The amendment provides responses to 41 contractor questions covering various technical aspects of the project, including clarifications on signage details, deduct alternates, patient bed panels, roller shades, demolition hours, window removal procedures, HVAC systems, and nurse call system specifications. Key clarifications include: Siemens will be the control system integrator, asbestos abatement is not required, materials movement should occur outside normal business hours, PVC cannot be used in interstitial spaces, and specific requirements for nurse call system cabling colors and equipment. The document references four RFI image attachments that provide additional visual details related to the contractors' questions.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25025B0008 – Amendment 0003 - Modernize Short Stay - 506-21-103 - Ann Arbor VAMC, MI
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 8
0003 02-04-2025
506-21-103
36C250
Department of Veterans Affairs
Network Contracting Office (NCO) 10
6150 Oak Tree Blvd., Suite 300
Independence OH 44131
36C250
Department of Veterans Affairs
Network Contracting Office (NCO) 10
6150 Oak Tree Blvd., Suite 300
Independence OH 44131
To all Offerors/Bidders
36C25025B0008
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 02-25-2025 1:00pm EST
X 1
The purpose of this amendment is to provide the following:
1.) Update the Date and Time of the Bid Opening: Bid Opening is herby changed to February 25, 2025, at 1:00pm EST.
2.) Provide responses to RFIs received prior to the RFI submission deadline. See Continuation Pages.
Kyle Lipper
1. The location plan indicates (qty.4) sign tags coded “G” and they don’t indicate in the sign drawings an associated sign design for the “G” tags. Please clarify. See attached drawings for reference.
• Refer to detail G on sheet IS900 for information.
• See RFI Image 01 Attachment.
2. The solicitation states that deduct #3 is to deduct work in C712, C713, and C714;
however, drawing G201, keynote 0.3 states that C716, C717, C737G are to be included in the deduct. Please advise.
• See drawing for clarification of deduct #3 scope.
• See RFI Image 02 Attachment.
3. In regard to specification 12 25 16 Patient Bed Panels, Section 2.1, Point B Substitution
Limitations; the referenced specification 01 25 00 Substitution Procedures has not been provided. Could the VA please confirm if alternates are acceptable and if section 01 25
00 is available?
• Basis of Design is Amico. If substitution can conform to specification requirements design intent, and requirements this would be permissible.
4. This area on 1/A127 has 12.01 Double Manual Roller Shades called out on our windows. Above it, Details A/A127 through F/A127 show 12.02 Double Motorized roller shades. Would you like to proceed with 12.01 Manual Shades, or 12.02 Motorized
Shades? Please note this conflict occurs on Details 1/A127 comparing to details A, B, C, D, E, and F/A127.
• Shades are to be manual shades.
5. Can you provide a logistical plan for the elevator to the dumpster location from the jobsite?
• See below and reference drawing 01E-A.107 and 01E-A.100.
• See RFI Image 03 Attachment.
6. Regular business hours for all aspects of demo and saw cutting?
• Cutting and demo can be done during regular business hours.
7. Window removal and how that affects the job site, if any, for the duration of the selective demo.
• Windows are to be removed and replaced, temporary weather barriers may be required while the windows are removed, and new windows are not installed.
8. Is the intent for the windows to be removed from the interior? or Exterior?
• Removing the windows from the interior would be preferable.
9. Reference Spec Section 01 00 00: The first 8 pages of this spec section are missing.
• Please see updated Specs issued via Amendment 0001, 01 00 00 General
Requirements specification section.
10. There is missing information in Specification Section 08 90 00, Louvers, Paragraphs 2.2
B and C.
• This specification section has been removed. The documents indicate carefully removing the existing louver and reusing it with the new air handler. Please see the revised Specs issued via Amendment 0001, specification table of contents.
11. Asbestos Abatement: On Solicitation Page 8 of 90, Paragraph 3, it states that there is no asbestos reported on any mechanical systems for this project. On Drawing G300, Infection Control Note C would indicate that there is asbestos abatement but there is no
Asbestos Abatement Specification or Schedule of Material containing asbestos. Is there asbestos abatement required as part of this project and if so, kindly provide a schedule for this abatement.
• Asbestos Abatement is not required as part of this project.
12. Reference Drawing IF701: Keynote Description for 9.40 and 9.47 are missing.
• 9.40: Provide 6”H integral sheet vinyl wall base. Provide metal top cap.
• 9.47: Provide 6”H integral resinous wall base. Provide metal top cap. Water proofing membrane required under resinous epoxy flooring system.
• All rooms to receive RB-1 for wall base; unless noted otherwise. Refer to attached sheet IF701 for details.
13. There is no Room Finish Schedule. There appears to be notes on a number of drawings indicating floor, wall and ceiling finish requirements by nothing consolidated as only a normal Room Finish Schedule would provide.
• There is no room finish schedule that will be provided. As stated in note (1) in the general finish notes, the finish tag under room name tag denotes finishes in room to receive material. If there is no tag noted, the finish is provided in the general finish notes. Accent finishes are noted on plans or keynoted.
14. Reference Drawing IF 702 – Wall Finish Plan. This drawing is not complete. Please
Note Question #2 above.
• All walls to be painted (P-1); unless noted otherwise. Accent wall finish tags are located on plan. Refer to attached sheet IF702 for details.
• Refer to keynotes 9.45 & 9.46 on page A127 in bid documents for ceiling/bulkhead accent paint locations.
• See RFI Image 04 Attachment.
15. Reference IF 701, Room 735. A floor finish is indicated as SC-1 but no such code or reference is made in the Finish Legend shown on Drawing IF 000. A legend of floor finishes indicated on Drawing IF 701 would be helpful also since a legend is used on the floor plan to indicate type of finish.
• (SC-1) to be high performance flooring coating: Armstrong-Armorseal 8100K.
Refer to attached sheet IF701 for floor pattern legend.
16. All drawing that are provided are indicated as original or revised. We have no idea if the drawing provided are the correct revision. Please indicate all correct drawings as “Bid
Set” that are to be used to bid this project.
• Refer to bid documents in Addendum #1. Bid Documents are identified in the left hand corner with the date of 4/24/2024.
17. Reference Finish Legend, Drawing IF 000: RES 1 is indicated but Specification 09 67
23 20 is for a Resinous Floor RES 2. Please provide a specification for RES 1 and where does RES 2 get used?
• (RES-2) not used in project. Specification 09 67 23 to be used for (RES-1).
18. Reference Drawing IF701: What is the Floor Finish for Room C717 and for the interior hallway (not indicated with a hall or corridor number)?
• Room Huddle C717 to receive (LVT-1)(RB-1).
• Existing hallway flooring to remain existing. 3 new alcoves to receive (LVT-
1)(RB-1). Refer to sheet IF701 for details.
• See RFI Image 04 Attachment.
19. Reference Drawing A407, Specialty Equipment Schedule: What are the various letter combination meanings. Some are obvious but what is GC/GC and GFE/CI? A complete list of meanings would eliminate any confusion.
• GC= General Contractor; GFE: Government Furnished Equipment; CI:
Contractor Installed; GI: Government Installed.
20. There is no procedure or forms for material substitution. Could Specification Section 12
25 16 – Patient Bed Panels be provided by HSI which is a well-known supplier of these fabricated Patient Bed Panels?
• Basis of Design is Amico. If substitution can conform to specification requirements design intent, and requirements this would be permissible.
21. Per drawing IF702 if material finishes on drawing should be assumed for the entire room or just where the lines on the drawing connect to. (accent walls or full room paint)
• The finish tags that have specific lines connecting to walls are accent locations only. All other walls are to be painted (P-1).
22. Rooms that do not have a specified material finish or paint will NOT have a finish. per
IF702.
• In the new scope of work, all gyp. walls to be painted (P-1) unless noted otherwise on plan. Finish tag under room name denotes finishes in room receive said material. Accent surface to be noted otherwise. Refer to sheet IF702 for revised details.
23. where Gypsum Board ceiling will be installed - can we assume the metal structure and the entirety of the ceiling to be painted to match the gyp. board. Per A127.
• In bid documents on sheet IF000 in the general finish notes, refer to note #3: All gyp. ceilings shall be painted (P-5). Undersides and faces of bulkheads shall be painted the same color as adjacent wall; unless noted otherwise. On sheet A127 bulkheads that are to receive accent paint colors are called out with keynotes.
Refer to keynote 9.45 Paint ceiling (p-2). and 9.46 Paint face of soffit (p-3), underside (p-5).
24. Are there any restrictions on when you can move materials from loading dock to work area?
• It is anticipated that materials should be moved off normal business hours. This is to be arranged and verified with the COR.
25. Please provide Specifications for “Corosion Resistant” piping.
• Please see Specs Section 22 66 00.
26. Can PVC be used in the interstitial spaces (floors 6 and 8) for sanitary drains and vents?
• PVC cannot be used in the interstitial spaces.
27. Some showers are tagged with a P-107 and others P-701. There is only a specification for P-107. Please clarify or provide specifications.
• Fixtures are identified on sheet P601. P-107 water closet, P-701 Shower head & control valve.
28. Please provide a “Basis of Design” for plumbing fixture P-809.
• Whitehall manufacturing #8193.
29. On M401 indicates that a 6” steam branch is coming off a 3” steam main pipe, and that a
3” condensate branch is coming off a 1-1/2” condensate main pipe. Please confirm this is correct.
• This is acceptable to provide a 3” steam pipe and 1.5” condensate pipe.
30. Is the chilled water for temporary AMU “BCXE1” to come from 5” CMS+R near col. G.3 and 8? If so, because it is so far from BCXE1 what size should the piping be to allow for its restrictions?
• Plan note 5 on M701 indicates a 3” main to be run from the 7th floor west
Mechanical Room to the 8th floor interstitial space (near the ICU). This is for combined flow from BCXE-2. 2” CHW runouts from the 3” main will be routed to each BCXE.
31. We would like clarification regarding 23 09 23-5 F. We read it to say that Siemens is the
Controls System Integrator and since the document specifies that the new controls are to be BACnet, any BACnet Controls Contractor can be the installing 23 09 23
Contractor. Is this correct?
We would like to clarify that Siemens as the Control System Integrator is responsible for integrating to the new BACnet control system. Is this correct?
• Facilities has requested that the existing Siemens Desigo control system be extended and modified for the new system. With Siemens being the control vendor, they can also be the System Integrator to ensure their systems, both new and old, are fully-integrated.
32. Is a nurse call and speaker device plan for Cardiology Procedure TEE C737 available?
• Reference 100% Construction Documents dated 12/01/2023 drawing TA107 for nurse call and speaker device locations. Cardiology/Procedure TEE C737, is part of deduct #4.
33. Is a nurse call and speaker device plan for Pre / Post OP C734 available?
• Reference 100% Construction Documents dated 12/01/2023 drawing TA107 for nurse call and speaker device locations. Pre/Post OP C734 is part of deduct #2.
34. Is a nurse call and speaker device plan for Huddle C717, Iso Room C721, Patient
Bedroom C714, C713, C712 available?
• Reference 100% Construction Documents dated 12/01/2023 drawing TA 107 for device for nurse call and speaker locations. Huddle C717 is part of deduct #3.
35. Please clarify Deduct #4 reference on Drawing No: TA107A in Cardiology Procedure /
TEE C737. This is not included on Solicitation document 36C25025B0008.
• Architect should review form and correct, if necessary, the solicitation document
36C25025B008 and share with bidders. Deduct #4 does include TA107A in
Cardiology Procedure / TEE C737 as shown on TA107A.
36. Please verify specified Vertical Equipment Rack is required or if the Rauland NC2828 equipment cabinet is acceptable. Referencing Page 978 & 979 of specification document
36C25025B0008 item D. Telecommunications Room(s) (TR): e. Vertical Equipment
Rack. This is different than other Responder 5 nurse call equipment cabinets at the VA
AA site.
• Rauland Responder V equipment cabinet model number NC2828 is an acceptable enclosure as long as it is locked and within a TR and or Signals
Closet.
37. What is the wall plate configuration behind patient room television? For instance, is this a Data Plate that Nurse Call interfaces with or is this an RF plate with integrated Nurse
Call jack?
• Please reference floor plan, symbol at TV locations and Sheet T501. Sheet T501 has a diamond R subscript 1 or 2 variation of faceplate.
38. Do we provide a 2JACK station that is not shown on floor plans? Specification Section
27 52 23 – 27, page 985, I. Auxiliary Alarm Monitoring: 2. Provide (2) alarm jacks at each patient station. The Rauland Responder 5 Patient Station has one jack.
• Please clarify/use (if) the Rauland Responder model 354018 - 2 Jack Station is no longer available.
39. Confirm the Facility’s LAN/WAN “will continue to be” ALLOWED for Nurses Call/Code
Blue main wiring.
• The Network will be available for use, but it is the responsibility of the contractor to replace all old network wiring with new wiring.
40. Are the following cables and colors acceptable for the Nurse Call System?
1. West Penn Wire 25302BGY1000:3C 20G STRD BC SHLD PLEN interface to
TV and Light Cable - Grey
2. West Penn Wire 25226BWH1000:1P 14G STRD UNSHLD PLENII power
Cable - White
3. West Penn Wire 254246EZWH1000:4P 23G SLD CAT 6 PLENUM L-net
Cable – White
4. West Penn Wire 25224BBK1000 : 2-Conductor 18AWG Stranded – Black
• CAT6A cable color code for the jackets are located on Sheet T501 detail 4 of the
100% Construction Documents dated 12/01/2023.
Network cables shall be CAT6A. If associated with the nurse call system, it shall be purple in color.
The above listed: Power limited cabling must meet environment in which it is installed e.g. plenum rated within a plenum space.
West Penn interface to TV and Light Cable - Grey is acceptable.
West Penn power Cable - White is acceptable.
West Penn 2C/18AWG Stranded - Black is acceptable.
41. I am asking about the seismic requirement that was listed in the second to last column of the AHU schedule. We are wondering if they are referring to the construction of the unit or how the unit is attached to the floor. IP = 1.5 is also the highest level of seismic restraint which might be a little much for Ann Arbor.
• IP = 1.5. The building is an “essential facility” meaning Risk Category IV per
Chapter 16 of the ASCE 7.
ATTACHMENTS:
See attached document: RFI Image 01.
See attached document: RFI Image 02.
See attached document: RFI Image 03.
See attached document: RFI Image 04.
File details come from the government source that posted it. Updated .