36C25223B0004 0007.docx

DOCX document 34 KB Posted

Attached to
Y1AZ--Construction Women's Clinic, Project #695-19-132
Solicitation number
36C25223B0004
Issued by

About this file

This document is an amendment to a solicitation for construction of a Women's Clinic project at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The amendment provides revisions to specifications and drawings, answers questions from potential offerors, and reminds that bids are due on February 28, 2023. Revisions include clarifications to several architectural and mechanical drawings as well as an expansion joint detail. The amendment also specifies furnishings and equipment to be provided by the contractor as part of the bid, including hospital-grade televisions and various racks and receptacles. Additional questions cover topics such as acceptable piping materials, equipment responsibilities, and staffing requirements. The Department of Veterans Affairs is the contracting agency, and the solicitation number is 36C25223B0004.

View the file

Other files

File Type Posted
ATTACH 19 Amendment 0007 rev.pdf PDF
ATTACH 16 Arch Drawings.pdf PDF
ATTACH 17 MEP Drawings.pdf PDF
ATTACH 15 Combined Spec Sections.pdf PDF
ATTACH 18 Furniture Dwg Shaft Photos Doc A.pdf PDF
36C25223B0004 0006.docx DOCX document
36C25223B0004 0005.docx DOCX document
S04 - Sign In Sheet.FE.pdf PDF
36C25223B0004 0004.docx DOCX document
S02 - ATTACH 1 - Construct Womens Clinic Project 695-19-132 Manual V1 rev Oct 28.pdf PDF
36C25223B0004 0003.docx DOCX document
S02 - ATTACH 2 - Construct Womens Clinic Project 695-19-132 Manual V2 rev.pdf PDF
36C25223B0004 0002.docx DOCX document
S02 - ATTACH 7 - 695-19-132 Drawing Set_BidPart-5.pdf PDF
S02 - ATTACH 5 - 695-19-132 Drawing Set_BidPart-3.pdf PDF
S02 - ATTACH 6 - 695-19-132 Drawing Set_BidPart-4.pdf PDF
S02 - ATTACH 4 - 695-19-132 Drawing Set_BidPart-2.pdf PDF
S02 - ATTACH 3 - 695-19-132 Drawing Set_BidPart-1.pdf PDF
36C25223B0004 0001.docx DOCX document
S02 - ATTACH 9 - SSJ Bldg Automation HVAC Cntrl System rev_Executed.pdf PDF
S02 - ATTACH 13 - SSJ Interior Signage rev_Executed.pdf PDF
S02 - ATTACH 14 - Wage Determination WI202100001.pdf PDF
S02 - ATTACH 10 - SSJ Door Hardware rev_Executed.pdf PDF
S02 - ATTACH 11 - SSJ Fire Alarm System rev_Executed.pdf PDF
S02 - ATTACH 8 - 695-19-132 Drawing Set_BidPart-6.pdf PDF
S02 - ATTACH 12 - SSJ HID MultiClass Readers rev_Executed.pdf PDF
36C25223B0004_1.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25223B0004 0007

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 695-19-132 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders

36C25223B0004 02-21-2023

X X X 2/28/2023 at 1:30PM Local Time

Please see Continuation Pages

CONTINUE TO MONITOR CONTRACT OPPORTUNITIES AT SAM.GOV FOR ANY AND ALL CHANGES TO THIS SOLICITATION.

Ryan McMillin Contracting Officer

CONTINUATION PAGES: CONSTRUCT WOMENS CLINIC PROJECT# 695-19-132

CLEMENT J. ZABLOCKI VA MEDICAL CENTER, MILWAUKEE, WI

I. The following changes are to be made to the solicitation:

a. REMINDER: Bid Due date/time is February 28, 2023, at 1:30pm Local Time.

Statement of Work No Change

II. The following changes are made on project specifications:

Specifications

1. The specifications include the following deletions. Eliminate the following Specification sections or eliminate the following paragraphs in Specification Section: None

2. The specifications include the following additional work. Provide the following in addition to the Specification Sections: None

3. The following Specification Sections include clarifications: None

III. The following changes are made on project drawings:

Architectural Drawings

1. The drawings include the following deletions. Eliminate the following Sheet: None

2. The drawings include the following clarifications. Revised information on Sheets: See ATTACH 19 for the following: AE100, AE100.A, AE100.B, AE110, AE110.A, AE110.B

3. The drawings include the Addition of the following Sheet: None

MEP Drawings

1. The drawings include the following deletions. Eliminate the following Sheet: None 2 The drawings include the following clarifications. Revised information on Sheets: See ATTACH 19 for the following: EL 101, PP401 3 The drawings include addition of the following Sheet: None

PLEASE NOTE: Additional Documents See ATTACH 19 for the following:

1. Revised Responsible Party Legend 1 page

IV. The following Questions and Answers / Clarifications are the result of bidders request(s) for information:

The following questions and answers provide clarification to the contract documents:

Q 93. Question / Answer #20 says an area for trailer / storage is TBD- Understand and OK. But then Question / Answer #22 requires the GC to include a site fence around the trailer and staging area. How are we to figure a cost for the fence when there is nothing identified? Can the VA provide a QTY of fencing to be included?

A93. 8’ high, to enclose an area of 20’ x 25’. Number of gates up to GC

Q94. Question / Answer #81 appears to be incomplete. The answer seems to be cut off mid-sentence. Can the balance of the answer be provided.

A 94. “Q81. A number of the wall types on sheet AE002 call out the security mesh as welded at 6” OC. Can a mechanical fastener be used to make the connection? Most trade specific framers do not carry a welding technician to complete this. Please advise if a Mechanical Fastener system can be used. A81.No, the VA Physical Security Design Manual requires these walls to have the security mesh installed by spot welding at 6” o.c. – this is a physical security requirement.”

Q95. Question / Answer #53 states that work in the basement to be coordinated with work above. In further review of the PD100 & PD101 key Note #1 refers to holes to be patched per detail #4 on PP600. Plan Page PP600 does not contain a detail #4. It only has Details #1 and #2. If there is a detail #3 and #4 – can these be provided, please?

A95. Reference detail 5/AE110 INFILL CONCRETE SLAB DETAIL in ATTACH 4 and PD100, PD101 ATTACH 19

Q 96. Question / Answer #69 – clarifies that the frames for the sliding doors are to be Aluminum. Yet the door schedule still calls from Frame Type “ES” is to be painted? Please advise if these Aluminum frames are to be painted or if they are to be anodized. If so please advise of color – clear / bronze / other?

A96. Frames are to be Clear Anodized.

Q97. Question / Answer #72 – Confirm that the General Contractor is to carry the costs for the “Basis of Design” Furniture in their bid per the ATTACH 18. As no specification was provided.

A97. Yes, the GC is to provide the furniture listed in the ATTACH 18. No additional information will be provided at this time.

Q98. Question / Answer #9 – Indicates that the contractor is to provide and install expansion joints at floors and ceiling. These are not shown on the floor plans (A100, A100.A and A100.B) or on the reflected ceiling plan (A110, A110.A and A110.B). Please advise as to the extend of the need expansion joints by showing on the floor / ceiling plans for clarity.

A98. Refer to updated drawings AE100, AE100.A, AE100.B, AE110, AE110.A, AE110.B, and EL101 for expansion joint cover locations.

Q 99. On Plan Page QH100 (per Amendment 6) the equipment schedule now calls for M0515 & M1000 (Televisions) to be supplied and Installed by the contractor. A few questions with this item Q99a. There is no specification for Televisions. Please advise what these are to be? Size, Grade, Etc – Please provide Basis of Design / specification.

A99a. Hospital Grade Samsung model QM43R-B.

Q99b. There do not appear to be any Televisions M1000 on the drawings – please confirm this is the case.

A99b. Correct, Bid per Construction Documents

Q99c. Are the M0515 TV to be wall mounted? Are these mounts to be included by the contractor?

A99c. Yes

Q99d. Also, on Plan Page QH100 (Amendment 6) a few items have changed to VA furnished / Contractor installed.

Q99d.1.F2017 – Waste Receptacle – These appear to be free standing – Please advise, what the VA will be providing A99d.1. See revised Responsible Party Legend in ATTACH 19 Q99d.2. F2310 – Rack, Pamphlet – There do not appear to be any of these. Please confirm A99d.2. See detail 12/AI200 in Bid Documents ATTACH 5

Q99d.3 F2550 – Paper Shredder, Heavy Duty – This appears to be located in the VCS office 1465. This appears to be free standing. Please advise what the VA is providing. Does this require any electrical as there does not appear to be a outlet in the area this is being placed? Does this require a direct electrical connection or does it come with a furnished cord to be plugged into an outlet?

A99d.3. See revised Responsible Party Legend, in ATTACH 19

Q100. During the walkthrough, a considerable amount of the existing waste and vent pipe throughout this area is PVC sch. 40 pipe and fittings. Since this is not a plenum can PVC sch. 40 be used for this new project? Spec sheet 22 13 00 -6 item 2 only notes cast iron or copper DWV tube only. Would be a considerable savings.

A100. PVC Schedule 40 pipe is acceptable.

Q101. Plan page reference is PP401. It looks like some of the size is mislabeled? We do not think you are allowed to upsize the piping after the connection is made. Please request clarification on this.

A101. See revised Plan Page PP401 in ATTACH 19

Q102. Does the project require 3 separate individuals for each role of SSHO, QC Manager and Site Superintendent? If so, are all 3 individuals required to be onsite full time?

A102. No, the project does not require three separate individuals. However, an individual cannot be responsible for more than two roles.

V. General Information:

1. REMINDER: VAAR 852.219-77 VA Notice of Limitations on Subcontracting – Certificate of Compliance for Services and Construction is included in this solicitation (see SF1442 pages 53-55); signed certification must accompany bid to be considered for award.

2. NOTE: NO Change to the public bid opening.

NOTE: Ensure to include solicitation number on the bid envelope and all correspondence is mailed or hand-carried to the following address:

Department of Veterans Affairs Great Lakes Acquisition Center ATTN: Stacy Hoover and Kristine Sutton 115 S. 84th St., Suite 101 Milwaukee, WI 53214-1476

Vendor bids are due February 28, 2023, at 1:30PM local time

ATTACHMENTS:

ATTACH 19 Amendment 0007 rev (Revised Responsible Party Legend)

ACCOMPANYING 36C25223B0004 0007

File details come from the government source that posted it. Updated .