This solicitation is for construction services for a Women's Clinic project located at the Milwaukee VA Medical Center. Key details include:

  • The solicitation involves construction of a new Women's Clinic at 5000 W. National Ave. in Milwaukee, WI, with a projected completion date in 2023.

  • Services required include demolition, site work, concrete, masonry, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, specialties, equipment, furnishings, special construction, conveyance equipment, mechanical, and electrical work.

  • The estimated price range for the project is $5-10 million.

  • The solicitation is unrestricted and preferences do not apply.

  • The period of performance is 730 calendar days from NTP.

  • The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 12.

  • The pre-proposal site visit is scheduled for January 2023 and proposals are due February 2023.

View the file

Other files

File Type Posted
36C25223B0004 0007.docx DOCX document
ATTACH 19 Amendment 0007 rev.pdf PDF
ATTACH 16 Arch Drawings.pdf PDF
ATTACH 15 Combined Spec Sections.pdf PDF
ATTACH 18 Furniture Dwg Shaft Photos Doc A.pdf PDF
36C25223B0004 0006.docx DOCX document
36C25223B0004 0005.docx DOCX document
S04 - Sign In Sheet.FE.pdf PDF
36C25223B0004 0004.docx DOCX document
S02 - ATTACH 1 - Construct Womens Clinic Project 695-19-132 Manual V1 rev Oct 28.pdf PDF
36C25223B0004 0003.docx DOCX document
S02 - ATTACH 2 - Construct Womens Clinic Project 695-19-132 Manual V2 rev.pdf PDF
36C25223B0004 0002.docx DOCX document
S02 - ATTACH 7 - 695-19-132 Drawing Set_BidPart-5.pdf PDF
S02 - ATTACH 5 - 695-19-132 Drawing Set_BidPart-3.pdf PDF
S02 - ATTACH 6 - 695-19-132 Drawing Set_BidPart-4.pdf PDF
S02 - ATTACH 4 - 695-19-132 Drawing Set_BidPart-2.pdf PDF
S02 - ATTACH 3 - 695-19-132 Drawing Set_BidPart-1.pdf PDF
36C25223B0004 0001.docx DOCX document
S02 - ATTACH 9 - SSJ Bldg Automation HVAC Cntrl System rev_Executed.pdf PDF
S02 - ATTACH 13 - SSJ Interior Signage rev_Executed.pdf PDF
S02 - ATTACH 14 - Wage Determination WI202100001.pdf PDF
S02 - ATTACH 10 - SSJ Door Hardware rev_Executed.pdf PDF
S02 - ATTACH 11 - SSJ Fire Alarm System rev_Executed.pdf PDF
S02 - ATTACH 8 - 695-19-132 Drawing Set_BidPart-6.pdf PDF
S02 - ATTACH 12 - SSJ HID MultiClass Readers rev_Executed.pdf PDF
36C25223B0004_1.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A. REFER TO F000 FOR FIRE SUPPRESSION GENERAL NOTES.

B. REFER TO GC101 FOR CONSTRUCTION PHASING.

C. REFER TO AE110 FOR RCP.

1. PROVIDE NEW FIRE SPRINKLER HEAD. MODIFY EXISTING BRANCH PIPING AS

REQUIRED FOR NEW FIRE SPRINKLER HEAD.

FIRE SUPPRESSION GENERAL NOTES

FIRE SUPPRESSION PLAN NOTES #

PROJECT

LOCATION: FIRST

FLOOR

BUILDING 111 KEY PLAN

N

SHADE

INDICATES AREA

NOT IN SCOPE,

TYP.

X U S RZAACCFFGG T

VCS OFFICE

CASH OUT

1465B

VCS CHIEF OFFICE

1465A

CONSULT

PATIENT TOILET

1448A

PROCEDURE

PATIENT TOILET

1452A

SOILED HOLDING

PROCEDURE

EXAM

EXAM

EXAM

EXAM

EXAM

FAMILY TOILET

1400A

LACTATION

CHECK-IN

INTAKE

LINEN CLOSET

INTAKE

PATIENT TOILET

LAB

CONSULT

CLEAN STORAGE

EQUIPMENT

INTAKE - ALCOVE

MENS TOILET

RECEPTION /

WAITING

WOMENS TOILET

ELECTRICAL

HAC

WHEELCHAIR

STORAGE

1400B

FAMILY WAITING

1400C

CORRIDOR

C1C03

CORRIDOR

C1C01

CORRIDOR

C1C02

CORRIDOR

C1C09

CORRIDOR

C1B06

CORRIDOR

C1C11

LOCKER ROOM

STAFF TOILET

RESIDENT

WORKROOM

CONFERENCE /

BREAK

CORRIDOR

C1C10

OPEN

WORKSTATIONS

SWING SPACE

STORAGE

INTAKE

MEDS

DRY STORAGE

CANISTER STORAGE

(TYP)

(TYP)

(TYP)

(TYP)

IIJJ HH

WHEELCHAIR WASH

PROVIDE FIRE SPRINKLER

COVERAGE FOR HOOD, AREA

AROUND HOOD, AND

REMAINING ROOM.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.1

M E

P v c h a w k D

D

W

.r v t

/7

/2

:1

:5

P M

FX101

FIRST FLOOR FIRE SUPPRESSION

PLANGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

N

SCALE: 1/8" = 1'-0"FX101

1 FIRST FLOOR - FIRE SUPPRESSION PLAN

GENERAL NOTE:

ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING

MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE

TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS

ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND

MEP DRAWINGS FOR PHASING PLAN.

THE BASIS OF DESIGN OF SPACING AND SIZING FOR THE COMPLETE FIRE

SUPPRESSION SPRINKLER SYSTEM SHALL BE FOR A WET PIPE SYSTEM

HYDRAULICALLY CALCULATED FOR A:

1 LIGHT HAZARD AREA LIMITED TO A MAXIMUM OF 225 SQ. FT. PER SPRINKLER

WITH THE DENSITY OF 0.10 GPM/SQ. FT. OVER THE MOST REMOTE 1500 SQ. FT.

PROVIDE AN ADDITION OF 250 GPM HOSE ALLOWANCE.

2 ALL MECHANICAL, ELECTRICAL AND SIMILAR SPACE AREAS SHALL BE

ORDINARY HAZARD (GROUP 1) LIMITED TO A MAXIMUM OF 130 SQ. FT. PER

SPRINKLER WITH A DENSITY OF 0.15 GPM/SQ. FT. PROVIDE AN ADDITION OF

250 GPM HOSE ALLOWANCE.

3 ALL STORAGE, TRASH, FILE STORAGE AND SIMILAR SPACE AREAS SHALL BE

ORDINARY HAZARD (GROUP 2) LIMITED TO A MAXIMUM OF 130 SQ. FT. PER

SPRINKLER WITH A DENSITY OF 0.20 GPM/SQ. FT. PROVIDE AN ADDITION OF

250 GPM HOSE ALLOWANCE.

Revisions: Date:

ADDENDUM #6 02/06/2023

6" RAISED

CURB

W.S. W.S.

B O B

BO443C

B

B0830.1

CG

CG

CG

CG

CG

RBR-2

FIELD

RBR-2

RBR-3

EXTG

RBR-4

CG

CG

CG

RBR-2 EXTG

F E

F E

F E

F E

F E

F E

P P

P P

OVERHEAD DOORS

CORRIDOR

CORRIDOR

PROSTHETICS

RECEPTION

OFFICE

PROSTHETICSPROG

ANALYST

ERGONOMICCLINICAL

SPEC

ERGONOMICS

OFFICE

WORKSHOP

ORTHOTICS

ELEC

CLO

C O R R

C O R R

PIT

LADDER

PROJECT

LOCATION: FIRST

FLOOR

BUILDING 111 KEY PLAN

N

SHADE

INDICATES AREA

NOT IN SCOPE,

TYP.

1. REMOVE EXISTING SANITARY WASTE AND VENT PIPING AS SHOWN BACK TO

EXISTING LOCATION. REMOVE ALL HANGERS, SUPPORTS, AND

ACCESSORIES. PATCH AND REPAIR ALL EXISTING FLOOR PENETRATIONS AS

REQUIRED. REFER TO DETAIL 4 ON SHEET PP600.

2. REMOVE EXISTING DOMESTIC WATER PIPING AS SHOWN BACK TO EXISTING

LOCATION. REMOVE ALL HANGERS, SUPPORTS, AND ACCESSORIES.

3. REMOVE PIPING TO WALL. PROVIDE CLEAN OUT. NO SCOPE OF WORK

SHALL OCCUR IN PNEUMATIC TUBE STATION ROOM.

4. REMOVE EXISTING WASTE/VENT RISER FOR NEW FLOOR PLAN LAYOUT.

PLUMBING PIPING DEMOLITION PLAN NOTES #

EX

4"WS/VS

EX 4"

WS

EX

4"WS19

X U S RZAACCFFGG T

EX

4"WS/VS

14"V

EX

4"WS/VS

4" 4"

4"4"

4"

4"

4"

4"

EX

4"WS/VS

1/2"

1/2"

2"

2"

4"

4"

2"

EX 2 1/2" CW, 1 1/2" HW,

1/2" HWC UP

EX

4"WS/VS

2"

EX

4"WS/VS

4" 4" 4"

4"

4"

4"

E X

W

4"

4"

IIJJ HH

CO

E X

E X

/2

H W

E X

C W

4"

EX 4" W

E X

W E

X

H

W R

1"CW

1"HW

1"CW

1"HW

EX 2" V

EX 2" CW EX 1 1/2" HW EX 1" HWR

1"HWR

1 1/2"HW

2"CW

E X

W

EX 4"

EX 4" W

EX 4" W

EX 1 1/2" HW

EX 2" CW

4"

4"

E X

V

E X

W

E X

W

EX 4" W

E X

W E

X

V

E X

W

4 4

ELECTRICAL

CLOSET

B0460EC

MANAGER'S

OFFICE

B0431B

HALLWAY

BCU01B

CREDIT

UNION

B0431ACCOUNTING

B0431C

STORAGE

B0431B

MECHANICAL

ROOM

B0433A

COPY CENTER

B0462

EQUIPMENT

B0464

LOAN OFFICER

C0431E

OFFICE

B0432A

OFFICE

B0432

HR LINKS

B0434

WHS

SUPERVISOR

B0451B

WAREHOUSE

B0451

SUPERVISOR

OFFICE

B0437B

BREAK

ROOM

B0437A

SPD CLEAN

SUPPLY

B0435A

ESCORT

SERVICE

B0437

CART

STORAGE

B0435

OFFICE

B0433

EXAM ROOM

B0622A

ELECTRICAL

B0627B

TELEPHONE

B0627A

HAC

B0627E

EXAM ROOM

B0622

BREAK

ROOM

B0627D

A. SEE SHEET P000 FOR PLUMBING GENERAL NOTES.

B. ALL WORK ON THIS SHEET SHALL OCCUR UNDER ONE (1) PHASE.

PLUMBING PIPING DEMOLITION GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.1

M E

P v c h a w k D

D

W

.r v t

/7

/2

:1

:2

P M

PD100

BASEMENT PLUMBING PIPING

DEMOLITION PLANGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

N

SCALE: 1/8" = 1'-0"PD100

2 BASEMENT PLUMBING PIPING DEMOLITION PLAN

GENERAL NOTE:

ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING

MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE

TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS

ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND

MEP DRAWINGS FOR PHASING PLAN.

PROJECT

LOCATION: FIRST

FLOOR

BUILDING 111 KEY PLAN

N

SHADE

INDICATES AREA

NOT IN SCOPE,

TYP.

A. SEE SHEET P000 FOR PLUMBING GENERAL NOTES.

PLUMBING PIPING DEMOLITION GENERAL NOTES

1. REMOVE EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED DOMESTIC

WATER PIPING, SANITARY WASTE, AND SANITARY VENT PIPING BACK TO

LOCATION AS SHOWN. REMOVE ALL ASSOCIATED VALVES, HANGERS, AND

SUPPORTS. PATCH AND REPAIR ALL EXISTING FLOOR PENETRATIONS AS

REQUIRED. REFER TO DETAIL 4 ON SHEET PP600.

2. REMOVE EXISTING FLOOR DRAIN/SINK AND ALL ASSOCIATED SANITARY

WASTE AND SANITARY VENT PIPING BACK TO LOCATION AS SHOWN. REMOVE

ALL ASSOCIATED HANGERS AND SUPPORTS. PATCH AND REPAIR ALL

EXISTING FLOOR PENETRATIONS AS REQUIRED.

3. REMOVE ALL EXISTING WATER TREATMENT SYSTEMS IN THIS ROOM.

REMOVE ALL ASSOCIATED DOMESTIC WATER, SANITARY WASTE, AND

SANITARY VENT PIPING BACK TO LOCATION AS SHOWN. REMOVE ALL

ASSOCIATED VALVES, HANGERS, AND SUPPORTS.

4. REMOVE EXISTING WASTE/VENT RISER FOR NEW FLOOR PLAN LAYOUT.

PLUMBING PIPING DEMOLITION PLAN NOTES #

X U S RZAACCFFGG T

EX 4"

WS/VS EX 4"

WS/VS

EX 4"

WS/VS

EX 4"

WS/VS

EX 4"

WS/VS

EX 4"

WS/VS

IIJJ HH

SANITATION

COMMUNICATION

CENTER

MAIL

DISTRIBUTION

CASH COUNT

1409A

CORRIDOR

C1B08

TOILET FEMALE

E L

E C

T R

IC

A

L

E C

WATER SOFTNER

TRAYLINE

KETTLE AREA

CANTEEN DRY

STORAGE

FOOD PREP

& SERVICE

CLASSROOM /

CONFERENCE

ADPAC /

TRAINING

CANTEEN ADMIN

OFFICE

OFFICE

1409B

STORAGE

1409C

TOILET MALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.1

M E

P v c h a w k D

D

W

.r v t

/7

/2

:1

:2

P M

PD101

FIRST FLOOR PLUMBING PIPING

DEMOLITION PLANGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

N

SCALE: 1/8" = 1'-0"PD101

2 FIRST FLOOR PLUMBING DEMOLITION PLAN

GENERAL NOTE:

ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING

MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE

TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS

ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND

MEP DRAWINGS FOR PHASING PLAN.

A500

6" RAISED

CURB

W.S. W.S.

B O B

BO443C

B

B0830.1

CG

CG

CG

CG

CG

RBR-2

FIELD

RBR-2

RBR-3

EXTG

RBR-4

CG

CG

CG

RBR-2 EXTG

F E

F E

F E

F E

F E

F E

P P

P P

OVERHEAD DOORS

CORRIDOR

CORRIDOR

PROSTHETICS

RECEPTION

OFFICE

PROSTHETICSPROG

ANALYST

ERGONOMICCLINICAL

SPEC

ERGONOMICS

OFFICE

WORKSHOP

ORTHOTICS

ELEC

CLO

C O R R

C O R R

PIT

LADDER

PROJECT

LOCATION: FIRST

FLOOR

BUILDING 111 KEY PLAN

N

SHADE

INDICATES AREA

NOT IN SCOPE,

TYP.

X U S RZAACCFFGG T

2"CW

1 1/2"HW

1 1/2"CW

CAP

2"CW

1 1/2"HW

1"HWR

CAP

IIJJ HH

PP400

A. REFER TO SHEET P000 FOR PLUMBING GENERAL NOTES.

B. REFER TO SHEET PP600 FOR INDIVIDUAL PIPING SIZES TO FIXTURES ON

PLUMBING FIXTURE SCHEDULE.

PLUMBING PIPING GENERAL NOTES

ELECTRICAL

CLOSET

B0460EC

MANAGER'S

OFFICE

B0431B

HALLWAY

BCU01B

CREDIT

UNION

B0431ACCOUNTING

B0431C

STORAGE

B0431B

MECHANICAL

ROOM

B0433A

COPY CENTER

B0462

EQUIPMENT

B0464

LOAN OFFICER

C0431E

OFFICE

B0432A

OFFICE

B0432

HR LINKS

B0434

WHS

SUPERVISOR

B0451B

WAREHOUSE

B0451

SUPERVISOR

OFFICE

B0437B

BREAK

ROOM

B0437A

SPD CLEAN

SUPPLY

B0435A

ESCORT

SERVICE

B0437

CART

STORAGE

B0435

OFFICE

B0433

EXAM ROOM

B0622A

ELECTRICAL

B0627B

TELEPHONE

B0627A

HAC

B0627E

EXAM ROOM

B0622

BREAK

ROOM

B0627D

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.1

M E

P v c h a w k D

D

W

.r v t

/7

/2

:1

:2

P M

PP100

BASEMENT PLUMBING PIPING

PLANGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH CH

100% BID DOCUMENTS

FULLY SPRINKLERED

N

SCALE: 1/8" = 1'-0"PP100

1 BASEMENT PLUMBING PLAN

GENERAL NOTE:

ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING

MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE

TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS

ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND

MEP DRAWINGS FOR PHASING PLAN.

X U S RZAACCFFGG T

VCS OFFICE

CASH OUT

1465B

VCS CHIEF OFFICE

1465A

CONSULT

PATIENT TOILET

1448A

PROCEDURE

PATIENT TOILET

1452A

SOILED HOLDING

PROCEDURE

EXAM

EXAM

EXAM

EXAM

EXAM

FAMILY TOILET

1400A

LACTATION

CHECK-IN

INTAKE

LINEN CLOSET

INTAKE

PATIENT TOILET

LAB

CONSULT

CLEAN STORAGE

EQUIPMENT

INTAKE - ALCOVE

MENS TOILET

RECEPTION /

WAITING

WOMENS TOILET

ELECTRICAL

HAC

WHEELCHAIR

STORAGE

1400B

FAMILY WAITING

1400C

ELECTRICAL

1403EC

CORRIDOR

C1C03

CORRIDOR

C1C01

CORRIDOR

C1C02

CORRIDOR

C1C09

CORRIDOR

C1B06

CORRIDOR

C1C11

LOCKER ROOM

STAFF TOILET

RESIDENT

WORKROOM

CONFERENCE /

BREAK

1454 CORRIDOR

C1C10

OPEN

WORKSTATIONS

SWING SPACE

STORAGE

INTAKE

MEDS

DRY STORAGE

CANISTER STORAGE

WHEELCHAIR WASH

IIJJ HH

PP401

PROJECT

LOCATION: FIRST

FLOOR

BUILDING 111 KEY PLAN

N

SHADE

INDICATES AREA

NOT IN SCOPE,

TYP.

A. REFER TO SHEET P000 FOR PLUMBING GENERAL NOTES.

B. REFER TO SHEET PP600 FOR INDIVIDUAL PIPING SIZES TO FIXTURES ON

PLUMBING FIXTURE SCHEDULE.

PLUMBING PIPING GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.1

M E

P v c h a w k D

D

W

.r v t

/7

/2

:1

:3

P M

PP101

FIRST FLOOR PLUMBING PIPING

PLANGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"PP101

1 FIRST FLOOR PLUMBING PIPING PLAN

N

GENERAL NOTE:

ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING

MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE

TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS

ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND

MEP DRAWINGS FOR PHASING PLAN.

X U S RZAA T

EX

4"WS/VS

EX 4"

WS

EX

4"WS/VS

EX

4"WS/VS

CAP

CO

2"W 2"W

1 1/2"W UP

1 1/2"W UP

EX 4"

WS/VS

EX 4"

WS/VS

CO

CO

CO

4"W

4"W

4"W

4"W

CO

3"W

3"W

2"W

4"W

CO

4"W

4"W 4"W

2"W

2"W

4"W UP

4"W UP

1 1/2"W UP

1 1/2"W UP

1 1/2"W UP

2"W UP

2"W UP 1 1/2"W UP

1 1/2"W UP

2"W UP

4"W UP

1 1/2"W UP

1 1/2"W UP

3"W

CO

4"W

OUTLINE OF

EXISTING CREDIT

UNION

PNEUMATIC TUBE

ROOM (LIGHT

HATCH)

1 1/2"W UP

2"W UP

CO

4"W UP

1 1/2"W UP

3"W UP

CO

CO

4"W UP 1 1/2"W UP

4"W UP 1 1/2"W UP

CO

1 1/2"W UP

1 1/2"W UP

1 1/2"W UP

CO

3"W

4"W UP 2"W UP

CO

4"V

CO

4"W 4"W

1 1/2"W

4"W

4"W

3"W 4"W

OFFICE

B0432

OFFICE

B0432A

HR LINKS

B0434

EMS PROGRAM MGR.

B0436ESCORT SERVICE

B0437

CART STORAGE

B0435

BREAK ROOM

B0437A

OFFICE

B0433

LOAN OFFICER

C0431E

MECHANICAL ROOM

B0433A

STORAGE

B0431B

COPY CENTER

B0462

EQUIPMENT

B0464

ACCOUNTING

B0431C

HALLWAY

BCU01B

MANAGER'S OFFICE

B0431B

ELECTRICAL CLOSET

B0460EC

1 1/2"V UP

2"W

A. REFER TO SHEET P000 FOR PLUMBING GENERAL NOTES.

B. REFER TO SHEET PP600 FOR INDIVIDUAL PIPING SIZES TO FIXTURES ON

PLUMBING FIXTURE SCHEDULE.

PLUMBING PIPING GENERAL NOTES

1. CONNECT NEW SANITARY WASTE PIPING TO EXISTING SANITARY WASTE

PIPING IN THIS LOCATION.

2. NO SCOPE OF WORK SHALL OCCUR IN THIS ROOM.

3. PIPING FROM ABOVE SHALL NOT PASS IN ROOM. COORDINATE WITH

ROUTING ON FLOOR ABOVE.

4. PROVIDE NEW PIPING OFFSET FOR BOTH WASTE/VENT RISER.

PLUMBING PLAN NOTES #

PROJECT

LOCATION: FIRST

FLOOR

BUILDING 111 KEY PLAN

N

SHADE

INDICATES AREA

NOT IN SCOPE,

TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.1

M E

P v c h a w k D

D

W

.r v t

/7

/2

:1

:4

P M

PP400

PLUMBING ENLARGED PLANS

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"PP400

1 BASEMENT PLUMBING PIPING ENLARGED PLAN

N

1. 3/4" CW, 3/4" HW, 1/2" HWR DOWN TO BOTH PLUMBING FIXTURES. PROVIDE

1/2" CW, 1/2" HW, 1/2" HWR TO EACH FIXTURE. PROVIDE ISOLATION VALVE ON

EACH SYSTEM TO EACH FIXTURE.

2. 1 1/2" CW, 3/4" HW, 1/2" HWR DOWN TO BOTH PLUMBING FIXTURES. PROVIDE

INDIVIDUAL PIPING TO EACH FIXTURE. COORDINATE WITH PLUMBING

FIXTURE SCHEDULE. PROVIDE ISOLATION VALVES ON EACH SYSTEM TO

EACH FIXTURE.

3. CONNECT NEW 2 1/2" CW, 1 1/2" HW, 3/4" HWR TO EXISTING PIPING IN THIS

AREA.

4. CONNECT NEW VENT PIPING TO RE-LOCATED EXISTING VENT RISER IN THE

LOCATION.

5. CONNECT NEW 1/2" CW FROM EXISTING DRINKING WATER SYSTEM.

LOCATED APPROXIMATELY 100 LINEAR FEET PLAN NORTH IN EXISTING

CANTEEN AREA. PROVIDE ISOLATION VALVE AT CONNECTION.

6. OFFSET PIPING IN WALL TO AVOID PNEUMATIC TUBE STATION ROOM BELOW.

7. PROVIDE AUTOMATIC BALANCE VALVE FOR HOT WATER RECIRCULATION.

SET TO 0.25 GPM.

8. PROPOSED ROUTING OF NEW PNEUMATIC TUBE STATION PIPING.

COORDINATE EXACT LOCATION AND ROUTING WITH DIVISION 14

CONTRACTOR. CONTACT KYLE MEGNA WITH SWISSLOG HEALTHCARE, EMAIL:

KYLE.MEGNA@SWISSLOG-HEALTHCARE.COM. OFFICE: 303-373-7847. CELL:

508-851-0551.

9. PROVIDE 1/2" INCH TEMPERED HW DOWN TO HOSE BIBB. INSTALL HOSE BIBB

18" A.F.F. COORDINATE FINAL LOCATIONS WITH OWNER FOR EXISTING

WHEELCHAIR WASHER.

10. PROVIDE ALL LOW VOLTAGE FROM SENSOR LV TRANSFORMER TO FLUSH

VALVES. ROUTE LOW VOLTAGE WIRING CONCEALED IN BUILDING FINISHES.

11. NO VALVES SHALL BE LOCATED ABOVE THIS ROOM.

12. PROVIDE THERMOSTATIC MIXING VALVE IN ACCESSIBLE LOCATION ABOVE

CEILING. CONNECT 1/2" HW AND 1/2" CW (FROM NEARBY MAIN) TO MIXING

VALVE. SET VALVE TO 100 DEG F FOR OUTLET TEMPERATURE. PROVIDE

BALL VALVE ON ALL INLETS AND OUTLET FOR ISOLATION.

13. COORDINATE LOCATION OF FLOOR DRAIN WITH ACTUAL LOCATION OF

WHEELCHAIR WASHER.

PLUMBING PIPING PLAN NOTES #

A. REFER TO SHEET P000 FOR PLUMBING GENERAL NOTES.

B. REFER TO SHEET PP600 FOR INDIVIDUAL PIPING SIZES TO FIXTURES ON

PLUMBING FIXTURE SCHEDULE.

PLUMBING PIPING GENERAL NOTES

X U SZAACC T

P-114

P-408

P-408

P-505

P-405

P-405

P-405

P-405

P-114

P-408

P-405 P-405

P-405

P-405P-405

P-405

P-405

P-408

P-405

P-114

P-405 P-505

P-408

P-408

P-405

P-609

P-404P-404 P-202P-103P-103

P-501P-114 P-408

P-405

EX 4"

WS/VS

EX 4"

WS/VS

EX 4"

WS/VS

1 1/2" V DN

EX 4"

WS/VS

P-FD-D

/2 "V

2 1/2"CW

1 1/2"HW

3/4"HWR

/2

"H W

/2

"H W

R

/2

"H W

/2 "C

W

"V

/2

"H W

R

/4

"H W

/4

"C W

2"CW

3/4"HW

1/2"HWR

"V

"C

W

/4

"H W

/2

"H W

R

P-103 P-103 P-404 P-404

P-FD-I

2"V

3/4"HWR

1"HW

2"CW

2"V

3/4"HWR

1"HW

2"CW

"C

W

"H

W

/4

"H W

R

P-114

3/4"HWR

2"HW

2"CW

2"V

3/4"HWR

2"HW

2"CW

2"V

"C

W

"H

W

/4

"H W

R

"V

"C

W 1 "H

W 1 /2

"H W

R

/4

"C W 3 /4

"H W

/2

"H W

R

"V

1 1/2"CW

3/4"HW

1/2"HWR

2"V2"V

1/2"CW

1/2"HW

1/2"HWR

/4

"H W

R

"H

W

/2 "C

W

"V 1

/2

"C W

/4

"H W

/4

"H W

R

"V

3/4"HWR

3/4"HW

3/4"CW

/4

"C W

/4

"H W

/4

"H W

R

"V

"V 3 /4

"C W

/4

"H W

/4

"H W

R

2"V

1/2"CW

1/2"HW

1/2"HWR

2"V

1 1/2"CW

1/2"HWR

3/4"HW

EXAM

CORRIDOR

C1C09

WHEELCHAIR WASH

CONFERENCE /

BREAK

STAFF TOILET

OPEN

WORKSTATIONS

LOCKER ROOM

STORAGE

HAC

WOMENS TOILET

MENS TOILET

PROCEDURE

PATIENT TOILET

1452A

PROCEDURE

1448PATIENT TOILET

1448A

MEDS

CONSULT

CLEAN STORAGE

EQUIPMENT

CONSULT

CORRIDOR

C1C02

LAB

CORRIDOR

C1C03

EXAM

EXAM

EXAM

EXAM

PATIENT TOILET

INTAKE

INTAKE

CHECK-IN

INTAKE

RECEPTION /

WAITING

LINEN CLOSET

INTAKE - ALCOVE

FAMILY WAITING

1400C

FAMILY TOILET

1400A LACTATION

ELECTRICAL

1403EC

SOILED HOLDING

2 1/2"CW

1 1/4"HW

3/4"HWR

P-FD-D

1/2"HWR

1/2"HW

1 1/2"CW 2"CW

2"V 2"V

1/2"HW

1 1/2"V

1/2"CW

/2

"H W

R

2"V

1 1/2"CW

1/2"CW

1/2"HW

1/2"HWR

1 1/2"V

1/2"HWR

1/2"HW

1 1/2"V

1/2"CW

/2

"C W

/2

"H W

/2

"H W

R

"V

2"V

PROJECT

LOCATION: FIRST

FLOOR

BUILDING 111 KEY PLAN

N

SHADE

INDICATES AREA

NOT IN SCOPE,

TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.1

M E

P v c h a w k D

D

W

.r v t

/7

/2

:1

:5

P M

PP401

PLUMBING ENLARGED PLANS

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"PP401

1 FIRST FLOOR PLUMBING PIPING ENLARGED PLAN

N

2 1/2"CW

1 1/4"HW

P-405

P-405

P-405

P-114

P-408

P-405

P-405

P-405

P-505

P-114

P-408 P-408

P-405

P-405

P-405

P-408

P-405

P-114

P-405

P-404

P-404

P-103

P-501

P-103

P-103

P-202 P-404

P-404

P-103

P-114

P-408P-405

P-FD-I

3/4"HWR

1 1/2"CW

1/2"HW

1/2"HWR

1/2"HWR

3/4"HW

3/4"CW

1/2"HWR

3/4"HW

2"CW

2"CW

1"HW

3/4"HWR

2"CW

1"HW

3/4"HWR

3/4"HWR

2"HW

2"CW

1 1/2"CW

2"CW

2"CW

2"HW

3/4"HWR

1/2"HWR

3/4"HW

1 1/2"CW

3/4"HWR

2"HW

2"CW

1 1/2"CW

3/4"HW

3/4"HWR

1/2"HWR

1/2"HW

1/2"CW

1/2"HWR

1/2"HW

1/2"CW

3/4"HWR

2"HW

2"CW

2 1/2"CW

2"HW

1/2"HWR

TO/FROM

CW/HW/HWR

PIPING SOURCES

TO

WHEELCHAIR

WASHER

1/2"HW

P-501

P-404

P-404

P-103

P-103

P-505

P-114

P-408

P-408

P-405

P-405

P-405

P-405

P-405

P-408

P-114

P-405 P-405

P-405

P-405

P-405

P-405

P-114

P-408

P-405

P-405

P-FD-I

P-408

P-114

P-202 P-404

P-404

P-609

1 1/2"V

1 1/2"W

2"V

2"V

2"V

2"W

1 1/2"W

3"W

4"W

4"W

4"W 2"V

2"V

2"V

2"V

1 1/2"V

2"V

2"W

2"W

4"W

4"W

4"W

2"V

2"V

2"V

2"V

1 1/2"W

2"V

4"W

1 1/2"W

2"W

3"W

2"V

3"W

2"V 2"V

2"V

2"V

2"V

2"V

2"V

2"V

2"V

1 1/2"W

1 1/2"W

4"W

1 1/2"V

2"W

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.1

M E

P v c h a w k D

D

W

.r v t

/7

/2

:1

:5

P M

PP700

PLUMBING SCHEMATICS AND

RISERSGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE:PP700

1 DOMESTIC WATER PIPING SCHEMATIC

SCALE:PP700

2 WASTE AND VENT PIPING SCHEMATIC

Revisions: Date:

E X x S

A

SD10Ø

SD10Ø

SD6Ø

SD8Ø

SD8Ø

SD12Ø

SD12Ø

SD6Ø

X U S RZAACCFFGG T

SD8Ø

VCS OFFICE

CASH OUT

1465B

VCS CHIEF OFFICE

1465A

CONSULT

PATIENT TOILET

1448A

PROCEDURE

PATIENT TOILET

1452A

SOILED HOLDING

PROCEDURE

EXAM

EXAM

EXAM

EXAM

EXAM

FAMILY TOILET

1400A

LACTATION

CHECK-IN

INTAKE

LINEN CLOSET

INTAKE

PATIENT TOILET

LAB

CONSULT

CLEAN STORAGE

EQUIPMENT

INTAKE - ALCOVE

MENS TOILET

RECEPTION /

WAITING

WOMENS TOILET

ELECTRICAL

HAC

WHEELCHAIR

STORAGE

1400B

FAMILY WAITING

1400C

ELECTRICAL

1403EC

CORRIDOR

C1C03

CORRIDOR

C1C01

CORRIDOR

C1C02

CORRIDOR

C1C09

CORRIDOR

C1B06

CORRIDOR

C1C11

CORRIDOR

C1C09

LOCKER ROOM

STAFF TOILET

RESIDENT

WORKROOM

CONFERENCE /

BREAK

CORRIDOR

C1C10

OPEN

WORKSTATIONS

SWING SPACE

STORAGE

INTAKE

MEDS

DRY STORAGE

CANISTER STORAGE

SD6Ø

SD6Ø

475475300300

EX. HWC-40

EX. HWC-42

E X x S

A

EX 144x36 SA DNEG24/24

EX 72x20 SA

EX 72x20 SA

CAPPED

WHEELCHAIR WASH

EX 40x12 EA

EX 24x14 SA

E X x S

A

EX 22x14 SA

EX 72x16 SA

EX 12x10 EA

EX 12x10 EA EX 12x10 EA

EX 90x28 SA

EX 90x28 SA x

EX. HWC-44

E X x E

A

EX 54x12 EA

EX 18x18 EA

EX 12x6 EA

E X x S

A

EX 54x16

EX 12x10 EA

EX 12x10 EA

EX 26x8

EX 12x9 SA EX 20x8 SA

EG24/24

EG24/12

300 EG24/24

EG24/24

EG24/24

EG24/24

EG24/24

EG24/24

EG24/24

SD6Ø

EG24/24

SD8Ø

SD8Ø

EG24/24

SD8Ø

SD8Ø

SD8Ø

EG24/24

SD8Ø

SD12Ø

EG24/24

SD8Ø

EG24/24

SD8Ø

SD6Ø

SD6Ø

SD8Ø

SD6Ø

EG24/24

EG24/24

SD10Ø

SD10Ø

EG24/24

EG24/24

SD6Ø

SD6Ø

SD6Ø

125SD6Ø

SD6Ø

EG24/12

EG24/12

125 EG24/12

EG24/12

EG24/12

EG24/24

SD8Ø

SD6Ø

EG24/24

SD6Ø

100EG24/24

EG24/24

SD6Ø

EG24/24

SD8Ø

EG24/24

SD8Ø

SD8Ø

SD8Ø

EG24/24

SD6Ø

EG24/24

275SD6Ø

SD8Ø

SD8Ø

EG24/24

EG24/24

8Ø

8Ø

SD8Ø

SD8Ø

EG24/24

SD8Ø

HWC-1465A

300 HWC-1465

Ø

10Ø

6Ø

HWC-1456

HWC-1453

HWC-1452

HWC-1448

HWC-1444

HWC-1410

x

18x14 SA

HWC-1457

HWC-C6

HWC-1477

HWC-1407

HWC-1400

6x6

HWC-1432

200HWC-1436

HWC-1440

EG24/24

10x10 x x

8x8

12x12 SA x x x

10x10

HWC-C7

x

12x10 x x x

6Ø

30x14 EA

14x12 EA

20x12 EA

Ø x E

A

12x10 x E

A

8Ø8Ø

16Ø

10Ø

8Ø

Ø ø8

6Ø

16x12 EA

12Ø

12Ø 12Ø

8Ø

Ø

8Ø

Ø x

6Ø

Ø

12x12 EA

6Ø

24x20 EA

6Ø

Ø

6Ø

6Ø

Ø

12x10 EA

Ø

8Ø8Ø

6Ø 6Ø 12x10 EA

12x10 EA

Ø

Ø8Ø

20x14 EA 14x14 EA

8x8

6Ø ø6

HWC-1439

HWC-1454

DN

DN

UP

DN

UP

x x E

A x

UP

DN

IIJJ HH

6Ø

8Ø

8Ø

20x12 SA

20x12 SA

14x12 SA

14x12 SA

14x12

12x10 x S

A

8Ø

EX 22x14 SA

16x12 SA 30x12 SA x S

A

6Ø

Ø

10Ø x E

A

8Ø8Ø

6Ø

6Ø ø10

E X x S

A

Ø x S

A

SG12/8

12x8 EA

EG12/8

10Ø EA 5

EF-1458 6

H-1458

12Ø EA

Ø

12Ø

24x20 EA

1. PROVIDE CAP OVER EXISTING DUCTWORK. SEAL DUCTWORK.

2. PROVIDE VOLUME DAMPER IN DUCT FOR BALANCING OF EXISTING

DOWNSTREAM DUCTWORK. COORDINATE WITH MEASURED AIRFLOW VALUES

OBTAINED PRIOR TO DEMOLITION.

3. NEW HOOD OVER WHEELCHAIR WASHER. INSTALL TO EXISTING STRUCTURE.

BOTTOM OF HOOD TO BE AT 6'-6" AFF. COORDINATE WITH ARCHITECTURAL

CEILING PLAN.

4. NO VOLUME DAMPERS SHALL BE LOCATED ABOVE THIS ROOM.

5. NEW 10"ø WELDED STAINLESS STEEL DUCT BETWEEN HOOD AND FAN.

SLOPE DUCTWOKR BACK TO HOOD.

6. NEW ROOF-MOUNTED EXHAUST FAN. REFER TO DETAIL 14 ON SHEET MM500.

COORDINATE WITH EXISTING ROOF WARRANTY/CONTRACTOR.

7. PROVIDE MOTORIZED CONTROL DAMPER IN DUCT. DAMPER SHALL SHUT

WHEN EF-1458 IS OFF.

MECHANICAL HVAC PLAN NOTES #

PROJECT

LOCATION: FIRST

FLOOR

BUILDING 111 KEY PLAN

N

SHADE

INDICATES AREA

NOT IN SCOPE,

TYP.

A. REFER TO SHEET M000 FOR MECHANICAL GENERAL NOTES.

MECHANICAL HVAC GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.1

M E

P v c h a w k D

D

W

.r v t

/7

/2

:1

:0

P M

MH101

FIRST FLOOR MECHANICAL HVAC

PLANGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"MH101

1 FIRST FLOOR MECHANICAL HVAC PLAN

N

GENERAL NOTE:

ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING

MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE

TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS

ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND

MEP DRAWINGS FOR PHASING PLAN.

T

T T

T T

T

T T

T T

T

T

T

T

T T

T

T

T

T

T

T

T

EX 2" HHWR

EX 2" HHWS

1 1/4"HHWR

1 1/4"HHWS

1"HHWS

1"HHWR

1"HHWS

1"HHWR

X U S RZAACCFFGG T

1 1/4"HHWS

1 1/4"HHWR

VCS OFFICE

CASH OUT

1465B

VCS CHIEF OFFICE

1465A

CONSULT

PATIENT TOILET

1448A

PROCEDURE

PATIENT TOILET

1452A

SOILED HOLDING

PROCEDURE

EXAM

EXAM

1445 EXAM

EXAM

EXAM

FAMILY TOILET

1400A

LACTATION

CHECK-IN

INTAKE

LINEN CLOSET

INTAKE

PATIENT TOILET

LAB

CONSULT

CLEAN STORAGE

EQUIPMENT

INTAKE - ALCOVE

MENS TOILET

RECEPTION /

WAITING

WOMENS TOILET

ELECTRICAL

HAC

WHEELCHAIR

STORAGE

1400B

FAMILY WAITING

1400C

CORRIDOR

C1C03

CORRIDOR

C1C01

CORRIDOR

C1C02

CORRIDOR

C1C09

CORRIDOR

C1B06

CORRIDOR

C1C11

LOCKER ROOM

STAFF TOILET

RESIDENT

WORKROOM

CONFERENCE /

BREAK

CORRIDOR

C1C10

OPEN

WORKSTATIONS

SWING SPACE

STORAGE

INTAKE

MEDS

DRY STORAGE

CANISTER STORAGE

HWC-1439

0.5

HWC-1436

2.50

HWC-1432

1.00

HWC-1477

3.75

HWC-1400

2.00 GPM

HWC-1452

2.00

HWC-1448

2.00

HWC-1444

1.00

HWC-C6

3.75

HWC-1410

6.50

HWC-1453

3.00

HWC-1454

1.00

HWC-1456

2.50

HWC-1457

1.00

HWC-1465

2.00

HWC-1465A

1.50

HWC-C7

1.75

HWC-1407

0.50

HWC-1457

HWC-1456

HWC-1454

HWC-1453

HWC-1452

HWC-1410

HWC-1448HWC-1444

HWC-1436

HWC-1432

HWC-1400

HWC-1407

HWC-1440

HWC-1447

HWC-1439

WHEELCHAIR WASH

HWC-C6

HWC-C7

HWC-1465

HWC-1465A

ELECTRICAL

1403EC

HWC-1440

2.00

EX 3/4"

EX 3/4"

EX 2" HHWR

EX 2" HHWS

EX 2" HHWR

EX 2" HHWS

EX 3/4" HHWSEX 3/4" HHWR

E X

/4

H

H W

R E

X

/2

H

H W

S

IIJJ HH

EX 3/4" HHWS

EX 3/4" HHWR

3/4"HHWS

3/4"HHWR

3/4"HHWS

3/4"HHWR

3/4"HHWR

3/4"HHWS

1"HHWS

1"HHWR

3/4"HHWR

3/4"HHWS

CORRIDOR

C1C09

1"HHWR

1"HHWS

1"HHWR

1"HHWS

CAP

CAP

1"HHWS

1"HHWR

1"HHWS

1"HHWR

1"HHWS

1"HHWR

1"HHWS

1"HHWR

1 1/4"HHWS

1 1/4"HHWR

1 1/4"HHWS

1 1/4"HHWR

1 1/4"HHWS

1 1/4"HHWR

1 1/2"HHWS

1 1/2"HHWR

PROJECT

LOCATION: FIRST

FLOOR

BUILDING 111 KEY PLAN

N

SHADE

INDICATES AREA

NOT IN SCOPE,

TYP.

A. REFER TO SHEET M000 FOR MECHANICAL GENERAL NOTES.

B. ROUTE 3/4 INCH HEATING HOT-WATER PIPING TO EACH COIL UNLESS

NOTED OTHERWISE.

MECHANICAL PIPING GENERAL NOTES

1. CONNECT NEW HEATING HOT-WATER PIPING TO EXISTING HEATING HOT-

WATER PIPING IN THIS AREA. PROVIDE ISOLATION VALVES AT CONNECTION

ON NEW PIPING.

2. PROVIDE 2-WAY CONTROL VALVE AND AUTOMATIC BALANCE VALVE (SET TO

3 GPM) AT END OF LOOP.

MECHANICAL PIPING PLAN NOTES #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.1

M E

P v c h a w k D

D

W

.r v t

/7

/2

:1

:1

P M

MP101

FIRST FLOOR MECHANICAL

PIPING PLANGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"MP101

2 FIRST FLOOR MECHANICAL PIPING PLAN

GENERAL NOTE:

ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING

MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE

TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS

ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND

MEP DRAWINGS FOR PHASING PLAN.

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.1

M E

P v c h a w k D

D

W

.r v t

/7

/2

:1

:3

P M

MM600

MECHANICAL SCHEDULES

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

HOT WATER COIL SCHEDULE

IDENTITY DATA AIR DATA

CAPACITY

(MBH

WATER DATA

REMARKSMARK MANUFACTURER MODEL

DUCT SIZE

(WxH) (IN)

AIRFLOW

(CFM) EAT (°F) LAT (°F)

AIR PD

(IN WG)

EWT

(°F) LWT (°F)

FLOWRATE

(GPM)

WATER

PD (FT

WG)

HWC-1400 GREENHECK CUSTOM HW 10x10 450 55 85 0.25 19.40 160 140 2.00 3 1 - 2

HWC-1407 GREENHECK CUSTOM HW 8x6 75 55 85 0.25 3.2 160 140 0.50 3 1 - 2

HWC-1410 GREENHECK CUSTOM HW 18x14 1450 55 85 0.25 62.6 160 140 6.50 3 1 - 2

HWC-1432 GREENHECK CUSTOM HW 8x8 200 55 85 0.25 8.6 160 140 1.00 3 1 - 2

HWC-1436 GREENHECK CUSTOM HW 12x10 525 55 85 0.25 22.7 160 140 2.50 3 1 - 2

HWC-1439 GREENHECK CUSTOM HW 8x8 80 55 85 0.25 3.5 160 140 0.50 3 1 - 2

HWC-1440 GREENHECK CUSTOM HW 10x10 450 55 85 0.25 19.4 160 140 2.00 3 1 - 2

HWC-1444 GREENHECK CUSTOM HW 8x8 175 55 85 0.25 7.6 160 140 1.00 3 1 - 2

HWC-1448 GREENHECK CUSTOM HW 8x8 380 55 85 0.25 16.4 160 140 2.00 3 1 - 2

HWC-1452 GREENHECK CUSTOM HW 8x8 400 55 85 0.25 17.3 160 140 2.00 3 1 - 2

HWC-1453 GREENHECK CUSTOM HW 12x10 600 55 85 0.25 25.9 160 140 3.00 3 1 - 2

HWC-1454 GREENHECK CUSTOM HW 8x8 250 55 85 0.25 10.8 160 140 1.00 3 1 - 2

HWC-1456 GREENHECK CUSTOM HW 12x10 600 55 85 0.25 25.9 160 140 2.50 3 1 - 2

HWC-1457 GREENHECK CUSTOM HW 8x8 200 55 85 0.25 8.6 160 140 1.00 3 1 - 2

HWC-1465 GREENHECK CUSTOM HW 10x10 450 55 85 0.25 19.4 160 140 2.00 3 1 - 2

HWC-1465A GREENHECK CUSTOM HW 10x10 300 55 85 0.25 13.0 160 140 1.50 3 1 - 2

HWC-1477 GREENHECK CUSTOM HW 16x10 825 55 85 0.25 35.6 160 140 3.75 3 1 - 2

HWC-C6 GREENHECK CUSTOM HW 14x12 850 55 85 0.25 36.7 160 140 3.75 3 1 - 2

HWC-C7 GREENHECK CUSTOM HW 10x10 400 55 85 0.25 17.3 160 140 1.75 3 1 - 2

REMARKS:

1. MANUFACTURER AND MODEL INFORMATION FOR BASIS OF DESIGN ONLY.

2. PROVIDE WITH MINIMUM 2-ROW COILS.

DIFFUSERS, REGISTERS, AND GRILLES SCHEDULE

IDENTITY DATA

SYSTEM STYLE / TYPE

PANEL SIZE

(IN)

NECK SIZE

(IN) MATERIAL COLOR REMARKSMARK MANUFACTURER MODEL

EG12/8 PRICE 510Z EXHAUST SIDEWALL EXHAUST GRILLE 12x8 12x8 STEEL WHITE 1, 3

EG24/12 PRICE 80 EXHAUST EGGCRATE 24x12 22x10 ALUMINUM WHITE 1 - 2

EG24/24 PRICE 80 EXHAUST EGGCRATE 24x24 22x22 ALUMINUM WHITE 1 - 2

SD6Ø PRICE SCD SUPPLY SQUARE CONE 24x24 6 STEEL WHITE 1 - 2

SD8Ø PRICE SCD SUPPLY SQUARE CONE 24x24 8 STEEL WHITE 1 - 2

SD10Ø PRICE SCD SUPPLY SQUARE CONE 24x24 10 STEEL WHITE 1 - 2

SD12Ø PRICE SCD SUPPLY SQUARE CONE 24x24 12 STEEL WHITE 1 - 2

SG12/8 PRICE 510 SUPPLY SIDEWALL SUPPLY GRILLE 12x8 12x8 STEEL WHITE 1, 4

REMARKS:

1. MANUFACTURER AND MODEL INFORMATION FOR BASIS OF DESIGN ONLY.

2. COORDINATE WITH ARCHITECTURAL PLANS FOR CEILING TYPE.

3. PROVIDE WITH SINGLE 0°DEFLECTION BLADES AT 0.75" SPACING.

4. PROVIDE WITH DOUBLE DEFLECTION BLADES AT 0.75" SPACING.

SYSTEM AIR BALANCE SCHEDULE

UNIT NUMBER EXHAUST CFM SUPPLY (VENTILATION) CFM

EF-30 7,725 -

WHEELCHAIR EXHAUST 500 -

1461 ELEC 500 450

AHU-V-7 - 8,660

TOTALS 8,725 9,110

POSITIVE AIRFLOW - 435

THEORETICAL PRESSURE - (IN W.C.) 0.09" wc

ROOM COOLING AND HEATING LOADS OUTPUT DATA SUMMARY SCHEDULE

AHU NO. ROOM NO. ROOM NAME

ROOM SIZE

AHU SYSTEM

TYPE

PEAK ROOM

COOLING LOAD

PEAK ROOM

HEATING LOAD CALCULATED ROOM AIRFLOW

REQUIRED

ROOM AIRFLOW

SELECTED DESIGN ROOM

AIRFLOW SELECTED DESIGN

REHEAT

TEMPERATURE (°F)

ROOM AIR RETURN

EXHAUST (G)

EXHAUST (S)

ROOM STATUS

(VAV OR CV)

ROOM AIR

BALANCE (+)

OR (-) OR (0)

AREA HEIGHT SENSIBLE

BTUH W CFM ACH ▲T ACH CFM ACHSF FT BTUH W

AHU-V-7 21A PATIENT TOILET 66.8 9'-0" CAV/RH - - - - - - - 10 - 10 95 100 CV -

AHU-V-7 1400 RECEPTION / WAITING 354.9 9'-0" CAV/RH 4500 1318.8 0 0 215 4.04 20 4 300 5.64 95 300 CV 0

AHU-V-7 1400A FAMILY TOILET 68.1 9'-0" CAV/RH - - - - - - - 10 - 12.23 95 125 CV -

AHU-V-7 1400C FAMILY WAITING 141.0 9'-0" CAV/RH - - - - - - - 4 150 7.09 95 150 CV 0

AHU-V-7 1407 LACTATION 81.7 9'-0" CAV/RH 5300 1552.9 0 0 249 20.31 20 6 75 6.12 95 75 CV 0

AHU-V-7 1409 MENS TOILET 235.8 9'-0" CAV/RH 500 146.5 0 0 24 0.67 20 10 450 12.72 95 500 CV -

AHU-V-7 1410 WOMENS TOILET 245.5 9'-0" CAV/RH 600 175.8 0 0 28 0.76 20 10 450 12.21 95 500 CV -

AHU-V-7 1432 CHECK-IN 211.7 9'-0" CAV/RH 3600 1054.8 0 0 170 5.35 20 4 200 6.30 95 200 CV 0

AHU-V-7 1434 INTAKE - ALCOVE 43.4 9'-0" CAV/RH 1000 293 0 0 49 7.53 20 4 200 30.72 95 200 CV 0

AHU-V-7 1435 INTAKE 90.0 9'-0" CAV/RH 1100 322.3 0 0 54 4 20 4 100 7.41 95 100 CV 0

AHU-V-7 1436 INTAKE 90.0 9'-0" CAV/RH 1100 322.3 0 0 54 4 20 4 100 7.41 95 100 CV 0

AHU-V-7 1437 INTAKE 128.6 9'-0" CAV/RH 1500 439.5 0 0 69 3.58 20 4 125 6.48 95 125 CV 0

AHU-V-7 1438 PATIENT TOILET 65.1 9'-0" CAV/RH - - - - - - - 10 - 12.80 95 125 CV -

AHU-V-7 1439 LAB 133.8 9'-0" CAV/RH 1200 351.6 0 0 59 2.94 20 6 250 12.46 95 250 CV -

AHU-V-7 1440 CONSULT 110.1 9'-0" CAV/RH 1100 322.3 0 0 72 4.36 20 6 125 7.57 95 125 CV 0

AHU-V-7 1441 EQUIPMENT 55.7 9'-0" CAV/RH 100 29.3 0 0 17 2.03 20 4 50 5.98 95 50 CV +

AHU-V-7 1442 CLEAN STORAGE 92.2 9'-0" CAV/RH 200 58.6 0 0 28 2.02 20 4 75 5.42 95 75 CV +

AHU-V-7 1443 EXAM 124.8 9'-0" CAV/RH 1400 410.2 0 0 69 3.69 20 6 125 6.67 95 125 CV 0

AHU-V-7 1444 CONSULT 110.1 9'-0" CAV/RH 1400 410.2 0 0 67 4.06 20 6 125 7.57 95 125 CV 0

AHU-V-7 1445 EXAM 107.5 9'-0" CAV/RH 1400 410.2 0 0 67 4.16 20 6 125 7.76 95 125 CV 0

AHU-V-7 1446 MEDS 61.3 9'-0" CAV/RH - - - - - - - 4 50 5.43 95 50 CV +

AHU-V-7 1447 EXAM 112.4 9'-0" CAV/RH 1400 410.2 0 0 67 3.97 20 6 125 7.41 95 125 CV 0

AHU-V-7 1448 PROCEDURE 167.6 9'-0" CAV/RH 3100 908.3 0 0 147 5.84 20 15 380 15.11 95 380 CV +

AHU-V-7 1448A PATIENT TOILET 57.3 9'-0" CAV/RH - - - - - - - 10 - 11.63 95 100 CV -

AHU-V-7 1449 EXAM 112.4 9'-0" CAV/RH 1400 410.2 0 0 66 3.91 20 6 125 7.41 95 125 CV 0

AHU-V-7 1450 SOILED HOLDING 52.1 9'-0" CAV/RH - - - - - - - 10 - 12.79 95 100 CV -

AHU-V-7 1451 EXAM 105.8 9'-0" CAV/RH 1400 410.2 0 0 67 4.22 20 6 125 7.88 95 125 CV 0

AHU-V-7 1452 PROCEDURE 173.1 9'-0" CAV/RH 3100 908.3 0 0 147 5.66 20 15 400 15.41 95 400 CV +

AHU-V-7 1452A PATIENT TOILET 66.7 9'-0" CAV/RH - - - - - - - 10 - 10.2 95 100 CV -

AHU-V-7 1453 LOCKER ROOM 142.9 9'-0" CAV/RH 800 234.4 0 0 38 1.77 20 10 250 11.66 95 300 CV -

AHU-V-7 1454 CONFERENCE / BREAK 258.5 9'-0" CAV/RH 4100 1201.3 0 0 193 4.98 20 4 250 6.45 95 250 CV 0

AHU-V-7 1455 STAFF TOILET 84.9 9'-0" CAV/RH 200 58.6 0 0 10 0.79 20 10 150 11.78 95 250 CV -

AHU-V-7 1456 16 OPEN WORKSTATIONS 547.9 9'-0" CAV/RH 12600 3691.8 0 0 598 7.28 20 4 600 7.30 95 600 CV 0

AHU-V-7 1457 5 RESIDENT WORKROOM 186.9 9'-0" CAV/RH 4000 1172 0 0 189 6.74 20 4 200 7.13 95 200 CV 0

AHU-V-7 1458 WHEELCHAIR WASH 150.0 9'-0" CAV/RH 400 117.2 0 0 17 0.755 20 4 450 20 95 500 CV -

AHU-V-7 1461 ELECTRICAL 76.7 9'-0" CAV/RH 200 58.6 0 0 46 3.99 20 4 500 43.46 - 500 - 0

AHU-V-7 1463 DRY STORAGE 96.7 9'-0" CAV/RH 200 58.6 0 0 11 0.76 20 4 75 5.17 95 75 CV 0

AHU-V-7 1465 5 OPEN OFFICE 269.6 9'-0" CAV/RH 4200 1230.6 0 0 198 4.90 20 4 300 7.42 95 300 CV 0

AHU-V-7 1465A VCS CHIEF OFFICE 120.9 9'-0" CAV/RH 1400 410.2 0 0 68 3.75 20 4 125 6.89 95 125 CV 0

AHU-V-7 1465B CASH OUT 81.0 9'-0" CAV/RH 1100 322.3 0 0 53 4.36 20 4 75 6.17 95 75 CV 0

EXISTING/NEW TERMINAL BOX BALANCE SCHEDULE

BOX TAG

EXISTING

AIRFLOW

(CFM)

EXISTING

FLOWRATE

(GPM)

NEW

AIRFLOW

(CFM)

NEW

FLOWRATE

(GPM)

1461 ELEC. 500 -

EX. HWC-30 4070 8.80

EX. HWC-31 9670 21.0

EX. HWC-32 2600 5.75

EX. HWC-41 3200 7.00

EX. HWC-43 6400 14.00

EX. HWC-64 1600 3.50

EX. HWC-65 700 1.50

HWC-1400 450 2.00

HWC-1407 75 0.50

HWC-1410 1450 6.5

HWC-1432 200 1.00

HWC-1436 525 2.5

HWC-1439 80 0.5

HWC-1440 450 2

HWC-1444 175 1

HWC-1448 380 2

HWC-1452 400 2

HWC-1453 600 3

HWC-1454 250 1

HWC-1456 600 2.5

HWC-1457 200 1

HWC-1465 450 2

HWC-1465A 300 1.5

HWC-1477 825 3.75

HWC-C6 850 3.75

HWC-C7 400 1.75

TOTALS 28,240 61.55 9,160 40.25

HOOD SCHEDULE

MARK MANUFACTURER MODEL

OPERATING WEIGHT

(LBS) LOCATION AIRFLOW (CFM) HOOD SIZE (INxIN) THROAT SIZE (INxIN) SERVICE

PRESSURE DROP (IN

WC) REMARKS

H-1458 GREENHECK GD1 130 WHEELCHAIR WASH 1458 500 72x48 6x6 EXHAUST 0.50 1 - 5

REMARKS:

1. MANUFACTURER AND MODEL INFORMATION FOR BASIS OF DESIGN ONLY.

2. PROVIDE WITH 6 INCH HIGH STAINLESS STEEL CEILING ENCLOSURES ON ALL SIDES.

3. HOOD HEIGHT IS 24 INCHES.

4. HOOD CONSTRUCTION IS 100% 430 SS. HANGER BRACKETS ARE GALVANIZED STEEL.

5. EXHAUST COLLAR (THROAT) TO BE FACTORY MOUNTED. CENTER IN HOOD.

EXHAUST FAN SCHEDULE

MARK MANUFACTURER MODEL TYPE DRIVE WEIGHT (LBS) AIRFLOW (CFM) ESP (IN WG) RPM

INLET

(SONES)

VOLTAGE /

PHASE BHP NOM HP REMARKS

EF-1458 GREENHECK CUE-100HP-VG UPBLAST CENT BELT 50 500 1.25 2036 11.5 120 / 1 0.28 1/3 1 - 5

REMARKS:

1. MANUFACTURER AND MODEL INFORMATION FOR BASIS OF DESIGN ONLY.

2. PROVIDE WITH INTEGRAL NEMA-1, TOGGLE DISCONNECT SWITCH (MOUNTED AND WIRED).

3. PROVIDE WITH GRAVITY BACKDRAFT DAMPER AND 18 INCH INSULATED ROOF CURB.

4. PROVIDE WITH INSECT SCREEN OVER OPENING.

5. FAN TO BE UL705 LISTED FOR "POWER VENTILATORS".

Revisions: Date:

S S

S S

S S

S S

SS

S S

S S

S

S S

S

S S

S S

S S

S S

S S

S

S

SS

OS

S S

SS

S S

C R

PROJECT

LOCATION: FIRST

FLOOR

BUILDING 111 KEY PLAN

N

SHADE

INDICATES AREA

NOT IN SCOPE,

TYP.

LIGHTING DEMOLITION GENERAL NOTES

A. REFER TO SHEET E000 FOR ELECTRICAL SYMBOL LEGEND AND

ABBREVIATIONS.

B. ELECTRICAL ITEMS SHOWN LIGHT WITH A SOLID LINETYPE AND LABELED

(E) ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.

C. ELECTRICAL ITEMS SHOWN BOLD WITH A HIDDEN LINETYPE ARE TO BE

REMOVED UNLESS NOTED OTHERWISE.

D. FOR EXISTING EQUIPMENT (SUCH AS LIGHT FIXTURES, WIRING DEVICES,

CONDUITS, ETC.) SHOWN ON PLANS TO BE REMOVED: COMPLETELY

CUT/CAP CONDUITS AT THE AREA OF WORK PERIMETER AND REMOVE

WIRING AND CONDUIT WITHIN THE WORK AREA. ABANDON EXISTING

CONDUIT IN PLACE WHERE OUTSIDE OF WORK AREA. DISCONNECT

WIRING AT THE OVERCURRENT PROTECTIVE DEVICE AND REMOVE

WIRING COMPLETELY FROM THE ABANDONNED CONDUITS.

E. DISCONNECT ALL ABANDONED WIRING OF ALL TYPES AT THE

OVERCURRENT PROTECTIVE DEVICE. COMPLETELY REMOVE ALL

ABANDONED WIRING AND ASSOCIATED CONDUITS WHERE NOT BEING

REUSED.

F. WHERE INTERRUPTED BY ELECTRICAL DEMOLITION: MAINTAIN,

RESTORE, AND REFEED EXISTING CIRCUITS TO REMAIN INCLUDING

ASSOCIATED WIRING AND CONDUITS THAT PASS THROUGH AREAS TO BE

RENOVATED THAT SERVE AREAS OUTSIDE OF PROJECT SCOPE.

G. CONTRACTOR SHALL NOTE THAT THE INTENT OF DEMOLITION IS TO

REMOVE EXISTING ELECTRICAL EQUIPMENT ITEMS IN THEIR ENTIRETY

TO ACCOMMODATE NEW CONSTRUCTION. ITEMS NOTED FOR

DEMOLITION ARE FOR REFERENCE AND DO NOT REPRESENT EVERY

ITEM TO BE REMOVED. CONTRACTOR TO ENSURE ALL ITEMS

LOCATED WITHIN SCOPE BOUNDARY NECESSARY FOR INSTALLATION OF

NEW CONSTRUCTION ARE REMOVED AND DISPOSED OF.

H. EQUIPMENT IN SCOPE AREA IS EXISTING TO BE REMOVED UNLESS

NOTED OTHERWISE. IN ADDITION TO REMOVING DEVICES, REMOVE

ASSOCIATED ELECTRICAL CIRCUITS AND EMPTY RACEWAYS BACK TO

SOURCE. REFER TO THE SPECIFICATIONS FOR ELECTRICAL DEMOLITION

REQUIREMENTS.

I. INFORMATION SHOWN ON THE PLANS WAS GATHERED FROM FIELD

OBSERVATION AND EXISTING DRAWINGS. CONTRACTOR SHALL FIELD

VERIFY EXISTING CONDITIONS AND IS RESPONSIBLE FOR ANY

ADDITIONAL TRACING, REMOVING, RELOCATION AND EXTENDING

CIRCUITS AND DEVICES NECESSARY TO MAINTAIN CONTINUITY OF

EXISTING EQUIPMENT NOT IN THE AREA OF WORK. CONTRACTOR SHALL

FIELD VERIFY EXACT DEMOLITION REQUIREMENTS AND INCLUDE

ASSOCIATED COSTS. ABANDONED WIRING, CONDUITS, FITTING, BOXES,

SUPPORTS, SHALL BE REMOVED FROM THE DEVICES BACK TO THE

RESPECTIVE SOURCE PANEL. UPDATE PANEL DIRECTORIES. REFER TO

THE SPECIFICATIONS FOR ADDITIONAL ELECTRICAL DEMOLITION

REQUIREMENTS.

J. DASHED WALLS INDICATE EXISTING WALLS BEING REMOVED. REFER TO

ARCHITECTURAL DEMOLITION AND PHASING PLANS FOR THE EXACT

EXTENT OF GENERAL CONSTRUCTION DEMOLITION REQUIRED.

K. CONTRACTOR SHALL SUPPORT AND PROTECT ELECTRICAL

INFRASTRUCTURE EXISTING TO REMAIN, INCLUDING BUT NOT LIMITED

TO CONDUITS, WIRING, DEVICES, AND FIXTURES AS REQUIRED.

L. CONTRACTOR SHALL COORDINATE REMOVAL AND REPLACEMENT OF

ANY ELECTRICAL CEILING DEVICES (I.E. LIGHT FIXTURES, FIRE ALARM)

OUTSIDE THE MAIN PROJECT AREA OF WORK TO ACCOMMODATE THE

NEW CONSTRUCTION.

M. CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR

LOCATIONS OF SMOKE PARTITIONS AND FIRE RATED WALLS, FLOORS,

AND CEILINGS AND THEIR HOURLY RATINGS. CONTRACTOR SHALL

PROVIDE FIRE STOPPING FOR CONDUITS AND OTHER PENETRATIONS

COVERED UNDER DIVISION 26 IN THESE SURFACES. FIRESTOPPING

SHALL MEET OR EXCEED THE RATING OF THE SURFACE BEING

PENETRATED. REFER TO SPECIFICATION 07 84 00 FOR ADDITIONAL

INFORMATION.

1. DISCONNECT AND REMOVE ALL EXISTING LIGHTING FIXTURES IN THIS

ROOM. REMOVE ALL ASSOCIATED WIRE AND CONDUIT TO BACK TO SOURCE

OR NEAREST JUNCTION BOX THAT REMAINS IN USE.

2. ALL EXISTING LIGHTING FIXTURES, LIGHTING CONTROLS AND ASSOCIATED

WIRE AND CONDUIT IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.

RE-FEED AS REQUIRED.

3. DISCONNECT AND REMOVE EXISTING LIGHT SWITCH AND ASSOCIATED

WIRING AND CONDUIT.

4. DISCONNECT AND REMOVE EXISTING LIGHT SWITCH AND ASSOCIATED

WIRING AND CONDUIT. ABANDON EXISTING CONDUIT IN PLACE WHERE

CONCEALED IN EXISTING WALL TO REMAIN. PROVIDE BLANK COVER PLATE

AS REQUIRED.

5. DISCONNECT AND REMOVE EXISTING WALL MOUNTED LIGHT FIXTURE AND

ASSOCIATED WIRING AND CONDUIT. ABANDON EXISTING CONDUIT IN PLACE

WHERE CONCEALED IN EXISTING WALL TO REMAIN. PROVIDE BLANK COVER

PLATE AS REQUIRED.

6. DISCONNECT AND REMOVE EXISTING EXIT SIGN AND ASSOCIATED WIRING

AND CONDUIT.

LIGHTING DEMOLITION PLAN NOTES #

1 1

X U S RZAACCFFGG T

3 6

SANITATION

COMMUNICATION

CENTER

MAIL

DISTRIBUTION

CASH COUNT

1409A

CORRIDOR

C1B08

TOILET FEMALE

E L

E C

T R

IC

A

L

E C

WATER SOFTNER

TRAYLINE

KETTLE AREA

CANTEEN DRY

STORAGE

FOOD PREP

& SERVICE

CLASSROOM /

CONFERENCE

ADPAC /

TRAINING

CANTEEN ADMIN

OFFICE

OFFICE

1409B

STORAGE

1409C

TOILET MALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.1

M E

P v c h a w k D

D

W

.r v t

/7

/2

:1

:2

P M

EDL101

FIRST FLOOR LIGHTING

DEMOLITION PLANGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 KGG AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

N

SCALE: 1/8" = 1'-0"EDL101

1 FIRST FLOOR LIGHTING DEMOLITION PLAN

GENERAL NOTE:

ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING

MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE

TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS

ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND

MEP DRAWINGS FOR PHASING PLAN.

Revisions: Date:

D OS

D

S S

S

OS

D

OS

S

D S

D D

DD

OS

D D

OS

OS

D D

OS

S

S

OS

S

OS

S

D

OS

OS

DD DD

OS

S

OS

D

S

OS

DD

S

DD

OS

S

S

DD

OS OS

DD

OS

DD

SS

OSD

D

S

S S

S

OS

OS

OS

OS

D D

OS

D D

OS

D D

S

S

SSDD

S

S

S

OS

A. REFER TO SHEET E000 FOR ELECTRICAL SYMBOL LEGEND AND

ABBREVIATIONS.

B. REFER TO SHEET E601 FOR LIGHT FIXTURE SCHEDULE.

C. REFER TO SHEET EP300 FOR ENLARGED ELECTRICAL ROOM PLANS.

D. CONNECT NIGHT LIGHTS, EXIT SIGNS AND EMERGENCY LIGHTS AHEAD OF

ALL SWITCHING, UNLESS NOTED OTHERWISE. PARTIAL SHADING OF A LIGHT

FIXTURE OR "EM" DESIGNATION INDICATES EMERGENCY / EGRESS

LIGHTING.

E. ALL AREAS WHERE AN OCCUPANCY SENSOR IS SHOWN ON THE DRAWINGS

SHALL BE PROVIDED WITH 100% COVERAGE OF THAT AREA WITH

OCCUPANCY SENSING OF THE TECHNOLOGY TYPE SHOWN OR NOTED.

F. MULTIPLE LIGHT SWITCHES/DIMMERS SHALL BE GANGED IN A SINGLE NEMA

RATED BOX UNLESS NOTED OTHERWISE.

G. ALL WALL DEVICES AND COVER PLATE COLORS TO BE SELECTED BY

ARCHITECT.

H. ELECTRICAL ITEMS SHOWN LIGHT WITH A SOLID LINETYPE AND LABELED (E)

ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.

I. ELECTRICAL ITEMS SHOWN BOLD WITH A SOLID LINETYPE ARE NEW UNLESS

NOTED OTHERWISE.

GENERAL NOTES

1. EXISTING 277/480V, 3-PH., 4W., “NORMAL” BRANCH PANEL TO REMAIN.

CONNECT NEW LIGHTING BRANCH CIRCUITS TO EXISTING CIRCUIT

BREAKERS FOR CIRCUITS SHOWN.

2. EXISTING 277/480V, 3-PH., 4W., “LIFE SAFETY” BRANCH PANEL TO REMAIN.

CONNECT NEW LIGHTING BRANCH CIRCUITS TO EXISTING CIRCUIT

BREAKERS FOR CIRCUITS SHOWN.

3. EXISTING 277/480V, 3-PH., 4W., “CRITICAL” BRANCH PANEL TO REMAIN.

CONNECT NEW LIGHTING BRANCH CIRCUITS TO EXISTING CIRCUIT

BREAKERS FOR CIRCUITS SHOWN.

4. PROVIDE CEILING MOUNTED DIGITAL DUAL-TECHNOLOGY (PIR AND

ULTRASONIC) OCCUPANCY SENSOR FOR CONTROL OF LIGHTING IN THIS

ROOM, SEE DETAIL #1 ON SHEET EP501.

5. PROVIDE DIGITAL SWITCH/DIMMER STATION FOR CONTROL OF LIGHTING

ZONE SHOWN, SEE DETAIL #1 ON SHEET EP501.

6. PROVIDE CEILING MOUNTED DIGITAL DUAL-TECHNOLOGY (PIR AND

ULTRASONIC) OCCUPANCY SENSOR FOR CONTROL OF LIGHTING IN THIS

ROOM, SEE DETAIL #2 ON SHEET EP501.

7. PROVIDE DIGITAL SWITCH/DIMMER STATION FOR CONTROL OF LIGHTING IN

THIS ROOM, SEE DETAIL #2 ON SHEET EP501.

8. PROVIDE CEILING MOUNTED LOW-VOLTAGE DUAL-TECHNOLOGY

OCCUPANCY SENSOR FOR CONTROL OF LIGHTING IN THIS ROOM, SEE

DETAIL #3 ON SHEET EP501.

9. PROVIDE LOW-VOLTAGE SWITCH FOR CONTROL OF LIGHTING IN THIS ROOM,

SEE DETAIL #3 ON SHEET EP501.

10. PROVIDE COMBINATION WALL DIMMER/SWITCH DUAL-TECHNOLOGY (PIR

AND ULTRASONIC) OCCUPANCY SENSOR FOR CONTROL OF LIGHTING IN

THIS ROOM. ROUTE 0-10C DIMMING CONDUCTORS IN SAME CONDUIT AS

CIRCUIT CONDUCTORS FROM LIGHT FIXTURES TO CONTROL.

SENSOR/DIMMER SWITCH TO BE CONFIGURED FOR VACANCY MODE

(MANUAL-ON/AUTO-OFF) WITH 30 MINUTED TIME DELAY.

11. PROVIDE COMBINATION WALL SWITCH DUAL-TECHNOLOGY (PIR AND

ULTRASONIC) OCCUPANCY SENSOR FOR CONTROL OF LIGHTING IN THIS

ROOM. SENSOR/SWITCH TO BE CONFIGURED FOR VACANCY MODE

(MANUAL-ON/AUTO-OFF) WITH 30 MINUTE TIME DELAY.

12. PROVIDE AIRCRAFT CABLE HANGER AS REQUIRED TO SUSPEND LIGHT

FIXTURE AT 9’-0” A.F.F. TO BOTTOM OF LIGHT FIXTURE.

13. MOUNT LIGHT FIXTURE ON WALL CENTERED ABOVE MIRROR AT 6’-6” A.F.F.,

SEE ARCHITECTURAL ELEVATIONS.

14. PROVIDE CEILING MOUNTED LOW-VOLTAGE DUAL-TECHNOLOGY

OCCUPANCY SENSOR FOR AUTOMATIC CONTROL OF ALL “NORMAL”

POWERED LIGHTING IN THIS ROOM, SEE DETAIL #4 ON SHEET EP501.

15. LIGHT FIXTURE TO BE “NIGHTLIGHT” WIRED FOR “ALWAYS ON” OPERATION.

16. PROVIDE LOW-VOLTAGE SWITCH FOR CONTROL OF ALL “NORMAL” POWERED

PROVIDE ALL LOW VOLTAGE WIRING IN CONDUIT AS REQUIRED TO

CONNECT TO SWITCH INPUT IN EXISTING LIGHTING CONTROL PANEL LCP.

17. MOUNT LIGHT FIXTURE ON UNDERSIDE OF CABINET, SEE ARCHITECTURAL

DRAWINGS FOR MOUNTING.

18. CONNECT NEW LIGHT FIXTURE TO EXISTING CORRIDOR LIGHTING CIRCUIT,

FIELD VERIFY EXACT CIRCUIT AND LOCATION FOR CONNECTION.

19. ROUTE LIGHTING BRANCH CIRCUIT TO PANEL THRU EXISTING SPARE RELAY

IN EXISTING LIGHTING CONTROL PANEL LCP.

20. EXISTING LIGHTING CONTROL PANEL TO REMAIN. CONNECT NEW NORMAL

CORRIDOR LIGHTING CIRCUITS THROUGH EXISTING SPARE RELAYS AS

SHOWN.

LIGHTING PLAN NOTES #

PROJECT

LOCATION: FIRST

FLOOR

BUILDING 111 KEY PLAN

N

SHADE

INDICATES AREA

NOT IN SCOPE,

TYP.

X1

AB4AAB4A

AB2A

X1

EPH-Q-16-32

EXIST.

LH-14-1

EXIST.1

ELH-CR-16-2

EXIST.

VCS CHIEF OFFICE

1465A VCS OFFICE

CASH OUT

1465B

DRY STORAGE

CANISTER STORAGE

CORRIDOR

C1C09

CORRIDOR

C1C11

CORRIDOR

C1C11

ELECTRICAL

HAC

WOMENS TOILET

STORAGE

MENS TOILET

CORRIDOR

C1B06

CORRIDOR

C1C10

CONFERENCE /

BREAK

OPEN

WORKSTATIONS

CLEAN STORAGE

EQUIPMENT

CONSULT

LAB

PATIENT TOILET

INTAKE

PATIENT TOILET

1448A

CONSULT

1444 PROCEDURE

PATIENT TOILET

1452A

CORRIDOR

C1C03 CORRIDOR

C1B06

CORRIDOR

C1C01

INTAKE

INTAKE

CHECK-IN

LINEN CLOSET

EXAM

EXAM

FAMILY WAITING

1400C

EXAM

EXAM

FAMILY TOILET

1400A

EXAM

LACTATION

RECEPTION /

WAITING

ELECTRICAL

1403EC

STAFF TOILET

LOCKER ROOM

SWING SPACE

RESIDENT

WORKROOM

MEDS

PROCEDURE

SOILED HOLDING

AB4AAB4A

EM

AB4A

EM

AB4A

EM15

AB4A

15 EM

AB2AAB2A

AB4A

AB4A

AB4A

AB4A

EM

CORRIDOR

C1B06

AB4A

AB4A

AB4A

V

LV

V

AB2A AB2A

AB2A

EM15

UC2

X1

X1

7 AB2A

AB2A

EM

AB2A

AB2A

AB2A

AB2A13

V

X1

X1

AB2A

EM

a b ba a b4

1a b

AA4B AA4B

1ab

AB4A AB4A

AB4A

AA4B

AA4B

CR:6

a a a a b

AA4B AA4B

b a

AB2A AB2A

EM

X1

LV

16DB1 DB1

DB2 DB2

DA2

DA2

b b b

DB2

DB2DB2

1a 1a a a V

DB2

a aa a

EM

DB2

DB2

DB2

DB2DB2DB2

EM

a

X1

DB1

DB1 DB1

DB1DB1

X1

4 17

AA4A

AA4A

ba ab b

1a 4

AA4B

AA4B

BB1B

AB2A AB2A

AA4BAA4B

DA2 DA2

DA2DA2

DA2

DA2

DB2

DB2

V

DC3 DC3

DC3

DC3

DC3 DC3

3a 3a

3a bb

3a 4 ab

DB2 DB2

DC3

DC3

DC3

DC3

DC3

3a 3a

3a bb

3a ab

UC2

AB2A AB2A AB2A

V

V

AB2A

AB2A

X1

LV 16

a b b

1a

AA4B

AA4B

ab

AA4B

b

1a

AA4B b

1a

AA4B

AA4B

ab

AB4A AB4A

EM15

X1

LV

X1

LV

AB4A

EM

AB4A

AB2A AB2A

AB2AAB2A

5a

5a

5a b b a

AB2A

EM15

AB2A

V

V

AB2A

AB4A

F4

F4

AB4A

EM

DB1DB1

DB1DB1

DB1DB1

DB1DB1

DB1

EM EM

EM

5a 5a 5a

5a5a

5a a

DB1 DB1 DB1 DB1 DB1

DB1DB1DB1DB1DB1

5a 5a 5a 5a 5a

5a 5a EMEMEM

15 14

AB2A

AB2A

AB2AAB2A

AB2A

AB2A

5a

5a b b

5a

5a

EM

EM

a b

AB2A AB2A AB2A AB2A

AB2A

AB2A AB2A AB2A AB2A

b b

5a 5a 5a

5a 5a 5a

5a 5a 5a 5a a b

AB2A AB2A

AB2AAB2A

AB2AAB2A

b

5a

5a b

5a

5a a b

AB4A

AB4A

AB4A

EM

V

LV

AB2AAB2AAB2A

EM

AB4A

AB4A AB4A

EM

LV

X1

V

AB2A

AB2A

AB2AAB2A

AB2A

BB1B

V

AB2A

AB2AAB2A AB2AAB2A

AB2A

AB2A AB2A

b b

5a 5a 5a

5a 5a5a ab

AB2A

AB2AAB2A

AB2A

X U S RZAACCFFGG T

LV

X1

DA2

DA2

AB2A

DB1

DB1

DB1

DB1

DB1

DB1

EM

DB1

DB1

V

UC2

UC2

UC2

V

1a b

UC2

UC2

5a

5a

AB4A

UC2

UC2

DC3

DA1

DA1

1a

1a

DA1

DA1

1a

1a

1a

1a

DA1

DA1

1a

1a

DA1

DA1

1a

1a

DA1

DA1

UC2

1 LS:18

LS:18

1 LS:18

LS:15

CR:6CR:6

CR:6 CR:6

CR:6

CR:6

CR:6

CR:6

CR:6

CR:6

CR:6CR:6

CR:6

LS:18

CR:6

CR:6

CR:6

CR:6

CR:6 CR:6

CR:6

LS:18

LS:15

LS:15

LS:15

3 3 1 1

LS:18

LS:15

CR:6

LS:15

CR:6

CR:6CR:6

CR:6

LS:18

LS:18

LS:18

LS:15

LS:18

LS:13LS:13

LS:13

LS:13

LS:13

LS:13

LS:13

LS:15

CR:6

CR:6

CR:6CR:6

CR:6

CR:6

3 3

LS:15

LS:18

3 3

LS:15

LS:13

CR:4

LS:13

LS:15

LS:13

LS:13197

LS:15

CR:4

LS:13

CR:4

CR:4 CR:4

CR:4

LS:13

LS:13

LS:13

LS:15

LS:15

5CR:4

CR:4

LS:13

BB1B

BB1B

BB1B

DB2DB2

5 5

X1

LS:15

LS:13

LS:13

UC2

UC2

BB1B

WHEELCHAIR WASH

BB1B

BB1B

1. ALL LIGHT FIXTURES SHOWN WITH "CR:X" CIRCUIT NUMBER ADJACENT TO

THE SYMBOL ARE TO BE CONNECTED TO THE CIRCUIT SHOWN IN EXISTING

PANEL ELH-CR-16-2.

2. ALL LIGHT FIXTURES SHOWN WITH "LS:X" CIRCUIT NUMBER ADJACENT TO

THE SYMBOL ARE TO BE CONNECTED TO THE CIRCUIT SHOWN IN EXISTING

PANEL ELH-LS-16-1.

3. LIGHT FIXTURES SHOWN WITH A CIRCUIT NUMBER ADJACENT TO THE

SYMBOL ARE TO BE CONNECTED TO THE CIRCUIT SHOWN IN EXISTING

PANEL LH-14-1 EXCEPT WHERE SHOWN WITH EITHER "CR:X" OR "LS:X" AS

NOTED ABOVE.

LIGHTING CIRCUIT NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.1

M E

P v c h a w k D

D

W

.r v t

/7

/2

:1

:2

P M

EL101

FIRST FLOOR LIGHTING PLAN

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

09/07/2022 KGG AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

N

SCALE: 1/8" = 1'-0"EL101

1 FIRST FLOOR LIGHTING PLAN

GENERAL NOTE:

ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING

MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE

TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS

ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND

MEP DRAWINGS FOR PHASING PLAN.

Revisions: Date:

EP300

EP300

T

T

T

T

CONSULT

PATIENT TOILET

1448A

MEDS

PROCEDURE

PATIENT TOILET

1452A

SOILED HOLDING

PROCEDURE

EXAM

EXAM

EXAM

EXAM

EXAM

CONSULT

LAB

CORRIDOR

C1C01

LINEN CLOSET

PATIENT TOILET

INTAKE

INTAKE

RECEPTION /

WAITING

LACTATION

FAMILY TOILET

1400A

FAMILY WAITING

1400C

INTAKE

CHECK-IN

CORRIDOR

C1C02

CORRIDOR

C1C03

EQUIPMENT

CORRIDOR

C1B06

INTAKE - ALCOVE

SWING SPACE

MENS TOILET

WOMENS TOILET

OPEN

WORKSTATIONS

CONFERENCE /

BREAK

CORRIDOR

C1C10

RESIDENT

WORKROOM

STAFF TOILET

LOCKER ROOM

CORRIDOR

C1C09

VCS OFFICE

VCS CHIEF…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .