36C25223B0011 0004.docx

DOCX document 19 KB Posted

Attached to
Z1DA--676-15-201 - Renovate B406 3rd Floor for Dementia Unit (C)
Solicitation number
36C25223B0011
Issued by

About this file

This document includes an amendment to a federal solicitation and details of the solicitation opportunity. The amendment provides substitutions for discontinued tile products listed in the solicitation and responses to additional contractor questions. The solicitation is for the renovation of the third floor of Building 406 at a VA medical center to create a dementia unit. Interested offerors must submit responses by March 7, 2023. Site visits are available by appointment only due to COVID-19 protocols, which require proof of a negative test, temperature screening, and mask wearing. The renovation work includes furnishing and installing tile, glass boards, towel bars, and toilet paper dispensers. Offerors must follow FAR guidelines for signing bids based on business type. The contracting office is the VA Great Lakes Acquisition Center and questions are due by February 21.

View the file

Other files

File Type Posted
S06 - 36C25223B0011 0014 ATT 3 - F7_minka-lavery-341-357-specification-sheet.pdf PDF
S06 - 36C25223B0011 014 ATT 2 - F6_PROG_P350110-020_spec.pdf PDF
36C25223B0011 0014.docx DOCX document
S06 - 36C25223B0011 0014 ATT 4 - F10_PROG_P3448-0930K9_spec.pdf PDF
S06 - 36C25223B0011 014 ATT 1 - F3_PROG_P300002-009_spec.pdf PDF
36C25223B0011 0013.docx DOCX document
36C25223B0011 0012.docx DOCX document
S06 0011 Att 2 The timeline located at the end of the SOW is hereby replaced with the following timeline.pdf PDF
S06 0011 - ATT 1 11 73 00 - CEILING MOUNT PATIENT LIFT Amd 4.pdf PDF
36C25223B0011 0011.docx DOCX document
36C25223B0011 0010.docx DOCX document
S06 0010 ATT 1 AS103C - WALL TYPES.pdf PDF
S06 0010 Att 3 Pre-Bid RFI Clarifications Set 2 676-15-201 Renovate 3rd Fl .xlsx XLSX spreadsheet
S06 0010 ATT 2 Amico-aca-bed-bumpers-vertical-specs.pdf PDF
S06 0009 - ATT 6 Floor Infill detail.pdf PDF
36C25223B0011 0009.docx DOCX document
S06 0009 - ATT 3 033053 (Short-Form) Cast-In-Place Concrete.pdf PDF
S06 0009 - ATT 2 B406 Mechanical Attic Plans.pdf PDF
S06 0009 - ATT 5 090516 Subsurface Prep for Floor Finishes.pdf PDF
S06 0009 Attachment 7 All RFI Responses.xlsx XLSX spreadsheet
S06 0009 - ATT 4 MH101.pdf PDF
S06 0009 ATT 1 400-9 Sections Details.pdf PDF
36C25223B0011 0008.docx DOCX document
S06 - Amendment 7 attachment 1.pdf PDF
36C25223B0011 0007.docx DOCX document
36C25223B0011 0006.docx DOCX document
3rd Set of RFI Responses for posting.pdf PDF
36C25223B0011 0005.docx DOCX document
Attachment 1 - RFI lighting Red markings.pdf PDF
36C25223B0011 0003.docx DOCX document
S06- site visit attendees.pdf PDF
36C25223B0011 0001.docx DOCX document
S02 - Att 2 676-15-201 Drawings_IFB - Final.pdf PDF
S02 - Att 5 Wage Rates.pdf PDF
S02 - Att 4 676-15-201 Specifications Vol 2_IFB REVISED 2023 01 23.pdf PDF
S02 - Att 3 676-15-201 Specifications Vol 1_IFB REVISED 2023 01 23.pdf PDF
S02 - Att 1 676-15-201 Renovate B406 3rd Floor - SOW - Const REVISED 2023 01 11 02.pdf PDF
36C25223B0011_1.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 676-15-201 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee

WI

53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee

WI

53214-1476 To all Offerors/Bidders

36C25223B0011 01-24-2023

X X X

X This amendment is incorporated into the solicitation.

This amendment incorporates the second set of responses to requests for information.

Please see responses on page 2.

Amy M. Burger Contract Specialist

SECOND SET OF RFI RESPONSES

1. Division 09 30 13 Ceramic and Porcelain Tile CT-1, CT-5, CT-6, PT-1, PT-2, PT-3 – Is discontinued and No longer available.

Please provide an alternate product for pricing.

ANSWER: For pricing purposes only, please use the following substitutions for discontinued tile. Final color selections to be made during submittal process.

CT-1: Use Daltile Nat'l Hues "Almond" 12" x 24" CT-5: Use CT-2 Daltile Nat'l Hues "Pearl White" 4" x 8" CT-6: Use CT-3 Daltile Nat'l Hues "Pearl White" cove base 5" x 8" CT-7: Use CT-4 Daltile Nat'l Hues "Pearl White" bullnose 4" x 4" PT-1: Use Daltile Continental Slate "Brazilian Green" 12" x 12" PT-2: Use Daltile Continental Slate "Brazilian Green" 3" x 3" PT-3: Use Daltile Continental Slate "Persian Gold" 3" x 3"

1. Does the contractor furnish the privacy curtain or the track only?

ANSWER: VA will provide privacy and shower curtains.

1. Provide a location of where the Latex Mastic Deck is used on the project?

ANSWER: Latex Mastic Deck is not used in this project.

1. Where is the contractor laydown yard? Can a fenced in area be located in front of B406?

Will construction mats be required as in past projects?

ANSWER: Yes, a fenced in area will be located in front of B406, and yes, construction mats are required.

1. Can a window be removed for removing debris and bringing in materials on each side of the building?

ANSWER: Yes

1. Spec 09 77 00 - FRP Glass board – Are factory mutual rated panels required or is Class A or Class C acceptable?

If Factory Mutual rating is a requirement, only white is available. Is this acceptable?

ANSWER: Class A FRP is acceptable per paragraph 2.1.D.4.

1. Toilet paper dispenser – Plan states Contractor installs and furnishes, Spec states VA furnished, contractor installed. Please confirm which is correct.

ANSWER: VA Provided / Contractor Installed

1. Towel bars – In specs but not on the plan. Are they required? If so, provide quantity, sizes, and locations.

ANSWER: Provide a towel bar at each Resident Bathroom (16 locations). Locate where additional Grab Bar (GB) is currently shown adjacent to showers. Provide towel bar in lieu of grab bar.

Also provide (2) towel bars at Spa Room: (1) towel bar is in lieu of additional grab bar (GB) currently shown adjacent to shower; and (1) towel bar to be located on exterior wall where unmarked bar is shown.

Towel bars to be 1" diameter, stainless steel with satin finish, 24" long.

File details come from the government source that posted it. Updated .