This solicitation is for construction services for the Women's Clinic project at the Milwaukee VA Medical Center. The solicitation number is 36C25223B0004 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.

The project involves renovating and upgrading existing spaces to create new women's clinic and support spaces. The work includes demolition, hazardous material abatement, and construction of new interior walls and finishes. Mechanical, electrical and plumbing systems will also be replaced or upgraded. The construction will be completed in phases to minimize disruptions to existing occupied areas. The estimated award date is October 2022 and the period of performance is 480 calendar days.

View the file

Other files

File Type Posted
36C25223B0004 0007.docx DOCX document
ATTACH 19 Amendment 0007 rev.pdf PDF
ATTACH 16 Arch Drawings.pdf PDF
ATTACH 17 MEP Drawings.pdf PDF
ATTACH 15 Combined Spec Sections.pdf PDF
ATTACH 18 Furniture Dwg Shaft Photos Doc A.pdf PDF
36C25223B0004 0006.docx DOCX document
36C25223B0004 0005.docx DOCX document
S04 - Sign In Sheet.FE.pdf PDF
36C25223B0004 0004.docx DOCX document
S02 - ATTACH 1 - Construct Womens Clinic Project 695-19-132 Manual V1 rev Oct 28.pdf PDF
36C25223B0004 0003.docx DOCX document
S02 - ATTACH 2 - Construct Womens Clinic Project 695-19-132 Manual V2 rev.pdf PDF
36C25223B0004 0002.docx DOCX document
S02 - ATTACH 5 - 695-19-132 Drawing Set_BidPart-3.pdf PDF
S02 - ATTACH 6 - 695-19-132 Drawing Set_BidPart-4.pdf PDF
S02 - ATTACH 4 - 695-19-132 Drawing Set_BidPart-2.pdf PDF
S02 - ATTACH 3 - 695-19-132 Drawing Set_BidPart-1.pdf PDF
36C25223B0004 0001.docx DOCX document
S02 - ATTACH 9 - SSJ Bldg Automation HVAC Cntrl System rev_Executed.pdf PDF
S02 - ATTACH 13 - SSJ Interior Signage rev_Executed.pdf PDF
S02 - ATTACH 14 - Wage Determination WI202100001.pdf PDF
S02 - ATTACH 10 - SSJ Door Hardware rev_Executed.pdf PDF
S02 - ATTACH 11 - SSJ Fire Alarm System rev_Executed.pdf PDF
S02 - ATTACH 8 - 695-19-132 Drawing Set_BidPart-6.pdf PDF
S02 - ATTACH 12 - SSJ HID MultiClass Readers rev_Executed.pdf PDF
36C25223B0004_1.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHASE 1

TEMPORARY CONSTRUCTION

BARRIERS FOR ACCESS CORRIDOR

TO BE CONSTRUCTED PRIOR TO

START OF PHASE 1 DEMOLITION.

TEMPORARY CORRIDOR TO

REMAIN AFTER END OF PROJECT

CONSTRUCTION.

STAFF TO HAVE TRAVEL ACCESS

THRU SPACE THROUGHOUT PHASE

1.

PHASE 1 -

AFTER HOURS

PROJECT

LOCATION: FIRST

FLOOR

BUILDING 111 KEY PLAN

N

SHADE

INDICATES AREA

NOT IN SCOPE,

TYP.

TEMPORARY INFECTION CONTROL

BARRIER WALLS. SEE PLAN AND PLAN

NOTES

CONSTRUCTION ACCESS DOORS

BEYOND PROJECT

BOUNDARY

IC / PHASING LEGEND

PHASE 1

1. CONTRACTOR TO CONSTRUCT 1 HR RATED

CONSTRUCTION BARRIERS AS NOTED ON PLAN. VA

STAFF TO USE PATH THROUGH EXISTING KITCHEN

SPACE SEPARATED BY CONSTRUCTION BARRIER

WALLS THROUGHOUT DURATION OF PHASE 1 & 2.

2. CONTRACTOR TO DEMOLISH, INCLUDING HAZMAT

AND MEP REMOVAL, AND RENOVATE, INCLUDING

MEP, AREA OF VCS OFFICES. CONTRACTOR TO USE

EXISTING PERIMETER WALL AS CONTRUCTION

BARRIER SEPARATION FOR DEMOLITION. NEW

PERIMETER WALL TO BE CONSTRUCTED FIRST TO

ACT AS CONSTRUCTION BARRIER.

3. PHASE 1 WORK TO OCCUR IN JUNCTION WITH

PHASE 1 - AFTER HOURS.

4. VCS OFFICES AND ADJACENT CORRIDOR ARE OPEN

AND OCCUPIED AFTER COMPLETION OF PHASE 1

AND PHASE 1 - AFTER HOURS.

5. PHASE 2 TO BEGIN AFTER OFFICES AND CORRIDOR

ARE COMPLETE AND OPEN.

PHASE 2

1. CONTRACTOR TO CONSTRUCT INFECTION

CONTROL/CONSTRUCTION BARRIERS AS NOTED

ON PLAN. VA STAFF TO USE PATH THROUGH

EXISTING KITCHEN SPACE SEPARATED BY

CONSTRUCTION BARRIER WALLS THROUGHOUT

DURATION OF PHASE 2.

2. CONTRACTOR TO DEMOLISH, INCLUDING HAZMAT

AND MEP REMOVAL, AND RENOVATE, INCLUDING

MEP, AREAS OF THE STAFF SUPPORT SPACES AND

PUBLIC RESTROOMS AS INDICATED ON PLAN.

3. STAFF AREAS AND PUBLIC RESTROOMS ARE OPEN

AND OCCUPIED AFTER COMPLETION OF PHASE 2.

4. PHASE 3 TO BEGIN AFTER COMPLETION OF PHASE

2.

PHASE 3

1. CONTRACTOR TO CONSTRUCT INFECTION

CONTROL/CONSTRUCTION BARRIERS AS NOTED ON

PLAN. VA STAFF TO USE NEW CORRIDORS TO

TRAVEL THROUGH SPACE.

2. CONTRACTOR TO DEMOLISH, INCLUDING HAZMAT

AND MEP REMOVAL, AND RENOVATE, INCLUDING

MEP, AREAS FOR THE WOMEN'S CLINIC AND SWING

SPACE.

NOT IN PHASE BOUNDARY

PERMANENT INFECTION CONTROL BARRIER

WALLS AND/OR DOORS. SEE PLAN AND PLAN

NOTES

PHASE 3 - AFTER HOURS

1. CONTRACTOR TO DEMOLISH, INCLUDING MEP, AND

RENOVATE, INCLUDING MEP, THE CORRIDORS

DURING AFTER HOURS. CONTRACTOR TO

COORDINATE WITH THE VA FOR KITCHEN STAFF

ACCESS.

2. PHASE 3 - AFTERHOURS TO OCCUR IN JUNCTION

WITH PHASE 3.

PHASE 1 - AFTER HOURS

1. CONTRACTOR TO DEMOLISH, INCLUDING MEP, AND

RENOVATE, INCLUDING MEP, THE CORRIDOR DURING

AFTER HOURS. THE

2. CORRIDOR MUST BE OPEN DURING BUSINESS

HOURS. CONTRACTOR TO COORDINATE WITH THE

VA FOR KITCHEN STAFF ACCESS.

3. PHASE 1 - AFTERHOURS TO OCCUR IN JUNCTION

WITH PHASE 1.

VA TO OCCUPY

VCS OFFICES

STAFF TO HAVE

TRAVEL ACCESS

THRU CORRIDOR

BUILT IN PHASE 1

THROUGHOUT PHASE

NOTE:

STAFF SPACES AND PUBLIC

RESTROOMS MUST BE

COMPLETE AND OCCUPIED

PRIOR TO BEGINNING WORK ON

PHASE 3.

PHASE 2

VA TO OCCUPY

STAFF AREA

PUBLIC RESTROOMS TO

BE OPEN TO PUBLIC

VA TO OCCUPY

VCS OFFICES

CORRIDOR IS OPEN.

STAFF TO TRAVEL

THRU NEW

CORRIDOR

THROUGHOUT

PHASE 3

PHASE 3-

AFTER HOURS

PHASE 3

PHASE 3-

AFTER HOURS

NO MORE THAN 50%

WIDTH OF MAIN

CORRIDOR TO BE

CLOSED AT ANY TIME

CONTRACTOR TO

COORDINATE WITH VA FOR

KITCHEN STAFF ACCESS TO

NEW CORRIDOR DURING

PHASE 3 - AFTER HOURS

WORK

PHASE 3

REFER TO MECHANCIAL

DRAWINGS FOR FULL

EXTEND OF WORK IN THIS

CORRIDOR.

VCS OFFICE

CASH OUT

1465B

VCS CHIEF OFFICE

1465A

CONSULT

PATIENT TOILET

1448A PROCEDURE

PATIENT TOILET

1452A

SOILED HOLDING

PROCEDURE

EXAM

EXAM

EXAM

EXAM

EXAM

FAMILY TOILET

1400A

LACTATION

CHECK-IN

1432INTAKE

LINEN CLOSET

INTAKE

PATIENT TOILET

LAB

CONSULT

CLEAN STORAGE

EQUIPMENT

INTAKE - ALCOVE

MENS TOILET

RECEPTION /

WAITING

WOMENS TOILET

ELECTRICAL

HAC

WHEELCHAIR

STORAGE

1400B

FAMILY WAITING

1400C

ELECTRICAL

1403EC

CORRIDOR

C1C03

CORRIDOR

C1C01

CORRIDOR

C1C02

CORRIDOR

C1C09

CORRIDOR

C1B06

CORRIDOR

C1C11

LOCKER ROOM

STAFF TOILET

RESIDENT

WORKROOM

CONFERENCE /

BREAK

CORRIDOR

C1C10

OPEN

WORKSTATIONS

SWING SPACE

STORAGE

INTAKE

MEDS

DRY STORAGE

CANISTER STORAGE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

REVISION 1 10-05-2022

C U s e rs

\m p a q u in

\O n e

D ri v e

G u id o n

D e s ig n in c \D o c u m e n ts \1

.1

.1

M E

P v m p a q u in

G

E N

G .r v t

/6 /2

:1

:5

P

M

P003

FIRST FLOOR PLUMBING PHASING

PLANGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/16" = 1'-0"P003

1 FIRST FLOOR PLUMBING PHASING PLAN - PHASE 1 DEMOLITION

SCALE: 1/16" = 1'-0"P003

3 FIRST FLOOR PLUMBING PHASING PLAN - PHASE 1 COMPLETE - PHASE 2 DEMOLITION

SCALE: 1/16" = 1'-0"P003

5 FIRST FLOOR PLUMBING PHASING PLAN - PHASE 2 COMPLETE - PHASE 3 DEMOLITION

SCALE: 1/16" = 1'-0"P003

6 FIRST FLOOR PLUMBING PHASING PLAN - CONSTRUCTION COMPLETE

GENERAL NOTE:

ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING

MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE

TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS

ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND

MEP DRAWINGS FOR PHASING PLAN.

Revisions: Date:

6" RAISED

CURB

W.S. W.S.

B O B

BO443C

B

B0830.1

CG

CG

CG

CG

CG

RBR-2

FIELD

RBR-2

RBR-3

EXTG

RBR-4

CG

CG

CG

RBR-2 EXTG

F E

F E

F E

F E

F E

F E

P P

P P

OVERHEAD DOORS

CORRIDOR

CORRIDOR

PROSTHETICS

RECEPTION

OFFICE

PROSTHETICSPROG

ANALYST

ERGONOMICCLINICAL

SPEC

ERGONOMICS

OFFICE

WORKSHOP

ORTHOTICS

ELEC

CLO

C O R R

C O R R

PIT

LADDER

PROJECT

LOCATION: FIRST

FLOOR

BUILDING 111 KEY PLAN

N

SHADE

INDICATES AREA

NOT IN SCOPE,

TYP.

1. REMOVE EXISTING SANITARY WASTE AND VENT PIPING AS SHOWN BACK TO

EXISTING LOCATION. REMOVE ALL HANGERS, SUPPORTS, AND

ACCESSORIES. PATCH AND REPAIR ALL EXISTING FLOOR PENETRATIONS AS

REQUIRED. REFER TO DETAIL 4 ON SHEET PP600.

2. REMOVE EXISTING DOMESTIC WATER PIPING AS SHOWN BACK TO EXISTING

LOCATION. REMOVE ALL HANGERS, SUPPORTS, AND ACCESSORIES.

3. REMOVE PIPING TO WALL. PROVIDE CLEAN OUT. NO SCOPE OF WORK

SHALL OCCUR IN PNEUMATIC TUBE STATION ROOM.

4. REMOVE EXISTING WASTE/VENT RISER FOR NEW FLOOR PLAN LAYOUT.

PLUMBING PIPING DEMOLITION PLAN NOTES #

EX

4"WS/VS

EX 4"

WS

EX

4"WS19

X U S RZAACCFFGG T

EX

4"WS/VS

14"V

EX

4"WS/VS

4" 4"

4"4"

4"

4"

4"

4"

EX

4"WS/VS

1/2"

1/2"

2"

2"

4"

4"

2"

EX 2 1/2" CW, 1 1/2" HW,

1/2" HWC UP

EX

4"WS/VS

2"

EX

4"WS/VS

4" 4" 4"

4"

4"

4"

E X

W

4"

4"

IIJJ HH

CO

E X

E X

/2

H W

E X

C W

4"

EX 4" W

E X

W E

X

H

W R

1"CW

1"HW

1"CW

1"HW

EX 2" V

EX 2" CW EX 1 1/2" HW EX 1" HWR

1"HWR

1 1/2"HW

2"CW

E X

W

EX 4" W

EX 4" W

EX 4" W

EX 1 1/2" HW

EX 2" CW

4"

4"

E X

V

E X

W

E X

W

EX 4" W

E X

W E

X

V

E X

W

4 4

ELECTRICAL

CLOSET

B0460EC

MANAGER'S

OFFICE

B0431B

HALLWAY

BCU01B

CREDIT

UNION

B0431ACCOUNTING

B0431C

STORAGE

B0431B

MECHANICAL

ROOM

B0433A

COPY CENTER

B0462

EQUIPMENT

B0464

LOAN OFFICER

C0431E

OFFICE

B0432A

OFFICE

B0432

HR LINKS

B0434

WHS

SUPERVISOR

B0451B

WAREHOUSE

B0451

SUPERVISOR

OFFICE

B0437B

BREAK

ROOM

B0437A

SPD CLEAN

SUPPLY

B0435A

ESCORT

SERVICE

B0437

CART

STORAGE

B0435

OFFICE

B0433

EXAM ROOM

B0622A

ELECTRICAL

B0627B

TELEPHONE

B0627A

HAC

B0627E

EXAM ROOM

B0622

BREAK

ROOM

B0627D

A. SEE SHEET P000 FOR PLUMBING GENERAL NOTES.

B. ALL WORK ON THIS SHEET SHALL OCCUR UNDER ONE (1) PHASE.

PLUMBING PIPING DEMOLITION GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

REVISION 1 10-05-2022

C U s e rs

\m p a q u in

\O n e

D ri v e

G u id o n

D e s ig n in c \D o c u m e n ts \1

.1

.1

M E

P v m p a q u in

G

E N

G .r v t

/6 /2

:2

:0

P

M

PD100

BASEMENT PLUMBING PIPING

DEMOLITION PLANGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

N

SCALE: 1/8" = 1'-0"PD100

2 BASEMENT PLUMBING PIPING DEMOLITION PLAN

GENERAL NOTE:

ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING

MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE

TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS

ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND

MEP DRAWINGS FOR PHASING PLAN.

PROJECT

LOCATION: FIRST

FLOOR

BUILDING 111 KEY PLAN

N

SHADE

INDICATES AREA

NOT IN SCOPE,

TYP.

A. SEE SHEET P000 FOR PLUMBING GENERAL NOTES.

PLUMBING PIPING DEMOLITION GENERAL NOTES

1. REMOVE EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED DOMESTIC

WATER PIPING, SANITARY WASTE, AND SANITARY VENT PIPING BACK TO

LOCATION AS SHOWN. REMOVE ALL ASSOCIATED VALVES, HANGERS, AND

SUPPORTS. PATCH AND REPAIR ALL EXISTING FLOOR PENETRATIONS AS

REQUIRED. REFER TO DETAIL 4 ON SHEET PP600.

2. REMOVE EXISTING FLOOR DRAIN/SINK AND ALL ASSOCIATED SANITARY

WASTE AND SANITARY VENT PIPING BACK TO LOCATION AS SHOWN. REMOVE

ALL ASSOCIATED HANGERS AND SUPPORTS. PATCH AND REPAIR ALL

EXISTING FLOOR PENETRATIONS AS REQUIRED.

3. REMOVE ALL EXISTING WATER TREATMENT SYSTEMS IN THIS ROOM.

REMOVE ALL ASSOCIATED DOMESTIC WATER, SANITARY WASTE, AND

SANITARY VENT PIPING BACK TO LOCATION AS SHOWN. REMOVE ALL

ASSOCIATED VALVES, HANGERS, AND SUPPORTS.

4. REMOVE EXISTING WASTE/VENT RISER FOR NEW FLOOR PLAN LAYOUT.

PLUMBING PIPING DEMOLITION PLAN NOTES #

X U S RZAACCFFGG T

EX 4"

WS/VS EX 4"

WS/VS

EX 4"

WS/VS

EX 4"

WS/VS

EX 4"

WS/VS

EX 4"

WS/VS

IIJJ HH

SANITATION

COMMUNICATION

CENTER

MAIL

DISTRIBUTION

CASH COUNT

1409A

CORRIDOR

C1B08

TOILET FEMALE

E L

E C

T R

IC

A

L

E C

WATER SOFTNER

TRAYLINE

KETTLE AREA

CANTEEN DRY

STORAGE

FOOD PREP

& SERVICE

CLASSROOM /

CONFERENCE

ADPAC /

TRAINING

CANTEEN ADMIN

OFFICE

OFFICE

1409B

STORAGE

1409C

TOILET MALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

REVISION 1 10-05-2022

C U s e rs

\m p a q u in

\O n e

D ri v e

G u id o n

D e s ig n in c \D o c u m e n ts \1

.1

.1

M E

P v m p a q u in

G

E N

G .r v t

/6 /2

:2

:0

P

M

PD101

FIRST FLOOR PLUMBING PIPING

DEMOLITION PLANGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

N

SCALE: 1/8" = 1'-0"PD101

2 FIRST FLOOR PLUMBING DEMOLITION PLAN

GENERAL NOTE:

ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING

MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE

TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS

ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND

A500

6" RAISED

CURB

W.S. W.S.

B O B

BO443C

B

B0830.1

CG

CG

CG

CG

CG

RBR-2

FIELD

RBR-2

RBR-3

EXTG

RBR-4

CG

CG

CG

RBR-2 EXTG

F E

F E

F E

F E

F E

F E

P P

P P

OVERHEAD DOORS

CORRIDOR

CORRIDOR

PROSTHETICS

RECEPTION

OFFICE

PROSTHETICSPROG

ANALYST

ERGONOMICCLINICAL

SPEC

ERGONOMICS

OFFICE

WORKSHOP

ORTHOTICS

ELEC

CLO

C O R R

C O R R

PIT

LADDER

PROJECT

LOCATION: FIRST

FLOOR

BUILDING 111 KEY PLAN

N

SHADE

INDICATES AREA

NOT IN SCOPE,

TYP.

X U S RZAACCFFGG T

2"CW

1 1/2"HW

1 1/2"CW

CAP

2"CW

1 1/2"HW

1"HWR

CAP

IIJJ HH

PP400

A. REFER TO SHEET P000 FOR PLUMBING GENERAL NOTES.

B. REFER TO SHEET PP600 FOR INDIVIDUAL PIPING SIZES TO FIXTURES ON

PLUMBING FIXTURE SCHEDULE.

PLUMBING PIPING GENERAL NOTES

ELECTRICAL

CLOSET

B0460EC

MANAGER'S

OFFICE

B0431B

HALLWAY

BCU01B

CREDIT

UNION

B0431ACCOUNTING

B0431C

STORAGE

B0431B

MECHANICAL

ROOM

B0433A

COPY CENTER

B0462

EQUIPMENT

B0464

LOAN OFFICER

C0431E

OFFICE

B0432A

OFFICE

B0432

HR LINKS

B0434

WHS

SUPERVISOR

B0451B

WAREHOUSE

B0451

SUPERVISOR

OFFICE

B0437B

BREAK

ROOM

B0437A

SPD CLEAN

SUPPLY

B0435A

ESCORT

SERVICE

B0437

CART

STORAGE

B0435

OFFICE

B0433

EXAM ROOM

B0622A

ELECTRICAL

B0627B

TELEPHONE

B0627A

HAC

B0627E

EXAM ROOM

B0622

BREAK

ROOM

B0627D

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

REVISION 1 10-05-2022

C U s e rs

\m p a q u in

\O n e

D ri v e

G u id o n

D e s ig n in c \D o c u m e n ts \1

.1

.1

M E

P v m p a q u in

G

E N

G .r v t

/6 /2

:2

:0

P

M

PP100

BASEMENT PLUMBING PIPING

PLANGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH CH

100% BID DOCUMENTS

FULLY SPRINKLERED

N

SCALE: 1/8" = 1'-0"PP100

1 BASEMENT PLUMBING PLAN

GENERAL NOTE:

ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING

MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE

TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS

ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND

X U S RZAACCFFGG T

VCS OFFICE

CASH OUT

1465B

VCS CHIEF OFFICE

1465A

CONSULT

PATIENT TOILET

1448A

PROCEDURE

PATIENT TOILET

1452A

SOILED HOLDING

PROCEDURE

EXAM

EXAM

EXAM

EXAM

EXAM

FAMILY TOILET

1400A

LACTATION

CHECK-IN

INTAKE

LINEN CLOSET

INTAKE

PATIENT TOILET

LAB

CONSULT

CLEAN STORAGE

EQUIPMENT

INTAKE - ALCOVE

MENS TOILET

RECEPTION /

WAITING

WOMENS TOILET

ELECTRICAL

HAC

WHEELCHAIR

STORAGE

1400B

FAMILY WAITING

1400C

ELECTRICAL

1403EC

CORRIDOR

C1C03

CORRIDOR

C1C01

CORRIDOR

C1C02

CORRIDOR

C1C09

CORRIDOR

C1B06

CORRIDOR

C1C11

LOCKER ROOM

STAFF TOILET

RESIDENT

WORKROOM

CONFERENCE /

BREAK

1454 CORRIDOR

C1C10

OPEN

WORKSTATIONS

SWING SPACE

STORAGE

INTAKE

MEDS

DRY STORAGE

CANISTER STORAGE

WHEELCHAIR WASH

IIJJ HH

PP401

PROJECT

LOCATION: FIRST

FLOOR

BUILDING 111 KEY PLAN

N

SHADE

INDICATES AREA

NOT IN SCOPE,

TYP.

A. REFER TO SHEET P000 FOR PLUMBING GENERAL NOTES.

B. REFER TO SHEET PP600 FOR INDIVIDUAL PIPING SIZES TO FIXTURES ON

PLUMBING FIXTURE SCHEDULE.

PLUMBING PIPING GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

REVISION 1 10-05-2022

C U s e rs

\m p a q u in

\O n e

D ri v e

G u id o n

D e s ig n in c \D o c u m e n ts \1

.1

.1

M E

P v m p a q u in

G

E N

G .r v t

/6 /2

:2

:0

P

M

PP101

FIRST FLOOR PLUMBING PIPING

PLANGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"PP101

1 FIRST FLOOR PLUMBING PIPING PLAN

N

GENERAL NOTE:

ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING

MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE

TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS

ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND

X U S RZAA T

EX

4"WS/VS

EX 4"

WS

EX

4"WS/VS

EX

4"WS/VS

CAP

CO

2"W 2"W

1 1/2"W UP

1 1/2"W UP

EX 4"

WS/VS

EX 4"

WS/VS

CO

CO

CO

4"W

4"W

4"W

4"W

CO

3"W

3"W

2"W

4"W

CO

4"W

4"W 4"W

2"W

2"W

4"W UP

4"W UP

1 1/2"W UP

1 1/2"W UP

1 1/2"W UP

2"W UP

2"W UP 1 1/2"W UP

1 1/2"W UP

2"W UP

4"W UP

1 1/2"W UP

1 1/2"W UP

3"W

CO

4"W

OUTLINE OF

EXISTING CREDIT

UNION

PNEUMATIC TUBE

ROOM (LIGHT

HATCH)

1 1/2"W UP

2"W UP

CO

4"W UP

1 1/2"W UP

3"W UP

CO

CO

4"W UP 1 1/2"W UP

4"W UP 1 1/2"W UP

CO

1 1/2"W UP

1 1/2"W UP

1 1/2"W UP

CO

3"W

4"W UP 2"W UP

CO

4"V

CO

4"W 4"W

1 1/2"W

4"W

4"W

3"W 4"W

OFFICE

B0432

OFFICE

B0432A

HR LINKS

B0434

EMS PROGRAM MGR.

B0436ESCORT SERVICE

B0437

CART STORAGE

B0435

BREAK ROOM

B0437A

OFFICE

B0433

LOAN OFFICER

C0431E

MECHANICAL ROOM

B0433A

STORAGE

B0431B

COPY CENTER

B0462

EQUIPMENT

B0464

ACCOUNTING

B0431C

HALLWAY

BCU01B

MANAGER'S OFFICE

B0431B

ELECTRICAL CLOSET

B0460EC

A. REFER TO SHEET P000 FOR PLUMBING GENERAL NOTES.

B. REFER TO SHEET PP600 FOR INDIVIDUAL PIPING SIZES TO FIXTURES ON

PLUMBING FIXTURE SCHEDULE.

PLUMBING PIPING GENERAL NOTES

1. CONNECT NEW SANITARY WASTE PIPING TO EXISTING SANITARY WASTE

PIPING IN THIS LOCATION.

2. NO SCOPE OF WORK SHALL OCCUR IN THIS ROOM.

3. PIPING FROM ABOVE SHALL NOT PASS IN ROOM. COORDINATE WITH

ROUTING ON FLOOR ABOVE.

4. PROVIDE NEW PIPING OFFSET FOR BOTH WASTE/VENT RISER.

PLUMBING PLAN NOTES #

PROJECT

LOCATION: FIRST

FLOOR

BUILDING 111 KEY PLAN

N

SHADE

INDICATES AREA

NOT IN SCOPE,

TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

REVISION 1 10-05-2022

C U s e rs

\m p a q u in

\O n e

D ri v e

G u id o n

D e s ig n in c \D o c u m e n ts \1

.1

.1

M E

P v m p a q u in

G

E N

G .r v t

/6 /2

:2

:1

P

M

PP400

PLUMBING ENLARGED PLANS

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"PP400

1 BASEMENT PLUMBING PIPING ENLARGED PLAN

N

1. 3/4" CW, 3/4" HW, 1/2" HWR DOWN TO BOTH PLUMBING FIXTURES. PROVIDE

1/2" CW, 1/2" HW, 1/2" HWR TO EACH FIXTURE. PROVIDE ISOLATION VALVE ON

EACH SYSTEM TO EACH FIXTURE.

2. 1 1/2" CW, 3/4" HW, 1/2" HWR DOWN TO BOTH PLUMBING FIXTURES. PROVIDE

INDIVIDUAL PIPING TO EACH FIXTURE. COORDINATE WITH PLUMBING

FIXTURE SCHEDULE. PROVIDE ISOLATION VALVES ON EACH SYSTEM TO

EACH FIXTURE.

3. CONNECT NEW 2 1/2" CW, 1 1/2" HW, 3/4" HWR TO EXISTING PIPING IN THIS

AREA.

4. CONNECT NEW VENT PIPING TO RE-LOCATED EXISTING VENT RISER IN THE

LOCATION.

5. CONNECT NEW 1/2" CW FROM EXISTING DRINKING WATER SYSTEM.

LOCATED APPROXIMATELY 100 LINEAR FEET PLAN NORTH IN EXISTING

CANTEEN AREA. PROVIDE ISOLATION VALVE AT CONNECTION.

6. OFFSET PIPING IN WALL TO AVOID PNEUMATIC TUBE STATION ROOM BELOW.

7. PROVIDE AUTOMATIC BALANCE VALVE FOR HOT WATER RECIRCULATION.

SET TO 0.25 GPM.

8. PROPOSED ROUTING OF NEW PNEUMATIC TUBE STATION PIPING.

COORDINATE EXACT LOCATION AND ROUTING WITH DIVISION 14

CONTRACTOR.

9. PROVIDE 1/2" INCH TEMPERED HW DOWN TO HOSE BIBB. INSTALL HOSE BIBB

18" A.F.F. COORDINATE FINAL LOCATIONS WITH OWNER FOR EXISTING

WHEELCHAIR WASHER.

10. PROVIDE ALL LOW VOLTAGE FROM SENSOR LV TRANSFORMER TO FLUSH

VALVES. ROUTE LOW VOLTAGE WIRING CONCEALED IN BUILDING FINISHES.

11. NO VALVES SHALL BE LOCATED ABOVE THIS ROOM.

12. PROVIDE THERMOSTATIC MIXING VALVE IN ACCESSIBLE LOCATION ABOVE

CEILING. CONNECT 1/2" HW AND 1/2" CW (FROM NEARBY MAIN) TO MIXING

VALVE. SET VALVE TO 100 DEG F FOR OUTLET TEMPERATURE. PROVIDE

BALL VALVE ON ALL INLETS AND OUTLET FOR ISOLATION.

13. COORDINATE LOCATION OF FLOOR DRAIN WITH ACTUAL LOCATION OF

WHEELCHAIR WASHER.

PLUMBING PIPING PLAN NOTES #

A. REFER TO SHEET P000 FOR PLUMBING GENERAL NOTES.

B. REFER TO SHEET PP600 FOR INDIVIDUAL PIPING SIZES TO FIXTURES ON

PLUMBING FIXTURE SCHEDULE.

PLUMBING PIPING GENERAL NOTES

X U SZAACC T

P-114

P-408

P-408

P-505

P-405

P-405

P-405

P-405

P-114

P-408

P-405 P-405

P-405

P-405P-405

P-405

P-405

P-408

P-405

P-114

P-405 P-505

P-408

P-408

P-405

P-609

P-404P-404 P-202P-103P-103

P-501P-114 P-408

P-405

EX 4"

WS/VS

EX 4"

WS/VS

EX 4"

WS/VS

1 1/2" V DN

EX 4"

WS/VS

P-FD-D

/2 "V

2 1/2"CW

1 1/2"HW

3/4"HWR

/2

"H W

/2

"H W

R

/2

"H W

/2 "C

W

"V

/2

"H W

R

/4

"H W

/4

"C W

2"CW

3/4"HW

1/2"HWR

"V

"C

W

/4

"H W

/2

"H W

R

P-103 P-103 P-404 P-404

P-FD-I

2"V

3/4"HWR

1"HW

2"CW

2"V

3/4"HWR

1"HW

2"CW

"C

W

"H

W

/4

"H W

R

P-114

3/4"HWR

2"HW

2"CW

2"V

3/4"HWR

2"HW

2"CW

2"V

"C

W

"H

W

/4

"H W

R

"V

"C

W 1 "H

W 1 /2

"H W

R

/4

"C W 3 /4

"H W

/2

"H W

R

"V

1 1/2"CW

3/4"HW

1/2"HWR

2"V2"V

1/2"CW

1/2"HW

1/2"HWR

/4

"H W

R

"H

W

/2 "C

W

"V

/2 "C

W

/4

"H W

/4

"H W

R

"V

3/4"HWR

3/4"HW

3/4"CW

/4

"C W

/4

"H W

/4

"H W

R

"V

"V 3 /4

"C W

/4

"H W

/4

"H W

R

2"V

1/2"CW

1/2"HW

1/2"HWR

2"V

1 1/2"CW

1/2"HWR

3/4"HW

EXAM

CORRIDOR

C1C09

WHEELCHAIR WASH

CONFERENCE /

BREAK

STAFF TOILET

OPEN

WORKSTATIONS

LOCKER ROOM

STORAGE

HAC

WOMENS TOILET

MENS TOILET

PROCEDURE

PATIENT TOILET

1452A

PROCEDURE

1448PATIENT TOILET

1448A

MEDS

CONSULT

CLEAN STORAGE

EQUIPMENT

CONSULT

CORRIDOR

C1C02

LAB

CORRIDOR

C1C03

EXAM

EXAM

EXAM

EXAM

PATIENT TOILET

INTAKE

INTAKE

CHECK-IN

INTAKE

RECEPTION /

WAITING

LINEN CLOSET

INTAKE - ALCOVE

FAMILY WAITING

1400C

FAMILY TOILET

1400A LACTATION

ELECTRICAL

1403EC

SOILED HOLDING

2 1/2"CW

1 1/4"HW

3/4"HWR

P-FD-D

1/2"HWR

1/2"HW

1 1/2"CW 2"CW

2"V 2"V

1/2"HW

1 1/2"V

1/2"CW

/2

"H W

R

2"V

1 1/2"CW

1/2"CW

1/2"HW

1/2"HWR

1 1/2"V

1/2"HWR

1/2"HW

1 1/2"V

1/2"CW

/2

"C W

/2

"H W

/2

"H W

R

"V

PROJECT

LOCATION: FIRST

FLOOR

BUILDING 111 KEY PLAN

N

SHADE

INDICATES AREA

NOT IN SCOPE,

TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

REVISION 1 10-05-2022

C U s e rs

\m p a q u in

\O n e

D ri v e

G u id o n

D e s ig n in c \D o c u m e n ts \1

.1

.1

M E

P v m p a q u in

G

E N

G .r v t

/6 /2

:2

:1

P

M

PP401

PLUMBING ENLARGED PLANS

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"PP401

1 FIRST FLOOR PLUMBING PIPING ENLARGED PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

REVISION 1 10-05-2022

C U s e rs

\m p a q u in

\O n e

D ri v e

G u id o n

D e s ig n in c \D o c u m e n ts \1

.1

.1

M E

P v m p a q u in

G

E N

G .r v t

/6 /2

:2

:1

P

M

PP600

PLUMBING SCHEDULES AND

DETAILSGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1 1/2" = 1'-0"PP600

1 TYPE D FLOOR DRAIN

PLUMBING FIXTURE SCHEDULE

MARK PLUMBING FIXTURE DESCRIPTION

CONNECTION SIZES (IN)

CW HW WASTE VENT

P-103 WATER CLOSET -

PUBLIC

WATER CLOSET (WALL HUNG, ASME A112.19.2) OFFICE AND INDUSTRIAL, ELONGATED BOWL, SIPHON JET 4.8 L (1.28 GALLONS) PER FLUSH, WALL OUTLET. TOP OF SEAT SHALL BE BETWEEN 400 MM AND 432 MM (16 INCHES AND 17 INCHES) ABOVE FINISHED FLOOR. HANDICAPPED WATER CLOSET SHALL HAVE SEAT SET 450 MM (18 INCHES) ABOVE FINISHED FLOOR.

1.SEAT: INSTITUTIONAL/INDUSTRIAL, EXTRA HEAVY DUTY, CHEMICAL RESISTANT, SOLID PLASTIC, OPEN FRONT LESS COVER FOR ELONGATED BOWLS, INTEGRALLY MOLDED BUMPERS, CONCEALED CHECK HINGE WITH STAINLESS STEEL POST. SEAT SHALL BE POSTURE CONTOURED BODY DESIGN. COLOR SHALL BE WHITE.

2.FITTINGS AND ACCESSORIES: GASKETS-NEOPRENE; BOLTS WITH CHROMIUM PLATED CAPS NUTS AND WASHERS AND CARRIER.

3.FLUSH VALVE: LARGE CHLORAMINES RESISTANT DIAPHRAGM, SEMI-RED BRASS VALVE BODY, EXPOSED CHROME PLATED, DUAL FLUSH NON-HOLD OPEN ADA APPROVED SIDE OSCILLATING HANDLE SENSOR

OPERATED (HARDWIRED) WITH MANUAL OVERRIDE WATER SAVER DESIGN PER FLUSH WITH MAXIMUM 10 PERCENT VARIANCE 25 MM (1 INCH) SCREWDRIVER BACK CHECK ANGLE STOP WITH VANDAL RESISTANT CAP, ADJUSTABLE TAILPIECE, A HIGH BACK PRESSURE VACUUM BREAKER, SPUD COUPLING FOR 40 MM (1-1/2 INCHES) TOP SPUD, WALL AND SPUD FLANGES, SOLID-RING PIPE SUPPORT, AND SWEAT SOLDER ADAPTER WITH COVER TUBE AND SET SCREW WALL FLANGE. VALVE BODY, COVER, TAILPIECE AND CONTROL STOP SHALL BE IN CONFORMANCE WITH ASTM ALLOY CLASSIFICATION FOR SEMI-RED BRASS. SEAT BUMPERS SHALL BE INTEGRAL PART OF FLUSH VALVE. SET CENTERLINE OF INLET 292 MM (11-1/2 INCHES) ABOVE SEAT. PROVIDE WITH TRANSFORMER.

1 1/2 4 2

P-114 WATER CLOSET -

PRIVATE

WATER CLOSET (WALL HUNG, ASME A112.19.2) BARIATRIC-RATED, INDUSTRIAL, ELONGATED BOWL, SIPHON JET 4.8 L (1.28 GALLONS) PER FLUSH, WALL OUTLET. TOP OF SEAT SHALL BE BETWEEN 400 MM AND 432 MM (16 INCHES AND 17 INCHES) ABOVE FINISHED FLOOR. HANDICAPPED WATER CLOSET SHALL HAVE SEAT SET 450 MM (18 INCHES) ABOVE FINISHED FLOOR.

1.SEAT: INSTITUTIONAL/INDUSTRIAL, EXTRA HEAVY DUTY (BARIATRIC-RATED), CHEMICAL RESISTANT, SOLID PLASTIC, OPEN FRONT LESS COVER FOR ELONGATED BOWLS, INTEGRALLY MOLDED BUMPERS, CONCEALED CHECK HINGE WITH STAINLESS STEEL POST. SEAT SHALL BE POSTURE CONTOURED BODY DESIGN. COLOR SHALL BE WHITE.

2.FITTINGS AND ACCESSORIES: GASKETS-NEOPRENE; BOLTS WITH CHROMIUM PLATED CAPS NUTS AND WASHERS AND CARRIER.

3.FLUSH VALVE: LARGE CHLORAMINES RESISTANT DIAPHRAGM, SEMI-RED BRASS VALVE BODY, EXPOSED CHROME PLATED, DUAL FLUSH NON-HOLD OPEN ADA APPROVED SIDE OSCILLATING HANDLE WATER

SAVER DESIGN PER FLUSH WITH MAXIMUM 10 PERCENT VARIANCE 25 MM (1 INCH) SCREWDRIVER BACK CHECK ANGLE STOP WITH VANDAL RESISTANT CAP, ADJUSTABLE TAILPIECE, A HIGH BACK PRESSURE VACUUM BREAKER, SPUD COUPLING FOR 40 MM (1-1/2 INCHES) TOP SPUD, WALL AND SPUD FLANGES, SOLID-RING PIPE SUPPORT, AND SWEAT SOLDER ADAPTER WITH COVER TUBE AND SET SCREW WALL FLANGE. VALVE BODY, COVER, TAILPIECE AND CONTROL STOP SHALL BE IN CONFORMANCE WITH ASTM ALLOY CLASSIFICATION FOR SEMI-RED BRASS. SEAT BUMPERS SHALL BE INTEGRAL PART OF FLUSH

VALVE. SET CENTERLINE OF INLET 292 MM (11-1/2 INCHES) ABOVE SEAT.

1 1/2 4 2

P-202 URINAL URINAL (WHEELCHAIR, WALL HUNG, ASME A112.19.2) BOWL WITH INTEGRAL FLUSH DISTRIBUTION, WALL TO FRONT OF FLARE 343 MM (13.5INCHES) MINIMUM. WALL HUNG WITH INTEGRAL TRAP, SIPHON JET FLUSHING ACTION 1.9 L (0.5 GALLONS) PER FLUSH WITH 50 MM (2 INCHES) BACK OUTLET AND 20 MM (3/4 INCH) TOP INLET SPUD.

1.SUPPORT URINAL WITH CHAIR CARRIER AND INSTALL WITH RIM 432 MM (17 INCHES) MAXIMUM ABOVE FINISHED FLOOR.

2.FLUSHING DEVICE: LARGE CHLORAMINES RESISTANT DIAPHRAGM, SEMI-RED BRASS BODY, EXPOSED FLUSH VALVE, HARDWIRED ACTIVE INFRARED SENSOR FOR AUTOMATIC OPERATION, NON-HOLD OPEN, WATER SAVER DESIGN, SOLID-RING PIPE SUPPORT, AND 20 MM (3/4 INCH) CAPPED SCREWDRIVER ANGLE STOP VALVE. SET CENTERLINE OF INLET 292 MM (11-1/2 INCHES) ABOVE URINAL. VALVE BODY, COVER, TAILPIECE AND CONTROL STOP SHALL BE IN CONFORMANCE WITH ASTM ALLOY CLASSIFICATION FOR SEMI-RED BRASS. PROVIDE WITH TRANSFORMER.

3/4 3 2

P-404 LAVATORY PUBLIC -

INTEGRAL SINK

LAVATORY (PUBLIC, INTEGRAL WITH COUNTERTOP):

1.FAUCET: SOLID CAST BRASS CONSTRUCTION, CHROME PLATED, PEDESTAL SPOUT 102 BY 127 MM (4 TO 5 INCHES) ABOVE THE RIM, ELECTRONIC SENSOR OPERATED, SINGLE CENTER MOUNTING, PLUG IN TRANSFORMER, TEE WITH CHECK VALVES, THERMOSTATIC MIXING VALVE. PROVIDE LAMINAR FLOW CONTROL DEVICE.

2.VALVE: TYPE T/P COMBINATION THERMOSTATIC AND PRESSURE BALANCING WITH LEVER OPERATING HANDLE. VALVE BODY SHALL BE COPPER ALLOY. INTERNAL PARTS SHALL BE COPPER, NICKEL ALLOY, CRS OR THERMOSTATIC MATERIAL. VALVE INLET AND OUTLET SHALL BE 13 MM (1/2 INCH) IPS. PROVIDE EXTERNAL SCREWDRIVER CHECKSTOPS AND TEMPERATURE LIMIT STOP. SET STOPS FOR A MAXIMUM TEMPERATURE OF 35 DEGREES C (95 DEGREES F). // VALVE SHALL ALSO SERVE P-418 IN THE SAME ROOM, WHERE APPLICABLE. // 3.DRAIN: CAST OR WROUGHT BRASS WITH FLAT GRID STRAINER AND OFFSET TAILPIECE, CHROME PLATED FINISH.

4.STOPS: ANGLE TYPE. SEE PARAGRAPH “STOPS”.

5.TRAP: CAST COPPER ALLOY, 38 MM BY 32 MM (1 1/2 INCHES BY 1 1/4 INCHES) P-TRAP. ADJUSTABLE WITH CONNECTED ELBOW AND 1.4 MM THICK (17 GAUGE) TUBING EXTENSION TO WALL. EXPOSED METAL TRAP SURFACE AND CONNECTION HARDWARE SHALL BE CHROME PLATED WITH A SMOOTH BRIGHT FINISH. SET TRAP PARALLEL TO WALL.

1/2 1/2 1 1/2 1 1/2

P-405 LAVATORY PRIVATE -

INTEGRAL SINK

LAVATORY (PRIVATE, INTEGRAL WITH COUNTERTOP):

1.FAUCET: SOLID CAST BRASS CONSTRUCTION WITH WASHERLESS CERAMIC DISC MIXING CARTRIDGE TYPE, RIGID GOOSENECK SPOUT WITH OUTLET 102 MM TO 127 MM (4 INCHES TO 5 INCHES) ABOVE SLAB WITH 102 MM (4 INCHES) WRIST BLADE HANDLES. PROVIDE LAMINAR FLOW CONTROL DEVICE. FAUCET, WALL AND FLOOR ESCUTCHEONS SHALL BE EITHER COPPER ALLOY OR CRS. EXPOSED METAL PARTS

SHALL BE CHROME PLATED WITH A SMOOTH BRIGHT FINISH.

2.VALVE: TYPE T/P COMBINATION THERMOSTATIC AND PRESSURE BALANCING WITH LEVER OPERATING HANDLE. VALVE BODY SHALL BE COPPER ALLOY. INTERNAL PARTS SHALL BE COPPER, NICKEL ALLOY, CRS OR THERMOSTATIC MATERIAL. VALVE INLET AND OUTLET SHALL BE 13 MM (1/2 INCH) IPS. PROVIDE EXTERNAL SCREWDRIVER CHECKSTOPS AND TEMPERATURE LIMIT STOP. SET STOPS FOR A MAXIMUM

TEMPERATURE OF 35 DEGREES C (95 DEGREES F).

3.DRAIN: CAST OR WROUGHT BRASS WITH FLAT GRID STRAINER AND OFFSET TAILPIECE, CHROME PLATED FINISH.

4.STOPS: ANGLE TYPE. SEE PARAGRAPH “STOPS”.

5.TRAP: CAST COPPER ALLOY, 38 MM BY 32 MM (1 1/2 INCHES BY 1 1/4 INCHES) P-TRAP. ADJUSTABLE WITH CONNECTED ELBOW AND 1.4 MM THICK (17 GAUGE) TUBING EXTENSION TO WALL. EXPOSED METAL TRAP SURFACE AND CONNECTION HARDWARE SHALL BE CHROME PLATED WITH A SMOOTH BRIGHT FINISH. SET TRAP PARALLEL TO WALL.

1/2 1/2 1 1/2 1 1/2

P-408 LAVATORY - WALL LAVATORY (ASME A112.19.2) STRAIGHT BACK, APPROXIMATELY 457 MM BY 381 MM (18 INCHES BY 15 INCHES) AND A 102 MM (4 INCHES) MAXIMUM APRON, FIRST QUALITY VITREOUS CHINA. PUNCHING FOR FAUCET ON 102 MM (4 INCHES) CENTERS. SUPPORT LAVATORY TO WALL WITH STEEL WALL PLATE. SET WITH RIM 864 MM (34 INCHES) ABOVE FINISHED FLOOR:

1.FAUCET: SOLID CAST BRASS CONSTRUCTION WITH WASHERLESS CERAMIC DISC MIXING CARTRIDGE TYPE AND CENTRALLY EXPOSED RIGID GOOSENECK SPOUT WITH OUTLET 127-152 MM (5-6 INCHES) ABOVE RIM. PROVIDE LAMINAR FLOW CONTROL DEVICE. ONE HUNDRED TWO MILLIMETERS (4-INCH) WRIST BLADE TYPE HANDLES ON FAUCETS SHALL BE CAST, FORMED OR DROP FORGED COPPER ALLOY.

FAUCET, WALL AND FLOOR ESCUTCHEONS SHALL BE EITHER COPPER ALLOY OR CRS. EXPOSED METAL PARTS, INCLUDING EXPOSED PART UNDER VALVE HANDLE WHEN IN OPEN POSITION, SHALL BE

CHROME PLATED WITH A SMOOTH BRIGHT FINISH.

2.DRAIN: CAST OR WROUGHT BRASS WITH FLAT GRID STRAINER AND OFFSET TAILPIECE, CHROME PLATED FINISH.

3.STOPS: ANGLE TYPE. SEE PARAGRAPH “STOPS”.

4.TRAP: CAST COPPER ALLOY, 38 MM BY 32 MM (1 1/2 INCHES BY 1 1/4 INCHES) P-TRAP. ADJUSTABLE WITH CONNECTED ELBOW AND 1.4 MM THICK (17 GAUGE) TUBING EXTENSION TO WALL. EXPOSED METAL

TRAP SURFACE, AND CONNECTION HARDWARE SHALL BE CHROME PLATED WITH A SMOOTH BRIGHT FINISH. SET TRAP PARALLEL TO WALL.

5.PROVIDE COVER FOR EXPOSED PIPING, DRAIN, STOPS AND TRAP PER A.D.A.

1/2 1/2 1 1/2 1 1/2

P-501 MOP SINK SERVICE SINK (REGULAR, ASME A112.19.1) SERVICE SINK, CLASS 1, SINGLE BOWL, ACID RESISTANT ENAMELED CAST IRON, APPROXIMATELY 610 MM BY 508 MM (24 INCHES BY 20 INCHES) WITH A 229 TO 305 MM (9 TO 12 INCHES) RAISED BACK WITHOUT FAUCET HOLES. EQUIP SINK WITH CRS RIM GUARD, AND MOUNTED ON TRAP STANDARD. SET SINKS RIM 711 MM (28 INCHES) ABOVE FINISHED FLOOR.

1.FAUCET: PART B, TYPE II, SOLID BRASS CONSTRUCTION, 9.5 L/M (2.5 GPM) COMBINATION FAUCET WITH REPLACEABLE MONEL SEAT, REMOVABLE REPLACEMENT UNIT CONTAINING ALL PARTS SUBJECT TO WEAR, INTEGRAL CHECK/STOPS, MOUNTED ON WALL ABOVE SINK. SPOUT SHALL HAVE A PAIL HOOK, 19 MM (3/4 INCH) HOSE COUPLING THREADS, VACUUM BREAKER, AND TOP OR BOTTOM BRACE TO WALL.

FOUR-ARM HANDLES ON FAUCETS SHALL BE CAST, FORMED, OR DROP FORGED COPPER ALLOY. ESCUTCHEONS SHALL BE EITHER FORGED COPPER ALLOY OR CRS. EXPOSED METAL PARTS, INCLUDING EXPOSED PART UNDER VALVE HANDLE WHEN IN OPEN POSITION, SHALL HAVE A SMOOTH BRIGHT FINISH.

2.DRAIN: GRID.

3.TRAP: TRAP STANDARD, PAINTED OUTSIDE AND ENAMELED INSIDE WITH ACID-RESISTANT ENAMEL, DRAIN THROUGH ADJOINING WALL.

3/4 3/4 3 2

P-505 CLINICAL SERVICE SINK CLINIC SERVICE SINK (FLUSHING RIM, WALL HUNG) APPROXIMATELY 508 MM BY 635 MM (20 INCHES BY 25 INCHES) BY 203 MM (8 INCHES) DEEP. SUPPORT WITH ASME A112.6.1M CHAIR CARRIER AND SECURE WITH 10 MM (3/8 INCH) BRACKET STUDS AND NUTS. SET SINK WITH RIM 762 MM (30 INCHES) ABOVE FINISHED FLOOR. PROVIDE 762 MM (30 INCHES) CRS DRAINBOARD WHERE REQUIRED, WITHOUT

CORRUGATIONS AND WITH HEAVY DUTY CRS BRACKETS.

1.FAUCET: ELBOW CONTROL, WALL HUNG, INTEGRAL CHECK/STOPS, SINGLE SPOUT WITH 19 MM (3/4 INCH) HOSE THREADED OUTLET AND PAIL HOOK, VACUUM BREAKER AND BRACE TO WALL. OUTLET 356 MM TO 381 MM (14 INCHES TO 15 INCHES) FROM WALL. EXPOSED METAL PARTS SHALL BE CHROMIUM PLATED WITH A SMOOTH BRIGHT FINISH. PROVIDE 9.5 L/M (2.5 GPM) LAMINAR FLOW CONTROL DEVICE.

2.FLUSH VALVE: LARGE DIAPHRAGM, SEMI-RED BRASS BODY, FOOT PEDAL OPERATED, EXPOSED CHROMIUM PLATED FLUSH VALVE WITH SCREWDRIVER BACK CHECK STRAIGHT STOP WITH CAP, UNION OUTLET, STREET ELLS, ELEVATED HIGH PRESSURE VACUUM BREAKER, CASING COVER, 32 MM (1 1/4 INCHES) ELBOW FLUSH CONNECTION FROM FINISHED WALL TO 38 MM (1 1/2 INCHES) TOP SPUD. SPUD

COUPLING, WALL AND SPUD FLANGES.

3.BED PAN WASHER: MECHANICAL PEDAL MIXING VALVE, WALL HUNG, WITH DOUBLE SELF-CLOSING PEDAL VALVE WITH LOOSE KEY STOPS, RENEWABLE SEATS AND SUPPLY FROM VALVE TO NOZZLE WITH WALL HOOK HOSE CONNECTION; 1219 MM (48 INCHES) OF HEAVY DUTY RUBBER HOSE, WITH EXTENDED SPRAY OUTLET ELEVATED VACUUM BREAKER, INDEXED LIFT UP PEDALS HAVING CLEARANCE OF NOT MORE THAN 13 MM (1/2 INCH) ABOVE THE FLOOR AND NOT LESS THAN 356 MM (14 INCHES) FROM WALL WHEN IN OPERATION. SUPPLY PIPE FROM WALL TO VALVE STOP SHALL BE RIGID, THREADED, IPS COPPER ALLOY PIPE. EXPOSED METAL PARTS SHALL BE CHROMIUM PLATED WITH A SMOOTH BRIGHT FINISH. PROVIDE VALVE PLATE FOR FOOT CONTROL. PROVIDE INLINE LAMINAR FLOW CONTROL DEVICE.

1 1/2 4 2

P-609 DRINKING FOUNTAIN

WITH BOTTLE FILLER

ELECTRIC WATER COOLER: MECHANICALLY COOLED, SELF CONTAINED, WHEEL CHAIR, BUBBLER STYLE FULLY EXPOSED DUAL HEIGHT STAINLESS STEEL FOUNTAIN, RECESSED IN WALL REFRIGERATION SYSTEM, STAINLESS STEEL GRILLE, STAINLESS STEEL SUPPORT ARM, WALL MOUNTING BOX, ENERGY EFFICIENT COOLING SYSTEM CONSISTING OF A HERMETICALLY SEALED RECIPROCATING TYPE COMPRESSOR, 115V, 60 HZ, SINGLE PHASE, FAN COOLED CONDENSER, PERMANENTLY LUBRICATED FAN MOTOR. SET HIGHEST BUBBLER 1016 MM (40 INCHES) ABOVE FINISHED FLOOR. PROVIDE WITH

BOTTLE FILLER OPTION.

1/2 1/2 1 1/2 1 1/2

P-FD-D FLOOR DRAIN A.TYPE D (FD-D) MEDIUM DUTY (NON-TRAFFIC) FLOOR DRAIN SHALL COMPLY WITH ASME A112.6.3. THE TYPE D FLOOR DRAIN SHALL HAVE A CAST IRON BODY WITH FLANGE FOR MEMBRANE TYPE FLOORING, INTEGRAL REVERSIBLE CLAMPING DEVICE, SEEPAGE OPENINGS AND 175 MM (7 INCH) DIAMETER OR SQUARE SATIN NICKEL BRONZE OR SATIN BRONZE STRAINER WITH 100 MM (4 INCH) FLANGE FOR TOILET

ROOMS, SHOWERS AND KITCHENS.

P-FD-I FLOOR DRAIN B.TYPE I (FD-I) MEDIUM DUTY (NON-TRAFFIC) FLOOR DRAIN SHALL COMPLY WITH ASME A112.6.3. THE TYPE I FLOOR DRAIN SHALL HAVE A CAST IRON BODY, WIDE FLANGE FOR SEAMLESS FLOOR, DOUBLE DRAINAGE PATTERN, WITH ALL INTERIOR SURFACES AND EXPOSED EXTERIOR SURFACES PROVIDED WITH ACID RESISTANT ENAMEL FINISH FOR SANITARY AREAS. THE TYPE I FLOOR DRAIN SHALL HAVE A CLAMPING DEVICE, SECURED NICKEL BRONZE RIM, ALUMINUM ENAMELED FINISH SEDIMENT BASKET WITH, PERFORATIONS WITH NOT LESS THAN 19,300 SQUARE MM (30 SQUARE INCHES) OF FREE AREA. THE SEDIMENT BASKET SHALL BE APPROXIMATELY 100 MM (4 INCHES) DEEP, AND BE PROVIDED WITH GRIPS FOR EASY HANDLING. THE FLOOR DRAIN SHALL BE PROVIDED WITH A LOOSE-SET, NICKEL BRONZE GRATE APPROXIMATELY 300 MM (12 INCHES) SQUARE AND OF SUFFICIENT STRENGTH TO SUPPORT PEDESTRIAN TRAFFIC. AMPLE SPACE BETWEEN BODY OF DRAIN AND SEDIMENT BASKET SHALL BE

PROVIDED FOR FREE FLOW OF WASTE LIQUIDS.

SEE

PLANS

SEE

PLANS

NO SCALEPP600

2 PIPE/DUCT PENETRATION OF SMOKE/FIRE BARRIERS

2 1/2"CW

1 1/4"HW

P-405

P-405

P-405

P-114

P-408

P-405

P-405

P-405

P-505

P-114

P-408 P-408

P-405

P-405

P-405

P-408

P-405

P-114

P-405

P-404

P-404

P-103

P-501

P-103

P-103

P-202 P-404

P-404

P-103

P-114

P-408P-405

P-FD-I

3/4"HWR

1 1/2"CW

1/2"HW

1/2"HWR

1/2"HWR

3/4"HW

3/4"CW

1/2"HWR

3/4"HW

2"CW

2"CW

1"HW

3/4"HWR

2"CW

1"HW

3/4"HWR

3/4"HWR

2"HW

2"CW

1 1/2"CW

2"CW

2"CW

2"HW

3/4"HWR

1/2"HWR

3/4"HW

1 1/2"CW

3/4"HWR

2"HW

2"CW

1 1/2"CW

3/4"HW

3/4"HWR

1/2"HWR

1/2"HW

1/2"CW

1/2"HWR

1/2"HW

1/2"CW

3/4"HWR

2"HW

2"CW

2 1/2"CW

2"HW

1/2"HWR

TO/FROM

CW/HW/HWR

PIPING SOURCES

TO

WHEELCHAIR

WASHER

1/2"HW

P-501

P-404

P-404

P-103

P-103

P-505

P-114

P-408

P-408

P-405

P-405

P-405

P-405

P-405

P-408

P-114

P-405 P-405

P-405

P-405

P-405

P-405

P-114

P-408

P-405

P-405

P-FD-I

P-408

P-114

P-202 P-404

P-404

P-609

1 1/2"V

1 1/2"W

2"V

2"V

2"V

2"W

1 1/2"W

3"W

4"W

4"W

4"W 2"V

2"V

2"V

2"V

1 1/2"V

2"V

2"W

2"W

4"W

4"W

4"W

2"V

2"V

2"V

2"V

1 1/2"W

2"V

4"W

1 1/2"W

2"W

3"W

2"V

3"W

2"V 2"V

2"V

2"V

2"V

2"V

2"V

2"V

2"V

1 1/2"W

1 1/2"W

4"W

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

REVISION 1 10-05-2022

C U s e rs

\m p a q u in

\O n e

D ri v e

G u id o n

D e s ig n in c \D o c u m e n ts \1

.1

.1

M E

P v m p a q u in

G

E N

G .r v t

/6 /2

:2

:1

P

M

PP700

PLUMBING SCHEMATICS AND

RISERSGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE:PP700

1 DOMESTIC WATER PIPING SCHEMATIC

SCALE:PP700

2 WASTE AND VENT PIPING SCHEMATIC

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AAV AUTOMATIC AIR VENT

AB AIR BLENDER

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR COOLED CONDENSING UNIT

ACD AUTOMATIC CONTROL DAMPER,

MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER, TWO

POSITION

ACU AIR CONDITIONING UNIT

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMS AIR FLOW MEASURING STATION

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERE

AP ACCESS PANEL

APD AIR PRESSURE DROP

AQST AQUASTAT

ARI AIR CONDITIONING AND

REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASHRAE AMERICAN SOCIETY OF

HEATING REFRIGERATION

AIR

CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BG BOTTOM GRILLE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BMT BONE MARROW TRANSPLANT

BR BOTTOM REGISTER

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTC BLOWOFF TANK CONTROL VALVE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

BWT BOILER PLANT WATER TUBE

C CENTIGRADE (CELSIUS)

CAV CONSTANT AIR VOLUME

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CEILING DIFFUSER

CD-1 CONSTRUCTION DOCUMENTS

(SUBMISSION1)

CD-2 CONSTRUCTION DOCUMENTS

(SUBMISSION2)

CENT CENTRIFICAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXODE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CR CEILING REGISTER

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN (TO

COOLING TOWER)

CWS CONDENSER WATER SUPPLY (FROM

COOLING TOWER)

D DAMPER - AUTOMATIC

Db DRY-BULB TEMPERATURE

DB DECIBELS

DCW DOMESTIC COLD WATER

DD-1 DESIGN DEVELOPMENT (SUBMISSION

1)

DD-2 DESIGN DEVELOPMENT (SUBMISSION

2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT

EXCHANGER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOHX FUEL OIL HEAT EXCHANGER

MECHANICAL ABBREVIATIONS

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT WC FEET OF WATER COLUMN

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

H HUMIDIFER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM

CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING)

PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HVD HOISTWAY VENT DAMPER

HX HEAT EXCHANGER

HZ HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTERGRATED PART LOAD VALUE

IRH INTRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

J INTENTIONALLY LEFT BLANK

KG KILOGRAM

KG/HR KILOGRAM PER HOUR

kPa KILOPASCAL

KW KILOWATT

KWH KILOWATT HOUR

L LITER

L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or

LITERS/MINUTE)

L/s LITERS PER SECOND (or

LITERS/SECOND)

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LPG LIQUEFIED PETROLEUM GAS

LPR LOW PRESSURE RETURN (STEAM

CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN

(CLEAN)

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL

PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/S METERS PER SECOND (OR

METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1,000 BTUH

MCA MINIMUM BRANCH CIRCUIT

AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING

VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN

(STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

Nm NEWTON METER

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC &

ATMOSPHERIC

ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NPSHA NET POSITIVE SUCTION HEAD

AVAILABLE

NPSHR NET POSITIVE SUCTION HEAD

REQUIRED

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTDOOR AIR DAMPER

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OR OPERATING ROOM

P PUMP

Pa PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PF PRE-FILTER

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER (SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR CONDITIONER

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD RETURN AIR DAMPER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD REFRIGERANT DISCHARGE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RELAD RELIEF AIR DAMPER

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCI SPINAL CODE INJURY

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SD-1 SCHEMATIC DESIGN (SUBMISSION1)

SD-2 SCHEMATIC DESIGN (SUBMISSION2)

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING VALVE

SVS STEAM VENT SILENCER

SW SOFTWATER

SWHX STEAM TO WATER HEAT EXCHANGER

T&PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

UC UNDER CUT

UC UNIT COOLER

UH UNIT HEATER

U UNDERWRITERS LABORATORY

URV UPBLAST UNIT VENTILATOR

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL

OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH

ADMINISTRATION

VI VIBRATION ISOLATOR

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE)

RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W WATTS

WAG WASTE ANETHESIA GAS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMPS

WCPU WATER COOLED PACKAGED UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

YR YEAR

A. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A

FURRED CHASE OR ABOVE HARD SUSPENDED CEILING, OR ACOUSTICAL CEILING.

B. THE FIRST FIGURE OF DUCT SIDE INDICATES DIMENSION OF FACE SHOWN OR INDICATED.

DUCT SIZES ARE NET INSIDE DIMENSIONS.

C. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS,

DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND

INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH

MECHANICAL INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT SERVED.

D. DIFFUSER, REGISTER, AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.

E. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO

PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.

F. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF

CEILING DIFFUSERS, REGISTERS, AND GRILLES.

MECHANICAL GENERAL NOTES

SECTION REFERENCE

DRAWING NUMBER

SHEET

LOCATION

DRAWING NUMBER

SHEET

LOCATION

DETAIL REFERENCE

OBJECT

REFERENCED

OBJECT

REFERENCED

X

XXXX

X

XXXX

SCALE: ??

VIEW TITLE

N NORTH ARROW

PROJECT BOUNDARY

BEYOND PROJECT BOUNDARY, NIC

DETAIL/DRAWING SCALE

TITLE OF DETAIL/DRAWING

DETAIL/DRAWING NUMBER

SHEET NUMBER

X X

XXXX

SHEET LOCATION

VIEW NUMBER

X X

X

SHEET LOCATION

VIEW NUMBER

XXXX

BUILDING SECTION REFERENCE

DRAWING NUMBER

SHEET

LOCATION

BUILDING X

XXXX

X

XXXX

ELEVATION REFERENCES

DRAWING SYMBOLS

XX-X X

EQUIPMENT

NUMBER

BUILDING NO. WHERE EQUIPMENT IS LOCATED

EQUIPMENT ABBREVIATION

UNIT NUMBER TAG

DN

DN

UP

UP

DNUP

DUCTWORK SYMBOLS

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

RETURN DUCT (UP & DOWN)

SQUARE 4-WAY CEILING DIFFUSERS

CONNECT NEW DUCT TO EXISTING DUCT

LIMIT OF DEMOLITION

VANED ELBOW (PROVIDE ALL SQUARE OR

RECTANGULAR ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

VANED ELBOW (SHORT RADIUS)

STANDARD RADIUS ELBOW (LONG RADIUS)

MANUAL VOLUME DAMPER

STANDARD BRANCH SUPPLY, NO

SPLITTER (45O TAP)

STANDARD BRANCH RETURN, NO

SPLITTER (45o TAP)

VD

SUPPLY

RETURN45°

45°

AIR TERMINAL SYMBOLS

TERMINAL UNIT WITH REHEAT COIL

T

MECHANCAL CONTROL SYMBOLS

ROOM THERMOSTAT / TRANSMITTER - WALL MOUNT

HOT WATER HEATING SUPPLY

HOT WATER HEATING RETURN

HWS

HWR

PIPING SYMBOLS

GENERAL PIPING SYMBOLS

DIRECTION OF PIPE PITCH (DOWN)

DIRECTION OF FLOW

ANCHOR

REDUCER OR INCREASER

ECCENTRIC REDUCER

TOP CONNECTION, 45o OR 90o

SIDE CONNECTION

CAPPED OUTLET

RISE OR DROP IN PIPE

UNION

PIPE UP

PIPE DOWN

BOTTOM CONNECTION, 45o OR 90o

VALVE SYMBOLS

BUTTERFLY VALVE

BALL VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC BALANCING CONTROL VALVE

WATER BALANCE DEVICE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

REVISION 1 10-05-2022

C U s e rs

\m p a q u in

\O n e

D ri v e

G u id o n

D e s ig n in c \D o c u m e n ts \1

.1

.1

M E

P v m p a q u in

G

E N

G .r v t

/6 /2

:3

:0

P

M

M000

MECHANICAL SYMBOLS AND

ABBREVIATIONSGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

TEMPORARY INFECTION CONTROL

BARRIER WALLS. SEE PLAN AND PLAN

NOTES

CONSTRUCTION ACCESS DOORS

BEYOND PROJECT

BOUNDARY

IC / PHASING LEGEND

PHASE 1

1. CONTRACTOR TO CONSTRUCT 1 HR RATED

CONSTRUCTION BARRIERS AS NOTED ON PLAN. VA

STAFF TO USE PATH THROUGH EXISTING KITCHEN

SPACE SEPARATED BY CONSTRUCTION BARRIER

WALLS THROUGHOUT DURATION OF PHASE 1 & 2.

2. CONTRACTOR TO DEMOLISH, INCLUDING HAZMAT

AND MEP REMOVAL, AND RENOVATE, INCLUDING

MEP, AREA OF VCS OFFICES. CONTRACTOR TO USE

EXISTING PERIMETER WALL AS CONTRUCTION

BARRIER SEPARATION FOR DEMOLITION. NEW

PERIMETER WALL TO BE CONSTRUCTED FIRST TO

ACT AS CONSTRUCTION BARRIER.

3. PHASE 1 WORK TO OCCUR IN JUNCTION WITH

PHASE 1 - AFTER HOURS.

4. VCS OFFICES AND ADJACENT CORRIDOR ARE OPEN

AND OCCUPIED AFTER COMPLETION OF PHASE 1

AND PHASE 1 - AFTER HOURS.

5. PHASE 2 TO BEGIN AFTER OFFICES AND CORRIDOR

ARE COMPLETE AND OPEN.

PHASE 2

1. CONTRACTOR TO CONSTRUCT INFECTION

CONTROL/CONSTRUCTION BARRIERS AS NOTED

ON PLAN. VA STAFF TO USE PATH THROUGH

EXISTING KITCHEN SPACE SEPARATED BY

CONSTRUCTION BARRIER WALLS THROUGHOUT

DURATION OF PHASE 2.

2. CONTRACTOR TO DEMOLISH, INCLUDING HAZMAT

AND MEP REMOVAL, AND RENOVATE, INCLUDING

MEP, AREAS OF THE STAFF SUPPORT SPACES AND

PUBLIC RESTROOMS AS INDICATED ON PLAN.

3. STAFF AREAS AND PUBLIC RESTROOMS ARE OPEN

AND OCCUPIED AFTER…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .