S02 - ATTACH 7 - 695-19-132 Drawing Set_BidPart-5.pdf
PDF 6 MB Posted
- Solicitation number
- 36C25223B0004
About this file
This solicitation is for construction services for the Women's Clinic project at the Milwaukee VA Medical Center. The solicitation number is 36C25223B0004 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.
The project involves renovating and upgrading existing spaces to create new women's clinic and support spaces. The work includes demolition, hazardous material abatement, and construction of new interior walls and finishes. Mechanical, electrical and plumbing systems will also be replaced or upgraded. The construction will be completed in phases to minimize disruptions to existing occupied areas. The estimated award date is October 2022 and the period of performance is 480 calendar days.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHASE 1
TEMPORARY CONSTRUCTION
BARRIERS FOR ACCESS CORRIDOR
TO BE CONSTRUCTED PRIOR TO
START OF PHASE 1 DEMOLITION.
TEMPORARY CORRIDOR TO
REMAIN AFTER END OF PROJECT
CONSTRUCTION.
STAFF TO HAVE TRAVEL ACCESS
THRU SPACE THROUGHOUT PHASE
1.
PHASE 1 -
AFTER HOURS
PROJECT
LOCATION: FIRST
FLOOR
BUILDING 111 KEY PLAN
N
SHADE
INDICATES AREA
NOT IN SCOPE,
TYP.
TEMPORARY INFECTION CONTROL
BARRIER WALLS. SEE PLAN AND PLAN
NOTES
CONSTRUCTION ACCESS DOORS
BEYOND PROJECT
BOUNDARY
IC / PHASING LEGEND
PHASE 1
1. CONTRACTOR TO CONSTRUCT 1 HR RATED
CONSTRUCTION BARRIERS AS NOTED ON PLAN. VA
STAFF TO USE PATH THROUGH EXISTING KITCHEN
SPACE SEPARATED BY CONSTRUCTION BARRIER
WALLS THROUGHOUT DURATION OF PHASE 1 & 2.
2. CONTRACTOR TO DEMOLISH, INCLUDING HAZMAT
AND MEP REMOVAL, AND RENOVATE, INCLUDING
MEP, AREA OF VCS OFFICES. CONTRACTOR TO USE
EXISTING PERIMETER WALL AS CONTRUCTION
BARRIER SEPARATION FOR DEMOLITION. NEW
PERIMETER WALL TO BE CONSTRUCTED FIRST TO
ACT AS CONSTRUCTION BARRIER.
3. PHASE 1 WORK TO OCCUR IN JUNCTION WITH
PHASE 1 - AFTER HOURS.
4. VCS OFFICES AND ADJACENT CORRIDOR ARE OPEN
AND OCCUPIED AFTER COMPLETION OF PHASE 1
AND PHASE 1 - AFTER HOURS.
5. PHASE 2 TO BEGIN AFTER OFFICES AND CORRIDOR
ARE COMPLETE AND OPEN.
PHASE 2
1. CONTRACTOR TO CONSTRUCT INFECTION
CONTROL/CONSTRUCTION BARRIERS AS NOTED
ON PLAN. VA STAFF TO USE PATH THROUGH
EXISTING KITCHEN SPACE SEPARATED BY
CONSTRUCTION BARRIER WALLS THROUGHOUT
DURATION OF PHASE 2.
2. CONTRACTOR TO DEMOLISH, INCLUDING HAZMAT
AND MEP REMOVAL, AND RENOVATE, INCLUDING
MEP, AREAS OF THE STAFF SUPPORT SPACES AND
PUBLIC RESTROOMS AS INDICATED ON PLAN.
3. STAFF AREAS AND PUBLIC RESTROOMS ARE OPEN
AND OCCUPIED AFTER COMPLETION OF PHASE 2.
4. PHASE 3 TO BEGIN AFTER COMPLETION OF PHASE
2.
PHASE 3
1. CONTRACTOR TO CONSTRUCT INFECTION
CONTROL/CONSTRUCTION BARRIERS AS NOTED ON
PLAN. VA STAFF TO USE NEW CORRIDORS TO
TRAVEL THROUGH SPACE.
2. CONTRACTOR TO DEMOLISH, INCLUDING HAZMAT
AND MEP REMOVAL, AND RENOVATE, INCLUDING
MEP, AREAS FOR THE WOMEN'S CLINIC AND SWING
SPACE.
NOT IN PHASE BOUNDARY
PERMANENT INFECTION CONTROL BARRIER
WALLS AND/OR DOORS. SEE PLAN AND PLAN
NOTES
PHASE 3 - AFTER HOURS
1. CONTRACTOR TO DEMOLISH, INCLUDING MEP, AND
RENOVATE, INCLUDING MEP, THE CORRIDORS
DURING AFTER HOURS. CONTRACTOR TO
COORDINATE WITH THE VA FOR KITCHEN STAFF
ACCESS.
2. PHASE 3 - AFTERHOURS TO OCCUR IN JUNCTION
WITH PHASE 3.
PHASE 1 - AFTER HOURS
1. CONTRACTOR TO DEMOLISH, INCLUDING MEP, AND
RENOVATE, INCLUDING MEP, THE CORRIDOR DURING
AFTER HOURS. THE
2. CORRIDOR MUST BE OPEN DURING BUSINESS
HOURS. CONTRACTOR TO COORDINATE WITH THE
VA FOR KITCHEN STAFF ACCESS.
3. PHASE 1 - AFTERHOURS TO OCCUR IN JUNCTION
WITH PHASE 1.
VA TO OCCUPY
VCS OFFICES
STAFF TO HAVE
TRAVEL ACCESS
THRU CORRIDOR
BUILT IN PHASE 1
THROUGHOUT PHASE
NOTE:
STAFF SPACES AND PUBLIC
RESTROOMS MUST BE
COMPLETE AND OCCUPIED
PRIOR TO BEGINNING WORK ON
PHASE 3.
PHASE 2
VA TO OCCUPY
STAFF AREA
PUBLIC RESTROOMS TO
BE OPEN TO PUBLIC
VA TO OCCUPY
VCS OFFICES
CORRIDOR IS OPEN.
STAFF TO TRAVEL
THRU NEW
CORRIDOR
THROUGHOUT
PHASE 3
PHASE 3-
AFTER HOURS
PHASE 3
PHASE 3-
AFTER HOURS
NO MORE THAN 50%
WIDTH OF MAIN
CORRIDOR TO BE
CLOSED AT ANY TIME
CONTRACTOR TO
COORDINATE WITH VA FOR
KITCHEN STAFF ACCESS TO
NEW CORRIDOR DURING
PHASE 3 - AFTER HOURS
WORK
PHASE 3
REFER TO MECHANCIAL
DRAWINGS FOR FULL
EXTEND OF WORK IN THIS
CORRIDOR.
VCS OFFICE
CASH OUT
1465B
VCS CHIEF OFFICE
1465A
CONSULT
PATIENT TOILET
1448A PROCEDURE
PATIENT TOILET
1452A
SOILED HOLDING
PROCEDURE
EXAM
EXAM
EXAM
EXAM
EXAM
FAMILY TOILET
1400A
LACTATION
CHECK-IN
1432INTAKE
LINEN CLOSET
INTAKE
PATIENT TOILET
LAB
CONSULT
CLEAN STORAGE
EQUIPMENT
INTAKE - ALCOVE
MENS TOILET
RECEPTION /
WAITING
WOMENS TOILET
ELECTRICAL
HAC
WHEELCHAIR
STORAGE
1400B
FAMILY WAITING
1400C
ELECTRICAL
1403EC
CORRIDOR
C1C03
CORRIDOR
C1C01
CORRIDOR
C1C02
CORRIDOR
C1C09
CORRIDOR
C1B06
CORRIDOR
C1C11
LOCKER ROOM
STAFF TOILET
RESIDENT
WORKROOM
CONFERENCE /
BREAK
CORRIDOR
C1C10
OPEN
WORKSTATIONS
SWING SPACE
STORAGE
INTAKE
MEDS
DRY STORAGE
CANISTER STORAGE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
REVISION 1 10-05-2022
C U s e rs
\m p a q u in
\O n e
D ri v e
G u id o n
D e s ig n in c \D o c u m e n ts \1
.1
.1
M E
P v m p a q u in
G
E N
G .r v t
/6 /2
:1
:5
P
M
P003
FIRST FLOOR PLUMBING PHASING
PLANGUIDON DESIGN, INC.
1221 N. PENNSYLVANIA STREET
SUITE 200
INDIANAPOLIS, INDIANA 46202
317.800.6388
CONSTRUCT WOMEN'S CLINIC
5000 W. NATIONAL AVE, MILWAUKEE, WI 53295
695-19-132
09/07/2022 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"P003
1 FIRST FLOOR PLUMBING PHASING PLAN - PHASE 1 DEMOLITION
SCALE: 1/16" = 1'-0"P003
3 FIRST FLOOR PLUMBING PHASING PLAN - PHASE 1 COMPLETE - PHASE 2 DEMOLITION
SCALE: 1/16" = 1'-0"P003
5 FIRST FLOOR PLUMBING PHASING PLAN - PHASE 2 COMPLETE - PHASE 3 DEMOLITION
SCALE: 1/16" = 1'-0"P003
6 FIRST FLOOR PLUMBING PHASING PLAN - CONSTRUCTION COMPLETE
GENERAL NOTE:
ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING
MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE
TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS
ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND
MEP DRAWINGS FOR PHASING PLAN.
Revisions: Date:
6" RAISED
CURB
W.S. W.S.
B O B
BO443C
B
B0830.1
CG
CG
CG
CG
CG
RBR-2
FIELD
RBR-2
RBR-3
EXTG
RBR-4
CG
CG
CG
RBR-2 EXTG
F E
F E
F E
F E
F E
F E
P P
P P
OVERHEAD DOORS
CORRIDOR
CORRIDOR
PROSTHETICS
RECEPTION
OFFICE
PROSTHETICSPROG
ANALYST
ERGONOMICCLINICAL
SPEC
ERGONOMICS
OFFICE
WORKSHOP
ORTHOTICS
ELEC
CLO
C O R R
C O R R
PIT
LADDER
PROJECT
LOCATION: FIRST
FLOOR
BUILDING 111 KEY PLAN
N
SHADE
INDICATES AREA
NOT IN SCOPE,
TYP.
1. REMOVE EXISTING SANITARY WASTE AND VENT PIPING AS SHOWN BACK TO
EXISTING LOCATION. REMOVE ALL HANGERS, SUPPORTS, AND
ACCESSORIES. PATCH AND REPAIR ALL EXISTING FLOOR PENETRATIONS AS
REQUIRED. REFER TO DETAIL 4 ON SHEET PP600.
2. REMOVE EXISTING DOMESTIC WATER PIPING AS SHOWN BACK TO EXISTING
LOCATION. REMOVE ALL HANGERS, SUPPORTS, AND ACCESSORIES.
3. REMOVE PIPING TO WALL. PROVIDE CLEAN OUT. NO SCOPE OF WORK
SHALL OCCUR IN PNEUMATIC TUBE STATION ROOM.
4. REMOVE EXISTING WASTE/VENT RISER FOR NEW FLOOR PLAN LAYOUT.
PLUMBING PIPING DEMOLITION PLAN NOTES #
EX
4"WS/VS
EX 4"
WS
EX
4"WS19
X U S RZAACCFFGG T
EX
4"WS/VS
14"V
EX
4"WS/VS
4" 4"
4"4"
4"
4"
4"
4"
EX
4"WS/VS
1/2"
1/2"
2"
2"
4"
4"
2"
EX 2 1/2" CW, 1 1/2" HW,
1/2" HWC UP
EX
4"WS/VS
2"
EX
4"WS/VS
4" 4" 4"
4"
4"
4"
E X
W
4"
4"
IIJJ HH
CO
E X
E X
/2
H W
E X
C W
4"
EX 4" W
E X
W E
X
H
W R
1"CW
1"HW
1"CW
1"HW
EX 2" V
EX 2" CW EX 1 1/2" HW EX 1" HWR
1"HWR
1 1/2"HW
2"CW
E X
W
EX 4" W
EX 4" W
EX 4" W
EX 1 1/2" HW
EX 2" CW
4"
4"
E X
V
E X
W
E X
W
EX 4" W
E X
W E
X
V
E X
W
4 4
ELECTRICAL
CLOSET
B0460EC
MANAGER'S
OFFICE
B0431B
HALLWAY
BCU01B
CREDIT
UNION
B0431ACCOUNTING
B0431C
STORAGE
B0431B
MECHANICAL
ROOM
B0433A
COPY CENTER
B0462
EQUIPMENT
B0464
LOAN OFFICER
C0431E
OFFICE
B0432A
OFFICE
B0432
HR LINKS
B0434
WHS
SUPERVISOR
B0451B
WAREHOUSE
B0451
SUPERVISOR
OFFICE
B0437B
BREAK
ROOM
B0437A
SPD CLEAN
SUPPLY
B0435A
ESCORT
SERVICE
B0437
CART
STORAGE
B0435
OFFICE
B0433
EXAM ROOM
B0622A
ELECTRICAL
B0627B
TELEPHONE
B0627A
HAC
B0627E
EXAM ROOM
B0622
BREAK
ROOM
B0627D
A. SEE SHEET P000 FOR PLUMBING GENERAL NOTES.
B. ALL WORK ON THIS SHEET SHALL OCCUR UNDER ONE (1) PHASE.
PLUMBING PIPING DEMOLITION GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
REVISION 1 10-05-2022
C U s e rs
\m p a q u in
\O n e
D ri v e
G u id o n
D e s ig n in c \D o c u m e n ts \1
.1
.1
M E
P v m p a q u in
G
E N
G .r v t
/6 /2
:2
:0
P
M
PD100
BASEMENT PLUMBING PIPING
DEMOLITION PLANGUIDON DESIGN, INC.
1221 N. PENNSYLVANIA STREET
SUITE 200
INDIANAPOLIS, INDIANA 46202
317.800.6388
CONSTRUCT WOMEN'S CLINIC
5000 W. NATIONAL AVE, MILWAUKEE, WI 53295
695-19-132
09/07/2022 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
N
SCALE: 1/8" = 1'-0"PD100
2 BASEMENT PLUMBING PIPING DEMOLITION PLAN
GENERAL NOTE:
ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING
MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE
TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS
ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND
MEP DRAWINGS FOR PHASING PLAN.
PROJECT
LOCATION: FIRST
FLOOR
BUILDING 111 KEY PLAN
N
SHADE
INDICATES AREA
NOT IN SCOPE,
TYP.
A. SEE SHEET P000 FOR PLUMBING GENERAL NOTES.
PLUMBING PIPING DEMOLITION GENERAL NOTES
1. REMOVE EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED DOMESTIC
WATER PIPING, SANITARY WASTE, AND SANITARY VENT PIPING BACK TO
LOCATION AS SHOWN. REMOVE ALL ASSOCIATED VALVES, HANGERS, AND
SUPPORTS. PATCH AND REPAIR ALL EXISTING FLOOR PENETRATIONS AS
REQUIRED. REFER TO DETAIL 4 ON SHEET PP600.
2. REMOVE EXISTING FLOOR DRAIN/SINK AND ALL ASSOCIATED SANITARY
WASTE AND SANITARY VENT PIPING BACK TO LOCATION AS SHOWN. REMOVE
ALL ASSOCIATED HANGERS AND SUPPORTS. PATCH AND REPAIR ALL
EXISTING FLOOR PENETRATIONS AS REQUIRED.
3. REMOVE ALL EXISTING WATER TREATMENT SYSTEMS IN THIS ROOM.
REMOVE ALL ASSOCIATED DOMESTIC WATER, SANITARY WASTE, AND
SANITARY VENT PIPING BACK TO LOCATION AS SHOWN. REMOVE ALL
ASSOCIATED VALVES, HANGERS, AND SUPPORTS.
4. REMOVE EXISTING WASTE/VENT RISER FOR NEW FLOOR PLAN LAYOUT.
PLUMBING PIPING DEMOLITION PLAN NOTES #
X U S RZAACCFFGG T
EX 4"
WS/VS EX 4"
WS/VS
EX 4"
WS/VS
EX 4"
WS/VS
EX 4"
WS/VS
EX 4"
WS/VS
IIJJ HH
SANITATION
COMMUNICATION
CENTER
DISTRIBUTION
CASH COUNT
1409A
CORRIDOR
C1B08
TOILET FEMALE
E L
E C
T R
IC
A
L
E C
WATER SOFTNER
TRAYLINE
KETTLE AREA
CANTEEN DRY
STORAGE
FOOD PREP
& SERVICE
CLASSROOM /
CONFERENCE
ADPAC /
TRAINING
CANTEEN ADMIN
OFFICE
OFFICE
1409B
STORAGE
1409C
TOILET MALE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
REVISION 1 10-05-2022
C U s e rs
\m p a q u in
\O n e
D ri v e
G u id o n
D e s ig n in c \D o c u m e n ts \1
.1
.1
M E
P v m p a q u in
G
E N
G .r v t
/6 /2
:2
:0
P
M
PD101
FIRST FLOOR PLUMBING PIPING
DEMOLITION PLANGUIDON DESIGN, INC.
1221 N. PENNSYLVANIA STREET
SUITE 200
INDIANAPOLIS, INDIANA 46202
317.800.6388
CONSTRUCT WOMEN'S CLINIC
5000 W. NATIONAL AVE, MILWAUKEE, WI 53295
695-19-132
09/07/2022 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
N
SCALE: 1/8" = 1'-0"PD101
2 FIRST FLOOR PLUMBING DEMOLITION PLAN
GENERAL NOTE:
ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING
MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE
TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS
ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND
A500
6" RAISED
CURB
W.S. W.S.
B O B
BO443C
B
B0830.1
CG
CG
CG
CG
CG
RBR-2
FIELD
RBR-2
RBR-3
EXTG
RBR-4
CG
CG
CG
RBR-2 EXTG
F E
F E
F E
F E
F E
F E
P P
P P
OVERHEAD DOORS
CORRIDOR
CORRIDOR
PROSTHETICS
RECEPTION
OFFICE
PROSTHETICSPROG
ANALYST
ERGONOMICCLINICAL
SPEC
ERGONOMICS
OFFICE
WORKSHOP
ORTHOTICS
ELEC
CLO
C O R R
C O R R
PIT
LADDER
PROJECT
LOCATION: FIRST
FLOOR
BUILDING 111 KEY PLAN
N
SHADE
INDICATES AREA
NOT IN SCOPE,
TYP.
X U S RZAACCFFGG T
2"CW
1 1/2"HW
1 1/2"CW
CAP
2"CW
1 1/2"HW
1"HWR
CAP
IIJJ HH
PP400
A. REFER TO SHEET P000 FOR PLUMBING GENERAL NOTES.
B. REFER TO SHEET PP600 FOR INDIVIDUAL PIPING SIZES TO FIXTURES ON
PLUMBING FIXTURE SCHEDULE.
PLUMBING PIPING GENERAL NOTES
ELECTRICAL
CLOSET
B0460EC
MANAGER'S
OFFICE
B0431B
HALLWAY
BCU01B
CREDIT
UNION
B0431ACCOUNTING
B0431C
STORAGE
B0431B
MECHANICAL
ROOM
B0433A
COPY CENTER
B0462
EQUIPMENT
B0464
LOAN OFFICER
C0431E
OFFICE
B0432A
OFFICE
B0432
HR LINKS
B0434
WHS
SUPERVISOR
B0451B
WAREHOUSE
B0451
SUPERVISOR
OFFICE
B0437B
BREAK
ROOM
B0437A
SPD CLEAN
SUPPLY
B0435A
ESCORT
SERVICE
B0437
CART
STORAGE
B0435
OFFICE
B0433
EXAM ROOM
B0622A
ELECTRICAL
B0627B
TELEPHONE
B0627A
HAC
B0627E
EXAM ROOM
B0622
BREAK
ROOM
B0627D
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
REVISION 1 10-05-2022
C U s e rs
\m p a q u in
\O n e
D ri v e
G u id o n
D e s ig n in c \D o c u m e n ts \1
.1
.1
M E
P v m p a q u in
G
E N
G .r v t
/6 /2
:2
:0
P
M
PP100
BASEMENT PLUMBING PIPING
PLANGUIDON DESIGN, INC.
1221 N. PENNSYLVANIA STREET
SUITE 200
INDIANAPOLIS, INDIANA 46202
317.800.6388
CONSTRUCT WOMEN'S CLINIC
5000 W. NATIONAL AVE, MILWAUKEE, WI 53295
695-19-132
09/07/2022 CDH CH
100% BID DOCUMENTS
FULLY SPRINKLERED
N
SCALE: 1/8" = 1'-0"PP100
1 BASEMENT PLUMBING PLAN
GENERAL NOTE:
ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING
MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE
TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS
ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND
X U S RZAACCFFGG T
VCS OFFICE
CASH OUT
1465B
VCS CHIEF OFFICE
1465A
CONSULT
PATIENT TOILET
1448A
PROCEDURE
PATIENT TOILET
1452A
SOILED HOLDING
PROCEDURE
EXAM
EXAM
EXAM
EXAM
EXAM
FAMILY TOILET
1400A
LACTATION
CHECK-IN
INTAKE
LINEN CLOSET
INTAKE
PATIENT TOILET
LAB
CONSULT
CLEAN STORAGE
EQUIPMENT
INTAKE - ALCOVE
MENS TOILET
RECEPTION /
WAITING
WOMENS TOILET
ELECTRICAL
HAC
WHEELCHAIR
STORAGE
1400B
FAMILY WAITING
1400C
ELECTRICAL
1403EC
CORRIDOR
C1C03
CORRIDOR
C1C01
CORRIDOR
C1C02
CORRIDOR
C1C09
CORRIDOR
C1B06
CORRIDOR
C1C11
LOCKER ROOM
STAFF TOILET
RESIDENT
WORKROOM
CONFERENCE /
BREAK
1454 CORRIDOR
C1C10
OPEN
WORKSTATIONS
SWING SPACE
STORAGE
INTAKE
MEDS
DRY STORAGE
CANISTER STORAGE
WHEELCHAIR WASH
IIJJ HH
PP401
PROJECT
LOCATION: FIRST
FLOOR
BUILDING 111 KEY PLAN
N
SHADE
INDICATES AREA
NOT IN SCOPE,
TYP.
A. REFER TO SHEET P000 FOR PLUMBING GENERAL NOTES.
B. REFER TO SHEET PP600 FOR INDIVIDUAL PIPING SIZES TO FIXTURES ON
PLUMBING FIXTURE SCHEDULE.
PLUMBING PIPING GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
REVISION 1 10-05-2022
C U s e rs
\m p a q u in
\O n e
D ri v e
G u id o n
D e s ig n in c \D o c u m e n ts \1
.1
.1
M E
P v m p a q u in
G
E N
G .r v t
/6 /2
:2
:0
P
M
PP101
FIRST FLOOR PLUMBING PIPING
PLANGUIDON DESIGN, INC.
1221 N. PENNSYLVANIA STREET
SUITE 200
INDIANAPOLIS, INDIANA 46202
317.800.6388
CONSTRUCT WOMEN'S CLINIC
5000 W. NATIONAL AVE, MILWAUKEE, WI 53295
695-19-132
09/07/2022 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"PP101
1 FIRST FLOOR PLUMBING PIPING PLAN
N
GENERAL NOTE:
ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING
MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE
TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS
ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND
X U S RZAA T
EX
4"WS/VS
EX 4"
WS
EX
4"WS/VS
EX
4"WS/VS
CAP
CO
2"W 2"W
1 1/2"W UP
1 1/2"W UP
EX 4"
WS/VS
EX 4"
WS/VS
CO
CO
CO
4"W
4"W
4"W
4"W
CO
3"W
3"W
2"W
4"W
CO
4"W
4"W 4"W
2"W
2"W
4"W UP
4"W UP
1 1/2"W UP
1 1/2"W UP
1 1/2"W UP
2"W UP
2"W UP 1 1/2"W UP
1 1/2"W UP
2"W UP
4"W UP
1 1/2"W UP
1 1/2"W UP
3"W
CO
4"W
OUTLINE OF
EXISTING CREDIT
UNION
PNEUMATIC TUBE
ROOM (LIGHT
HATCH)
1 1/2"W UP
2"W UP
CO
4"W UP
1 1/2"W UP
3"W UP
CO
CO
4"W UP 1 1/2"W UP
4"W UP 1 1/2"W UP
CO
1 1/2"W UP
1 1/2"W UP
1 1/2"W UP
CO
3"W
4"W UP 2"W UP
CO
4"V
CO
4"W 4"W
1 1/2"W
4"W
4"W
3"W 4"W
OFFICE
B0432
OFFICE
B0432A
HR LINKS
B0434
EMS PROGRAM MGR.
B0436ESCORT SERVICE
B0437
CART STORAGE
B0435
BREAK ROOM
B0437A
OFFICE
B0433
LOAN OFFICER
C0431E
MECHANICAL ROOM
B0433A
STORAGE
B0431B
COPY CENTER
B0462
EQUIPMENT
B0464
ACCOUNTING
B0431C
HALLWAY
BCU01B
MANAGER'S OFFICE
B0431B
ELECTRICAL CLOSET
B0460EC
A. REFER TO SHEET P000 FOR PLUMBING GENERAL NOTES.
B. REFER TO SHEET PP600 FOR INDIVIDUAL PIPING SIZES TO FIXTURES ON
PLUMBING FIXTURE SCHEDULE.
PLUMBING PIPING GENERAL NOTES
1. CONNECT NEW SANITARY WASTE PIPING TO EXISTING SANITARY WASTE
PIPING IN THIS LOCATION.
2. NO SCOPE OF WORK SHALL OCCUR IN THIS ROOM.
3. PIPING FROM ABOVE SHALL NOT PASS IN ROOM. COORDINATE WITH
ROUTING ON FLOOR ABOVE.
4. PROVIDE NEW PIPING OFFSET FOR BOTH WASTE/VENT RISER.
PLUMBING PLAN NOTES #
PROJECT
LOCATION: FIRST
FLOOR
BUILDING 111 KEY PLAN
N
SHADE
INDICATES AREA
NOT IN SCOPE,
TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
REVISION 1 10-05-2022
C U s e rs
\m p a q u in
\O n e
D ri v e
G u id o n
D e s ig n in c \D o c u m e n ts \1
.1
.1
M E
P v m p a q u in
G
E N
G .r v t
/6 /2
:2
:1
P
M
PP400
PLUMBING ENLARGED PLANS
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA STREET
SUITE 200
INDIANAPOLIS, INDIANA 46202
317.800.6388
CONSTRUCT WOMEN'S CLINIC
5000 W. NATIONAL AVE, MILWAUKEE, WI 53295
695-19-132
09/07/2022 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"PP400
1 BASEMENT PLUMBING PIPING ENLARGED PLAN
N
1. 3/4" CW, 3/4" HW, 1/2" HWR DOWN TO BOTH PLUMBING FIXTURES. PROVIDE
1/2" CW, 1/2" HW, 1/2" HWR TO EACH FIXTURE. PROVIDE ISOLATION VALVE ON
EACH SYSTEM TO EACH FIXTURE.
2. 1 1/2" CW, 3/4" HW, 1/2" HWR DOWN TO BOTH PLUMBING FIXTURES. PROVIDE
INDIVIDUAL PIPING TO EACH FIXTURE. COORDINATE WITH PLUMBING
FIXTURE SCHEDULE. PROVIDE ISOLATION VALVES ON EACH SYSTEM TO
EACH FIXTURE.
3. CONNECT NEW 2 1/2" CW, 1 1/2" HW, 3/4" HWR TO EXISTING PIPING IN THIS
AREA.
4. CONNECT NEW VENT PIPING TO RE-LOCATED EXISTING VENT RISER IN THE
LOCATION.
5. CONNECT NEW 1/2" CW FROM EXISTING DRINKING WATER SYSTEM.
LOCATED APPROXIMATELY 100 LINEAR FEET PLAN NORTH IN EXISTING
CANTEEN AREA. PROVIDE ISOLATION VALVE AT CONNECTION.
6. OFFSET PIPING IN WALL TO AVOID PNEUMATIC TUBE STATION ROOM BELOW.
7. PROVIDE AUTOMATIC BALANCE VALVE FOR HOT WATER RECIRCULATION.
SET TO 0.25 GPM.
8. PROPOSED ROUTING OF NEW PNEUMATIC TUBE STATION PIPING.
COORDINATE EXACT LOCATION AND ROUTING WITH DIVISION 14
CONTRACTOR.
9. PROVIDE 1/2" INCH TEMPERED HW DOWN TO HOSE BIBB. INSTALL HOSE BIBB
18" A.F.F. COORDINATE FINAL LOCATIONS WITH OWNER FOR EXISTING
WHEELCHAIR WASHER.
10. PROVIDE ALL LOW VOLTAGE FROM SENSOR LV TRANSFORMER TO FLUSH
VALVES. ROUTE LOW VOLTAGE WIRING CONCEALED IN BUILDING FINISHES.
11. NO VALVES SHALL BE LOCATED ABOVE THIS ROOM.
12. PROVIDE THERMOSTATIC MIXING VALVE IN ACCESSIBLE LOCATION ABOVE
CEILING. CONNECT 1/2" HW AND 1/2" CW (FROM NEARBY MAIN) TO MIXING
VALVE. SET VALVE TO 100 DEG F FOR OUTLET TEMPERATURE. PROVIDE
BALL VALVE ON ALL INLETS AND OUTLET FOR ISOLATION.
13. COORDINATE LOCATION OF FLOOR DRAIN WITH ACTUAL LOCATION OF
WHEELCHAIR WASHER.
PLUMBING PIPING PLAN NOTES #
A. REFER TO SHEET P000 FOR PLUMBING GENERAL NOTES.
B. REFER TO SHEET PP600 FOR INDIVIDUAL PIPING SIZES TO FIXTURES ON
PLUMBING FIXTURE SCHEDULE.
PLUMBING PIPING GENERAL NOTES
X U SZAACC T
P-114
P-408
P-408
P-505
P-405
P-405
P-405
P-405
P-114
P-408
P-405 P-405
P-405
P-405P-405
P-405
P-405
P-408
P-405
P-114
P-405 P-505
P-408
P-408
P-405
P-609
P-404P-404 P-202P-103P-103
P-501P-114 P-408
P-405
EX 4"
WS/VS
EX 4"
WS/VS
EX 4"
WS/VS
1 1/2" V DN
EX 4"
WS/VS
P-FD-D
/2 "V
2 1/2"CW
1 1/2"HW
3/4"HWR
/2
"H W
/2
"H W
R
/2
"H W
/2 "C
W
"V
/2
"H W
R
/4
"H W
/4
"C W
2"CW
3/4"HW
1/2"HWR
"V
"C
W
/4
"H W
/2
"H W
R
P-103 P-103 P-404 P-404
P-FD-I
2"V
3/4"HWR
1"HW
2"CW
2"V
3/4"HWR
1"HW
2"CW
"C
W
"H
W
/4
"H W
R
P-114
3/4"HWR
2"HW
2"CW
2"V
3/4"HWR
2"HW
2"CW
2"V
"C
W
"H
W
/4
"H W
R
"V
"C
W 1 "H
W 1 /2
"H W
R
/4
"C W 3 /4
"H W
/2
"H W
R
"V
1 1/2"CW
3/4"HW
1/2"HWR
2"V2"V
1/2"CW
1/2"HW
1/2"HWR
/4
"H W
R
"H
W
/2 "C
W
"V
/2 "C
W
/4
"H W
/4
"H W
R
"V
3/4"HWR
3/4"HW
3/4"CW
/4
"C W
/4
"H W
/4
"H W
R
"V
"V 3 /4
"C W
/4
"H W
/4
"H W
R
2"V
1/2"CW
1/2"HW
1/2"HWR
2"V
1 1/2"CW
1/2"HWR
3/4"HW
EXAM
CORRIDOR
C1C09
WHEELCHAIR WASH
CONFERENCE /
BREAK
STAFF TOILET
OPEN
WORKSTATIONS
LOCKER ROOM
STORAGE
HAC
WOMENS TOILET
MENS TOILET
PROCEDURE
PATIENT TOILET
1452A
PROCEDURE
1448PATIENT TOILET
1448A
MEDS
CONSULT
CLEAN STORAGE
EQUIPMENT
CONSULT
CORRIDOR
C1C02
LAB
CORRIDOR
C1C03
EXAM
EXAM
EXAM
EXAM
PATIENT TOILET
INTAKE
INTAKE
CHECK-IN
INTAKE
RECEPTION /
WAITING
LINEN CLOSET
INTAKE - ALCOVE
FAMILY WAITING
1400C
FAMILY TOILET
1400A LACTATION
ELECTRICAL
1403EC
SOILED HOLDING
2 1/2"CW
1 1/4"HW
3/4"HWR
P-FD-D
1/2"HWR
1/2"HW
1 1/2"CW 2"CW
2"V 2"V
1/2"HW
1 1/2"V
1/2"CW
/2
"H W
R
2"V
1 1/2"CW
1/2"CW
1/2"HW
1/2"HWR
1 1/2"V
1/2"HWR
1/2"HW
1 1/2"V
1/2"CW
/2
"C W
/2
"H W
/2
"H W
R
"V
PROJECT
LOCATION: FIRST
FLOOR
BUILDING 111 KEY PLAN
N
SHADE
INDICATES AREA
NOT IN SCOPE,
TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
REVISION 1 10-05-2022
C U s e rs
\m p a q u in
\O n e
D ri v e
G u id o n
D e s ig n in c \D o c u m e n ts \1
.1
.1
M E
P v m p a q u in
G
E N
G .r v t
/6 /2
:2
:1
P
M
PP401
PLUMBING ENLARGED PLANS
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA STREET
SUITE 200
INDIANAPOLIS, INDIANA 46202
317.800.6388
CONSTRUCT WOMEN'S CLINIC
5000 W. NATIONAL AVE, MILWAUKEE, WI 53295
695-19-132
09/07/2022 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"PP401
1 FIRST FLOOR PLUMBING PIPING ENLARGED PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
REVISION 1 10-05-2022
C U s e rs
\m p a q u in
\O n e
D ri v e
G u id o n
D e s ig n in c \D o c u m e n ts \1
.1
.1
M E
P v m p a q u in
G
E N
G .r v t
/6 /2
:2
:1
P
M
PP600
PLUMBING SCHEDULES AND
DETAILSGUIDON DESIGN, INC.
1221 N. PENNSYLVANIA STREET
SUITE 200
INDIANAPOLIS, INDIANA 46202
317.800.6388
CONSTRUCT WOMEN'S CLINIC
5000 W. NATIONAL AVE, MILWAUKEE, WI 53295
695-19-132
09/07/2022 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1 1/2" = 1'-0"PP600
1 TYPE D FLOOR DRAIN
PLUMBING FIXTURE SCHEDULE
MARK PLUMBING FIXTURE DESCRIPTION
CONNECTION SIZES (IN)
CW HW WASTE VENT
P-103 WATER CLOSET -
PUBLIC
WATER CLOSET (WALL HUNG, ASME A112.19.2) OFFICE AND INDUSTRIAL, ELONGATED BOWL, SIPHON JET 4.8 L (1.28 GALLONS) PER FLUSH, WALL OUTLET. TOP OF SEAT SHALL BE BETWEEN 400 MM AND 432 MM (16 INCHES AND 17 INCHES) ABOVE FINISHED FLOOR. HANDICAPPED WATER CLOSET SHALL HAVE SEAT SET 450 MM (18 INCHES) ABOVE FINISHED FLOOR.
1.SEAT: INSTITUTIONAL/INDUSTRIAL, EXTRA HEAVY DUTY, CHEMICAL RESISTANT, SOLID PLASTIC, OPEN FRONT LESS COVER FOR ELONGATED BOWLS, INTEGRALLY MOLDED BUMPERS, CONCEALED CHECK HINGE WITH STAINLESS STEEL POST. SEAT SHALL BE POSTURE CONTOURED BODY DESIGN. COLOR SHALL BE WHITE.
2.FITTINGS AND ACCESSORIES: GASKETS-NEOPRENE; BOLTS WITH CHROMIUM PLATED CAPS NUTS AND WASHERS AND CARRIER.
3.FLUSH VALVE: LARGE CHLORAMINES RESISTANT DIAPHRAGM, SEMI-RED BRASS VALVE BODY, EXPOSED CHROME PLATED, DUAL FLUSH NON-HOLD OPEN ADA APPROVED SIDE OSCILLATING HANDLE SENSOR
OPERATED (HARDWIRED) WITH MANUAL OVERRIDE WATER SAVER DESIGN PER FLUSH WITH MAXIMUM 10 PERCENT VARIANCE 25 MM (1 INCH) SCREWDRIVER BACK CHECK ANGLE STOP WITH VANDAL RESISTANT CAP, ADJUSTABLE TAILPIECE, A HIGH BACK PRESSURE VACUUM BREAKER, SPUD COUPLING FOR 40 MM (1-1/2 INCHES) TOP SPUD, WALL AND SPUD FLANGES, SOLID-RING PIPE SUPPORT, AND SWEAT SOLDER ADAPTER WITH COVER TUBE AND SET SCREW WALL FLANGE. VALVE BODY, COVER, TAILPIECE AND CONTROL STOP SHALL BE IN CONFORMANCE WITH ASTM ALLOY CLASSIFICATION FOR SEMI-RED BRASS. SEAT BUMPERS SHALL BE INTEGRAL PART OF FLUSH VALVE. SET CENTERLINE OF INLET 292 MM (11-1/2 INCHES) ABOVE SEAT. PROVIDE WITH TRANSFORMER.
1 1/2 4 2
P-114 WATER CLOSET -
PRIVATE
WATER CLOSET (WALL HUNG, ASME A112.19.2) BARIATRIC-RATED, INDUSTRIAL, ELONGATED BOWL, SIPHON JET 4.8 L (1.28 GALLONS) PER FLUSH, WALL OUTLET. TOP OF SEAT SHALL BE BETWEEN 400 MM AND 432 MM (16 INCHES AND 17 INCHES) ABOVE FINISHED FLOOR. HANDICAPPED WATER CLOSET SHALL HAVE SEAT SET 450 MM (18 INCHES) ABOVE FINISHED FLOOR.
1.SEAT: INSTITUTIONAL/INDUSTRIAL, EXTRA HEAVY DUTY (BARIATRIC-RATED), CHEMICAL RESISTANT, SOLID PLASTIC, OPEN FRONT LESS COVER FOR ELONGATED BOWLS, INTEGRALLY MOLDED BUMPERS, CONCEALED CHECK HINGE WITH STAINLESS STEEL POST. SEAT SHALL BE POSTURE CONTOURED BODY DESIGN. COLOR SHALL BE WHITE.
2.FITTINGS AND ACCESSORIES: GASKETS-NEOPRENE; BOLTS WITH CHROMIUM PLATED CAPS NUTS AND WASHERS AND CARRIER.
3.FLUSH VALVE: LARGE CHLORAMINES RESISTANT DIAPHRAGM, SEMI-RED BRASS VALVE BODY, EXPOSED CHROME PLATED, DUAL FLUSH NON-HOLD OPEN ADA APPROVED SIDE OSCILLATING HANDLE WATER
SAVER DESIGN PER FLUSH WITH MAXIMUM 10 PERCENT VARIANCE 25 MM (1 INCH) SCREWDRIVER BACK CHECK ANGLE STOP WITH VANDAL RESISTANT CAP, ADJUSTABLE TAILPIECE, A HIGH BACK PRESSURE VACUUM BREAKER, SPUD COUPLING FOR 40 MM (1-1/2 INCHES) TOP SPUD, WALL AND SPUD FLANGES, SOLID-RING PIPE SUPPORT, AND SWEAT SOLDER ADAPTER WITH COVER TUBE AND SET SCREW WALL FLANGE. VALVE BODY, COVER, TAILPIECE AND CONTROL STOP SHALL BE IN CONFORMANCE WITH ASTM ALLOY CLASSIFICATION FOR SEMI-RED BRASS. SEAT BUMPERS SHALL BE INTEGRAL PART OF FLUSH
VALVE. SET CENTERLINE OF INLET 292 MM (11-1/2 INCHES) ABOVE SEAT.
1 1/2 4 2
P-202 URINAL URINAL (WHEELCHAIR, WALL HUNG, ASME A112.19.2) BOWL WITH INTEGRAL FLUSH DISTRIBUTION, WALL TO FRONT OF FLARE 343 MM (13.5INCHES) MINIMUM. WALL HUNG WITH INTEGRAL TRAP, SIPHON JET FLUSHING ACTION 1.9 L (0.5 GALLONS) PER FLUSH WITH 50 MM (2 INCHES) BACK OUTLET AND 20 MM (3/4 INCH) TOP INLET SPUD.
1.SUPPORT URINAL WITH CHAIR CARRIER AND INSTALL WITH RIM 432 MM (17 INCHES) MAXIMUM ABOVE FINISHED FLOOR.
2.FLUSHING DEVICE: LARGE CHLORAMINES RESISTANT DIAPHRAGM, SEMI-RED BRASS BODY, EXPOSED FLUSH VALVE, HARDWIRED ACTIVE INFRARED SENSOR FOR AUTOMATIC OPERATION, NON-HOLD OPEN, WATER SAVER DESIGN, SOLID-RING PIPE SUPPORT, AND 20 MM (3/4 INCH) CAPPED SCREWDRIVER ANGLE STOP VALVE. SET CENTERLINE OF INLET 292 MM (11-1/2 INCHES) ABOVE URINAL. VALVE BODY, COVER, TAILPIECE AND CONTROL STOP SHALL BE IN CONFORMANCE WITH ASTM ALLOY CLASSIFICATION FOR SEMI-RED BRASS. PROVIDE WITH TRANSFORMER.
3/4 3 2
P-404 LAVATORY PUBLIC -
INTEGRAL SINK
LAVATORY (PUBLIC, INTEGRAL WITH COUNTERTOP):
1.FAUCET: SOLID CAST BRASS CONSTRUCTION, CHROME PLATED, PEDESTAL SPOUT 102 BY 127 MM (4 TO 5 INCHES) ABOVE THE RIM, ELECTRONIC SENSOR OPERATED, SINGLE CENTER MOUNTING, PLUG IN TRANSFORMER, TEE WITH CHECK VALVES, THERMOSTATIC MIXING VALVE. PROVIDE LAMINAR FLOW CONTROL DEVICE.
2.VALVE: TYPE T/P COMBINATION THERMOSTATIC AND PRESSURE BALANCING WITH LEVER OPERATING HANDLE. VALVE BODY SHALL BE COPPER ALLOY. INTERNAL PARTS SHALL BE COPPER, NICKEL ALLOY, CRS OR THERMOSTATIC MATERIAL. VALVE INLET AND OUTLET SHALL BE 13 MM (1/2 INCH) IPS. PROVIDE EXTERNAL SCREWDRIVER CHECKSTOPS AND TEMPERATURE LIMIT STOP. SET STOPS FOR A MAXIMUM TEMPERATURE OF 35 DEGREES C (95 DEGREES F). // VALVE SHALL ALSO SERVE P-418 IN THE SAME ROOM, WHERE APPLICABLE. // 3.DRAIN: CAST OR WROUGHT BRASS WITH FLAT GRID STRAINER AND OFFSET TAILPIECE, CHROME PLATED FINISH.
4.STOPS: ANGLE TYPE. SEE PARAGRAPH “STOPS”.
5.TRAP: CAST COPPER ALLOY, 38 MM BY 32 MM (1 1/2 INCHES BY 1 1/4 INCHES) P-TRAP. ADJUSTABLE WITH CONNECTED ELBOW AND 1.4 MM THICK (17 GAUGE) TUBING EXTENSION TO WALL. EXPOSED METAL TRAP SURFACE AND CONNECTION HARDWARE SHALL BE CHROME PLATED WITH A SMOOTH BRIGHT FINISH. SET TRAP PARALLEL TO WALL.
1/2 1/2 1 1/2 1 1/2
P-405 LAVATORY PRIVATE -
INTEGRAL SINK
LAVATORY (PRIVATE, INTEGRAL WITH COUNTERTOP):
1.FAUCET: SOLID CAST BRASS CONSTRUCTION WITH WASHERLESS CERAMIC DISC MIXING CARTRIDGE TYPE, RIGID GOOSENECK SPOUT WITH OUTLET 102 MM TO 127 MM (4 INCHES TO 5 INCHES) ABOVE SLAB WITH 102 MM (4 INCHES) WRIST BLADE HANDLES. PROVIDE LAMINAR FLOW CONTROL DEVICE. FAUCET, WALL AND FLOOR ESCUTCHEONS SHALL BE EITHER COPPER ALLOY OR CRS. EXPOSED METAL PARTS
SHALL BE CHROME PLATED WITH A SMOOTH BRIGHT FINISH.
2.VALVE: TYPE T/P COMBINATION THERMOSTATIC AND PRESSURE BALANCING WITH LEVER OPERATING HANDLE. VALVE BODY SHALL BE COPPER ALLOY. INTERNAL PARTS SHALL BE COPPER, NICKEL ALLOY, CRS OR THERMOSTATIC MATERIAL. VALVE INLET AND OUTLET SHALL BE 13 MM (1/2 INCH) IPS. PROVIDE EXTERNAL SCREWDRIVER CHECKSTOPS AND TEMPERATURE LIMIT STOP. SET STOPS FOR A MAXIMUM
TEMPERATURE OF 35 DEGREES C (95 DEGREES F).
3.DRAIN: CAST OR WROUGHT BRASS WITH FLAT GRID STRAINER AND OFFSET TAILPIECE, CHROME PLATED FINISH.
4.STOPS: ANGLE TYPE. SEE PARAGRAPH “STOPS”.
5.TRAP: CAST COPPER ALLOY, 38 MM BY 32 MM (1 1/2 INCHES BY 1 1/4 INCHES) P-TRAP. ADJUSTABLE WITH CONNECTED ELBOW AND 1.4 MM THICK (17 GAUGE) TUBING EXTENSION TO WALL. EXPOSED METAL TRAP SURFACE AND CONNECTION HARDWARE SHALL BE CHROME PLATED WITH A SMOOTH BRIGHT FINISH. SET TRAP PARALLEL TO WALL.
1/2 1/2 1 1/2 1 1/2
P-408 LAVATORY - WALL LAVATORY (ASME A112.19.2) STRAIGHT BACK, APPROXIMATELY 457 MM BY 381 MM (18 INCHES BY 15 INCHES) AND A 102 MM (4 INCHES) MAXIMUM APRON, FIRST QUALITY VITREOUS CHINA. PUNCHING FOR FAUCET ON 102 MM (4 INCHES) CENTERS. SUPPORT LAVATORY TO WALL WITH STEEL WALL PLATE. SET WITH RIM 864 MM (34 INCHES) ABOVE FINISHED FLOOR:
1.FAUCET: SOLID CAST BRASS CONSTRUCTION WITH WASHERLESS CERAMIC DISC MIXING CARTRIDGE TYPE AND CENTRALLY EXPOSED RIGID GOOSENECK SPOUT WITH OUTLET 127-152 MM (5-6 INCHES) ABOVE RIM. PROVIDE LAMINAR FLOW CONTROL DEVICE. ONE HUNDRED TWO MILLIMETERS (4-INCH) WRIST BLADE TYPE HANDLES ON FAUCETS SHALL BE CAST, FORMED OR DROP FORGED COPPER ALLOY.
FAUCET, WALL AND FLOOR ESCUTCHEONS SHALL BE EITHER COPPER ALLOY OR CRS. EXPOSED METAL PARTS, INCLUDING EXPOSED PART UNDER VALVE HANDLE WHEN IN OPEN POSITION, SHALL BE
CHROME PLATED WITH A SMOOTH BRIGHT FINISH.
2.DRAIN: CAST OR WROUGHT BRASS WITH FLAT GRID STRAINER AND OFFSET TAILPIECE, CHROME PLATED FINISH.
3.STOPS: ANGLE TYPE. SEE PARAGRAPH “STOPS”.
4.TRAP: CAST COPPER ALLOY, 38 MM BY 32 MM (1 1/2 INCHES BY 1 1/4 INCHES) P-TRAP. ADJUSTABLE WITH CONNECTED ELBOW AND 1.4 MM THICK (17 GAUGE) TUBING EXTENSION TO WALL. EXPOSED METAL
TRAP SURFACE, AND CONNECTION HARDWARE SHALL BE CHROME PLATED WITH A SMOOTH BRIGHT FINISH. SET TRAP PARALLEL TO WALL.
5.PROVIDE COVER FOR EXPOSED PIPING, DRAIN, STOPS AND TRAP PER A.D.A.
1/2 1/2 1 1/2 1 1/2
P-501 MOP SINK SERVICE SINK (REGULAR, ASME A112.19.1) SERVICE SINK, CLASS 1, SINGLE BOWL, ACID RESISTANT ENAMELED CAST IRON, APPROXIMATELY 610 MM BY 508 MM (24 INCHES BY 20 INCHES) WITH A 229 TO 305 MM (9 TO 12 INCHES) RAISED BACK WITHOUT FAUCET HOLES. EQUIP SINK WITH CRS RIM GUARD, AND MOUNTED ON TRAP STANDARD. SET SINKS RIM 711 MM (28 INCHES) ABOVE FINISHED FLOOR.
1.FAUCET: PART B, TYPE II, SOLID BRASS CONSTRUCTION, 9.5 L/M (2.5 GPM) COMBINATION FAUCET WITH REPLACEABLE MONEL SEAT, REMOVABLE REPLACEMENT UNIT CONTAINING ALL PARTS SUBJECT TO WEAR, INTEGRAL CHECK/STOPS, MOUNTED ON WALL ABOVE SINK. SPOUT SHALL HAVE A PAIL HOOK, 19 MM (3/4 INCH) HOSE COUPLING THREADS, VACUUM BREAKER, AND TOP OR BOTTOM BRACE TO WALL.
FOUR-ARM HANDLES ON FAUCETS SHALL BE CAST, FORMED, OR DROP FORGED COPPER ALLOY. ESCUTCHEONS SHALL BE EITHER FORGED COPPER ALLOY OR CRS. EXPOSED METAL PARTS, INCLUDING EXPOSED PART UNDER VALVE HANDLE WHEN IN OPEN POSITION, SHALL HAVE A SMOOTH BRIGHT FINISH.
2.DRAIN: GRID.
3.TRAP: TRAP STANDARD, PAINTED OUTSIDE AND ENAMELED INSIDE WITH ACID-RESISTANT ENAMEL, DRAIN THROUGH ADJOINING WALL.
3/4 3/4 3 2
P-505 CLINICAL SERVICE SINK CLINIC SERVICE SINK (FLUSHING RIM, WALL HUNG) APPROXIMATELY 508 MM BY 635 MM (20 INCHES BY 25 INCHES) BY 203 MM (8 INCHES) DEEP. SUPPORT WITH ASME A112.6.1M CHAIR CARRIER AND SECURE WITH 10 MM (3/8 INCH) BRACKET STUDS AND NUTS. SET SINK WITH RIM 762 MM (30 INCHES) ABOVE FINISHED FLOOR. PROVIDE 762 MM (30 INCHES) CRS DRAINBOARD WHERE REQUIRED, WITHOUT
CORRUGATIONS AND WITH HEAVY DUTY CRS BRACKETS.
1.FAUCET: ELBOW CONTROL, WALL HUNG, INTEGRAL CHECK/STOPS, SINGLE SPOUT WITH 19 MM (3/4 INCH) HOSE THREADED OUTLET AND PAIL HOOK, VACUUM BREAKER AND BRACE TO WALL. OUTLET 356 MM TO 381 MM (14 INCHES TO 15 INCHES) FROM WALL. EXPOSED METAL PARTS SHALL BE CHROMIUM PLATED WITH A SMOOTH BRIGHT FINISH. PROVIDE 9.5 L/M (2.5 GPM) LAMINAR FLOW CONTROL DEVICE.
2.FLUSH VALVE: LARGE DIAPHRAGM, SEMI-RED BRASS BODY, FOOT PEDAL OPERATED, EXPOSED CHROMIUM PLATED FLUSH VALVE WITH SCREWDRIVER BACK CHECK STRAIGHT STOP WITH CAP, UNION OUTLET, STREET ELLS, ELEVATED HIGH PRESSURE VACUUM BREAKER, CASING COVER, 32 MM (1 1/4 INCHES) ELBOW FLUSH CONNECTION FROM FINISHED WALL TO 38 MM (1 1/2 INCHES) TOP SPUD. SPUD
COUPLING, WALL AND SPUD FLANGES.
3.BED PAN WASHER: MECHANICAL PEDAL MIXING VALVE, WALL HUNG, WITH DOUBLE SELF-CLOSING PEDAL VALVE WITH LOOSE KEY STOPS, RENEWABLE SEATS AND SUPPLY FROM VALVE TO NOZZLE WITH WALL HOOK HOSE CONNECTION; 1219 MM (48 INCHES) OF HEAVY DUTY RUBBER HOSE, WITH EXTENDED SPRAY OUTLET ELEVATED VACUUM BREAKER, INDEXED LIFT UP PEDALS HAVING CLEARANCE OF NOT MORE THAN 13 MM (1/2 INCH) ABOVE THE FLOOR AND NOT LESS THAN 356 MM (14 INCHES) FROM WALL WHEN IN OPERATION. SUPPLY PIPE FROM WALL TO VALVE STOP SHALL BE RIGID, THREADED, IPS COPPER ALLOY PIPE. EXPOSED METAL PARTS SHALL BE CHROMIUM PLATED WITH A SMOOTH BRIGHT FINISH. PROVIDE VALVE PLATE FOR FOOT CONTROL. PROVIDE INLINE LAMINAR FLOW CONTROL DEVICE.
1 1/2 4 2
P-609 DRINKING FOUNTAIN
WITH BOTTLE FILLER
ELECTRIC WATER COOLER: MECHANICALLY COOLED, SELF CONTAINED, WHEEL CHAIR, BUBBLER STYLE FULLY EXPOSED DUAL HEIGHT STAINLESS STEEL FOUNTAIN, RECESSED IN WALL REFRIGERATION SYSTEM, STAINLESS STEEL GRILLE, STAINLESS STEEL SUPPORT ARM, WALL MOUNTING BOX, ENERGY EFFICIENT COOLING SYSTEM CONSISTING OF A HERMETICALLY SEALED RECIPROCATING TYPE COMPRESSOR, 115V, 60 HZ, SINGLE PHASE, FAN COOLED CONDENSER, PERMANENTLY LUBRICATED FAN MOTOR. SET HIGHEST BUBBLER 1016 MM (40 INCHES) ABOVE FINISHED FLOOR. PROVIDE WITH
BOTTLE FILLER OPTION.
1/2 1/2 1 1/2 1 1/2
P-FD-D FLOOR DRAIN A.TYPE D (FD-D) MEDIUM DUTY (NON-TRAFFIC) FLOOR DRAIN SHALL COMPLY WITH ASME A112.6.3. THE TYPE D FLOOR DRAIN SHALL HAVE A CAST IRON BODY WITH FLANGE FOR MEMBRANE TYPE FLOORING, INTEGRAL REVERSIBLE CLAMPING DEVICE, SEEPAGE OPENINGS AND 175 MM (7 INCH) DIAMETER OR SQUARE SATIN NICKEL BRONZE OR SATIN BRONZE STRAINER WITH 100 MM (4 INCH) FLANGE FOR TOILET
ROOMS, SHOWERS AND KITCHENS.
P-FD-I FLOOR DRAIN B.TYPE I (FD-I) MEDIUM DUTY (NON-TRAFFIC) FLOOR DRAIN SHALL COMPLY WITH ASME A112.6.3. THE TYPE I FLOOR DRAIN SHALL HAVE A CAST IRON BODY, WIDE FLANGE FOR SEAMLESS FLOOR, DOUBLE DRAINAGE PATTERN, WITH ALL INTERIOR SURFACES AND EXPOSED EXTERIOR SURFACES PROVIDED WITH ACID RESISTANT ENAMEL FINISH FOR SANITARY AREAS. THE TYPE I FLOOR DRAIN SHALL HAVE A CLAMPING DEVICE, SECURED NICKEL BRONZE RIM, ALUMINUM ENAMELED FINISH SEDIMENT BASKET WITH, PERFORATIONS WITH NOT LESS THAN 19,300 SQUARE MM (30 SQUARE INCHES) OF FREE AREA. THE SEDIMENT BASKET SHALL BE APPROXIMATELY 100 MM (4 INCHES) DEEP, AND BE PROVIDED WITH GRIPS FOR EASY HANDLING. THE FLOOR DRAIN SHALL BE PROVIDED WITH A LOOSE-SET, NICKEL BRONZE GRATE APPROXIMATELY 300 MM (12 INCHES) SQUARE AND OF SUFFICIENT STRENGTH TO SUPPORT PEDESTRIAN TRAFFIC. AMPLE SPACE BETWEEN BODY OF DRAIN AND SEDIMENT BASKET SHALL BE
PROVIDED FOR FREE FLOW OF WASTE LIQUIDS.
SEE
PLANS
SEE
PLANS
NO SCALEPP600
2 PIPE/DUCT PENETRATION OF SMOKE/FIRE BARRIERS
2 1/2"CW
1 1/4"HW
P-405
P-405
P-405
P-114
P-408
P-405
P-405
P-405
P-505
P-114
P-408 P-408
P-405
P-405
P-405
P-408
P-405
P-114
P-405
P-404
P-404
P-103
P-501
P-103
P-103
P-202 P-404
P-404
P-103
P-114
P-408P-405
P-FD-I
3/4"HWR
1 1/2"CW
1/2"HW
1/2"HWR
1/2"HWR
3/4"HW
3/4"CW
1/2"HWR
3/4"HW
2"CW
2"CW
1"HW
3/4"HWR
2"CW
1"HW
3/4"HWR
3/4"HWR
2"HW
2"CW
1 1/2"CW
2"CW
2"CW
2"HW
3/4"HWR
1/2"HWR
3/4"HW
1 1/2"CW
3/4"HWR
2"HW
2"CW
1 1/2"CW
3/4"HW
3/4"HWR
1/2"HWR
1/2"HW
1/2"CW
1/2"HWR
1/2"HW
1/2"CW
3/4"HWR
2"HW
2"CW
2 1/2"CW
2"HW
1/2"HWR
TO/FROM
CW/HW/HWR
PIPING SOURCES
TO
WHEELCHAIR
WASHER
1/2"HW
P-501
P-404
P-404
P-103
P-103
P-505
P-114
P-408
P-408
P-405
P-405
P-405
P-405
P-405
P-408
P-114
P-405 P-405
P-405
P-405
P-405
P-405
P-114
P-408
P-405
P-405
P-FD-I
P-408
P-114
P-202 P-404
P-404
P-609
1 1/2"V
1 1/2"W
2"V
2"V
2"V
2"W
1 1/2"W
3"W
4"W
4"W
4"W 2"V
2"V
2"V
2"V
1 1/2"V
2"V
2"W
2"W
4"W
4"W
4"W
2"V
2"V
2"V
2"V
1 1/2"W
2"V
4"W
1 1/2"W
2"W
3"W
2"V
3"W
2"V 2"V
2"V
2"V
2"V
2"V
2"V
2"V
2"V
1 1/2"W
1 1/2"W
4"W
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
REVISION 1 10-05-2022
C U s e rs
\m p a q u in
\O n e
D ri v e
G u id o n
D e s ig n in c \D o c u m e n ts \1
.1
.1
M E
P v m p a q u in
G
E N
G .r v t
/6 /2
:2
:1
P
M
PP700
PLUMBING SCHEMATICS AND
RISERSGUIDON DESIGN, INC.
1221 N. PENNSYLVANIA STREET
SUITE 200
INDIANAPOLIS, INDIANA 46202
317.800.6388
CONSTRUCT WOMEN'S CLINIC
5000 W. NATIONAL AVE, MILWAUKEE, WI 53295
695-19-132
09/07/2022 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE:PP700
1 DOMESTIC WATER PIPING SCHEMATIC
SCALE:PP700
2 WASTE AND VENT PIPING SCHEMATIC
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AAV AUTOMATIC AIR VENT
AB AIR BLENDER
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER, TWO
POSITION
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
AQST AQUASTAT
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF
HEATING REFRIGERATION
AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BMT BONE MARROW TRANSPLANT
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTC BLOWOFF TANK CONTROL VALVE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BWT BOILER PLANT WATER TUBE
C CENTIGRADE (CELSIUS)
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS
(SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS
(SUBMISSION2)
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO
COOLING TOWER)
CWS CONDENSER WATER SUPPLY (FROM
COOLING TOWER)
D DAMPER - AUTOMATIC
Db DRY-BULB TEMPERATURE
DB DECIBELS
DCW DOMESTIC COLD WATER
DD-1 DESIGN DEVELOPMENT (SUBMISSION
1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION
2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT
EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
MECHANICAL ABBREVIATIONS
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING)
PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HVD HOISTWAY VENT DAMPER
HX HEAT EXCHANGER
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IRH INTRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
J INTENTIONALLY LEFT BLANK
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
L LITER
L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or
LITERS/MINUTE)
L/s LITERS PER SECOND (or
LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUEFIED PETROLEUM GAS
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN
(CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT
AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN
(STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
Nm NEWTON METER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC &
ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD
AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD
REQUIRED
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
P PUMP
Pa PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD RETURN AIR DAMPER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RELAD RELIEF AIR DAMPER
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCI SPINAL CODE INJURY
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
SW SOFTWATER
SWHX STEAM TO WATER HEAT EXCHANGER
T&PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
U UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL
OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH
ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
WAG WASTE ANETHESIA GAS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
YR YEAR
A. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A
FURRED CHASE OR ABOVE HARD SUSPENDED CEILING, OR ACOUSTICAL CEILING.
B. THE FIRST FIGURE OF DUCT SIDE INDICATES DIMENSION OF FACE SHOWN OR INDICATED.
DUCT SIZES ARE NET INSIDE DIMENSIONS.
C. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS,
DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND
INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH
MECHANICAL INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT SERVED.
D. DIFFUSER, REGISTER, AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.
E. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO
PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
F. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF
CEILING DIFFUSERS, REGISTERS, AND GRILLES.
MECHANICAL GENERAL NOTES
SECTION REFERENCE
DRAWING NUMBER
SHEET
LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
SCALE: ??
VIEW TITLE
N NORTH ARROW
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY, NIC
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
X X
XXXX
SHEET LOCATION
VIEW NUMBER
X X
X
SHEET LOCATION
VIEW NUMBER
XXXX
BUILDING SECTION REFERENCE
DRAWING NUMBER
SHEET
LOCATION
BUILDING X
XXXX
X
XXXX
ELEVATION REFERENCES
DRAWING SYMBOLS
XX-X X
EQUIPMENT
NUMBER
BUILDING NO. WHERE EQUIPMENT IS LOCATED
EQUIPMENT ABBREVIATION
UNIT NUMBER TAG
DN
DN
UP
UP
DNUP
DUCTWORK SYMBOLS
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
SQUARE 4-WAY CEILING DIFFUSERS
CONNECT NEW DUCT TO EXISTING DUCT
LIMIT OF DEMOLITION
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
MANUAL VOLUME DAMPER
STANDARD BRANCH SUPPLY, NO
SPLITTER (45O TAP)
STANDARD BRANCH RETURN, NO
SPLITTER (45o TAP)
VD
SUPPLY
RETURN45°
45°
AIR TERMINAL SYMBOLS
TERMINAL UNIT WITH REHEAT COIL
T
MECHANCAL CONTROL SYMBOLS
ROOM THERMOSTAT / TRANSMITTER - WALL MOUNT
HOT WATER HEATING SUPPLY
HOT WATER HEATING RETURN
HWS
HWR
PIPING SYMBOLS
GENERAL PIPING SYMBOLS
DIRECTION OF PIPE PITCH (DOWN)
DIRECTION OF FLOW
ANCHOR
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION, 45o OR 90o
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
PIPE UP
PIPE DOWN
BOTTOM CONNECTION, 45o OR 90o
VALVE SYMBOLS
BUTTERFLY VALVE
BALL VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC BALANCING CONTROL VALVE
WATER BALANCE DEVICE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
REVISION 1 10-05-2022
C U s e rs
\m p a q u in
\O n e
D ri v e
G u id o n
D e s ig n in c \D o c u m e n ts \1
.1
.1
M E
P v m p a q u in
G
E N
G .r v t
/6 /2
:3
:0
P
M
M000
MECHANICAL SYMBOLS AND
ABBREVIATIONSGUIDON DESIGN, INC.
1221 N. PENNSYLVANIA STREET
SUITE 200
INDIANAPOLIS, INDIANA 46202
317.800.6388
CONSTRUCT WOMEN'S CLINIC
5000 W. NATIONAL AVE, MILWAUKEE, WI 53295
695-19-132
09/07/2022 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
TEMPORARY INFECTION CONTROL
BARRIER WALLS. SEE PLAN AND PLAN
NOTES
CONSTRUCTION ACCESS DOORS
BEYOND PROJECT
BOUNDARY
IC / PHASING LEGEND
PHASE 1
1. CONTRACTOR TO CONSTRUCT 1 HR RATED
CONSTRUCTION BARRIERS AS NOTED ON PLAN. VA
STAFF TO USE PATH THROUGH EXISTING KITCHEN
SPACE SEPARATED BY CONSTRUCTION BARRIER
WALLS THROUGHOUT DURATION OF PHASE 1 & 2.
2. CONTRACTOR TO DEMOLISH, INCLUDING HAZMAT
AND MEP REMOVAL, AND RENOVATE, INCLUDING
MEP, AREA OF VCS OFFICES. CONTRACTOR TO USE
EXISTING PERIMETER WALL AS CONTRUCTION
BARRIER SEPARATION FOR DEMOLITION. NEW
PERIMETER WALL TO BE CONSTRUCTED FIRST TO
ACT AS CONSTRUCTION BARRIER.
3. PHASE 1 WORK TO OCCUR IN JUNCTION WITH
PHASE 1 - AFTER HOURS.
4. VCS OFFICES AND ADJACENT CORRIDOR ARE OPEN
AND OCCUPIED AFTER COMPLETION OF PHASE 1
AND PHASE 1 - AFTER HOURS.
5. PHASE 2 TO BEGIN AFTER OFFICES AND CORRIDOR
ARE COMPLETE AND OPEN.
PHASE 2
1. CONTRACTOR TO CONSTRUCT INFECTION
CONTROL/CONSTRUCTION BARRIERS AS NOTED
ON PLAN. VA STAFF TO USE PATH THROUGH
EXISTING KITCHEN SPACE SEPARATED BY
CONSTRUCTION BARRIER WALLS THROUGHOUT
DURATION OF PHASE 2.
2. CONTRACTOR TO DEMOLISH, INCLUDING HAZMAT
AND MEP REMOVAL, AND RENOVATE, INCLUDING
MEP, AREAS OF THE STAFF SUPPORT SPACES AND
PUBLIC RESTROOMS AS INDICATED ON PLAN.
3. STAFF AREAS AND PUBLIC RESTROOMS ARE OPEN
AND OCCUPIED AFTER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .