This solicitation is for renovation services to renovate the third floor of Building B406 at the VA Medical Center in Tomah, Wisconsin for a dementia unit. Key details include:

  • The scope of work involves cast-in-place concrete work, including structural concrete, suspended slabs, equipment pads, and surface preparations. Submittals are due by March 7, 2023 with the bid opening to take place on that same date at the Department of Veterans Affairs Great Lakes Acquisition Center in Milwaukee.

  • A pre-bid site visit is scheduled for February 7, 2023 with RSVP required due to COVID protocols which include screening, masks, and proof of a negative COVID test within 72 hours for entry onto the patient floor. Additional site visits may be scheduled based on demand.

  • The awarded contractor must follow signature requirements for individuals, partnerships, corporations, joint ventures, and agents as outlined in FAR 4. The solicitation instructions specify contacting only the named contracting officer for questions.

View the file

Other files

File Type Posted
S06 - 36C25223B0011 0014 ATT 3 - F7_minka-lavery-341-357-specification-sheet.pdf PDF
S06 - 36C25223B0011 014 ATT 2 - F6_PROG_P350110-020_spec.pdf PDF
36C25223B0011 0014.docx DOCX document
S06 - 36C25223B0011 0014 ATT 4 - F10_PROG_P3448-0930K9_spec.pdf PDF
S06 - 36C25223B0011 014 ATT 1 - F3_PROG_P300002-009_spec.pdf PDF
36C25223B0011 0013.docx DOCX document
36C25223B0011 0012.docx DOCX document
S06 0011 Att 2 The timeline located at the end of the SOW is hereby replaced with the following timeline.pdf PDF
S06 0011 - ATT 1 11 73 00 - CEILING MOUNT PATIENT LIFT Amd 4.pdf PDF
36C25223B0011 0011.docx DOCX document
36C25223B0011 0010.docx DOCX document
S06 0010 ATT 1 AS103C - WALL TYPES.pdf PDF
S06 0010 Att 3 Pre-Bid RFI Clarifications Set 2 676-15-201 Renovate 3rd Fl .xlsx XLSX spreadsheet
S06 0010 ATT 2 Amico-aca-bed-bumpers-vertical-specs.pdf PDF
S06 0009 - ATT 6 Floor Infill detail.pdf PDF
36C25223B0011 0009.docx DOCX document
S06 0009 - ATT 2 B406 Mechanical Attic Plans.pdf PDF
S06 0009 - ATT 5 090516 Subsurface Prep for Floor Finishes.pdf PDF
S06 0009 Attachment 7 All RFI Responses.xlsx XLSX spreadsheet
S06 0009 - ATT 4 MH101.pdf PDF
S06 0009 ATT 1 400-9 Sections Details.pdf PDF
36C25223B0011 0008.docx DOCX document
S06 - Amendment 7 attachment 1.pdf PDF
36C25223B0011 0007.docx DOCX document
36C25223B0011 0006.docx DOCX document
3rd Set of RFI Responses for posting.pdf PDF
36C25223B0011 0005.docx DOCX document
36C25223B0011 0004.docx DOCX document
Attachment 1 - RFI lighting Red markings.pdf PDF
36C25223B0011 0003.docx DOCX document
S06- site visit attendees.pdf PDF
36C25223B0011 0001.docx DOCX document
S02 - Att 2 676-15-201 Drawings_IFB - Final.pdf PDF
S02 - Att 5 Wage Rates.pdf PDF
S02 - Att 4 676-15-201 Specifications Vol 2_IFB REVISED 2023 01 23.pdf PDF
S02 - Att 3 676-15-201 Specifications Vol 1_IFB REVISED 2023 01 23.pdf PDF
S02 - Att 1 676-15-201 Renovate B406 3rd Floor - SOW - Const REVISED 2023 01 11 02.pdf PDF
36C25223B0011_1.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA MEDICAL CENTER DEPARTMENT OF VETERAN AFFAIRS

TOMAH, WI

RENOVATE B406 3RD FLOOR

VA PROJECT: 676-15-201 01-01-21

03 30 53 - 1

SECTION 03 30 53

(SHORT FORM) CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Cast-in-place structural concrete.

2. Suspended slab infill on metal deck.

3. Equipment pads.

4. Preparation of existing surfaces to receive concrete.

5. Preparation of existing surface to received concrete topping.

1.2 RELATED WORK

A. Section 01 45 29, TESTING LABORATORY SERVICES: Materials Testing and

Inspection During Construction.

B. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this Section.

B. American Concrete Institute (ACI):

117-10(R2015)...........Specification for Tolerances for Concrete

Construction and Materials and Commentary

211.1-91(R2009).........Standard Practice for Selecting Proportions for

Normal, Heavyweight, and Mass Concrete.

211.2-98(R2004).........Standard Practice for Selecting Proportions for

Structural Lightweight Concrete.

301/301M-16.............Specifications for Structural Concrete.

305.1-14 - .............Hot Weather Concreting.

306.1-90(R2002).........Cold Weather Concreting.

318/318M-19.............Building Code Requirements for Structural

Concrete and Commentary

347R-14 - ..............Guide to Formwork for Concrete.

SP-66-04-...............ACI Detailing Manual.

C. ASTM International (ASTM):

A615/A615M-20...........Standard Specification for Deformed and Plain

Carbon Steel Bars for Concrete Reinforcement

A996/A996M-16...........Standard Specification for Rail Steel and Axle

Steel Deformed Bars for Concrete Reinforcement

03 30 53 - 2

A1064/A1064M-18a........Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and

Deformed, for Concrete

C33/C33M-18.............Standard Specification for Concrete Aggregates.

C39/C39M-20.............Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens.

C94/C94M-20.............Standard Specification for Ready-Mixed

Concrete.

C143/C143M-20...........Standard Test Method for Slump of Hydraulic

Cement Concrete.

C150/C150M-20...........Standard Specification for Portland Cement.

C171-16.................Standard Specification for Sheet Materials for

Curing Concrete.

C192/C192M-19...........Standard practice for Making and Curing

Concrete Test Specimens in the Laboratory.

C219-20a................Standard Terminology Relating to Hydraulic and

Other Inorganic Cements.

C260/C260M-10a(2016)....Standard Specification for Air-Entraining

Admixtures for Concrete.

C330/C330M-17a..........Standard Specification for Lightweight

Aggregates for Structural Concrete.

C494/C494M-19...........Standard Specification for Chemical Admixtures for Concrete.

C618-19 ................Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in

Concrete.

C881/C881M-20 ..........Standard Specification for Epoxy-Resin-Base

Bonding Systems for Concrete.

C989/C989M-18a .........Standard Specification for Slag Cement for Use in Concrete and Mortars.

C1240-20 ..............Standard Specification for Silica Fume Used in

Cementitious Mixtures.

D1751-18 ...............Standard Specification for Preformed Expansion

Joint Fillers for Concrete Paving and

Structural Construction (Non-extruding and

Resilient Bituminous Types).

03 30 53 - 3

E1155-20................Determining FF Floor Flatness and FL Floor

Levelness Numbers.

E1745-17 ...............Standard Specification for Water Vapor

Retarders Used in Contact with Soil or Granular

Fill under Concrete Slabs.

D. International Concrete Repair Institute:

310.2R-2013 -...........Selecting and Specifying Concrete Surface

Preparation for Sealers, Coatings, Polymer

Overlays, and Concrete Repair.

1.4 SUBMITTALS

A. Submittal Procedures: Refer to Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, AND SAMPLES. All items indicated below are required submittals requiring Contracting Officer’s Representative (COR) review and approval.

B. Submittal Drawings:

1. Submit large scale drawings of reinforcing steel, including all reinforcing bend diagrams and reinforcing details, to the COR for review and approval.

C. Manufacturer's Literature and Data:

1. Concrete Mix Design.

2. Air-entraining admixture, chemical admixtures, and curing compounds.

3. Indicate manufacturer's recommendation for each application.

D. Sustainable Construction Submittals:

1. Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.

E. Certificates: Certify products comply with specifications.

1. Each ready-mix concrete batch delivered to site.

1.5 DELIVERY

A. Deliver each ready-mixed concrete batch with mix certification in duplicate according to ASTM International (ASTM) C94/C94M.

1.6 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

PART 2 - PRODUCTS

2.1 MATERIALS

A. Portland Cement: ASTM C150/C150M, Type I or II.

03 30 53 - 4

B. Pozzolans:

1. Fly Ash: ASTM International (ASTM) C618, Class C or F including supplementary optional physical requirements. Pozzolans shall not exceed 25 percent of total cementitious materials by weight.

2. Slag: ASTM International (ASTM) C989/C989M; Grade 100.

3. Silica Fume: ASTM International (ASTM) C1240.

C. Coarse Aggregate: ASTM International (ASTM) C33/C33M.

1. Size 467 for footings and walls over 300 mm (12 inches) thick.

2. Size 7 for coarse aggregate for applied topping and metal pan stair fill.

3. Size 67 for other applications.

D. Fine Aggregate: ASTM International (ASTM) C33/C33M.

E. Lightweight Aggregate for Structural Concrete: ASTM International

(ASTM) C330/C330M, Table 1.

F. Mixing Water: Fresh, clean, and potable.

G. Air-Entraining Admixture: ASTM International (ASTM) C260/C260M.

H. Chemical Admixtures: ASTM International (ASTM) C494/C494M.

I. Vapor Barrier: ASTM International (ASTM) E1745, Class A with a minimum puncture resistance of 2200 g (3000 pounds); minimum 0.38 mm (15 mil) thick.

J. Reinforcing Steel: ASTM International (ASTM) A615/A615M or

ASTM International (ASTM) A996/A996M, deformed. See Structural Drawings for grade.

K. Forms: Wood, plywood, metal, or other materials, approved by

Contracting Officer, of grade or type suitable to obtain type of finish specified.

1. Plywood: Exterior grade, free of defects and patches on contact surface.

2. Lumber: Sound, grade-marked, S4S stress graded softwood.

3. Form coating: As recommended by Contractor.

L. Welded Wire Fabric: ASTM International (ASTM) A1064/A1064M, sized as indicated.

M. Expansion Joint Filler: ASTM International (ASTM) D1751.

N. Sheet Materials for Curing Concrete: ASTM International (ASTM) C171.

O. Abrasive Aggregates: Aluminum oxide grains or emery grits.

P. Liquid Densifier/Sealer: 100 percent active colorless aqueous siliconate solution.

03 30 53 - 5

Q. Grout, Non-Shrinking: Premixed ferrous or non-ferrous. Grout to show no settlement or vertical drying shrinkage at 3 days. Compressive strength for grout, at least 18 MPa (2500 psi) at 3 days and 35 MPa (5000 psi) at 28 days.

2.2 ACCESSORIES

A. Bonding Agent: ASTM International (ASTM) C 1059/C 1059M, Type II.

B. Structural Adhesive: ASTM International (ASTM) C881, 2-component material suitable for use on dry or damp surfaces. Provide material

Type, Grade, and Class to suit Project requirements.

C. Water Stops: Rubber base with self-healing properties. Expanding clay based products not acceptable.

D. Weeps: Geotextile type as recommended by Contractor and approved by the COR.

2.3 CONCRETE MIXES

A. Design concrete mixes according to ASTM International (ASTM) C94/C94M, Option C.

B. Compressive strength at 28 days: minimum 30 MPa (4,000 psi).

C. Submit mix design and results of compression tests to the Contracting

Officer for his evaluation. Identify all materials, including admixtures, making-up the concrete.

D. Maximum Slump for Vibrated Concrete: 100 mm (4 inches) tested according to ASTM International (ASTM) C143.

E. Cement and Water Factor (See Table I):

TABLE I - CEMENT AND WATER FACTORS FOR CONCRETE

Concrete: Strength Non-Air-Entrained Air-Entrained

Min. 28 Day Comp.

Str.

MPa (psi)

Min. Cement kg/cu. m

(lbs./cu.

yd.)

Max. Water

Cement Ratio

Min. Cement kg/cu. m

(lbs./cu.

yd.)

Max. Water

Cement Ratio

35 (5000)1,3 375 (630) 0.45 385 (650) 0.40

30 (4000)1,3 325 (550) 0.55 340 (570) 0.50

25 (3000)1,3 280 (470) 0.65 290 (490) 0.55

25 (3000)1,2 300 (500) See 4 Below 310 (520) See 4 Below

03 30 53 - 6

TABLE I - CEMENT AND WATER FACTORS FOR CONCRETE

Concrete: Strength Non-Air-Entrained Air-Entrained

Min. 28 Day Comp.

Str.

MPa (psi)

Min. Cement kg/cu. m

(lbs./cu.

yd.)

Max. Water

Cement Ratio

Min. Cement kg/cu. m

(lbs./cu.

yd.)

Max. Water

Cement Ratio

Notes:

1. If trial mixes are used, achieve a compressive strength 8.3 MPa (1 200 psi) in excess of f'c. For concrete strengths greater than 35 MPa (5,000 psi), achieve a compressive strength 9.7 MPa (1,400 psi) in excess of f’c.

2. Lightweight Structural Concrete: Pump mixes may require higher cement values as specified in ACI 318/318M.

3. For Concrete Exposed to High Sulfate Content Soils: Maximum water cement ratio is 0.44.

4. Laboratory Determined according to ACI 211.1 for normal weight concrete or

ACI 211.2 for lightweight structural concrete.

F. Air-entrainment as specified, and conform with the following for air content table:

TABLE II - TOTAL AIR CONTENT FOR VARIOUS SIZES OF COARSE AGGREGATES

Nominal Maximum Size of

Coarse Aggregate

Total Air Content, percent

10 mm (3/8 inches) 6 Moderate exposure; 7.5 severe exposure

13 mm (1/2 inches) 5.5 Moderate exposure; 7 severe exposure

19 mm (3/4 inches) 5 Moderate exposure; 6 severe exposure

25 mm (1 inches) 4.5 Moderate exposure; 6 severe exposure

40 mm (1 1/2 inches) 4.5 Moderate exposure; 5.5 severe exposure

2.4 BATCHING AND MIXING

A. Store, batch, and mix materials according to ASTM C94/C94M.

1. Job-Mixed: Batch mix concrete in stationary mixers as specified in

ASTM International (ASTM) C94/C94M.

2. Ready-Mixed Concrete: Comply with ASTM International (ASTM)

C94/C94M, except use of non-agitating equipment for transporting concrete to Site is not acceptable.

3. EXECUTION Mixing Structural Lightweight Concrete: Charge mixer with

2/3 of total mixing water and total aggregate for each batch. Mix

03 30 53 - 7 ingredients minimum 30 seconds in stationary mixer or minimum 10 revolutions at mixing speed in truck mixer. Add remaining mixing water and other ingredients and continue mixing. Above procedure may be modified as recommended by aggregate producer.

4. When aggregate producer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

PART 3 - EXECUTION

3.1 FORMWORK

A. Installation: Conform to ACI 347. Construct forms to obtain concrete of the shapes, dimensions and profiles indicated, with tight joints.

B. Design and construct forms to prevent bowing-out of forms between supports and to be removable without prying against or otherwise damaging fresh concrete.

C. When patching formed concrete, seal form edges against existing surface to prevent leakage; set forms so that patch is flush with adjacent surfaces.

D. Treating and Wetting: Treat or wet concrete contact surfaces:

1. Coat plywood and lumber forms with non-staining form sealer.

2. Wet wood forms thoroughly when they are not treated with form release agent.

3. Prevent water from accumulating and remaining within forms.

4. Clean and coat removable metal forms with light form oil before reinforcement is placed.

5. In hot weather, cool metal forms by thoroughly wetting with water just before placing concrete.

6. Prevent water from accumulating and remaining within forms.

E. Inserts, Sleeves, and Similar Items: Install anchors, inserts, wires, hangers, sleeves, boxes for floor hinges, and other cast-in items specified in other Sections. Place where indicated, square, flush and secured to formwork.

F. Construction Tolerances - General: Install and maintain concrete formwork to assure completion of work within specified tolerances.

G. Adjust or replace completed work exceeding specified tolerances before placing concrete.

3.2 REINFORCEMENT

A. Install concrete reinforcement according to ACI 318 and ACI SP-66.

03 30 53 - 8

B. Support and securely tie reinforcing steel to prevent displacement during placing of concrete.

C. Drilling for Dowels in Existing Concrete: Use sharp bits, drill hole slightly oversize, fill with epoxy grout, inset the dowel, and remove excess epoxy.

3.3 VAPOR BARRIER – NOT USED

3.4 PLACING CONCRETE

A. Remove hardened concrete, debris and other foreign materials from interior of forms, and from inside of mixing and conveying equipment.

Obtain approval from Contracting Officer's Representative before placing concrete.

B. Install screeds at required elevations for concrete slabs.

C. Roughen and clean free from laitance, foreign matter, and loose particles before placing new concrete on existing concrete.

1. Blow-out areas with compressed air and immediately coat contact areas with adhesive in compliance with manufacturer's instructions.

D. Place structural concrete according to ACI 301 and ACI 318.

E. Convey concrete from mixer to final place of deposit by method that will prevent segregation or loss of ingredients. Do not deposit, in

Work, concrete that has attained its initial set or has contained its water or cement more than 1 1/2 hours. Do not allow concrete to drop freely more than 1500 mm (5 feet) in unexposed work nor more than

900 mm (3 feet) in exposed work.

F. Place and consolidate concrete in horizontal layers not exceeding

300 mm (12 inches) in thickness. Consolidate concrete by spading, rodding, and mechanical vibrator. Do not secure vibrator to forms or reinforcement. Continuously vibrate during placement of concrete.

3.5 TOLERANCES

A. Slab on Grade Finish Tolerance: Comply with ACI 117, FF-number and

FL-number method.

1. Paragraph 4.8.3, Class A 3 mm (1/8 inches) for offset in form-work.

2. Table R4.8.4, "Flat" 6 mm (1/4 inch) in 3 m (10 feet) for slabs.

3.6 PROTECTION AND CURING

A. Protect exposed surfaces of concrete from premature drying, wash by rain or running water, wind, mechanical damage, and excessive hot or cold temperatures.

03 30 53 - 9

B. Curing Methods: Cure concrete with curing compound using wet method with sheets.

C. Formed Concrete Curing: Wet the tops and exposed portions of formed concrete and keep moist until forms are removed.

1. If forms are removed before 14 days after concrete is cast, install sheet curing materials as specified above.

D. Concrete Flatwork Curing:

1. Install sheet materials according to the manufacturer's instructions.

a. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's

Representative consideration.

3.7 FORM REMOVAL

A. Maintain forms in place until concrete is self-supporting, with construction operation loads.

B. Remove fins, laitance and loose material from concrete surfaces when forms are removed. Repair honeycombs, rock pockets, sand runs, spalls, or otherwise damaged surfaces by patching with the same mix as concrete minus the coarse aggregates.

C. Finish to match adjacent surfaces.

3.8 FINISHES

A. Slab Finishes:

1. Allow bleed water to evaporate before surface is finished. Do not sprinkle dry cement on surface to absorb water.

2. Scratch Finish: Rake or wire broom after partial setting slab surfaces to received bonded applied cementitious application, within

2 hours after placing, to roughen surface and provide permanent bond between base slab and applied cementitious materials.

3. Float Finish: Interior equipment pads, and slabs to receive non-cementitious materials, except as specified.

a. Screen and float to smooth dense finish.

b. After first floating, while surface is still soft, check surfaces for alignment using straightedge or template. Correct high spots by cutting down with trowel or similar tool. Correct low spots by filling in with material same composition as floor finish. Remove any surface projections on floated finish by rubbing or dry grinding. Refloat slab to uniform sandy texture.

03 30 53 - 10

4. Steel Trowel Finish: Applied toppings, concrete surfaces to receive resilient floor covering or carpet, future floor roof and other monolithic concrete floor slabs exposed to view without other finish indicated or specified.

a. Delay final steel troweling to secure smooth, dense surface, usually when surface can no longer be dented by fingers. During final troweling, tilt steel trowel at slight angle and exert heavy pressure on trowel to compact cement paste and form dense, smooth surface.

b. Finished surface: Free from trowel marks. Uniform in texture and appearance.

5. Finished Slab Flatness (FF) and Levelness (FL):

a. Slab on Grade: Specified overall value FF 25/FL 20. Minimum local value FF 17/FL 15.

b. Test flatness and levelness according to ASTM E1155.

3.9 SURFACE TREATMENTS

A. Mix and apply the following surface treatments according to manufacturer's instructions.

1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

B. Liquid Densifier/Sealer: Use for exposed concrete floors and concrete floors to receive carpeting except those specified to receive non-slip finish.

3.10 APPLIED TOPPING

A. Install concrete topping with thickness and strength shown with only enough water to ensure stiff, workable, plastic mix.

B. Continuously place applied topping until entire area is complete, struck off with straightedge, compact by rolling or tamping, float and steel trowel to hard smooth finish.

3.11 RESURFACING FLOORS

A. Remove existing flooring by abrasive blasting or grinding, in areas to receive resurfacing, to expose existing structural slab. Achieve a surface profile of 2 to 4 according to ICRI 310.2R for the condition found at Site.

03 30 53 - 11

B. Prepare exposed structural slab surface by cleaning, wetting, and applying adhesive according to manufacturer's instructions as specified in the flooring section.

3.12 FOUNDATION WALL INFILL – NOT USED

- - E N D - -