ATTACH 16 Arch Drawings.pdf

PDF 7 MB Posted

Attached to
Y1AZ--Construction Women's Clinic, Project #695-19-132
Solicitation number
36C25223B0004
Issued by

About this file

This federal contract opportunity is a solicitation for the construction of a Women's Clinic at the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 facility. Key details include that the solicitation number is 36C25223B0004 and the project number is 695-19-132. The required scope of work includes demolition, hazardous material removal, and new construction work to be completed in three phases to minimize disruption. The estimated award date is not provided. Responses are due by the date specified in the solicitation. The agency involved is the Department of Veterans Affairs.

View the file

Other files

File Type Posted
36C25223B0004 0007.docx DOCX document
ATTACH 19 Amendment 0007 rev.pdf PDF
ATTACH 17 MEP Drawings.pdf PDF
ATTACH 15 Combined Spec Sections.pdf PDF
ATTACH 18 Furniture Dwg Shaft Photos Doc A.pdf PDF
36C25223B0004 0006.docx DOCX document
36C25223B0004 0005.docx DOCX document
S04 - Sign In Sheet.FE.pdf PDF
36C25223B0004 0004.docx DOCX document
S02 - ATTACH 1 - Construct Womens Clinic Project 695-19-132 Manual V1 rev Oct 28.pdf PDF
36C25223B0004 0003.docx DOCX document
S02 - ATTACH 2 - Construct Womens Clinic Project 695-19-132 Manual V2 rev.pdf PDF
36C25223B0004 0002.docx DOCX document
S02 - ATTACH 7 - 695-19-132 Drawing Set_BidPart-5.pdf PDF
S02 - ATTACH 5 - 695-19-132 Drawing Set_BidPart-3.pdf PDF
S02 - ATTACH 6 - 695-19-132 Drawing Set_BidPart-4.pdf PDF
S02 - ATTACH 4 - 695-19-132 Drawing Set_BidPart-2.pdf PDF
S02 - ATTACH 3 - 695-19-132 Drawing Set_BidPart-1.pdf PDF
36C25223B0004 0001.docx DOCX document
S02 - ATTACH 9 - SSJ Bldg Automation HVAC Cntrl System rev_Executed.pdf PDF
S02 - ATTACH 13 - SSJ Interior Signage rev_Executed.pdf PDF
S02 - ATTACH 14 - Wage Determination WI202100001.pdf PDF
S02 - ATTACH 10 - SSJ Door Hardware rev_Executed.pdf PDF
S02 - ATTACH 11 - SSJ Fire Alarm System rev_Executed.pdf PDF
S02 - ATTACH 8 - 695-19-132 Drawing Set_BidPart-6.pdf PDF
S02 - ATTACH 12 - SSJ HID MultiClass Readers rev_Executed.pdf PDF
36C25223B0004_1.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

B

FI

B

ER

C

LO

SE

T

VE

R T

P

EN

1-

FA

FI

RE

AP

PA

RA

TU

S

H

AC

C 1C

D

H

AL

LW

AY

0.

EX

AM

R O O M

TO

IL

ET

ST

AF

F

EX

AM

R O O M

B R

EA

K R O O M

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

EX

AM

O

FF

IC

E

EX

AM

O

FF

IC

E

D

IE

TI

C

IA

N

EX

AM

R O O M

EX

AM

R O O M

EX

AM

O

FF

IC

E

EX

AM

O

FF

IC

E

B

LO

O D

D R

AW

IN

G

IN

TA

K E

C 1C

C

H

AL

LW

AY

C 1C

A

C O

RR

ID

O R

C 1C

B

H

AL

LW

AY

EX

AM

O

FF

IC

E

SO

IL

ED

U

TI

LI

TY

SO

C

IA

L

W O R K

ER

IN

TA

K E

C

LI

N

IC

AL

P H

AR

M

AC

IS

T

6.

C

LI

N

IC

AL

P H

AR

M

AC

IS

T

TO

IL

ET

FE

M

AL

E

YE

LL

O W

C

LI

N

IC

R

EC

EP

TI

O N

TO

IL

ET

M

AL

E

B

TO

IL

ET

FE

M

AL

E

A

TO

IL

ET

M

AL

E

C H

AP

EL

AU

DI

TO

R

IU

M

02 AV

EQ

U

IP

EQ

U

IP

M

EN

T

ST

O R

AG

E

ST

O R

AG

E

C 1C

A

C O

RR

ID

O R

VE

R T

P

EN

1-

VE

R T

P

EN

1-

EX

AM

O

FF

IC

E

EX

AM

O

FF

IC

E

A

EU

C H

AR

IS

T

C H

AP

EL

M

ED

IT

AT

IO

N

B

O

RT

H

JE

W

IS

H

P

RO

T.

C H

AP

C

P R O

TE

ST

AN

T

C H

AP

LA

IN

D

P R O

TE

ST

AN

T

C H

AP

LA

IN

E

C

AT

H O

LI

C

C H

AP

LA

IN

ET

FE

M

AL

E

TO

IL

ET

M

AL

E

D

ST

O R

AG

E

F

P R O G

M

AN

AG

ER

P

AS

TO

R

AL

C

AR

E

C

P R O G

AS

SI

ST

AN

T

P

AS

TO

R

AL

C

AR

E

H

AL

LW

AY

B

TO

IL

ET

M

AL

E

A

TO

IL

ET

FE

M

AL

E

H

AC

C 1C

H

AL

LW

AY

C 1B

EL

EV

AT

O R

LO

B B Y

FA

FI

RE

A P

EC

EL

EC

TR

IC

AL

C

LO

SE

T

VE

R T

P

EN

1-

A

FI

B

ER

C 1C

C O

RR

ID

O R

FA

FI

RE

AP

PA

RA

TU

S

C 1C

A

H

AL

LW

AY

EL

EV

AT

O R 1-

[W H

SE

ST

R

1-

ST

AI

R W

EL

L

H

VA

C

TO

IL

ET

M

AL

E

TO

IL

ET

FE

M

AL

E

C

H

AL

LW

AY

O

FF

IC

E

O

FF

IC

E

P

AT

IE

N T

B

IL

LI

N G

B

EN

EF

IT

S

P

RO

GR

AM

M

AN

AG

ER

FA

FI

RE

AP

PA

RA

TU

S

C 1B

S0

C O

RR

ID

O R

C 1B

EL

EV

AT

O R

LO

B B Y

EC

EL

EC

TR

IC

AL

C

LO

SE

T

EC

EL

EC

TR

IC

AL

C

LO

SE

T

FA

FI

RE

AP

PA

RA

TU

S

4.

C 1A

C O

RR

ID

O R

D

IN

IN

G

R O O M

C 1B

A

C O

RR

ID

O R

VE

R T

P

EN

1-

ST

R

1-

ST

AI

R W

EL

L

FI

B

ER

C

LO

SE

T

VE

R T

P

EN

1-

C 1B

EL

EV

AT

O R

LO

B B Y

C

C

LI

N

IC

AL

SU

PP

O

RT

D

IV

M G R.

P H

AR

M

AC

Y O

FF

IC

E

A

P H

AR

M

AC

Y

SU

P

ER

VI

SO

R' S

D

C O N

TR

O

LE

D

SU

B

ST

AN

C

ES

VA

U

LT

F

P H

AR

M

AC

Y

AD

M

IN

S U P P O R T

A

P

AT

IE

N T

C O N

SU

LT

AT

IO

N

H

AC

FA

FI

RE

AP

PA

RT

AU

S

FI

B

ER

EC

EL

EC

TR

IC

AL

C

LO

SE

T

C

ST

O R

AG

E12

EC

EL

EC

TR

IC

AL

C

LO

SE

T

W

AI

TI

N G

AR

EA

C 1A

H

AL

LW

AY

C 1A B

H

AL

LW

AY

EX

AM

O

FF

IC

E

EX

AM

O

FF

IC

E

O

FF

IC

E

O

FF

IC

E

O

FF

IC

E

SC

R

EE

N

IN

G

C

LI

N

IC

AL

SU

PP

LI

ES

EX

AM

EX

AM

EX

AM

O

FF

IC

E

ST

R

1-

ST

AI

R W

EL

L

EX

AM

EX

AM

EX

AM

O

FF

IC

E

LA

B

D R

AW

IN

TA

K E

LA

B

D R

AW

O

FF

IC

E

FA

FI

RE

AP

PA

R

TU

S

C 1A A

H

AL

LW

AY

C 1B

C O

RR

ID

O R

ST

R

EX

1-

ST

AI

R W

EL

L

ST

R

1-

ST

AI

R W

EL

L

VE

R T

P

EN

1-

ST

R

1-

ST

AI

R W

EL

L

VE

R T

P

EN

1-

ST

R

1-

ST

AI

R W

EL

L

VE

R T

P

EN

1-

W

AI

TI

N G

EX

AM

R O O M

EX

AM

R O O M

SO

C

IA

L

W O R K

ER

SO

C

IA

L

W O R K

ER

SO

C

IA

L

W O R K

ER

C O N

SU

LT

AT

IO

N

EX

AM

R O O M

10 16

EX

AM

R O O M

EX

AM

R O O M

C 1C

N

H

AL

LW

AY

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

TO

IL

ET

P

AT

IE

N T

RN

O

FF

IC

E

SO

IL

ED

U

TI

LT

IY

EX

AM

R O O M

P H

AR

M

AC

IS

T

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

TO

IL

ET

P

AT

IE

N T

C 1C

N

H

AL

LW

AY

AE

C

EL

EC

TR

IC

AL

C

LO

SE

T

EX

AM

R O O M

R

EC

EP

TI

O N

R

ED

C

LI

N

IC

W

AI

TI

N G

AR

EA

RN

IN

TE

R

VI

EW

R O O M

RN

IN

TE

R

VI

EW

R O O M

EX

AM

R O O M

TO

IL

ET

ST

AF

F

H

AC

D

IE

TI

C

IA

N

IN

TA

K E/

EX

IT

IN

TA

K E/

EX

IT

P H

YS

IC

IA

N

W O

RK

R O O M

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

N U R

SE

S

ST

AT

IO

N

EC

EL

EC

TR

IC

AL

C

LO

SE

T

AE

C

EL

EC

TR

IC

AL

C

LO

SE

T

B

FI

B

ER

SO

IL

ED

U

TI

LI

TY 11

C

LE

AN

U

TI

LI

TY

C 1A S1

H

AL

LW

AY

50 ED

AD

M

IN

O

FF

IC

E 11

TO

IL

ET

ST

AF

F

C O N

FE

R

EN

C E

R O O M 11

D

EC

O N

TA

M

IN

AT

IO

N

C O

RR

ID

O R

C 1A S1

C O

RR

ID

O R

TO

IL

ET

P

AT

IE

N T

TR

IA

GE

TR

IA

GE

O

VE

RF

LO

W M .H

AS

SE

SS

M

EN

T

C 1A S0

H

AL

LW

AY

H

AC

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

LO

C K

ER

R O O M

O

FF

IC

E

W

AI

TI

N G

AR

EA

C 1A S0 3A

C O

RR

ID

O R

TO

IL

ET

FE

M

AL

E

TO

IL

ET

M

AL

E

C 1A S0

C O

RR

ID

O R

A

R

EC

EP

TI

O N

W

AI

TI

N G

AR

EA

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

O

FF

IC

E

C 1A

C O

RR

ID

O R

EX

AM

R O O M

C

LE

AN

U

TI

LI

TY

EX

AM

R O O M

C 1A S0 5B

C O

RR

ID

O R

P

AT

IE

N T

AD

VO

C

AT

E

M .I.

S.

M .I.

S.

M .I.

S.

C 1A S0

C O

RR

ID

O R

R

EC

EP

TI

O N

AR

EA

ED

U C

AT

IO

N C H

EC

K

IN

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

C O N

FE

R

EN

C E

R O O M

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

W

AI

TI

N G

AR

EA

C H

EC

K

IN

AR

EA

W O

RK

R O O M

SO

IL

ED

H O

LD

IN

G

TO

IL

ET

P

AT

IE

N T

D

IE

TI

C

IA

N

P H O

TO

TH

ER

AP

Y

C

LI

N

IC

AL

LA

B

ST

O R

AG

E

M

ED

IC

AT

IO

N

R O O M

TO

IL

ET

ST

AF

F

EX

AM

R O O M

C 1A C

H

AL

LW

AY

C 1A B

H

AL

LW

AY

C 1A A

H

AL

LW

AY

C 1A

C O

RR

ID

O R

C 1A A

C O

RR

ID

O R

C H

EC

K

IN

C H

EC

K O U T

AR

EA

C 1C

H

AL

LW

AY

W

AI

TI

N G

AR

EA

EX

AM

O

FF

IC

E

C 1B

S0

C O

RR

ID

O R

C 1B

SO

7A

LO

B B Y

C

AN

TE

EN

R

ET

AI

L

ST

O R E

ST

AR

B U C K S

LO

B B Y

O

FF

IC

E

LI

GH

T R O O M

TE

LE

P H

AR

M

P H

AR

M

O

FF

IC

E

LA

C

TA

TI

O N

O

FF

IC

E

C H

EC

K

IN

AR

EA

W H

EE

LC

H

AI

R

ST

O R

AG

E

VE

R T

P

EN

1-

EX

AM

R O O M

AM

B U

LA

N C E

B

AY

D

EC

O N

TA

M

IN

AT

IO

N

C 1A S0

C O

RR

ID

O R

ST

R

1-

ST

AI

R W

EL

L

VE

R T

P

EN

1-

ST

R

EX

1-

ST

AI

W

EL

L

8.

ST

R

1-

ST

AI

R W

EL

L

ST

R

EX

1-

ST

AI

R W

EL

L

4.

FA

FI

RE

AP

PA

RA

TU

S

A

VE

ST

IB

U

LE

EL

EV

B

AN

K

1- C

EL

EV

AT

O R

EL

EV

B

AN

K

1- C

EL

EV

AT

O R

EL

EV

B

AN

K

1- C

EL

EV

AT

O R

EL

EV

B

AN

K

1- C

EL

EV

AT

O R

EL

EV

B

AN

K

1- A-

EL

EV

AT

O R

EL

EV

B

AN

K

1- A-

EL

EV

AT

O R

EL

EV

B

AN

K

1- A-

EL

EV

AT

O R

EL

EV

B

AN

K

1- A-

EL

EV

AT

O R

EL

EV

B

AN

K

1- B

EL

EV

AT

O R

EL

EV

B

AN

K

1- B

EL

EV

AT

O R

EL

EV

B

AN

K

1- B

EL

EV

AT

O R

EL

EV

B

AN

K

1- B

EL

EV

AT

O R

VE

R T

P

EN

1-

B

P H

AR

M

AC

Y P

RO

G

RA

M

M

GR

C 1A S1

H

AL

LW

AY

P H

AR

M

AC

Y

O

FF

IC

E

A

P

AT

IE

N T

TO

IL

ET

ST

O R

AG

E

EC

EL

EC

TR

IC

AL

C

LO

SE

T

AE

C

EL

EC

TR

IC

AL

C

LO

SE

T

AE

C

EL

EC

TR

IC

AL

C

LO

SE

T

H

P H

AR

M

AC

Y

SU

PR

A

EX

AM

O

FF

IC

E

M H U C C

EX

AM

O

FF

IC

E

EX

AM

O

FF

IC

E

C 1C

AA

FI

B

ER

C

LO

SE

T

EX

AM

EX

AM

EX

AM

EX

AM

EX

AM

R M

EX

AM

R M

EX

AM

R M

EX

AM

R M

EX

AM

R M

EX

AM

R M

EX

AM

R M

EX

AM

R M

O

FF

IC

E

EX

AM

R M

EX

AM

R M

EX

AM

R M

EX

AM

R M

EX

AM

R M

EX

AM

R M

EX

AM

R M

EX

AM

R M

EX

AM

R M

A

AL

C O

VE

A

AL

C O

VE

B

AL

C O

VE

S

TO

R

AG

E

A

AL

C O

VE

K

IT

C H

EN

ET

TE

O

FF

IC

E

S

TO

R

AG

E

C C

C O R R

ID

O R

C C

C O R R

ID

O R

C C

C O R R

ID

O R

C C C

C O R R

ID

O R

C C

C O R R

ID

O R

C C B

H

AC

EC

EX

AM

R O O M

C O N

TR

O L

B

O

FF

IC

E

R

EC

EP

TI

O N

O

FF

IC

E

EX

AM

EX

AM

TO

IL

ET

C T

X- R

AY

O

FF

IC

E

M .I.

S.

O

FF

IC

E

O

FF

IC

E

M

ED

R O O M

C 1A S1

H

AL

LW

AY

C 1A S1

H

AL

LW

AY

C 1A S1

H

AL

LW

AY

A

AL

C O

VE

LO

B B Y

B

AT

M

O

FF

IC

E

O

FF

IC

E

A

B

AR

B

ER

EX

AM

O

FF

IC

E

EX

AM

O

FF

IC

E

EX

AM

O

FF

IC

E

ET

FE

M

AL

E

M

ER

C 1C

H

AL

LW

AY

FR

EE

ZE

R

R

EF

R

IG

ER

AT

O R

EC

EL

EC

C

LO

SE

T

C

M O R

GU

E

EL

EV

AT

O R

LO

B B Y

P

AT

IE

N T

AD

VO

C

AT

E

H

AC

C

LE

AN

U

TL

IT

IY

C 1B

C O

RR

ID

O R

O

VE

N S

C 1C

H

AL

LW

AY

B

C

LO

SE

T

FA

FI

RE

AP

PA

RA

TU

S

FR

O

ZE

N

FO

O D

IC

R

D

EX

IT

P

AS

SA

G

EW

AY D

C

LE

AN

D O C K

EL

EV

AT

O R

A

P H

AR

M

O

FF

IC

E

B

P H

AR

M

O

FF

IC

E

A

P H

AR

M

O

FF

IC

E12 D

P H

AR

M

O

FF

IC

E

P H

AR

M

AD

M

IN

O

FF

IC

E

P H

AR

M

W

AI

TI

N G

R

EG

IS

TR

AT

IO

N

C

P H

AR

M

O

FF

IC

E 12 B

P H

AR

M

O

FF

IC

E

EL

EV

AT

O R

1-

[M O R

GU

E]

H

AC

01 AV

EQ

U

IP

AG

EN

T

C

AS

H

IE

R

A

ST

O R

AG

E

LP

N

O

FF

IC

E

D

P H

AR

M

C

AR

T

ST

O R

AG

E

M Y

H

EA

LT

H E

VE

T

M Y

H

EA

LT

H E

VE

T

M

EN

S

B

AT

H

RO

O M

W O M

EN

S

B

AT

H

RO

O M

W

EL

C O M E

AO

D

E

TR

AV

EL

AL

C O

VE

EL

EC

TR

IC

AL

C

LO

SE

T

SA

RG

EN

T

LO

C K

ER

R O O M

FE

M

AL

E

D

EP

U

TY

C H

IE

F

O F

P O

LI

C E

Se cr et ar y

Lo ck er

R oo m

M al e

EV

ID

EN

C E

C 1A S0

H al lw ay

A

C H

IE

F

O F

P O

LI

C E

C O N

FE

R

EN

C E

R O O M

D et en tio n

C om m un ic at io n

O

FF

IC

E

O

FF

IC

E

B

SC

R

EE

N

IN

G

FR

EE

ZE

R

ST

AG

IN

G

C O O

LE

R

B

EV

ER

AG

E

C O O

LE

R

C H

EM

IC

AL

ST

O R

AG

E

EC

E

LE

C

TR

IC

AL

C

LO

SE

T

C 1D

P

AS

SA

G E

C

AR

TW

AS

H

N O U R

IS

H M

EN

T

C O

LD

FO

O D

P R O

DU

C

TI

O N

VE

G

ET

AB

LE

C O O

LE

R

1.

M

EA

T

TH

AW

C O O

LE

R

FO

O D

B

AN

K

IN

P R O C

ES

S

C O O

LE

R

R

EF

RI

G

P R

EP

C O O

LE

R

R

EF

IG

M

EA

T

P R

EP

C O O

LE

R

B U

LK

H O T

FO

O D

C

AR

T

R

IN

SE

P

AS

SA

G E

P

AP

ER

SU

PP

LI

ES

TR

AS

H

R

EC

YC

LI

N G

FS

S

O

FF

IC

E

A

M

AN

AG

ER

B

AS

SI

ST

AN

T

A

FP

W

AL

K

IN

C O O

LE

R

O

FF

IC

E

C

AL

L

C

EN

TE

R

O

FF

IC

E

C

LI

N

IC

AS

SI

ST

P

AL

LE

T

ST

AG

IN

G

TR

AS

H

C O M

PA

C

TO

R

TR

AI

N

IN

G

W

AR

EW

AS

H

C

LE

AN

D

IS

H

R O O M

C

LE

RK

O

FF

IC

E

R

EC

EI

VI

N G

SH

IP

P

IN

G

D O C K

A

IN

GR

ED

IE

N T

C O N

TR

O L

D

AY

D

RY

ST

O R

AG

E

AI

RL

O C K

AI

RL

O C K

TO

IL

ET

M

AL

E

M

EE

TI

N G

R O O M

D N

U P

R

D

ET

EC

TI

VE

B

St or ag e

A

AR

M O

RY

FE

C

F.

E.

F.

E.

EM

P

LO

YE

E

SM

O K

IN

G

SH

EL

TE

R

CHARTING

DN (7) R.

P

AT

IE

N T

SM

O K

IN

G

SH

EL

TE

R

GREASE

DN

DN

DNDNDN

T E A M

S T A

TI

O N

CORRIDOR

C1AS19

C O R R

ID

O R

C A S

C L E A N

S U P P L Y

T E A M

S T A

TI

O N

U C

E X A M

R O O M

U C

E X A M

R O O M

M H

E X A M

R O O M

M H

E X A M

R O O M

M .H

T O

IL

E T

U C

E X A M

R O O M

N O U R

IS

H

R O O M

T E A M

S T A

TI

O N

U C

E X A M

R O O M

U C

E X A M

R O O M

U C

E X A M

R O O M

S O

IL

E D

U T

IL

IT

Y

S T A F F

W O R K R O O M

C .T

R E C E P T

IO

N

W A

IT

IN

G

R O O M

E L E C

C L O S E T

E C

O F F

IC

E

B

O F F

IC

E

S T A F F

T O

IL

E T

U C

E X A M

R O O M

O P E N

O F F

IC

E

A

C O R R

ID

O R

C A S

C O R R

ID

O R

C A S

A N T E

R O O M

IS

O

E X A M

R O O M

IS

O

E X A M

R O O M

T O

IL

E T

A

T O

IL

E T

A

T O

IL

E T

C O N S U L T

D

IS

C H A R G E

C O R R

ID

O R

C A S

C O R R

ID

O R

C A S

A R E A

W E L L

B E

S T A

IR

ST

R-

EX

B

-1

H A C

H C

C .O .W

PA

RK

M E D S

DN

TOTAL OCCUPANCY

FEC

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

EXISTING 2 HR - FIRE SEPARATION

EXISTING 1 HR - FIRE SEPARATION

EXISTING SMOKE RESISTIVE HAZARDOUS

AREA

B

1500 SF

CODE ANALYSIS LEGEND

VCS CHIEF

OFFICE

1465A

VCS OFFICE

CASH OUT

1465B

EXIT

EXITNEW 90 MIN

DOOR IN EXISTING

2-HOUR WALL

ASSEMBLY

RECEPTION /

WAITING

CHECK-IN

INTAKE

INTAKE

PATIENT TOILET

LAB

CONSULT

EQUIPMENT

CLEAN STORAGE

1442 CONSULT

PATIENT TOILET

1448A

PROCEDURE

PATIENT TOILET

1452A

SOILED HOLDING

PROCEDURE

EXAM

EXAM

EXAM

EXAM

EXAM

LINEN CLOSET

FAMILY WAITING

1400C FAMILY TOILET

1400A

LACTATION

SWING SPACE

MENS TOILET

WOMENS TOILET

HAC

ELECTRICAL

LOCKER ROOM

STAFF TOILET

RESIDENT

WORKROOM

CONFERENCE /

BREAK

OPEN

WORKSTATIONS

TRAVEL DISTANCE= 155'-0"

4111 SF

15028

B

575 SF

B

783 SF

B

187 SF

B

675 SF

B

INTAKE

MEDS

DIAG

ONAL DISTANCE= 90'-0"

FEC

F E

C F

E C

FEC

EXIT

E X

IT

E

X

IT

WHEELCHAIR

WASH

DRY STORAGE

CANISTER

STORAGE

GI102

201 SF

B

271 SF

B

287 SF

B

90 SF

B

PROJECT LOCATION:

FIRST FLOOR

BUILDING 111 KEY PLAN

N

SHADE INDICATES

AREA NOT IN SCOPE,

TYP.

ARCHITECTURAL SYMBOLS LEGEND

NO NEW ARCHITECTURAL WORK TO TAKE PLACE IN

THIS AREA. REFER TO MEP DRAWINGS FOR

EXTENT OF WORK.

EXIT

FEC

EXISTING WALL UPGRADED TO 1 HOUR

FIRE RATED CONSTRUCTION

EXISTING WALL UPGRADED TO 1 HOUR

FIRE RATED CONSTRUCTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C

U s e rs \d c h ri s te n s e n \D o c u m e n ts \1

.1

.1

A v d c h ri s te n s e n M

N F

X

.r v t

/7

/2

:2

:1

P M

GI101

LIFE SAFETY PLAN

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

02/06/2022 JF DMC

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1" = 20'-0"GI101

2 FIRST FLOOR LIFE SAFETY PLAN

LIFE SAFETY OCCUPANCY COUNT

AREA SF OCC OCC FACTOR # OF OCC

CONFERENCE / BREAK 287 SF B 15 12

CORRIDOR, LOCKER ROOM 271 SF B 150 2

OFFICE SUITE 675 SF B 150 5

OPEN WORKSTATIONS 575 SF B 30 16

PUBLIC TOILETS 783 SF B 150 6

RESIDENT BREAKROOM 201 SF B 30 5

STAFF TOILET 90 SF B 150 1

SWING SPACE 187 SF B 150 2

WOMEN'S CLINIC SUITE 4111 SF B 150 28

7181 SF 77

N

NOTE:

REFER TO SHEET GI102 FOR WALL RATINGS.

Revisions: Date:

ADDENDUM #6 02/06/2023

C 1C

C O R R

ID

O R

ST

R

1-

ST

AI

R W

EL

L

FA

FI

R E

AP

P

AR

AT

U S

C O R R

ID

O R

VE

R T

P

EN

1-

ST

R

1-

ST

AI

R W

EL

L

FI

B

ER

C

LO

SE

T

VE

R T

P

EN

1-

C 1B

EL

EV

AT

O R

LO

B B Y

C

C

LI

N

IC

AL

SU

P P O R T, D

IV

M G R

D

R N

O

FF

IC

E

SO

IL

ED

U

TI

LT

IY

EX

AM

R O O M

P H

AR

M

AC

IS

T

EX

AM

R O O M

EX

AM

R O O M

EX

AM

R O O M

P

AT

IE

N T

C 1C

N

H

AL

LW

AY

AE

C

EL

EC

TR

IC

AL

C

LO

SE

T

EX

AM

R O O M

R

EC

EP

TI

O N

R

ED

C

LI

N

IC

W

AI

TI

N G

AR

EA

R N

IN

TE

R

VI

EW

R O O M

R N

IN

TE

R

VI

EW

R O O M

EX

AM

R O O M

TO

IL

ET

ST

AF

F

H

AC

D

IE

TI

C

IA

N

IN

TA

K E/

EX

IT

IN

TA

K E/

EX

IT

C

AN

TE

EN

R

ET

AI

L

ST

AR

B U C K S

ST

R

1-

ST

AI

R W

EL

L

EL

EV

B

AN

K

1- B

EL

EV

AT

O R

EL

EV

B

AN

K

1- B

EL

EV

AT

O R

EL

EV

B

AN

K

1- B

EL

EV

AT

O R

EL

EV

B

AN

K

1- B

EL

EV

AT

O R

B

P H

AR

M

AC

Y P R O G R

AM

M G R

M

ER

FR

EE

ZE

R

R

EF

R

IG

ER

AT

O R

C 1B

C O R R

ID

O R

O

VE

N S16

FR

O

ZE

N

FO

O D

IC

R

LP

N

FE

C

FE

C

PROJECT LOCATION:

FIRST FLOOR

BUILDING 111 KEY PLAN

N

SHADE INDICATES

AREA NOT IN SCOPE,

TYP.

TOTAL OCCUPANCY

FEC

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

EXISTING 2 HR - FIRE SEPARATION

EXISTING 1 HR - FIRE SEPARATION

EXISTING SMOKE RESISTIVE HAZARDOUS

AREA

B

1500 SF

CODE ANALYSIS LEGEND

1 HR FIRE RATED

SMOKE PARTITION

WALL RATING LEGEND

EXISTING WALL UPGRADED TO 1

HOUR FIRE RATED

EXISTING 2 HOUR FIRE RATED

ARCHITECTURAL SYMBOLS LEGEND

NO NEW ARCHITECTURAL WORK TO TAKE PLACE IN

THIS AREA. REFER TO MEP DRAWINGS FOR

EXTENT OF WORK.

VCS CHIEF

OFFICE

1465A

VCS OFFICE

CASH OUT

1465B

EXIT

EXIT

NEW 90 MIN

DOOR IN EXISTING

2-HOUR WALL

ASSEMBLY

RECEPTION /

WAITING

CHECK-IN

INTAKE

INTAKE

PATIENT TOILET

LAB

CONSULT

EQUIPMENT

CLEAN STORAGE

CONSULT

PATIENT TOILET

1448A

PROCEDURE

PATIENT TOILET

1452A

SOILED HOLDING

PROCEDURE

EXAM

EXAM

EXAM

1447EXAM

EXAM

LINEN CLOSET

FAMILY WAITING

1400C

FAMILY TOILET

1400A

LACTATION

SWING SPACE

MENS TOILET

WOMENS TOILET

HAC

ELECTRICAL

LOCKER ROOM

STAFF TOILET

RESIDENT

WORKROOM

CONFERENCE /

BREAK

OPEN

WORKSTATIONS

TRAVEL DISTANCE= 155'-0"

4111 SF

15028

B

575 SF

B 783 SF

B

187 SF

B

675 SF

B

INTAKE

MEDS

1446DIAG

ONAL DISTANCE= 90'-0"

FEC

F E

C F

E C

EXIT

E X

IT

E

X

IT

WHEELCHAIR

WASH

DRY STORAGE

CANISTER

STORAGE

STORAGE

C O

R R

ID

O

R

C C

CORRIDOR

C1C11

201 SF

B

287 SF

B

271 SF

B

TRAVEL DISTANCE= 57'-0"

90 SF

B

INTAKE - ALCOVE

CORRIDOR

C1C01

CORRIDOR

C1C03

C O

R R

ID

O

R

C C

CORRIDOR

C1B06

CORRIDOR

C1C09

CORRIDOR

C1C09

EXIT

FEC

EXISTING WALL UPGRADED TO 1 HOUR

FIRE RATED CONSTRUCTION

EXISTING WALL UPGRADED TO 1 HOUR

FIRE RATED CONSTRUCTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C

U s e rs \d c h ri s te n s e n \D o c u m e n ts \1

.1

.1

A v d c h ri s te n s e n M

N F

X

.r v t

/7

/2

:2

:2

P M

GI102

ENLARGED LIFE SAFETY PLAN

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

02/06/2022 JF DMC

100% BID DOCUMENTS

FULLY SPRINKLERED

NOTE:

REFER TO SHEET GI101 FOR CODE ANALYSIS.

N

SCALE: 1/8" = 1'-0"GI102

1 FIRST FLOOR LIFE SAFETY PLAN - ENLARGED

Revisions: Date:

PROJECT LOCATION:

FIRST FLOOR

BUILDING 111 KEY PLAN

N

SHADE INDICATES

AREA NOT IN SCOPE,

TYP.

1. PROVIDE 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION PER

NFPA 241. REFER TO DETAIL 5/GC101.

2. PROVIDE TEMPORARY CONSTRUCTION ACCESS DOOR WITH CARD READER.

REFER TO DETAIL 6/GC101.

3. PROVIDE PERMANENT PARTITION AND DOOR TO ACT AS INFECTION

CONTROL BARRIER DURING CONSTRUCTION. REFER TO AE002 AND AE100

FOR WALL TYPE.

4. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. REFER TO DETAIL 7/GC101 AND SPECIFICATION FOR

ADDITIONAL INFORMATION.

5. CONTRACTOR TO DEMOLISH PORTION OF WALL PRIOR TO BEGINNING WORK

IN PHASE 1.

6. CONTRACTOR TO DEMOLISH WALL AND DOOR PRIOR TO BEGINNING WORK

IN PHASE 1.

INFECTION CONTROL PLAN NOTES

1 HR FIRE RATED

SMOKE PARTITION

WALL RATING LEGEND

EXISTING WALL UPGRADED TO 1

HOUR FIRE RATED

EXISTING 2 HOUR FIRE RATED

VCS OFFICE

CASH OUT

1465B

VCS CHIEF

OFFICE

1465A

CONSULT

PATIENT TOILET

1448A

PROCEDURE

PATIENT TOILET

1452A

SOILED HOLDING

PROCEDURE

EXAM

EXAM

EXAM

EXAM

EXAM

FAMILY TOILET

1400A

LACTATION

CHECK-IN

INTAKE

LINEN CLOSET

INTAKE

PATIENT TOILET

LAB

CONSULT

CLEAN STORAGE

EQUIPMENT

INTAKE - ALCOVE

MENS TOILET

RECEPTION /

WAITING

WOMENS TOILET

ELECTRICAL

HAC

WHEELCHAIR

STORAGE

1400B

OPEN

WORKSTATIONS

CONFERENCE /

BREAK

LOCKER ROOM

STAFF TOILET

RESIDENT

WORKROOM

SWING SPACE

CORRIDOR

C1B06

CORRIDOR

C1C11

CORRIDOR

C1C09

INTAKE

CORRIDOR

C1C01

CORRIDOR

C1C02

FAMILY WAITING

1400C

MEDS

CORRIDOR

C1C03

CANISTER

STORAGE

DRY STORAGE

CORRIDOR

C1C10

WHEELCHAIR

WASH

STORAGE

PHASE 1

TEMPORARY CONSTRUCTION BARRIERS

FOR ACCESS CORRIDOR TO BE

CONSTRUCTED PRIOR TO START OF

PHASE 1 DEMOLITION. TEMPORARY

CORRIDOR TO REMAIN AFTER END OF

PROJECT CONSTRUCTION.

STAFF TO HAVE TRAVEL ACCESS THRU

SPACE THROUGHOUT PHASE 1. DASHED

LINE INDICATES THE STAFF'S PATH OF

TRAVEL.

CLEAR

5' - 0"

NOTE:

VCS OFFICES AND ADJACENT

CORRIDOR MUST BE COMPLETE AND

OCCUPIED PRIOR TO BEGINNING WORK

ON PHASE 2.

PHASE 1 -

AFTER HOURS

EXISTING WALL TO ACT AS

CONSTRUCTION BARRIER DURING

DEMOLITION. NEW WALL TO BE

CONSTRUCTED FIRST TO

COMPLETE CONSTRUCTION

BARRIER AT THIS LOCATION.

PHASE 2

CLEAR

7' - 0"

STAFF TO HAVE TRAVEL

ACCESS THRU CORRIDOR

BUILT IN PHASE 1

THROUGHOUT PHASE 2

STAFF TO HAVE TRAVEL

ACCESS THRU SPACE

THROUGHOUT PHASE 2

NOTE:

STAFF SPACES AND PUBLIC

RESTROOMS MUST BE COMPLETE AND

OCCUPIED PRIOR TO BEGINNING WORK

ON PHASE 3.

VCS CHIEF

OFFICE

1465A

VCS OFFICE

CASH OUT

1465B

CANISTER

STORAGE

DRY STORAGE

VA TO OCCUPY VCS

OFFICES

1 2

VCS OFFICE

CASH OUT

1465B

VCS CHIEF

OFFICE

1465A

MENS TOILET

WOMENS TOILET

ELECTRICAL

HAC

OPEN

WORKSTATIONS

CONFERENCE /

BREAK

LOCKER ROOM

STAFF TOILET

RESIDENT

WORKROOM

SWING SPACE

C O

R R

ID

O

R

C C

VA TO OCCUPY

STAFF AREA

PUBLIC RESTROOMS TO BE

OPEN TO PUBLIC

VA TO OCCUPY VCS

OFFICES

CORRIDOR IS OPEN.

STAFF TO TRAVEL THRU

NEW CORRIDOR

THROUGHOUT PHASE 3

WHEELCHAIR

WASH

STORAGE

CORRIDOR

C1C09

PHASE 3-

AFTER HOURS

PHASE 3

PHASE 3

PHASE 3-

AFTER HOURS

NO MORE THAN 50% WIDTH OF

MAIN CORRIDOR TO BE

CLOSED AT ANY TIME

CONTRACTOR TO COORDINATE

WITH VA FOR KITCHEN STAFF

ACCESS TO NEW CORRIDOR

DURING PHASE 3 - AFTER HOURS

WORK

REFER TO MEP DRAWINGS FOR

EXTENT OF WORK IN THESE AREAS

CONTINUOUS FIRESAFE SEALANT

TOP AND BOTTOM, & BOTH SIDES

3 1/2" SOUND ATTENUATION BATT.

5/8" TYPE X GYPSUM BOARD, BOTH SIDES

3 5/8" METAL STUD @ 16" O.C. WITH

RUNNER CHANNELS ALONG TOP

AND BOTTOM

CONSTRUCTION

SIDE

PUBLIC

SIDE

6 MIL. FIRE RETARDANT VISQUEEN

MEMBRANE. CONTINUOUSLY ADHERE

TO THE STRUCTURAL DECK ABOVE AND

TO THE FLOOR BELOW WITH TAPE.

UNDERSIDE OF STRUCTURAL DECK

UL LISTING: U465

COORDINATE WITH EXISTING CEILING

PUBLIC

SIDE

1 HOUR FIRE RATED METAL DOOR ASSEMBLY

AND FRAME WITH SEALS, CARD READER,

HARDWARE AND CLOSER

TRIATEK MONITOR

HAND SANITIZER

SEAL ALL EDGES WITH TAPE

SEAL ALL EDGES WITH TAPE

REFER TO TEMPORARY BARRIER TYPE FOR

REQUIRED CONDITION TO STRUCTURE ABOVE

VA / OSHA TEMPORARY SIGNAGE

CONTINUOUSLY ADHERED FIRE

RETARDANT POLY TO FLOOR WITH TAPE

BEAD OF CONT. SEALANT

6 MIL. FIRE RETARDANT POLY

INTERIOR SIDE

CONSTRUCTION

SIDE

CONTINUOUSLY ADHERED 6 MIL. FIRE

RETARDANT POLY TO DECK WITH TAPE

UNDERSIDE OF STRUCTURAL DECK

CEILING

TEMPORARY IC BARRIER WALL CONSTRUCTION (DUST WALL)

OCCUPIED

SIDE

TEMPORARY INFECTION CONTROL BARRIER

WALLS. SEE PLAN AND PLAN NOTES

CONSTRUCTION ACCESS DOORS

BEYOND PROJECT BOUNDARY

IC / PHASING LEGEND

PHASE 1

1. CONTRACTOR TO CONSTRUCT 1 HR RATED CONSTRUCTION

BARRIERS AS NOTED ON PLAN. VA STAFF TO USE PATH

THROUGH EXISTING KITCHEN SPACE SEPARATED BY

CONSTRUCTION BARRIER WALLS THROUGHOUT DURATION OF

PHASE 1 & 2.

2. CONTRACTOR TO DEMOLISH, INCLUDING HAZMAT AND MEP

REMOVAL, AND RENOVATE, INCLUDING MEP, AREA OF VCS

OFFICES. CONTRACTOR TO USE EXISTING PERIMETER WALL AS

CONSTRUCTION BARRIER SEPARATION FOR DEMOLITION. NEW

PERIMETER WALL TO BE CONSTRUCTED FIRST TO ACT AS

CONSTRUCTION BARRIER.

3. PHASE 1 WORK TO OCCUR IN JUNCTION WITH PHASE 1 - AFTER

HOURS.

4. VCS OFFICES AND ADJACENT CORRIDOR ARE OPEN AND

OCCUPIED AFTER COMPLETION OF PHASE 1 AND PHASE 1 -

AFTER HOURS.

5. PHASE 2 TO BEGIN AFTER OFFICES AND CORRIDOR ARE

COMPLETE AND OPEN.

PHASE 2

1. CONTRACTOR TO CONSTRUCT INFECTION

CONTROL/CONSTRUCTION BARRIERS AS NOTED ON PLAN. VA

STAFF TO USE PATH THROUGH EXISTING KITCHEN SPACE

SEPARATED BY CONSTRUCTION BARRIER WALLS

THROUGHOUT DURATION OF PHASE 2.

2. CONTRACTOR TO DEMOLISH, INCLUDING HAZMAT AND MEP

REMOVAL, AND RENOVATE, INCLUDING MEP, AREAS OF THE

STAFF SUPPORT SPACES AND PUBLIC RESTROOMS AS

INDICATED ON PLAN.

3. STAFF AREAS AND PUBLIC RESTROOMS ARE OPEN AND

OCCUPIED AFTER COMPLETION OF PHASE 2.

4. PHASE 3 TO BEGIN AFTER COMPLETION OF PHASE 2.

PHASE 3

1. CONTRACTOR TO CONSTRUCT INFECTION

CONTROL/CONSTRUCTION BARRIERS AS NOTED ON PLAN. VA

STAFF TO USE NEW CORRIDORS TO TRAVEL THROUGH SPACE.

2. CONTRACTOR TO DEMOLISH, INCLUDING HAZMAT AND MEP

REMOVAL, AND RENOVATE, INCLUDING MEP, AREAS FOR THE

WOMEN'S CLINIC AND SWING SPACE.

NOT IN PHASE BOUNDARY

PERMANENT INFECTION CONTROL BARRIER WALLS

AND/OR DOORS. SEE PLAN AND PLAN NOTES

PHASE 3 - AFTER HOURS

1. CONTRACTOR TO DEMOLISH, INCLUDING MEP, AND RENOVATE,

INCLUDING MEP, THE CORRIDORS DURING AFTER HOURS.

CONTRACTOR TO COORDINATE WITH THE VA FOR KITCHEN

STAFF ACCESS.

2. PHASE 3 - AFTERHOURS TO OCCUR IN JUNCTION WITH PHASE 3.

PHASE 1 - AFTER HOURS

1. CONTRACTOR TO DEMOLISH, INCLUDING MEP, AND RENOVATE,

INCLUDING MEP, THE CORRIDOR DURING AFTER HOURS. THE

2. CORRIDOR MUST BE OPEN DURING BUSINESS HOURS.

CONTRACTOR TO COORDINATE WITH THE VA FOR KITCHEN

STAFF ACCESS.

3. PHASE 1 - AFTERHOURS TO OCCUR IN JUNCTION WITH PHASE 1.

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY: TYPE D

PATIENT RISK GROUP: HIGH

CLASS OF PRECAUTION MATRIX: IV

A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

B. REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

C. PROJECT SHALL BE COMPLETED IN 3 PHASES.

D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

F. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE

PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR

PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW

THE FLOOR PLATE OF THE PROJECT BOUNDARY.

G. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED

IN A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED

AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

H. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

I. WORK REQUIRING VIBRATION OR LOUD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 8:00 AM AND 5:00 PM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

J. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"

STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR

LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

K. PROVIDE THE VA OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

L. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

M. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED

WITH 4 MIL. POLY SHEET.

N. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

O. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND IN APPROVED CONTAINERS.

FLAMMABLE MATERIALS SHALL NOT BE STORED IN THE FACILITY.

P. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

A. PROJECT AREAS ARE TO BE OCCUPIED BY STAFF AND VETERANS

THROUGHOUT CONSTRUCTION.

B. PHASES NOTED AS AFTER HOURS - CORRIDOR WORK TO BE COMPLETED

DURING NIGHT SHIFTS, 5:00 PM TO 5:00 AM. COORDINATE WITH COR. ALL

WORK TO BE COMPLETED AND OPEN FOR PUBLIC USE AT THE END OF EACH

NIGHT'S WORK.

C. CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS

SHALL BE COMPLETED DURING DAY SHIFTS.

D. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION

FOR EACH PHASE AND AREA OF WORK.

E. COORDINATE WITH MEP PHASING PLANS FOR SIMULTANEOUS WORK TO BE

COMPLETED.

PHASING GENERAL NOTES

INFECTION CONTROL GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C

U s e rs \d c h ri s te n s e n \D o c u m e n ts \1

.1

.1

A v d c h ri s te n s e n M

N F

X

.r v t

/7

/2

:2

:5

P M

GC101

INFECTION CONTROL/PHASING PLAN

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

02/06/2022 JF DMC

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/16" = 1'-0"GC101

4 PHASING PLAN - CONSTRUCTION COMPLETE

SCALE: 1/16" = 1'-0"GC101

1. PHASING PLAN - PHASE 1 DEMOLITION

N

SCALE: 1/16" = 1'-0"GC101

2 PHASING PLAN - PHASE 1 COMPLETE - PHASE 2 DEMOLITION

N

SCALE: 1/16" = 1'-0"GC101

3 PHASING PLAN - PHASE 2 COMPLETE - PHASE 3 DEMOLITION

N

N

SCALE: 1 1/2" = 1'-0"GC101

1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION NFPA 241

SCALE: 1/4" = 1'-0"GC101

6 TEMPORARY WALL CONSTRUCTION ELEVATION

SCALE: 1 1/2" = 1'-0"GC101

7 TEMPORARY PLASTIC CONSTRUCITON BARRIER

Revisions: Date:

ADDENDUM #6 02/06/2023

A. ALL WALLS WILL BE WALL TYPES S3A.Gi UNLESS OTHERWISE NOTED.

B. ALL WALL TYPE INDICATORS REFER TO THIS SHEET UNLESS OTHERWISE

NOTED.

C. REFER TO DIMENSION PLANS FOR PARTITION TYPE LOCATIONS.

PARTITIONS ARE DISTINGUISHED ON PLANS BY SYMBOL DESIGNATION

GRAPHIC DESIGNATION, OR A COMBINATION OF BOTH. NOT ALL

PARTITIONS ON THIS SHEET MAY BE USED. REFER TO PARTITION TYPE

SCHEDULE ON THIS SHEET FOR PARTITIONS USED ON THIS PROJECT.

D. ALL DIMENSIONS ARE FROM FACE OF STUD TO FACE OF STUD, OR TO FACE

OF BLOCK. REFER TO PARTITION S3A.Gi FOR PARTITION WIDTH

DIMENSIONS.

E. ALL WALL STUDS TO BE 16" O.C. UNLESS OTHERWISE NOTED.

F. REFER TO SPECIFICATIONS AND TO TABLE ON THIS SHEET FOR MINIMUM

STUD GAUGE, MAXIMUM SPACING AND ALLOWABLE LIMITING HEIGHT

DEFLECTION CRITERIA FOR GYPSUM BOARD ASSEMBLIES AND REQUIRED

FINISHES. FOR WALLS WHERE STUDS ARE ATTACHED TO STRUCTURE

ABOVE, PROVIDE CROSS BRACING AS NECESSARY MEETING THE CRITERIA

INDICATED TO ACCOMMODATE THE SPECIFIED DEFLECTION CRITERIA OF

THE WALL.

G. ALL INTERIOR NON-BEARING STUDS TO BE DESIGNED FOR A DEFLECTION

EQUAL TO BUT NOT GREATER THAN L/240, UNLESS FULL HEIGHT FINISH IS

DETERMINED TO BE FRAGILE OR BRITTLE, THEN DEFLECTION TO BE L/360.

EXAMPLES OF FRAGILE FINISHES WOULD INCLUDE BUT NOT LIMITED TO

ANY TYPE OF WALL TILE, PLASTER OR PLASTER SKIM COAT.

H. ALTHOUGH WALL STUD SIZES ARE LISTED ON PLANS AND WALL TYPE S3A.Gi

IN AREAS WHERE STUDS ARE TO STRUCTURE ABOVE OR HIGH AREAS,

CONTRACTOR TO VERIFY SIZED INDICATED IS ADEQUATE FOR HEIGHT

LISTED. PROVIDE ADEQUATE SIZE STEEL STUD FRAMING AND NOTIFY

ARCHITECT OF ANY DISCREPANCY PRIOR TO FABRICATION OR

INSTALLATION.

I. KING STUDS AT DOOR FRAMES TO BE 18 GA. UNLESS OTHERWISE NOTED.

J. PROVIDE 5/8" TYPE "X" GYPSUM WALLBOARD FOR ALL OTHER WALL

CONSTRUCTION, UNLESS OTHERWISE NOTED.

K. PROVIDE 5/8" TYPE "X" GYPSUM WALLBOARD IN BULKHEAD CONSTRUCTION.

L. REFER TO LIFE SAFETY PLANS FOR LOCATIONS AND RATINGS OF SMOKE

AND FIRE RATED PARTITIONS. REFERENCE TEST NUMBERS APPLY ONLY TO

PARTITIONS INDICATED TO BE RATED.

M. FIRE RATING TEST NUMBERS ARE FOR UNDERWRITER'S LABORATORIES

(UL) ASSEMBLIES UNLESS OTHERWISE NOTED.

N. FIRE RESISTANT RATED PARTITIONS SHALL EXTEND TO THE INSIDE FACE

OF EXTERIOR SHEATHING, INCLUDING EXTENSIONS THROUGH SOFFITS.

O. SEAL ALL OPENINGS, GAPS, PENETRATIONS, AND JOINTS IN PARTITIONS

TYPES AS FOLLOWS:

a. FIRE RATED PARTITIONS: SEAL IN ACCORDANCE WITH THE

REQUIREMENTS SPECIFIED FOR THROUGH PENETRATION

FIRESTOP SYSTEMS AND FIRE RESISTIVE JOINT SYSTEMS.

b. SMOKE TIGHT PARTITIONS: SEAL COMPLETELY WITH

ELASTOMERIC SEALANT. FOR THE LOCATION AND EXTENT OF

PARTITIONS, DESIGNATED AS "SMOKE TIGHT", REFER TO THE LIFE

SAFETY DRAWINGS.

c. ALL OTHER LOCATIONS: SEAL AS INDICATED AND REQUIRED

ELSEWHERE BY THE CONTRACT DOCUMENTS.

P. INSULATION HEAD CONDITIONS AT FLOOR / ROOF DECK:

a. FIRE RESISTANT RATED PARTITIONS SHALL USE MINERAL WOOL

INSULATION AND APPROPRIATE FIRE RATED SEALANT.

b. NON-RATED PARTITIONS REQUIRING SOUND ATTENUATION SHALL

USE SOUND ATTENUATION BATTS (SAB).

Q. PROVIDE STENCILED IDENTIFICATION FOR RATED PARTITIONS.

R. STC RATING APPLIES WHERE PARTITION TAG QUALIFIER INDICATES WITH

AN "i". PROVIDE SOUND ATTENUATION BATTS OF THICKNESS INDICATED ON

SCHEDULE WHERE INDICATED BY QUALIFIER.

S. FOR PARTITIONS WITH STC RATINGS INDICATED SOUND ATTENUATION

BATTS TO EXTEND FULL HEIGHT OF PARTITION UNLESS OTHERWISE

NOTED. FLOOR TRACK TO BE SET IN A CONTINUOUS BED OF SEALANT.

T. WHERE PARTITION TYPE INDICATES SOUND ACOUSTICAL BATT, WITH FINISH

BOARD GOING TO DECK ON ONE SIDE ONLY, PROVIDE VAPOR BARRIER TO

SECURE INSULATION IN PLACE.

U. PROVIDE 5/8" MOISTURE/MOLD RESISTANT GYPSUM BOARD IN SOILED

ROOMS, TOILET ROOMS, ON WALLS BEHIND PLUMBING FIXTURES, AND IN

ALL WET LOCATIONS.

V. PROVIDE 5/8" CEMENTITIOUS BACKER BOARD BEHIND CERAMIC WALL TILE.

COORDINATE LOCATIONS WITH FINISH WALL PLANS.

W. PROVIDE CORNER AND END WALL FRAMING AS DETAILED ON AE002.

X. CONTRACTOR TO VERIFY ALL EXISTING PARTITION TYPE FIRE AND SMOKE

RATINGS. REPAIR AND UPGRADE ALL RATED WALLS TO MAINTAIN

INDICATED RATINGS.

WALL TYPES LEGEND AND GENERAL NOTES

X#X.#

INDICATES STRUCTURAL MATERIAL

CH = SHAFT WALL

F = FURRING

S = STEEL

M = MASONRY

W = WOOD

INDICATES NOMINAL SIZE

INDICATES STRUCTURE AND

FINISH HEIGHTS

QUALIFIER'S (X-X-X)

G GYPSUM BOARD FINISH

2G 2 LAYERS OF GYPSUM BOARD

1SB 1 HR RATED SMOKE BARRIER

2SB 2 HR RATED SMOKE BARRIER

1F 1 HR FIRE RATED

2F 2 HR FIRE RATED

i SOUND INSULATION t THERMAL INSULATION

B BULLET RESISTANT

L LEAD LINED

M MESH (STEEL SECURITY MESH)

MR MOIST/MOLD RESISTANT GYPSUM

SP SMOKE PARTITION

TB TILE BACKER CEMENT BOARD

A = STRUCTURE TO DECK, FINISH TO DECK

B = STRUCTURE TO DECK, FINISH ONE SIDE TO DECK

C = STRUCTURE TO DECK, FINISH TO ABOVE CEILING

D = STRUCTURE TO ABOVE CEILING, FINISH TO ABOVE CEILING

P = PARTIAL HEIGHT WALL

U = STRUCTURE TO UNDERSIDE OF CEILING, FINISH TO UNDERSIDE OF CEILING

*SEE WALL TYPES FOR PROJECT SPECIFIC CONSTRUCTION

CH

2 1/2" 4" 6"

F 7/8

1 1/2" 2 1/2" 3 5/8"

4" 6" 8" 12"

S

2 1/2" 3 5/8"

4" 6" 8" 12"

M

2 5/8" 3 5/8" 5 5/8" 7 5/8" 11 5/8"

W

3/4"

3 1/2"

5 1/2" 7 1/4" 11 1/4"

" 1 HR FIRE/SMOKE

10'-0" MAX 10'-0" MAX

A. LETTERED STENCILS SHALL BE APPLIED TO EACH SIDE OF RATED PARTITIONS

AT 10'-0" INTERVALS; BUT NO LESS THAN ONCE PER PARTITION LENGTH.

B. USE THE FOLLOWING LANGUAGE FOR STENCILS:

"1 HR FIRE/SMOKE" "1 HR FIRE"

"2 HR FIRE/SMOKE" "2 HR FIRE"

"LIMIT TRANSFER OF SMOKE"

PERMANENT RED PAINT

LETTERING, TYP.

CEILING LINE

STENCILING NOTES

WALL TAG LEGEND

WALL TAG

STRUCTURAL

SIZE

FINISH DIM FIRE RATING UL DESIGN

MIN STC

RATING

COMMENTS

S3A.G 3 5/8" 4 7/8" NA35NANA

LINE OF STRUCTURE ABOVE

LINE OF CEILING

LINE OF STRUCTURE BELOW

PLAN

5/8"

STRUCTURAL SIZE

5/8"

FINISH DIMENSION

5/8" TYPE X GYP BD

BEAD OF CONT. SEALANT

STEEL STUDS @ 16" O.C.

STEEL STUD BRACING @ 4'-0" O.C.

CEILING

DEEP LEG SLIP TRACK AT DECK

HOLD GYPSUM BACK FROM DECK FOR

DEFLECTION

WALL TAG

STRUCTURAL

SIZE

FINISH DIM FIRE RATING UL DESIGN

MIN STC

RATING

COMMENTS

3 5/8" 4 7/8" SMOKE PARTITION46NANA

LINE OF STRUCTURE ABOVE

LINE OF CEILING

LINE OF STRUCTURE BELOW

PLAN

5/8"

STRUCTURAL SIZE

5/8"

FINISH DIMENSION

STEEL STUD BRACING @ 4'-0" O.C.

CEILING

DEEP LEG SLIP TRACK AT DECK

HOLD GYPSUM BACK FROM DECK FOR

DEFLECTION

6"

S3B.SPi

INSULATION PRESENT WITH QUALIFER (i OR t)

5/8" TYPE X GYP BD

BEAD OF CONT. SEALANT

STEEL STUDS @ 16" O.C.

INSULATION PRESENT WITH QUALIFER (i OR t)

WALL TAG

STRUCTURAL

SIZE

FINISH DIM FIRE RATING UL DESIGN

MIN STC

RATING

COMMENTS

F3D.G 3 5/8" 4 1/4" NANANANA

LINE OF STRUCTURE ABOVE

LINE OF CEILING

LINE OF STRUCTURE BELOW

PLAN

STRUCTURAL DIMENSION

5/8"

FINISH DIMENSION

STEEL STUD BRACING @ 4'-0" O.C.

CEILING

6"

5/8" TYPE X GYP BD [MOISTURE

RESISTANT WITH QUALIFIER (MR)]

BEAD OF CONT. SEALANT

STEEL STUDS @ 16" O.C.

INSULATION PRESENT WITH QUALIFER (i OR t)

EXISTING WALL / COLUMN, VIF.

F0D.G 7/8" 1 1/2" NA NA NA HAT CHANNEL @ 24" O.C.

WALL TAG

STRUCTURAL

SIZE

FINISH DIM FIRE RATING UL DESIGN

MIN STC

RATING

COMMENTS

S3A.1F 3 5/8" 4 7/8" NA40U4651 HR.

LINE OF STRUCTURE ABOVE

LINE OF CEILING

LINE OF STRUCTURE BELOW

PLAN

5/8"

STRUCTURAL SIZE

5/8"

FINISH DIMENSION

5/8" TYPE X GYP BD

BEAD OF CONT. SEALANT

STEEL STUDS @ 16" O.C.

STEEL STUD BRACING @ 4'-0" O.C.

CEILING

DEEP LEG SLIP TRACK AT DECK

HOLD GYPSUM BACK FROM DECK FOR

DEFLECTION

FILL FLUTES OF DECK WITH FIRE SAFING

AT FIRE RATED WALLS

INSULATION PRESENT WITH QUALIFER (i OR t)

WALL TYPES

S3A.Gi 3 5/8" 4 7/8" NA46NANA

WALL TAG

STRUCTURAL

SIZE

FINISH DIM FIRE RATING UL DESIGN

MIN STC

RATING

COMMENTS

LINE OF STRUCTURE ABOVE

LINE OF CEILING

LINE OF STRUCTURE BELOW

PLAN

STRUCTURAL DIMENSION

5/8"

FINISH DIMENSION

CEILING

5/8" TYPE X GYP BD [MOISTURE RESISTANT WITH

QUALIFIER (MR)]

BEAD OF CONT. SEALANT

STEEL STUDS @ 16" O.C.

INSULATION PRESENT WITH QUALIFER (i OR t)

EXISTING WALL / COLUMN, VIF.

F3A.MRi 3 5/8" 4 1/4" NA34NANA

F3A.TBi 3 5/8" 4 1/4" NA34NANA

5/8" CEMENT BOARD BACKER WITH QUALIFIER (TB)

S3A.1FTBi 3 5/8" 4 7/8" NA46U4651 HR.

S3A.GTBi 3 5/8" 4 7/8" NA46NANA

S3A.MRi 3 5/8" 4 7/8" NA46NANA

5/8" CEMENT BOARD BACKER WITH QUALIFER (TB)

5/8" CEMENT BOARD BACKER WITH QUALIFER (TB)

WALL TAG

STRUCTURAL

SIZE

FINISH DIM FIRE RATING UL DESIGN

MIN STC

RATING

COMMENTS

LINE OF STRUCTURE ABOVE

LINE OF CEILING

LINE OF STRUCTURE BELOW

PLAN

STRUCTURAL DIMENSION

1 1/8"

FINISH DIMENSION

CEILING

BEAD OF CONT. SEALANT

STEEL STUDS @ 16" O.C.

INSULATION PRESENT WITH QUALIFER (i OR t)

EXISTING WALL / COLUMN, VIF.

F3A.2Gi 3 5/8" 4 7/8" NA38NANA

DEEP LEG SLIP TRACK AT DECK

HOLD GYPSUM BACK FROM DECK FOR

DEFLECTION

DEEP LEG SLIP TRACK AT DECK

HOLD GYPSUM BACK FROM DECK FOR

DEFLECTION

F3A.Gi 3 5/8" 4 1/4" NA34NANA

WALL TAG

STRUCTURAL

SIZE

FINISH DIM FIRE RATING UL DESIGN

MIN STC

RATING

COMMENTS

LINE OF STRUCTURE ABOVE

LINE OF CEILING

LINE OF STRUCTURE BELOW

PLAN

1 1/4"

STRUCTURAL SIZE

5/8"

FINISH DIMENSION

2 LAYERS OF 5/8" TYPE X GYP BD

BEAD OF CONT. SEALANT

STEEL STUDS @ 16" O.C.

STEEL STUD BRACING @ 4'-0" O.C.

CEILING

DEEP LEG SLIP TRACK AT DECK

HOLD GYPSUM BACK FROM DECK FOR

DEFLECTION

INSULATION PRESENT WITH QUALIFER (i OR t)

S3A.TB2Gi 3 5/8" 5 1/2" NA52NANA

5/8" CEMENT BOARD BACKER WITH QUALIFER (TB)

S3A.2Gi 3 5/8" 5 1/2" NA52NANA

S3A.1Fi 3 5/8" 4 7/8" NA46U4651 HR.F0D.TB 7/8" 1 1/2" NA NA NA HAT CHANNEL @ 24" O.C.

5/8" CEMENT BOARD WITH QUALIFIER (TB)

F3D.TB 3 5/8" 4 1/4" NANANANA

WALL TAG

STRUCTURAL

SIZE

FINISH DIM FIRE RATING UL DESIGN

MIN STC

RATING

COMMENTS

LINE OF STRUCTURE ABOVE

LINE OF CEILING

LINE OF STRUCTURE BELOW

PLAN

5/8"

STRUCTURAL SIZE

5/8"

FINISH DIMENSION

5/8" TYPE X GYP BD

BEAD OF CONT. SEALANT

STEEL STUDS @ 16" O.C.

STEEL STUD BRACING @ 4'-0" O.C.

CEILING

DEEP LEG SLIP TRACK AT DECK

HOLD GYPSUM BACK FROM DECK FOR

DEFLECTION

INSULATION PRESENT WITH QUALIFER (i OR t)

S3A.GMi 3 5/8" 5" NA46NANA

9 GA DIAMOND MESH (1 1/2" x 2" MAX EXPANDED METAL)

FROM FLOOR TO DECK. SPOT WELD TO STUDS EVERY 6"

ON NON-SECURED SIDE OF PARTITION. OVERLAP

JOINTS - PRESENT WITH QUALIFIER (M)

3 5/8" 5" SMOKE PARTITION46NANAS3B.SPMi

9 GA DIAMOND MESH (1 1/2" x 2" MAX EXPANDED METAL)

FROM FLOOR TO DECK. SPOT WELD TO STUDS EVERY 6"

ON NON-SECURED SIDE OF PARTITION. OVERLAP

JOINTS - PRESENT WITH QUALIFIER (M)

F0A.GM 7/8" 1 5/8" NA NA NA HAT CHANNEL @ 24" O.C.

9 GA DIAMOND MESH (1 1/2" x 2" MAX EXPANDED METAL)

FROM FLOOR TO DECK. SPOT WELD TO STUDS EVERY 6"

ON NON-SECURED SIDE OF PARTITION. OVERLAP

JOINTS - PRESENT WITH QUALIFIER (M)

WALL TAG

STRUCTURAL

SIZE

FINISH DIM FIRE RATING UL DESIGN

MIN STC

RATING

COMMENTS

S3A.2F.5 3 5/8" 4 7/8" NA40U4651 HR.

LINE OF STRUCTURE ABOVE

LINE OF CEILING

LINE OF STRUCTURE BELOW

PLAN

FINISH DIMENSION

2 LAYERS OF 5/8" TYPE X GYP BD

BEAD OF CONT. SEALANT

STEEL STUDS @ 16" O.C.

STEEL STUD BRACING @ 4'-0" O.C.

CEILING

DEEP LEG SLIP TRACK AT DECK

HOLD GYPSUM BACK FROM DECK FOR

DEFLECTION

FILL FLUTES OF DECK WITH FIRE SAFING

AT FIRE RATED WALLS

PROJECT SIDE

WALL TAG

STRUCTURAL

SIZE

FINISH DIM FIRE RATING UL DESIGN

MIN STC

RATING

COMMENTS

S3A.2F 3 5/8" 6 1/8" NA40U4192 HR.

LINE OF STRUCTURE ABOVE

LINE OF CEILING

LINE OF STRUCTURE BELOW

PLAN

1 1/4"

STRUCTURAL SIZE

1 1/4"

FINISH DIMENSION

5/8" TYPE X GYP BD (2 LAYERS EACH SIDE)

BEAD OF CONT. SEALANT

STEEL STUDS @ 16" O.C.

STEEL STUD BRACING @ 4'-0" O.C.

CEILING

DEEP LEG SLIP TRACK AT DECK

HOLD GYPSUM BACK FROM DECK FOR

DEFLECTION

FILL FLUTES OF DECK WITH FIRE SAFING

AT FIRE RATED WALLS

INSULATION PRESENT WITH QUALIFER (i OR t)

NOTE:

• TYPICAL LIMITING HEIGHTS-INTERIOR PARTITIONS, L/240 (5 PSF), WITH 5/8"GYPSUM BOARD EACH SIDE.

• PROVIDE DIAGONAL STUD BRACING AT ALL NON FULL HEIGHT INTERIOR PARTITIONS STAGGERED AT 48" O.C. TO DECK ABOVE. PROVIDE

STUD ATTACHMENT TO DECK W/ MIN. SPAN OF 2 DECK FLUTES. BRACING TO BE THE SAME SIZE AND GAUGE AS VERTICAL STUDS.

25 GA. STUDS (NON-COMPOSITE)

STUD WIDTH STUD SPACING ALLOW. DEFLECTION HEIGHT

16" L/240 6'-11"1-5/8"

24" L/240 6'-0"162S125-18

16" L/240 9'-6"2-1/2"

24" L/240 8'-4"250S125-18

16" L/240 12'-5"3-5/8"

24" L/240 10'-10"362S125-18

16" L/240 13'-9"4"

24" L/240 12'-0"400S125-18

22 GA. STUDS (NON-COMPOSITE)

STUD WIDTH STUD SPACING ALLOW. DEFLECTION HEIGHT

16" L/240 8'-1"1-5/8"

24" L/240 7'-1"162S125-27

16" L/240 11'-2"2-1/2"

24" L/240 9'-9"250S125-27

16" L/240 14'-6"3-5/8"

24" L/240 12'-8"362S125-27

16" L/240 16'-1"4"

24" L/240 14'-0"400S125-27

20 GA. STUDS (NON-COMPOSITE)

STUD WIDTH STUD SPACING ALLOW. DEFLECTION HEIGHT

16" L/240 8'-4"1-5/8"

24" L/240 7'-3"162S125-30

16" L/240 11'-7"2-1/2"

24" L/240 10'-1"250S125-30

16" L/240 15'-0"3-5/8"

24" L/240 13'-1"362S125-30

16" L/240 16'-8"4"

24" L/240 14'-7"400S125-30

16" L/240 22'-4"6"

24" L/240 19'-6"600S125-27

16" L/240 23'-1"6"

24" L/240 20'-2"600S125-30

18 GA. STUDS (NON-COMPOSITE)

STUD WIDTH STUD SPACING ALLOW. DEFLECTION HEIGHT

16" L/240 13'-0"2-1/2"

24" L/240 11'-5"250S125-43

16" L/240 17'-5"3-5/8"

24" L/240 15'-3"362S125-43

16" L/240 18'-10"4"

24" L/240 16'-5"400S125-43

16" L/240 26'-1"6"

24" L/240 22'-10"600S125-43

SSMA NON-COMPOSITE STUDS

HIGH PRIORITY PARTITION

LOWER PRIORITY PARTITION

HIGH PRIORITY CEILING /

ROOF ASSEMBLY

LOWER PRIORITY PARTITION

RATING

3 HOUR ASSEMBLY

2 HOUR ASSEMBLY

1 HOUR ASSEMBLY

SMOKE-RATED ASSEMBLY

NON-RATED ASSEMBLY

PRIORITY

NOTE: LOWER NUMBER, HIGHER PRIORITY

TOP OF METAL DECK OR CONCRETE

FIRE CAULKING AS REQUIRED BY UL# HWS0001

(BY FRAMING CONTRACTOR)

PACK FLUTES OF DECK WITH FIRE SAFING AS

REQUIRED PER UL# HWS0001

Z-CLIPS 2" WIDTH

BOTTOM OF METAL DECK

LIGHT GAUGE FRAMING DEFLECTION TRACK,

CONFORMING TO UL# HW-D-0060

5/8" TYPE X GYP. BD. EACH SIDE OF STUD

SCRIBED TO DECK UL# U465

METAL STUD

PARALLEL NOTE:

NON-RATED CONSTRUCTION SIMILAR W/O

FIRE SAFING & SCRIBING BYP. BD. TO DECK

6"

TOP OF METAL DECK OR CONCRETE

FIRE CAULKING AS REQUIRED BY UL# HWS0001

(BY FRAMING CONTRACTOR)

PACK FLUTES OF DECK WITH FIRE SAFING AS

REQUIRED PER UL# HWS0001

Z-CLIPS 2" WIDTH

BOTTOM OF METAL DECK

LIGHT GAUGE FRAMING DEFLECTION TRACK,

CONFORMING TO UL# HW-D-0060

5/8" TYPE X GYP. BD. EACH SIDE OF STUD

SCRIBED TO DECK UL# U465

METAL STUD

PERPENDICULAR NOTE:

NON-RATED CONSTRUCTION SIMILAR W/O

FIRE SAFING & SCRIBING BYP. BD. TO DECK

INSULATION STUFFED INSIDE BOX

METAL STUD FRAMING

CORNER BEAD AT ALL

OUTSIDE CORNERS (TYPICAL)

20 GA. METAL STUDS WRAPPED WITH

20 GA. TRACK ON BOTH SIDES,

CONTINUOUS FROM FLOOR TO DECK

INSULATION STUFFED INSIDE BOX

METAL STUD FRAMING

CORNER BEAD AT ALL

OUTSIDE CORNERS (TYPICAL)

20 GA. METAL STUDS WRAPPED WITH

20 GA. TRACK ON BOTH SIDES,

CONTINUOUS FROM FLOOR TO DECK

1 HR FIRE RATED

SMOKE PARTITION

WALL RATING LEGEND

EXISTING WALL UPGRADED TO 1

HOUR FIRE RATED

EXISTING 2 HOUR FIRE RATED

FRT WOOD BLOCKING

FRT WOOD BLOCKING LOAD TABLE

NOTCHED METAL STUD BLOCKING

NOTCHED METAL STUD BLOCKING LOAD TABLES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C

U s e rs \d c h ri s te n s e n \D o c u m e n ts \1

.1

.1

A v d c h ri s te n s e n M

N F

X

.r v t

/7

/2

:2

:2

P M

AE002

WALL TYPES

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

02/06/2022 JF DMC

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1 1/2" = 1'-0"AE002

1 RATED WALL PRIORITY

SCALE: 1 1/2" = 1'-0"AE002

2 DEFLECTION TRACK

WALL TYPE SCHEDULE

WALL TYPES USED IN THIS PROJECT

F0A.GM

F0D.G

F0D.TB

F3A.2Gi

F3A.Gi

F3A.MRi

F3A.TBi

F3D.G

F3D.TB

S3A.1F

S3A.1Fi

S3A.1FTBi

S3A.2F

S3A.2F.5

S3A.2Gi

S3A.G

S3A.Gi

S3A.GMi

S3A.GTBi

S3A.MRi

S3A.TB2Gi

S3B.SPi

S3B.SPMi

SCALE: 3" = 1'-0"AE002

3 TYPICAL CORNER FRAMING

ROOM STC - FGI REQUIREMENTS, AS...

ROOM

NUMBER ROOM NAME STC BOD

STC

PRV.

ROOM

TYPE/OCC.

1400 RECEPTION / WAITING 35 CORRIDOR 35 PUBLIC

1400A FAMILY TOILET 45 CORRIDOR 46 TOILET

1400B WHEELCHAIR STORAGE N/A N/A

1400C FAMILY WAITING N/A N/A

1407 LACTATION 35 CORRIDOR 35 PUBLIC

1408 SWING SPACE N/A 35

1409 MENS TOILET 45 CORRIDOR 46 TOILET

1410 WOMENS TOILET 45 CORRIDOR 46 TOILET

1432 CHECK-IN N/A N/A PUBLIC

1433 LINEN CLOSET N/A 35

1434 INTAKE - ALCOVE N/A N/A

1435 INTAKE 50 ROOM - 35 CORRIDOR 52 CONSULT

1436 INTAKE 50 ROOM - 35 CORRIDOR 52 CONSULT

1437 INTAKE 50 ROOM - 35 CORRIDOR 52 CONSULT

1438 PATIENT TOILET 45 CORRIDOR 46 TOILET

1439 LAB 35 CORRIDOR 46 STAFF

1440 CONSULT 50 ROOM - 35 CORRIDOR 52 CONSULT

1441 EQUIPMENT N/A 35

1442 CLEAN STORAGE N/A 35

1443 EXAM 50 ROOM - 35 CORRIDOR 52 EXAM

1444 CONSULT 50 ROOM - 35 CORRIDOR 52 CONSULT

1445 EXAM 50 ROOM - 35 CORRIDOR 52 EXAM

1446 MEDS N/A 46 STAFF

1447 EXAM 50 ROOM - 35 CORRIDOR 52 EXAM

1448 PROCEDURE 50 ROOM - 35 CORRIDOR 52 TREATMENT

1448A PATIENT TOILET 45 CORRIDOR 46 TOILET

1449 EXAM 50 ROOM - 35 CORRIDOR 52 EXAM

1450 SOILED HOLDING N/A 44

1451 EXAM 50 ROOM - 35 CORRIDOR 52 EXAM

1452 PROCEDURE 50 ROOM - 35 CORRIDOR 52 TREATMENT

1452A PATIENT TOILET 45 CORRIDOR 46 TOILET

1453 LOCKER ROOM 35 CORRIDOR 46 STAFF

1454 CONFERENCE / BREAK 35 CORRIDOR 46

1455 STAFF TOILET 35 CORRIDOR 46 TOILET

1456 OPEN WORKSTATIONS 35 CORRIDOR 35 STAFF

1457 RESIDENT WORKROOM 35 CORRIDOR 46 STAFF

1458 WHEELCHAIR WASH N/A 35

1459 STORAGE N/A 35

1460 HAC N/A 35

1461 ELECTRICAL N/A 35

1463 DRY STORAGE N/A 35

1464 CANISTER STORAGE N/A 35

1465 VCS OFFICE 35 CORRIDOR 35 STAFF

1465A VCS CHIEF OFFICE 35 CORRIDOR 46 STAFF

1465B CASH OUT 35 CORRIDOR 46 STAFF

C1B06 CORRIDOR N/A N/A

C1C01 CORRIDOR N/A N/A

C1C02 CORRIDOR N/A N/A

C1C03 CORRIDOR N/A N/A

C1C09 CORRIDOR N/A N/A

C1C10 CORRIDOR N/A N/A

C1C11 CORRIDOR N/A N/A

Revisions: Date:

ADDENDUM #6 02/06/2023

NOT TO SCALEAE002

4 IN-WALL BLOCKING DETAIL

X U S RZAACCFFGG T

13 13

3' - 10" 16' - 4"

3'

0"

1/ 2"

/8

7'

48' - 1"

E Q6'

" 7

NOTE:

ONLY WORK TO TAKE PLACE IN THIS AREA

IS THE INSTALL OF THE CONSTRUCTION

BARRIER ACCESS CORRIDOR FOR STAFF

ACCESS. THE WORK IS TO TAKE PLACE

PRIOR TO DEMOLITION OF PHASE 1.

REFER TO SHEETS GC101 FOR MORE

INFORMATION.

NOTE:

THIS DOOR AND WALL IS INSTALLED

PRIOR TO PHASE 1 DEMOLITION.

REFER TO GC101 FOR MORE

INFORMATION.

PROJECT LOCATION:

FIRST FLOOR

BUILDING 111 KEY PLAN

N

SHADE INDICATES

AREA NOT IN SCOPE,

TYP.

DEMOLITION GENERAL NOTES

A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND

REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION

SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING

IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE

DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND

ITEMS REQUIRED TO BE REMOVED.

B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OF UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

E. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE

ARCHITECTURAL FLOOR PLAN AE101 AND ENGINEERING DRAWINGS FOR

ADDITIONAL INFORMATION.

F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN

INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS

WORK.

G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

I. ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES

SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES

CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE

REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED

AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR

FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE

REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED

ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING

PANELS, WITHIN AND BEYOND PROJECT LIMITS.

J. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

K. REMOVE ALL FLOORING THROUGHOUT PROJECT BOUNDARY UNLESS

OTHERWISE NOTED.

L. WHERE EXISTING FLOOR FINISH IS REMOVED, FLOORING AND ADHESIVE

SHALL BE REMOVED TO PROVIDE A CLEAN FLOOR SLAB. FLOOR SLAB SHALL

BE FILLED/ LEVELED TO PROVIDE A LEVEL FINISH PER NEW FLOORING

MANUFACTURES RECOMMENDATIONS. REFER TO SPECIFICATION 09 05 16.

M. WALLS SHALL BE REMOVED THROUGHOUT PROJECT BOUNDARY UNLESS

OTHERWISE INDICATED.

N. COLUMN WRAPS SHALL BE REMOVED FROM EXISTING COLUMNS

THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE INDICATED.

O. REMOVE WALL MOUNTED ACCESSORIES AND MOUNTING HARDWARE

THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED.

P. REMOVE ALL PLUMBING FIXTURES, PARTITIONS, AND ASSOCIATED

ACCESSORIES THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE

NOTED. REFER TO PLUMBING PLAN FOR ADDITIONAL INFORMATION.

Q. REMOVE DOOR LEAVES, FRAMES AND HARDWARE THROUGHOUT PROJECT

BOUNDARY UNLESS OTHERWISE NOTED.

R. REMOVE EXISTING WALL PROTECTION, CORNER GUARDS, HANDRAILS AND/

OR GUARDRAILS THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE

NOTED.

S. REMOVE FLOOR AND WALL MOUNTED CASEWORK THROUGHOUT PROJECT

BOUNDARY UNLESS OTHERWISE NOTED.

T. WORK IN CORRIDORS TO TAKE PLACE DURING AFTER HOURS OF THE

FACILITY - COORDINATE WITH VA.

SANITATION

COMMUNICATION

CENTER

MAIL

DISTRIBUTION

OFFICE

1409B

CANTEEN ADMIN

OFFICE

STORAGE

1409C

CASH COUNT

1409A

CORRIDOR

C1B08

TOILET FEMALE

TOILET MALE

PHARMACY

PROGRAM MGR.

1412B

SECRETARY

1412D

CLINICAL

SUPPORT MGR.

ELEVATOR

1-B-10

ELEVATOR

1-B-11

ELEVATOR

1-B-9

ELEVATOR

1-B-12

ELEVATOR

LOBBY

C1B07

CORRIDOR

C1B06

E L

E C

T R

IC

A

L

E C

STAIR

STR1-1

FIBER

WATER SOFTENER

RED CLINIC

WAITING

TRAYLINE

INTAKE

E L

E C

T R

IC

A

L

A E

C

PRIMARY

CARE LAB

SOILED

UTILITY

EXAM 16

EXAM 15

1638HALLWAY

C1CN05

RN OFFICE

EXAM 17

EXAM 14

TOILET

PATIENT

TOILET

PATIENT

PHARMACIST

HALLWAY

C1CN04

HALLWAY

C1CN03

EXAM 8

EXAM 7

EXAM 6

EXAM 5

EXAM 4

1617 EXAM 2

EXAM 1

HAC

TOILET

STAFF

HALLWAY

C1CN01

EXAM 3

RN INTERVIEW

RN INTERVIEW

RECEPTION

INTAKE

INTAKE

DIETICIAN

ELECTRICAL

1608EC

HALLWAY

16C1C09

ELECTRICAL

1657BEC

FIBER

1657C

STORAGE

BREAD & DESSERT

STAIR

STR 1-2

MEETING ROOM

CLEAN DISH

ROOM

SALAD

PREPARATION

KETTLE AREA

WARE WASH

HAC

TRAINING

CORRIDOR

C1C13

TOILET

FEMALE

GROUP ROOM

REFRIGERATION / MACHINERY

CANTEEN FREEZER

CANTEEN

REFRIGERATOR

CANTEEN DRY

STORAGE

FOOD PREP

& SERVICE

FROZEN

FOOD ICR

OVENS

CLASSROOM /

CONFERENCE

ADPAC /

TRAINING

HAC

1425C

FOOD STORAGE

1425A

FOOD STORAGE

1425B

CORRIDOR

C1B10

CANTEEN RETAIL

STORE

CANTEEN COLD

STORAGE

FOOD COURT

VENDING

E L

E C

T R

IC

A

L

A E

C

SANITATION

CORRIDOR

C1C15

DEMOLITION PLAN SYMBOLS

WALL TO BE

REMOVED

DEMOLISHED DOOR

DEMOLITION PLAN NOTES

1. EXISTING FLOOR DRAIN - SEE MEP DRAWINGS FOR DESIGN

DETERMINATION / MITIGATION OF FLOOR DRAIN.

2. REMOVE WINDOW AND FRAME IN THEIR ENTIRETY

3. EXISTING CHASE CONSTRUCTION TO REMAIN. REMOVE FINISH AND PREP

FOR NEW

4. REMOVE EXISTING EQUIPMENT IN ITS ENTIRETY

5. EXISTING FLOORING TO REMAIN. COORDINATE WITH FINISH PLANS.

6. REMOVE / RELOCATE WATER TANK FILTRATION SYSTEM - SEE MEP

DRAWINGS

7. REMOVE PLUMBING FIXTURES - SEE MEP DRAWINGS

8. REMOVE CERAMIC TILE FLOORING, ASSUME 2" THICK SET MORTAR

BED AND PREPARE/ INFILL AND LEVEL FLUSH TO EXISTING CONCRETE SLAB

FOR NEW FLOORING. COORDINATE WITH SHEET AE101.A FOR FLOOR DRAIN

LOCATION.

9. EXISTING FLOOR GREASE TRAP FILTER - SEE MEP DRAWINGS FOR DESIGN

DETERMINATION / MITIGATION OF FLOOR GREASE TRAP FILTER

10. EXISTING ELECTRICAL PANELS - SEE MEP DRAWINGS FOR DESIGN

DETERMINATION OF PANELS

11. EXISTING DOOR, FRAME, AND HARDWARE TO REMAIN.

12. REMOVE RESILIENT TILE FLOORING AND WALL BASE AND PREPARE

EXISTING CONCRETE AND WALL FOR NEW FLOORING - SEE FINISH FLOOR

PLAN

13. PORTION OF WALL INDICATED TO REMAIN. REMOVE FINISHES AND PREP

FOR NEW - REFER TO AE100

14. EXISTING DUMBWAITER SYSTEM CONSTRUCTION TO BE REMOVED

15. REMOVE CONCRETE CURB CONDITION - COORDINATE WITH TILE FLOORING

REMOVAL

16. REMOVE DUMBWAITER, STRUCTURE, AND ASSOCIATED EQUIPMENT.

REMOVE RAISED CONCRETE PAD AND GRIND FLUSH TO EXISTING SLAB.

CONTRACTOR TO VERIFY FIRST AND SECOND FLOOR OPENING IS CLOSED

OFF. IF NOT CLOSED, CONTRACTOR TO CLOSE FLOOR OPENING.

17. REMOVE CMU WALL IN ITS ENTIRETY.

18. EXISTING TILE WALL FINISH TO REMAIN.

19. WALL STUDS TO REMAIN. REMOVE WALL FINISH FROM PROJECT SIDE AND

PREP FOR NEW 1 HOUR FIRE RATED WALL CONSTRUCTION - REFER TO

DETAIL 9/AE400.

20. REMOVE WALL PROTECTION, CORNER GUARDS, AND HANDRAIL THROUGH

CORRIDOR. PREP FOR NEW WALL PROTECTION, CORNER GUARDS, AND

HANDRAIL. REFER TO AI SERIES DRAWINGS.

21. REMOVE PORTION OF EXISTING WALL AND DOOR PRIOR TO BEGINNING

WORK IN PHASE 1. FINISH WALL EDGE WHERE EXISTING WALL IS TO

REMAIN.

22. REMOVE DOOR, FRAME, AND HARDWARE IN ITS ENTIRETY. PREP FOR INFILL

CONSTRUCTION AND FINISH.

23. REMOVE PORTION OF WALL PRIOR TO DEMOLOTION OF PHASE 1 TO

CREATE ACCESS CORRIDOR.

1 HR FIRE RATED

SMOKE PARTITION

WALL RATING LEGEND

EXISTING WALL UPGRADED TO 1

HOUR FIRE RATED

EXISTING 2 HOUR FIRE RATED

DEMOLITION SYMBOLS LEGEND

NO ARCHITECTURAL NEW WORK TO TAKE PLACE IN

THIS AREA. DEMOLITION OF THE CEILINGS TO

TAKE PLACE TO ALLOW FOR MEP DEMOLITION.

REFER TO MEP DRAWINGS FOR EXTENT OF

DEMOLITION WORK.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C

U s e rs \d c h ri s te n s e n \D o c u m e n ts \1

.1

.1

A v d c h ri s te n s e n M

N F

X

.r v t

/7

/2

:2

:1

P M

AD100

FIRST FLOOR DEMOLITION PLAN

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

02/06/2022 JF DMC

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AD100

1 OVERALL DEMOLITION PLAN

N

GENERAL NOTE:

ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND MEP

DRAWINGS FOR PHASING PLAN.

Revisions: Date:

ADDENDUM #6 02/06/2023

X U S RZAACCFFGG T

ELECTRICAL

CLOSET

B0460EC

MANAGER'S

OFFICE

B0431B

HALLWAY

BCU01B

CREDIT

UNION

B0431

ACCOUNTING

B0431C

STORAGE

B0431B

MECHANICAL

ROOM

B0433A

COPY CENTER

B0462

EQUIPMENT

B0464

LOAN OFFICER

C0431E

OFFICE

B0432A

OFFICE

B0432

HR LINKS

B0434

WHS

SUPERVISOR

B0451B

WAREHOUSE

B0451

SUPERVISOR

OFFICE

B0437B

BREAK

ROOM

B0437A

SPD CLEAN

SUPPLY

B0435A

ESCORT

SERVICE

B0437

CART

STORAGE

B0435

OFFICE

B0433

EXAM ROOM

B0622A

ELECTRICAL

B0627B

TELEPHONE

B0627A

HAC

B0627E

EXAM ROOM

B0622

BREAK

ROOM

B0627D

PROJECT LOCATION:

FIRST FLOOR

BUILDING 111 KEY PLAN

N

SHADE INDICATES

AREA NOT IN SCOPE,

TYP.

TYPE GRAPHIC DESCRIPTION

EXISTING SALVAGED 2x4 ACOUSTICAL CEILING

TILE

GYPSUM BOARD CEILING. CEILING PAINT.

REFLECTED CEILING PLAN TYPE LEGEND

EXISTING CEILING / NO CEILING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C

U s e rs \d c h ri s te n s e n \D o c u m e n ts \1

.1

.1

A v d c h ri s te n s e n M

N F

X

.r v t

/7

/2

:2

:1

P M

AD109

BASEMENT REFLECTED CEILING DEMOLITION

PLAN

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

CONSTRUCT WOMEN'S CLINIC

5000 W. NATIONAL AVE, MILWAUKEE, WI 53295

695-19-132

02/06/2022 JLG DMC

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AD109

1 BASEMENT REFLECTED CEILING DEMOLITION PLAN

Revisions: Date:

ADDENDUM #6 02/06/2023

N

N…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .