022

TBD

671-20-128 Department of Veterans Affairs Network Contracting Office, NCO17 2002 Scott Blvd.

Temple TX 76504 Department of Veterans Affairs Network Contracting Office, NCO17 2002 Scott Blvd.

Temple TX 76504 Joyce Mills 254-899-6016

Acquisition Title: Replace Elevators P-14, P15, P-11 and S-12, Project No. 671-20-128

Contractor shall provide all necessary labor, materials, equipment, and supervision to complete all required project work in accordance with the provided SOW, Specifications, and Drawings. Project is located at the Audie L. Murphy VAMC 7400 Merton Minter, San Antonio, Texas 78229.

This is a "Competitive" requirement Set Aside 100% Service Disabled Veteran Owned Small Business (SDVOSB).

Magnitude of the Construction Project: $1,000,000.00 and $2,000,000.00 The applicable North American Industry Classification System (NAICS) code for this project is 238220 ($16.5 Mil)

Pre-Bid Site Visit shall be held on July 19, 2022 @ 9:00 am CST. All interested Contactors shall meet at the San Antonio VAMC Engineering Office.

All Contractors attending the Pre-Bid Site Visit may be required to be COVID Screened to enter the facility. Please ensure you arrive early to allow enough time to go through screening. Picture ID and Face Mask will be required.

Cut off for submission of RFI(s)/Questions shall be July 22, 2022 @ 1:00 PM CST. All RFI(s)/Questions must be emailed to the following email: joyce.mills@va.gov. Please include the solicitation No.36C25722B0027 on the subject line. RFI(s)/Questions must be submitted in word format.

All Bidders must submit a Bid Guarantee as part of their Bid Package. Additionally, the Awardee must be able to obtain the necessary level of Performance and Payment Bonds.

SUBMISSION OF BIDS: All bids shall be submitted via email to the following email address: joyce.mills@va.gov by the date and time as stated in Block 13a below. Please include the solicitation No.36C25722B0027 on the subject line of your email when submitting your bid package.

**All Contractors are required to comply with EO 14042 regarding COVID vaccines.

Note: All Bidders must comply with submission of the required documentation per the Standard of Responsibility.

Funds are not currently available for this solicitation. Award of a contract as a result of this solicitation is contingent upon the availability of appropriated funds from which payment of this contract may be made.

There shall be no legal liability on the part of the Government for contract purposes until funds are made available to the Contracting Officer. The Contracting Officer will confirm availability of funds prior to award of a contract.

X X 52.211-10 X 0 (zero) 10:00 am C S T 08-18-2022 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Department of Veterans Affairs Central Texas Veterans HCS 2002 Scott Blvd.

Temple TX 76504 This is accomplished through the Tungsten Network located at:

http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices.

(877) 353-9791

(512) 460-5540 X

JOYCE M. MILLS

CONTRACTING OFFICER

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
Statement of Work6
SECTION B – SCHEDULE OF PRICES/DESCRIPTION13
Bid Submission Instructions17
VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors18
SPECIAL STANDARD OF RESPONSIBILITY19
OSHA -EMR Requirement20
INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-10)21
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS22
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)22
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)22
2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)22
2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)23
2.5 52.228-1 BID GUARANTEE (SEP 1996)24
2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)25
2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)25
2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)26
2.9 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)26
2.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)26
2.11 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)27
REPRESENTATIONS AND CERTIFICATIONS28
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)28
3.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)32
3.3 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)33
GENERAL CONDITIONS36
4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)36
4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (NOV 2021)36
4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)37
4.4 52.210-1 MARKET RESEARCH (NOV 2021)38
4.5 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS, FPMR PART 101-29 (AUG 1998)39
4.6 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS (JUN 1988)39
4.7 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)40
4.8 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2021)40
4.9 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)43
4.10 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)44
4.11 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (NOV 2021)45
4.12 SUPPLEMENTAL INSURANCE REQUIREMENTS49
4.13 52.236-4 PHYSICAL DATA (APR 1984)50
4.14 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997) ALTERNATE II (APR 1984)50
4.15 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)51
4.16 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION)54
4.17 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018)56
4.18 VAAR 852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (SEP 2021) (DEVIATION)57
4.19 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)58
4.20 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)60
4.21 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)61
4.22 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)61
4.23 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)61
4.24 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)62
4.25 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)63
4.26 VAAR 852.246-75 WARRANTY OF CONSTRUCTION—GUARANTEE PERIOD SERVICES (OCT 2018)64
4.27 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)65
4.28 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)65
4.29 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)65
4.30 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)65
ATTACHMENTS: Specifications and Drawings68
"General Decision Number: TX20220231 06/17/202269

Statement of Work

Replace Elevator P14, P15, P11 and S12 671 – 20 – 128

1. PROJECT OVERVIEW

1.1 PURPOSE:

The Department of Veterans Affairs (VA) intends to Replace 4 exiting elevators at the Audie L. Murphy division of the South Texas Veterans Health Care System. The four (4) elevators are P14, P15, P11 and S12. The project is located 7400 Merton Minter San Antonio, TX 78229.

The project is intended to replace elevators into 3 sections of the Audie Murphy Medical Center. The elevator will be completely replaced with new modernize components. Major components include new oil interceptor, HVAC system, and elevator controls.

2. SCOPE OF WORK

2.1 GENERAL: Provide all labor, materials, supplies, tools and equipment, supervision and construction services necessary to replace elevator P14, P15, P11 & S12. All necessary testing and commissioning is required.

Work shall include:

Base Bid – Replace and/or provide new all elevator components for elevators P14, P15, P11, & S12 to include but not limited to conduit & wireway, conductors, traveling cables, controller & supervisory panel, microprocessor control system, machine room monitor, pumps, motors, valve assembly, and hydraulic system The contractor will need to add split system HVAC for each of the elevator machine room locations This project has three (3) additional alternates. Additional alternates #l will be the new oil interceptor for each of the three (3) elevator locations. Please refer to the drawings and specifications for the add alternates.

A site visit is recommended prior to bidding.

All numbers are approximate. Contractor(s) need to verify all amounts. If there is a discrepancy in the amounts provided and or any condition affecting work shall be brought to the attention of the VA Representative before proceeding with the work.

The Contractor shall be responsible for obtaining and coordinating the services of any and all third-party Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely delivery, and documented final product.

O&M Manuals, As-Built drawings in CAD and PDF, applicable permits, installation, testing, and commissioning are also required.

Normal hours of operation for the project are 8:00AM to 5:00 PM Monday through Friday except for Federal Holidays. The Contractor will be required to work on Saturday, Sunday, holidays, or outside the project site’s normal working hours for item impacting patient care (i.e. power outages and/or demo placing patients in harm’s way, crane). For example some demolition and major utility disruptions will require non-normal hour work. The contractor will need to submit a written request for approval to the VA-COR at least three (2) working days prior to the proposed start of such work.

2.2 DESCRIPTION OF WORK

A. Existing Conditions

a. The contractor must perform and submit a complete site survey of the existing condition before the end of the demo phase. The site survey must include verification of all tie-in connection points for the MEP, the depth, size & material for any components that may conflict with the proposed construction. The contractor shall retain any all labor required to provide the most accurate data of the site’s existing condition. Once this information is obtained, the contractor shall prepare a submittal according to the specification section 01 33 23

b. Contractor will coordinate all work with existing work to remain and existingconditions.
c. Contractor shall be responsible for complying with all the construction documents and applicableDepartment of Veterans Affairs Master Specifications as part of this project.
d. Contractor must also comply with all applicable city, county, state, and federal regulations / codesand applicable OSHA standards project. Construction shall also comply with Infection ControlRisk Assessment (ICRA), attached, and IC standards delineated in the specifications.
e. Exterior on-site staging WILL NOT be provided on the VA premises except wherenotedin the drawings and specification. Only dumpsters will be allowed for debrisremoval. Use a covered lock dumpster and label it with the project name and primecontractor information on it. Leaving the dumpster open, the contractor will riskhaving other contractors or VA staff throwing items into it.
f. Demolition and renovation shall take place with minimal disruption to adjacentworkspaces.
g. Demolition debris shall be recycled to the best ability of the contractor. Reports ofweight and deposition of all waste are to accompany the monthly progress payments(C&D Waste Form attached). Form also included in corresponding specification.

h. Any item damage during removal is the contractor’s responsibility to replace with no additional cost to the government.

i. All work shall be in accordance with VA specifications. All costs shall be included in the base bid. All work shall be coordinated with the VA prior to any demolition work being performed.

B. Additional Requirements

a. Housekeeping - Accumulation of trash, paper, wood shavings, sawdust, excelsior, boxes and other packing materials will be cleaned up as often as necessary and at the end of each work day.

b. False Alarms – Fire Department response fees for false alarms caused by the contractor will be paid by the contractor. To avoid this, dust covers for smoke detectors and alarms are required to be used while construction work is ongoing. These covers shall be removed at the end of the construction work shift to keep them operational.

c. Fire Watch - Provide fire watch for impairments more than 4 hours in a 24-hour period. Request interruptions in accordance with Article, OPERATIONS AND STORAGE AREAS, and coordinate with COR and facility safety officer. All existing or temporary fire protection systems (fire alarms, sprinklers) located in construction areas shall be tested as coordinated with the medical center. Parameters for the testing and results of any tests performed shall be recorded by the medical center and copies provided to the COR.

d. Smoking is strictly prohibited in all facilities, near flammable liquids, highly combustible materials. Smoking is only authorized in designated smoking areas.

e. Security – Contractors will wear security badge in plain sight above the waist at all times. Contractors found without a badge will be immediately removed from VA property by VA Police.

f. Parking – There will be NO contractor parking allowed on the VA campus except for unloading materials & equipment and loading demolition debris & equipment.

g. Tuberculosis (TB) – Contractor is responsible for ensuring that if contracted construction worker(s) have been determined to be at risk for transmission of TB based upon the TB pre-construction risk assessment. The contractor must provide written certification, within 24 hours upon request, to the COR that all contract employees assigned to the work site have had a pre-placement tuberculin screening within 90 days prior to assignment to the work site and been found to be free of active TB. Refer to the contract documents for this requirement.

h. OSHA 10 & 30 -Hour Training Course – All construction workers are required to have the OSHA 10-hour Construction Safety training certification. The construction safety manager and/or superintendent shall have the 30-hour Construction Safety course certification. Proof of certification shall be on site at all times.

i. Infection Control (IC) and Safety– All contractors, construction workers and COR’s must attend the Infection Prevention training every fiscal year. All construction workers shall always have a current IC training sticker attached to their badges. If this requirement is not met, workers will be removed from construction site. Refer to construction documents for additional information.

Construction sign and copy of IC permit (attached) shall always be posted in project site. All IC and dust control measures shall always be implemented.

All fire and smoke wall penetrations shall be fireproofed according to corresponding wall rating. These shall be through a sleeve and sealed with fire barrier compound to be approved by VA.

j. All construction and installation work shall comply with VA specifications for material and workmanship, NEC, NFPA and all applicable city, county, state, and federal regulations and codes and OSHA standards. Refer construction drawings and specs for requirements.

k. All incidental work associated with the installation and construction works in the exterior and interior of the building shall be included in the base bid.

i. All IT installation shall be PANDUIT certified.

l. Conduct work as to interfere as least as possible with facility operations. All coordination for utilities shutdown shall be coordinated at least 72 hours prior to event with COR. For major utility system shutdowns, coordination shall be done at least 2 weeks in advance.

2.3 OTHER DELIVERABLES

A. Period of Performance: 365 Calendar days after Notice to Proceed for the Base Bid + 30 Calendar days for the Additional Alternative #1 B. Performance and Payment bonds: Due 10 Calendar days after Notice of Award C. Proof of Insurance: Due 10 Calendar days after Notice of Award D. Contractor Quality Control Plan (CQCP): The contractor shall develop a quality control plan and shall furnish to VA for review no later than 30 calendar days after the receipt of notice to proceed. The plan shall identify personnel, procedures, control, instructions, tests, records, and forms to be used. VA will consider an interim plan for the first 45 calendar days of operation. Installation will be allowed to begin only after acceptance of the CQCP or acceptance of an interim plan applicable to the feature of the work to be started. Work outside of the features of the work included in an accepted interim plan will not be permitted to begin until acceptance of a CQCP or another interim plan containing the additional features of the work to be started. After acceptance of the CQCP, the Contractor shall notify the Contracting Officer Representative (COR) in writing of any proposed change. Proposed changes are subject to acceptance by the Contracting Officer. Please see Appendix H for additional details.

E. Safety Plan: Contractor shall develop and implement a Comprehensive safety plan to eliminate injuries occurring relative to providing the design and installation services for this project. Contractor shall furnish to VA for review no later than 15 calendar days after the receipt of notice to proceed. The plan shall also describe how final system installation will meet all applicable requirements of NFPA30 and NFPA30A. Construction/Renovation work will be allowed to begin only after VA’s acceptance of the Safety Plan. Contractor is responsible for providing enough project lead time to allow for VA review of Safety Plan before acceptance. The Department of Labor OSHA requires that all Contractors involved in installation on VA owned or leased property comply with the Incorporation of General Industry Safety and Health Standards applicable to Installation Work and Technical Amendments, Final Rule 29 CFR Parts 1910 and 1926 as published in the Federal Register Volume 58, No. 124, June 30, 1993. In addition, any Contractor that performs construction type work on any VA project as defined by the Scope of the referenced regulation is required to; (1) Provide and maintain his own protective equipment and devices, etc.; and (2) Require all sub-contractors used on site to follow these same provisions in the regulation.

F. Operations and Maintenance Manuals (O&M): The Contractor shall provide three (3) complete sets of O&M manuals including a recommended spare parts list identifying components adequate for competitive supply procurement for operation and maintenance of the system. The O&M Manuals shall include maintenance and inspection for all equipment. A three-ring binder containing all the O&M and electronic files on CD-ROM shall be provided within the binder.

G. Submittals CD: As part of the closeout documentation, the contractor shall provide the COR, 4 CDs containing all the approved submittals.

H. Operations and Maintenance Training: The Contractor shall provide on-site O&M training for the location which will consist of two (2) formal on-site training sessions during a 30-day period to including but not limited to system operation, corrective and preventive maintenance and inspections.

The contractor shall provide training manuals that include the hands-on exercises, O&M data and troubleshooting guides necessary for personnel to assume full O&M responsibility for the system after completion of the training. The contractor shall provide a written training syllabus for the topics and detailed training content for review and approval by the COR at least 30 days prior to the scheduled training. The contractor will coordinate with the COR the scheduling of any training classes in advance. The COR may require the classes to be provided on non-consecutive days at the convenience of the VA Staff. The Contractor shall video tape this training for official use and forward CD (4 copies) including those training videos.

I. Warranty: Contractor shall provide a minimum three (3) year warranty, unless specified otherwise in the specs, from both the manufacturer and installer including parts and labor to include normal, premium or holidays hours. The Warranty period shall start on the date of Substantial Completion.

2.4 ACCEPTANCE

A. For the purposes of Warranty and payment for the work performed at a location, government “Acceptance” will be provided by the VA upon the completion of all the following:

a. The Contractor has demonstrated/ verified that the implemented ECMs function as intended at commissioning. All punch list items identified during the commissioning have been resolved.

b. The Contractor has provided O&M manuals.

c. The Contractor has provided Record drawings to include a CD with all as builds CAD files, one full set, one half set and one Mylar full set.

2.5 CONFIDENTIALITY AND NONDISCLOSURE

A. The preliminary and final deliverables and all associated working papers, application source code, and other material deemed relevant by the VA which has been generated by the contractor in the performance of this Order are the exclusive property of the U.S. Government and shall be submitted to the VA-COR at the end of the contract.

B. The Contracting Officer will be the sole authorized official to release verbally or in writing, any data, the draft deliverables, the final deliverables, or any other written or printed materials pertaining to this contract. No information shall be released by the contractor. Any request for information relating to this contract presented to the contractor shall be submitted to the CO for response.

C. Press releases, marketing material or any other printed or electronic documentation related to this project, shall not be publicized without the written approval of the CO.

D. To the extent that the work under this contract requires that the contractor be given access to proprietary business, technical or financial information belonging to the Government or other companies, the contractor shall treat such information as proprietary business sensitive and agrees not to appropriate such information to its own use or to disclose such information to third parties unless specifically authorized by the CO in writing. A mutually agreed to agreement for exchange of sensitive information or nondisclosure agreement may be required.

E. General Requirements for Privacy Information:

· Information Systems Officer, Information Protection: The contractor will not have access to VA Desktop computers nor will they have access to online resources belonging to the government while conducting services.

· Privacy Officer: The contractor will not have access to Patient Health Information (PHI) nor will they have the capability of accessing patient information during the services provided to the VA.

· Records Manager: There will be no federal records created, maintained, used or dispositioned with this contract; regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.].

SECTION B – SCHEDULE OF PRICES/DESCRIPTION

DESCRIPTION: The contractor shall provide all labor, supervision, materials, and equipment to complete all required project work in strict accordance with the SOW, Specificaitons, and Drawings to Replace Elevators P-14, P-15, P11, and S-12, located at the Audie L. Murphy VAMC 7400 Merton Minter, San Antonio, Texas.

** NOTE: Award shall be made on the Base Bid unless the base bid is less than the allocated funding for the project. If the base bid is less than allocated funding, award shall be made on the basis of a Bid Alternate(s) beginning with Bid Alternate #1 and proceeding through Bid Alternate #3 in order to accommodate allocated funding. Offerors must bid all items in order to be considered.

FAR 36.205 Statutory Cost Limitations states: Solicitations containing one or more items subject to statutory cost limitations shall state - The applicable cost limitation for each affecting item in a separate schedule; That an offer which does not contain separately-prices schedules will not be considered; and That the price on each schedule shall include an approximate apportionment of all estimated direct costs, allocable indirect costs, and profit.

BASE BID ITEM:

ITEMUNIT TOTAL
NO. DESCRIPTION OF SERVICEQTYPRICE AMOUNT
0001PROVIDE ALL NECESSARY1 JB $________ $_________
LABOR, MATERIALS, AND
EQUIPMENT NECESSARY TO
REPLACE Elevators P-14, P-15, P-11 and
S-12 LOCATED AT THE VAMC
SAN ANTONIO TEXAS IN ACCORDANCE
WITH THE PROVIDED SOW, SPECIFICATIONS
AND DRAWING(S) .
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEM I)
0002PERFORMANCE AND PAYMENT1 ea$__________ $_________
BONDS

TOTAL (0001 & 0002) $__________

Total number of days for completion: 365 calendar days

BID ALTERNATE #1 + (Base Bid + Add Alternate #1):

0003PROVIDE ALL NECESSARY1 JB $________ $_________
LABOR, MATERIALS, AND
EQUIPMENT NECESSARY TO
REPLACE Elevators P-14, P-15, P-11 and
S-12 LOCATED AT THE VAMC
SAN ANTONIO TEXAS IN ACCORDANCE
WITH THE PROVIDED SOW, SPECIFICATIONS
AND DRAWING(S) .
(SEE GENERAL REQUIREMENT 1.3 STATEMENT OF BID ITEM I)
0004AND TO INCLUDE ADDITION OF ADD ALTNATE #1:
PROVIDE ALL NECESSARY1 JB $________ $_________
LABOR, MATERIALS, AND EQUIPMENT
NECESSARY TO INCLUDE IN LIE U OF
REFURBISHMENT OF ELEVEATOR HOISTWAY
ENTRANCE ASSEBLY AT EACH ELEVATOR
OPEING, REPLACE THE ELEVATOR HOISTWAY
ENTRANCE ASSEBLY AT EACH ELEVATOR IN
IT’S ENTIRETY.
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEM B. ALTERNATE NO. 1)
0005PERFORMANCE AND PAYMENT1 ea$__________ $_________
BONDS

TOTAL (0003, 0004, & 0005) $_________

Total number of days for completion: 365 calendar days

BID ALTERNATE #2 + (Base Bid + Add Alternate #1 + Add Alternate #2):

0006PROVIDE ALL NECESSARY1 JB $________ $_________
LABOR, MATERIALS, AND
EQUIPMENT NECESSARY TO
REPLACE Elevators P-14, P-15, P-11 and
S-12 LOCATED AT THE VAMC
SAN ANTONIO TEXAS IN ACCORDANCE
WITH THE PROVIDED SOW, SPECIFICATIONS
AND DRAWING(S) .
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEM I)
0007AND TO INCLUDE ADDITION OF ADD ALTNATE #1:
PROVIDE ALL NECESSARY1 JB $________ $_________
LABOR, MATERIALS, AND EQUIPMENT
NECESSARY TO INCLUDE IN LIE U OF
REFURBISHMENT OF ELEVEATOR HOISTWAY
ENTRANCE ASSEBLY AT EACH ELEVATOR
OPENING, REPLACE THE ELEVATOR HOISTWAY
ENTRANCE ASSEBLY AT EACH ELEVATOR IN
IT’S ENTIRETY.
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEM B. ALTERNATE NO. 1)
0008AND TO INCLUDE ADDITION OF ADD ALTNATE #2:
PROVIDE ALL NECESSARY1 JB $________ $_________
LABOR, MATERIALS, AND EQUIPMENT
NECESSARY TO INCLUDE REOMVE
ELEVATOR S-12 FROM SCOPE OF WORK.
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEM C ALTERNATE NO. 2)
0009PERFORMANCE AND PAYMENT1 ea$__________ $_________
BONDS

TOTAL (0006, 0007, 0008 & 0009) $_________

Total number of days for completion: 365 calendar days

BID ALTERNATE #3 + (Base Bid + Add Alternate #1 + Add Alternate #2, and Add Alternate #3):

0010PROVIDE ALL NECESSARY1 JB $________ $_________
LABOR, MATERIALS, AND
EQUIPMENT NECESSARY TO
REPLACE Elevators P-14, P-15, P-11 and
S-12 LOCATED AT THE VAMC
SAN ANTONIO TEXAS IN ACCORDANCE
WITH THE PROVIDED SOW, SPECIFICATIONS
AND DRAWING(S) .
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEM I)
0011AND TO INCLUDE ADDITION OF ADD ALTNATE #1:
PROVIDE ALL NECESSARY1 JB $________ $_________
LABOR, MATERIALS, AND EQUIPMENT
NECESSARY TO INCLUDE IN LIE U OF
REFURBISHMENT OF ELEVEATOR HOISTWAY
ENTRANCE ASSEBLY AT EACH ELEVATOR
OPENING, REPLACE THE ELEVATOR HOISTWAY
ENTRANCE ASSEBLY AT EACH ELEVATOR IN
IT’S ENTIRETY.
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEM B. ALTERNATE NO. 1)
0012AND TO INCLUDE ADDITION OF ADD ALTNATE #2:
PROVIDE ALL NECESSARY1 JB $________ $_________
LABOR, MATERIALS, AND EQUIPMENT
NECESSARY TO INCLUDE REOMVE
ELEVATOR S-12 FROM SCOPE OF WORK.
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEM C. ALTERNATE NO. 2)
0013AND TO INCLUDE ADDITION OF ADD ALTNATE #3:
PROVIDE ALL NECESSARY1 JB $________ $_________
LABOR, MATERIALS, AND EQUIPMENT
NECESSARY TO INCLUDE REOMVE
REMOVE 3 OIL/WATER SEPARATORS.
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEM D. ALTERNATE NO.3)
0014PERFORMANCE AND PAYMENT1 ea$__________ $_________
BONDS

TOTAL (0010, 0011, 0012, 0013 & 0014) $_________

Total number of days for completion: 365 calendar days

Bid Submission Instructions

A. All bid packages shall be submitted via email to the following email address: joyce.mills@va.gov , by the specified Bid Closing date and time stated on the SF1442, Page 1, Block 13a. The applicable Solicitation Number for this IFB must be included on the subject line of the email.

B. A public Bid Opening will not be held. Bids shall be opened by the Contracting Officer and Contract Specialist, witnessed and recorded on an official Bid Abstract. Bid Abstracts will be available upon request via email.

VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors

1. Contractor employees who work in or travel to VHA locations must comply with the following:

a. Documentation requirements:

1) If fully vaccinated, shall show proof of vaccination.

i. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.

2) If unvaccinated and granted a medical or religious exception, shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test.

3) Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.

4) Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates.

a. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

3. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.

SPECIAL STANDARD OF RESPONSIBILITY

Solicitation Submittal Requirements:

The Offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each Contractor who is part of the partnership or joint venture and for the entity itself. EMR shall not be submitted for subcontractors.)

1. OSHA or EPA Violation(s): Offerors shall provide Summary of Work-Related Injuries and Illnesses, affirming that the Offeror has no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years. Form is provided as “Attachment A” which must be completed and submitted as part of your offer.

2. Experience Modification Rate (EMR): Offerors shall provide documentation to show that the offeror has an Experience Modification Rate (EMR) of equal to or less than 1.0.

3. Limitation on Subcontracting:

IAW VAAR 852.219-77 each offeror will review the clause and complete the certificate included in the clause. This certificate will be complete prior to solicitation closing and submitted with the proposal, bid, or quote documents. Failure to comply with this requirement will result in removal from consideration for award. Form is provided as “Attachment B” which must be completed and submitted as part of your offer.

OSHA -EMR Requirement

OSHA or EPA Violation(s):

(1) Offerors shall provide Summary of Work-Related Injuries and Illnesses, affirming that the

(2) Offeror has no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years

Experience Modification Rate (EMR):

(1) Offerors shall provide documentation to show that the offeror has an Experience Modification Rate (EMR) of equal to or less than 1.0.

36C25722B0027

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-10)

OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS

At the time of proposal Offeror’s are required to complete.

a) Offeror’s total proposed price: $ __________

b) Cost of Materials $ __________

c) Total excluding materials (a-b) $ __________

d) Amount projected to be paid to non-VIP listed SDVOSBs: $ __________

e) Offeror’s percentage of estimated Non VIP work (d/c X 100 = %) __________%

f) Offeror’s percentage of estimated self-performed work (100 – e = %) __________%

A/E-Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed VOSBs.

General construction. In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.

Special trade contractors. In the case of a contract for special trade contractors, it will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade
Goals for female participation for each trade
47.8 %
6.9 %

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Temple Texas

(End of Provision)

2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

2.5 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be percent of the bid price or , whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)

Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Hand-Carried Address:

Department of Veterans Affairs Network Contracting Office, NCO17 2002 Scott Blvd.

Temple TX 76504

Mailing Address:

Department of Veterans Affairs Network Contracting Office, NCO17 2002 Scott Blvd.

Temple TX 76504

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of Provision)

2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for July 19, 2022 @ 9:00 am CST

(c) Participants will meet at VAMC San Antonio Engineering Office (End of Provision)

2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer.