Y1DA--671-20-128 Replace Elevator P-14, P-15, P-11 & S-12 (VA-22-00067864)
Solicitation number
36C25722B0027
Issued by

About this file

This document provides clarification to questions received in response to a solicitation for the replacement of elevators P-14, P-15, P-11 and S-12 at the Veterans Affairs Medical Center in Temple, Texas. The solicitation is issued by the Department of Veterans Affairs Network Contracting Office and seeks engineering, furnishing, installation and renovation services to modernize the specified elevators. Clarification is provided that some specification items like replacement of the plunger assembly and car frame may not be necessary, and bidders should provide separate pricing for modernization only and replacement of additional components if needed. Responses also clarify that the elevator equipment rooms will interface with the building automation system for temperature and sump pump monitoring, but no other fire alarm or controls work is required beyond new detectors in elevator shafts connected to the existing system. The performance period remains 360 days but potential delays for long lead equipment procurement will be considered in future modifications.

View the file

Other files

File Type Posted
36C25722B0027 0011.docx DOCX document
36C25722B0027 0010.docx DOCX document
36C25722B0027 0009.docx DOCX document
Supplemental Information.pdf PDF
36C25722B0027 0008.docx DOCX document
IMG_0415.pdf PDF
36C25722B0027 0006.docx DOCX document
36C25722B0027 0005.docx DOCX document
IMG_0416.jpg JPG image
36C25722B0027 0004.docx DOCX document
Sign-in-Sheet Pre-Bid Site Visit.pdf PDF
36C25722B0027 0003.docx DOCX document
36C25722B0027 0002.docx DOCX document
VAAR 852.236-92.pdf PDF
Door Controller DC1000 Data Sheet.pdf PDF
Dwg 6 Cfig 6 Selective Elevator Monitor Inside of Elev Rev3.pdf PDF
Pre Bid - Sign In Sheet.pdf PDF
36C25722B0027 0001.docx DOCX document
36C25722B0027_2.docx DOCX document
VA AM Elevator Replacement 100 CD Specifications.pdf PDF
VA AM Elevator Replacement 100 CD Drawings 04192022 SM.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 671-20-128 Department of Veterans Affairs Network Contracting Office, NCO17 2002 Scott Blvd.

Temple TX 76504 Department of Veterans Affairs Network Contracting Office, NCO17 2002 Scott Blvd.

Temple TX 76504 To all Offerors/Bidders

36C25722B0027 08-31-2022

X X X

See continuation on Page 2:

Joyce M. Mills Contracting Officer Amendment 0007 is issued to provide additional clarification to original responses for RFIs 4, 5, 6, 9, and 11. Additional clarification is highlighted in yellow as follows:

4. Is replacing the sling and platform necessary or can it be saved for value engineering?

A: The contractor can provide a proposal request to provide this as an option.

What does this mean? How do contractors bid this work item?

Clarification: The contractor does not need to replace the Sling and/or Platform. Please verify if the sling and platform can be reused.

5. Upon review of the provided documents, it appears that the specifications were written for the installation of a new elevator and not the modernization of the existing cars. This specification cannot be used for this project and will not allow prospective bidders to accurately quote the job. Will the VA please provide a revised specification that describes the modernization of the elevators rather than the installation of new ones.

A: See Section 14 24 00, 1.1, A update to read:

This section specifies the engineering, furnishing, installation and renovation of the electric hydraulic elevator systems as describe herein and indicated on the contract drawings.

See the Sheet Key Notes for refurbishing options and directives.

Just to clarify, is this saying that some of the items in the specifications are not applicable to the project and the drawings show what to do? For example, the spec reads like a new plunger assembly, new casing and well hole, new car frame, & new car platform are all needed on this modernization. This would be incredibly expensive and not necessary to achieve a typical elevator modernization. Please clarify.

Clarification: This project is considered a Modernization. Due to the age and use of the facility the VA put the specification incase those item mention in your question will need to be replace. Please include in you bid the cost to Modernize the elevator only and a use the specs for the other item in case when the project starts one or more of those items will need to be replace.

6.. Period of Performance: With as many supply-chain issues that the construction industry is facing, please allow for long lead items to be delivered prior to issuing a Notice to Proceed. Otherwise, a 360-day performance period will not be sufficient considering the phasing for P-14 and P- 15 elevators.

A: Due to the CLC building still being occupied P14 and P-15 cannot be done at the same time. Please planed delivery dated accordingly We are aware that P-14 & P-15 cannot be done at the same time. Since that is the case, we will need more time on the project because procurement on some equipment has extremely long lead times currently. It would help to delay a Notice to Proceed on the project until long lead equipment has been shipped. Please confirm.

Clarification: The potential delay of long lead items will be considered as a mod in the future. For biding purposes, the project will be 360 days 9.. HVAC Controls: Will the new HVAC equipment need to be tied into the hospital BAS or is it all local? Please provide the company name of the required HVAC controls contractor if BAS integration is required.

A: The equipment rooms will tie into the BAS. Use Entech Sales and Service No controls work is shown on the drawings to be tied into the BAS. Please provide details of the work if that is required.

Clarification: HVAC Controls - The space temperature within the elevator equipment room shall be monitored by the BAS through a wall-mounted temperature sensor within the elevator equipment room. In addition, the elevator sump pump control panel shall be interfaced to the BAS to monitor any alarms.

11. Fire Alarm Design: The notes on the plans referencing FA work are brief and lack details. Is there an equipment schedule or additional clarifications? The specifications don’t appear to be job-specific either. Please clarify exactly what needs to be done to the existing FA system for this project.

A: The fire sprinkler should be installed to meeting the ASME A17.1 2019 This question is in reference to Fire Alarm, not fire sprinkler. Please clarify what is to be done to the fire alarm for the project.

Clarification: A new addressable photoelectric smoke detector and a new addressable fixed temperature heat detector shall be located at the top of the elevator shafts above each elevator cab. The new detectors shall be wired to the existing building fire alarm system. The existing fire alarm wiring from the removed existing detectors may be reused.

Replace Elevator P-14, P-15, P-11 & S-12, Project No. 671-20-128