This document provides details for a federal contract solicitation to renovate the third floor of Building B406 at a Department of Veterans Affairs medical center for a dementia unit. Key requirements include removing existing flooring and underlayment in specified areas, installing new flooring infill, and completing associated finish carpentry and ceiling work. The solicitation number is 36C25223B0011, with an opportunity type of solicitation. Requests for information or clarifications are due by February 21, 2023 at 4:30pm CST by email to the contracting specialist. Bids must be hand delivered by March 16, 2023 at 2:00pm CST to the Great Lakes Acquisition Center. The pre-bid site visit is scheduled for February 7, 2023 between 9:45am and 11:15am CST with COVID screening required. The incumbent roofing contractor is Wenger Construction, which provided a five-year warranty on the roof installation in 2014.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 676-15-201 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee
WI
53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee
WI
53214-1476 To all Offerors/Bidders
36C25223B0011 01-24-2023
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
Thursday, March 16, 2023 @ 2PM X This amendment is incorporated into the solicitation.
This amendment incorporates 14 RFI clarifications. This includes Attachments 1-6 as updates to specifications and drawings. Attachment 7 is the total of RFI questions to avoid confusion with the numbering.
The bid opening is March 16, 2023 @ 2pm. Hand Delivery is mandatory.
A TEAMS log in is provided for those who are not attended in person.
Amy M. Burger Contract Specialist RFI Clarifications
1. VA revision Edit Sheet AE101B Room 30650, Dishwasher Answer: Delete the dishwasher from the staff breakroom (30650), provide cabinet with doors.
2. Ref Q&A #27- What is the thickness of the underlayment that is to be removed? Does the entire 3rd floor require underlayment removal and a new self-level floor infill throughout the space? Or just her areas designated with keynote D2.1 & D2.2 on drawing AD102?
The general demolition note 2 on drawing AS102 indicates to remove existing construction on the floor to expose the structural floor slab. Keynote D2.1 & D2.2 are not shown in all rooms therefore what areas require underlayment removal? How thick is it? What type of material is required to infill the areas of underlayment removal? Is a 0 to 1” self-level underlayment required or is the area more than 1” and require 3/8” pea-gravel added to the mix?
Answer: The topping appears to be 1”, and it should be removed where noted on the plans. If it becomes damaged by demolition in other area. See attached drawing for reference. Attachment 1.
3. Amendment 3 had questions 1-13 included, then amendment 4 had 8 added questions, bringing the total to 21 questions and answers provided. Amendment 6 provides more questions / Answers, but started at #23. Was there a Question #22? If so can you please provide the question and the answer?
Answer: Question 4 of the 2nd Set of RFIs actually combined two separate questions (17 and 18). There should have been 9 questions in the 2nd set for a total of 22.
4. Amendment 6, Q&A #25 referenced “Infill detail is provided as an attachment” We did not find the reference attached detail. Please provide details.
Answer: See Attachment 6.
5. Amendment 6, Q&A #26 Follow up questions. Please provide the size of the steel reinforcing to be used at the new openings.
Answer: Please assume C12 x 20.7 for framing of ductwork openings.
6. Amendment 6 Q&A #29, “Follow Specification 06 20 00 Finish Carpentry” Follow up questions Specification says “Hardwood”, no further information is provided. Can we get the following information provided.
i. All wood trim (species - on this project) is to be “Plain sawn maple” per specification section 09 06 00.
ii. Very limited information is provided in regard to the connections and hangers for this trellis. Can you please advise on the grade and finish of the connectors and hangers for this.
Answer: Please see details 6, 7, and 10 on Sheet AS505. Hangers to be 3/8" threaded rods. Rods to be painted steel.
7. Amendment 6, Q&A #53, Follow up question. Can you provide the currently installed grid and tile manufacture and tile selection to assure the replacements will match the already installed ceiling system on the 2nd floor.
Answer: In B406: 12' long mains PN# ML 7301D; 4' long T PN# ML 7343; 2' long T PN# ML 7323; Periumeter Trim PN# 7800RWH; Ceiling Tile: Armstong or Prelude - Tiles wise the new universal 2’x2’ is 1728, we prefer to make all new 2x2, it sits flush in the grid.
A nicer look is the recessed tile, Technical name is tegular, we have many areas that have this style also. Smooth finish, washable is 3114pbn, worm holes like the universal is 704A.
8. Amendment 6, Q&A #56, asks if removal unit costs shall be provided for SOW D#2 (This is related to Testing and Balancing – please confirm). The answer was Yes, but the Solicitation only contains a single lump sum bid. Will a revised bid schedule be provided? Please clarify this question and if unit pricing is required.
Answer: Clarification of Q56: SOW D.2. is saying that the Prime's sub must Test and Balance building systems. Additionally, the Prime and sub must work cooperatively with the VA Cx Agent to verify the Test and Balance of building systems. There is no line item cost. Costs related to this cooperation should be included in the lump sum.
9. Amendment 6, Q&A #61 states specification 03 30 53 has been provided. Please advise when and where this can be found or if this will be provided in a future amendment.
Answer: See Attachment 3
10. Amendment 6, Q&A #65, Follow up question. Can you please provide an updated site plan showing the trees that need protection?
Answer: All trees are to be protected. There is one large one and one newly planted one in the proposed laydown area.
11. Amendment 6, Q&A #70, Follow up question. Can you provide the average depth of the infills needed at notes D2.1 and D2.2to be assumed?
Answer: See question 133. The topping appears to be 1”, and it should be removed where noted on the plans. If it becomes damaged by demolition in other area. See attached drawing for reference.
12. Amendment 6, Q&A #82, Follow up question. Without knowing who holds the current roof warranty, pricing of the roof patching can be very difficult. Please advise who holds the current roof warranty.
Answer: Wenger Construction, Inc., N3105 Hwy 45, Cambellsport, WI 53010, installed the roof in 2014 and provided a five year warranty on the Inspire roofing shingles.
13. Amendment 6, Q&A #83, Follow up questions. The response was to see “Attached Mechanical Plans”. None were attached. Please advise if these will be issued in Amendment 009, and when we can expect that Amendment with Updated drawings.
Answer: See Attachment 2
14. Amendment 6, Q&A #128, Refers to updated drawings. Will undated drawings be provided with Amendment 9, and when can that Amendment be expected? Will the bid date be extended to review the drawing changes?
Answer: See Attachment 4 and 5
You must hand deliver bid by 2pm on March 16, 2023.
Will be in person @ GLAC. You may join on Teams if you want.
Microsoft Teams meeting Join on your computer, mobile app or room device Click here to join the meeting Meeting ID: 284 325 914 445 Passcode: G5etpS Download Teams | Join on the web Or call in (audio only) +1 872-701-0185,,245993645# United States, Chicago Phone Conference ID: 245 993 645# Find a local number | Reset PIN
Learn More | Meeting options
See attached document: S06 0009 ATT 1 400-9 Sections Details.
See attached document: S06 0009 - ATT 2 B406 Mechanical Attic Plans.
See attached document: S06 0009 - ATT 3 033053 (Short-Form) Cast-In-Place Concrete.
See attached document: S06 0009 - ATT 4 MH101.
See attached document: S06 0009 - ATT 5 090516 Subsurface Prep for Floor Finishes.
See attached document: S06 0009 - ATT 6 Floor Infill detail.
See attached document: S06 0009 Attachment 7 All RFI Responses.