Z1DA--676-15-201 - Renovate B406 3rd Floor for Dementia Unit (C)
Solicitation number
36C25223B0011
Issued by

About this file

This solicitation is for the renovation of a dementia unit at the Department of Veterans Affairs Great Lakes Healthcare System in Milwaukee, Wisconsin. Key details include:

  • The scope of work involves renovating room B406 on the third floor to accommodate dementia patients, including new lighting, data cabling, and other interior finishes.

  • Site visits are scheduled for February 7, 2023 and are limited to eight attendees who must provide proof of a negative COVID test within 72 hours and go through health screening on site.

  • Requests for information on the solicitation are due by February 21, 2023. Bids must be submitted by March 7, 2023.

  • Specifications require the use of mineral wool insulation and aluminum ceiling grids in kitchen areas. Data cabling must be CAT6A and duress buttons can use CAT6.

  • The incumbent is the Department of Veterans Affairs and the contracting agency is the Veterans Health Administration Veterans Integrated Service Network 12 located in Milwaukee, Wisconsin.

View the file

Other files

File Type Posted
S06 - 36C25223B0011 0014 ATT 3 - F7_minka-lavery-341-357-specification-sheet.pdf PDF
S06 - 36C25223B0011 014 ATT 2 - F6_PROG_P350110-020_spec.pdf PDF
36C25223B0011 0014.docx DOCX document
S06 - 36C25223B0011 0014 ATT 4 - F10_PROG_P3448-0930K9_spec.pdf PDF
S06 - 36C25223B0011 014 ATT 1 - F3_PROG_P300002-009_spec.pdf PDF
36C25223B0011 0013.docx DOCX document
36C25223B0011 0012.docx DOCX document
S06 0011 Att 2 The timeline located at the end of the SOW is hereby replaced with the following timeline.pdf PDF
S06 0011 - ATT 1 11 73 00 - CEILING MOUNT PATIENT LIFT Amd 4.pdf PDF
36C25223B0011 0011.docx DOCX document
36C25223B0011 0010.docx DOCX document
S06 0010 ATT 1 AS103C - WALL TYPES.pdf PDF
S06 0010 Att 3 Pre-Bid RFI Clarifications Set 2 676-15-201 Renovate 3rd Fl .xlsx XLSX spreadsheet
S06 0010 ATT 2 Amico-aca-bed-bumpers-vertical-specs.pdf PDF
S06 0009 - ATT 6 Floor Infill detail.pdf PDF
36C25223B0011 0009.docx DOCX document
S06 0009 - ATT 3 033053 (Short-Form) Cast-In-Place Concrete.pdf PDF
S06 0009 - ATT 2 B406 Mechanical Attic Plans.pdf PDF
S06 0009 - ATT 5 090516 Subsurface Prep for Floor Finishes.pdf PDF
S06 0009 Attachment 7 All RFI Responses.xlsx XLSX spreadsheet
S06 0009 - ATT 4 MH101.pdf PDF
S06 0009 ATT 1 400-9 Sections Details.pdf PDF
36C25223B0011 0008.docx DOCX document
S06 - Amendment 7 attachment 1.pdf PDF
36C25223B0011 0007.docx DOCX document
36C25223B0011 0006.docx DOCX document
3rd Set of RFI Responses for posting.pdf PDF
36C25223B0011 0005.docx DOCX document
36C25223B0011 0004.docx DOCX document
Attachment 1 - RFI lighting Red markings.pdf PDF
S06- site visit attendees.pdf PDF
36C25223B0011 0001.docx DOCX document
S02 - Att 2 676-15-201 Drawings_IFB - Final.pdf PDF
S02 - Att 5 Wage Rates.pdf PDF
S02 - Att 4 676-15-201 Specifications Vol 2_IFB REVISED 2023 01 23.pdf PDF
S02 - Att 3 676-15-201 Specifications Vol 1_IFB REVISED 2023 01 23.pdf PDF
S02 - Att 1 676-15-201 Renovate B406 3rd Floor - SOW - Const REVISED 2023 01 11 02.pdf PDF
36C25223B0011_1.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 676-15-201 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee

WI

53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee

WI

53214-1476 To all Offerors/Bidders

36C25223B0011 01-24-2023

X X X

X This amendment is incorporated into the solicitation.

This amendment incorporates the first set of responses to requests for information.

Please see responses on page 2.

Amy M. Burger Contract Specialist

FIRST SET OF RFI RESPONSES

1. Ref specification 11 73 00- Can the weight capacity for the bariatric lifts be reduced from 1100lbs to 1000lbs?

Answer: No

2. See Attachment 1 with red arrows on plan to fully understand this RFI. Do the marks on the plans indicate type F8 lighting?

Answer: No, Type F7 sconce.

3. Please provide information on an F15 light.

Answer: Provide typ. Strip light. (Metalux 4SNX-41SL-FDL OR EQ.)

4. Do the F11, F3 & lights in the bulb need separate switching from the room switching?

Answer: F3 in Bedroom = no.

F11 in Team/Med room = yes.

5. Does the project require Cat 6 or Cat 6A cable? Both are mentioned on the drawings and spec.

Answer: CAT 6A cable is required for all data cables. CAT 6 is required for duress buttons.

6. Are the new data cables going to be terminated in the new (EHRM Project) or existing IT room?

Answer: The cables will be terminated at the patch panel in the new (designed) IT closet. EHRM project will complete the interior of the IT closet. The interior contents of the new IT closet are not in the Scope of this renovation.

7. Do you want two 24 strand MM fibers installed or a SM and MM fiber?

Answer: SM Fiber

8. Do you require a Cat 6 cable to each Duress button as the plans state?

Answer: CAT 6 is required for the duress buttons.

9. Is a representative from the Div. 27 contactor required to provide training on VA provided equipment?

Answer: No. VA will train on all VA provided/contractor installed equipment.

10. Are 20 mil studs acceptable?

Answer: The proposed ClarkDietrich 70 ksi G40EQ studs are acceptable.

11. On Sheet AS601, the wall types for smoke and fire rated partitions indicate 3" mineral fiber (mineral wool type) for acoustical insulation. For thermal insulation the notes indicate batt insulation, and the acoustical walls that are not smoke or fire rated indicate batt insulation. Is the insulation noted as batt insulation not mineral fiber (mineral wool)? Also, is glass fiber (fiberglass insulation) acceptable at the areas noted as batt insulation? Is the thermal and acoustical insulation at the VA was typically mineral fiber (mineral wool type)? There is a significant difference between mineral wool and fiberglass insulation.

Answer: Specification 07 21 13 for insulation allows only Mineral Fiber for semi-rigid, batt, and blanket insulation.

12. The specification calls out Aluminum ceiling grid for ACT. Aluminum is more expensive than steel. Generally, aluminum is only needed in high moisture areas to prevent rusting. Is aluminum to be used in all spaces?

Answer: Provide and install aluminum grids at the kitchen areas. Provide and install steel grid elsewhere.

13. Are we to go by the spec supplied or the most current VA spec for Div. 27?

Answer: The specification in the solicitation is sufficient as the revisions in most current version do not effect this project. Please use the specification in the solicitation.

EXTRA NOTES FROM THE VA

Corrections Sheet Note PD 101 Call out note at mixing valve is a 1, it should be 2.

MD 102 Call out note 9 should be a 7.

IT closet will be completed by the EHRM project and will include all interior components. This renovation project will be limited to pulling cable and terminating cable from end point to the IT closet patch panel. All components salvaged from this renovation project will remain in scope related to the IT closet.

See attached document: Attachment 1 - RFI lighting Red markings.