VA AM Elevator Replacement 100 CD Drawings 04192022 SM.pdf
PDF 7 MB Posted
- Solicitation number
- 36C25722B0027
About this file
This solicitation is for replacing four hydraulic elevators (P-14, P-15, P-11 and S-12) at the Audie L. Murphy VA Hospital located in San Antonio, Texas. The project number is 671-20-128. The solicitation includes drawings and specifications for demolishing the existing elevators and installing new systems, including elevator cab finishes, controls, and mechanical equipment. Bids are due on April 19, 2022. The construction work must be completed in phases to maintain elevator service, with infection control measures in place. The awarded contractor will be responsible for repairing and patching walls, floors, and the roof during construction. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17 is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25722B0027 0011.docx | DOCX document | |
| 36C25722B0027 0010.docx | DOCX document | |
| 36C25722B0027 0009.docx | DOCX document | |
| Supplemental Information.pdf | ||
| 36C25722B0027 0008.docx | DOCX document | |
| 36C25722B0027 0007.docx | DOCX document | |
| IMG_0415.pdf | ||
| 36C25722B0027 0006.docx | DOCX document | |
| 36C25722B0027 0005.docx | DOCX document | |
| IMG_0416.jpg | JPG image | |
| 36C25722B0027 0004.docx | DOCX document | |
| Sign-in-Sheet Pre-Bid Site Visit.pdf | ||
| 36C25722B0027 0003.docx | DOCX document | |
| 36C25722B0027 0002.docx | DOCX document | |
| VAAR 852.236-92.pdf | ||
| Door Controller DC1000 Data Sheet.pdf | ||
| Dwg 6 Cfig 6 Selective Elevator Monitor Inside of Elev Rev3.pdf | ||
| Pre Bid - Sign In Sheet.pdf | ||
| 36C25722B0027 0001.docx | DOCX document | |
| 36C25722B0027_2.docx | DOCX document | |
| VA AM Elevator Replacement 100 CD Specifications.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction &
Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANTS
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
INTERIORSARCHITECTURE
COX DESIGN ASSOCIATES
PLANNING
AUSTIN CHICAGO DENVER EL PASO
04/19/2022
BI
M
AL
M
VA
H R
EP
LA
C E
FO
U
R E
LE
VA
TO
R
S/
SA
N
EW
E
LE
VA
TO
R S_
AR
C
H _0
1.
rv t
4/
/2
4:
:2
PM
GI-000
CONSTRUCTION
DOCUMENTS 100%
COVER SHEET REPLACE/MODERNIZE FOUR
(4) HYDRAULIC ELEVATORS
7400 MERTON MINTER, SAN ANTONIO, TX
78229
04/19/2022 RHC MAG
671-20-128
AUDIE L. MURPHY VA HOSPITAL
7400 MERTON MINTER BLVD. SAN ANTONIO, TX. 78229
REPLACE/MODERNIZE FOUR (4) HYDRAULIC ELEVATORS
PROJECT # 671-20-128
ELEVATOR P14 ELEVATOR P15 ELEVATOR S12 ELEVATOR P11
CONSTRUCTION DOCUMENTS 100% SUBMITTAL
Revisions: Date:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction &
Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANTS
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
INTERIORSARCHITECTURE
COX DESIGN ASSOCIATES
PLANNING
AUSTIN CHICAGO DENVER EL PASO
04/19/2022
BI
M
AL
M
VA
H R
EP
LA
C E
FO
U
R E
LE
VA
TO
R
S/
SA
N
EW
E
LE
VA
TO
R S_
AR
C
H _0
1.
rv t
4/
/2
4:
:2
PM
GI-001
CONSTRUCTION
DOCUMENTS 100%
INDEX OF DRAWINGS REPLACE/MODERNIZE FOUR
(4) HYDRAULIC ELEVATORS
7400 MERTON MINTER, SAN ANTONIO, TX
78229
04/19/2022 RHC MAG
671-20-128
5 - ELECTRICAL
EP-000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
EP-001 OVERALL ELECTRICAL FLOOR PLAN
ED-101 ENLARGED ELECTRICAL FLOOR PLANS -
ELEVATOR P-11 - DEMOLITION
ED-102 ENLARGED ELECTRICAL FLOOR PLANS -
ELEVATOR S-12 AND ELEC ROOM L007 -
DEMOLITION
ED-103 ENLARGED ELECTRICAL FLOOR PLANS -
ELEVATOR P-14 & P-15 - DEMOLITION
ED-201 PARTIAL ONE-LINE DIAGRAM DEMOLITION
EP-101 ENLARGED ELECTRICAL FLOOR PLANS -
ELEVATOR P-11 - NEW WORK
EP-102 ENLARGED ELECTRICAL FLOOR PLANS -
ELEVATOR S-12 AND ELEC ROOM L007 - NEW
WORK
EP-103 ENLARGED ELECTRICAL FLOOR PLANS -
ELEVATOR P-14 & P-15 - NEW WORK
EP-201 PARTIAL ONE-LINE DIAGRAM NEW WORK
EP-301 ELECTRICAL SCHEDULES
EP-401 ELECTRICAL DETAILS
EP-402 ELECTRICAL DETAILS
4 - MECHANICAL
MH-001 MECHANICAL SYMBOLS AND ABBREVIATIONS
MHD-101 MECHANICAL DEMOLITION P-11 & S-12
ELEVATOR FLOOR PLANS
MHD-102 MECHANICAL DEMOLITION P-14 & P-15
ELEVATOR FLOOR PLANS
MH-101 MECHANICAL P-11 & S-12 ELEVATOR FLOOR
PLANS
MH-102 MECHANICAL P-14 & P-15 ELEVATOR FLOOR
PLANS
MH-103 MECHANICAL OVERALL FLOOR PLAN
MH-201 MECHANICAL CONTROL DIAGRAMS,
SCHEDULES, & DETAILS
3 - PLUMBING
PP-001 PLUMBING SYMBOLS AND ABBREVIATIONS
PPD-101 PLUMBING DEMOLITION P-11 & S-12 ELEVATOR
FLOOR PLANS
PPD-102 PLUMBING DEMOLITION P-14 & P-15 ELEVATOR
FLOOR PLANS
PP-101 PLUMBING P-11 & S-12 ELEVATOR FLOOR PLANS
PP-102 PLUMBING P-14 & P-15 ELEVATOR FLOOR PLANS
PP-201 PLUMBING SCHEDULES & DETAILS
2 - ARCHITECTURAL
AD-100 ELEVATOR P-11 DEMOLITION PLANS
AD-101 ELEVATOR S-12 DEMOLITION PLANS
AD-102 ELEVATOR P-14 & P-15 DEMOLITION PLANS
AS-100 ELEVATOR P-11 & S-12 FLOOR PLANS
AS-101 ELEVATOR P-14 & P-15 FLOOR PLANS
AS-200 ELEVATOR P-11 & S-12 ELEVATIONS
AS-201 ELEVATOR P-11 & S-12 SECTIONS
AS-202 ELEVATOR P-14 & P-15 ELEVATIONS
AS-203 ELEVATOR P-14 & P-15 SECTIONS
AS-300 MATERIAL FINISH SCHEDULE AND 3D VIEWS
1 - GENERAL
GI-000 COVER SHEET
GI-001 INDEX OF DRAWINGS
GI-002 GENERAL NOTES
GI-003 ARCHITECTURAL ABBREVIATIONS
GI-004 ACCESSIBILITY STANDARDS
GI-100 OVERALL PLAN
GI-101 LIFE SAFETY / CODE ANALYSIS P-11 & S-12
GI-102 LIFE SAFETY / CODE ANALYSIS P-14 & P-15
GI-103 INFECTION CONTROL / PHASING PLANS - PHASE
1 P-11 & S-12
GI-104 INFECTION CONTROL / PHASING PLANS - PHASE
1 P-14 & P-15
GI-105 INFECTION CONTROL / PHASING PLANS - PHASE
2 P-14 & P-15
1. UNLESS NOTED AS EXISTING, ALL MATERIALS, EQUIPMENT,
MANUFACTURED ITEMS AND ASSEMBLIES INCORPORATED INTO THE
WORK SHALL BE NEW.
2. UNLESS NOTED TO BE REMOVED AND DISPOSED, ALL EXISTING ITEMS
ARE TO REMAIN. THEY SHALL BE PROTECTED FROM DAMAGE DUE TO
CONSTRUCTION ACTIVITIES. ANY EXISTING ITEMS TO REMAIN THAT
BECOME DAMAGED DUE TO CONSTRUCTION ACTIVITIES SHALL BE
REPAIRED OR REPLACED TO MATCH EXISTING AT NO ADDITIONAL COST
TO THE OWNER.
3. NOTATIONS FOR ITEMS OF WORK APPLY TO EACH AND EVERY
GRAPHICAL INDICATION SHOWN ON THE DRAWINGS, WHETHER OR NOT
NOTED.
4. ALL ITEMS NOTED TO HAVE PAINT FINISH SHALL BE THOROUGHLY
CLEANED AND PROPERLY PREPARED IN ACCORDANCE WITH THE
SPECIFICATIONS PRIOR TO THE APPLICATION OF PRIMER AND PAINT.
5. THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE
MECHANICAL, ELECTRICAL, AND PLUMBING WORK AND SATISFY THE
REQUIREMENTS FOR SUPPORT, FLOOR, WALL AND ROOF OPENINGS,
FLASHINGS AND CURBS ETC. THE ARCHITECT SHALL BE NOTIFIED OF
CONFLICTS OR DISCREPANCIES PRIOR TO COMMENCEMENT OF
CONSTRUCTION.
6. CONTRACTOR TO REPLACE & ACCURATELY LOCATE ALL EXISTING
SIGNAGE AND LABELS NOTING RATED WALL ASSEMBLIES AND SMOKE
PARTITIONS
7. THE GENERAL CONTRACTOR SHALL VISIT THE SITE, VERIFY FIELD
CONDITIONS AND CAREFULLY COMPARE SUCH FIELD CONDITIONS AND
OTHER INFORMATION KNOWN TO THE CONTRACTOR WITH CONTRACT
DOCUMENTS.
8. THE GENERAL CONTRACTOR SHALL REPORT ANY UNFORESEEN FIELD
CONDITIONS, ERRORS, INCONSISTENCIES, OR OMISSIONS DISCOVERED
AT ANY TIME DURING THE WORK, UPON SUCH DISCOVERY, THE
CONTRACTOR SHALL IMMEDIATELY CONTACT THE CONTRACT OFFICER
FOR CLARIFICATION BEFORE PROCEEDING OR CONTINUING WITH THAT
PORTION OF THE WORK OR ANY PORTION RELATED THERE TO.
9. ALL WORK SHALL CONFORM TO ALL APPLICABLE CODES AND
STANDARDS INCLUDING THE INTERNATIONAL BUILDING CODE 2015
EDITION, VA MASTER SPECIFICATIONS, AND NFPA 101 2015 EDITION.
10. THE GENERAL CONTRACTOR SHALL NOTIFY THE CONTRACT OFFICER,
CONTRACTING OFFICER'S REPRESENTATIVE, AND ARCHITECT OF ANY
DISCREPANCIES BETWEEN THE DRAWINGS, NOTES AND ACTUAL FIELD
CONDITIONS BEFORE BIDDING AND COMMENCING ANY WORK, AND
REQUEST CLARIFICATION IN WRITING.
11. WHEN UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL
ELEMENTS THAT CONFLICT WITH THE INTENDED FUNCTION OR DESIGN
ARE ENCOUNTERED, INVESTIGATE AND MEASURE THE NATURE AND
EXTENT OF THE CONFLICT. PROMPTLY SUBMIT A WRITTEN REPORT TO
THE CONTRACT OFFICER.
12. WHERE MOUNTING HEIGHTS ARE NOT INDICATED, INSTALL
COMPONENTS USING MANUFACTURER'S OR INDUSTRY STANDARDS.
WHERE STANDARDS DO NOT EXIST, NOTIFY THE COR FOR
CLARIFICATION.
13. CONTRACTOR SHALL NOT BARRICADE / BARRIER EMERGENCY EGRESS
TO OR FROM THIS AREA. CONTRACTOR SHALL MAINTAIN EXIT TO
EXTERIOR DURING THE WORK PROCESS.
14. PROVIDE ACCESS TO THE WORK AS DIRECTED BY THE C.O.R. SECURE
ACCESS POINT AS SPECIFIED AND DIRECTED BY THE COR PROJECT
ENGINEER. PROVIDE WALK-OFF MATS TO MEET FACILITY INFECTION
CONTROL GUIDELINES AT EACH ACCESS POINT.
15. CONTRACTOR TO NOTIFY VA 2 WEEKS IN ADVANCE PRIOR TO ANY
MAJOR UTILITY DISRUPTIONS OR OUTAGES. MAJOR OUTAGES
INVOLVING EMERGENCY AND CRITICAL BRANCH, SHALL BE
COORDINATED NOT LESS THAN 21 CALENDAR DAYS.
16. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE
CONTRACT DOCUMENTS, THE BETTER QUALITY, MORE STRINGENT
REQUIREMENTS OR GREATER QUANTITY OF WORK, AS DETERMINED BY
THE GOVERNMENT, SHALL BE PROVIDED.
MAIN BUILDING
P-14,P-15
S-12
P-11
COMMUNITY
LIVING
CENTER
MAIN TOWER
SPINAL
CORD
INJURY
UNIT
"G" BUILDING
POLYTRAUMA
REHIBILITATION CENTER
CANTEEN
ENTRANCE
AUDIE L. MURPHY
MEMORIAL VA HOSPITAL
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction &
Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANTS
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
INTERIORSARCHITECTURE
COX DESIGN ASSOCIATES
PLANNING
AUSTIN CHICAGO DENVER EL PASO
04/19/2022
BI
M
AL
M
VA
H R
EP
LA
C E
FO
U
R E
LE
VA
TO
R
S/
SA
N
EW
E
LE
VA
TO
R S_
AR
C
H _0
1.
rv t
4/
/2
4:
:2
PM
GI-002
CONSTRUCTION
DOCUMENTS 100%
GENERAL NOTES REPLACE/MODERNIZE FOUR
(4) HYDRAULIC ELEVATORS
7400 MERTON MINTER, SAN ANTONIO, TX
78229
04/19/2022 RHC MAG
671-20-128
DRAWINGS FOR THE FOLLOWING DISCIPLINES ARE
CONTAINED IN THE DOCUMENT. THE DISCIPLINES ARE
IDENTIFIED BY THE REFERENCE WHICH IS
INCORPORATED INTO THE SHEET TITLE.
EACH DRAWING IS NUMBERED ACCORDING TO ITS
LOCATION ON THE SHEET. THE DRAWING TITLE
APPEARS ABOVE THE DEMARCATION LINE AND, APPROPRIATE THE
SCALE IS LOCATED BELOW THE DEMARCATION LINE IN THE LOWER
LEFT-HAND QUADRANT OF THE KEY. THE DRAWING CAN BE
REFERENCED BACK TO IT'S ORIGINAL SHEET AND
DRAWING BY THE DRAWING REFERENCE LOCATION IN
THE LOWER RIGHT-HAND QUADRANT.
SHEET NUMBER
DRAWING NUMBER ON SHEET BY LOCATION
REFERENCE
EXCEPT WHERE DIRECTED TO PLACE ITEMS OF THE WORK AT THE
"APPROXIMATE LOCATION SHOWN." DO NOT SCALE DRAWINGS FOR
DIMENSIONAL INFORMATION
1.
ALL ELEMENTS OF THE DOCUMENTS MAY NOT BE DRAWN TO EXACT SCALE.
ALL DIMENSIONS REQUESTED ARE SHOWN (OR MAY BE DERIVED FROM THOSE
SHOWN OR NOTED) ON THE FLOOR PLANS. DETAIL PLANS, ELEVATIONS,
SECTIONS, SCHEDULES, CONFIGURATION DETAILS, AND SPECIFICATIONS. SEE
THE NOTES BELOW AND SYMBOLS FOR DIMENSIONING CONVENTIONS USED
ON THIS PROJECT.
2.
EXCEPT WHERE SPECIFICALLY NOTED TO THE CONTRARY, ALL DIMENSIONS
SHOWN ON THE ARCHITECTURAL DRAWINGS CONFORM TO THE FOLLOWING
CONVENTIONS.
3.
DIMENSIONS UTILIZING THE "CENTERLINE" SYMBOL ARE MEASURED TO:
ꞏ CENTERLINE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED
FINISHES HAVING THICKNESS WHICH MAY BE ADDED TO SUCH
WALLS) AT PARTITIONS FRAMED WITH METAL STUDS. REFER TO
"PARTITION SCHEDULE" TO DETERMINE THICKNESS OF EACH
PARTITION TYPE.
ꞏ CENTERLINE OF DOOR, WINDOW, OR LOUVER OPENING.
ꞏ CENTERLINE OF OTHER FEATURES AS INDICATED.
A.
DIMENSIONS UTILIZING THE "FACE OF" SYMBOL ARE MEASURED TO:
ꞏ FACE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED
FINISHES HAVING THICKNESS WHICH MAY BE ADDED TO SUCH WALL)
AS DEFINED BY THE PARTITION SCHEDULE. UNLESS NOTED AS A
"FACE OF FINISH" OR "CLEAR" DIMENSION (SEE NOTE "E" BELOW),
DIMENSIONS ARE NOT MEASURED TO THE FACE OF APPLIED FINISH.
REFER TO THE "PARTITION SCHEDULE" TO DETERMINE THE
THICKNESS OF EACH PARTITION TYPE.
B.
WHERE "EQUAL" DIMENSIONS ARE USED ON REFLECTED CEILING PLANS TO
LOCATE CEILING GRID WORK POINTS, MEASURE DIMENSIONS TO:
ꞏ EDGE OF THE INDICATED CEILING AT THE FACE OF THE ADJACENT
APPLIED FINISH MEASURED AT THE PLANE OF THE CEILING.
ꞏ CAUTION: DUE TO THE POSSIBLE APPLICATION OF APPLIED FINISHES -
THICKNESS OF WHICH MAY VARY BETWEEN FLOOR AND CEILING AND
IS NOT ACCOUNTED FOR (EXCEPT AS INDICATED BY "FOF" OR
"CLEAR") BY THE DIMENSION SHOWN ON THE FLOOR PLANS - THE
CONTRACTOR MUST ADJUST AS NECESSARY, THE FLOOR PLAN
DIMENSIONS TO REFLECT THE ACTUAL DIMENSIONS FOUND AT PLANE
OF THE CEILING.
C.
WHERE WALLS AND/OR PARTITIONS OF UNEQUAL THICKNESS ABUT,
ALIGN EXPOSED FACES, UNLESS OTHERWISE NOTED.
4.
ALIGN
DIMENSION, WHEN OCCURS
WHERE OPENINGS IN WALLS (SUCH AS INTERIOR WINDOWS OR DOORS) ARE
NOT DIMENSIONED BUT SHOWN AS BEING IN THE CENTER OF A GIVEN WALL
SURFACE, LOCATE OPENINGS AS GRAPHICALLY REPRESENTED.
5.
DISCIPLINE REFERENCES
DRAWING NUMBERING
DRAWING REFERENCE
GENERAL NOTES
REF. 1/1-A1
BUILDING SECTION
RE: 1/AS-126
SHEET NUMBER
DIMENSIONING CONVENTIONSARCHITECTURAL FLOOR PLAN SYMBOLS
A
COLUMN GRID
NORTH ARROW
REVISION NUMBER AND EXTENT
KEYED NOTE MARK
-SEE CORRESPONDING
NUMBERED KEY NOTE ON SHEET WHERE
REFERENCE OCCURS
REVISION NUMBER - SEE
REVISION HISTORY ON THE
TITLE BLOCK OF EACH SHEET
EXTENT OF CURRENT REVISION
1-A26
1-A26
CL
DEMOLITION LINE
ELEVATION INDICATOR
CENTER LINE INDICATOR
EXISTING TO REMAIN LINE
FEATURES ABOVE LINE INDICATOR
BREAK, ROUND (USER DEFINES SIZE)
BREAK, STRAIGHT (SEE SECTION INDICATORS,
BUILDING, WITH BREAK STANDARDS)
DETAIL INDICATOR
DETAIL INDICATOR
DIMENSION LINE
CENTER LINE
GI GENERAL INFORMATION
A ARCHITECTURAL
FP FIRE PROTECTION
P PLUMBING
M MECHANICAL
E ELECTRICAL
T TECHNOLOGY
AS-100
DISCIPLINE SHEET NUMBER
LOCATION MAP - NTS
CONSTRUCTION LIMITS
N
EXISTING TO REMAIN
CONCRETE
MASONRY
BUILDING INTERIOR
MATERIAL GRAPHICS
GYP BD RIGID INSULATION
WOOD EARTH
BATT INSULATION
DESIGN MANUALS:
- PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS
- PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES
- PG-18-5 EQUIPMENT LIST GUIDES
- PG-18-8 SEISMIC DESIGN HANDBOOK
- PG-18-10 DESIGN MANUALS
- VA PHYSICAL SECURITY DESIGN MANUAL FOR MISSION CRITICAL FACILITIES
- VA DESIGN GUIDELINES FOR ELEVATORS
- VA ARCHITECTURAL DESIGN MANUAL
- VA MECHANICAL DESIGN MANUAL
- VA ELECTRICAL DESIGN MANUAL
- VA PLUMBING DESIGN MANUAL
- VA FIRE PROTECTION DESIGN MANUAL
APPLICABLE CODES AND REGULATIONS:
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL CURRENT APPLICABLE CODES AND STANDARDS.
IN ADDITION TO ALL DEPARTMENT OF VETERANS AFFAIRS, LOCAL, AND STATE CODES, ALL WORK SHALL COMPLY WITH THE ACCESSIBILITY REQUIREMENTS OF THE STATE AND THE DEPARTMENT OF VETERANS AFFAIRS GUIDELINES, ABA (ARCHITECTURAL BARRIERS ACT) ACCESSIBILITY STANDARD FOR FEDERAL FACILITIES.
APPLICABLE CODES AND STANDARDS (LATEST EDITIONS) INCLUDE:
- ABA ACCESSIBILITY STANDARDS (2015)
- NFPA 101, "LIFE SAFETY CODE" (2018)
- NFPA 10, "PORTABLE FIRE EXTINGUISHERS" (2018)
- NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS" (2019)
- NFPA 70, "NATIONAL ELECTRICAL CODE (NEC)" (2017)
- NFPA 72, "NATIONAL FIRE ALARM CODE" (2019)
- NFPA 90A, "INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS" (2018)
- NFPA 99, "INSTALLATION FOR HEALTH CARE FACILITIES" (2018)
- NFPA 220, "TYPES OF BUILDING CONSTRUCTION" (2018)
- NFPA 241, "STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS" (2019)
- INTERNATIONAL BUILDING CODE (IBC) (2018)
- INTERNATIONAL MECHANICAL CODE (IMC) (2018)
- INTERNATIONAL PLUMBING CODE (IPC) (2018)
- INTERNATIONAL ENERGY CONSERVATION CODE (2018)
N
CLOSED CELL SPRAY
FOAM INSULATION
KEY PLAN - NTS
PROJECT SUMMARY
N
S STRUCTURAL
ARCHITECTURAL ABBREVIATIONS
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAMA AMERICAN ARCHITECTURAL MANUFACTURERS
ASSOCIATION
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE
ACI AMERICAN CONCRETE INSTITUTE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
ADB AUTOMATIC DOOR BOTTOM
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGA AMERICAN GAS ASSOCIATION
AGC ASSOCIATED GENERAL CONTRACTORS
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ANT ANTENNA
APA AMERICAN PLYWOOD ASSOCIATION
APPD APPROVED
APPROX APPROXIMATE
APT APARTMENT
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ASTM AMERICAN SOCIETY FOR TESTING AND
MATERIALS
ATCH ATTACHMENT
ATM AUTOMATIC TELLER MACHINE
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVE AVENUE
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING INSTITUTE
AWPA AMERICAN WOOD PRESERVERS' ASSOCIATION
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B LABEL CLASS B DOOR
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BD FT BOARD FEET (FOOT)
BEV BEVEL
BHMA BUILDER'S HARDWARE MANUFACTURER'S
ASSOCIATION
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKT BLANKET
BLVD BOULEVARD
BM BEAM OR BENCHMARK
BOT BOTTOM
BR BEDROOM
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BU BUSHEL
BUR BUILT-UP ROOFING
C CELSIUS CHANNEL
C CHANNEL CELSIUS
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
C TO C CENTER TO CENTER
CAB CABINET
CAC CEILING ATTENUATION CLASS
CB CATCH BASIN OR CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS OR CONTRACT
DOCUMENTS
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR
INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CENTER OF GRAVITY OR CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CHK CHECK
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
cm² SQUARE CENTIMETER cm³ CUBIC CENTIMETER
CM CONSTRUCTION MANAGEMENT
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE, CERTIFICATE OF
OCCUPANCY, CLEANOUT, OR COMPANY
CO2 CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
CONC FLR CONCRETE FLOOR
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CRSI CONCRETE REINFORCING STEEL INSTITUTE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER CONTOUR
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF ELECTRIC WATER COOLER
DIA DIAMETER
DIAG DIAGONAL DIAGRAM
DIAG DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DR DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E EAST
E LABEL CLASS E DOOR
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC
ELEC DR OP ELECTRIC DOOR OPENER
ELEV ELEVATOR
EMER EMERGENCY
EMER SHR EMERGENCY SHOWER
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE BOARD (INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
ESMT EASEMENT
ESP ESPECIALLY
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXP BT EXPANSION BOLT
EXST GR EXISTING GRADE
EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER
EXT GR EXTERIOR GRADE
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
FAB FABRIC
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FAS BD FASCIA BOARD
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND EQUIPMENT
FH FLAT HEAD OR FLAT HEAD SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIN WD FINISH WOOD
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLR FIN FLOOR FINISH
FLR SK FLOOR LAVATORY
FLUOR FLUORESCENT
FLUOR FIX FLUORESCENT FIXTURE
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF STUD
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR FIREPROOF
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT, OR FRAME
FR SNK FLUSHING RIM LAVATORY
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER OR
FIBERGLASS REINFORCED PLASTIC
FRZ FREEZER
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUTURE
FWC FABRIC WALLCOVERING
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS-FIBER-REINFORCED CONCRETE
GFRG GLASS-FIBER-REINFORCED GYPSUM
GFRP GLASS-FIBER-REINFORCED PLASTIC
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLOCK
GLU LAM GLUED LAMINATED WOOD
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H HIGH
H PLAM HIGH PRESSURE PLASTIC LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD DOOR
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGER
HM HECTOMETER
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE OR HORSEPOWER
HQ HEADQUARTERS
HS HEAT-STRENGTHENED (GLASS) OR HIGH
STRENGTH
HSE HOUSE
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
I INTERSTATE (HIGHWAY) OR MOMENT OF
INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE DIAMETER, OR
INTERIOR DESIGN
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRANE ASSEMBLY
IWH INSTANTANEOUS WATER HEATER
JAN JANITOR
J-BOX JUNCTION BOX
KD KILN DRIED OR KNOCKED DOWN
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
L ANGLE
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE
LHR LEFT HAND REVERSE LATENT HEAT RATIO
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKWASHER
LL LEAD LINED
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING CONCRETE
LYR LAYER
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTENANCE
MAN MANUAL
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL MEDIUM
MED MEDIUM MEDICAL
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMB MEMBRANE
MEMO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM MINUTE
MIN MINUTE MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLWK MILLWORK
mm MILLIMETER
MO MASONRY OPENING OR MOTOR OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP LAVATORY
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
N NORTH
NA NOT APPLICABLE
NAAMM NATIONAL ASSOCIATION OF ARCHITECTURAL
METAL MANUFACTURERS
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NEMA NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NEUT NEUTRAL
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NRCA NATIONAL ROOFING CONTRACTORS
ASSOCIATION
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O/O OUT TO OUT
O OXYGEN
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OUTSIDE DIMENSION
OD OUTSIDE DIMENSION OUTSIDE DIAMETER
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER INSTALLED
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE RADIUS
ORD ORDNANCE OR OVERFLOW ROOF DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OSHA OCCUPATIONAL SAFETY AND HEALTH
ADMINSTRATION
OUT OUTLET
OZ OUNCE
PAR PARALLEL OR PARAPET
PARA PARAGRAPH
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON
PBD PARTICLEBOARD
PC PIECE, POLYCARBONATE OR PORTLAND
CEMENT
PCA PORTLAND CEMENT ASSOCIATION
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHAR PHARMACY
PHOTO PHOTOGRAPH
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
PO POST OFFICE PURCHASE ORDER
PO PURCHASE ORDER POST OFFICE
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMATIC TUBE, OR PRESSURE
TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
PWR POWER
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RADIUS OR RISER
RA RETURN AIR
RAD RADIATOR
RB RESILIENT BASE OR RUBBER BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REMOTE CONTROL
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY REFRIGERATION
REFR REFRIGERATION REFRACTORY
REG REGISTER
REINF REINFORCE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RF RADIO FREQUENCY
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR SOLID CORE
SCH SCHOOL
SCHED SCHEDULE
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE DETECTOR, OR
SOAP DISPENSER;
SDG SIDING
SECT SECTION
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGD SLIDING GLASS DOOR
SGL SINGLE
SHR SHOWER
SHR HD SHOWER HEAD
SHRD SHOWER DRAIN
SHT SHEET
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SJI STEEL JOIST INSTITUTE
SK SKETCH
SKLT SKYLIGHT
SLD WDW HORIZONTAL SLIDING WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMK SMOKE
SND SANITARY NAPKIN DISPENSER
SND INS SOUND INSULATION
SNDU SANITARY NAPKIN DISPOSAL UNIT
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPLY SUPPLY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER OR SERVICE LAVATORY
SST STAINLESS STEEL
ST STAIRS OR STREET
STC SOUND TRANSMISSION CLASS
STD STANDARD
STIF STIFFENER
STL JST STEEL JOIST
STL LNTL STEEL LINTEL
STL PL STEEL PLATE
STL RF DK STEEL ROOF DECK
STL TB STEEL TUBE
STL TR STEEL TRUSS
STNLS STAINLESS
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
STRUCT STL STRUCTURAL STEEL
SUB SUBSTITUTE
SURF SURFACE
SUSP SUSPEND
SUSP CLG SUSPENDED CEILING
SV SHEET VINYL
SW SWITCH
SWDR SWING DOOR
SYM SYMBOL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
T&G TONGUE AND GROOVE
T&M TIME AND MATERIALS
TB THROUGH BOLT OR TOWEL BAR
TCA TILE COUNCIL OF AMERICA
TCP TELEPHONE CONTROL PANEL TEMPERATURE
CONTROL PANEL; TRAFFIC CONTROL PLAN
TD TOWEL DISPENSER
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
TER TERRAZZO
THD THREAD
THERM THERMAL
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TMPD TEMPERED
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TO TOP OF ___
TO FDN TOP OF FOUNDATION
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TR TOWEL RACK
TRANS TRANSOM
TRANS WD FINTRANSPARENT WOOD FINISH
TRTD TREATED
TS TENSILE STRENGTH OR TUBE STEEL
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
U HEAT TRANSFER COEFFICIENT
UC UNDERCUT
UCD UNDERCUT DOOR
UGND UNDERGROUND
UL UNDERWRITERS LABORATORIES
ULT ULTIMATE
UNFIN UNFINISH
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UR URINAL
UTIL UTILITY
UV ULTRAVIOLET
V VOLT
VAC VACUUM
VAR VARIES
VCT VINYL COMPOSITION TILE VITRIFIED CLAY TILE
VEH VEHICLE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VFAT VINYL FACED ACOUSTICAL TILE
VIC VICINITY
VID VIDEO
VIF VERIFY IN FIELD
VNR VENEER
VOC VOLATILE ORGANIC COMPOUND
VOL VOLUME
VOLT VOLTAGE
VP VENEER PLASTER
VR VAPOR RETARDER
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
VWF VINYL WALL FABRIC
W WIDE OR WEST
W/ WITH
W/O WITHOUT
WARR WARRANTY
WBL WOOD BLOCKING
WC WALL COVERING OR WATER CLOSET
WC WL HNG WATER CLOSET, WALL HUNG
WCHR WATER CHILLER
WCL WL MTDWATER COOLER, WALL HUNG
WD WOOD
WDW WINDOW
WF WIDE FLANGE
WFAB WALL FABRIC
WFR WOOD FRAME
WFS WOOD FURRING STRIPS
WH WATER HEATER
WHSE WAREHOUSE
WLD WELDED
WM WIRE MESH
WP WATERPROOFING
WPD WATER PRESSURE DROP
WPM WATERPROOF MEMBRANE
WR WEATHER RESISTANT
WS WEATHERSTRIP
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
X BRACE CROSS BRACE
XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)
YD YARD
YR YEAR
UNO
ACM ASBESTOS CONTAINING MATERIAL
ACP ACRYLIC GLAZING
COR CONTRACTING OFFICER'S REPRESENTATIVE
WPR WALL PROTECTION / RAILING
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction &
Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANTS
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
INTERIORSARCHITECTURE
COX DESIGN ASSOCIATES
PLANNING
AUSTIN CHICAGO DENVER EL PASO
04/19/2022
BI
M
AL
M
VA
H R
EP
LA
C E
FO
U
R E
LE
VA
TO
R
S/
SA
N
EW
E
LE
VA
TO
R S_
AR
C
H _0
1.
rv t
4/
/2
4:
:2
PM
GI-003
CONSTRUCTION
DOCUMENTS 100%
ARCHITECTURAL
ABBREVIATIONS
REPLACE/MODERNIZE FOUR
(4) HYDRAULIC ELEVATORS
7400 MERTON MINTER, SAN ANTONIO, TX
78229
04/19/2022 RHC MAG
671-20-128
LEVERS PUSH/PULL PANIC BAR EXIT DEVICE
NOTE: DOOR HARDWARE IS MOUNTED 30" MIN - 44" MAX FROM FINISH FLOOR TO TOP OF THE DEVICE.
LATCHING & LOCKING DOORS THAT ARE HAND OPERATED AND WHICH ARE IN A PATH OF TRAVEL ARE OPERABLE WITH A SINGLE EFFORT (LEVER, PUSH/PULL, PANIC BAR OR OTHER HARDWARE ASSIGNED TO
PROVIDE PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING HARDWARE)
MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED 5 LBF, WHEN FIRE DOORS ARE REQUIRED THE
MAX EFFORT TO OPERATE THE DOOR MAY BE INCREASED TO THE MINIMUM ALLOWABLE BY THE
APPROPRIATE AUTHORITY , NOT TO EXCEED 15 LBF.
2 1/4" MAX
2 1/4" MIN
OD: 1 1/4" MIN, 2" MAX
PERIMETER DIMENSION:
4" MIN, 6 1/4" MAX
CLEARANCE DIMENSION:
1 1/2" MIN
1 1/2" MIN
2 1/4" MAX
2.5" MIN.
72" MIN.
2.5" MIN.
1.5" MIN.
15"
A. PROJECTING OBJECTS B. RECESSED OBJECTS
CODE CARD
FIRE ALARM STATION
DIGITAL
ALARM
SYSTEM
WALL
MOUNTED
COAT HOOK
DOOR
MOUNTED
COAT HOOKS
(4 '-0
" F O
R A
D A
IN
ST
AL
LA
TI
O
N S
CONTINUOUS FLOOR TO
CEILING CORNER
GUARD
MOP AND
BROOM
HOLDER
FIRE
EXTINGUISHER
CABINET
SWITCHES
FIRE
ALARM
PULL
ELECTRICAL &
TELEPHONE
RECEPTACLES TV / CABLE OUTLET
THERMOSTATS
MASTER
PAGE
INTERCOM
MASTER
STATION
DUTY STATION
STAFF STATION
FOR REFERENCE ONLY - THIS DOES NOT INDICATE EQUIPMENT OR FIXTURES PROVIDED
FINISH CEILING
FINISH FLOOR
4'
6"
4'
0"
1' - 6"
1'
0"
5'
6"
3"
EX
IS
TI
N
G
M
AT
C H
M
AX
3'
6"
3'
1' - 0"
3'
6"
M
AX
4'
0"
1'
6"
9"
6"
9"
4'
6"
EQ EQ EQ
5'
0"
ROOM SIGNAGE
SEE SHEET AS-721
ACCESS CONTROL HARDWARE
DOOR PUSH
PLATE, 4'-0" MIN.
AWAY FROM DOOR
STRIKE IF LOCATED
ON AN ADJACENT
WALL
2'
MIN.
1' - 3"
6'
0"
1' - 0"
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction &
Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANTS
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
INTERIORSARCHITECTURE
COX DESIGN ASSOCIATES
PLANNING
AUSTIN CHICAGO DENVER EL PASO
04/19/2022
BI
M
AL
M
VA
H R
EP
LA
C E
FO
U
R E
LE
VA
TO
R
S/
SA
N
EW
E
LE
VA
TO
R S_
AR
C
H _0
1.
rv t
4/
/2
4:
:2
PM
GI-004
CONSTRUCTION
DOCUMENTS 100%
ACCESSIBILITY STANDARDS REPLACE/MODERNIZE FOUR
(4) HYDRAULIC ELEVATORS
7400 MERTON MINTER, SAN ANTONIO, TX
78229
04/19/2022 RHC MAG
671-20-128
SCALE: 12" = 1'-0"4 DOOR HARDWARE1
SCALE: 12" = 1'-0"2 HANDRAIL PROFILES
SCALE: 12" = 1'-0"1 VISIBLE HALL SIGNALS
SCALE: 12" = 1'-0"3 SPACING OF GRAB BARS1
SCALE: 1/4" = 1'-0"5 TYPICAL MOUNTING HEIGHTS1
P14 & P15
S12 P11
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction &
Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
INTERIORSARCHITECTURE
COX DESIGN ASSOCIATES
PLANNING
AUSTIN CHICAGO DENVER EL PASO
04/19/2022
BI
M
AL
M
VA
H R
EP
LA
C E
FO
U
R E
LE
VA
TO
R
S/
SA
N
EW
E
LE
VA
TO
R S_
AR
C
H _0
1.
rv t
4/
/2
4:
:5
PM
GI-100
CONSTRUCTION
DOCUMENTS 100%
OVERALL PLAN REPLACE/MODERNIZE FOUR
(4) HYDRAULIC ELEVATORS
7400 MERTON MINTER, SAN ANTONIO, TX
78229
04/19/2022 RHC MAG
671-20-128
SCALE: 1" = 30'-0"
OVERALL PLAN1
N
UP
UP
UP
UP
NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS
FIRST FLOOR
ELEVATOR
LOBBY STAIRS
P-11
NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS
GROUND
LEVEL
ELEVATOR
LOBBY
S-12
STAIRS
A. BUILDING IS FULLY SPRINKLERED.
B. EXIT STAIR ENCLOSURES ARE TWO HOUR RATED.
C. ALL PARTITIONS SHOWN WITHOUT FIRE RATING ARE NON-RATED U.N.O.
D. DURING DEMOLITION AND NEW CONSTRUCTION PHASES, CONTRACTOR SHALL
MAINTAIN REQUIRED RATING AT ALL EXISTING WALLS, FLOORS AND ROOFS TO
REMAIN.
E. REFER TO SHEET AS-300, FOR DOOR SCHEDULE, NUMBER, HARDWARE, RATING
AND SECURITY INFORMATION.
F. CONTRACTOR SHALL COORDINATE WITH ALL DISCIPLINE DRAWINGS FOR
ADDITIONAL INFORMATION.
G. ALL DOORS IN A RATED PARTITION OR SMOKE PARTITION SHALL HAVE THE
APPROPRIATE RATING TO CORRESPOND WITH WALL.
H. REFER TO SHEET XX-XXX, FOR PARTITION TYPES.
NEW WALL
PATH OF EGRESS
EXISTING WALL
NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS
SECOND
FLOOR
ELEVATOR
LOBBY
P-11
STAIRS
NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS
BASEMENT
ELEVATOR
LOBBY
S-12
S-12
EQUIPMENT
ROOM
GENERAL
STORAGE
MAIN TOWER
P-14,P-15 S-12
P-11
MAIN BUILDING
COMMUNITY
LIVING
CENTER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction &
Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
INTERIORSARCHITECTURE
COX DESIGN ASSOCIATES
PLANNING
AUSTIN CHICAGO DENVER EL PASO
04/19/2022
BI
M
AL
M
VA
H R
EP
LA
C E
FO
U
R E
LE
VA
TO
R
S/
SA
N
EW
E
LE
VA
TO
R S_
AR
C
H _0
1.
rv t
4/
/2
4:
:5
PM
GI-101
CONSTRUCTION
DOCUMENTS 100%
LIFE SAFETY / CODE ANALYSIS
P-11 & S-12
REPLACE/MODERNIZE FOUR
(4) HYDRAULIC ELEVATORS
7400 MERTON MINTER, SAN ANTONIO, TX
78229
04/19/2022 RHC MAG
671-20-128
SCALE: 1/4" = 1'-0"2 P-11 - FIRST FLOOR LIFE SAFETY PLAN
SCALE: 1/4" = 1'-0"3 S-12 GROUND LEVEL LIFE SAFETY PLAN
LIFE SAFETY LEGEND
LIFE SAFETY GENERAL NOTES
SCALE: 1/4" = 1'-0"1 P-11 SECOND FLOOR LIFE SAFETY PLAN
SCALE: 1/4" = 1'-0"4 S-12 BASEMENT LIFE SAFETY PLAN
KEY PLAN
NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS
STAIRS
P-14 P-15
FIRST FLOOR
ELEVATOR
LOBBY
H.A.C.
NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS
STAIRS
P-14 & P-15
EQUIPMENT
ROOM
P-14 P-15
SECOND FLOOR
ELEVATOR
LOBBY
A. BUILDING IS FULLY SPRINKLERED.
B. EXIT STAIR ENCLOSURES ARE TWO HOUR RATED.
C. ALL PARTITIONS SHOWN WITHOUT FIRE RATING ARE NON-RATED U.N.O.
D. DURING DEMOLITION AND NEW CONSTRUCTION PHASES, CONTRACTOR SHALL
MAINTAIN REQUIRED RATING AT ALL EXISTING WALLS, FLOORS AND ROOFS TO
REMAIN.
E. REFER TO SHEET AS-300, FOR DOOR SCHEDULE, NUMBER, HARDWARE, RATING
AND SECURITY INFORMATION.
F. CONTRACTOR SHALL COORDINATE WITH ALL DISCIPLINE DRAWINGS FOR
ADDITIONAL INFORMATION.
G. ALL DOORS IN A RATED PARTITION OR SMOKE PARTITION SHALL HAVE THE
APPROPRIATE RATING TO CORRESPOND WITH WALL.
H. REFER TO SHEET XX-XXX, FOR PARTITION TYPES.
NEW WALL
PATH OF EGRESS
EXISTING WALL
MAIN TOWER
P-14,P-15 S-12
P-11
MAIN BUILDING
COMMUNITY
LIVING
CENTER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction &
Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
INTERIORSARCHITECTURE
COX DESIGN ASSOCIATES
PLANNING
AUSTIN CHICAGO DENVER EL PASO
04/19/2022
BI
M
AL
M
VA
H R
EP
LA
C E
FO
U
R E
LE
VA
TO
R
S/
SA
N
EW
E
LE
VA
TO
R S_
AR
C
H _0
1.
rv t
4/
/2
4:
:5
PM
GI-102
CONSTRUCTION
DOCUMENTS 100%
LIFE SAFETY / CODE ANALYSIS
P-14 & P-15
REPLACE/MODERNIZE FOUR
(4) HYDRAULIC ELEVATORS
7400 MERTON MINTER, SAN ANTONIO, TX
78229
04/19/2022 RHC MAG
671-20-128
SCALE: 1/4" = 1'-0"2 P-14 & P-15 FIRST FLOOR LIFE SAFETY PLAN
SCALE: 1/4" = 1'-0"1 P-14 & P-15 SECOND FLOOR LIFE SAFETY PLAN
LIFE SAFETY LEGEND
LIFE SAFETY GENERAL NOTES
KEY PLAN
UP
UP
UP
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED IN
SPECIFICATIONS.
B. REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
C. PROJECT SHALL BE COMPLETED IN PHASES (i.e. NO TWO ELEVATORS IN THE SAME
HOISTWAY SHALL BE INOPERABLE AT ONE TIME); REFERENCE SPECIFICATION 01 00 00
PART 1.10G.
D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND FIELD
VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR THE SCOPE OF ABOVE CEILING
WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE PROJECT BOUNDARY.
E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL BARRIER WALL
CONSTRUCTION AND INFECTION CONTROL MEASURES WITH COR.
F. PROVIDE THE REQUIRED VA AND OSHA TEMPORARY SIGNAGE AT EACH TEMPORARY
DOOR LOCATION.
G. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC.
MULTIPURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE LIQUIDS UP
TO 30 GALLONS.
H. NEW MATERIAL MOVED THROUGH FACILITY SHALL BE COVERED WITH 4 MIL. POLY
SHEET.
I. DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT BOUNDARY
THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED ROUTE IN ENCLOSED
DUMPSTER CART DESIGNED FOR SUCH PURPOSE WITH A LID.
J. MATERIAL AND DEBRIS SHALL BE PROPERLY STORED IN DESIGNATED AREAS AND
APPROVED CONTAINERS. FLAMMABLE MATERIALS SHALL NOT BE STORED IN THE
FACILITY.
K. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE PROJECT
BOUNDARY.
L. MAINTAIN CLEAR PATH TO EXIT STAIRS AS REQUIRED.
M. PROVIDE LOCKABLE TEMPORARY DOOR TO BE USED TO ACCESS CONSTRUCTION
AREAS BY AUTHORIZED PERSONNEL.
A. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE.
B. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
C. SEAL UNUSED DOORS WITH DUCT TAPE
D. BLOCK OFF AND SEAL AIR VENTS.
E. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES. A 24"X36" STICKY
WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.
MAT SHALL BE REPLACED OR CLEANED AS NECESSARY.
F. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
G. COVER HEAT AND SMOKE DETECTORS IN WORK AREA DURING ALL DUST
PRODUCING ACTIVITIES.
H. EMPTY TRASH DAILY.
A. WIPE WORK SURFACES WITH DISINFECTANT.
B. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
C. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK
AREA.
D. REMOVE ISOLATION HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
E. TERMINAL CLEANING AS NEEDED AND/OR PROJECT COMPLETION.
A. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
B. PROJECT SHALL BE COMPLETED DURING NORMAL BUSINESS HOURS. COORDINATE
WITH COR.
C. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION FOR
EACH PHASE AND AREA OF WORK.
D. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR AND
STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING INFORMATION FOR
ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED CMP SCHEDULE FOR WORK
ALSO REQUIRED ABOVE AND BELOW FLOOR PLATE OF THE PROJECT BOUNDARY.
E. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE CEILING ARE TO REMAIN,
CEILING TILES SHALL BE REMOVED AND STORED IN SAFE MANOR UNTIL CEILING
TILES CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE
REPLACED BY THE CONTRACTOR.
F. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED DURING
NORMAL BUSINESS HOURS
G. EVERY EFFORT SHALL BE MADE TO KEEP NOISE AND VIBRATION TO A MINIMUM.
EXISTING WALL
TEMPORARY BARRIER WALLS
NEW WALLTEMPORARY
CONSTRUCTION
ACCESS DOOR
COORDINATE WITH EXISTING CEILING
CONSTRUCTION
SIDE
PUBLIC
SIDE
3 5/8" METAL STUD @ 16" O.C. WITH RUNNER
CHANNELS ALONG TOP AND BOTTOM
TWO LAYERS 5/8" TYPE X GYPSUM BOARD
APPLIED TO ONE SIDE OF STEEL STUDS W/
TAPED JOINTS
UL LISTING: V497
CONTINUOUS FIRE SAFE SEALANT
TOP AND BOTTOM
NFPA 241
CONTINUOUS FIRE SAFE SEALANT TOP AND BOTTOM
REQUIRED TEMPORARY SIGNAGE
1 HOUR FIRE RATED METAL DOOR
ASSEMBLY AND FRAME WITH SEALS,
CARD READER, HARDWARE AND
TEMPORARY SIGNAGE
HAND SANITIZER
TRIATEK MONITOR
CONTINUOUS FIRE SAFE SEALANT TOP AND BOTTOM
PUBLIC
SIDE
REQUIRED AUTO-CLOSE MECHANISM
UL LISTING: V497
SCHLAGE CO-100
CYPHER LOCK.
CONTRACTOR TO
TURN OVER LOCK
TO VA AFTER
COMPLETION OF
PROJECT
NFPA 241
MIN.
4' - 0"
GI-103
GI-103 2
FIRST FLOOR
ELEVATOR
LOBBY
STAIRS
P-11
GI-103
GROUND
LEVEL
ELEVATOR
LOBBY
S-12
STAIRS
GI-103 2
GI-103
GI-1032
SECOND
FLOOR
ELEVATOR
LOBBY
P-11
STAIRS
4'
0"
GI-103
GI-103
BASEMENT
ELEVATOR
LOBBY
S-12
S-12
EQUIPMENT
ROOM
MAIN TOWER
P-14,P-15 S-12
P-11
MAIN BUILDING
COMMUNITY
LIVING
CENTER
1. PROVIDE INFECTION CONTROL TEMPORARY BARRIER WALL CONSTRUCTION.
VERIFY LOCATION IN FIELD, CALL BUTTONS SHALL BE OPERATIONAL DURING ALL
PHASES.
2. PROVIDE INFECTION CONTROL TEMPORARY DOOR, REUSE DOOR IN SUBSEQUENT
PHASES.
3. CONTRACTOR TO COORDINATE WITH VA C.O.R. FOR LOCATION OF TEMPORARY
WALLS AND DOORS IN THIS LOCATION.
4. SEAL OFF EXISTING DOOR WITH 6 MIL FIRE RETARDANT POLYETHYLENE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction &
Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
INTERIORSARCHITECTURE
COX DESIGN ASSOCIATES
PLANNING
AUSTIN CHICAGO DENVER EL PASO
04/19/2022
BI
M
AL
M
VA
H R
EP
LA
C E
FO
U
R E
LE
VA
TO
R
S/
SA
N
EW
E
LE
VA
TO
R S_
AR
C
H _0
1.
rv t
4/
/2
4:
:5
PM
GI-103
CONSTRUCTION
DOCUMENTS 100%
INFECTION CONTROL / PHASING
PLANS - PHASE 1 P-11 & S-12
REPLACE/MODERNIZE FOUR
(4) HYDRAULIC ELEVATORS
7400 MERTON MINTER, SAN ANTONIO, TX
78229
04/19/2022 RHC MAG
671-20-128
INFECTION CONTROL - GENERAL NOTES
INFECTION CONTROL - DURING
CONSTRUCTION
INFECTION CONTROL - UPON COMPLETION
PHASING GENERAL NOTES
INFECTION CONTROL LEGEND
KEY PLAN
SCALE: 1 1/2" = 1'-0"1 TYP. TEMPORARY 1-HR BARRIER WALL CONSTRUCTION - V497
SCALE: 1/4" = 1'-0"2 TYP. TEMPORARY 1-HR BARRIER WALL CONSTRUCTION ELEVATION - V497
SCALE: 1/4" = 1'-0"4 P-11 FIRST FLOOR INFECTIOUS CONTROL PLAN - PHASE 1
SCALE: 1/4" = 1'-0"5 S-12 GROUND LEVEL INFECTIOUS CONTROL PLAN - PHASE 1
SCALE: 1/4" = 1'-0"3 P-11 SECOND FLOOR INFECTIOUS CONTROL PLAN - PHASE 1
SCALE: 1/4" = 1'-0"6 S-12 BASEMENT INFECTIOUS CONTROL PLAN - PHASE 1
SHEET KEYNOTES XX
STAIRS
P-14 P-15
GI-103
GI-103
FIRST FLOOR
ELEVATOR
LOBBY
H.A.C.
STAIRS
P-14 & P-15
EQUIPMENT
ROOM
P-14 P-15
GI-103
GI-103
SECOND FLOOR
ELEVATOR
LOBBY
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED IN
SPECIFICATIONS.
B. REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
C. PROJECT SHALL BE COMPLETED IN PHASES (i.e. NO TWO ELEVATORS IN THE SAME
HOISTWAY SHALL BE INOPERABLE AT ONE TIME); REFERENCE SPECIFICATION 01 00 00
PART 1.10G.
D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND FIELD
VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR THE SCOPE OF ABOVE CEILING
WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE PROJECT BOUNDARY.
E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL BARRIER WALL
CONSTRUCTION AND INFECTION CONTROL MEASURES WITH COR.
F. PROVIDE THE REQUIRED VA AND OSHA TEMPORARY SIGNAGE AT EACH TEMPORARY
DOOR LOCATION.
G. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC.
MULTIPURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE LIQUIDS UP
TO 30 GALLONS.
H. NEW MATERIAL MOVED THROUGH FACILITY SHALL BE COVERED WITH 4 MIL. POLY
SHEET.
I. DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT BOUNDARY
THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED ROUTE IN ENCLOSED
DUMPSTER CART DESIGNED FOR SUCH PURPOSE WITH A LID.
J. MATERIAL AND DEBRIS SHALL BE PROPERLY STORED IN DESIGNATED AREAS AND
APPROVED CONTAINERS. FLAMMABLE MATERIALS SHALL NOT BE STORED IN THE
FACILITY.
K. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE PROJECT
BOUNDARY.
L. MAINTAIN CLEAR PATH TO EXIT STAIRS AS REQUIRED.
M. PROVIDE LOCKABLE TEMPORARY DOOR TO BE USED TO ACCESS CONSTRUCTION
AREAS BY AUTHORIZED PERSONNEL.
A. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE.
B. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
C. SEAL UNUSED DOORS WITH DUCT TAPE
D. BLOCK OFF AND SEAL AIR VENTS.
E. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES. A 24"X36" STICKY
WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.
MAT SHALL BE REPLACED OR CLEANED AS NECESSARY.
F. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
G. COVER HEAT AND SMOKE DETECTORS IN WORK AREA DURING ALL DUST
PRODUCING ACTIVITIES.
H. EMPTY TRASH DAILY.
A. WIPE WORK SURFACES WITH DISINFECTANT.
B. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
C. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK
AREA.
D. REMOVE ISOLATION HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
E. TERMINAL CLEANING AS NEEDED AND/OR PROJECT COMPLETION.
A. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
B. PROJECT SHALL BE COMPLETED DURING NORMAL BUSINESS HOURS. COORDINATE
WITH COR.
C. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION FOR
EACH PHASE AND AREA OF WORK.
D. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR AND
STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING INFORMATION FOR
ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED CMP SCHEDULE FOR WORK
ALSO REQUIRED ABOVE AND BELOW FLOOR PLATE OF THE PROJECT BOUNDARY.
E. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE CEILING ARE TO REMAIN,
CEILING TILES SHALL BE REMOVED AND STORED IN SAFE MANOR UNTIL CEILING
TILES CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE
REPLACED BY THE CONTRACTOR.
F. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED DURING
NORMAL BUSINESS HOURS
G. EVERY EFFORT SHALL BE MADE TO KEEP NOISE AND VIBRATION TO A MINIMUM.
EXISTING WALL
TEMPORARY BARRIER WALLS
NEW WALLTEMPORARY
CONSTRUCTION
ACCESS DOOR
MAIN TOWER
P-14,P-15 S-12
P-11
MAIN BUILDING
COMMUNITY
LIVING
CENTER
1. PROVIDE INFECTION CONTROL TEMPORARY BARRIER WALL CONSTRUCTION.
VERIFY LOCATION IN FIELD, CALL BUTTONS SHALL BE OPERATIONAL DURING ALL
PHASES.
2. PROVIDE INFECTION CONTROL TEMPORARY DOOR, REUSE DOOR IN SUBSEQUENT
PHASES.
3. CONTRACTOR TO COORDINATE WITH VA C.O.R. FOR LOCATION OF TEMPORARY
WALLS AND DOORS IN THIS LOCATION.
4. SEAL OFF EXISTING DOOR WITH 6 MIL FIRE RETARDANT POLYETHYLENE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction &
Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
INTERIORSARCHITECTURE
COX DESIGN ASSOCIATES
PLANNING
AUSTIN CHICAGO DENVER EL PASO
04/19/2022
BI
M
AL
M
VA
H R
EP
LA
C E
FO
U
R E
LE
VA
TO
R
S/
SA
N
EW
E
LE
VA
TO
R S_
AR
C
H _0
1.
rv t
4/
/2
4:
:5
PM
GI-104
CONSTRUCTION
DOCUMENTS 100%
INFECTION CONTROL / PHASING
PLANS - PHASE 1 P-14 & P-15
REPLACE/MODERNIZE FOUR
(4) HYDRAULIC ELEVATORS
7400 MERTON MINTER, SAN ANTONIO, TX
78229
04/19/2022 RHC MAG
671-20-128
SCALE: 1/4" = 1'-0"2 P-14 & P-15 FIRST FLOOR INFECTIOUS CONTROL PLAN - PHASE 1
SCALE: 1/4" = 1'-0"1 P-14 & P-15 SECOND FLOOR INFECTIOUS CONTROL PLAN - PHASE 1
INFECTION CONTROL - GENERAL NOTES
INFECTION CONTROL - DURING
CONSTRUCTION
INFECTION CONTROL - UPON COMPLETION
PHASING GENERAL NOTES
INFECTION CONTROL LEGEND
KEY PLAN
GI-103
GI-103
STAIRS
P-14 P-15
FIRST FLOOR
ELEVATOR
LOBBY
H.A.C.
GI-103
GI-103
STAIRS
P-14 & P-15
EQUIPMENT
ROOM
P-14 P-15
SECOND FLOOR
ELEVATOR
LOBBY
MAIN TOWER
P-14,P-15 S-12
P-11
MAIN BUILDING
COMMUNITY
LIVING
CENTER
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED IN
SPECIFICATIONS.
B. REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
C. PROJECT SHALL BE COMPLETED IN PHASES (i.e. NO TWO ELEVATORS IN THE SAME
HOISTWAY SHALL BE INOPERABLE AT ONE TIME); REFERENCE SPECIFICATION 01 00 00
PART 1.10G.
D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND FIELD
VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR THE SCOPE OF ABOVE CEILING
WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE PROJECT BOUNDARY.
E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL BARRIER WALL
CONSTRUCTION AND INFECTION CONTROL MEASURES WITH COR.
F. PROVIDE THE REQUIRED VA AND OSHA TEMPORARY SIGNAGE AT EACH TEMPORARY
DOOR LOCATION.
G. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC.
MULTIPURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE LIQUIDS UP
TO 30 GALLONS.
H. NEW MATERIAL MOVED THROUGH FACILITY SHALL BE COVERED WITH 4 MIL. POLY
SHEET.
I. DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT BOUNDARY
THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED ROUTE IN ENCLOSED
DUMPSTER CART DESIGNED FOR SUCH PURPOSE WITH A LID.
J. MATERIAL AND DEBRIS SHALL BE PROPERLY STORED IN DESIGNATED AREAS AND
APPROVED CONTAINERS. FLAMMABLE MATERIALS SHALL NOT BE STORED IN THE
FACILITY.
K. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE PROJECT
BOUNDARY.
L. MAINTAIN CLEAR PATH TO EXIT STAIRS AS REQUIRED.
M. PROVIDE LOCKABLE TEMPORARY DOOR TO BE USED TO ACCESS CONSTRUCTION
AREAS BY AUTHORIZED PERSONNEL.
A. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE.
B. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
C. SEAL UNUSED DOORS WITH DUCT TAPE
D. BLOCK OFF AND SEAL AIR VENTS.
E. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES. A 24"X36" STICKY
WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.
MAT SHALL BE REPLACED OR CLEANED AS NECESSARY.
F. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
G.
This is the start of the file's text. The full file is on GovTribe.