S06 0011 Att 2 The timeline located at the end of the SOW is hereby replaced with the following timeline.pdf

PDF 57 KB Posted

Attached to
Z1DA--676-15-201 - Renovate B406 3rd Floor for Dementia Unit (C)
Solicitation number
36C25223B0011
Issued by

About this file

This document contains a federal contract solicitation and related files. The solicitation is for renovation work to convert space on the third floor of Building B406 at the Tomah VA Medical Center into a dementia unit. Offerors must submit responses by March 7, 2023. A non-mandatory site visit is scheduled for February 7, 2023 to view the existing space. The solicitation includes screening requirements for visitors to the patient floor due to COVID-19 protocols. The attached timeline file replaces and updates the schedule included in the original statement of work, outlining a 542-day performance period consisting of phases for submittals, review, construction, and closeout. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration VISN 12.

View the file

Other files

File Type Posted
S06 - 36C25223B0011 0014 ATT 3 - F7_minka-lavery-341-357-specification-sheet.pdf PDF
S06 - 36C25223B0011 014 ATT 2 - F6_PROG_P350110-020_spec.pdf PDF
36C25223B0011 0014.docx DOCX document
S06 - 36C25223B0011 0014 ATT 4 - F10_PROG_P3448-0930K9_spec.pdf PDF
S06 - 36C25223B0011 014 ATT 1 - F3_PROG_P300002-009_spec.pdf PDF
36C25223B0011 0013.docx DOCX document
36C25223B0011 0012.docx DOCX document
S06 0011 - ATT 1 11 73 00 - CEILING MOUNT PATIENT LIFT Amd 4.pdf PDF
36C25223B0011 0011.docx DOCX document
36C25223B0011 0010.docx DOCX document
S06 0010 ATT 1 AS103C - WALL TYPES.pdf PDF
S06 0010 Att 3 Pre-Bid RFI Clarifications Set 2 676-15-201 Renovate 3rd Fl .xlsx XLSX spreadsheet
S06 0010 ATT 2 Amico-aca-bed-bumpers-vertical-specs.pdf PDF
S06 0009 - ATT 6 Floor Infill detail.pdf PDF
36C25223B0011 0009.docx DOCX document
S06 0009 - ATT 3 033053 (Short-Form) Cast-In-Place Concrete.pdf PDF
S06 0009 - ATT 2 B406 Mechanical Attic Plans.pdf PDF
S06 0009 - ATT 5 090516 Subsurface Prep for Floor Finishes.pdf PDF
S06 0009 Attachment 7 All RFI Responses.xlsx XLSX spreadsheet
S06 0009 - ATT 4 MH101.pdf PDF
S06 0009 ATT 1 400-9 Sections Details.pdf PDF
36C25223B0011 0008.docx DOCX document
S06 - Amendment 7 attachment 1.pdf PDF
36C25223B0011 0007.docx DOCX document
36C25223B0011 0006.docx DOCX document
3rd Set of RFI Responses for posting.pdf PDF
36C25223B0011 0005.docx DOCX document
36C25223B0011 0004.docx DOCX document
Attachment 1 - RFI lighting Red markings.pdf PDF
36C25223B0011 0003.docx DOCX document
S06- site visit attendees.pdf PDF
36C25223B0011 0001.docx DOCX document
S02 - Att 2 676-15-201 Drawings_IFB - Final.pdf PDF
S02 - Att 5 Wage Rates.pdf PDF
S02 - Att 4 676-15-201 Specifications Vol 2_IFB REVISED 2023 01 23.pdf PDF
S02 - Att 3 676-15-201 Specifications Vol 1_IFB REVISED 2023 01 23.pdf PDF
S02 - Att 1 676-15-201 Renovate B406 3rd Floor - SOW - Const REVISED 2023 01 11 02.pdf PDF
36C25223B0011_1.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The timeline located at the end of the SOW is hereby replaced with the following timeline:

TITLE Length in Days Activity

Limited Notice to Proceed 1 day LNTP

Phase 0: 30 days Contractor submit all product submittals.

Phase 1: 15 days VA review of Product Submittals

NTP/Pre‐Construction Meeting: 1 day NTP

Phase 2: 45 days Pre‐Construction Period Contractor to submit all other submittals.

Phase 3: 30 days VA review all other submittals.

Phase 4: 360 days Construction

Phase 5: 60 days Post‐Substantial Completion (Contractor to submit all closeout documents first 45 days, last 15 days are Vas)

542 days total