RFI Form Solicitation - Response 33 03-01-25.pdf

PDF 1 MB Posted

Attached to
506-21-103 Modernize Short Stay Federal contract opportunity
Solicitation number
36C25025B0008
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document is a Request for Information (RFI) for the VA Ann Arbor Medical Center project (Solicitation No. 36C25025B0008) concerning the Modernize Short Stay project. The RFI, submitted by SoundCom on 01/10/2025, seeks clarification about nurse call and speaker device plans for the Pre/Post OP C734 area, which is part of deduct #2 in the construction documents. The submitter notes confusion regarding the referenced drawing TA107, indicating no speakers or nurse call devices are plotted on the 04.24.2024 Bid Documents, and requests confirmation about device provisions.

The project is located at 2215 Fuller Rd, Ann Arbor, MI 48105, with the project number 506-21-103. The RFI emphasizes strict requirements for contractors submitting questions, mandating specific identification of solicitation sections, specification references, or drawing numbers when requesting clarification. The government warns that failure to comply with these documentation requirements may prevent a timely response.

View the file

Other files for this federal contract opportunity

Other files attached to 506-21-103 Modernize Short Stay, newest first.
File Type Posted
RFI Form Solicitation - Response 32 03-01-25.pdf PDF
RFI 5 1.20.25 RDC Response 02-20-25.pdf PDF
RFI 6 1.21.2025 RDC Response 02-20-25.pdf PDF
36C25025B0008 Amendment 0005.pdf PDF
RFI 10 1.28.2025_HE response.pdf PDF
RFI 36C25025B0008 Project 506-21-103 Modernize Short Stay Question 1 RDC Response.pdf PDF
VA Response 36C25025B0008_1 Modernize Short Stay Ann Arbor VAMC - RB Construction_RFI 006 03-06-25.pdf PDF
36C25025B0008_1 Modernize Short Stay Ann Arbor VAMC - RB Construction_RFI 005 RDC Response 03-05-25.pdf PDF
Manual_GH3_GB_US.pdf PDF
datasheet_gh3-twin_Guldmann.pdf PDF
RFI 8 1.23.25 RDC Response 02-26-2025.pdf PDF
RFI Form Solicitation - Humidifier RFI RDC Response 03-03-25.pdf PDF
RFI - Manual or Motorized Shades A127 RDC Response 02-20-25.pdf PDF
RFI 36C25025B0008 Project 506-21-103 Modernize Short Stay Question 3 RDC Response.pdf PDF
VA AA Short Stay_23 09 23.pdf PDF
Manitowoc_SY0324A Ice Machine.pdf PDF
datasheet_rails_gb.pdf PDF
RFI12 2.3.25 RDC Response 02-26-2025.pdf PDF
RFI Form Solicitation - 8 02-28-25.pdf PDF
RFI 11 1.29.25 RDC Response 03-04-25.pdf PDF
RFI 2-21-25 RDC Response 3-6-25.pdf PDF
36C25025B0008 Amendment 0004.pdf PDF
RFI Image 04..pdf PDF
36C25025B0008 Amendment 0003.pdf PDF
RFI Image 02..pdf PDF
RFI Image 03..pdf PDF
RFI Image 01..pdf PDF
36C25025B0008 AMENDMENT 0002.pdf PDF
506-21-103 Modernize Short Stay Pre Bid Sign in Sheets.pdf PDF
506-21-103 Modernize Short Stay 100 BD Revised - Drawings.pdf PDF
506-21-103 Modernize Short Stay 100 BD Revised - Specifications.pdf PDF
36C25025B0008 AMENDMENT 0001.pdf PDF
Project - 506-21-103 Modernize Short Stay - Specifications.pdf PDF
Project - 506-21-103 Modernize Short Stay - Drawings 2.pdf PDF
RFI Form Solicitation.doc DOC document
36C25025B0008.pdf PDF
Project - 506-21-103 Modernize Short Stay - Drawings 3.pdf PDF
Wage Determination - MI20240100 10.25.2024.pdf PDF
Project - 506-21-103 Modernize Short Stay - Drawings 1.pdf PDF
Contractor EMR Certification Form .docx DOCX document
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

Solicitation No. 36C25025B0008

TO: Contract Specialist: Christina Shockey

Email: Christina.Shockey@va.gov

RFI NO.: 33 DATE: 01/10/2025 REFERENCE: Pre / Post OP C734

REPLY NEEDED BY:

INFORMATION NEEDED:

Is a nurse call and speaker device plan for Pre / Post OP C734 available?

REPLY:

• Reference 100% Construction Documents dated 12/01/2023 drawing TA107 for nurse call and speaker device locations.

Pre/Post OP C734 is part of deduct #2.

I find no Construction Documents dated 12/01/2023 drawing TA107.

On Bid Documents 100% dated 04.24.2024 there are no Speakers or Nurse Call plotted. Does this indicate none are to be provided?

PROJECT NUMBER: 506-21-103 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.

PROJECT TITLE: Modernize Short Stay PROJECT LOCATION: Ann Arbor VAMC

2215 Fuller Rd

Ann Arbor, MI 48105

SUBMITTED BY: SoundCom – Pete Lawson City/State: Farmington Hills, MI

PHONE NO.: 616.262.6605

cmoyer Text Box Please see attached TA107 from bid documents

REPLY FROM:

DATE:

ATTACHMENTS:

COPY TO:

AP

EDC

2 2 2 2

HD HD

EDC

CR

EDC

CR CR

EDC

EDC

10CR

CR C

R

EDC

3 EDC

EDC

EDC

8CR CR

CR

EDC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

AP

2 2 2

AP

AP

AP

AP

AP

AP

AP

AP

AP

AP

AP

N T

N T

N T

N T

N T

N T

N T

N T

N T

NS

N

NC

NC NC NC

N

NSNM

N E

N E

NS N N

N

NS

N T

NS NS

NC

NC

NC NC NC NC NC

NM

N

NC NC NC NC NC NC NC

NC

NM

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

N T

CC

72" MH 2

72" MH

72" MH2

38" MH2

38" MH

72" MH

38" MH

72" MH

38" MH

72" MH

38" MH

72" MH

38" MH

72" MH

38" MH

72" MH

38" MH

72" MH

38" MH

72" MH

38" MH

72" MH

38" MH

72" MH

38" MH

72" MH

38" MH

72" MH

38" MH

72" MH

38" MH

72" MH

38" MH

72" MH

38" MH

72" MH

38" MH

72" MH

38" MH

38" MH 2

72" MH 2

36" MH 2

80" MH 2

36" MH 2

80" MH 2

36" MH 2

80" MH 2

36" MH 2

80" MH 2

36" MH 2

80" MH 2

72" MH

38" MH

72" MH

38" MH

36" MH

80" MH

36" MH

80" MH

72" MH2

38" MH2

N E

6666666

N T

HA

HA

HA

HA

HA HA

2 2

NC

72" MH

38" MH

72" MH

38" MH

N E

N E

N E

N E

N E

N E

N

EN

E N

E

N E

N E

N E

N

N

N N N N N

SP

SP

N T

N T

N T

N T

N T

N T

N T

N T

N T

N T

N T

N

TN T

N T

N T

" M

H 1R

R

72" MH

R

72" MH

R

78" MH

R

78" MH

R

72" MH

R

72" MH

R

72" MH

R

72" MH

1R

" M

H

CRHA

HA

2 2

SP

N E

N E

N E

N E

N E

N E

N E

72" MH

R

I

IIIIII II

I

R

72" M H 1

38" MH2

72" MH

R

72" MH

R

72" MH

R

72" MH

R

R

72" MH

R

72" MH

R

R

72" MH1

R

NS N

NNNNNNNNNN

N

N

AREA OF WORK

WEST SERVICE BAY EAST SERVICE BAY

QPNL

K

JG

C711

Patient Bedroom (Isolation)

C717 Huddle

C701B

Patient Toilet

C762

Family Waiting

C737

Cardiology Procedure /

TEE

C737B

Clean Probe Storage

C701

Cardiology Procedure/Patient

Bedroom

C702

Patient Bedroom

C709

Bariatric Patient

Bedroom (Isolation) C708

Patient Bedroom C707

Patient Bedroom

C706

Patient Bedroom (Isolation)

C704

Patient Bedroom (Isolation)

C713

Patient Bedroom

C718-1 Corridor-1

C714

Patient Bedroom

C719 Office

C725 Breakroom

C715

Electrical Room

C730

Equipment Alcove

C718 Corridor

C736

Nurse Station

C721

Nurse Station

C723

Soiled Holding

T401

E.1 E.4 F.3 G.3

8.1

8.8

9.7

N.6

C742A C726

C725

C728

C729 C731 C737J

Toilet/Changing

C714B

Patient Toilet

C713B

Patient Toilet

C712

Patient Bedroom

C711B

Patient Toilet

C709B

Patient Toilet

(Bariatric)

C710 Anteroom

C708B

Patient Toilet

C720 Cart/Stretcher

C718A Corridor

C731 Meds

C729B Cart/Stretcher

C707B

Patient Toilet

C706B

Patient Toilet C704B

Patient Toilet

C705 Anteroom

C702B

Patient Toilet

C718C Corridor C741

Cardiology Waiting

C734A

Nurse Station

C735

Electrical Closet

C732 Staff Toilet

C727

HAC

C742

Staff Lactation C726

Med. Gas

C728

Clean Linen / Clean Utility

C729 Nourishment

C703

Patient Bedroom

AB29-1-1,2,3,4,

5,6,7,8

AB29-1-12,13,14,15,

16,17,18,19

AB29-1-

20,21,22,23, 24,25,26,27

AB29-1-

31,32,33,34, 35,36,37,38

AB29-2-

1,2,3,4 ,5,6,7,8

AB29-2-

12,13,14,15, 16,18,19,20

AB29-2-

24,25,26,27, 28,29,30,31

AB29-2-

35,36,37,38, 39,40,41,42

AB29-3-

1,2,3,4, 5,6,7,8

AB29-3-

12,13,14,15, 16,17,18,19

AB29-3-20,21,22

C716

AB29-3-

23,24,25,26, 27,28,29,30

AB29-

3-34,35,36,37, 38,39,40,41

AB29-3-42,43

C718D

AB29-3-44,45

AB29-3-46,47

T401

AB29-4-16,17

AB29-4-18,19,

20,21, 22,23

AB29-5-9,10

AB29-5-11,12 AB29-5-13,14

AB29-5-15,16

AB29-5-25,26

AB29-5-19,20

AB29-5-21,22

AB29-5-23,24

Staff Locker Room

C716

C730

C734

PRE /

POST OP

AB29-3-9,10,11

AB29-2-

43,44,45

AB29-2-32,33,34

AB29-2-

21,22,23

AB29-2-

9,10,11

AB29-1-

39,40,41

AB29-1-28,29,30

AB29-1-

9,10,11

AB29-4-

34,35,36,37

AB29-4-

38,39,40,41

AB29-4-

42,43,44,45

AB29-5-

1,2,3,4

AB29-5-

5,6,7,8

C734B

STAFF TLT

AB29-4-

26,27,28,29

AB29-4-

30,31,32,33

TR

E718A

S

AB29-3-31,32,33

S

S SSSS S

SS SS

S

C715B

Endoscopy Waiting

Corridor-2

C718-2

C712B

Patient Toilet

Patient Toilet

C703B

SSSSS

S

S

AB29-4-24,25

AB29-5-17,18

AB29-5-

27,28,29,30 ,31,32,33,34

AB29-5-35,36

AB29-5-37,38

BAS: FINAL LOCATION

TO BE COORDINATED

P: 567-250-9130 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 35% 02.25.2022

Design Development 65% 04.28.2023

Construction Documents 95% 09.05.2023

Bid Documents 100% 12.01.2023

PROJECT NO.

STATE COA FIRM NO.

/3 /2

:2

:5

P M

Modernize Short Stay Unit & Observation Beds

Building 1E

12/01/2023

PARTIAL SEVENTH FLOOR PLAN -

TELECOMMUNICATIONS

TA107

GESJCM

506-21-103

Ann Arbor, Michigan (506)

B01E

Department of Veterans Affairs

100% CONSTRUCTION

DOCUMENTS

21025.00

2021-05246

KEY PLAN

N Scale: 3/32" = 1'-0"

PARTIAL SEVENTH FLOOR PLAN -

TELECOMMUNICATIONS

PLAN NOTES:

1. LOCATION OF TELECOMMUNICATIONS ROOM SERVING THE AREA OF RENOVATION.

2. SEE ENLARGED PLAN ON SHEET T401 FOR MORE INFORMATION.

3. SEE COLUMN LINE G.3-8 FOR BAS - DATA GENERAL LOCATION TO BE COORDINATED.

GENERAL NOTES:

A. INCLUDE PILLOW SPEAKER WITH EACH PATIENT BED NURSE CALL STATION.

Revisions Date

PHASING NOTE:

REFER TO THE ARCHITECTURAL DOCUMENTS FOR A SEQUENCE OF CONSTRUCTION PLAN, THIS PROJECT IS INTENDED TO BE DONE AS A SINGLE PHASE. ALL WORK SHALL BE COORDINATED AND SCHEDULED WITH THIS CONSTRUCTION SEQUENCE. ALL REQUIRED SHUTDOWNS SHALL BE IDENTIFIED AT THE START OF CONSTRUCTION

AND SHALL BE COORDINATED AND SCHEDULED

WITH THE VA.

File details come from the government source that posted it. Updated .