VA AM Elevator Replacement 100 CD Drawings 04192022 SM.pdf

PDF 7 MB Posted

Attached to
Y1DA--671-20-128 Replace Elevator P-14, P-15, P-11 & S-12 (VA-22-00067864)
Solicitation number
36C25722B0027
Issued by

About this file

This solicitation is for replacing four hydraulic elevators (P-14, P-15, P-11 and S-12) at the Audie L. Murphy VA Hospital located in San Antonio, Texas. The project number is 671-20-128. The solicitation includes drawings and specifications for demolishing the existing elevators and installing new systems, including elevator cab finishes, controls, and mechanical equipment. Bids are due on April 19, 2022. The construction work must be completed in phases to maintain elevator service, with infection control measures in place. The awarded contractor will be responsible for repairing and patching walls, floors, and the roof during construction. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17 is the contracting agency.

View the file

Other files

File Type Posted
36C25722B0027 0011.docx DOCX document
36C25722B0027 0010.docx DOCX document
36C25722B0027 0009.docx DOCX document
Supplemental Information.pdf PDF
36C25722B0027 0008.docx DOCX document
36C25722B0027 0007.docx DOCX document
IMG_0415.pdf PDF
36C25722B0027 0006.docx DOCX document
36C25722B0027 0005.docx DOCX document
IMG_0416.jpg JPG image
36C25722B0027 0004.docx DOCX document
Sign-in-Sheet Pre-Bid Site Visit.pdf PDF
36C25722B0027 0003.docx DOCX document
36C25722B0027 0002.docx DOCX document
VAAR 852.236-92.pdf PDF
Door Controller DC1000 Data Sheet.pdf PDF
Dwg 6 Cfig 6 Selective Elevator Monitor Inside of Elev Rev3.pdf PDF
Pre Bid - Sign In Sheet.pdf PDF
36C25722B0027 0001.docx DOCX document
36C25722B0027_2.docx DOCX document
VA AM Elevator Replacement 100 CD Specifications.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction &

Facilities Management

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANTS

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

INTERIORSARCHITECTURE

COX DESIGN ASSOCIATES

PLANNING

AUSTIN CHICAGO DENVER EL PASO

04/19/2022

BI

M

AL

M

VA

H R

EP

LA

C E

FO

U

R E

LE

VA

TO

R

S/

SA

N

EW

E

LE

VA

TO

R S_

AR

C

H _0

1.

rv t

4/

/2

4:

:2

PM

GI-000

CONSTRUCTION

DOCUMENTS 100%

COVER SHEET REPLACE/MODERNIZE FOUR

(4) HYDRAULIC ELEVATORS

7400 MERTON MINTER, SAN ANTONIO, TX

78229

04/19/2022 RHC MAG

671-20-128

AUDIE L. MURPHY VA HOSPITAL

7400 MERTON MINTER BLVD. SAN ANTONIO, TX. 78229

REPLACE/MODERNIZE FOUR (4) HYDRAULIC ELEVATORS

PROJECT # 671-20-128

ELEVATOR P14 ELEVATOR P15 ELEVATOR S12 ELEVATOR P11

CONSTRUCTION DOCUMENTS 100% SUBMITTAL

Revisions: Date:

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction &

Facilities Management

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANTS

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

INTERIORSARCHITECTURE

COX DESIGN ASSOCIATES

PLANNING

AUSTIN CHICAGO DENVER EL PASO

04/19/2022

BI

M

AL

M

VA

H R

EP

LA

C E

FO

U

R E

LE

VA

TO

R

S/

SA

N

EW

E

LE

VA

TO

R S_

AR

C

H _0

1.

rv t

4/

/2

4:

:2

PM

GI-001

CONSTRUCTION

DOCUMENTS 100%

INDEX OF DRAWINGS REPLACE/MODERNIZE FOUR

(4) HYDRAULIC ELEVATORS

7400 MERTON MINTER, SAN ANTONIO, TX

78229

04/19/2022 RHC MAG

671-20-128

5 - ELECTRICAL

EP-000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

EP-001 OVERALL ELECTRICAL FLOOR PLAN

ED-101 ENLARGED ELECTRICAL FLOOR PLANS -

ELEVATOR P-11 - DEMOLITION

ED-102 ENLARGED ELECTRICAL FLOOR PLANS -

ELEVATOR S-12 AND ELEC ROOM L007 -

DEMOLITION

ED-103 ENLARGED ELECTRICAL FLOOR PLANS -

ELEVATOR P-14 & P-15 - DEMOLITION

ED-201 PARTIAL ONE-LINE DIAGRAM DEMOLITION

EP-101 ENLARGED ELECTRICAL FLOOR PLANS -

ELEVATOR P-11 - NEW WORK

EP-102 ENLARGED ELECTRICAL FLOOR PLANS -

ELEVATOR S-12 AND ELEC ROOM L007 - NEW

WORK

EP-103 ENLARGED ELECTRICAL FLOOR PLANS -

ELEVATOR P-14 & P-15 - NEW WORK

EP-201 PARTIAL ONE-LINE DIAGRAM NEW WORK

EP-301 ELECTRICAL SCHEDULES

EP-401 ELECTRICAL DETAILS

EP-402 ELECTRICAL DETAILS

4 - MECHANICAL

MH-001 MECHANICAL SYMBOLS AND ABBREVIATIONS

MHD-101 MECHANICAL DEMOLITION P-11 & S-12

ELEVATOR FLOOR PLANS

MHD-102 MECHANICAL DEMOLITION P-14 & P-15

ELEVATOR FLOOR PLANS

MH-101 MECHANICAL P-11 & S-12 ELEVATOR FLOOR

PLANS

MH-102 MECHANICAL P-14 & P-15 ELEVATOR FLOOR

PLANS

MH-103 MECHANICAL OVERALL FLOOR PLAN

MH-201 MECHANICAL CONTROL DIAGRAMS,

SCHEDULES, & DETAILS

3 - PLUMBING

PP-001 PLUMBING SYMBOLS AND ABBREVIATIONS

PPD-101 PLUMBING DEMOLITION P-11 & S-12 ELEVATOR

FLOOR PLANS

PPD-102 PLUMBING DEMOLITION P-14 & P-15 ELEVATOR

FLOOR PLANS

PP-101 PLUMBING P-11 & S-12 ELEVATOR FLOOR PLANS

PP-102 PLUMBING P-14 & P-15 ELEVATOR FLOOR PLANS

PP-201 PLUMBING SCHEDULES & DETAILS

2 - ARCHITECTURAL

AD-100 ELEVATOR P-11 DEMOLITION PLANS

AD-101 ELEVATOR S-12 DEMOLITION PLANS

AD-102 ELEVATOR P-14 & P-15 DEMOLITION PLANS

AS-100 ELEVATOR P-11 & S-12 FLOOR PLANS

AS-101 ELEVATOR P-14 & P-15 FLOOR PLANS

AS-200 ELEVATOR P-11 & S-12 ELEVATIONS

AS-201 ELEVATOR P-11 & S-12 SECTIONS

AS-202 ELEVATOR P-14 & P-15 ELEVATIONS

AS-203 ELEVATOR P-14 & P-15 SECTIONS

AS-300 MATERIAL FINISH SCHEDULE AND 3D VIEWS

1 - GENERAL

GI-000 COVER SHEET

GI-001 INDEX OF DRAWINGS

GI-002 GENERAL NOTES

GI-003 ARCHITECTURAL ABBREVIATIONS

GI-004 ACCESSIBILITY STANDARDS

GI-100 OVERALL PLAN

GI-101 LIFE SAFETY / CODE ANALYSIS P-11 & S-12

GI-102 LIFE SAFETY / CODE ANALYSIS P-14 & P-15

GI-103 INFECTION CONTROL / PHASING PLANS - PHASE

1 P-11 & S-12

GI-104 INFECTION CONTROL / PHASING PLANS - PHASE

1 P-14 & P-15

GI-105 INFECTION CONTROL / PHASING PLANS - PHASE

2 P-14 & P-15

1. UNLESS NOTED AS EXISTING, ALL MATERIALS, EQUIPMENT,

MANUFACTURED ITEMS AND ASSEMBLIES INCORPORATED INTO THE

WORK SHALL BE NEW.

2. UNLESS NOTED TO BE REMOVED AND DISPOSED, ALL EXISTING ITEMS

ARE TO REMAIN. THEY SHALL BE PROTECTED FROM DAMAGE DUE TO

CONSTRUCTION ACTIVITIES. ANY EXISTING ITEMS TO REMAIN THAT

BECOME DAMAGED DUE TO CONSTRUCTION ACTIVITIES SHALL BE

REPAIRED OR REPLACED TO MATCH EXISTING AT NO ADDITIONAL COST

TO THE OWNER.

3. NOTATIONS FOR ITEMS OF WORK APPLY TO EACH AND EVERY

GRAPHICAL INDICATION SHOWN ON THE DRAWINGS, WHETHER OR NOT

NOTED.

4. ALL ITEMS NOTED TO HAVE PAINT FINISH SHALL BE THOROUGHLY

CLEANED AND PROPERLY PREPARED IN ACCORDANCE WITH THE

SPECIFICATIONS PRIOR TO THE APPLICATION OF PRIMER AND PAINT.

5. THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE

MECHANICAL, ELECTRICAL, AND PLUMBING WORK AND SATISFY THE

REQUIREMENTS FOR SUPPORT, FLOOR, WALL AND ROOF OPENINGS,

FLASHINGS AND CURBS ETC. THE ARCHITECT SHALL BE NOTIFIED OF

CONFLICTS OR DISCREPANCIES PRIOR TO COMMENCEMENT OF

CONSTRUCTION.

6. CONTRACTOR TO REPLACE & ACCURATELY LOCATE ALL EXISTING

SIGNAGE AND LABELS NOTING RATED WALL ASSEMBLIES AND SMOKE

PARTITIONS

7. THE GENERAL CONTRACTOR SHALL VISIT THE SITE, VERIFY FIELD

CONDITIONS AND CAREFULLY COMPARE SUCH FIELD CONDITIONS AND

OTHER INFORMATION KNOWN TO THE CONTRACTOR WITH CONTRACT

DOCUMENTS.

8. THE GENERAL CONTRACTOR SHALL REPORT ANY UNFORESEEN FIELD

CONDITIONS, ERRORS, INCONSISTENCIES, OR OMISSIONS DISCOVERED

AT ANY TIME DURING THE WORK, UPON SUCH DISCOVERY, THE

CONTRACTOR SHALL IMMEDIATELY CONTACT THE CONTRACT OFFICER

FOR CLARIFICATION BEFORE PROCEEDING OR CONTINUING WITH THAT

PORTION OF THE WORK OR ANY PORTION RELATED THERE TO.

9. ALL WORK SHALL CONFORM TO ALL APPLICABLE CODES AND

STANDARDS INCLUDING THE INTERNATIONAL BUILDING CODE 2015

EDITION, VA MASTER SPECIFICATIONS, AND NFPA 101 2015 EDITION.

10. THE GENERAL CONTRACTOR SHALL NOTIFY THE CONTRACT OFFICER,

CONTRACTING OFFICER'S REPRESENTATIVE, AND ARCHITECT OF ANY

DISCREPANCIES BETWEEN THE DRAWINGS, NOTES AND ACTUAL FIELD

CONDITIONS BEFORE BIDDING AND COMMENCING ANY WORK, AND

REQUEST CLARIFICATION IN WRITING.

11. WHEN UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL

ELEMENTS THAT CONFLICT WITH THE INTENDED FUNCTION OR DESIGN

ARE ENCOUNTERED, INVESTIGATE AND MEASURE THE NATURE AND

EXTENT OF THE CONFLICT. PROMPTLY SUBMIT A WRITTEN REPORT TO

THE CONTRACT OFFICER.

12. WHERE MOUNTING HEIGHTS ARE NOT INDICATED, INSTALL

COMPONENTS USING MANUFACTURER'S OR INDUSTRY STANDARDS.

WHERE STANDARDS DO NOT EXIST, NOTIFY THE COR FOR

CLARIFICATION.

13. CONTRACTOR SHALL NOT BARRICADE / BARRIER EMERGENCY EGRESS

TO OR FROM THIS AREA. CONTRACTOR SHALL MAINTAIN EXIT TO

EXTERIOR DURING THE WORK PROCESS.

14. PROVIDE ACCESS TO THE WORK AS DIRECTED BY THE C.O.R. SECURE

ACCESS POINT AS SPECIFIED AND DIRECTED BY THE COR PROJECT

ENGINEER. PROVIDE WALK-OFF MATS TO MEET FACILITY INFECTION

CONTROL GUIDELINES AT EACH ACCESS POINT.

15. CONTRACTOR TO NOTIFY VA 2 WEEKS IN ADVANCE PRIOR TO ANY

MAJOR UTILITY DISRUPTIONS OR OUTAGES. MAJOR OUTAGES

INVOLVING EMERGENCY AND CRITICAL BRANCH, SHALL BE

COORDINATED NOT LESS THAN 21 CALENDAR DAYS.

16. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE

CONTRACT DOCUMENTS, THE BETTER QUALITY, MORE STRINGENT

REQUIREMENTS OR GREATER QUANTITY OF WORK, AS DETERMINED BY

THE GOVERNMENT, SHALL BE PROVIDED.

MAIN BUILDING

P-14,P-15

S-12

P-11

COMMUNITY

LIVING

CENTER

MAIN TOWER

SPINAL

CORD

INJURY

UNIT

"G" BUILDING

POLYTRAUMA

REHIBILITATION CENTER

CANTEEN

ENTRANCE

AUDIE L. MURPHY

MEMORIAL VA HOSPITAL

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction &

Facilities Management

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANTS

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

INTERIORSARCHITECTURE

COX DESIGN ASSOCIATES

PLANNING

AUSTIN CHICAGO DENVER EL PASO

04/19/2022

BI

M

AL

M

VA

H R

EP

LA

C E

FO

U

R E

LE

VA

TO

R

S/

SA

N

EW

E

LE

VA

TO

R S_

AR

C

H _0

1.

rv t

4/

/2

4:

:2

PM

GI-002

CONSTRUCTION

DOCUMENTS 100%

GENERAL NOTES REPLACE/MODERNIZE FOUR

(4) HYDRAULIC ELEVATORS

7400 MERTON MINTER, SAN ANTONIO, TX

78229

04/19/2022 RHC MAG

671-20-128

DRAWINGS FOR THE FOLLOWING DISCIPLINES ARE

CONTAINED IN THE DOCUMENT. THE DISCIPLINES ARE

IDENTIFIED BY THE REFERENCE WHICH IS

INCORPORATED INTO THE SHEET TITLE.

EACH DRAWING IS NUMBERED ACCORDING TO ITS

LOCATION ON THE SHEET. THE DRAWING TITLE

APPEARS ABOVE THE DEMARCATION LINE AND, APPROPRIATE THE

SCALE IS LOCATED BELOW THE DEMARCATION LINE IN THE LOWER

LEFT-HAND QUADRANT OF THE KEY. THE DRAWING CAN BE

REFERENCED BACK TO IT'S ORIGINAL SHEET AND

DRAWING BY THE DRAWING REFERENCE LOCATION IN

THE LOWER RIGHT-HAND QUADRANT.

SHEET NUMBER

DRAWING NUMBER ON SHEET BY LOCATION

REFERENCE

EXCEPT WHERE DIRECTED TO PLACE ITEMS OF THE WORK AT THE

"APPROXIMATE LOCATION SHOWN." DO NOT SCALE DRAWINGS FOR

DIMENSIONAL INFORMATION

1.

ALL ELEMENTS OF THE DOCUMENTS MAY NOT BE DRAWN TO EXACT SCALE.

ALL DIMENSIONS REQUESTED ARE SHOWN (OR MAY BE DERIVED FROM THOSE

SHOWN OR NOTED) ON THE FLOOR PLANS. DETAIL PLANS, ELEVATIONS,

SECTIONS, SCHEDULES, CONFIGURATION DETAILS, AND SPECIFICATIONS. SEE

THE NOTES BELOW AND SYMBOLS FOR DIMENSIONING CONVENTIONS USED

ON THIS PROJECT.

2.

EXCEPT WHERE SPECIFICALLY NOTED TO THE CONTRARY, ALL DIMENSIONS

SHOWN ON THE ARCHITECTURAL DRAWINGS CONFORM TO THE FOLLOWING

CONVENTIONS.

3.

DIMENSIONS UTILIZING THE "CENTERLINE" SYMBOL ARE MEASURED TO:

ꞏ CENTERLINE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED

FINISHES HAVING THICKNESS WHICH MAY BE ADDED TO SUCH

WALLS) AT PARTITIONS FRAMED WITH METAL STUDS. REFER TO

"PARTITION SCHEDULE" TO DETERMINE THICKNESS OF EACH

PARTITION TYPE.

ꞏ CENTERLINE OF DOOR, WINDOW, OR LOUVER OPENING.

ꞏ CENTERLINE OF OTHER FEATURES AS INDICATED.

A.

DIMENSIONS UTILIZING THE "FACE OF" SYMBOL ARE MEASURED TO:

ꞏ FACE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED

FINISHES HAVING THICKNESS WHICH MAY BE ADDED TO SUCH WALL)

AS DEFINED BY THE PARTITION SCHEDULE. UNLESS NOTED AS A

"FACE OF FINISH" OR "CLEAR" DIMENSION (SEE NOTE "E" BELOW),

DIMENSIONS ARE NOT MEASURED TO THE FACE OF APPLIED FINISH.

REFER TO THE "PARTITION SCHEDULE" TO DETERMINE THE

THICKNESS OF EACH PARTITION TYPE.

B.

WHERE "EQUAL" DIMENSIONS ARE USED ON REFLECTED CEILING PLANS TO

LOCATE CEILING GRID WORK POINTS, MEASURE DIMENSIONS TO:

ꞏ EDGE OF THE INDICATED CEILING AT THE FACE OF THE ADJACENT

APPLIED FINISH MEASURED AT THE PLANE OF THE CEILING.

ꞏ CAUTION: DUE TO THE POSSIBLE APPLICATION OF APPLIED FINISHES -

THICKNESS OF WHICH MAY VARY BETWEEN FLOOR AND CEILING AND

IS NOT ACCOUNTED FOR (EXCEPT AS INDICATED BY "FOF" OR

"CLEAR") BY THE DIMENSION SHOWN ON THE FLOOR PLANS - THE

CONTRACTOR MUST ADJUST AS NECESSARY, THE FLOOR PLAN

DIMENSIONS TO REFLECT THE ACTUAL DIMENSIONS FOUND AT PLANE

OF THE CEILING.

C.

WHERE WALLS AND/OR PARTITIONS OF UNEQUAL THICKNESS ABUT,

ALIGN EXPOSED FACES, UNLESS OTHERWISE NOTED.

4.

ALIGN

DIMENSION, WHEN OCCURS

WHERE OPENINGS IN WALLS (SUCH AS INTERIOR WINDOWS OR DOORS) ARE

NOT DIMENSIONED BUT SHOWN AS BEING IN THE CENTER OF A GIVEN WALL

SURFACE, LOCATE OPENINGS AS GRAPHICALLY REPRESENTED.

5.

DISCIPLINE REFERENCES

DRAWING NUMBERING

DRAWING REFERENCE

GENERAL NOTES

REF. 1/1-A1

BUILDING SECTION

RE: 1/AS-126

SHEET NUMBER

DIMENSIONING CONVENTIONSARCHITECTURAL FLOOR PLAN SYMBOLS

A

COLUMN GRID

NORTH ARROW

REVISION NUMBER AND EXTENT

KEYED NOTE MARK

-SEE CORRESPONDING

NUMBERED KEY NOTE ON SHEET WHERE

REFERENCE OCCURS

REVISION NUMBER - SEE

REVISION HISTORY ON THE

TITLE BLOCK OF EACH SHEET

EXTENT OF CURRENT REVISION

1-A26

1-A26

CL

DEMOLITION LINE

ELEVATION INDICATOR

CENTER LINE INDICATOR

EXISTING TO REMAIN LINE

FEATURES ABOVE LINE INDICATOR

BREAK, ROUND (USER DEFINES SIZE)

BREAK, STRAIGHT (SEE SECTION INDICATORS,

BUILDING, WITH BREAK STANDARDS)

DETAIL INDICATOR

DETAIL INDICATOR

DIMENSION LINE

CENTER LINE

GI GENERAL INFORMATION

A ARCHITECTURAL

FP FIRE PROTECTION

P PLUMBING

M MECHANICAL

E ELECTRICAL

T TECHNOLOGY

AS-100

DISCIPLINE SHEET NUMBER

LOCATION MAP - NTS

CONSTRUCTION LIMITS

N

EXISTING TO REMAIN

CONCRETE

MASONRY

BUILDING INTERIOR

MATERIAL GRAPHICS

GYP BD RIGID INSULATION

WOOD EARTH

BATT INSULATION

DESIGN MANUALS:

- PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS

- PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES

- PG-18-5 EQUIPMENT LIST GUIDES

- PG-18-8 SEISMIC DESIGN HANDBOOK

- PG-18-10 DESIGN MANUALS

- VA PHYSICAL SECURITY DESIGN MANUAL FOR MISSION CRITICAL FACILITIES

- VA DESIGN GUIDELINES FOR ELEVATORS

- VA ARCHITECTURAL DESIGN MANUAL

- VA MECHANICAL DESIGN MANUAL

- VA ELECTRICAL DESIGN MANUAL

- VA PLUMBING DESIGN MANUAL

- VA FIRE PROTECTION DESIGN MANUAL

APPLICABLE CODES AND REGULATIONS:

ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL CURRENT APPLICABLE CODES AND STANDARDS.

IN ADDITION TO ALL DEPARTMENT OF VETERANS AFFAIRS, LOCAL, AND STATE CODES, ALL WORK SHALL COMPLY WITH THE ACCESSIBILITY REQUIREMENTS OF THE STATE AND THE DEPARTMENT OF VETERANS AFFAIRS GUIDELINES, ABA (ARCHITECTURAL BARRIERS ACT) ACCESSIBILITY STANDARD FOR FEDERAL FACILITIES.

APPLICABLE CODES AND STANDARDS (LATEST EDITIONS) INCLUDE:

- ABA ACCESSIBILITY STANDARDS (2015)

- NFPA 101, "LIFE SAFETY CODE" (2018)

- NFPA 10, "PORTABLE FIRE EXTINGUISHERS" (2018)

- NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS" (2019)

- NFPA 70, "NATIONAL ELECTRICAL CODE (NEC)" (2017)

- NFPA 72, "NATIONAL FIRE ALARM CODE" (2019)

- NFPA 90A, "INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS" (2018)

- NFPA 99, "INSTALLATION FOR HEALTH CARE FACILITIES" (2018)

- NFPA 220, "TYPES OF BUILDING CONSTRUCTION" (2018)

- NFPA 241, "STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS" (2019)

- INTERNATIONAL BUILDING CODE (IBC) (2018)

- INTERNATIONAL MECHANICAL CODE (IMC) (2018)

- INTERNATIONAL PLUMBING CODE (IPC) (2018)

- INTERNATIONAL ENERGY CONSERVATION CODE (2018)

N

CLOSED CELL SPRAY

FOAM INSULATION

KEY PLAN - NTS

PROJECT SUMMARY

N

S STRUCTURAL

ARCHITECTURAL ABBREVIATIONS

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAMA AMERICAN ARCHITECTURAL MANUFACTURERS

ASSOCIATION

AB ANCHOR BOLT

ABC AGGREGATE BASE COURSE

AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE

ACI AMERICAN CONCRETE INSTITUTE

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR ADJUSTABLE

ADMIN ADMINISTRATION

ADB AUTOMATIC DOOR BOTTOM

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGA AMERICAN GAS ASSOCIATION

AGC ASSOCIATED GENERAL CONTRACTORS

AGGR AGGREGATE

AHJ AUTHORITY HAVING JURISDICTION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF ARCHITECTS

AISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTION

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AMP AMPERE

AMT AMOUNT

ANOD ANODIZE

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

ANT ANTENNA

APA AMERICAN PLYWOOD ASSOCIATION

APPD APPROVED

APPROX APPROXIMATE

APT APARTMENT

AR AS REQUIRED

ARCH ARCHITECT

ASB ASBESTOS

ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION

ASKLR AUTOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ASTM AMERICAN SOCIETY FOR TESTING AND

MATERIALS

ATCH ATTACHMENT

ATM AUTOMATIC TELLER MACHINE

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AVE AVENUE

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL WOODWORKING INSTITUTE

AWPA AMERICAN WOOD PRESERVERS' ASSOCIATION

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

B LABEL CLASS B DOOR

B PL BASE PLATE

BALC BALCONY

BAT BATTEN

BB BULLETIN BOARD

BD BOARD

BD FT BOARD FEET (FOOT)

BEV BEVEL

BHMA BUILDER'S HARDWARE MANUFACTURER'S

ASSOCIATION

BI FLD DR BIFOLDING DOORS

BITUM BITUMINOUS

BKG BACKING

BLD BUILD

BLDG BUILDING

BLKT BLANKET

BLVD BOULEVARD

BM BEAM OR BENCHMARK

BOT BOTTOM

BR BEDROOM

BRCG BRACING

BRDG BRIDGING

BRDG JST BRIDGING JOIST

BRG BEARING

BRG PL BEARING PLATE

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BU BUSHEL

BUR BUILT-UP ROOFING

C CELSIUS CHANNEL

C CHANNEL CELSIUS

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

C TO C CENTER TO CENTER

CAB CABINET

CAC CEILING ATTENUATION CLASS

CB CATCH BASIN OR CORNER BEAD

CBB CEMENTITIOUS (BACKER) BOARD

CC CUBIC CENTIMETER

CCTV CLOSED CIRCUIT TELEVISION

CCW COUNTERCLOCKWISE

CD CONSTRUCTION DOCUMENTS OR CONTRACT

DOCUMENTS

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR

INSTALLED

CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CENTER OF GRAVITY OR CORNER GUARD

CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS

CH BD CHALKBOARD

CHEM CHEMICAL

CHFR CHAMFER

CHK CHECK

CI CAST IRON

CIP CAST-IN-PLACE

CIR CIRCLE

CIRC CIRCULAR

CJ CONSTRUCTION JOINT OR CONTROL JOINT

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

cm² SQUARE CENTIMETER cm³ CUBIC CENTIMETER

CM CONSTRUCTION MANAGEMENT

CMU CONCRETE MASONRY UNIT

CNR CORNER

CNTR COUNTER

CO CARBON MONOXIDE, CERTIFICATE OF

OCCUPANCY, CLEANOUT, OR COMPANY

CO2 CARBON DIOXIDE

COL COLUMN

COM COMMON

COMB COMBINATION, COMBINED

COMM COMMUNICATION

COMP COMPONENT

CONC CONCRETE

CONC FLR CONCRETE FLOOR

COND CONDENSER OR CONDITION

CONF CONFERENCE

CONN CONNECT

CONSTR CONSTRUCTION

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

CORR CORRIDOR

CPM CRITICAL PATH METHOD

CPRS COMPRESSIBLE

CPT CARPET

CRS COLD ROLLED STEEL

CRSI CONCRETE REINFORCING STEEL INSTITUTE

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSI CONSTRUCTION SPECIFICATIONS INSTITUTE

CSK COUNTER SUNK

CSMT CASEMENT

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTG COATING

CTR CENTER CONTOUR

CTRL CONTROL

CTV CABLE TELEVISION

CU COPPER C

CU FT CUBIC FEET

CU IN CUBIC INCH

CU YD CUBIC YARD

CURT CURTAIN

CYL CYLINDER

CYL L CYLINDER LOCK

D DEPTH OR PENNY (NAIL)

D LABEL CLASS D DOOR

DAT DATUM

DB DECIBEL

DBL DOUBLE

DBL GLZ DOUBLE GLAZE

DC DIRECT CURRENT

DEG DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF ELECTRIC WATER COOLER

DIA DIAMETER

DIAG DIAGONAL DIAGRAM

DIAG DIAGRAM DIAGONAL

DIFF DIFFERENCE OR DIFFUSER

DIM DIMENSION

DIR DIRECTION

DISP DISPENSER

DIST DISTANCE

DIV DIVIDE OR DIVISION

DL DEAD LOAD

DOC DOCUMENT

DOUG FIR DOUGLAS FIR

DOZ DOZEN

DR DOOR, DRAIN, DRESSING ROOM, OR DRIVE

DR CL DOOR CLOSER

DR FR DOOR FRAME

DR OPNG DOOR OPENING

DS DOWNSPOUT

DSGN DESIGN

DW DISHWASHER

DWG DRAWING

DWTR DUMBWAITER

E EAST

E LABEL CLASS E DOOR

EA EACH

EFF EFFICIENCY

EFS EXTERIOR FINISH SYSTEM

EIFS EXTERIOR INSULATION AND FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRIC

ELEC DR OP ELECTRIC DOOR OPENER

ELEV ELEVATOR

EMER EMERGENCY

EMER SHR EMERGENCY SHOWER

ENCL ENCLOSURE

ENGR ENGINEER

ENVIR ENVIRONMENT

EPA ENVIRONMENTAL PROTECTION AGENCY

EPDM ETHYLENE PROPYLENE DIENE MONOMER

EPO EMERGENCY POWER OFF

EPS EXPANDED POLYSTYRENE BOARD (INSULATION)

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEON

ESCAL ESCALATOR

ESMT EASEMENT

ESP ESPECIALLY

EST ESTIMATE

ETC AND SO FORTH OR ET CETERA

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR EXPOSED

EXP BT EXPANSION BOLT

EXST GR EXISTING GRADE

EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER

EXT GR EXTERIOR GRADE

F FAHRENHEIT OR FEMALE

FA FIRE ALARM

FAB FABRIC

FAC FACTOR

FACIL FACILITY

FAS FASCIA

FAS BD FASCIA BOARD

FCO FLOOR CLEANOUT

FCTY FACTORY

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURE, AND EQUIPMENT

FH FLAT HEAD OR FLAT HEAD SCREWS

FHC FIRE HOSE CABINET

FHMS FLAT HEAD MACHINE SCREW

FHP FULL HEIGHT PARTITION

FHWS FLAT HEAD WOOD SCREW

FIG FIGURE

FIL FILLET

FIN FINISH

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIN WD FINISH WOOD

FIXT FIXTURE

FL FLOORLINE

FLASH FLASHING

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLR FLOOR

FLR FIN FLOOR FINISH

FLR SK FLOOR LAVATORY

FLUOR FLUORESCENT

FLUOR FIX FLUORESCENT FIXTURE

FM FACTORY MUTUAL

FM-G FACTORY MUTUAL GLOBAL

FO FINISHED OPENING

FOC FACE OF CONCRETE OR FACE OF CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF SLAB OR FACE OF STUD

FOUNT FOUNTAIN

FOW FACE OF WALL

FP FIRE PROTECTION OR FIREPROOF

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FIRE RATING, FIRE RESISTANT, OR FRAME

FR SNK FLUSHING RIM LAVATORY

FREQ FREQUENCY

FRMG FRAMING

FRP FIBER REINFORCED POLYESTER OR

FIBERGLASS REINFORCED PLASTIC

FRZ FREEZER

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET OR FOOT

FTG FOOTING

FURG FURRING

FURN FURNISH OR FURNITURE

FUT FUTURE

FWC FABRIC WALLCOVERING

GA GAGE OR GYPSUM ASSOCIATION

GAL GALLON

GALV GALVANIC OR GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GDR GUARD RAIL

GEN GENERAL OR GENERATOR

GFRC GLASS-FIBER-REINFORCED CONCRETE

GFRG GLASS-FIBER-REINFORCED GYPSUM

GFRP GLASS-FIBER-REINFORCED PLASTIC

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLOCK

GLU LAM GLUED LAMINATED WOOD

GR FL GROUND FLOOR

GRAN GRANITE

GRTG GRATING

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GSU GLAZED STRUCTURAL UNIT

GT GROUT

GUAR GUARANTEE

GUT GUTTER

GYP GYPSUM

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H HIGH

H PLAM HIGH PRESSURE PLASTIC LAMINATE

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIBB

HC HOLLOW CORE

HCWD HOLLOW CORE WOOD DOOR

HDBD HARDBOARD

HDNR HARDENER

HDO HIGH DENSITY OVERLAY

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HEX HEXAGON

HF HIGH FREQUENCY

HGR HANGER

HM HECTOMETER

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMDF HOLLOW METAL DOOR AND FRAME

HMF HOLLOW METAL FRAME

HNDRL HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HOSP HOSPITAL

HP HIGH PRESSURE OR HORSEPOWER

HQ HEADQUARTERS

HS HEAT-STRENGTHENED (GLASS) OR HIGH

STRENGTH

HSE HOUSE

HSKPG HOUSEKEEPING

HST HOIST

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR CONDITIONING

HVY HEAVY

HW HOT WATER

HYD HYDRANT

HYDR HYDRAULIC

I INTERSTATE (HIGHWAY) OR MOMENT OF

INERTIA

IAQ INDOOR AIR QUALITY

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE DIAMETER, OR

INTERIOR DESIGN

ID NO IDENTIFICATION NUMBER

ILLUM ILLUMINATION

INCL INCLUDED

IND INDEPENDENT OR INDUSTRIAL

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INTERCOM INTERCOMMUNICATION

INTL INTERNATIONAL

IRMA INVERTED ROOF MEMBRANE ASSEMBLY

IWH INSTANTANEOUS WATER HEATER

JAN JANITOR

J-BOX JUNCTION BOX

KD KILN DRIED OR KNOCKED DOWN

KIT KITCHEN

KO KNOCKOUT

KPL KICKPLATE

L ANGLE

LAB LABORATORY

LAD LADDER

LAM LAMINATE

LAM GL LAMINATED GLASS

LAU LAUNDRY

LAV LAVATORY

LBR LUMBER

LBS POUND

LD BRG LOAD-BEARING

LDR LEADER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LH LEFT HAND

LHR LEFT HAND REVERSE

LHR LEFT HAND REVERSE LATENT HEAT RATIO

LIB LIBRARY

LIN LINEAR

LINO LINOLEUM

LIQ LIQUID

LKR LOCKER

LKR RM LOCKER ROOM

LKWASH LOCKWASHER

LL LEAD LINED

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMST LIMESTONE

LNDSCP LANDSCAPE

LR LIVING ROOM

LRG LARGE

LRV LOUVERED ROOF VENT

LS LUMP SUM

LT LIGHT

LT GA LIGHT GAGE

LT WT LIGHTWEIGHT

LTG LIGHTING

LTNG LIGHTNING

LVD LOUVERED

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

LWIC LIGHTWEIGHT INSULATING CONCRETE

LYR LAYER

MACH MACHINE

MACH RM MACHINE ROOM

MAINT MAINTENANCE

MAN MANUAL

MATL MATERIAL

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MB MACHINE BOLT

MCB METAL CORNER BEAD

MD DECK

ME MECHANICAL ENGINEER

MEAS MEASURE

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MED MEDICAL MEDIUM

MED MEDIUM MEDICAL

MEK METHYL ETHYL KETONE

MEL MELAMINE

MEMB MEMBRANE

MEMO MEMORANDUM

MEZZ MEZZANINE

MF MILL FINISH

MFD MANUFACTURED

MFG MANUFACTURING

MFR MANUFACTURER

MFR REC MANUFACTURER'S RECOMMENDATION

MGT MANAGEMENT

MH MANHOLE

MIC MICROPHONE

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM MINUTE

MIN MINUTE MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MIT MITER

MKR MARKER

ML METAL LATH

MLDG MOLDING (MOULDING)

MLWK MILLWORK

mm MILLIMETER

MO MASONRY OPENING OR MOTOR OPERATED

MOD MODEL, MODIFY OR MODULE

MOD BIT MODIFIED BITUMEN

MON MONITOR

MOPR MOP RACK

MR MOISTURE RESISTANT

MS MACHINE SCREW OR MOP LAVATORY

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

MW MICROWAVE

MWP MEMBRANE WATERPROOFING

N NORTH

NA NOT APPLICABLE

NAAMM NATIONAL ASSOCIATION OF ARCHITECTURAL

METAL MANUFACTURERS

NAT NATURAL

NATL NATIONAL

NC NOISE CRITERIA

NCOMBL NONCOMBUSTIBLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NEMA NATIONAL ELECTRICAL MANUFACTURERS

ASSOCIATION

NEUT NEUTRAL

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NR NOISE REDUCTION

NRC NOISE REDUCTION COEFFICIENT

NRCA NATIONAL ROOFING CONTRACTORS

ASSOCIATION

NRP NONREMOVABLE

NS NARROW STILE

NUM NUMERAL

O/O OUT TO OUT

O OXYGEN

OA OUTSIDE AIR OR OVERALL

OC ON CENTER

OCC OCCUPY

OCT OCTAGON

OD OUTSIDE DIAMETER OUTSIDE DIMENSION

OD OUTSIDE DIMENSION OUTSIDE DIAMETER

OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OF/OI OWNER FURNISHED/OWNER INSTALLED

OH OVERHANG

OH DR OVERHEAD (COILING) DOOR

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

OPT OPTIONAL

OR OPERATING ROOM OR OUTSIDE RADIUS

ORD ORDNANCE OR OVERFLOW ROOF DRAIN

ORG ORGANIC

ORIG ORIGINAL

ORN ORNAMENTAL

OSHA OCCUPATIONAL SAFETY AND HEALTH

ADMINSTRATION

OUT OUTLET

OZ OUNCE

PAR PARALLEL OR PARAPET

PARA PARAGRAPH

PART PARTIAL

PAT PATTERN

PB PUSHBUTTON

PBD PARTICLEBOARD

PC PIECE, POLYCARBONATE OR PORTLAND

CEMENT

PCA PORTLAND CEMENT ASSOCIATION

PCC PRECAST CONCRETE

PCCP CONCRETE PAVEMENT

PCD PAPER CUP DISPENSER

PCF POUNDS PER CUBIC FOOT

PCP PORTLAND CEMENT PLASTER

PED PEDESTAL

PEN PENETRATE

PEND PENDANT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PGBD PEGBOARD

PHAR PHARMACY

PHOTO PHOTOGRAPH

PHS PHILLIPS HEAD SCREW

PKG PACKAGE

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER OR PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PMTL PAINTED METAL

PNEU PNEUMATIC

PNL PANEL

PO POST OFFICE PURCHASE ORDER

PO PURCHASE ORDER POST OFFICE

POLY POLYETHYLENE (PLASTIC)

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATE

PREFIN PREFINISH

PRELIM PRELIMINARY

PREP PREPARATION

PRESS PRESSURE

PREV PREVIOUS

PRKG PARKING

PRMLD PREMOLDED

PROJ PROJECT

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, PNEUMATIC TUBE, OR PRESSURE

TREATED

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC)

PVG PAVING

PWR POWER

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QRY QUARRY

QT QUARRY TILE

QTB QUARRY TILE BASE

QTF QUARRY TILE FLOOR

QTR QUARTER

QTY QUANTITY

QUAD QUADRANT

QUAL QUALITY

R RADIUS OR RISER

RA RETURN AIR

RAD RADIATOR

RB RESILIENT BASE OR RUBBER BASE

RB HK ROBE HOOK

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REMOTE CONTROL

RCP REFLECTED CEILING PLAN

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECD RECEIVED

RECPT RECEPTACLE

RECT RECTANGLE

REF REFERENCE OR REFRIGERATOR

REFR REFRACTORY REFRIGERATION

REFR REFRIGERATION REFRACTORY

REG REGISTER

REINF REINFORCE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

RET RETURN

REV REVISION

RF RADIO FREQUENCY

RFG ROOFING

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RHMS ROUND HEAD MACHINE SCREW

RHR RIGHT HAND REVERSE

RHWS ROUND HEAD WOOD SCREW

RL ROOF LEADER

RLG RAILING

RM ROOM

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RPM REVOLUTIONS PER MINUTE

RS ROUGH SAWN

RT RIGHT

RV ROOF VENT

RVS REVERSE

RWD REDWOOD

RWL RAIN WATER LEADER

SA SUPPLY AIR

SALV SALVAGE

SAMP SAMPLE

SAN SANITARY

SAT SUSPENDED ACOUSTICAL TILE

SATC SUSPENDED ACOUSTICAL TILE CEILING

SB SPLASH BLOCK

SBS STYRENE BUTADIEN STYRENE

SBSTR SUBSTRATE

SC SHADING COEFFICIENT OR SOLID CORE

SCH SCHOOL

SCHED SCHEDULE

SCHEM SCHEMATIC

SCP SCUPPER

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SCWD SOLID CORE WOOD DOOR

SD SHOP DRAWINGS, SMOKE DETECTOR, OR

SOAP DISPENSER;

SDG SIDING

SECT SECTION

SEG SEGMENT

SEL SELECT

SEP SEPARATE

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGD SLIDING GLASS DOOR

SGL SINGLE

SHR SHOWER

SHR HD SHOWER HEAD

SHRD SHOWER DRAIN

SHT SHEET

SHT MTL FLASH SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SJI STEEL JOIST INSTITUTE

SK SKETCH

SKLT SKYLIGHT

SLD WDW HORIZONTAL SLIDING WINDOW

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SMK SMOKE

SND SANITARY NAPKIN DISPENSER

SND INS SOUND INSULATION

SNDU SANITARY NAPKIN DISPOSAL UNIT

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SPLY SUPPLY

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SANITARY SEWER OR SERVICE LAVATORY

SST STAINLESS STEEL

ST STAIRS OR STREET

STC SOUND TRANSMISSION CLASS

STD STANDARD

STIF STIFFENER

STL JST STEEL JOIST

STL LNTL STEEL LINTEL

STL PL STEEL PLATE

STL RF DK STEEL ROOF DECK

STL TB STEEL TUBE

STL TR STEEL TRUSS

STNLS STAINLESS

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

STRUCT STL STRUCTURAL STEEL

SUB SUBSTITUTE

SURF SURFACE

SUSP SUSPEND

SUSP CLG SUSPENDED CEILING

SV SHEET VINYL

SW SWITCH

SWDR SWING DOOR

SYM SYMBOL

SYNTH SYNTHETIC

SYS SYSTEM

T TREAD

T&G TONGUE AND GROOVE

T&M TIME AND MATERIALS

TB THROUGH BOLT OR TOWEL BAR

TCA TILE COUNCIL OF AMERICA

TCP TELEPHONE CONTROL PANEL TEMPERATURE

CONTROL PANEL; TRAFFIC CONTROL PLAN

TD TOWEL DISPENSER

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR TEMPORARY

TER TERRAZZO

THD THREAD

THERM THERMAL

THK THICKNESS

THRES THRESHOLD

THRU THROUGH

THRUOUT THROUGHOUT

TK BD TACKBOARD

TMPD TEMPERED

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TO TOP OF ___

TO FDN TOP OF FOUNDATION

TOB TOP OF BEAM

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TR TOWEL RACK

TRANS TRANSOM

TRANS WD FINTRANSPARENT WOOD FINISH

TRTD TREATED

TS TENSILE STRENGTH OR TUBE STEEL

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

U HEAT TRANSFER COEFFICIENT

UC UNDERCUT

UCD UNDERCUT DOOR

UGND UNDERGROUND

UL UNDERWRITERS LABORATORIES

ULT ULTIMATE

UNFIN UNFINISH

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

UR URINAL

UTIL UTILITY

UV ULTRAVIOLET

V VOLT

VAC VACUUM

VAR VARIES

VCT VINYL COMPOSITION TILE VITRIFIED CLAY TILE

VEH VEHICLE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VFAT VINYL FACED ACOUSTICAL TILE

VIC VICINITY

VID VIDEO

VIF VERIFY IN FIELD

VNR VENEER

VOC VOLATILE ORGANIC COMPOUND

VOL VOLUME

VOLT VOLTAGE

VP VENEER PLASTER

VR VAPOR RETARDER

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

VWF VINYL WALL FABRIC

W WIDE OR WEST

W/ WITH

W/O WITHOUT

WARR WARRANTY

WBL WOOD BLOCKING

WC WALL COVERING OR WATER CLOSET

WC WL HNG WATER CLOSET, WALL HUNG

WCHR WATER CHILLER

WCL WL MTDWATER COOLER, WALL HUNG

WD WOOD

WDW WINDOW

WF WIDE FLANGE

WFAB WALL FABRIC

WFR WOOD FRAME

WFS WOOD FURRING STRIPS

WH WATER HEATER

WHSE WAREHOUSE

WLD WELDED

WM WIRE MESH

WP WATERPROOFING

WPD WATER PRESSURE DROP

WPM WATERPROOF MEMBRANE

WR WEATHER RESISTANT

WS WEATHERSTRIP

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

X BRACE CROSS BRACE

XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)

YD YARD

YR YEAR

UNO

ACM ASBESTOS CONTAINING MATERIAL

ACP ACRYLIC GLAZING

COR CONTRACTING OFFICER'S REPRESENTATIVE

WPR WALL PROTECTION / RAILING

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction &

Facilities Management

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANTS

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

INTERIORSARCHITECTURE

COX DESIGN ASSOCIATES

PLANNING

AUSTIN CHICAGO DENVER EL PASO

04/19/2022

BI

M

AL

M

VA

H R

EP

LA

C E

FO

U

R E

LE

VA

TO

R

S/

SA

N

EW

E

LE

VA

TO

R S_

AR

C

H _0

1.

rv t

4/

/2

4:

:2

PM

GI-003

CONSTRUCTION

DOCUMENTS 100%

ARCHITECTURAL

ABBREVIATIONS

REPLACE/MODERNIZE FOUR

(4) HYDRAULIC ELEVATORS

7400 MERTON MINTER, SAN ANTONIO, TX

78229

04/19/2022 RHC MAG

671-20-128

LEVERS PUSH/PULL PANIC BAR EXIT DEVICE

NOTE: DOOR HARDWARE IS MOUNTED 30" MIN - 44" MAX FROM FINISH FLOOR TO TOP OF THE DEVICE.

LATCHING & LOCKING DOORS THAT ARE HAND OPERATED AND WHICH ARE IN A PATH OF TRAVEL ARE OPERABLE WITH A SINGLE EFFORT (LEVER, PUSH/PULL, PANIC BAR OR OTHER HARDWARE ASSIGNED TO

PROVIDE PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING HARDWARE)

MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED 5 LBF, WHEN FIRE DOORS ARE REQUIRED THE

MAX EFFORT TO OPERATE THE DOOR MAY BE INCREASED TO THE MINIMUM ALLOWABLE BY THE

APPROPRIATE AUTHORITY , NOT TO EXCEED 15 LBF.

2 1/4" MAX

2 1/4" MIN

OD: 1 1/4" MIN, 2" MAX

PERIMETER DIMENSION:

4" MIN, 6 1/4" MAX

CLEARANCE DIMENSION:

1 1/2" MIN

1 1/2" MIN

2 1/4" MAX

2.5" MIN.

72" MIN.

2.5" MIN.

1.5" MIN.

15"

A. PROJECTING OBJECTS B. RECESSED OBJECTS

CODE CARD

FIRE ALARM STATION

DIGITAL

ALARM

SYSTEM

WALL

MOUNTED

COAT HOOK

DOOR

MOUNTED

COAT HOOKS

(4 '-0

" F O

R A

D A

IN

ST

AL

LA

TI

O

N S

CONTINUOUS FLOOR TO

CEILING CORNER

GUARD

MOP AND

BROOM

HOLDER

FIRE

EXTINGUISHER

CABINET

SWITCHES

FIRE

ALARM

PULL

ELECTRICAL &

TELEPHONE

RECEPTACLES TV / CABLE OUTLET

THERMOSTATS

MASTER

PAGE

INTERCOM

MASTER

STATION

DUTY STATION

STAFF STATION

FOR REFERENCE ONLY - THIS DOES NOT INDICATE EQUIPMENT OR FIXTURES PROVIDED

FINISH CEILING

FINISH FLOOR

4'

6"

4'

0"

1' - 6"

1'

0"

5'

6"

3"

EX

IS

TI

N

G

M

AT

C H

M

AX

3'

6"

3'

1' - 0"

3'

6"

M

AX

4'

0"

1'

6"

9"

6"

9"

4'

6"

EQ EQ EQ

5'

0"

ROOM SIGNAGE

SEE SHEET AS-721

ACCESS CONTROL HARDWARE

DOOR PUSH

PLATE, 4'-0" MIN.

AWAY FROM DOOR

STRIKE IF LOCATED

ON AN ADJACENT

WALL

2'

MIN.

1' - 3"

6'

0"

1' - 0"

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction &

Facilities Management

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANTS

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

INTERIORSARCHITECTURE

COX DESIGN ASSOCIATES

PLANNING

AUSTIN CHICAGO DENVER EL PASO

04/19/2022

BI

M

AL

M

VA

H R

EP

LA

C E

FO

U

R E

LE

VA

TO

R

S/

SA

N

EW

E

LE

VA

TO

R S_

AR

C

H _0

1.

rv t

4/

/2

4:

:2

PM

GI-004

CONSTRUCTION

DOCUMENTS 100%

ACCESSIBILITY STANDARDS REPLACE/MODERNIZE FOUR

(4) HYDRAULIC ELEVATORS

7400 MERTON MINTER, SAN ANTONIO, TX

78229

04/19/2022 RHC MAG

671-20-128

SCALE: 12" = 1'-0"4 DOOR HARDWARE1

SCALE: 12" = 1'-0"2 HANDRAIL PROFILES

SCALE: 12" = 1'-0"1 VISIBLE HALL SIGNALS

SCALE: 12" = 1'-0"3 SPACING OF GRAB BARS1

SCALE: 1/4" = 1'-0"5 TYPICAL MOUNTING HEIGHTS1

P14 & P15

S12 P11

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction &

Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

INTERIORSARCHITECTURE

COX DESIGN ASSOCIATES

PLANNING

AUSTIN CHICAGO DENVER EL PASO

04/19/2022

BI

M

AL

M

VA

H R

EP

LA

C E

FO

U

R E

LE

VA

TO

R

S/

SA

N

EW

E

LE

VA

TO

R S_

AR

C

H _0

1.

rv t

4/

/2

4:

:5

PM

GI-100

CONSTRUCTION

DOCUMENTS 100%

OVERALL PLAN REPLACE/MODERNIZE FOUR

(4) HYDRAULIC ELEVATORS

7400 MERTON MINTER, SAN ANTONIO, TX

78229

04/19/2022 RHC MAG

671-20-128

SCALE: 1" = 30'-0"

OVERALL PLAN1

N

UP

UP

UP

UP

NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS

FIRST FLOOR

ELEVATOR

LOBBY STAIRS

P-11

NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS

GROUND

LEVEL

ELEVATOR

LOBBY

S-12

STAIRS

A. BUILDING IS FULLY SPRINKLERED.

B. EXIT STAIR ENCLOSURES ARE TWO HOUR RATED.

C. ALL PARTITIONS SHOWN WITHOUT FIRE RATING ARE NON-RATED U.N.O.

D. DURING DEMOLITION AND NEW CONSTRUCTION PHASES, CONTRACTOR SHALL

MAINTAIN REQUIRED RATING AT ALL EXISTING WALLS, FLOORS AND ROOFS TO

REMAIN.

E. REFER TO SHEET AS-300, FOR DOOR SCHEDULE, NUMBER, HARDWARE, RATING

AND SECURITY INFORMATION.

F. CONTRACTOR SHALL COORDINATE WITH ALL DISCIPLINE DRAWINGS FOR

ADDITIONAL INFORMATION.

G. ALL DOORS IN A RATED PARTITION OR SMOKE PARTITION SHALL HAVE THE

APPROPRIATE RATING TO CORRESPOND WITH WALL.

H. REFER TO SHEET XX-XXX, FOR PARTITION TYPES.

NEW WALL

PATH OF EGRESS

EXISTING WALL

NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS

SECOND

FLOOR

ELEVATOR

LOBBY

P-11

STAIRS

NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS

BASEMENT

ELEVATOR

LOBBY

S-12

S-12

EQUIPMENT

ROOM

GENERAL

STORAGE

MAIN TOWER

P-14,P-15 S-12

P-11

MAIN BUILDING

COMMUNITY

LIVING

CENTER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction &

Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

INTERIORSARCHITECTURE

COX DESIGN ASSOCIATES

PLANNING

AUSTIN CHICAGO DENVER EL PASO

04/19/2022

BI

M

AL

M

VA

H R

EP

LA

C E

FO

U

R E

LE

VA

TO

R

S/

SA

N

EW

E

LE

VA

TO

R S_

AR

C

H _0

1.

rv t

4/

/2

4:

:5

PM

GI-101

CONSTRUCTION

DOCUMENTS 100%

LIFE SAFETY / CODE ANALYSIS

P-11 & S-12

REPLACE/MODERNIZE FOUR

(4) HYDRAULIC ELEVATORS

7400 MERTON MINTER, SAN ANTONIO, TX

78229

04/19/2022 RHC MAG

671-20-128

SCALE: 1/4" = 1'-0"2 P-11 - FIRST FLOOR LIFE SAFETY PLAN

SCALE: 1/4" = 1'-0"3 S-12 GROUND LEVEL LIFE SAFETY PLAN

LIFE SAFETY LEGEND

LIFE SAFETY GENERAL NOTES

SCALE: 1/4" = 1'-0"1 P-11 SECOND FLOOR LIFE SAFETY PLAN

SCALE: 1/4" = 1'-0"4 S-12 BASEMENT LIFE SAFETY PLAN

KEY PLAN

NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS

STAIRS

P-14 P-15

FIRST FLOOR

ELEVATOR

LOBBY

H.A.C.

NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS

STAIRS

P-14 & P-15

EQUIPMENT

ROOM

P-14 P-15

SECOND FLOOR

ELEVATOR

LOBBY

A. BUILDING IS FULLY SPRINKLERED.

B. EXIT STAIR ENCLOSURES ARE TWO HOUR RATED.

C. ALL PARTITIONS SHOWN WITHOUT FIRE RATING ARE NON-RATED U.N.O.

D. DURING DEMOLITION AND NEW CONSTRUCTION PHASES, CONTRACTOR SHALL

MAINTAIN REQUIRED RATING AT ALL EXISTING WALLS, FLOORS AND ROOFS TO

REMAIN.

E. REFER TO SHEET AS-300, FOR DOOR SCHEDULE, NUMBER, HARDWARE, RATING

AND SECURITY INFORMATION.

F. CONTRACTOR SHALL COORDINATE WITH ALL DISCIPLINE DRAWINGS FOR

ADDITIONAL INFORMATION.

G. ALL DOORS IN A RATED PARTITION OR SMOKE PARTITION SHALL HAVE THE

APPROPRIATE RATING TO CORRESPOND WITH WALL.

H. REFER TO SHEET XX-XXX, FOR PARTITION TYPES.

NEW WALL

PATH OF EGRESS

EXISTING WALL

MAIN TOWER

P-14,P-15 S-12

P-11

MAIN BUILDING

COMMUNITY

LIVING

CENTER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction &

Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

INTERIORSARCHITECTURE

COX DESIGN ASSOCIATES

PLANNING

AUSTIN CHICAGO DENVER EL PASO

04/19/2022

BI

M

AL

M

VA

H R

EP

LA

C E

FO

U

R E

LE

VA

TO

R

S/

SA

N

EW

E

LE

VA

TO

R S_

AR

C

H _0

1.

rv t

4/

/2

4:

:5

PM

GI-102

CONSTRUCTION

DOCUMENTS 100%

LIFE SAFETY / CODE ANALYSIS

P-14 & P-15

REPLACE/MODERNIZE FOUR

(4) HYDRAULIC ELEVATORS

7400 MERTON MINTER, SAN ANTONIO, TX

78229

04/19/2022 RHC MAG

671-20-128

SCALE: 1/4" = 1'-0"2 P-14 & P-15 FIRST FLOOR LIFE SAFETY PLAN

SCALE: 1/4" = 1'-0"1 P-14 & P-15 SECOND FLOOR LIFE SAFETY PLAN

LIFE SAFETY LEGEND

LIFE SAFETY GENERAL NOTES

KEY PLAN

UP

UP

UP

A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED IN

SPECIFICATIONS.

B. REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

C. PROJECT SHALL BE COMPLETED IN PHASES (i.e. NO TWO ELEVATORS IN THE SAME

HOISTWAY SHALL BE INOPERABLE AT ONE TIME); REFERENCE SPECIFICATION 01 00 00

PART 1.10G.

D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND FIELD

VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR THE SCOPE OF ABOVE CEILING

WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE PROJECT BOUNDARY.

E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL BARRIER WALL

CONSTRUCTION AND INFECTION CONTROL MEASURES WITH COR.

F. PROVIDE THE REQUIRED VA AND OSHA TEMPORARY SIGNAGE AT EACH TEMPORARY

DOOR LOCATION.

G. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC.

MULTIPURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE LIQUIDS UP

TO 30 GALLONS.

H. NEW MATERIAL MOVED THROUGH FACILITY SHALL BE COVERED WITH 4 MIL. POLY

SHEET.

I. DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT BOUNDARY

THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED ROUTE IN ENCLOSED

DUMPSTER CART DESIGNED FOR SUCH PURPOSE WITH A LID.

J. MATERIAL AND DEBRIS SHALL BE PROPERLY STORED IN DESIGNATED AREAS AND

APPROVED CONTAINERS. FLAMMABLE MATERIALS SHALL NOT BE STORED IN THE

FACILITY.

K. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE PROJECT

BOUNDARY.

L. MAINTAIN CLEAR PATH TO EXIT STAIRS AS REQUIRED.

M. PROVIDE LOCKABLE TEMPORARY DOOR TO BE USED TO ACCESS CONSTRUCTION

AREAS BY AUTHORIZED PERSONNEL.

A. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO

ATMOSPHERE.

B. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

C. SEAL UNUSED DOORS WITH DUCT TAPE

D. BLOCK OFF AND SEAL AIR VENTS.

E. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES. A 24"X36" STICKY

WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.

MAT SHALL BE REPLACED OR CLEANED AS NECESSARY.

F. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING

PERFORMED.

G. COVER HEAT AND SMOKE DETECTORS IN WORK AREA DURING ALL DUST

PRODUCING ACTIVITIES.

H. EMPTY TRASH DAILY.

A. WIPE WORK SURFACES WITH DISINFECTANT.

B. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

C. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK

AREA.

D. REMOVE ISOLATION HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

E. TERMINAL CLEANING AS NEEDED AND/OR PROJECT COMPLETION.

A. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT

CONSTRUCTION.

B. PROJECT SHALL BE COMPLETED DURING NORMAL BUSINESS HOURS. COORDINATE

WITH COR.

C. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION FOR

EACH PHASE AND AREA OF WORK.

D. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR AND

STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING INFORMATION FOR

ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED CMP SCHEDULE FOR WORK

ALSO REQUIRED ABOVE AND BELOW FLOOR PLATE OF THE PROJECT BOUNDARY.

E. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE CEILING ARE TO REMAIN,

CEILING TILES SHALL BE REMOVED AND STORED IN SAFE MANOR UNTIL CEILING

TILES CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE

REPLACED BY THE CONTRACTOR.

F. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED DURING

NORMAL BUSINESS HOURS

G. EVERY EFFORT SHALL BE MADE TO KEEP NOISE AND VIBRATION TO A MINIMUM.

EXISTING WALL

TEMPORARY BARRIER WALLS

NEW WALLTEMPORARY

CONSTRUCTION

ACCESS DOOR

COORDINATE WITH EXISTING CEILING

CONSTRUCTION

SIDE

PUBLIC

SIDE

3 5/8" METAL STUD @ 16" O.C. WITH RUNNER

CHANNELS ALONG TOP AND BOTTOM

TWO LAYERS 5/8" TYPE X GYPSUM BOARD

APPLIED TO ONE SIDE OF STEEL STUDS W/

TAPED JOINTS

UL LISTING: V497

CONTINUOUS FIRE SAFE SEALANT

TOP AND BOTTOM

NFPA 241

CONTINUOUS FIRE SAFE SEALANT TOP AND BOTTOM

REQUIRED TEMPORARY SIGNAGE

1 HOUR FIRE RATED METAL DOOR

ASSEMBLY AND FRAME WITH SEALS,

CARD READER, HARDWARE AND

TEMPORARY SIGNAGE

HAND SANITIZER

TRIATEK MONITOR

CONTINUOUS FIRE SAFE SEALANT TOP AND BOTTOM

PUBLIC

SIDE

REQUIRED AUTO-CLOSE MECHANISM

UL LISTING: V497

SCHLAGE CO-100

CYPHER LOCK.

CONTRACTOR TO

TURN OVER LOCK

TO VA AFTER

COMPLETION OF

PROJECT

NFPA 241

MIN.

4' - 0"

GI-103

GI-103 2

FIRST FLOOR

ELEVATOR

LOBBY

STAIRS

P-11

GI-103

GROUND

LEVEL

ELEVATOR

LOBBY

S-12

STAIRS

GI-103 2

GI-103

GI-1032

SECOND

FLOOR

ELEVATOR

LOBBY

P-11

STAIRS

4'

0"

GI-103

GI-103

BASEMENT

ELEVATOR

LOBBY

S-12

S-12

EQUIPMENT

ROOM

MAIN TOWER

P-14,P-15 S-12

P-11

MAIN BUILDING

COMMUNITY

LIVING

CENTER

1. PROVIDE INFECTION CONTROL TEMPORARY BARRIER WALL CONSTRUCTION.

VERIFY LOCATION IN FIELD, CALL BUTTONS SHALL BE OPERATIONAL DURING ALL

PHASES.

2. PROVIDE INFECTION CONTROL TEMPORARY DOOR, REUSE DOOR IN SUBSEQUENT

PHASES.

3. CONTRACTOR TO COORDINATE WITH VA C.O.R. FOR LOCATION OF TEMPORARY

WALLS AND DOORS IN THIS LOCATION.

4. SEAL OFF EXISTING DOOR WITH 6 MIL FIRE RETARDANT POLYETHYLENE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction &

Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

INTERIORSARCHITECTURE

COX DESIGN ASSOCIATES

PLANNING

AUSTIN CHICAGO DENVER EL PASO

04/19/2022

BI

M

AL

M

VA

H R

EP

LA

C E

FO

U

R E

LE

VA

TO

R

S/

SA

N

EW

E

LE

VA

TO

R S_

AR

C

H _0

1.

rv t

4/

/2

4:

:5

PM

GI-103

CONSTRUCTION

DOCUMENTS 100%

INFECTION CONTROL / PHASING

PLANS - PHASE 1 P-11 & S-12

REPLACE/MODERNIZE FOUR

(4) HYDRAULIC ELEVATORS

7400 MERTON MINTER, SAN ANTONIO, TX

78229

04/19/2022 RHC MAG

671-20-128

INFECTION CONTROL - GENERAL NOTES

INFECTION CONTROL - DURING

CONSTRUCTION

INFECTION CONTROL - UPON COMPLETION

PHASING GENERAL NOTES

INFECTION CONTROL LEGEND

KEY PLAN

SCALE: 1 1/2" = 1'-0"1 TYP. TEMPORARY 1-HR BARRIER WALL CONSTRUCTION - V497

SCALE: 1/4" = 1'-0"2 TYP. TEMPORARY 1-HR BARRIER WALL CONSTRUCTION ELEVATION - V497

SCALE: 1/4" = 1'-0"4 P-11 FIRST FLOOR INFECTIOUS CONTROL PLAN - PHASE 1

SCALE: 1/4" = 1'-0"5 S-12 GROUND LEVEL INFECTIOUS CONTROL PLAN - PHASE 1

SCALE: 1/4" = 1'-0"3 P-11 SECOND FLOOR INFECTIOUS CONTROL PLAN - PHASE 1

SCALE: 1/4" = 1'-0"6 S-12 BASEMENT INFECTIOUS CONTROL PLAN - PHASE 1

SHEET KEYNOTES XX

STAIRS

P-14 P-15

GI-103

GI-103

FIRST FLOOR

ELEVATOR

LOBBY

H.A.C.

STAIRS

P-14 & P-15

EQUIPMENT

ROOM

P-14 P-15

GI-103

GI-103

SECOND FLOOR

ELEVATOR

LOBBY

A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED IN

SPECIFICATIONS.

B. REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

C. PROJECT SHALL BE COMPLETED IN PHASES (i.e. NO TWO ELEVATORS IN THE SAME

HOISTWAY SHALL BE INOPERABLE AT ONE TIME); REFERENCE SPECIFICATION 01 00 00

PART 1.10G.

D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND FIELD

VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR THE SCOPE OF ABOVE CEILING

WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE PROJECT BOUNDARY.

E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL BARRIER WALL

CONSTRUCTION AND INFECTION CONTROL MEASURES WITH COR.

F. PROVIDE THE REQUIRED VA AND OSHA TEMPORARY SIGNAGE AT EACH TEMPORARY

DOOR LOCATION.

G. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC.

MULTIPURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE LIQUIDS UP

TO 30 GALLONS.

H. NEW MATERIAL MOVED THROUGH FACILITY SHALL BE COVERED WITH 4 MIL. POLY

SHEET.

I. DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT BOUNDARY

THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED ROUTE IN ENCLOSED

DUMPSTER CART DESIGNED FOR SUCH PURPOSE WITH A LID.

J. MATERIAL AND DEBRIS SHALL BE PROPERLY STORED IN DESIGNATED AREAS AND

APPROVED CONTAINERS. FLAMMABLE MATERIALS SHALL NOT BE STORED IN THE

FACILITY.

K. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE PROJECT

BOUNDARY.

L. MAINTAIN CLEAR PATH TO EXIT STAIRS AS REQUIRED.

M. PROVIDE LOCKABLE TEMPORARY DOOR TO BE USED TO ACCESS CONSTRUCTION

AREAS BY AUTHORIZED PERSONNEL.

A. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO

ATMOSPHERE.

B. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

C. SEAL UNUSED DOORS WITH DUCT TAPE

D. BLOCK OFF AND SEAL AIR VENTS.

E. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES. A 24"X36" STICKY

WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.

MAT SHALL BE REPLACED OR CLEANED AS NECESSARY.

F. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING

PERFORMED.

G. COVER HEAT AND SMOKE DETECTORS IN WORK AREA DURING ALL DUST

PRODUCING ACTIVITIES.

H. EMPTY TRASH DAILY.

A. WIPE WORK SURFACES WITH DISINFECTANT.

B. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

C. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK

AREA.

D. REMOVE ISOLATION HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

E. TERMINAL CLEANING AS NEEDED AND/OR PROJECT COMPLETION.

A. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT

CONSTRUCTION.

B. PROJECT SHALL BE COMPLETED DURING NORMAL BUSINESS HOURS. COORDINATE

WITH COR.

C. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION FOR

EACH PHASE AND AREA OF WORK.

D. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR AND

STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING INFORMATION FOR

ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED CMP SCHEDULE FOR WORK

ALSO REQUIRED ABOVE AND BELOW FLOOR PLATE OF THE PROJECT BOUNDARY.

E. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE CEILING ARE TO REMAIN,

CEILING TILES SHALL BE REMOVED AND STORED IN SAFE MANOR UNTIL CEILING

TILES CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE

REPLACED BY THE CONTRACTOR.

F. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED DURING

NORMAL BUSINESS HOURS

G. EVERY EFFORT SHALL BE MADE TO KEEP NOISE AND VIBRATION TO A MINIMUM.

EXISTING WALL

TEMPORARY BARRIER WALLS

NEW WALLTEMPORARY

CONSTRUCTION

ACCESS DOOR

MAIN TOWER

P-14,P-15 S-12

P-11

MAIN BUILDING

COMMUNITY

LIVING

CENTER

1. PROVIDE INFECTION CONTROL TEMPORARY BARRIER WALL CONSTRUCTION.

VERIFY LOCATION IN FIELD, CALL BUTTONS SHALL BE OPERATIONAL DURING ALL

PHASES.

2. PROVIDE INFECTION CONTROL TEMPORARY DOOR, REUSE DOOR IN SUBSEQUENT

PHASES.

3. CONTRACTOR TO COORDINATE WITH VA C.O.R. FOR LOCATION OF TEMPORARY

WALLS AND DOORS IN THIS LOCATION.

4. SEAL OFF EXISTING DOOR WITH 6 MIL FIRE RETARDANT POLYETHYLENE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction &

Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

INTERIORSARCHITECTURE

COX DESIGN ASSOCIATES

PLANNING

AUSTIN CHICAGO DENVER EL PASO

04/19/2022

BI

M

AL

M

VA

H R

EP

LA

C E

FO

U

R E

LE

VA

TO

R

S/

SA

N

EW

E

LE

VA

TO

R S_

AR

C

H _0

1.

rv t

4/

/2

4:

:5

PM

GI-104

CONSTRUCTION

DOCUMENTS 100%

INFECTION CONTROL / PHASING

PLANS - PHASE 1 P-14 & P-15

REPLACE/MODERNIZE FOUR

(4) HYDRAULIC ELEVATORS

7400 MERTON MINTER, SAN ANTONIO, TX

78229

04/19/2022 RHC MAG

671-20-128

SCALE: 1/4" = 1'-0"2 P-14 & P-15 FIRST FLOOR INFECTIOUS CONTROL PLAN - PHASE 1

SCALE: 1/4" = 1'-0"1 P-14 & P-15 SECOND FLOOR INFECTIOUS CONTROL PLAN - PHASE 1

INFECTION CONTROL - GENERAL NOTES

INFECTION CONTROL - DURING

CONSTRUCTION

INFECTION CONTROL - UPON COMPLETION

PHASING GENERAL NOTES

INFECTION CONTROL LEGEND

KEY PLAN

GI-103

GI-103

STAIRS

P-14 P-15

FIRST FLOOR

ELEVATOR

LOBBY

H.A.C.

GI-103

GI-103

STAIRS

P-14 & P-15

EQUIPMENT

ROOM

P-14 P-15

SECOND FLOOR

ELEVATOR

LOBBY

MAIN TOWER

P-14,P-15 S-12

P-11

MAIN BUILDING

COMMUNITY

LIVING

CENTER

A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED IN

SPECIFICATIONS.

B. REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

C. PROJECT SHALL BE COMPLETED IN PHASES (i.e. NO TWO ELEVATORS IN THE SAME

HOISTWAY SHALL BE INOPERABLE AT ONE TIME); REFERENCE SPECIFICATION 01 00 00

PART 1.10G.

D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND FIELD

VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR THE SCOPE OF ABOVE CEILING

WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE PROJECT BOUNDARY.

E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL BARRIER WALL

CONSTRUCTION AND INFECTION CONTROL MEASURES WITH COR.

F. PROVIDE THE REQUIRED VA AND OSHA TEMPORARY SIGNAGE AT EACH TEMPORARY

DOOR LOCATION.

G. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC.

MULTIPURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE LIQUIDS UP

TO 30 GALLONS.

H. NEW MATERIAL MOVED THROUGH FACILITY SHALL BE COVERED WITH 4 MIL. POLY

SHEET.

I. DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT BOUNDARY

THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED ROUTE IN ENCLOSED

DUMPSTER CART DESIGNED FOR SUCH PURPOSE WITH A LID.

J. MATERIAL AND DEBRIS SHALL BE PROPERLY STORED IN DESIGNATED AREAS AND

APPROVED CONTAINERS. FLAMMABLE MATERIALS SHALL NOT BE STORED IN THE

FACILITY.

K. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE PROJECT

BOUNDARY.

L. MAINTAIN CLEAR PATH TO EXIT STAIRS AS REQUIRED.

M. PROVIDE LOCKABLE TEMPORARY DOOR TO BE USED TO ACCESS CONSTRUCTION

AREAS BY AUTHORIZED PERSONNEL.

A. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO

ATMOSPHERE.

B. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

C. SEAL UNUSED DOORS WITH DUCT TAPE

D. BLOCK OFF AND SEAL AIR VENTS.

E. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES. A 24"X36" STICKY

WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.

MAT SHALL BE REPLACED OR CLEANED AS NECESSARY.

F. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING

PERFORMED.

G.

This is the start of the file's text. The full file is on GovTribe.