This solicitation is for construction services for a Women's Clinic project at a Department of Veterans Affairs medical center. The solicitation seeks bids for renovations and upgrades to existing spaces to create new clinic areas, staff offices and support spaces. Work includes demolition, hazardous material abatement, and installation of new walls, floors, ceilings and building systems. Bids are due by mid-October 2022, with construction to be completed in phases to minimize disruptions to ongoing medical center operations. The award is a firm-fixed-price contract.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION:
FIRST FLOOR
BUILDING 111 KEY PLAN
N
SHADE INDICATES
AREA NOT IN SCOPE,
TYP.
A. PROVIDE BLOCKING IN WALLS TO ACCOMMODATE EQUIPMENT,
FURNISHINGS, AND TECHNOLOGY, AND WALL MOUNTED ACCESSORIES AS
REQUIRED. REFER TO ARCHITECTURE SHEETS FOR MORE INFORMATION.
B. COORDINATE ALL EQUIPMENT LOCATIONS AND UTILITIES REQUIREMENTS
WITH EQUIPMENT PLANS, SCHEDULES, AND ENGINEERING DRAWINGS.
C. REFER TO FURNITURE VENDOR DRAWINGS AND DETAILED FURNITURE
SCHEDULE FOR FINAL FURNITURE PLACEMENT.
D. REFER TO THE VA ACQUISITION CODES FOR EACH PIECE OF EQUIPMENT
WITHIN THE PROJECT SCOPE TO DETERMINE THE PURCHASING AND
INSTALLATION RESPONSIBILITY REQUIRED.
E. FINAL FURNITURE AND EQUIPMENT SPECIFICATIONS TO BE REVIEWED AND
APPROVED BY THE VA PRIOR TO PLACEMENT OF ORDER.
F. ALL EQUIPMENT AND FURNITURE INDICATED IN THE DRAWINGS ARE DRAWN
TO SCALE FOR TEST FITTING UNLESS OTHERWISE NOTED.
EQUIPMENT GENERAL NOTES
CC CONTRACTOR FURNISHED / CONTRACTOR INSTALLED
VC VA FURNISHED / CONTRACTOR INSTALLED
VV VA FURNISHED / VA INSTALLED
VC(CF) VA FURNISHED WITH CONSTRUCTION FUNDS / CONTRACTOR INSTALLED
VV(CF) VA FURNISHED WITH CONSTRUCTION FUNDS / VA INSTALLED
R RELOCATE / REUSED EXISTING EQUIPMENT
RESPONSIBLE PARTY LEGEND
270 SF
VCS OFFICE
1465 81 SF
CASH OUT
1465B
121 SF
VCS CHIEF
OFFICE
1465A
52 SF
SOILED HOLDING
173 SF
PROCEDURE
67 SF
PATIENT TOILET
1452A
168 SF
PROCEDURE
57 SF
PATIENT TOILET
1448A
110 SF
CONSULT
208 SF
CHECK-IN
90 SF
INTAKE
30 SF
LINEN CLOSET
WHEELCHAIR
STORAGE
1400B
360 SF
RECEPTION /
WAITING
65 SF
PATIENT TOILET
129 SF
INTAKE
134 SF
LAB
112 SF
EXAM
105 SF
EXAM
106 SF
EXAM
68 SF
FAMILY TOILET
1400A
82 SF
LACTATION
141 SF
FAMILY WAITING
1400C
E L
E C
T R
IC
A
L
E
C
43 SF
INTAKE - ALCOVE
92 SF
CLEAN STORAGE
56 SF
EQUIPMENT
94 SF
CONSULT
305 SF
CORRIDOR
C1C03
118 SF
CORRIDOR
C1C01
293 SF
CORRIDOR
C1C02
5794 SF
CORRIDOR
C1C09
747 SF
CORRIDOR
C1B06
703 SF
CORRIDOR
C1C11
243 SF
WOMENS TOILET
209 SF
MENS TOILET
77 SF
ELECTRICAL
54 SF
HAC
143 SF
LOCKER ROOM
85 SF
STAFF TOILET
187 SF
RESIDENT
WORKROOM
259 SF
CONFERENCE /
BREAK
88 SF
CORRIDOR
C1C10
548 SF
OPEN
WORKSTATIONS
AI201
186 SF
SWING SPACE
25 SF
STORAGE
89 SF
INTAKE
61 SF
MEDS
125 SF
EXAM
1443 108 SF
EXAM
4'
97 SF
DRY STORAGE
30 SF
CANISTER
STORAGE
E0903E0903E0903E0903
M4020 F0206
F0206 F0305 F0740
M0515
F2017
E2000
F0740F0305
A1030
A5025
M1804
M1803
A1015
F0275
F4500
A1015
M1803 M1804
F4500
F0275
F2017
F2010
T7 R7000K4665
F4600
F0210
M0515
F3050
F0505
M
F2550
M1803M1804A1015
F0275
F4500
AI201
AI200
AI200
AI202
AI202
AI202
AI201
AI202
AI201
AI201
AI200
209 SF
WHEELCHAIR
WASH
AI202
NOTE:
ONLY NEW ARCHITECTURAL WORK TO TAKE
PLACE IN THIS AREA IS THE INSTALL OF THE
CONSTRUCTION BARRIER ACCESS
CORRIDOR FOR STAFF ACCESS. THE WORK
IS TO TAKE PLACE PRIOR TO DEMOLITION OF
PHASE 1.
REFER TO SHEETS GC100 AND GC101 FOR
MORE INFORMATION.
WHEELCHAIR
WASHER - CENTER
TO HOOD ABOVE
ARCHITECTURAL SYMBOLS LEGEND
NO NEW ARCHITECTURAL WORK TO TAKE PLACE IN
THIS AREA. REFER TO MEP DRAWINGS FOR
EXTENT OF WORK.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C
U s e rs \d c h ri s te n s e n \D o c u m e n ts \1
.1
.1
A v d c h ri s te n s e n M
N F
X
.r v t
/6 /2
:5
:2
P
M
QH100
FIRST FLOOR EQUIPMENT PLAN AND
SCHEDULE
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA STREET
SUITE 200
INDIANAPOLIS, INDIANA 46202
317.800.6388
CONSTRUCT WOMEN'S CLINIC
5000 W. NATIONAL AVE, MILWAUKEE, WI 53295
695-19-132
09/07/2022 JDF DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
EQUIPMENT SCHEDULE
JSN DESCRIPTION
FFE
FURNISHED COMMENTS
CC
A1030 Locker, over under CC
A1200 Ceiling Mounted CC Patient Lift
A5025 Bench, Locker room, Floor mounted CC
A5180 Cubicle curtain and track CC
E0903 Locker, supply with shelves CC
F0240 Wall-mounted desk with upper storage bins -
HERMAN MILLER
CC
L1200 Pass-through specimen cabinet. CC
R
F3331 FLOOR SAFE, LARGE R
F3332 FLOOR SAFE, SMALL R
F3333 COIN COUNTER R
VV
A1014 Telephone, Wall mounted VV
A1015 Telephone, Desk VV
A5077 HAND SANITIZER DISPENSER VV
A5080 PAPER TOWEL DISPENSER VV
A5106 SHARPS w/ GLOVE DISPENSER VV
A5145 Hook, Garment VV
E2000 Check-in Kiosk VV
F0205 Chair, with arms VV
F0206 Chair, bariatric with arms VV
F0210 Chair, without arms VV
F0230 Chair, Drafting VV
F0255 Chair, easy VV
F0275 Chair, swivel VV
F0305 Chair, waiting VV
F0340 Stool, adjusting VV
F0420 Cabinet, Filing VV
F0505 Mop Bucket VV
F0740 Table, Lamp VV
F2000 Waste, paper VV
F2010 Waste, paper, step on VV
F2017 Waste Receptacle VV
F2310 Rack, Pamphlet VV
F2550 PAPER SHREDDER, HEAVY DUTY VV
F3050 Whiteboard, Dry erase VV
F3200 Clock, 12" Dia. VV
F4500 WORKSTABLE, 24x66 VV
F4600 TABLE, MOBILE FOLDABLE VV
K4665 MICROWAVE VV
L0100 Microscope VV
M0515 Television VV
M0750 Flowmeter, Air VV
M0755 Flowmeter, Oxygen VV
M0765 Regulator, Vacuum VV
M1000 Television VV
M1410 Chair,Lab, Blood draw VV
M1803 COMPUTER, 24" SCREEN w/UNDERCOUNTER
CPU MOUNT
VV
M1804 24" MONITOR VV
M1830 Copier, Printer VV
M2055 Shelving, storage VV
M3150 Distribution, Medication VV
M4020 Scale, Person weighing VV
M4200 Ophthalmoscope VV
M7401 Exam Light VV
M9025 Table, examination/treatment with cabinet. VV
M9066 Examination Table, Procedure VV
R6200 Refrigerator, Under counter, 5 CU FT VV
R7000 Refrigerator, 14 CU FT VV
N
SCALE: 1/8" = 1'-0"QH100
1 OVERALL EQUIPMENT PLAN
GENERAL NOTE:
ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND MEP
DRAWINGS FOR PHASING PLAN.
Revisions: Date:
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AAV AUTOMATIC AIR VENT
AB AIR BLENDER
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER, TWO
POSITION
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
AQST AQUASTAT
ARI AIR CONDITIONING AND REFRIGERATION
INSTITUTE
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING
REFRIGERATION AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BMT BONE MARROW TRANSPLANT
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTC BLOWOFF TANK CONTROL VALVE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BWT BOILER PLANT WATER TUBE
C CENTIGRADE (CELSIUS)
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO COOLING
TOWER)
CWS CONDENSER WATER SUPPLY (FROM
COOLING TOWER)
D DAMPER - AUTOMATIC
Db DRY-BULB TEMPERATURE
DB DECIBELS
DCW DOMESTIC COLD WATER
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
FIRE SUPPRESSION ABBREVIATIONS
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HVD HOISTWAY VENT DAMPER
HX HEAT EXCHANGER
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IRH INTRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
J INTENTIALLY LEFT BLANK
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
L LITER
L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUEFIED PETROLEUM GAS
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
Nm NEWTON METER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD REQUIRED
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
P PUMP
Pa PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD RETURN AIR DAMPER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RELAD RELIEF AIR DAMPER
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCI SPINAL CODE INJURY
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
SW SOFTWATER
SWHX STEAM TO WATER HEAT EXCHANGER
T&PCV TEMPERATURE AND PRESSURE CONTROL
VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
U UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED
BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
WAG WASTE ANETHESIA GAS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
YR YEAR
GENERAL PIPING SYMBOLS
VALVE SYMBOLS
FIRE SPRINKLER HEAD (CEILING)
FIRE SPRINKLER ZONE RISER VALVE
GENERAL NOTES
A. PROVIDE RECORD FLOW TEST PRIOR TO PREPARING SHOP
DRAWINGS AND HYDRAULIC CALCULATIONS. CONTRACTOR
SHALL PROVIDE THE FIRE SUPPRESSION DESIGN CRITERIA FORM
AS PART OF THEIR STATE SUBMITTAL.
B. COORDINATE INSTALLATION OF ALL SYSTEMS WITH MECHANICAL
(HVAC), PLUMBING, AND ELECTRICAL SYSTEMS. CEILING CAVITY
SPACE IS RESTRICTED AND INSTALLTION OF DUCTWORK SHALL
TAKE PRIORITY OVER ALL OTHER TRADES. NO EXTRA
COMPENSATION WILL BE ALLOWED TO COVER THE COST OF
RELOCATING SYSTEMS FOUND ENCROACHING ON SPACE
REQUIRED BY MECHANICAL, PLUMBING, OR ELECTRICAL
SYSTEMS.
C. PROVIDE SPRINKLERS ABOVE AND BELOW WIDE DUCTS (48" AND
WIDER INCLUDING INSULATION) PER NFPA 13 REQUIREMENTS.
REFER TO HVAC DRAWINGS FOR ADDITIONAL INFORMATION.
D. PIPING ARRANGEMENT AND SPRINKLER LOCATIONS ARE
DIAGRAMMATIC AND ARE PROVIDED FOR THE CONTRACTOR'S
INFORMATION. EXACT ROUTING OF PIPING AND FINAL SIZING
AND LOCATION OF SPRINKLERS SHALL BE SELECTED BY THE
CONTRACTOR TO ACCOUNT FOR ACTUAL FIELD CONDITIONS.
ALL AREAS SHALL BE PROTECTED UNLESS SPECIFICALLY
NOTED OTHERWISE. COORDINATE INSTALLATION WITH
CEILING HEIGHTS AND SOFFITS. REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION.
E. EXTENDED COVERAGE SPRINKLERS MAY BE UTILIZED. THE USE
OF EXTENDED COVERAGE SHALL BE CONFIRMED BY HYDRAULIC
CALCULATIONS. PIPING SHALL BE CONCEALED IN ALL FINISHED
AREAS.
F. THIS BUILDING SHALL BE CONSIDERED LIGHT/ORDINARY HAZARD
OCCUPANCY WITH EXCEPTIONS PER NFPA 13, STATE, AND
LOCAL CODES. DESIGN DENSITIES SHALL BE IN ACCORDANCE
WITH GOVERNMENT/VA REQUIREMENTS.
G. SPRINKLER PIPING SHALL BE SCHEDULE 10 STEEL FOR PIPING
THAT IS 2-1/2" AND LARGER. PROVIDE SCHEDULE 40 STEEL
PIPING FOR 2" AND SMALLER UNLESS OTHERWISE NOTED.
THINWALL, LIGHTWALL, PRO-PRESS TYPE PIPING/FITTINGS WILL
NOT BE ALLOWED.
H. PROVIDE PIPE LABELS FOR ALL SPRINKLER PIPING & DEVICES.
LABELS SHALL READ "FIRE PROTECTION PIPING".
FIRE SPRINKLER HEAD (SIDEWALL)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\m p a q u in
\O n e
D ri v e
G u id o n
D e s ig n in c \D o c u m e n ts \1
.1
.1
M E
P v m p a q u in
G
E N
G .r v t
/6 /2
:2
:4
P
M
F000
FIRE SUPPRESSION SYMBOLS
AND ABBREVIATIONSGUIDON DESIGN, INC.
1221 N. PENNSYLVANIA STREET
SUITE 200
INDIANAPOLIS, INDIANA 46202
317.800.6388
CONSTRUCT WOMEN'S CLINIC
5000 W. NATIONAL AVE, MILWAUKEE, WI 53295
695-19-132
09/07/2022 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
NOT TO SCALEF000
1 SPRINKLER WITH RETURN BEND
PHASE 1
TEMPORARY CONSTRUCTION
BARRIERS FOR ACCESS CORRIDOR
TO BE CONSTRUCTED PRIOR TO
START OF PHASE 1 DEMOLITION.
TEMPORARY CORRIDOR TO
REMAIN AFTER END OF PROJECT
CONSTRUCTION.
STAFF TO HAVE TRAVEL ACCESS
THRU SPACE THROUGHOUT PHASE
1.
PHASE 1 -
AFTER HOURS
ADJUST EXISTING FIRE SPRINKLER
HEAD LAYOUT AS REQUIRED TO
PROVIDE ADEQUATE FIRE
SPRINKLER COVERAGE FOR
TEMPORARY CORRIDOR. PROVIDE
ALL FIRE SPRINKLER HEADS AS
REQUIRED AND CONNECT TO
EXISTING FIRE SPRINKLER PIPING
SYSTEM. FIELD VERIFY ALL
CONNECTION LOCATIONS.
VA TO OCCUPY
VCS OFFICES
STAFF TO HAVE
TRAVEL ACCESS
THRU CORRIDOR
BUILT IN PHASE 1
THROUGHOUT PHASE
NOTE:
STAFF SPACES AND PUBLIC
RESTROOMS MUST BE
COMPLETE AND OCCUPIED
PRIOR TO BEGINNING WORK ON
PHASE 3.
PHASE 2
VA TO OCCUPY
STAFF AREA
PUBLIC RESTROOMS TO
BE OPEN TO PUBLIC
VA TO OCCUPY
VCS OFFICES
CORRIDOR IS OPEN.
STAFF TO TRAVEL
THRU NEW
CORRIDOR
THROUGHOUT
PHASE 3
PHASE 3-
AFTER HOURS
PHASE 3
PHASE 3-
AFTER HOURS
NO MORE THAN 50%
WIDTH OF MAIN
CORRIDOR TO BE
CLOSED AT ANY TIME
CONTRACTOR TO
COORDINATE WITH VA FOR
KITCHEN STAFF ACCESS TO
NEW CORRIDOR DURING
PHASE 3 - AFTER HOURS
WORK
PHASE 3
REFER TO MECHANCIAL
DRAWINGS FOR FULL
EXTEND OF WORK IN THIS
CORRIDOR.
TEMPORARY INFECTION CONTROL
BARRIER WALLS. SEE PLAN AND PLAN
NOTES
CONSTRUCTION ACCESS DOORS
BEYOND PROJECT
BOUNDARY
IC / PHASING LEGEND
PHASE 1
1. CONTRACTOR TO CONSTRUCT 1 HR RATED
CONSTRUCTION BARRIERS AS NOTED ON PLAN. VA
STAFF TO USE PATH THROUGH EXISTING KITCHEN
SPACE SEPARATED BY CONSTRUCTION BARRIER
WALLS THROUGHOUT DURATION OF PHASE 1 & 2.
2. CONTRACTOR TO DEMOLISH, INCLUDING HAZMAT
AND MEP REMOVAL, AND RENOVATE, INCLUDING
MEP, AREA OF VCS OFFICES. CONTRACTOR TO USE
EXISTING PERIMETER WALL AS CONTRUCTION
BARRIER SEPARATION FOR DEMOLITION. NEW
PERIMETER WALL TO BE CONSTRUCTED FIRST TO
ACT AS CONSTRUCTION BARRIER.
3. PHASE 1 WORK TO OCCUR IN JUNCTION WITH
PHASE 1 - AFTER HOURS.
4. VCS OFFICES AND ADJACENT CORRIDOR ARE OPEN
AND OCCUPIED AFTER COMPLETION OF PHASE 1
AND PHASE 1 - AFTER HOURS.
5. PHASE 2 TO BEGIN AFTER OFFICES AND CORRIDOR
ARE COMPLETE AND OPEN.
PHASE 2
1. CONTRACTOR TO CONSTRUCT INFECTION
CONTROL/CONSTRUCTION BARRIERS AS NOTED
ON PLAN. VA STAFF TO USE PATH THROUGH
EXISTING KITCHEN SPACE SEPARATED BY
CONSTRUCTION BARRIER WALLS THROUGHOUT
DURATION OF PHASE 2.
2. CONTRACTOR TO DEMOLISH, INCLUDING HAZMAT
AND MEP REMOVAL, AND RENOVATE, INCLUDING
MEP, AREAS OF THE STAFF SUPPORT SPACES AND
PUBLIC RESTROOMS AS INDICATED ON PLAN.
3. STAFF AREAS AND PUBLIC RESTROOMS ARE OPEN
AND OCCUPIED AFTER COMPLETION OF PHASE 2.
4. PHASE 3 TO BEGIN AFTER COMPLETION OF PHASE
2.
PHASE 3
1. CONTRACTOR TO CONSTRUCT INFECTION
CONTROL/CONSTRUCTION BARRIERS AS NOTED ON
PLAN. VA STAFF TO USE NEW CORRIDORS TO
TRAVEL THROUGH SPACE.
2. CONTRACTOR TO DEMOLISH, INCLUDING HAZMAT
AND MEP REMOVAL, AND RENOVATE, INCLUDING
MEP, AREAS FOR THE WOMEN'S CLINIC AND SWING
SPACE.
NOT IN PHASE BOUNDARY
PERMANENT INFECTION CONTROL BARRIER
WALLS AND/OR DOORS. SEE PLAN AND PLAN
NOTES
PHASE 3 - AFTER HOURS
1. CONTRACTOR TO DEMOLISH, INCLUDING MEP, AND
RENOVATE, INCLUDING MEP, THE CORRIDORS
DURING AFTER HOURS. CONTRACTOR TO
COORDINATE WITH THE VA FOR KITCHEN STAFF
ACCESS.
2. PHASE 3 - AFTERHOURS TO OCCUR IN JUNCTION
WITH PHASE 3.
PHASE 1 - AFTER HOURS
1. CONTRACTOR TO DEMOLISH, INCLUDING MEP, AND
RENOVATE, INCLUDING MEP, THE CORRIDOR DURING
AFTER HOURS. THE
2. CORRIDOR MUST BE OPEN DURING BUSINESS
HOURS. CONTRACTOR TO COORDINATE WITH THE
VA FOR KITCHEN STAFF ACCESS.
3. PHASE 1 - AFTERHOURS TO OCCUR IN JUNCTION
WITH PHASE 1.
PROJECT
LOCATION: FIRST
FLOOR
BUILDING 111 KEY PLAN
N
SHADE
INDICATES AREA
NOT IN SCOPE,
TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
REVISION 1 10-05-2022
C U s e rs
\m p a q u in
\O n e
D ri v e
G u id o n
D e s ig n in c \D o c u m e n ts \1
.1
.1
M E
P v m p a q u in
G
E N
G .r v t
/6 /2
:2
:4
P
M
F002
FIRE PROTECTION PHASING PLAN
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA STREET
SUITE 200
INDIANAPOLIS, INDIANA 46202
317.800.6388
CONSTRUCT WOMEN'S CLINIC
5000 W. NATIONAL AVE, MILWAUKEE, WI 53295
695-19-132
09/07/2022 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"F002
1 FIRE SUPPRESSION PHASING PLAN - PHASE 1 DEMOLITION
SCALE: 1/16" = 1'-0"F002
3 FIRE SUPPRESSION PHASING PLAN - PHASE 1 COMPLETE - PHASE 2 DEMOLITION
SCALE: 1/16" = 1'-0"F002
5 FIRE SUPPRESSION PHASING PLAN - PHASE 2 COMPLETE - PHASE 3 DEMOLITION
SCALE: 1/16" = 1'-0"F002
6 FIRE SUPPRESSION PHASING PLAN - CONTRUCTION COMPLETE
N N
N N
GENERAL NOTE:
ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING
MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE
TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS
ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND
MEP DRAWINGS FOR PHASING PLAN.
X U S RZAACCFFGG T
IIJJ HH
(TYP)
(TYP)
(TYP)
(TYP)
PROJECT
LOCATION: FIRST
FLOOR
BUILDING 111 KEY PLAN
N
SHADE
INDICATES AREA
NOT IN SCOPE,
TYP.
SANITATION
COMMUNICATION
CENTER
DISTRIBUTION
CASH COUNT
1409A
CORRIDOR
C1B08
TOILET FEMALE
E L
E C
T R
IC
A
L
E C
WATER SOFTNER
TRAYLINE
KETTLE AREA
CANTEEN DRY
STORAGE
FOOD PREP
& SERVICE
CLASSROOM /
CONFERENCE
ADPAC /
TRAINING
CANTEEN ADMIN
OFFICE
OFFICE
1409B
STORAGE
1409C
TOILET MALE
A. REFER TO F000 FOR FIRE SUPPRESSION GENERAL NOTES.
B. REFER TO F002 FOR DEMO PHASING.
FIRE SUPPRESSION DEMOLITION GENERAL NOTES
FIRE SUPPRESSION DEMOLITION PLAN NOTES #
1. PROVIDE NEW FIRE SPRINKLER HEAD. MODIFY EXISTING BRANCH PIPING
AS REQUIRED FOR NEW FIRE SPRINKLER HEAD.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
REVISION 1 10-05-2022
C U s e rs
\m p a q u in
\O n e
D ri v e
G u id o n
D e s ig n in c \D o c u m e n ts \1
.1
.1
M E
P v m p a q u in
G
E N
G .r v t
/6 /2
:2
:4
P
M
FDX101
FIRST FLOOR FIRE SUPPRESSION
DEMOLITION PLANGUIDON DESIGN, INC.
1221 N. PENNSYLVANIA STREET
SUITE 200
INDIANAPOLIS, INDIANA 46202
317.800.6388
CONSTRUCT WOMEN'S CLINIC
5000 W. NATIONAL AVE, MILWAUKEE, WI 53295
695-19-132
09/07/2022 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"FDX101
1 FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN
N
GENERAL NOTE:
ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING
MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE
TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS
ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND
MEP DRAWINGS FOR PHASING PLAN.
A. REFER TO F000 FOR FIRE SUPPRESSION GENERAL NOTES.
B. REFER TO GC101 FOR CONSTRUCTION PHASING.
C. REFER TO AE110 FOR RCP.
1. PROVIDE NEW FIRE SPRINKLER HEAD. MODIFY EXISTING BRANCH PIPING AS
REQUIRED FOR NEW FIRE SPRINKLER HEAD.
FIRE SUPPRESSION GENERAL NOTES
FIRE SUPPRESSION PLAN NOTES #
PROJECT
LOCATION: FIRST
FLOOR
BUILDING 111 KEY PLAN
N
SHADE
INDICATES AREA
NOT IN SCOPE,
TYP.
X U S RZAACCFFGG T
VCS OFFICE
CASH OUT
1465B
VCS CHIEF OFFICE
1465A
CONSULT
PATIENT TOILET
1448A
PROCEDURE
PATIENT TOILET
1452A
SOILED HOLDING
PROCEDURE
EXAM
EXAM
EXAM
EXAM
EXAM
FAMILY TOILET
1400A
LACTATION
CHECK-IN
INTAKE
LINEN CLOSET
INTAKE
PATIENT TOILET
LAB
CONSULT
CLEAN STORAGE
EQUIPMENT
INTAKE - ALCOVE
MENS TOILET
RECEPTION /
WAITING
WOMENS TOILET
ELECTRICAL
HAC
WHEELCHAIR
STORAGE
1400B
FAMILY WAITING
1400C
CORRIDOR
C1C03
CORRIDOR
C1C01
CORRIDOR
C1C02
CORRIDOR
C1C09
CORRIDOR
C1B06
CORRIDOR
C1C11
LOCKER ROOM
STAFF TOILET
RESIDENT
WORKROOM
CONFERENCE /
BREAK
CORRIDOR
C1C10
OPEN
WORKSTATIONS
SWING SPACE
STORAGE
INTAKE
MEDS
DRY STORAGE
CANISTER STORAGE
(TYP)
(TYP)
(TYP)
(TYP)
IIJJ HH
WHEELCHAIR WASH
PROVIDE FIRE SPRINKLER
COVERAGE FOR HOOD, AREA
AROUND HOOD, AND
REMAINING ROOM.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
REVISION 1 10-05-2022
C U s e rs
\m p a q u in
\O n e
D ri v e
G u id o n
D e s ig n in c \D o c u m e n ts \1
.1
.1
M E
P v m p a q u in
G
E N
G .r v t
/6 /2
:4
:2
P
M
FX101
FIRST FLOOR FIRE SUPPRESSION
PLANGUIDON DESIGN, INC.
1221 N. PENNSYLVANIA STREET
SUITE 200
INDIANAPOLIS, INDIANA 46202
317.800.6388
CONSTRUCT WOMEN'S CLINIC
5000 W. NATIONAL AVE, MILWAUKEE, WI 53295
695-19-132
09/07/2022 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
N
SCALE: 1/8" = 1'-0"FX101
1 FIRST FLOOR - FIRE SUPPRESSION PLAN
GENERAL NOTE:
ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING
MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE
TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS
ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND
MEP DRAWINGS FOR PHASING PLAN.
THE BASIS OF DESIGN OF SPACING AND SIZING FOR THE COMPLETE FIRE
SUPPRESSION SPRINKLER SYSTEM SHALL BE FOR A WET PIPE SYSTEM
HYDRAULICALLY CALCULATED FOR A:
1 LIGHT HAZARD AREA LIMITED TO A MAXIMUM OF 225 SQ. FT. PER SPRINKLER
WITH THE DENSITY OF 0.10 GPM/SQ. FT. OVER THE MOST REMOTE 1500 SQ. FT.
PROVIDE AN ADDITION OF 250 GPM HOSE ALLOWANCE.
2 ALL MECHANICAL, ELECTRICAL AND SIMILAR SPACE AREAS SHALL BE
ORDINARY HAZARD (GROUP 1) LIMITED TO A MAXIMUM OF 130 SQ. FT. PER
SPRINKLER WITH A DENSITY OF 0.15 GPM/SQ. FT. PROVIDE AN ADDITION OF
250 GPM HOSE ALLOWANCE.
3 ALL STORAGE, TRASH, FILE STORAGE AND SIMILAR SPACE AREAS SHALL BE
ORDINARY HAZARD (GROUP 2) LIMITED TO A MAXIMUM OF 130 SQ. FT. PER
SPRINKLER WITH A DENSITY OF 0.20 GPM/SQ. FT. PROVIDE AN ADDITION OF
250 GPM HOSE ALLOWANCE.
A/E ARCHITECT / ENGINEER
AD AREA DRAIN/ACCESS DOOR
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
ASD ADJUSTABLE SPEED DRIVES
ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATION, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF ECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
BFP REDUCED PRESSURE BACKFLOW
PREVENTER
BHP BREAK HORSEPOWER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CELSIUS
CA COMPRESSED AIR
CGA COMPRESSED GAS ASSOCIATION
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CO CLEANOUT
CS CLINICAL SINK
CV CONTROL VALVE
DCW DOMESTIC COLD WATER
DFU DRAINAGE FIXTURE UNITS
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
EL ELEVATION
EMCS ENERGY MONOSERRAT AND CENTRAL
SYSTEM
EPA ENVIROMENTAL PROTECTION AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EWS/SH EYE WASH/DRENCH SHOWER
EX EXISTING
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE) CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FS FLOW SWITCH
FU FIXTURE UNITS
GAL GALLON
GCO GRADE CLEANOUTS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H&CW HOT AND COLD WATER
HB HOSE BIBB
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK (DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
ID INSIDE DIAMETER
IE INVERT ELEVATION
ICW INDUSTRIAL COLD WATER
IHW INDUSTRIAL HOT WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
KW KILOWATT
KWH KILOWATT-HOUR
PLUMBING ABBREVIATIONS
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH 1000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTADING
MSB MOP SERVICE BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N20 NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM. NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
PA PASCAL
PD PRESSURE DROP OR DIFFERENCE
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAGE
PTRV PRESSURE TEMPERATURE RELIEF VALVE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RP RECIRCULATION PUMP
RO REVERSE OSMOSIS WATER
RWL RAIN WATER LEADER
SAN SANITARY SEWER
SMACNA SHEET METAL AND AIR
CONDITIONING ONTRACTORS
NATIONAL ASSOCIATION
SCFM STANDARD CUBIC FOOT/MINUTE
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SMH SANITARY MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT/SF SQUARE FEET
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL VALVE
TD TEMPERATURE DIFFERENCE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
V VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNITS
YCO YARD CLEANOUT
YH YARD HYDRANT
SECTION REFERENCE
DRAWING NUMBER
SHEET
LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
SCALE: ??
VIEW TITLE
N NORTH ARROW
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY, NIC
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING
NUMBER
SHEET NUMBER
X
X
XXXX
SHEET LOCATION
VIEW NUMBER
X X
X
SHEET LOCATION
VIEW NUMBER
XXXX
BUILDING SECTION REFERENCE
DRAWING NUMBER
SHEET
LOCATION
BUILDING X
XXXX
X
XXXX
ELEVATION REFERENCES
DRAWING SYMBOLS
XX-X X
EQUIPMENT
NUMBER
BUILDING NO. WHERE EQUIPMENT IS
LOCATED
EQUIPMENT ABBREVIATION
UNIT NUMBER TAG
CO
GENERAL PLUMBING SYMBOLS
TOP CONNECTION, 45o OR 90o
BOTTOM CONNECTION, 45o OR 90o
CAPPED OUTLET
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW AND
EXISTING WORK
LIMIT OF DEMOLITION
CLEAN OUT
BALANCE VALVE
BALL/BUTTERFLY VALVE
PLUMBING VALVE SYMBOLS
A. COORDINATE INSTALLATION OF PLUMBING SYSTEMS WITH ALL OTHER SYSTEMS. ANY
COST DUE TO LACK OF COORDINATION OF THIS SYSTEM WITH OTHER SYSTEMS WILL BE
THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR.
B. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE AREA TO BECOME
FAMILIAR WITH THE EXISTING CONDITIONS. VERIFY SIZE, LOCATION, AND USAGE OF
EXISTING UTILITIES PRIOR TO CONSTRUCTION. ROUTE PIPING AND CONNECT AS
REQUIRED.
C. DO NOT ROUTE ANY SYSTEMS OVER EXISTING AND/OR NEW ELECTRICAL AND/OR IT AND
TELECOMMUNCIATIONS ROOMS.
D. CUT, PATCH & REPAIR ALL OPENINGS IN WALLS, FLOORS, CEILING, ETC. WHERE
REQUIRED FOR NEW CONSTRUCTION. PATCHING SHALL MATCH EXISTING CONSTRUCTION
& FINISHES. COORDINATE ALL PATCHING AND FINISHES WITH ARCHITECT.
E. PROVIDE VALVE TAGS & PLASTIC LAMINATE IDENTIFICATION ON CEILING FOR ALL NEW
AND EXISTING VALVES AND EQUIPMENT LOCATED WITHIN THE CONSTRUCTION LIMITS AS
INDICATED IN THE SPECIFICATIONS.
F. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT
DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER
QUANTITY OF WORK, AS DETERMINED BY THE GOVERNMENT, SHALL BE PROVIDED.
G. CONTRACTOR IS TO VERIFY THE PRESENCE OF EXISTING CONDUIT IN THE EXISTING
FLOOR SLABS PRIOR TO ANY WORK TAKING PLACE.
PLUMBING GENERAL NOTES
PLUMBING PIPING SYMBOLS
DOMESTIC COLD WATER (CW)
DOMESTIC HOT WATER (HW)
DOMESTIC HOT WATER RETURN (HWR)
VENT (SANITARY)
SOIL, WASTE, OR SANITARY SEWER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
REVISION 1 10-05-2022
C U s e rs
\m p a q u in
\O n e
D ri v e
G u id o n
D e s ig n in c \D o c u m e n ts \1
.1
.1
M E
P v m p a q u in
G
E N
G .r v t
/6 /2
:1
:4
P
M
P000
PLUMBING SYMBOLS AND
ABBREVIATIONSGUIDON DESIGN, INC.
1221 N. PENNSYLVANIA STREET
SUITE 200
INDIANAPOLIS, INDIANA 46202
317.800.6388
CONSTRUCT WOMEN'S CLINIC
5000 W. NATIONAL AVE, MILWAUKEE, WI 53295
695-19-132
09/07/2022 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
TEMPORARY INFECTION CONTROL
BARRIER WALLS. SEE PLAN AND PLAN
NOTES
CONSTRUCTION ACCESS DOORS
BEYOND PROJECT
BOUNDARY
IC / PHASING LEGEND
PHASE 1
1. CONTRACTOR TO CONSTRUCT 1 HR RATED
CONSTRUCTION BARRIERS AS NOTED ON PLAN. VA
STAFF TO USE PATH THROUGH EXISTING KITCHEN
SPACE SEPARATED BY CONSTRUCTION BARRIER
WALLS THROUGHOUT DURATION OF PHASE 1 & 2.
2. CONTRACTOR TO DEMOLISH, INCLUDING HAZMAT
AND MEP REMOVAL, AND RENOVATE, INCLUDING
MEP, AREA OF VCS OFFICES. CONTRACTOR TO USE
EXISTING PERIMETER WALL AS CONTRUCTION
BARRIER SEPARATION FOR DEMOLITION. NEW
PERIMETER WALL TO BE CONSTRUCTED FIRST TO
ACT AS CONSTRUCTION BARRIER.
3. PHASE 1 WORK TO OCCUR IN JUNCTION WITH
PHASE 1 - AFTER HOURS.
4. VCS OFFICES AND ADJACENT CORRIDOR ARE OPEN
AND OCCUPIED AFTER COMPLETION OF PHASE 1
AND PHASE 1 - AFTER HOURS.
5. PHASE 2 TO BEGIN AFTER OFFICES AND CORRIDOR
ARE COMPLETE AND OPEN.
PHASE 2
1. CONTRACTOR TO CONSTRUCT INFECTION
CONTROL/CONSTRUCTION BARRIERS AS NOTED
ON PLAN. VA STAFF TO USE PATH THROUGH
EXISTING KITCHEN SPACE SEPARATED BY
CONSTRUCTION BARRIER WALLS THROUGHOUT
DURATION OF PHASE 2.
2. CONTRACTOR TO DEMOLISH, INCLUDING HAZMAT
AND MEP REMOVAL, AND RENOVATE, INCLUDING
MEP, AREAS OF THE STAFF SUPPORT SPACES AND
PUBLIC RESTROOMS AS INDICATED ON PLAN.
3. STAFF AREAS AND PUBLIC RESTROOMS ARE OPEN
AND OCCUPIED AFTER COMPLETION OF PHASE 2.
4. PHASE 3 TO BEGIN AFTER COMPLETION OF PHASE
2.
PHASE 3
1. CONTRACTOR TO CONSTRUCT INFECTION
CONTROL/CONSTRUCTION BARRIERS AS NOTED ON
PLAN. VA STAFF TO USE NEW CORRIDORS TO
TRAVEL THROUGH SPACE.
2. CONTRACTOR TO DEMOLISH, INCLUDING HAZMAT
AND MEP REMOVAL, AND RENOVATE, INCLUDING
MEP, AREAS FOR THE WOMEN'S CLINIC AND SWING
SPACE.
NOT IN PHASE BOUNDARY
PERMANENT INFECTION CONTROL BARRIER
WALLS AND/OR DOORS. SEE PLAN AND PLAN
NOTES
PHASE 3 - AFTER HOURS
1. CONTRACTOR TO DEMOLISH, INCLUDING MEP, AND
RENOVATE, INCLUDING MEP, THE CORRIDORS
DURING AFTER HOURS. CONTRACTOR TO
COORDINATE WITH THE VA FOR KITCHEN STAFF
ACCESS.
2. PHASE 3 - AFTERHOURS TO OCCUR IN JUNCTION
WITH PHASE 3.
PHASE 1 - AFTER HOURS
1. CONTRACTOR TO DEMOLISH, INCLUDING MEP, AND
RENOVATE, INCLUDING MEP, THE CORRIDOR DURING
AFTER HOURS. THE
2. CORRIDOR MUST BE OPEN DURING BUSINESS
HOURS. CONTRACTOR TO COORDINATE WITH THE
VA FOR KITCHEN STAFF ACCESS.
3. PHASE 1 - AFTERHOURS TO OCCUR IN JUNCTION
WITH PHASE 1.
PROJECT
LOCATION: FIRST
FLOOR
BUILDING 111 KEY PLAN
N
SHADE
INDICATES AREA
NOT IN SCOPE,
TYP.
PHASE 1
PHASE 1 -
AFTER HOURS
PHASE 2PHASE 2
VA TO OCCUPY
VCS OFFICES
(ABOVE)
PHASE 3
VA TO OCCUPY
STAFF AREA
(ABOVE)
PUBLIC RESTROOMS TO
BE OPEN TO PUBLIC
(ABOVE)
VA TO OCCUPY
VCS OFFICES
(ABOVE)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
REVISION 1 10-05-2022
C U s e rs
\m p a q u in
\O n e
D ri v e
G u id o n
D e s ig n in c \D o c u m e n ts \1
.1
.1
M E
P v m p a q u in
G
E N
G .r v t
/6 /2
:1
:4
P
M
P002
BASEMENT PLUMBING PIPING
PHASING PLANGUIDON DESIGN, INC.
1221 N. PENNSYLVANIA STREET
SUITE 200
INDIANAPOLIS, INDIANA 46202
317.800.6388
CONSTRUCT WOMEN'S CLINIC
5000 W. NATIONAL AVE, MILWAUKEE, WI 53295
695-19-132
09/07/2022 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
GENERAL NOTE:
ALL WORK TO BE COMPLETED SIMULTANEOUSLY (DEMOLITION - INCLUDING
MEP, HAZMAT REMOVAL, NEW CONSTRUCTION - INCLUDING MEP) BY PHASE
TO REDUCE DISRUPTION TO OCCUPIED SPACES. MULTIPLE MOBILIZATIONS
ARE NOT PERMITTED WITHOUT COR APPROVAL. REFER TO SHEET GC101 AND
MEP DRAWINGS FOR PHASING PLAN.
SCALE: 1/16" = 1'-0"P002
1 BASEMENT PLUMBING PIPING PHASING PLAN - PHASE 1 DEMOLITION
N
N
SCALE: 1/16" = 1'-0"P002
4 BASEMENT PLUMBING PIPING PHASING PLAN - NEW CONSTRUCTION
SCALE: 1/16" = 1'-0"P002
2 BASEMENT PLUMBING PIPING PHASING PLAN - PHASE 1 COMPLETE - PHASE 2 DEMOLITION
SCALE: 1/16" = 1'-0"P002
3 BASEMENT PLUMBING PIPING PHASING PLAN - PHASE 2 COMPLETE - PHASE 3 DEMOLITION
N
N