36C25025B0008.pdf

PDF 964 KB Posted

Attached to
506-21-103 Modernize Short Stay Federal contract opportunity
Solicitation number
36C25025B0008
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This is a solicitation package (SF1442) for a construction project to modernize the Short Stay Clinic at the Ann Arbor VA Medical Center. The work includes renovating patient rooms, specialty procedure rooms, staff areas, storage rooms, and locker rooms; upgrading physical security systems; installing a new air handler unit with associated ductwork and controls; and testing/balancing of HVAC, data and water systems.

The solicitation is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses with a magnitude between $5-10 million under NAICS code 236220. The performance period is 240 calendar days after notice to proceed. Bids are due January 28, 2025 at 1:00pm EST with a pre-bid site visit scheduled for January 7, 2025 at noon EST. The project will take place on the 6th, 7th and 8th floors of Building 1E at the Ann Arbor VAMC. Three deductive bid alternates are included: window replacement work, pre/post-op suite work, and work related to specific patient suites. A bid guarantee of 20% (not to exceed $3 million) is required.

View the file

Other files for this federal contract opportunity

Other files attached to 506-21-103 Modernize Short Stay, newest first.
File Type Posted
RFI 10 1.28.2025_HE response.pdf PDF
RFI 36C25025B0008 Project 506-21-103 Modernize Short Stay Question 1 RDC Response.pdf PDF
VA Response 36C25025B0008_1 Modernize Short Stay Ann Arbor VAMC - RB Construction_RFI 006 03-06-25.pdf PDF
36C25025B0008_1 Modernize Short Stay Ann Arbor VAMC - RB Construction_RFI 005 RDC Response 03-05-25.pdf PDF
Manual_GH3_GB_US.pdf PDF
datasheet_gh3-twin_Guldmann.pdf PDF
RFI 8 1.23.25 RDC Response 02-26-2025.pdf PDF
RFI Form Solicitation - Humidifier RFI RDC Response 03-03-25.pdf PDF
RFI - Manual or Motorized Shades A127 RDC Response 02-20-25.pdf PDF
RFI 36C25025B0008 Project 506-21-103 Modernize Short Stay Question 3 RDC Response.pdf PDF
RFI Form Solicitation - Response 32 03-01-25.pdf PDF
RFI Form Solicitation - Response 33 03-01-25.pdf PDF
RFI 5 1.20.25 RDC Response 02-20-25.pdf PDF
RFI 6 1.21.2025 RDC Response 02-20-25.pdf PDF
36C25025B0008 Amendment 0005.pdf PDF
VA AA Short Stay_23 09 23.pdf PDF
Manitowoc_SY0324A Ice Machine.pdf PDF
datasheet_rails_gb.pdf PDF
RFI12 2.3.25 RDC Response 02-26-2025.pdf PDF
RFI Form Solicitation - 8 02-28-25.pdf PDF
RFI 11 1.29.25 RDC Response 03-04-25.pdf PDF
RFI 2-21-25 RDC Response 3-6-25.pdf PDF
36C25025B0008 Amendment 0004.pdf PDF
RFI Image 02..pdf PDF
RFI Image 03..pdf PDF
RFI Image 01..pdf PDF
RFI Image 04..pdf PDF
36C25025B0008 Amendment 0003.pdf PDF
506-21-103 Modernize Short Stay Pre Bid Sign in Sheets.pdf PDF
36C25025B0008 AMENDMENT 0002.pdf PDF
506-21-103 Modernize Short Stay 100 BD Revised - Specifications.pdf PDF
36C25025B0008 AMENDMENT 0001.pdf PDF
506-21-103 Modernize Short Stay 100 BD Revised - Drawings.pdf PDF
Project - 506-21-103 Modernize Short Stay - Drawings 3.pdf PDF
Wage Determination - MI20240100 10.25.2024.pdf PDF
Project - 506-21-103 Modernize Short Stay - Specifications.pdf PDF
Project - 506-21-103 Modernize Short Stay - Drawings 2.pdf PDF
RFI Form Solicitation.doc DOC document
Project - 506-21-103 Modernize Short Stay - Drawings 1.pdf PDF
Contractor EMR Certification Form .docx DOCX document
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25025B0008 - Modernize Short Stay - 506-21-103 - Ann Arbor VAMC, MI

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. EMAIL ADDRESS

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

EMAIL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________

(hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

1 90

36C25025B0008

X

12-03-2024

506-25-1-586-0002

506-21-103

36C250

Department of Veterans Affairs

Network Contracting Office (NCO) 10

24 Frank Lloyd Wright Dr., Lobby M2200

Ann Arbor MI 48105

Department of Veterans Affairs

Network Contracting Office (NCO) 10

24 Frank Lloyd Wright Dr.

Lobby M2200

Ann Arbor MI 48105

Shockey, Christina Christina.Shockey@va.gov

Project entitled Modernize Short Stay, project number 506-21-103, which requires the contractor to furnish all labor, materials, supervision, equipment, and all other necessary resources to fully complete the work identified in the contract specifications and drawings.

See Important Bidder Information starting on page 9.

This acquisition is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses with the ability to accomplish the work via North American Industry Classification System (NAICS) code 236220, $45 Million Small Business Size Standard.

Place of Performance is at the Ann Arbor VA Medical Center, Ann Arbor, Michigan 48105.

Magnitude of Construction is Between $5,000,000 and $10,000,000.

10 240

52.211-10

1 1:00pm EST

01-28-2025

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your

Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

SEE BID SCHEDULE ON PAGE 3

Offeror Email Address:

Offeror Federal Tax ID:

Offeror Unique Entity ID:

Network Contracting Office (NCO) 10

6150 Oak Tree Blvd., Suite 300

Independence OH 44131

36C250 Department of Veterans Affairs

Financial Services Center

Invoices to be Submitted Electronically www.ob10.com/us/en/veterans-affairs// e-Invoice Setup Info Phone 877-489-6135 TX 78714-9971

Kyle Lipper

BID SCHEDULE

36C25025B0008

Project 506-21-103 Modernize Short Stay

ALL ITEMS MUST BE PRICED IN ORDER TO BE RESPONSIVE TO THE SOLICITATION

Per Veterans Affairs Acquisition Regulation (VAAR) Provision 852.236-92 – NOTICE TO

BIDDERS – ADDITIVE OR DEDUCTIVE BID LINE ITEMS (APR 2019) The low bid shall be the

Bidder that—

(i) Is otherwise eligible for award; and

(ii) Offers the lowest aggregate amount for the first or base line item, plus or minus (in the order stated in the list of priorities in the bid schedule) those additive or deductive line items that provide the most features within the funds determined available.

The included Deductive Bid Items are listed in descending order of priority in the event funds are not available to award Bid Item I, Base Bid, Entire Project. Deductive No. 1 is the highest priority, Deductive No. 2 second highest priority, and Deductive No. 3 is the lowest priority.

BID ITEMS

Bid Item No. I, Base Bid, Entire Project: Contractor shall furnish all labor, materials, equipment, supervision, and all other necessary items to complete entire project 506-21-103

Modernize Short Stay per contract documents. Work location is the VA Ann Arbor.

Performance Period for Bid Item I, Base Bid, Entire Project is 240 Calendar Days after receipt of

Notice to Proceed.

Total Bid Item No. I Base Bid, Entire Project: $____________ (Lump Sum)

Bid Item No. II, Deductive No. 1: Deduct all work related removal and replacement of windows.

Performance Period for Bid Item No. II, Deductive No. 1 is 233 Calendar Days after receipt of

Notice to Proceed.

Deductive Amount No. 1: Subtract -$_____________

Bid Item No. III, Deductive No. 2: Deduct all work related pre & post op suite.

Performance Period for Bid Item No. III, Deductive No. 2 is 150 Calendar Days after receipt of Notice to

Proceed.

Deductive Amount No. 2: Subtract -$_____________

Bid Item No. IV, Deductive No. 3: Deduct all work related to patient suites C712, C713, C714.

Performance Period for Bid Item No. IV, Deductive No. 3 is 233 Calendar Days after receipt of Notice to

Proceed.

Deductive Amount No. 3: Subtract -$____________

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or

Repair)

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,

ALTERATION, OR REPAIR)– BACK

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)

2.2 52.216-1 TYPE OF CONTRACT (APR 1984)

2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE

OF THE WORK (MAY 2014)

2.4 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION

MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)

2.5 52.233-2 SERVICE OF PROTEST (SEP 2006)

2.6 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

2.7 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

2.8 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION

(OCT 2018)

2.9 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

2.10 VAAR 852.236-92 NOTICE TO BIDDERS—ADDITIVE OR DEDUCTIVE BID LINE

ITEMS (APR 2019)

2.11 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES

INCORPORATED BY REFERENCE (JAN 2008)

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024) ...25

3.2 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—

REPRESENTATION AND DISCLOSURES (DEC 2023)

3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (NOV 2021)

GENERAL CONDITIONS

4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

4.2 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR

INFORMATION SYSTEMS (NOV 2021)

4.3 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984) ALTERNATE I (APR 1984)

4.4 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022)

4.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION

(FEB 2024)

4.6 52.223-21 FOAMS (MAY 2024)

4.7 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE

AGREEMENTS (NOV 2023)

4.8 52.240-1 PROHIBITION ON UNMANNED AIRCRAFT MANUFACTURED OR

ASSEMBLED BY AMERICAN SECUIRTY DRONE ACT—COVERED FOREIGN

ENTITIES (NOV 2024)

4.9 SUPPLEMENTAL INSURANCE REQUIREMENTS

4.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

4.11 52.244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (NOV 2024)

4.12 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)

4.13 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)

4.14 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (MAY 2020)

4.15 VAAR 852.204-71 INFORMATION AND INFORMATION SYSTEMS SECURITY

(FEB 2023)

4.16 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)

4.17 VAAR 852.219-70 VA SMALL BUSINESS SUBCONTRACTING PLAN MINIMUM

REQUIREMENTS (JAN 2023) (DEVIATION)

4.18 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED

SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)

(DEVIATION)

4.19 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)

(DEVIATION)

4.20 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND

VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)

4.21 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)

4.22 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (INCLUDING NAS– CPM) (NOV 2018)

4.23 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

4.24 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

(APR 2019)

4.25 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)

4.26 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)

ALTERNATE I (APR 2019)

4.27 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT

ADMINISTRATION (OCT 2020)

4.28 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) ..78

4.29 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT

(SEP 2019)

4.30 MANDATORY WRITTEN DISCLOSURES

4.31 IT CONTRACT SECURITY

4.27 ADDITIONAL ATTACHMENTS

CONSTRUCTION SCOPE OF WORK

Project 506-21-103 Modernize Short Stay

1. GENERAL INTENT:

The General Intent of this project is to renovate the Patient Short Stay Clinic and supporting facilities to be more modern and effective. This will include updating patient rooms, staff areas such as the nurse’s station, locker rooms, storage rooms, and procedure rooms.

2. LOCATION OF WORK:

The work is located on the Sixth (6th), Seventh (7th), and Eighth (8th) Floors of Building 1E at Ann

Arbor VA Medical Center, 2215 Fuller Road, Ann Arbor, MI 48105.

3. DESCRIPTION OF WORK TO BE PERFORMED:

The Contractor shall furnish all labor, tools, materials, and equipment to renovate Patient Short Stay

Clinic. Work includes, but is not limited to, the following:

Renovation of existing patient rooms, specialty procedure rooms, staff areas, storage rooms, and locker rooms. Upgrading physical security systems. Installation of new Air Handler Unit, air terminal unit boxes, ductwork, and diffusers, and control valves. Testing, adjusting, and balancing of the entire

HVAC, data, and water system, including air handling unit, supply, return, and exhaust systems.

Commissioning of all systems as per VA commissioning guidelines. Coordinating any sort of shutdowns, equipment removals and/or installations with a two (2) week written notice given to the

COR.

Asbestos is not reported to be on any of the mechanical systems affected by this project.

The structure of the building will not be modified.

The above paragraphs constitute a basic outline of the work to be accomplished and in no way comprise all the details for this project. Contractor shall refer to drawings and specifications for comprehensive construction requirements.

4. PERIOD OF PERFORMANCE:

The Period of Performance (POP) for this work is 240 calendar days from the Notice to Proceed.

IMPORTANT BIDDER INFORMATION

BIDDING MATERIALS: All bidding materials consisting of the solicitation, all issued amendments, bidding forms, specifications, drawings, and all other related documents will be posted to the Contract

Opportunities website located at https://sam.gov/content/opportunities - this is the only official location where solicitation and bidding documents can be obtained and where updates are posted. No ‘hard copy’ bidding materials are available nor is there a ‘bidders list’ maintained.

BID SUBMISSION: The following documents shall be included with the bid submission:

(1) An original, completed, signed and dated SF 1442 Offer page (‘wet ink signature’).

(a) An original completed Bid Schedule if one is provided - otherwise the lump sum bid amount for the entire project is entered in block 17 of the SF1442 Offer page.

Failure to provide a properly completed and signed original offer could result in the bid being determined non-responsive and rejected. EMAILED, FAXED, OR DELIVERY BY ANY OTHER

ELECTRONIC MEANS IS NOT AUTHORIZED.

(2) Acknowledgment of all amendments that are issued by one of the following methods:

a)Completing block 19 of the SF1442 by entering and acknowledging all issued amendments or;

b)Completing blocks 15a, b, and c of each issued amendment and including with the bid submission.

Failure to acknowledge an Amendment or Amendments could (case dependent) result in the bid being determined non-responsive and rejected.

(3) An original completed and signed SF 24 Bid Bond or other allowable Bid Security. Failure to provide acceptable bid security in the proper amount, form, and content shall result in the bid being determined non-responsive and shall be rejected.

(4) Completed Annual Representations and Certifications (FAR 52.204-8) (MAY 2022). It is recommended that bidders complete their Representations and Certifications online at

WWW.SAM.GOV.

(5) Completed Contractor Experience Modification Rate (EMR) Certification documents (see solicitation attachments for the form).

(6) Completed Certification required by VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON

SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND

CONSTRUCTION (JAN 2023) (DEVIATION).

Failure to provide a completed and legibly signed certification by an authorized company representative shall result in the bid being determined non-responsive and shall be rejected.

(7) Any and all other documentation required by the solicitation.

Bidders are wholly responsible for insuring and verifying their offer and all required bid documents are received at the office designated in block 8 of the SF 1442 by the date and time specified in block 13a. of the SF 1442 (subject to amendment).

https://sam.gov/content/opportunities http://www.sam.gov/

ADDITIONAL SOLICITATION INFORMATION

PROJECT No. 506-21-103 SCOPE OF WORK STATEMENT:

The Contractor shall furnish all labor, tools, materials, and equipment to renovate Patient Short Stay

Clinic. Work includes, but is not limited to, the following: Renovation of existing patient rooms, specialty procedure rooms, staff areas, storage rooms, and locker rooms. Upgrading physical security systems.

Installation of new Air Handler Unit, air terminal unit boxes, ductwork, and diffusers, and control valves.

Testing, adjusting, and balancing of the entire HVAC, data, and water system, including air handling unit, supply, return, and exhaust systems. Commissioning of all systems as per VA commissioning guidelines.

Coordinating any sort of shutdowns, equipment removals and/or installations with a two (2) week written notice given to the COR.

WAGE DETERMINATION: Department of Labor General Decision Number MI20240100 dated

10/25/2024 is included as an attachment to solicitation and is applicable to any resultant contract. If necessary, subsequent revisions will be posted to the solicitation via amendment prior to bid opening.

Revision may also be applicable prior to any contract award. Wage decisions are available at Wage

Determinations Online (WDOL) at https://sam.gov/content/wage-determinations .

REQUESTS FOR INFORMATION (RFI): To obtain clarifications and/or additional information concerning the solicitation requirements, specifications and/or drawings, or any other issue pertaining to the advertisement for bids, submit a written RFI utilizing the RFI Form attached to this solicitation and send via email to the attention of Contract Specialist Christina.Shockey@va.gov. The subject line of the email must read ‘RFI # – 36C25025B0008 Project 506-21-103 Modernize Short Stay. RFIs related to the project technical documents must be specific identifying section, paragraph and page no. of the specifications or cite the drawing number and must be in question format. RFIs related to the solicitation or other related documents shall refer to the specific provision, clause, etc. All RFIs submitted shall include the solicitation number and title, contractor name, city, state, telephone, email address, date submitted, and the RFI question(s). RFI responses will be posted to the original solicitation located at in amendment format. Deadline for submission of RFIs for this solicitation is January 14, 2025. No questions will be answered after this date unless determined to be in the best interest of the Government as deemed by the Contracting Officer. Telephone requests for information will not be accepted nor returned.

TYPE OF SET-ASIDE

THIS SOLICITATION IS A TOTAL SET-ASIDE FOR

SERVICE-DISABLED VETERAN OWNED SMALL BUSINESSES (SDVOSB)

SEE VAAR CLAUSE 852.219-73 FOR ELIGIBILITY REQUIREMENTS.

DATABASE REGISTRATION INFORMATION

SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION: The System for Award

Management (SAM) website located at https://sam.gov is the Official U.S. Government system that consolidated the capabilities of the Central Contractor Registration (CCR including FedReg), Online

Representations and Certifications Application (ORCA), and the Excluded Parties List System (EPLS).

Federal Acquisition Regulations require that federal contractors wishing to do business with the

Government and bid on work shall have an active registration in SAM. The offeror shall have an active registration in SAM at the time of offer submission otherwise the Contracting Officer shall deem the https://sam.gov/content/wage-determinations mailto:Christina.Shockey@va.gov https://sam.gov/ offeror’s bid non-responsive to the solicitation requirements (see FAR 52.204-7 for complete SAM registration requirements).

THE EXCLUDED PARTIES LIST SYSTEM (EPLS): To ensure that the individuals or businesses providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and

1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System (EPLS) located at https://sam.gov for each person or business providing services under this contract. During the performance of this contract the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities.

VETS-4212 REPORTING REQUIREMENT: Contractors are required to submit a required annual

Form VETS-4212, Federal Contractor Veterans' Employment Report in all cases where the contractor or subcontractor has received an award of $150,000 or more in any fiscal year. Contracting Officers are prohibited from awarding a contract to a contractor that has not submitted a required VETS-4212 Report with respect to the preceding fiscal year if the contractor was subject to the reporting requirement of 38

U.S.C. 4212(d). Submit this report as soon as possible, if not already submitted, to avoid delays in the contract award process. For more information on this requirement and/or for completing the web-based reporting form, visit the following website https://www.dol.gov/agencies/vets/programs/vets4212. See

FAR provision 52.222-38, Compliance with Veterans' Employment Reporting Requirements (FEB 2016) under the Representations, Certifications and Other Statements of Offerors, and FAR clause 52.222-37, Employment Reports on Veterans (JUN 2020) found in the General Conditions section of the solicitation.

BONDING INFORMATION

BID GUARANTEE: A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for opening of bids, shall require rejection of the bid in all cases except those listed in Federal Acquisition Regulation (FAR) 28.101-4. Bid Bonds must be provided using Standard

Form 24 (see FAR 28.106-1) and the form must be provided in original (no white outs, faxed or copied signatures, seals) with ‘wet ink’ signatures and contain the proper solicitation number, bid opening date, and be from a corporate surety listed in Department of Treasury Circular 570. Individual sureties are subject to the approval and acceptance of the Contracting Officer (see FAR 28.203) and be accompanied by Standard Form 28 Affidavit of Individual Surety. Other forms of bid security may be acceptable as denoted in FAR Part 28.203-2.

PERFORMANCE AND PAYMENT BONDS: In accordance with Contract Clause 52.228-15, and

FAR 28.102, Contractors are reminded that any amount awarded over $35,000.00 shall require a Payment

Bond (SF 25A), and awards exceeding $150,000.00 shall require both Payment and Performance Bonds

(SF 25). Payment and Performance bonds are due no later than 10 days after notification of award.

Bonds must be provided with original ‘wet ink’ signatures - no white-outs or other corrections are allowable. Copies and facsimiles of bonds are not acceptable.

SECURITY

BACKGROUND INVESTIGATIONS: All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation is commensurate with the level of access needed to perform the statement of work. This requirement is also applicable to all subcontractor personnel requiring the same level of access.

https://sam.gov/ https://www.dol.gov/agencies/vets/programs/vets4212

Levels and associated types of Background Investigations:

• If the project requires that workers have only limited physical access to the VA facility for a period of one year or less, a local flash badge with fingerprint check is issued.

• If the project requires that workers require un-supervised, logical and/or physical access for 180 consecutive or aggregate days in a 365 day period, over a 3 year period, a background investigation may be required (Special Agency Check (SAC)) which must be completed prior to being allowed access.

• If the project requires that workers have access to a VA Network (such as the Building

Management System) or un-supervised, full-time, logical, and/or restricted physical access for more than 6 months or more than 180 aggregate days in a one-year period, a background investigation is required (Special Agency Check and National Agency Check with Written

Inquiries (NACI)) and access is not allowed until a favorable SAC completion.

All costs for SAC and NACI checks are borne by the contractor. The VA may at its discretion make deductions against the contract in order to recoup the investigation costs. At present, the VA is not charging contractors for background investigations but this is subject to change.

MEDICAL CENTER ACCESS: Anyone participating in the site visit, or for any other reason that involves visiting the medical center related to this solicitation, must have a valid ID on their person and their vehicle must be properly registered and insured. Company owned vehicles must be clearly marked.

Visitors are prohibited from possessing weapons while on a federal installation (See 18 USC 930 –

Possession of Firearms and Dangerous Weapons in Federal Facilities). Handheld cellphone usage or texting while driving is also prohibited. All VA Medical Centers and associated properties are Federal

Property. Smoking and vaping is prohibited on medical center grounds including in vehicles or contractor owned/leased office or storage trailers.

PRIVACY TRAINING: All workers regardless of project length must take VA Privacy Training which will be coordinated after project award with the Contracting Officer’s Representative.

E-VERIFY SYSTEM (e-verify.gov): Companies awarded a contract in excess of $150,000 (except for those with performance periods of 120 calendar days or less) with the federal government shall enroll in

E-Verify within 30 days of the contract award date. They shall also begin using the E-Verify system to confirm that all of their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (See FAR

Clause 52.222-54).

OTHER IMPORTANT BIDDER INFORMATION

PRIME CONTRACTOR INFORMATION- SAFETY OR ENVIRONMENTAL VIOLATIONS

AND EXPERIENCE MODIFICATION RATING INFORMATION

All Bidders/Offerors shall submit information pertaining to their past Safety and Environmental record.

(using the attached EMR information/data form) pertaining to their past Safety and Environmental record.

The information must contain a certification that the bidder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, a Bidder/Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of

EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.

All Bidders/Offerors shall submit information regarding their current Experience Modification Rate

(EMR). This information shall be obtained from the Bidders/Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If a Bidder/Offeror’s EMR is above 1.0, Bidder/Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.

Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and Puerto Rico shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.

If the NCCI cannot issue an EMR because the Bidder/Offeror lacks insurance history, Bidder/Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that it has assigned Bidder/Offeror a Unity Rating of 1.0.

The above information, along with other information obtained from Government systems, such as the

OSHA and EPA online inspection history databases, will be used to make an initial Determination of

Responsibility.

This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.

CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS: The Contractor shall perform work under this contract consistent with the relevant policy and objectives identified in the agency, organizational, or facility Green Environmental Management System (GEMS) applicable for the contract. The Contractor shall perform work in a manner that conforms to all appropriate Environmental

Management Programs and Operational Controls identified by the agency, organizational, or facility

GEMS, and provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In the event an environmental nonconformance or noncompliance associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the Contractor shall respond and take corrective action immediately. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the facility GEMS Coordinator. In addition, the Contractor shall ensure that their employees are aware of the roles and responsibilities identified by the environmental management system and how these requirements affect their work performed under this contract.

All on-site contractor personnel shall complete yearly EPA sponsored environmental training specified for the type of work conducted on-site. Upon inclusion in the contract, the Contracting Officer's

Representative will verify that all contractor personnel have acquired EMS Awareness Training at their appropriate site or location.

REFERENCES TO VA ENGINEER, RESIDENT ENGINEER, SENIOR RESIDENT ENGINEER,

OR PROJECT MANAGER: Any reference contained within contract specifications and/or drawings to the “VA Engineer”, “Resident Engineer”, “Senior Resident Engineer”, “Project Manager”, or their abbreviations are to be read as meaning the “Contracting Officer’s Representative (COR)”.

PAYMENT FOR MATERIALS STORED OFF-SITE: Payment in advance of installation for materials stored off-site is at the discretion of the Contracting Officer after receipt of a request by the contractor. Extraordinary measures are required regarding the security, insurance, labeling, storage, etc. if payment is authorized for materials stored off-site.

SCHEDULE OF MATERIAL SUBMITTALS: The submittals contemplated by FAR 52.236-5, Material and Workmanship are listed on the Schedule of Material Submittals in the Specifications, if provided. The schedule is for reference only – the selected contractor is responsible to provide all submittals required by the contract.

REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE

ASSESSMENT SYSTEM (CPARS)

(a) As prescribed in Federal Acquisition Regulation (FAR) Part 42.15, the Department of Veterans

Affairs (VA) evaluates contractor past performance on all contracts that exceed $750,000 and shares those evaluations with other Federal Government contract specialists and procurement officials. The FAR requires that the contractor be provided an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement VA uses an online database, CPARS.

(b) Each contractor whose contract award is estimated to exceed $750,000 is required to register with

CPARS database at the following web address: www.cpars.gov. Help in registering can be obtained by contacting Customer Support Desk at 207-438-1690. Registration should occur no later than thirty days after contract award and must be kept current should there be any change to the contractor's registered representative.

(c) For contracts with a period of one year or less, the contracting officer will perform a single evaluation when the contract is complete. For contracts exceeding one year, either by virtue of the original performance period or as modified, the contracting officer will evaluate the contractor's performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report shall be assigned in CPARS to the contractor's designated representative for comment. The contractor representative will have thirty days to submit any comments and return.

(d) Failure to have a current registration in the CPARS database, or to re-assign the report to the VA contracting officer within those thirty days, will result in the Government's evaluation being placed on file in the database with a statement that the “contractor failed to respond.”

NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS POLICIES

1. Contractor shall comply with all applicable records management laws and regulations, as well as

National Archives and Records Administration (NARA) records policies, including but not limited to the

Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII

Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.

2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C.

chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the

Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.

3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the

Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by enough technical documentation to permit understanding and use of the records and data.

4. The Government and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of the Government or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity (HCA).

Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, the contractor must report it to Government Contracting Officer. The agency must report promptly to NARA in accordance with 36 CFR 1230.

5. The Contractor shall immediately notify the appropriate Government Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to the Government’s control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer who awarded the contract. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).

6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The

Contractor (and any sub-contractor) is required to abide by all Government guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.

7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with the project location VA Medical Center’s written policy.

8. The Contractor shall not create or maintain any records containing any non-public Government information that are not specifically tied to or authorized by the contract.

9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.

10. The Government owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government and shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any

Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through

FAR 52.227-20.

11. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training, Talent Management

System (TMS) Item #3873736, Records Management for Records Officers and Liaisons. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training. All training shall be coordinate with the Contracting

Officer’s Representative assigned to the contract.

OTHER IMPORTANT NOTICES

1. Contractor employees shall not be considered government employees for any purpose under this contract.

2. Contractor employees may be required to undergo Tuberculosis, Influenza, COVID, or other contagious disease screening prior to being authorized to work on-site. Screening is per individual

VA Medical Center policy and shall be reviewed and discussed at the pre-construction conference.

3. Special Notes regarding FAR 52.229-3: Federal, State and Local Taxes:

Offerors are hereby notified that under Michigan Compiled Laws, Chapter 205 Taxation, Sections

205.54w & 205.54s, Michigan exempts from sales and use taxes personal property purchased by construction contractors that will be affixed to and made a structural part of a non-profit hospital. A

“non-profit hospital” is defined as that portion of a building owned or operated by a governmental unit in which medical attention is provided, as well as that portion of real property necessary and related to a such a building. Therefore, VA has determined that the contractor’s purchase of such building and construction materials that will be affixed to or made a structural part of this particular

VA construction project is exempt from Michigan Sales or Use Tax. To take advantage of the tax exemption the successful offeror under this solicitation must complete a Michigan Sales and Use Tax

Certificate of Exemption and keep on file as required by the Michigan Tax Code.

Notwithstanding FAR 52.229-3, all bids received in response to this solicitation are presumed to reflect any tax benefit that may be realized upon the execution of the exemption certificate.

Link to the Michigan Sales and Use Tax Certificate of Exemption Form: 3372, Michigan Sales and

Use Tax Certificate of Exemption https://www.michigan.gov/taxes/-/media/Project/Websites/taxes/Forms/2007/2007_3372.pdf?rev=f31828b81c1a4d1fb3144ca3f47ca7db&hash=79508DBC3FD550D40428001EA6E19C69 https://www.michigan.gov/taxes/-/media/Project/Websites/taxes/Forms/2007/2007_3372.pdf?rev=f31828b81c1a4d1fb3144ca3f47ca7db&hash=79508DBC3FD550D40428001EA6E19C69

The VA will not field nor respond to any questions regarding the Michigan Sales and Use Tax

Certification of Exemption nor any questions regarding Michigan Tax Code.

END OF IMPORTANT BIDDER INFORMATION SECTION

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO

BIDDERS/OFFERORS

2.1 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)

(a) All actual and potential offerors are encouraged to provide feedback on the preaward and debriefing processes, as applicable. Feedback may be provided to agencies up to 45 days after award. The feedback is anonymous, unless the participant self-identifies in the survey. Actual and potential offerors can participate in the survey by selecting the following link: https:// www.acquisition.gov/360.

(b) The Contracting Officer will not review the information provided until after contract award and will not consider it in the award decision. The survey is voluntary and does not convey any protections, rights, or grounds for protest. It creates a way for actual and potential offerors to provide the Government constructive feedback about the preaward and debriefing processes, as applicable, used for a specific acquisition.

(End of Clause)

2.2 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—

SECONDARY SITE OF THE WORK (MAY 2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.4 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—

CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material,"

"designated country construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials Under Trade Agreements" (Federal Acquisition

Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the

Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of

FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the

Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

2.5 52.233-2 SERVICE OF PROTEST (SEP 2006)

Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government

Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Kyle Lipper

Hand-Carried Address:

Network Contracting Office (NCO) 10

24 Frank Lloyd Wright Dr., Lobby M2200 Ann Arbor MI 48105 Mailing Address:

Department of Veterans Affairs

Network Contracting Office (NCO) 10

24 Frank Lloyd Wright Dr., Lobby M2200 Ann Arbor MI 48105

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of Provision)

2.6 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I

(FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and

Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for—

January 7, 2025, at 12pm (Noon) EST

(c) Participants will meet at—

VA Ann Arbor Building 3 Conference Room 106A

2.7 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY

REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far https://www.va.gov/oal/library/vaar/

FAR

Number

Title Date

52.204-7 SYSTEM FOR AWARD MANAGEMENT OCT 2018

52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE

REPORTING

AUG 2020

52.204-22 ALTERNATIVE LINE ITEM PROPOSAL JAN 2017

52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS DEC 2016

52.214-4 FALSE STATEMENTS IN BIDS APR 1984

52.214-5 SUBMISSION OF BIDS DEC 2016

52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS APR 1984

52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND

WITHDRAWALS OF BIDS

NOV 1999

52.214-18 PREPARATION OF BIDS—CONSTRUCTION APR 1984

52.214-19 CONTRACT…