This document is a Request for Information (RFI) for the Ann Arbor VAMC Modernize Short Stay project (Solicitation No. 36C25025B0008). The RFI focuses on clarifying specific technical details about wood sliding door assemblies, including elevator routes, dumpster locations, noise restrictions, and working hours. The contractor, Daniels Building Company, submitted questions about corridor soffit details, ceiling lighting fixtures, and specification references.

The technical specifications outline requirements for interior aluminum-framed, top-hung sliding wood door assemblies using ASSA ABLOY RITE Slide Sliding Door System. Key specifications include extruded aluminum tracks, soft self-closing mechanisms, concealed door guides, flush wood doors with particleboard cores, 1-3/4" minimum door thickness, and compliance with accessibility and building codes. The document provides detailed installation, fabrication, and quality control guidelines for the door assemblies, with emphasis on proper alignment, smooth operation, and meeting performance standards.

View the file

Other files for this federal contract opportunity

Other files attached to 506-21-103 Modernize Short Stay, newest first.
File Type Posted
RFI 10 1.28.2025_HE response.pdf PDF
RFI 36C25025B0008 Project 506-21-103 Modernize Short Stay Question 1 RDC Response.pdf PDF
VA Response 36C25025B0008_1 Modernize Short Stay Ann Arbor VAMC - RB Construction_RFI 006 03-06-25.pdf PDF
36C25025B0008_1 Modernize Short Stay Ann Arbor VAMC - RB Construction_RFI 005 RDC Response 03-05-25.pdf PDF
Manual_GH3_GB_US.pdf PDF
datasheet_gh3-twin_Guldmann.pdf PDF
RFI 8 1.23.25 RDC Response 02-26-2025.pdf PDF
RFI Form Solicitation - Humidifier RFI RDC Response 03-03-25.pdf PDF
RFI - Manual or Motorized Shades A127 RDC Response 02-20-25.pdf PDF
RFI 36C25025B0008 Project 506-21-103 Modernize Short Stay Question 3 RDC Response.pdf PDF
VA AA Short Stay_23 09 23.pdf PDF
Manitowoc_SY0324A Ice Machine.pdf PDF
datasheet_rails_gb.pdf PDF
RFI12 2.3.25 RDC Response 02-26-2025.pdf PDF
RFI Form Solicitation - 8 02-28-25.pdf PDF
RFI 11 1.29.25 RDC Response 03-04-25.pdf PDF
RFI 2-21-25 RDC Response 3-6-25.pdf PDF
RFI Form Solicitation - Response 32 03-01-25.pdf PDF
RFI Form Solicitation - Response 33 03-01-25.pdf PDF
RFI 6 1.21.2025 RDC Response 02-20-25.pdf PDF
36C25025B0008 Amendment 0005.pdf PDF
36C25025B0008 Amendment 0004.pdf PDF
RFI Image 02..pdf PDF
RFI Image 03..pdf PDF
RFI Image 01..pdf PDF
RFI Image 04..pdf PDF
36C25025B0008 Amendment 0003.pdf PDF
506-21-103 Modernize Short Stay Pre Bid Sign in Sheets.pdf PDF
36C25025B0008 AMENDMENT 0002.pdf PDF
506-21-103 Modernize Short Stay 100 BD Revised - Specifications.pdf PDF
36C25025B0008 AMENDMENT 0001.pdf PDF
506-21-103 Modernize Short Stay 100 BD Revised - Drawings.pdf PDF
36C25025B0008.pdf PDF
Project - 506-21-103 Modernize Short Stay - Drawings 3.pdf PDF
Wage Determination - MI20240100 10.25.2024.pdf PDF
Project - 506-21-103 Modernize Short Stay - Drawings 1.pdf PDF
Contractor EMR Certification Form .docx DOCX document
Project - 506-21-103 Modernize Short Stay - Specifications.pdf PDF
Project - 506-21-103 Modernize Short Stay - Drawings 2.pdf PDF
RFI Form Solicitation.doc DOC document
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

cmoyer Text Box

1. Refer to the attached logistical plans. VA to confirm which elevator to be used for construction.

2. The contractor shall provide dumpsters.

3. VA to confirm working hours.

4. Please see attached specification and product data for fascia profile.

5. This line represents a strip lighting fixture in the soffit. Refer to EL107 for lighting fixture.

VHAANNVanFlE Text Box

1. Use service Elevator C7-14 as shown in Addendum #3 Item 5 with related drawings.

3. This project is planned to be done during regular hours.

Text Box This line represents a strip lighting fixture in the soffit. Refer to EL107 for lighting fixture.

ANN ARBOR VA MODERNIZE SHORT STAY UNIT AND OBSERVATION BEDS BLDG 1E (506-

21-103) 21025.00

ANN ARBOR, MI

WOOD SLIDING DOOR ASSEMBLIES 081473.20 - 1

SECTION 081473.20 - WOOD SLIDING DOOR ASSEMBLIES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Interior Aluminum-Framed, Top-Hung Sliding Wood Door Assemblies and Related

Hardware.

B. Related Sections:

1. Division 01 Section "General Conditions".

2. Division 08 Section "Door Hardware Schedule".

C. Codes and References: Comply with the version year adopted by the Authority Having

Jurisdiction.

1. ICC/ANSI A117.1 - Accessible and Usable Buildings and Facilities.

2. ICC/IBC - International Building Code.

3. NFPA 80 - Fire Doors and Windows.

4. NFPA 101 - Life Safety Code.

5. NFPA 105 - Installation of Smoke Door Assemblies.

6. Window and Door Manufacturers Association - WDMA I.S.1-A Architectural Wood

Flush Doors.

7. Michigan Building Codes, Local Amendments.

D. Standards: Comply with the following industry standards:

1. UL 1784 Standard for Air Leakage Tests of Door Assemblies and Other Opening

Protectives.

1.3 PRE-INSTALLATION MEETINGS

A. Pre-installation Conference: Refer to Division 01 Section "Project Requirements".

WOOD SLIDING DOOR ASSEMBLIES 081473.20 - 2

1.4 SUBMITTALS

A. Comply with Division 01 Section "Submittal Procedures".

B. Product Data: Manufacturer's product data sheets including installation details, material descriptions, dimensions of individual components and profiles, door hardware and accessories, and finishes.

C. Shop Drawings: Show details of fabrication and installation, including the following:

1. Assembly elevations and sections indicating dimensions, tolerances, materials, components, hardware, finishes, options, and accessories.

2. Door hardware locations, mounting heights, quantities, and installation requirements.

3. Frame anchorages and wall reinforcement requirements.

D. Samples for Verification: For each type of exposed finish indicated, provide samples below as requested by Architect.

1. Frame finish sample.

2. Door veneer sample.

E. Maintenance Data: For top-hung, sliding door assemblies include in maintenance manuals.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials to site in manufacturer’s original, unopened containers and packaging, with labels clearly identifying product name and manufacturer.

B. Notify manufacturer immediately of any shipping damage.

C. Storage and Handling Requirements:

1. Store and handle materials in accordance with manufacturer’s instructions.

2. Keep materials in manufacturer’s original, unopened containers and packaging until installation.

3. Store materials in clean, dry area indoors.

4. Protect materials and finish during storage, handling, and installation to prevent damage.

1.6 WARRANTY

A. General Warranty: The special warranty specified in this Article shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by the Contractor under require-ments of the Contract Documents.

B. Special Warranty: Manufacturer's written warranty agreeing to repair or replace components of the top-hung, sliding door assemblies that fail in materials or workmanship within the specified warranty period. Failures include, but are not limited to, the following:

WOOD SLIDING DOOR ASSEMBLIES 081473.20 - 3

1. Structural failures.

2. Deterioration of metals, metal finishes, and other materials beyond normal weathering.

3. Warping (bow, cup, or twist) more than 1/4 inch in a 42-by-84-inch section.

4. Telegraphing of core construction in wood face veneers exceeding 0.01 inch in a 3-inch span.

5. Failure of operating components to function normally.

C. Warranty includes installation and finishing that may be required due to repair or replacement of defective doors.

D. General Warranty Period: One year from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Aluminum Frames: Aluminum cased opening perimeter frames manufactured with integral C-channel door cavity and acoustic seals.

B. Closing Mechanism: Soft self-closing mechanism integrated with top track.

C. Door Guide: Concealed type door guide.

D. Accessibility Standards: Comply with applicable provisions in Accessibility Guidelines for

Buildings and Facilities ICC (ANSI) A117.1 and requirements of authorities having jurisdiction.

2.2 MANUFACTURERS

A. Subject to compliance with requirements, provide the named product, or the comparable product by one of the alternate specified manufacturers. Comparable products are subject to review and approval through the submittal process specified.

B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Basis of design: ASSA ABLOY

2.3 INTERIOR TOP-HUNG, SLIDING DOOR ASSEMBLIES

A. Basis-of-Design Manufacturer:

1. Basis of Design: ASSA ABLOY RITE SLIDE Sliding Door System (RS).

B. Frame and Door Assembly Components:

1. Single Piece Box Top Track: Extruded aluminum track system with mounting brackets.

2. Fascia: Extruded aluminum with matching integral end caps.

WOOD SLIDING DOOR ASSEMBLIES 081473.20 - 4

3. Integral Soft-Closer: Soft and self-closing damper mechanism.

4. Concealed Door Bottom Floor Guide.

5. Seal Sets: Integral to frame.

6. Operating Hardware.

C. Specified Wall Thickness:

1. As indicated on Architectural Drawings.

D. Frame Profiles: Extruded aluminum cased frame and trim with integral vertical jamb receiver channel.

1. 1-1/2" Faces.

E. Fascia Profile:

1. Standard: Square.

2. Custom Fascia Profile:

a. Round.

F. Frame Finish:

1. Standard: Clear Anodized.

G. Framing Anchors and Fastenings: Manufacturer's standard concealed anchors and fastenings.

H. Flush Wood Door Construction:

1. Standard: WDMA I.S.1-A Performance Grade: Extra Heavy Duty; Aesthetic Grade: A

Premium.

2. Minimum Thickness: 1-3/4".

3. Core Construction" Particleboard Core Door (PC). Wood fiber based materials complying with ANSI A208.1 Particleboard standard. Grade LD-1.

4. Face Veneer: As selected by Architect.

5. Finish: Comply with referenced standard for factory finishing.

6. LEED Standard: Minimum requirements of LEED MR4 and IEQ4.4.

7. Door Glazing: As indicated on Architectural Elevations and Drawings.

a. Minimum 6" vertical stiles and 10" bottom rail required.

I. Door Preparation. Doors leafs to be factory machined for hardware including pilot and function holes.

J. Door Hardware Components:

1. General: Heavy-duty, operating door hardware units in sizes, quantities, and types recommended by manufacturer for sliding door assemblies indicated.

2. Cylinders and Keying: Refer to Division 08 Section "Door Hardware".

WOOD SLIDING DOOR ASSEMBLIES 081473.20 - 5

2.4 FABRICATION

A. General: Fabricate top-hung, sliding door assemblies in sizes, profiles, and configurations indi-cated on Architectural Schedules and Drawings.

B. Factory prepare door assemblies for field installation of door hardware and accessories to greatest extent possible.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify dimensions of wall openings.

B. Examine wall openings and conditions, with Installer present, for plumb, level and square, and compliance with requirements for installation tolerances and other conditions affecting performance of the Work. Sliding door operation will be adversely affected by out-of-tolerance framing.

C. Examine surfaces to receive door bottom guide. Floor shall have no height variance throughout the complete sliding operation.

D. Notify Architect of conditions that would adversely affect installation or subsequent use of sliding doors. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 DOOR, FRAME AND HARDWARE ASSEMBLY INSTALLATION

A. General: Comply with manufacturer's written installation instructions and approved shop drawings.

B. Install frame components and sliding doors plumb, level, square, and in proper alignment.

C. Anchor sliding door assemblies securely in place to supports according to manufacturer's written installation instructions.

3.3 ADJUSTING AND CLEANING

A. Adjust sliding doors and hardware for smooth operation in accordance with manufacturer's written instructions without binding and with tight fit at contact points and seals. Sliding doors to close against walls without gaps.

B. Repair minor damages to finish in accordance with manufacturer’s written instructions and as approved by Architect.

WOOD SLIDING DOOR ASSEMBLIES 081473.20 - 6

3.4 PROTECTION

A. Provide final protection and maintain conditions, in a manner acceptable to manufacturer and

Installer that ensure sliding door assemblies are without damage or deterioration at the time of

Substantial Completion.

3.5 FIELD QUALITY CONTROL

A. Field Inspection (Punch Report): Reference Division 01 Sections “Closeout Procedures”.

Produce project punch report for each installed door opening indicating compliance with approved submittals and verification hardware is properly installed, operating and adjusted.

Include list of items to be completed and corrected, indicating the reasons or deficiencies causing the Work to be incomplete or rejected.

1. Organization of List: Include separate Door Opening and Deficiencies and Corrective

Action Lists organized by Mark, Opening Remarks and Comments, and related Opening

Images and Video Recordings.

3.6 DOOR HARDWARE SETS

A. The hardware sets represent the design intent and direction of the owner and architect. They are a guideline only and should not be considered a detailed hardware schedule. Discrepancies, conflicting hardware and missing items should be brought to the attention of the architect with corrections made prior to the bidding process. Omitted items not included in a hardware set should be scheduled with the appropriate additional hardware required for proper application and functionality.

1. Refer to Section 080671, Door Hardware Sets, for hardware sets.

END OF SECTION 081473.20