36C25223B0011 0011.docx

DOCX document 236 KB Posted

Attached to
Z1DA--676-15-201 - Renovate B406 3rd Floor for Dementia Unit (C)
Solicitation number
36C25223B0011
Issued by

About this file

This document provides details for a federal contract solicitation to renovate the third floor of Building 406 at a Veterans Affairs medical center to create a dementia unit. Key requirements include demolishing existing spaces and constructing new walls, installing new finishes, and upgrading mechanical and electrical systems. Bids are due no later than March 7, 2023 with an opening date of March 24, 2023. A pre-bid site visit is scheduled for February 7, 2023 with COVID-19 screening required for attendance. The solicitation is being conducted by the Department of Veterans Affairs Great Lakes Acquisition Center on behalf of Veterans Integrated Service Network 12. Inquiries must be submitted by February 21st and bids shall include signatures by an authorized corporate representative to be valid.

View the file

Other files

File Type Posted
S06 - 36C25223B0011 0014 ATT 3 - F7_minka-lavery-341-357-specification-sheet.pdf PDF
S06 - 36C25223B0011 014 ATT 2 - F6_PROG_P350110-020_spec.pdf PDF
36C25223B0011 0014.docx DOCX document
S06 - 36C25223B0011 0014 ATT 4 - F10_PROG_P3448-0930K9_spec.pdf PDF
S06 - 36C25223B0011 014 ATT 1 - F3_PROG_P300002-009_spec.pdf PDF
36C25223B0011 0013.docx DOCX document
36C25223B0011 0012.docx DOCX document
S06 0011 Att 2 The timeline located at the end of the SOW is hereby replaced with the following timeline.pdf PDF
S06 0011 - ATT 1 11 73 00 - CEILING MOUNT PATIENT LIFT Amd 4.pdf PDF
36C25223B0011 0010.docx DOCX document
S06 0010 ATT 1 AS103C - WALL TYPES.pdf PDF
S06 0010 Att 3 Pre-Bid RFI Clarifications Set 2 676-15-201 Renovate 3rd Fl .xlsx XLSX spreadsheet
S06 0010 ATT 2 Amico-aca-bed-bumpers-vertical-specs.pdf PDF
S06 0009 - ATT 6 Floor Infill detail.pdf PDF
36C25223B0011 0009.docx DOCX document
S06 0009 - ATT 3 033053 (Short-Form) Cast-In-Place Concrete.pdf PDF
S06 0009 - ATT 2 B406 Mechanical Attic Plans.pdf PDF
S06 0009 - ATT 5 090516 Subsurface Prep for Floor Finishes.pdf PDF
S06 0009 Attachment 7 All RFI Responses.xlsx XLSX spreadsheet
S06 0009 - ATT 4 MH101.pdf PDF
S06 0009 ATT 1 400-9 Sections Details.pdf PDF
36C25223B0011 0008.docx DOCX document
S06 - Amendment 7 attachment 1.pdf PDF
36C25223B0011 0007.docx DOCX document
36C25223B0011 0006.docx DOCX document
3rd Set of RFI Responses for posting.pdf PDF
36C25223B0011 0005.docx DOCX document
36C25223B0011 0004.docx DOCX document
Attachment 1 - RFI lighting Red markings.pdf PDF
36C25223B0011 0003.docx DOCX document
S06- site visit attendees.pdf PDF
36C25223B0011 0001.docx DOCX document
S02 - Att 2 676-15-201 Drawings_IFB - Final.pdf PDF
S02 - Att 5 Wage Rates.pdf PDF
S02 - Att 4 676-15-201 Specifications Vol 2_IFB REVISED 2023 01 23.pdf PDF
S02 - Att 3 676-15-201 Specifications Vol 1_IFB REVISED 2023 01 23.pdf PDF
S02 - Att 1 676-15-201 Renovate B406 3rd Floor - SOW - Const REVISED 2023 01 11 02.pdf PDF
36C25223B0011_1.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 676-15-201 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders

36C25223B0011 01-24-2023

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: Friday March 24, 2023 @

2PM

X This amendment is incorporated into the solicitation.

This amendment incorporates 5 additional RFI clarifications regarding asbestos abatement.

This amendment further incorporates a revised brand name or equal requirement for patient lifts and a revised schedule.

The bid opening is extended to March 24, 2023 @ 2pm. Hand Delivery is mandatory.

Please email amy.burger@va.gov asap if you need more time to com pile bid based on the updated patient lift specification

Amy M. Burger Contract Specialist RFI Clarifications

1. Drawing HA101 Hazardous Materials 3rd Floor Asbestos Abatement Plan – the only abatement called out in the drawings is the note shown in the snip below from drawing HA101.

0.

1. The SCOPE OF WORK document included (as an attachment to the bid doc.’s) shows the following (snip below).

1. SCOPE OF WORK APPENDIX A (pages 5-7 of the Scope of Work) shows the snips below (notes pertaining to Bldg. 406 2nd Floor and 3rd Floor.

1. The demolition drawing shows the wood grain vinyl composite engineered flooring to be demolished / removed but drawing HA101does not show it or it’s mastic as being asbestos that needs to be abated. Note 1. Above from the SCOPE OF WORK document says “Blk old floor mastic likely has not been removed and should be assumed”. Should our base bid “assume” that all the wood grain vinyl composite engineered floor be abated? FYI, if the mastic under this floor must be abated, then the entire flooring assembly including the asbestos containing mastic will need to be removed by a certified asbestos abatement subcontractor. Demolition Laborers CANNOT remove the vinyl flooring if the mastic is positive. The $25,000 dollar allowance outlined in item C.5. of the SCOPE OF WORK will NOT cover the cost to remove the vinyl composite engineered flooring if the mastic is determined to be positive for asbestos.

Answer: Yes, bidders are to price the bid assuming that they have to abate all the ACM listed in Item 5 of the SOW and anything shown in the Appendix. There was to be an added amount ($25K) to test for and abate any unknown ACM they might run into that was not outlined in the drawings provided.

HA101 cannot show ACM other than what is clearly present in the PTAC units. However, the VA knows from the asbestos inventory that there is other asbestos present but not the exact location. The possibility of other asbestos has been included in the SOW and in the Appendix A. Part of the project involves testing for and abating unknown asbestos.

Known Asbestos:

· Transite Panels behind PTAC Units

· Friable Pipe Insulation within the walls

· Friable and non-friable flooring materials - black mastic on third floor

· Sealant on duct work on the second floor

1. Same idea as #4 above pertaining to Note 3 above – There is ductwork removal called out in the ceiling of the 2nd Floor, the note above says the brown sealant on the duct joints throughout 2nd floor is positive for ACM, BUT the HA101 drawing does not state anything about ductwork material on 2nd floor having to be abated and/or any material on the second floor being positive for asbestos.

A. Should our base bid “assume” that the ductwork on second floor will have to be abated / removed by an asbestos abatement subcontractor?

Answer:

A. Yes. The duct work on the second floor is to be abated and costs included in base bid.

B. In addition to that question, should our base bid “assume” that all the ductwork on 3rd floor contains the same brown sealant that contains asbestos, therefor it will need to be abated also?

Answer:

B. No. Renovation work on second and third floors were completed at different times. The brown sealant is not reported as present in the Asbestos Survey (Appendix A). However, it would be prudent, prior to demolition, to look for this sealant and if found test to confirm it is an asbestos containing material (ACM). The $25000 line item added to everyone’s bid is to be used to test unidentified and suspect ACM. If this amount of money is insufficient, then a change order will be required.

VA REVISIONS

1. Patient Lifts - NEW Information! Specification 11 73 00

Elements of this specification have changed. Please review the document as a whole for changes. See attachment.

You must hand deliver bid by 2pm on March 24, 2023.

Will be in person @ GLAC. You may join on Teams if you want.

Microsoft Teams meeting Join on your computer, mobile app or room device Click here to join the meeting Meeting ID: 284 325 914 445 Passcode: G5etpS Download Teams | Join on the web Or call in (audio only) +1 872-701-0185,,245993645# United States, Chicago Phone Conference ID: 245 993 645# Find a local number | Reset PIN

Learn More | Meeting options

See attached document: S06 0011 - ATT 1 11 73 00 - CEILING MOUNT PATIENT LIFT Amd 4.

See attached document: S06 0011 ATT 2 REVISED TIMELINE image4.png image5.png image1.png image2.png image3.png

File details come from the government source that posted it. Updated .